HomeMy WebLinkAbout2012-058 CONT AMND #1 - JBR Environmental • I
PROFESSIONAL SERVICES CONTRACT
AMENDMENT NO. 1
Engineering services contract made on the date specified below in Recital A between
the City and Consultant as follows:
Recitals:'
A. The following information applies to this contract:
CITY: CITY OF ASHLAND ENGINEER: JBR Environmental
City Hall Consultants, Inc.
20 E. Main St. Address: 8160 South Highland Drive
Ashland, Oregon 97520 Sandy, UT 84093
541 488-5347 FAX: 541 488-6006 Telephone:541-770-6977 Fax:541-770-7019
Date of this agreement: March 19, 2012 B: RFP Date:
Proposal Date: September 8, 2011
¶2.3 City Contracting Officer: Michael R. Faught, Director of Public Works
¶2.4. Project: Soil and Groundwater Sampling; Testing and Monitoring at 555 Emigrant
Creek Road, Project No. 2009-07
¶6.1. Consultant's Representative: Susan Kolan, Controller
¶8.3. Original Contract Amount: $49,080.00
¶8.4. Previous Contract Amendments: $ 0
B. AMENDMENT NO. 1 Bfz
1. Modification to "Services to be provided" to
Add services per attached proposal and cost estimate dated Dec. ,ly 2011 and
made a part of this amendment.
2. Modification to "Compensation
A. Add cost of extra work= $4000.00
B. Adjusted total contract amount = $53,080.00 (8.15% increase)
CONSULTANT CITY
BY BY
City Department Head
Fed. ID# DATE: '-A \ rz
Coding:
(for City use only)
Professional Services Contract Amendment NO 1 JBR Enviro Consult 3 19 12.doc 1
i
�® B R
creating solutions for today's environment
December 16,2011
City of Ashland
51 Winbum Way
Ashland, OR 97520
ATTN: Mike Morrison
Dear Mike,
As requested,this letter provides information to the City of Ashland(City)regarding the need for
additional budget for JBR Environmental Consultants(JBR)to complete the soil sampling
activities for the Ashland Gun Club site characterization. This work is being conducted in
accordance with the Site Characterization Work Plan(Work Plan)for the Ashland Gun Club
(AGC)that was submitted to Oregon Department of Environmental Quality(DEQ)on June 21,
2011,by JBR on behalf of the City.
Soil sampling activities began at the AGC on Tuesday,December 6, 2011, for this project. As
discussed with you by telephone and by email over the last two weeks, field conditions
encountered were such that soil sampling activities required a greater effort than originally
anticipated based on conditions documented in previous reports at the AGC. As indicated in my
email to you and Jim Olson on December 13,2011,these field conditions included:
• Frozen ground
• Wet soil,which hindered the separation of the lead shot from the soil. Because the soil
is fine,when it's wet, it coats the shot and makes it more difficult to separate. We had
planned on using a dry sieve,which is what we used on other shooting range projects,but
instead had to wash the soil through the sieve.
• Mr.Jim Miller's request not to use the backhoe on his property to collect the samples.
When we prepared the initial budget for this work,we had assumed that we would be
able to use the backhoe everywhere to collect the samples,except in the wetlands.
However, after speaking with Mr. Miller, we were only able to use the backhoe to collect
samples on City property.
• Thick grass root mat(up to 3 inches)on Mr. Miller's
property,which hindered hand digging(with shovel).
1811 Environmental Consultants,Inc.
Therefore, in order to complete the work approved by DEQ in the 3400188th St.SW,Ste.605
Work Plan,we are requesting an additional$4,000 to cover the Lynnwood.Washington 98037
costs to complete the soil sampling. This will be about 2 additional [p]425.977.4994
field days for 2 JBR staff. [f 1425.977.4995
wvnyjhrenv.com
i
• i
Also,as discussed,we will be able to complete this work by the January 31, 2012 deadline,
specified in the leasing agreement between the City and AGC,if we are able to complete the
work next week. If the AGC prefers to keep the facility open to its members over the next two
weeks for the holidays,then we can complete the work beginning January 3,2012. However, if
the work is delayed until January,we would only be able to provide data tables and maps
showing sample locations by the January 31 deadline. We could provide a report showing
metals distribution and volumes by mid-February 2012.
We understand that keeping costs down is a priority for the City. Because our costs are invoiced
on at time and materials basis,any budget not spent will be returned to the City.
Thanks for working with us on a solution for this.
Sincerely, / J
Rebekah Brooks,RG
NW Division Manager
Cc: Jim Olson,City of Ashland
I
I
IN Environmental Consultants,Inc.
Dar temn/ate for AVPry R932.nr 5831
Response to State of Montana RFP No.12-2177V
Service Category No.15
Tank Management
Provided on March 22,2012 by: Provided for:
JBR Environmental State Procurement Bureau
Consultants,Inc. General Services Division
121002 Browns Gulch Rd Department of
Butte,Montana 59701 Administration
wwwjbrenv.com P.O.Box 200135
Helena,MT 59620-0135
1BR
CITY REORDER Page 1 / 1
�. CITY O F
�/� T
7`ls H LAN D -----DATE-----] ` � PO NUMBER
20 E MAIN ST. 12/2/2011 10574
ASHLAND, OR 97520
(541)488-5300
- VENDOR: 015886 SHIP TO: Ashland Public Works
JBR ENVIRONMENTAL CONSULTANTS (541) 488-5587
8160 S HIGHLAND DR 51 WINBURN WAY
SANDY, UT 84093 ASHLAND, OR 97520
FOB Point: Req.No.:
Terms: Net Dept.:
Req.Del.Date: Contact: Jim SOn
Special Inst: Confirming? N
Quantity Unit - - Description Unit Price: . .Ext Price.
THIS IS A REVISED PURCHASE ORDER
Soil and Groundwater Sampling, Testing 49,080.00
and Monitoring at 555 Emigrant Creek
Road, Project No. 2009-07
Contract for Engineering Services
Beginning date: November 8, 2011
Completion date: November 8, 2013
Insurance required/On file
Processed change order 04/11/2012 4,000.00
Add services per proposal and cost
estimated dated Dec. 16, 2011
SUBTOTAL 53.080.00.
BILL TO:Account Payable TAX 0.00
20 EAST MAIN ST FREIGHT 0.00,
541-552-2028 TOTAL 53,080.00
ASHLAND, OR 97520
Account Number -
. ..Project Number '�. _� Amount � Account Number .. � :� Project Number Amount;�,=,
E 410.08.24.00.604100 E 200907.400 53 080.00
Auth filed Signature VENDOR COPY
FORM #10 CITY OF
CONTRACT AMENDMENT APPROVAL REQUEST FORM �� ���
Request for a Change Order
Name of Supplier I Contractor 1 Consultant: JBR Environmental Consultants Total amount of this
8160 South Highland Dr.,Sandy,UT 84093 contract amendment:
Purchase Order Number: 10574
Title 1 Description:Soil and Groundwater Testing and Monitoring at the Ashland Gun Club $
® Per attached contract amendment
Contract Amendment
Original contract amount $ 49.080.00 100 %of original contract
Total amount of rep vlous contract amendments 0 %of original contract
Amount of this contract amendment 4.000.00 8.15%of original contract
TOTAL AMOUNT OF CONTRACT $ 53.080.00 108.15%of original contract
In accordance with OAR 137-047-0800:1)The amendment is within the scope of procurement as described in the solicitation documents,Sole Source notice or approval of Special
Procurement.2)The amendment is necessary to comply with a change in law that affects performance of the contract.3)The amendment results from renegotiation of the terms and
conditions,including the contract price,of a contract and the amendment is advantageous to the City of Ashland,subject to all of the following conditions:a)goods and services to be
provided under the amended contract are the same as the goods and services to be provided under the unamended contract;b)The City determines that,with all things considered,the
amended contract is at least as favorable to the City as the unamended contract;c)The amended contract does not have a total term greater than allowed in the solicitation document
contract or approval of a Special Procurement An amendment is not within the scope of the procurement if the City determines that if it had described the changes to be made by the
amendment in the procurement documents,it would likely have increased competition or affected award of contract.
Contract amendment is within the scope of procurement: YES X NO' (If"NO",requires Council approval I Attach copy of CC.)
Sourcing Method:
SMALL PROCUREMENT-Less than$5.000 INVITATION TO BID or COOPERATIVE PROCUREMENT,ORF or
❑"YES',the total amount of contract and REQUEST FOR PROPOSAL EXEMPTION PURSUANT TO AMC 2.50
cumulative amendments<$6,000. ❑ "YES",the total amount of cumulative El'YES",the total amount of original contract and
❑If'NO",amount exceeding authority requires amendments<25%of original contract amount or cumulative amendments-<$100K for Goods&
Council approval.Attach copy of Council $250,000 whichever is less. Services,<_$75K for Personal Services,<$50K for
Communication. ❑If'NO",amount exceeding authority requires Attorney Fees.
❑ Exempt-Reason: Council approval.Attach copy of Council ❑If'NO',amount exceeding authodly requires
Communication. Council approval.Attach copy of Council
❑ Exempt-Reason: Communication.
- -- -- --- ---- -El Exempt-Reason: - -INTERMEDIATE PROCUREMENT SOLESOURCE EMERGENCYPROCUREMENT
Goods&Services-$5,000 to$100.000 ❑ 'YES',the total amount of cumulative ❑ Written Findings:Document the nature of the
Personal Services -$5,000 to$75.000 amendments s 25%of original contract amount or emergency,including necessity and circumstances
® "YES",the total amount of cumulative $250,000 whichever is less. requiring the contract amendment
amendments s 25%of original contract amount. ❑If"NO',amount exceeding authority requires ❑ Obtain direction and written approval from City
❑ If'NO',amount exceeding authority requires Council approval.Attach copy of Council Administrator
Council approval.Attach copy of Council Communication. ❑ If applicable,attach copy of Council
Communication. ❑ Exempt-Reason: Communication
❑ Exempt-Reason: ❑ Exempt-Reason:
SPECIAL PROCUREMENT INTERGOVERNMENTAL AGREEMENT
❑"YES',the total amount of original contract and cumulative El'YES',the original contract was approved by City Council.
amendments are within the amount and terms initially approved by Provide dale approved by City Council: (Date)
Council as a Special Procurement. If'NO',Council approval is required.Attach copy of Council Communication.
❑ If'NO',amount exceeding authority requires Council approval. ❑ Contract amendment approved and signed by City Administrator.
Attach copy of Council Communication.
Project Number 2009.07 Account Number 410.08.24.00.604100 Account Number___-__-__-_ -
'Expenditure must be charged to the appropriate account numbers for the financials to reflect the actual expenditures accurately. Attach extra pages ff needed.
Employee Signature: Department Head Signature:
(Equal to or greater tl en$ !000)
Funds appropriated for urrent fiscal year:. EE / NO
G:1pub-wrksleng109-07 Gun Club Environmental VC AdminlEng VendorllJBR Contract Amendment Approval.doc