HomeMy WebLinkAbout2012-070 CONT Chg Order #2 - Cut N Break Construction G 1 T Y OF
ASHLAND
DEPARTMENT OF PUBLIC WORKS
CONTRACT CHANGE.ORDER NO :�; , .,' 2 '•" ,;;�
PROJECT: IB a„BvdaPark StalgRepla`cement H,. ;:... . DATE :m,+�04118/a12• T„
LOCATION: [Come ofFN195V Stand1W f`er S1 J PROJECT NO.:
CONTRACTOR lCui7�Break;Constlruciion^Inc�"" r - I PURCHASE ORDER:
r""`°" 50684 "_al
The following described extra cost is due to the requirement to meet additional BOLI Prevailing Wage rates.Origninal contract
.was estimated below BOLT limit of$50,000.(See attached Council Communication dated April 17/2012)
Item No. 11 Description Quantity Unit Price Amount
Extra costs to cover the
Item#I
9difference between Ashland ' �+
vim' a „
Living Wage and BOLI $ _ ,970.09
r „
Total this Change Order
Previous Change Order $ 640 ON
Original Contract Total $ ' £ 9,610 00
Revised Contract Total $ 14,220.09
PERCENT CIIANGE OF ORIGINAL CONTRACT 48.0%
All Public Works construction activities relative to this project(PW E: Project#2011-32)is complete and officially accepted by
Public Works Engineering Div.Remaining Parks Dept.stair installation to be completed at a later date under separate Parks
Department Purchase Order.
Recommended By: AO %� t� 4/18/2012
anager D ate
Approved By: _� 4/18/2012
Public Works Director Date
Accepted By: Cut'N Break Consiriietron Inc
Meajord O 7501 `i
ontracto R esentative D to
ENGINEERING Tel,541488-5747
20 E,
land,O Street TT 541488 800- 5-20 ,
As a,0Oregon 97520 TTY: 800-]15-2900
www.asldandocus '
G 1pub-orrks\eng\1132 Bluebird Park Styr ReplacemenM Admin\CuWB=oChange OrderslChange Oder No 2 4-18-2012 As
° Page 1 / 1
�JJ�� CITY OF RECORDER_
'TE _
�. S H LAND DATE � - PO NUMBER '
20 E MAIN ST. 2/14/2012 10684
ASHLAND, OR 97520 _
(541)488-5300
VENDOR: 004823 SHIP To: Ashland Public Works
CUT N' BREAK CONSTRUCTION INC. (541)488-5587
P O BOX 1455 51 WINBURN WAY
MEDFORD, OR 97501 ASHLAND, OR 97520
FOB Point: Req.No.:
Terms: Net Dept.:
Req. Del.Date: Contact: Pieter Smeenk
Special Inst: Confirming? NO
Quariti ,. .,; Unit ' ` Description '. Unit Price Ext.Price '
THIS IS A REVISED PURCHASE ORDER
Bluebird Stair Installation 9,610.00
Per attached drawings, proposal and
contract
'Contract for Goods and Services
Beginning date: February 15, 2012
Completion date: March 15, 2012
Note: Beg/Completion dates per Pieter
on February 14, 2012
Insurance required/On file
Processed change order 03/2312012 640.00
Change Order No. 1
Processed change order 04/24/2012 3,970.09
Change Order No. 2
Extra cost to cover BOLI Prevailing Wage
Change Order approved by Council on
April 17, 2012
SUBTOTAL 14 220.09
BILL TO:Account Payable TAX 0.00
20 EAST MAIN ST FREIGHT 0.00
541-552-2028 TOTAL 14,220.09
ASHLAND, OR 97520
Account Number . : Project Number.- -, Amount Account Number � Project Number � ;�: ,,. Amount '
E 260.08.12.00.70420 E 201132.120 14 220.09
Autho ized Signature VENDOR COPY
FORM #10 CITY OF
CONTRACT AMENDMENT APPROVAL REQUEST FORM ASHLAND
Request for a Change Order
Name of Supplier 1 Contractor I Consultant: Cut'N Break Construction,Inc. Total amount of this
contract amendment:
Purchase Order Number:10684
Title 1 Description: Blue Bird Park Stair Replacement-PWE Project No.2011.32 $3970.09
❑ Per attached contract amendment
Contract Amendment
Original contract amount $ 9.610.00 100 %of original contract
Total amount of previous contract amendments 640.00 6.7 %of original contract
Amount of this contract amendment 3.970.09 41.3 %of original contract
TOTAL AMOUNT OF CONTRACT $ 14.220.09 48 %of original contract
In accordance with OAR 137-047-0800:1)The amendment is within the scope of pmcurementas described in the solicitation documents,Sole Source notice or approval of Special
Procurement.2)The amendment is necessary to comply with a change in law thataffects performance of the contract.3)The amendment results from renegotiation of the terms and
conditions,including the contract price,of a contract and the amendment is advantageous to the City of Ashland,subject to all of the following conditions:a)goods and services to be
provided under the amended contract are the same as the goods and services to be provided under the unamended contract;b)The City determines that,with all things considered,the
amended contract is at least as favorable to the City as the unamended contract c)The amended contract does not have a total term greater than allowed in the solicitation document,
contractor approval of a Special Procurement An amendment is not within the scope of the procurement if the City determines that if it had described the changes to be made by the
amendment in the procurement documents,it would likely have increased competition or affected award of contract.
Contract amendment is within the scope of procurement: YES NO' X (If"NO",requires Council approval 1 Attach copy of CC.)
Sourcing Method:
SMALL PROCUREMENT-Less than$5,000 INVITATION TO BID or COOPERATIVE PROCUREMENT,QRF or
❑"YES",the total amount of contract and REQUEST FOR PROPOSAL EXEMPTION PURSUANT TO AMC 2.50
cumulative amendments<-$6,000. ❑ 'YES',the total amount of cumulative ❑"YES',the total amount of original contract and
❑ If'NO',amount exceeding authority requires amendments<–25%of original contract amount or cumulative amendments s$100K for Goods&
Council approval.Attach copy of Council $250,000 whichever is less. Services,s$75K for Personal Services,<$50K for
Communication. ❑If"NO',amount exceeding authority requires Attorney Fees.
❑ Exempt–Reason: Council approval.Attach copy of Council ❑If'NO",amount exceeding authority requires
Communication. Council approval.Attach Copy of Council
❑ Exempt–Reason: Communication.
❑ Exempt–Reason:
INTERMEDIATE PROCUREMENT. SOLESOURCE EMERGENCY PROCUREMENT
Goods&Services-$5.000 to$100.000 ❑ 'YES',the total amount of cumulative ❑ Written Findings:Document the nature of the
Personal Services -$5,000 to$75,000 amendments–<25%of original contract amount or emergency,including necessity and circumstances
❑ 'YES',the total amount of cumulative $250,000 whichever is less. requiring the contract amendment
Fendments–<25%of original contract amount. El If"NO",amount exceeding authority requires [I Obtain direction and written approval from City
If"NO",amount exceeding authority requires Council approval.Attach copy of Council Administrator
ouncil approval.Attach copy of Council Communication. - ❑ If applicable,attach copy of Council
Communication. ❑ Exempt–Reason: Communication
❑ Exempt–Reason: ❑ Exempt–Reason:
SPECIAL PROCUREMENT INTERGOVERNMENTAL AGREEMENT
❑'YES',the total amount of original contract and cumulative ❑'YES',the original contract was approved by City Council.
amendments are within the amount and terms initially approved by Provide date approved by City Council: (Dale)
Council as a Special Procurement. If'NO',Council approval is required.Attach copy of Council Communication.
❑ If'NO",amount exceeding authority requires Council approval. ❑ Contract amendment approved and signed by City Administrator.
Attach copy of Council Communication.
Project Number: 2011.32 Account Number: 260.08.12.00.74200
'Expenditure must be charged to tl a appropriate aaccJcour trnumbers for the financials to reflect the actual expenditures accurately. Attac(hh a ra pages if needed.
Employee Signature: ��� / Q"flue Department Head Signature: �n��nC,v of y/ly
/n (Equal to or greater than 000)
Funds appropriated for curred fiscal year: ,ES / No kx I—, -�–� t/�IG ./�
Finance Director(Eq 5,000) Date
Comments: ����C q-L� L 0
Form#10-Contract Amendment Approval Request Form, Request for a Change Order,Page 1 of 1,4/18/2012