Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
1979-121 Agrmt - PNB - Pole Price Schedules
April 9, 1979 Mr. d:-* -Be'loang Ah 4a�l Right-of-Way Manager Pacific Northwest Bell 825 N. E. 20th Ave. Portland, OR 97232 Re: Joint Pole Agreement Dear Mr. DeYoung: . It has been over a year since we last revised the price schedules between the City of Ashland and Pacific North- west Bell for joint pole use and related appurtenances. The schedule now being used was effective July 1 , 1977, and .I assume that you have a new agreement with Pacific Power . and Light dated July 1 , 1978. Would you please prepare the revised schedules for our approval? Thank you. Very truly yours, Brian L.- City Administrator BLA:ab cc: Director of Electric Utilities Director of Finance ' c. Pacific Northwest Bell Sixteen Hundred Bell Plaza Seattle, Washington 98191 Seattle, June 27, 1979 Mr. Brian L. Almquist City Administrator City Hall Ashland, Oregon 97520 Dear Mr. Almquist: Enclosed is a fully executed original of our newly agreed upon Pole Price Schedule. Very truly yours, Roy PY Lukens Encl. I REVISED POLE PRICE SCHEDULES BETWEEN CITY OF ASHLAND & PACIFIC NORTHWEST BELL TELEPHONE COMPANY The attached revised schedules, I, II, III, IV, & V, covering the cost of poles and associated pole costs for use under the Contract Rental Agreement dated April 15, 1958 between City of Ashland and Pacific Northwest Bell Telephone Company are effective July 1, 1979. CITY OF ASHLAND By• 4�nag�er Joint Use Facilit s PACIFIC NORTHWEST BELL TELEPHONE COMPANY By: 6/✓(/! sc1 General Manager —cVstribution Services PROVED �eortewst em TABLE I SCHEDULES OF REMAINING LIFE VALUES STRAIGHT LI14E - 35 Years. Length of Poles Year Set 25' 30' 35' 4o' 45' 50' 55' 6o' 1978-79 154 181 228 264 0 8 411 514 1 7 142 175 221 256 300 3 7 3 29 4 197b 144 169 2 1 33 387 1975 13 1 3 207 240 282 325 375 1974 13 157 200 232 273 314 363 5 1973 129 151 193 22 20 303 351 3 1972 12 —7-5— 1 —2-16-- 1 255 292 424 1971 119 140 179 208 2 —2-91--327 09 1970 114 135 172 200 237 270 315 3 1969 109 130 --1-6-5 192 22 200 303 379 1968 104 125 15 1N-- 219 250 291 3 1967 99 120 151 —1-76-- 7 210 --27o--0 279 3 9 1 9 115 14 . 168 201 230 2 7 33 1965 89 110 1 137 160- 192 220 255 31 1964 64 105 1 130 152 183 210 243 30 1963 80 i 100 123 1 17 200 231 289 1 2 76 95 110 13u —165 190 219 27 1961 72 90 109 128 150 1 0 207 259 1960 85 1 102 120 147 170 195 --2W- 1959 6b0 1 96 112 1 138 160 183 229 1958 60 75 0 105 129 150 171 21 1957 56 70 98 120 l 0 159 199 1956 52 5 7 91 111 130 1 '7 1 . 1955 48 60 72 64 102 120 135 1 9 i 5 55 0 77 93 1 110 123 1 15 1953 50 0 70 84 100 lll 1 1952 3 5 54 63 75 90 99 12 1951 32 40 48 5 0 112 1950 2 35 +2 9 57 70 77 9 1949 2 30 30 2 00 —7v- 1946 20 25 30 35 4o 50 55 . 70 1947 10 20 21T 2 32 4o 5 1946 12 15 18 21 --2)T— 30 33 2 1945 8 10 12 1 1 20 22 2 1944 1 5 7 10 11 1 1943 0 1 0 0 0 0 0 0 1 0 Effective 7/1/79 1 TABLE II SCHEDULE OF SALVAGE VALUES FOR WOOD POLES (Based on 10 year straight line depreciation) Years in Service 25' 30' 35' 40' 45' 50' 55' 60' Less than 1 _46_ 65 95 120 145 170 210 295 41 59 86 108 131 153 189 267 ___?_._ . .__ 37 52 76 96 116 136 168 236 3 32 46 67 84 102 u9 147 207 _4 28 39 57 72 87 102 126 177 5 23 33 48 60 73 85 105 148 18 26 38 48 58 68 84 118 7 14 20 29 36 44 51 , 63 89 .8- _ 9 13 . 19 24 29 34 42 59 _ 9 __ __.. ._ _- _ 5 7 10 12 15 17 21 30 10 0 0 0 0 0 0 0 0 Effective 7/1/79 TABLE III SCHEDULE OF POLE PRICES FOR USE UNDER CONTACT RENTAL AOREE14ENTS i 25' 30' 35' 40' 45' 50' 55' 60' Cost of Poles 46 65 95 120 145 170 210 295 Delivery at Hole 17 18 20 24 27 30 34 37 Digging Hole 27 28 31 33 36 42 44 47 Setting Pole 64 (includes all labor 70 82 87 101 116 123 135 cost) TOTALS 154 181 228 264 309 358 411 514 Effective 7/1/79 TABLE IV AVERAGE COSTS OF VARIOUS POLE OPERATIONS UNDER CONTACT RENTAL AGREEMENTS Cementing ... . .. ..... Straightening Pole (no transferring) ... . o 64 Lowering Pole to ground ...... . .... .... .. . ... .. . Hauling Pole to Yard .. ... .. . ..... ... ... . .. .. ... .... ...... . ...... Moving Pole- (by trenching - no transferring) . . ..... .. ... .. . .... 130 Moving Pole (to new hole - no transferring) 107 Topping Pole... ... . . . . .. ...... ..... ... ... .. . . . . . . .. .. .. . .. ..... 20 Effective 7/1/79 TABLE V SCHEDULE OF GUYING COSTS UNDER CONTACT RENTAL AGREEMENTS Anchors - with Rods and Guy Protectors Rod Diameter Average Cost 3/4" and under $ 80 1 inch no 1 1/4" 16o Anchor Guys - Less Anchors, Rods and Protectors Guy Diameter Average Cost 5/16" 6m Strand $ 53 3/81, 10M Strand 58 7/16" 16M strand 75 s Overhead Guys - Guys to Stub Guy Diameter Average Cost 5/16VI 79 3/8" $ 87 Iz 7/16" ].18 Sidewalk Pipe and Fixtures S Pipe Diameter Average Cost 2" $ 73 2 1/2" 85 Effective 7/1/79 4 c