Loading...
HomeMy WebLinkAbout2012-21 Miscellaneous Fees & Charges Repealing 2011-26 RESOLUTION NO. 2012- A RESOLUTION ADOPTING A MISCELLANEOUS FEES AND CHARGES DOCUMENT AND REPEALING PRIOR FEE RESOLUTION 2011-26 Recitals: A. The City currently has many ordinances that establish fees for different departments and activities. B. The City desires to provide all of its miscellaneous fees and charges in one document so that citizens can easily determine the costs of city services. C. The City desires to repeal all prior resolutions that establish fees and charges and adopt all fees and charges with one resolution for convenience of its citizenry. THE CITY OF ASHLAND RESOLVES AS FOLLOWS: SECTION 1. The Miscellaneous Fees and Charges Document, which is attached hereto and incorporated herein by this reference, is hereby approved and establishes the fees and charges for City services. New fees, those not charged before, are not affective until 30 days following date of approval unless otherwise established by Council action. SECTION 2. The following resolutions are specifically repealed: Resolutions 2011-26 and all other fees and charges inconsistent with the fees and charges set forth herein are repealed. SECTION 3. This resolution was duly PASSED and ADOPTED this /9 day of I A 1 2012, and takes effect upon signing by the Mayor. Barbara Christensen, City Recorder SIGNED and APPROVED this day of June, 2012. JohA Stromberg, Mayor Reviewed as to form: David Lohman, ity Attorney Page 1 of 1 CITY OF ASHLAND MISCELLANEOUS FEES AND CHARGES DOCUMENT ADOPTED: EFFECTIVE: ASHLAND PARKS & RECREATION PARKS AND RECREATION MISCELLANEOUS FEES AND CHARGES ADOPTED: EFFECTIVE: Miscellaneous Fees and Charges page 2 miscellaneous fees 8 charges Table of Contents CITY OF -ASHLAND MISCELLANEOUS FEES AND CHARGES ALPHABETICALLY BY DEPARTMENT SECTION 1 - Administrative Services/Finance AdministrativeBilling Charge..............................................................................................................................Page 8 Initial Business License Application Fee..............................................................................................................Page 8 Temporary Business License Application Fee......................................................................................................Page 8 RenewalApplication Fee......................................................................................................................................Page 8 RentalProperty Fees.............................................................................................................................................Page 8 LateApplication Fee.............................................................................................................................................Page 8 Late Renewal Fee(paid 30 days after the due date)..............................................................................................Page 8 Utility Billing Administrative Fees.......................................................................................................................Page 9 ReconnectionCharge............................................................................................................................................Page 9 ServiceConnection...............................................................................................................................................Page 9 ParkingStructure Fees..........................................................................................................................................Page 9 DowntownParking Area Fees...............................................................................................................................Page 9 SECTION 2 - City Recorder CopyFees............................................................................................................................................................Page 10 AudioTapes........................................................................................................................................................Page 10 LiquorLicenses...................................................................................................................................................Page 10 TaxicabLicenses.................................................................................................................................................Page 10 LienSearches......................................................................................................................................................Page 10 Elections..............................................................................................................................................................Page 10 Street/Alley Vacat ions........................................................................................................................................Page 10 Ambulance............................................:.............................................................................................................Page 10 Annexat ion..............................................................................................:...........................................................Page 10 ResearchFee.......................................................................................................................................................Page 10 SECTION 3 - Community Development Pre-Application Conference................................................................................................................................Page I I AdministrationActions.......................................................................................................................................Page I 1 TypeI,II and III Reviews...................................................................................................................................Page 11 LegislativeAmendments.....................................................................................................................................Page 12 Appeals................................................................................................................................................................Page 12 , SolarAccess........................................................................................................................................................Page 12 Community Development Fee............................................................................................................................Page 12 CopyFees............................................................................................................................................................Page 12 PreparedDocuments...........................................................................................................................................Page 12 ResearchFee.......................................................................................................................................................Page 12 BuildingPermit Fees...........................................................................................................................................Page 13 Plan Review Fee for Commercial and Residential..............................................................................................Page 13 Miscellaneous Fees for Commercial...........................................................................................:.......................Page 13 Inspection Fees for Commercial and Residential................................................................................................Page 14 Residential Plumbing Permit Fees......................................................................................................................Page 14 Commercial Plumbing Permit Fees.....................................................................................................................Page 15 Residential Mechanical Permit Fees...................................................................................................................Page 15 Commercial Mechanical Permit Fees..................................................................................................................Page 16 ElectricalPermit Fees.........................................................................................................................................Page 16 Residential Restricted Energy Electrical Permit Fees.........................................................................................Page 17 RenewableEnergy Systems................................................................................................................................Page 17 miscellaneous fees 8 charges page 3 Table of Contents SECTION 4- Electric TemporaryService Drop.....................................................................................................................................Page 18 MeterCharges.....................................................................................................................................................Page 18 Non Radio Frequency Meter Charges.................................................................................................................Page 18 Non Sufficient Funds Check Fee........................................................................................................................Page 18 ReconnectionCharge..........................................................................................................................................Page 18 ServiceCalls.......................................................................................................................................................Page 18 ServiceConnection.............................................................................................................................................Page 18 ScheduledWork After Hours..............................................................................................................................Page 18 Unauthorized Connection...................................................................................................................................Page 18 LineExtension Charges......................................................................................................................................Page 19 ENRCalculations................................................................................................................................................Page 19 SECTION 5 - Fire CopyFees............................................................................................................................................................Page 20 ReportFees.........................................................................................................................................................Page 20 ResearchFee.......................................................................................................................................................Page 20 FireFees..............................................................................................................................................................Page 20 Emergency Medical Services..............................................................................................................................Page 20 PlanChecks.........................................................................................................................................................Page 21 Other...................................................................................................................................................................Page 21 FirstAid/CPR Classes.........................................................................................................................................Page 21 InspectionFees....................................................................................................................................................Page 21 WeedAbatement.................................................................................................................................................Page 21 SECTION 6 - Information Technology InstallationFees..................................................................................................................................................Page 22 DisconnectFees..................................................................................................................................................Page 22 TruckRoll...........................................................................................................................................................Page 22 Field Technician Hourly Rate..............................................................................................................................Page 22 Consulting and Technical Support Hourly Rate..................................................................................................Page 22 Non-City Employee Staff Screening...................................................................................................................Page 22 Fiber Service Installation....................................................................................................................................Page 22 TransitFees.........................................................................................................................................................Page 22 StaticIP Address.................................................................................................................................................Page 23 Qualityof Service Fee.........................................................................................................................................Page 23 Business Augmented Upload Package................................................................................................................Page 23 Non-Return of Customer Premise Equipment(CPE)Devices............................................................................Page 23 CATV Seasonal Reconnects&Disconnects.......................................................................................................Page 23 CATVHouse Amp Fee.......................................................................................................................................Page 23 Utility Billing Lobby Signage Fee.................................:....................................................................................Page 23 i page 4 miscellaneous fees 6 charges Table of Contents SECTION 7 - Municipal Court AppealTranscript Fee.........................................................................................................................................Page 24 City Attorney Deferred Sentence/Diversion.......................................................................................................Page 24 CivilCompromise Costs.....................................................................................................................................Page 24 ComplianceInspection Fee.................................................................................................................................Page 24 Court Appointed Counsel Fees and Charges.......................................................................................................Page 24 DefaultJudgment................................................................................................................................................Page 24 DiscoveryFees....................................................................................................................................................Page 24 Diversion by Municipal Court.............................................................................................................................Page 24 Extend/Amend City Attorney Deferred Sentence/Diversion...............................................................................Page 24 Failure to Appear for Bench Trial/Show Cause Hearing....................................................................................Page 24 Failure to Appear for Jury Trial..........................................................................................................................Page 24 Forfeitureof Security..........................................................................................................................................Page 24 Mediation of Violation(Municipal Court Mediation) ........................................................................................Page 24 NonSufficient Funds Check Fee ........................................................................................................................Page 24 CourtCosts .........................................................................................................................................................Page 24 Expunction..........................................................................................................................................................Page 24 Show Cause Admission of Allegat ion.................................................................................................................Page 24 BenchProbation Fee...........................................................................................................................................Page 24 Warrant................................................................................................................................................................Page 24 Withholding on County Assessment...................................................................................................................Page 24 Domestic Partnership Registrat ion......................................................................................................................Page 24 SECTION 8 - Police PoliceReports....................................................................................................................................................Page 25 ResearchFee.......................................................................................................................................................Page 25 VisaLetters.........................................................................................................................................................Page 25 FingerPrint Cards...............................................................................................................................................Page 25 Photographs(CD)................................................................................................................................................Page 25 AudioTapes/ICOP Videos..................................................................................................................................Page 25 Non Sufficient Funds Check Fee........................................................................................................................Page 25 Impound/Tow Fee...............................................................................................................................................Page 25 TaxiOperator License.........................................................................................................................................Page 25 BicycleLicense...................................................................................................................................................Page 25 SECTION 9 - Public Works - Miscellaneous Fees & Charges Copy Fees,Black,White and Color....................................................................................................................Page 26 Plat&Plan Checks..............................................................................................................................................Page 26 Public Works/Engineering Inspections,Permit Etc............................................................................................Page 27 GISData&Mapping Services............................................................................................................................Page 28 Sanitary Sewer Connection Fees.........................................................................................................................Page 29 WaterConnection Fees.......................................................................................................................................Page 29 CemeteryFees.....................................................................................................................................................Page 30 SextonFees.........................................................................................................................................................Page 31 MiscellaneousFees.............................................................................................................................................Page 31 Vases...................................................................................................................................................................Page 31 CPI&ENR Calculations.....................................................................................................................................Page 31 miscellaneous fees 8 charges page 5 Table of Contents SECTION 10 - Parks and Recreation Miscellaneous Fees and Charges PARKS WeddingPackages..............................................................................................................................................Page 33 GroupPicnic Rentals..........................................................................................................................................Page 33 Deposits..............................................................................................................................................................Page 33 SpecialEvent Fees..............................................................................................................................................Page 33 AlcoholFee.........................................................................................................................................................Page 34 General Building Reservations....................................................:......................................................................Page 33 FieldUsage.........................................................................................................................................................Page 33 CalleSeating.......................................................................................................................................................Page 34 DanielMeyer Pool..............................................................................................................................................Page 34 Youth&Adult Recreation Programs Ashland Rotary Centennial Ice Rink.......................................................Page 34 OakKnoll Golf Course Fees...............................................................................................................................Page 34 CommunityGarden Fees....................................................................................................................................Page 35 Nature Center School Programs..........................................................................................................................Page 35 Nature Center Community Programs..................................................................................................................Page 35 Oak Knoll Golf Course Wedding Fees...............................................................................................................Page 35 Maps....................................................................................................................................................................Page 35 SECTION 11 - List of Rates and Charges Set by Separate Resolutions System Development Charges (SDCs) List of Resolutions Parks and Recreation Resolution 2000-29..........................................................................................................Page 36 Transportation Resolution 1999-42.....................................................................................................................Page 36 SewerResolution 2006-27..................................................................................................................................Page 36 StormResolution 2002-15..................................................................................................................................Page 36 WaterResolution 2006-27..................................................................................................................................Page 36 Utilities Rates and Fees List of Resolutions AFNResolution 2010-28.................................................................................................................................:..Page 36 Electric Resolution 2009-26................................................................................................................................Page 36 SewerResolution 2011-09..................................................................................................................................Page 36 Storm Drain Resolution 2009-28........................................................................................................................Page 36 . Transportation Resolution 2009-27.....................................................................................................................Page 36 WaterResolution 2011-08.....................................:............................................................................................Page 36 SECTION 12 - Research Fee ResearchFee.......................................................................................................................................................Page 36 SECTION 13 - Building Valuation Data Building Safety Division—Building Valuation Data—August 2011...................................................Page 37 page 6 miscellaneous fees 8 charges Miscellaneous Fees and Charges Miscellaneous fees 8 charges page 7 Section 1-Administration Administration Services/Finance Miscellaneous Fees and Charges Administrative Billing Charge (up to 10%) Per Billing Business License Fees Initial Business License Application Fee Licensee shall pay a prorated fee of$10 for each month, $120.00 for first 2 employees* or portion of a month, remaining in the fiscal year from +$5.00 for each additional the date of the application with a minimum fee of$25.00 employee Temporary Business License Application Fee $25.00 Renewal Application Fee $75.00 for first 2 employees* +$10.00 for each additional employee Rental Property Fees Same as above for activity including six or more properties. Late Application Fee $25.00 Late Renewal Fee (paid 30 days after the due date) 10%with a minimum of$25.00 *Pursuant to AMC 6.04.020.E an employee is an individual who performs service for another individual or organization. The number of employees reported shall be the number of employees as of the date the new ap- plication or renewal will become effective if approved. It does not matter whether an individual is a full, part- time, or temporary employee for business license purposes. page 8 miscellaneous fees and charges Section 1-Administration Utility Billina Miscellaneous Fees and Charges Current Proposed Administrative Fees: Notification of Pending Collection $10.00 Returned Check Charge $35.00 Reconnection Charge: During Business Hours $25.00 After Hours or Holidays $100.00 Service Connection: Normal working hours $10.00 Other Hours or Holidays $100.00 Parking Fees Parking Structure Fees: 6:00 a.m. - 6:00 p.m. (or segment) $1.00 6:00 p.m. - 2:00 a.m. (per hour) $1.00 6:00 a.m. -2:00 a.m. (maximum) $3.00 Parking permit(where applicable in City structure or lot) 6:00 a.m. - 6:00 p.m. Monday - Saturday (unless otherwise posted)$20.00 Parking Ticket Surcharge (citywide) $4.00 Downtown Parking Area Fees: Short Term (<30 minutes) unloading from"marked" No charge business vehicle with flashers Daily parking permit(Orange)- 1st day or fraction of day $0.00 $5.00/day Additional days (limited to 5 days; no charge on Sunday or $1.00/day federal holidays) • Limit of two per business address at a time • Applicable permits/licenses must be current • Each permit is good for one parking space • Not applicable to handicapped or short term spaces equal to or less than 15 minutes, green loading zones, fire or other restricted areas. miscellaneous fees and charges page 9 Section 2—City Recorder City Recorder Miscellaneous Fees & Charges Copy Fees: Black and White Copies Letter/Legal Single-Sided $ .20 each Black and White Copies Letter/Legal Double-Sided $ .40 each Black and White Copies Tabloid Single-Sided $ .40 each Black and White Copies Tabloid Double-Sided $ .80 each Color Copies Letter Legal Single-Sided $1.50 each Color Copies Tabloid Single-Sided $3.00 each Audio Tapes: CD/DVD/Cassette $5.00 each Liquor Licenses: Temporary Liquor License (processing fee) $10.00 Liquor License(new processing fee) $100.00 Liquor License(change of ownership processing fee) $75.00 Annual Renewal Liquor License $35.00 Taxicab Licenses: New Certification application (one-time processing fee) $250.00 Annual Renewal of Certificate $200.00 (per vehicle) Lien Searches: (fees set by Ordinance 2385 in 1986) Routine requests $20.00 Rush/Fax Requests $30.00 Elections: (amount set by Resolution #2009-05) Required deposit for Citizens Initiative $500.00 Street/Alley Vacations: (filing fee set by Resolution 1994-24) Required deposit of filing fee $500.00 Ambulance: Annual renewal fee $300.00 Annual ambulance fee (each vehicle) $100.00 Annexation: Processing fee for County Department of Assessment $300.00 Research Fee: Refer to Section 12 on page 37 page 10 miscellaneous fees and charges Section 3-Community Development Planning/Community Development Miscellaneous Fees and Charges Current Proposed Pre-Application Conference: $125.00 $127.00 Administration Actions: Final Plat Review: Partitions $125.00+$10/lot $127.00+$10/lot Subdivisions $318.00+$27/lot $325.00+$27/lot New Sign Permit $125.00+$2.50/sq ft $127.00+$2.50/sq ft Replacement Sign Permit $27.00+2.50/sq It Home Occupation Permits $27.00 Zoning permit(fence, accessory structure, etc.) $27.00 Land Use Approval Extension Request $318.00 $325.00 Lot Line Adjustments $318.00 $325.00 Any other Administrative Action $318.00 $325.00 Type I Reviews: Tree Removal Permit(not associated with another action) $27.00 Solar Setback Variance $963.00 $982.00 Amendments to Conditions $963.00 $982.00 Physical & Environmental Constraints Permit $963.00 $982.00 Conditional Use Permit-Accessory Residential Unit $625.00 $982.00 Conditional Use Permit(Type I only) $963.00 $982.00 Variance (Type I only) $963.00 $982.00 Residential Site Review $963.00+$64/unit $982.00+$65/unit Final Plan Performance Standards $963.00+$64/lot $982.00+$65/lot Land Partitions $963.00+$64/lot $982.00+$65/lot Commercial Site Review $963.00+0.5% $982.00+.5% (.005) of project value* of project value* Any other Type I Review $963.00 $ 982.00 Independent Review of Wireless Communication Facilities** $5000.00 Type II Reviews: Conditional Use Permit(Type II only) $1928.00 $1970.00 Variance (Type II only) $1928.00 $1970.00 Outline Plan or Preliminary Plat for Subdivisions $1928.00+132/lot $1970.00+132/lot Final Plan with Outline $2573.00+132/lot $2624.00+132/lot Commercial Site Review $1928.00+.5% (.005)of project value* Any other Type II Review $1928.00 $1970.00 Independent Review of Wireless Communication Facilities** $5000.00 * Project value includes the estimated valuation of all structures(per State of Oregon Building Code),as well as all related project site improvements,such as grading,paving, landscaping,bioswales,etc **The initial deposit required with an application for a new wireless communication facility that is not collo- cated is$5,000,and shall be used by the City for the costs of expert review of the application. If any time during the planning application process the account balance is less than $1,000,the Applicant shall upon no- tification by the City replenish the account so the balance is at least$5,000. The maximum total consultant fees to be charged to the Applicant shall be$10,000,and any unused portion of fee will be refunded. miscellaneous fees and charges page 11 Section 3-Community Development Type III Reviews: Current Proposed Zone/Comprehensive Plan Map Change $2573.00 $2624.00 Comprehensive Plan Change $2573.00 $2624.00 Annexation $3862.00 $3947.00 Urban Growth Boundary Amendment $3862.00 $3947.00 Any other Type 111 Review $3216.00 $3286.00 Legislative Amendments: Comprehensive Plan Map/Large Zoning Map Amendment $4,507.00 $4606.00 Land Use Ordinance Amendment $4,507.00 $4606.00 Comprehensive Plan Amendment $4,507.00 $4606.00 City Sponsored Legislation (City Council Directive) $0.00 Appeals: Appeal for initial Public Hearing $150.00 Appeal for Final Decision of City (Planning Commission or City Council) $318.00 $325.00 Solar Access: Solar Access Permit(not a Solar Variance) $50.00+$10.00 per lot affected Community Development Fee: This fee is charged concurrently with Building Permit 1.1% (.011)of Fees at the time of building permit application for all new construction building permits requiring a plan review. per building code definition of valuation Community Development Copy Fees Current Proposed Copy Fees: Black and White Copies Letter/Legal Single-Sided $ .20 each Black and White Copies Letter/Legal Double-Sided $ .40 each Black and White Copies Tabloid Single-Sided $ .40 each Black and White Copies Tabloid Double-Sided $ .80 each Color Copies Letter/Legal Single-Sided $1.50 each Color Copies Tabloid Single-Sided $3.00 each Prepared Documents: Site Design & Use Standards $5.00 Street Tree Guide $5.00 Transportation Element $5.00 Downtown Plans (2001, 1998) $5.00 Street Standards Guide $5.00 Comprehensive Plan/Land Use Code $40.00 Research Fee: Refer to Section 12 on page 37 page 12 miscellaneous fees and charges Section 3-Community Development Building Division Permit Fees for Commercial and Residential In accordance with OAR 918-050-0030,the applicant for a building permit shall provide an estimate of con- struction costs at the time of application. Permit valuations shall include value of all work, including mate- rials and labor,for which the permit is issued. This estimate shall also include the cost of electrical,gas,me- chanical, plumbing, and permanent equipment and systems. The City will also prepare an estimate of the building valuation based on the current ICC Valuation table that is published and updated annually. The building permit will be based on the highest of these two estimates. Buildina Permit Fees: Total Value of Work Performed: $1.00 to $500.00 $10.00 $501.00 to $2,000.00 $10.00 for the first$500.00 plus $1.50 for each additional $100.00 or fraction thereof,to and including $2,000.00 $2,001.00 to $25,000.00 $32.50 for the first $2000.00 plus $6.00 for each additional $1000.00 or fraction thereof,to and including$25,000.00 $25,001.00 to $50,000.00 $170.50 for the first $25,000.00 plus $4.50 for each additional $1,000.00 or fraction thereof, to and including $50,000.00 $50,001.00 to $100,000.00 $283.00 for the first$50,000.00 plus $3.00 for each additional $1,000.00 or fraction thereof,to and including $100,000.00 $100,001.00 and up $433.00 for the first$100,000.00 plus $2.50 for each additional $1,000.00 or fraction thereof Plan Review Fee for Commercial and Residential: Plan Review Fee A plan review fee equal to 65%of the structural permit fee shall be due at application Additional Plan Review Fee $65.00 per hour Deferred Submittal Fee 65%of structural permit fee of deferred submittal valuation with a $50.00 minimum fee Miscellaneous Fees for Commercial: Commercial Fire Sprinkler/Fire Suppression/ Total value of work performed(structural permit Fire Alarm fee) Commercial Fire Sprinkler/Fire Suppression/ 65%of structural permit fee Fire Alarm Plan Review Note: See appendix for methodology for calculation of valuation for all permit fees utilizing valuation/ miscellaneous fees and charges page 13 Section 3-Community Development Inspection Fees for Commercial and Residential: Inspections for which no building permit applies $65.00 per hour; (minimum 1 hour) per inspector Re-inspection Fee $50.00 Inspections outside normal business hours (minimum 1 hr) $130.00 per hour; per inspector Residential Plumbing Permit Fees New Residential: Cost Each 1 bathroom/kitchen (includes: first 100 feet of water/sewer lines; hose bibs; ice maker; under floor low-point drains; and rain-drain packages) $285.00 2 bathrooms/1 kitchen $345.00 3 bathrooms/1 kitchen $405.00 Each additional bathroom (over 3) $45.00 Each additional kitchen (over 1) $45.00 Remodel /Alterations: Remodel/Alterations (minimum fee) $40.00 Each fixture, appurtenance, and first 100 ft of piping $15.00 Miscellaneous Residential: Minimum Fee $40.00 Piping or private storm drainage systems exceeding the first 100 feet $22.00 Backflow Assembly $15.00 Residential Fire Sprinkler (include plan review): $2.44 x total square footage of structure = Sprinkler Valuation (use Building Permit Fees Valuation Table on page 13 for fee calculation) Manufactured Dwellina or Pre-Fab: Connections to building sewer and water supply $50.00 RV and Manufactured Dwellina Parks: Base fee (including the first 10 or fewer spaces) $150.00 Each additional 10 spaces $100.00 page 14 miscellaneous fees and charges Section 3-Community Development Commercial Plumbina Permit Fees Commercial. Industrial, and Dwellings other than one - or two-family: Minimum fee $40.00 Each fixture $15.00 Piping(based on number of feet) $0.75/ft Miscellaneous: Minimum fee $40.00 Specialty fixtures $15.00 Re-inspection (no. of hrs. x fee per hour) $65.00 Special requested inspections(no. of hrs x fee per hour) $65.00 Medical gas piping: Minimum fee $50.00 Valuation $500 to $2,000 $50.00 +$5 per$100 of valuation Valuation $2,001 to $25,000 $125.00+ $18 per$100 of valuation Valuation $25,001 to $50,000 $540.00+ $14 per$100 of valuation Valuation $50,001 to $100,000 $890.00+ $9 per$100 of valuation Valuation greater than $100,000 $1,340.00+ $8 per$100 of valuation Residential Mechanical Permit Fees Mechanical Permit Minimum Fee: $50.00 Furnace/Burner includina ducts & vents: Up to 100k BTU/hr. $12.00 Over 100k BTU/hr. $15.00 Heaters/StovesNents: Unit Heater $15.00 Wood/pellet/gas stove/flue $15.00 Repair/alter/add to heating appliance or refrigeration $12.00 unit or cooling system/absorption system Evaporated cooler $15.00 Vent fan with one duct/appliance vent $7.50 Hood with exhaust and duct $10.00 Floor furnace including vent $15.00 Gas Piping: One to four outlets $6.00 Additional outlets (each) $0.75 Air-handling Units, including Ducts: Up to 10,000 CFM $10.00 Over 10,000 CFM $15.00 miscellaneous fees and charges page 15 Section 3-Community Development Compressor/Absorption System/Heat Pump: Up to 3 hp/100K BTU $15.00 Up to 15 hp/500K BTU $25.00 Up to 30 hp/1,000 BTU $50.00 Up to 50 hp/1,750 BTU $60.00 Over 50 hp/1,750 BTU $75.00 Incinerator: Domestic incinerator $25.00 Commercial Mechanical Permit Fees Minimum Fee $50.00 Total valuation of mechanical system and installation costs 0.5%of valuation Miscellaneous Fees: Re-inspection $50.00 Specially requested inspection(per hour) $65.00 Regulated equipment(un-classed) $50.00 Electrical Permit Fees Residential per unit, service included: Cost Each 1,000 sq. ft. or less $106:00 Each additional 500 sq. ft. or portion thereof $19.00 Limited energy $25.00 Each manufactured home or modular dwelling service or feeder $50.00 Multi-family residential $45.00 Residential and Commercial—Services or Feeders: installation, alteration, relocation: 200 amps or less $63.00 201 to 400 amps $75.00 401 to 600 amps $125.00 601 to 1,000 amps $163.00 Over 1,000 amps or volts $375.00 Reconnect Only $50.00 Temporary Services or Feeders: 200 amps or less $50.00 201 to 400 amps $69.00 401 to 600 $100.00 Over 600 amps or 1,000 volts, see services or feeders section above page 16 miscellaneous fees and charges Section 3-Community Development Branch Circuits: new, alteration, extension per panel: Current Proposed Branch circuits with purchase of a service or feeder $3.00 Branch circuits without purchase of a service or feeder: First branch circuit $43.00 Each additional branch circuit $3.00 Miscellaneous Fees: service or feeder not included: Each pump or irrigation circle $50.00 Each sign or outline lighting $50.00 Signal circuit or a limited energy panel, alteration or extension $50.00 Specially requested inspection (per hour) $65.00 Each additional inspection over the allowable $50.00 Residential Restricted Eneray Electrical Permit Fees Fee for all systems*: $25.00 Audio and stereo systems Burglar alarm system Doorbell Garage-door opener Heating, ventilation, &air-conditioning systems Landscape lighting& Sprinkler controls Landscape irrigation controls Outdoor landscape lighting Vacuum Systems Each additional inspection $25.00 *For new construction, this permit fee covers all systems listed or can be sold separately. Renewable Energy Systems: 5 KVA or less $79.00 5.01 KVA to 15 KVA $94.00 15.01 KVA to 25 KVA .$156.00 Wind generation systems in excess of 25 KVA: 25.01 KVA to 50 KVA $204.00 50.10 KVA to 100 KVA $469.00 For wind generations systems that exceed 100 KVA the permit fee shall be calculated in accordance with OAR 918-309-0040 Solar generation systems in excess of 25 KVA: $6.25/KVA The permit charge will not increase beyond the calculation for 100 KVA. Permits issued under this sub- section include three inspections. Additional inspections will be billed at an hourly rate. State of Oreaon Surcharge - ORS 455.210(4) State of Oregon permit surcharge is 12%of structural, plumbing, mechanical and electrical components of the overall building permit. miscellaneous fees and charges page 17 Section 4— Electric Electric Miscellaneous Fees and Charges Temporary Service Drop: Current Proposed Single Phase Underground temp 300 amps or less $206.00 $241.00 Single Phase Overhead temp 300 amps or less $253.00 $288.00 Three Phase Actual Cost Meter Charges: Meter Tests for accuracy: Once in twelve months No Charge Two or more times in twelve months $120.00 $168.00 Meter repairs/replacement(Damaged by Customer) Actual Cost Non Radio Frequency Meter Charges: Conversion from Radio Frequency (RF)to Non RF meter No Charge Monthly Fee to manually read Non RF meter No Charge Non Sufficient Funds Check Fee: $35.00 Reconnection Charge: Normal working hours $25.00 Other hours or Holidays $100.00 Service Calls: Once in twelve months No Charge Two or more times in twelve months $165.00 $195.00 Other hours or Holidays $203.00 $290.00 Service Connection for Applicant: Normal working hours $10.00 Other hours or Holidays $100.00 Scheduled work after hours: Actual Cost Unauthorized Connection: $215.00 Unauthorized Connection $215.00 II miscellaneous fees and charges page 18 Section 4-Electric Line Extension Charges New Single-Family Residential Service: Current Proposed Overhead service in existing developed areas from distribution line to and including meter $477.00 $541.00 Overhead service upgrade or increased service for 300 amps or less $477.00 $541.00 Replacement of service from overhead to underground, 300 amps or less. Customer provides all trenching, conduit, backfilling and compaction as directed by the City. $993.00 $1,136.00 Underground residential service of 300 amps or less. Customer provides conduit, trenching, back fill, compaction as directed by the City. $602.00 $684.00 *Underground Distribution Installation Charges: Per Lot less house service and engineering fees. $1,043.00 $1130.00 *Subdivisions of 0 to 20 engineering fee per lot $150.00 $163.00 * Subdivisions of 21+engineering fee per lot $227.50 $247.00 *Three Phase subdivision as required by city per lot $227.50 $247.00 Any overhead/underground service over 300 amps Actual Cost Commercial, Institutional and Industrial Service Actual Cost **Blower Door Leak Test(gas heat customers only) $75.00 **Duct Leak Test(gas heat customers only) $125.00 * Methodology: Current ENR Rate - Old ENR Rate/Old ENR Rate=% Rate of Adjustment (9289.65-8573.87)/8573.87= 8.35% Source: Engineering News Record Construction Cost Index (ENR) **Electric heat customers= no fee miscellaneous fees and charges page 19 Section 5-Fire Fire Miscellaneous Fees and Charges Copy Fees: Black and White Copy Letter/Legal Single Sided $ .20 each Black and White Copies Letter/Legal Double Sided $ .40 each Black and White Copies Tabloid Single Sided $ .40 each Black and White Copies Tabloid Double-Sided $ .80 each Color Copy Letter/Legal Single Sided $ 1.50 each Color Copy Tabloid $ 3.00 each Report Fees: Non patient Pre-hospital Care Reports $12.00 for 10 pages or less $15.00 over 10 pages Fire Incident Reports $12.00 for 10 pages or less $15.00 over 10 pages Photographs $12.00 per case request CD/DVD $19.00 per case request Mailing Cost Actual Cost Research Fee: Refer to Section 12 on page 37 Fire Fees: Cost Recovery Equipment *Per Current Oregon State Fire Marshal Standardized Cost Schedule Personnel *$50.00 per person per hour—2 Hour minimum per person Hazardous Materials Cleanup Actual Cost Emergency Medical Services: FireMed Annual Household Fee-Annual Renewal $55.00 per year FireMed Plus Annual Household Fee-Annual Renewal $95.00 per year Emergency Medical Service Fee—Aid Call $250.00 per patient Ambulance Base Rate $899.78 per patient Ambulance Mileage Rate $14.00 per mile Ambulance Waiting Time $25.00 per 1/2 hour Ambulance Stand By (2 hour minimum) $100.00 per hour On scene Coordinator $50.00 per hour Extra attendant $45.00 each Ambulance Service Area III2010 rate schedule Base rates will be adjusted each year by the most current posted "Consumer Price Index" (CPI). Other rates and mileage charges will be adjusted only by approval of the County Commissioners. page 20 miscellaneous fees and charges Section 5-Fire Fire and Life Safety: Plan Checks: Any Building Permit - 24%of the Building Division Structural Permit Fee and Plan Check Fee New Subdivision or Land Partition -24%of the Engineering Subdivision Plat Check Fee Other: Fire Hydrant Flow Tests required for new installations will be assessed at $100 per flow test. Any review required by the Oregon Uniform Fire Code, and which does not involve a building permit, will be charged at the rate of$50.00 per hour. A minimum charge of$25.00 will be assessed to these reviews. When the Building Division assesses additional fees for plan reviews and/or field inspections, any fire department staff time associated with that activity will be included in their fees at their specified rate. Current Proposed First Aid/CPR Classes: Basic Life Support(BLS) for Healthcare Providers CPR Class $55.00/person Heart Saver CPR& First Aid Class $55.00/person Heart Saver CPR Class $35.00/person Family and Friends CPR Class $5.00/person Inspection Fees: Initial Inspection (Re-inspection Included) Occupancy Type "B" 0-1,000 sf. $32.00 $33.00 1,001-3000 sf. $50.00 Occupancy Type "A, E, F, H, 1, M, S" 0-3,000 sf. + B 1,001-3,000 $48.00 $50.00 Occupancy Type "A,B, E, F, H, 1, M, S" 3,001-10,000 sf. $96.00 $99.00 10,001-20,000 sf. $144.00 $148.00 Over 20,000 sf. $192.00 $197.00 Occupancy Type "R, SR" 3 to 10 Units $48.00 $50.00 11 to 40 Units $96.00 $99.00 41 to 70 Units $144.00 $148.00 Over 70 Units $192.00 $197.00 Non-Compliance after 2"d Inspection Inspection Fee + $50.00 '$52.00 Non-Compliance after 3rd Inspection Inspection Fee+ $100.00 $103.00 Non-Compliance after 4h Inspection / Subsequent Inspections Inspection Fee+ $150.00 $154.00 Weed Abatement: Staff time Refer to Section 12 on page 37 Mailing Cost Actual Cost Weed Abatement by Contractor Actual Cost miscellaneous fees and charges page 21 Section 6-Information Technology Information Technology Miscellaneous Fees and Charges* Installation Fees: Current Proposed Basic installation-Pre-wired CATV outlets only $ 20.00 (Additional charges for parts and supplies apply) Wi Max standard installation $0.00 $200.00 Add Trap("filter") $10.00 New customer cable modem activation $0.00 $10.00 Cable Modem $0.00 $50.00 Refurbished 90—day replacement warranty Additional materials $0.00 $10.00 Over-and-beyond regular installation including multi outlets, outlet plates, additional wiring, replacement of customer damaged outlets. Disconnect Fees: Disconnect $50.00 Remove Trap("Filter") $10.00, Truck Roll: $20.00 Field Technician Hourly Rate: Non-standard work such as advancing troubleshooting, non-standard outlets, fishing wire inside walls, etc. $40.00 Consulting and Technical Support Hourly Rate: For support issues not related to AFN infrastructure, performance, and reliability. Minimum charge on hour. $70.00 Non-City Employee Staff Screening: Charge for each vendor employee submitted for authorization to Access AFN and City Service Center facilities. $150.00 Fiber Service Installation: $1,500.00 Minimum one-time fee for overhead served connections. Mandatory two-year agreement. Requests for underground served installations and/or for services beyond 1000' feet of existing overhead AFN fiber network will be charged by quote. Transit Fees: Transit @ 100 Mbps $300.00/month Transit @ 1 Gbps $400.00/month page 22 miscellaneous fees and charge Section 6-Information Technology Current Proposed Static IP Address: $0.00 $5.00/mo each Maximum of 5 static IP addresses* • Minimum level of service for static IP and QoS is "CHOICE"or higher service tier. QoS ("Quality of Service") Fee: $3.50/mo Primarily requested through Retail Partners for VOIP (phone)enhancement. Available on AFN Choice or higher Service. Modem DOCSIS 1.1 compliant or greater Business Augmented Upload Package (additional 5 Mbps): $15.00/mo Available exclusively on AFN Direct with the following requirements: • Current City of Ashland Business License Business Augmented Upload Package available only with: • Small Office/Home Office (SOHO) • Small Business *Additional fee added to base AFN Direct retail rates on specific packages. Maximum SOHO upload speed with augmented upload service at up to 9 Mbps Small Office/Home Office Business Augmented Upload Package @$80/month Maximum Small Business upload speed with augmented upload service at up to 10 Mbps Small Business Augmented Upload Package @$100.00/month Non-return of customer premise equipment (CPE) devices: $300.00 CPE's must be returned on disconnect date of AFN Anywhere and/or AFNMax services. Cable TV (CATV) Seasonal Reconnects 8 Disconnects: $0.00 $10.00/visit Non-pay disconnects&reconnects Service change Install HBO filter CATV House Amp Fee: $0.00 $35.00/each Utility Billing Lobby Signaae Fee: $0.00 $100.00/mo. • Resolution 2010-28(Section 2,page 38)grants Information Technology management ability to set promotional rates. miscellaneous fees and charges page 23 Section 7-Municipal Court Municipal Court Miscellaneous Fees and Charges Court Administration Fees: Crime Violation Proposed Appeal Transcript Fee $35.00 $10.00 City Attorney Deferred Sentence/Diversion $60.00 $40.00 Civil Compromise Costs $75.00 N/A Compliance Inspection Fee N/A $25.00 Court Appointed Counsel Fees and Charges Billed ranging from $250-$600 Default Judgement N/A $15.00 Discovery Fees Imposed in Accordance with Miscellaneous Fee& Police Department Resolutions See Police and City Recorder Fees Diversion by Municipal Court: Classes 1-IV,A-D Unclassified and Specific Fine Violations N/A Presumptive Fine Extend/Amend City Attorney Deferred Sentence/Diversion $45.00 $45.00 Failure to Appear for Bench Trial/Show Cause hearing $90.00 $70.00 Failure to Appear for Jury Trial $150.00 N/A Forfeiture of Security $25.00 $25.00 Mediation of Violation(Municipal Court Mediation) N/A $65.00 Non Sufficient Funds Check $25.00 $25.00 Court Costs $35.00 $45.00 Expunction $250.00 $0.00 $240.00 Show Cause Admission of Allegation $25.00 $10.00 Bench Probation Fee $100.00 N/A Bank Costs Warrant $25.00 10% at monthly W itholding on County Assesment distribution Other Domestic Partnership Registration $25.00 All other Fees and charges inconsistent with the fees and charges set forth herein are repealed.Nothing in this Resolution is intended to detract from the inherent power of the Court pursuant to general law to impose fees and charges established in state law or City ordinance in addition to the fees and charges specified herien. page 24 miscellaneous fees and charge Section 8-Police Police Miscellaneous Fees and Charges Police Reports: $12.00 for reports 10 pages or $15.00 for reports over 10 pages Research Fee: Refer to Section 12 on page 37 Visa Letters: $19.00 Fingerprints Cards: $20.00 first card $10.00 each additional card Photographs (CD): $19.00 Audio Tapes/ ICOP Videos: $19.00 Non Sufficient Funds Check Fee: $35.00 Impound/Tow Fee: $105.00 Cash only Taxi Operator License: $20.00 renewal $42.00 new Bicycle License: $2.00 miscellaneous fees and charges page 25 Section 9-Public Works Public Works Miscellaneous Fees and Chases Copy Fees: Black and White Copies Letter/Legal Single-Sided $0.20 each Black and White Copies Letter/Legal Double-Sided $0.40 each Black and White Copies Tabloid Single-Sided $0.40 each Black and White Copies Tabloid Double-Sided $0.80 each Color Copies Letter/Legal Single-Sided $1.50 each Color Copies Tabloid Single-Sided $3.00 each Existing maps printed in color on HP1055CM plotter(241b bond Paper) Arch C 18 x 24 3.00 sq. ft. $18.00 Arch D 24 x 36 6.00 sq. ft. $36.00 Arch E 36 x 48 12.00 sq. ft. $72.00 Existing maps or copies of existing maps copied in B&W on Xerox 3030 large format copier (201b bond paper) Arch C 18 x 24 $8.00 Arch D 24 x 36 $12.00 Arch E 36 x 48 $16.00 Note: Maps printed on materials other than the specified bond are double the standard print fee Plat& Plan Checks: Current Proposed Subdivision Plats $705.00 plus $106.00 per lot $720.00 plus $108.00 per lot Condominium Plats $705.00 plus $106.00 per lot $720.00 plus$108.00 per lot Partition Plats (does not include 24%Fire Department Review Fee) $377.00 $385.00 Subdivision Improvement Plat Check 5%Engineer Fee (5%of 5% Engineer Fee (5%of the public improvement cost) the public improvement cost) Engineering Development Fee (this fee is charged concurrently with Building Permit Fees at the time of building permit applications. Applies To all new residential dwelling units and commercial 0.75%of valuation Developments. Remodels,additions and accessory Buildings are not assessed this fee.) page 26 miscellaneous fees and charge Section 9-Public Works Public Works/Enaineerina Inspections. Permits. etc: Current Proposed Subdivision Construction Inspection/ 5%Engineer Fee(5%of Public Works Improvement Inspection the public improvement cost) Street or Alley Excavation Permit $190.00 +per ft. cost $194.00+ per ft. cost based on pavement age based on pavement age Encroachment Permit $190.00 $194.00 Miscellaneous Construction Permit $62.00 $63.00 (Construction of curb,sidewalk,driveway Apron,etc.) Dust Suppression Permit $62.00 $63.00 Driveway Painting Permit $15.00 (includes a can of paint) Right-of Way Closure-Street $190.00 $194.00 Right-of Way Closure-Sidewalk(>72 hrs) $62.00 $63.00 Right-of Way Closure-Sidewalk(<72 hrs) $15.00 Right-of Way Closure-Parking Space(>72 hrs) $61.00 $63.00 Right-of Way Closure-Parking Space(<72 hrs) $15.00 Block Party $15.00 Sidewalk Dining—Annual Renewal $4.00/sq. ft. (minimum 50 sq. ft) Functional Item—Annual Renewal $62.00 $63.00 Special Event Permits (per Resolution 2012-08): Large Event—4 hours or more with entry fee $1,000.00 *Fees listed below Large Event—4 hours or more with NO entry fee$850.00 replace these fees Small Event—Less than 4 hours with entry fee $700.00 Small Event—Less than 4 hours with NO entry fee$350.00 Basic Event(no city staff required) $130.00 City Sponsored Event $0.00 Base Special Event Permit Fee (plus applicable fees below) $130.00 Events that require city staff overtime 60% of city staff Off Rush Fee (less than 90 days advance notice) $250.00 miscellaneous fees and charges page 27 Section 9-Public Works Public Works/Ennineerina Inspections, Permits, etc. (cont) Current Proposed Loaned Functional Item, Pennant Application Fee $128.00 $131.00 Publication Box Per Publication-Annual Renewal $26.00 $27.00 Special vehicle Permit-Initial Fee $262.00 $268.00 Special vehicle Permit-Annual Renewal $105.00 $107.00 Penalty for No Permit 150%of permit cost Street or Alley Vacation $635.00 $649.00 GIS Data & Mapping Services: Current Proposed GIS Hourly Rate $78.00 $80.00 Information on Disk $38.00/utility per $40.00/utility per Quarter section Quarter section Planning Pre-Application Maps $21.00 $22.00 Plotting Fee $6.00/square foot New Address Assignment $36.00/address# $37.00/address# Street Name Approval Fee $102.00/street $104.00/street page 28 miscellaneous fees and charg es Section 9-Public Works Sanitary Sewer Connection Fees: Current: Pronosed: Sanitary sewer mainline video inspection $302.00 min. $311.00 min. (cost based on time and materials) Water Connection Fees: 3/4 inch service connection from main line including meter $1,669.00 $1,717.00 If owner/builder/contractor provides trench and backfill $386.00 $397.00 1 inch service connection from main line Including meter $1,909.00 $1,964.00 If owner/builder/contractor provides trench and backfill $520.00 $535.00 1 1/2 inch service connection from main line including meter $2,624.00 $2,700.00 If owner/builder/contractor provides trench and backfill $1,099.00 $1,131.00 2 inch service connection from main line including meter $2,871.00 $2,954.00 If owner/builder/contractor provides trench and backfill $1,433.00 $1,475.00 3 inch service connection from main line including meter Actual Cost First Utility Locate at an address No Charge Additional Locates at same address $66.00 $68.00 Water meter re-read Once in 12 months No Charge Each additional re-read in 12 months $29.00 $30.00 Water Meter Field Test $47.00 $48.00 Water Meter Bench Test 3/4" or 1" Water Meter $102.00 $105.00 1 1/2" or 2" Water Meter $191.00 $197.00 Larger Meters Actual Cost miscellaneous fees and charges page 29 Section 9-Public Works Water Connection Fees Continued Current Proposed Water pressure check once in 12 month No Charge Each additional pressure check in 12 months $37.00 $38.00 Water Chlorination Test-Subdivision retest upon failure (cost based on time and materials) $606.00 $624.00 Water Pressure Test -Subdivision retest up failure (cost based on time and materials) $363.00 $374.00 Water Main Line Tap -up to 6 inch waterline (cost based on time and materials) $1,810.00/tap $1,862.00/tap Water Main Line Tap -above 6 inch waterline $2,416.00 min + $2,486.00 min + (cost based on time and materials) actual cost/tap actual cost/tap Cemetery Fees: Sales of grave spaces or burial plots (fees split, 40%to the cemetery fund&60%to the cemetery trust fund) Grave Space -Lawn and Monument Sections $488.00 $499.00 Grave Space -Baby Land $154.00 $158.00 Grave Space -Niches (bronze) $411.00 $422.00 Grave Space -Urn garden $154.00 $158.00 Grave space -Crypt $1,027.00 $1,055.00 Sales of liners and markers: (fees split,40%to the cemetery fund &60% to the cemetery trust fund) Concrete cemetery box, including setting $411.00 $422.00 Concrete liners Cost plus 10% Final inscriptions $125.00 min charge Grave markers Wholesale cost X 2.5 not to exceed $700.00 Grave marker setting, concrete base $154.00 $158.00 Monticello burial vault(sealed concrete) $1,130.00 $1,161.00 page 30 miscellaneous fees and charges Section 9-Public Works Current Proposed Sexton Fees: Opening and closing graves, ground $411.00 $422.00 Opening and closing graves, double-deep $462.00 $474.00 Opening and closing graves, infant $154.00 $158.00 Opening and closing crypts $411.00 $422.00 Opening closed crypts $411.00 $422.00 Opening and closing niches $103.00 $106.00 Inter cremains in grave spaces $154.00 $158.00 Scattering ofcremains $103.00 $106.00 Disinterment $1,027.00/in advance $1,050.00/in advance Saturday, Sunday or Holiday burial $411.00 $422.00 Miscellaneous Fees: Grave Setup Rental $103.00/occurrence $105.00/occurrence Tent Rental $51.00/day $52.00/day Perpetual care lots, sold before 1927 $103.00 $106.00 Vases: Galvanized $41.00 $42.00 *cemetery fees will be subject to a 1.5%finance charge per month if not paid within 60 days of use. All above services will be sold pre-need in installments, interest free,with a minimum payment of one-twelfth of the total sale. 2012 CPI and ENR Calculations: Methodology: Current CPI Rate - Old CPI Rate/Old CPI Rate=% Rate of Adjustment (140.235-137.2)/137.2= 2.2% Methodology: Current ENR Rate - Old ENR Rate/Old ENR Rate =% Rate of Adjustment (9268-9011)/9011 =2.9% CPI used for: ENR used for: Plat & Plan Checks Sanitary Sewer Connection Fees Public Works/engineering Inspections, Permits, etc. Water Connection Fees GIS Data& Mapping Services Cemetery Fees miscellaneous fees and charges page 31 Section 10-Parks and Recreation ASHLAME3 PARKS RL RECREATION[ Section 10 Parks and Recreation Miscellaneous Fees and Charges page 32 miscellaneous fees and charges Section 10-Parks and Recreation Parks Miscellaneous Fees and Charges Wedding Packages: Current Proposed Lithia Park Sites $800.00/8 hrs. $400.00/4 hrs. Community Center $1,150.00 park site included Pioneer Hall $1,150.00 park site included Group Picnic Rentals: Cotton Memorial Area $75.00/4 hrs. Madrone Area $60.00/4 hrs. Top Southern Lawn $55.00/4 hrs. Hillside Picnic Area $55.00/4 hrs. Sycamore Grove $75.00/4 hrs. Brinkworth Area $60.00/4 hrs. Root Memorial Area $60.00/4 hrs. Lawn below Upper Duck Pond $60.00/4 hrs. Butler Bandshell $220.00/8 hrs. Deposits: Picnic Areas $75.00 Lithia Park Weddings $75.00 Butler Bandshell $190.00 Buildings Security $300.00 for events (refundable) $150.00 for meetings (refundable) Special Event Fees: Street Closure Fee $75.00 Park Booth fee $25.00/per booth (max. 10) Alcohol Fee: $150.00 (non-refundable) General Building Reservations: The Grove Full Facility $41.50/hr. on weekdays $50.00/hr. on weekends The Grove Otte/Petterson $22.50/hr. on weekdays $25.00/hr. on weekends Hunter Park Senior Center $19.50/hr. on weekdays $31.50/hr. on weekends Long Tenn User Fee $15.00/hr. (at least 6 days/yr) Oak Knoll Golf Course $19.50/hr. on weekdays $31.50/hr. on weekends Pioneer Hall/Community Center $19.50/hr. on weekdays $31.50/hr. on weekends Miscellaneous Equipment Fee $100.00 Field Usage: Tournaments $36.50/day each team Lights $28.00/hour miscellaneous fees and charges page 33 Section 10-Parks and Recreation Current Proposed Calle Seatina: Artisans $4.00/sq. foot Restaurant Seating $4.00/sq. foot Daniel Meyer Pool: Admission $2.00 Lap Swim $2.50 Water Aerobics $3.25 Swim Lessons $45/$24/$50 (age of child/length of lesson) Private Lessons $18.00 Open Swim punch card $30.00 Lap Swim punch card $40.00 Water Aerobics punch card $55.00 Season Pass $140.00 Youth Recreation Programs: 60/40 split with instructor and Parks Department Adult Recreation Programs: 60/40 split with instructor and Parks Department Ashland Rotary Centennial Ice Rink: Youth Admission $3.25 $3.50 Adult Admission $4.00 Skate Rental $2.50 Hockey Admission $5.50 Group Rental $5.00 Oak Knoll Golf Course Annual Passes: Annual Pass-Single $1,100.00 Annual Pass-Family $1,540.00 Daily Adult Fees lanes 18 to 541 9 Holes: November-February $11.00 March-October $16.00 18 Holes: November-February $15.00 March-October $24.00 page 34 miscellaneous fees and charge Section 10-Parks and Recreation Daily Senior Fees (aces 55 & up) Monday-Friday Only 9 Holes: November-February $11.00 March-October $14.00 18 Holes: November-February $14.00 March-October $22.00 Daily Junior Fees (aaes 8 to 17) 9 Holes: Year-Round $5.00 18 Holes: Year-Round $10.00 Driving Range One token (35) balls $3.00 Cart Fees (ver person) 9 Holes: November-February $6.00 March-October $8.00 18 Holes: November-February $11.00 March-October $3.00 Community Garden Fees: 10x10 $30.00-$35 -depending on location 10x20 $42.00-$47 -depending on location 20x20 $65.00 4x12 $25.00 Nature Center School Proarams: $200.00/Class Nature Center Community Programs: 70/30 split with instructor and Parks Department Oak Knoll Golf Course Wedding Fees: November-February $1,500.00 - full day November-February $800.00 - half day March-October $750.00 - full day March-October $400.00 - half day Maps: City of Ashland Map $3.00 (or 2 maps for$5.00) Watershed Map $3.00 (or 2 maps for$5.00) miscellaneous fees and charges page 35 Section 11— Rates and Charges Set by Separate Resolutions Rates and Charges Set by Separate Resolutions Listed Below* System Development Charges (SDCs) Parks and Recreation SDCs -Resolution 2000-29 Transportation SDCs -Resolution 1999-42 Sewer SDCs -Resolution 2006-27 Storm SDCs -Resolution 2002-15 Water SDCs -Resolution 2006-27 Utility Rates and Fees AFN Utility Fees -Resolution 2010-28 Sewer Rates -Resolution 2012-13 Storm Drain Fees -Resolution 2009-28 Transportation Fees -Resolution 2009-27 Water Rates -Resolution 2012-12 SECTION 12 - Research Fee A. The City shall charge a research fee based on the hourly wage of the staff person doing the re search, and the fee shall be billed in fifteen minute increments. The hourly wage used to calcu- late the research fee shall not include the cost of benefits. The City will establish a fee in its an- nual fee resolution that is reasonably calculated to reimburse the City for the actual cost of mak- ing public records available, including locating the requested records, reviewing the records to delete exempt material, supervising a person's inspection of original documents to protect the integrity of the records, summarizing, compiling, or tailoring a record, either in organization of media, to meet the person's request. The City may charge for search time even if it fails to locate any records responsive to the requestor even if the records located are subsequently determined to be exempt from disclosure. Copies of documents provided by a routine file search of 15-30 minutes or less will be charged at a copy rate established in the annual fee resolution. B. The City may include a fee established to reimburse for the costs of time spent by the city attorney in reviewing the public records, redacting materials from the public records into exempt and nonexempt records. The City fee may also include the cost of time spent by an attorney for the City in determining the application of the provisions of ORS 192.505. C. The City may not establish a fee greater than$25 unless the requester is provided with written notification of the estimated amount of the fee and the requestor confirms in writing that he/she wants the City to proceed with making the records available. D. Prepayment shall be required if the amount of the request is greater than $25. If the actual charges are less than the prepayment, and overpayment shall be refunded. *All of the above resolutions can be found in full text on the City of Ashland's Website: http://ashland.or.us page 36 miscellaneous fees and charges Section 13 - Building Valuation Data Community Development Department —Building Safety Division Methodology for calculation of permit valuation tn Icc INTERNATIONAL CODE COUNCII Building Valuation Data —August 2011 The international Code Council is pleased to provide the does not take into account any regional cost differences. As following Budding Valuation Data (BVD)for its members. The such, the use of Regional Cost Moddlers is subject to the BVD will be updated at six-momh intervals, with the next authority having jurisdiction. update In February 2012. ICC strongly recommends that all jurisdictions and other interested parties actively evaluate and Permit Fee Multiplier st assess the impact of this BVD table before utilizing it in their Determine the Permit Fee Multiplier. current code enforcement related activities. 1. Based on historical records, determine the total annual The BVD table provides the.average' construction costs per construction value which has occurred within the square foot,which can be used in determining permit fees for jurisdiction for the past year. a jurisdiction. Permit fee schedules are addressed in Section 109.2 of the 2009 International Building m g Code (13C)whereas ? Determine the percentage (%) of the budding Section 109.3 addresses building permit valuations. The department budget expected to be provided by 6u0ding permit fees can be established by using the BVD table and a permit revenue. Permit Fee Multiplier,which is based on the total construction Bldg.Dept.Budget x(X) value within the jurisdiction for the past year.The Square Foot Pemtit Fee Multiplier= Censtr i:Wn Cost table presents factors that reflect relative Total Annual Construction Value value of one construction dassificaloNOCCUpancy group to Example another so that more expensive construction is assessed greater permit fees than less expensive construction. The building department operates on a$300,000 budget and it expects to cover 75 percent of that from building permit fees. ICC has developed this data to aid jurisdictions in determining The tonal annual construction value which occurred within the permit fees. It is important to note that while this BVD table jurisdiction in the previous year is$30,000,000. does determine an estimated value of a budding (.e., Gross 8300,000 x 759E Area x Square Foot Construction Cost), this data is only permit Fee Multiplier= - =0.0075 intended to assist jurisdictions in determining their permit fees. 1`.0.000,000 This data table is not intended to be used as an estimating guide because the data only reflects average costs and is not Permit Fee representative of specific construction. The permit tee is determined using the building gross area,the This degree of precision is sufficient for the intended purpose, Square Foot Construction Cost and the Permit Fee Multiplier. which is to help establish permit fees so as to fund code Permit Fee=Cross Area x Square Foot Construction Cast eomplianoe activities. This BVD table provides jurisdictions x Permit Fee Multiplier with a simplified way to determine the estimated value of a building that does not rely on the permit applicant to determine Example the cost of construction. Therefore, the bidding process fix a Type of Construration:IIB partictdar,job and other associated factors do not affect the Area: Sat story-8,000 sq.R. value of a building for determining the permit fee.Whether a 2nd story-8.000 sq.fL specific project is bid at a cost above or below the computed Height 2 stories value of construction does not affect the permit fee because Permit Fee Multiplier-0.0075 the cost of related code enforcement activities is not directly Use Group:8 affected by the bid process and results. 1. Gross area: Building Valuation Business-2 stories x 8,000 sq.ft.= 18,000 sq.ft. The following building valuation data represents average Z Square Foot Construction Cost: valuations for most buildrigs. In conjunctimn with IBC Section 81118=$147.38Mq.ft 108.3,this data is offered as an aid for the building official to 3. Permit Fee: determine if the permit valuation is.underestimated. Again it Business=18,009 sq.ft.x 8147.38rsq.R x 0.0075 should be noted that when using this data„these are "average' costs based on typical construction methods for =517,888 each oocupancy group and type of construction.The average costs include foundation work, structural and nonstructural budding components, electrical, plumbing, mechanical and interior finish material. The data is a national average and miscellaneous fees and charges page 37 Section 13- Building Valuation Data Important Points • For purposes of establishing the Permit Fee Multiplier,the • The BVD is not intended to apply to ahetations or repairs estmated total annual construction value for a given time to existing buildings. Because the scope of alterations or period(t year)is the sum of each building's value(Gross repairs to an existing building vanes so greatly,the Square Area x Square Foot Construction Cost)for that time period Foot Construction Costs table does not reflect accurate (e.g.. 1 year). values for that purpose. However, the Square Foot • The Square Foot Construction Cost does not include the Costs table can be used to determine the cost of an addition that is basically a stand-amne building price of the land on which the building is built The Square Which happens to be attached to an existing building. In Fact Construction Cost takes into account everything from the case of such additions, the only alterations to the foundation work to the roof structure and coverings but existing building would involve the attachment of the does not include the pace of the land.The cost of the land addition to the existing budding and the openings between does not affect the cost of related code enforcement the addition and the existing building. activities and is not included in the Square Foot Construction Cost. Square Foot Construction Costs♦6,.,• Group(2005 Ortsmabonal Bunding Cods) W IS IIA as MA 10B IV VA VB A-1 AMMly,Millen,Win Ctaga 213M 206.01 200.72 191.95 190.03 175.03 185.11 1 164.60 157.61 hl Assembly.Mezen,rtin:ut stage 19509 197.55 182.59 173.7E 141.91 196.91 166.97 146 48 139.49 M2 ASSlnbly,n)F=Ma 164.7E HOM 163.69 19.42 14029 136.63 143.89 12717 122.52 M2 A6eerrOly,MMU121116,Cara,ean¢let pals 163.74 199.06 153.65 149.42 138.29 135.63 142.89 12627 121.52 A-3 Act rrj)y,dxlrMes 197,16 169.12 184.52 175.75 163,14 10.84 169.94 141141 141.42 M3 Acaerroy,general,m=nq rats,IP4anes,rnuse44na 165:45 198.21 151.91 144.14 131.22 127.22 13733 115.79 IN.50 "Auenby,aenu 194:9 196.!5 18016 172.7E 15991 15191 16197 1M 48 139.49 B Bustless 166.35 150.31 154.97 147.3E 133.73 125.85 14126 11716 11240 E Edueadaml 176.39 170.31 165.24 157.71 146.90 139.05 152.20 12791 123.47 F-1 Factory art Ink-M21.readerate nrafd 99.33 94.20 W.63 8929 76.18 72.6 81.59 62.7E 59.05 F-2 Factory and lCdWlal DN nezard 97.33 9320 58.63 64.29 76.11 71.96 80.59 627E 58.05 n-1 ny11ruzmd,exprrve6 92.63 8E.00 e3.32 79.09 71.17 66.94 75.39 67.76 N.P. n234 aanm 92.63 Stoll 53.32 7909 71.47 46.94 73.39 57.76 53.03 A-5 rIPM 166.35 1EO.31 154.97 147.38 133.73 128.66 141.26 11716 112.00 Ft lnM=MaL RPNhsea enl9Tn!r*rt 16645 lea.61 196.13 14376 137.18 133.65 14'_.57 12398 115.71 Di IS1d0al rOapllaX 279.74 173.70 269.36 260.77 24624 N.P. 254.66 270.07 N.P. =011atr homes 19496 198.42 163.44 175.69 162.52 N.P. 169.77 14635 N.P. imrollal restrzre 18993 193.49 178.15 170.56 156.15 152.28 164.45 141.98 134.42 I0:10NL cay Oars wri!s 16645 MAI 156.13 143.36 137.18 133.55 15.57 12308 119.71 MIlle 12274 118.114 112.61 107.3E 97.91 65.15 101.85 84.86 61.13 s4anCl1,noels 167.66 162.02 157.54 150.77 136.75 135.13 14715 12495 120.28 6sY MX,mugnef 14076 134.93 130.44 123.67 11232 10.70 120.72 99.22 9316 btlemda,ono!-aril r40-hnl 1)241 128.q 12553 12247 117.59 114,66 116.59 109.66 102.91 MM8a,Wfelaumed M4lg facures 16645 16091 156.13 149.36 13718 733.65 145.57 12308 118.71 e,mddefdle nYdto 91.63 8700 81.32 7809 69.17 E6.94 74.39 5576 52.03 irarara 93.63 8690 81.32 7709 69.17 64.94 73.39 55.76 -1.W u u[py,rmbCellaneou6 636E 65.79 61.57 53.14 521E 46.79 53.36 40.81 1815 a. PClate Garages use Ir31y,mlacedane s D. uN611sned D261cre as tae 4448 WCgj-615.00 Per 64.h. C. FM 61181 only DUM150 MOM 29 pertem 0. NP.-ml paln7ep page38 miscellaneous fees and charg Miscellaneous Fees and Charges Miscellaneous fees 8 charges page 39