HomeMy WebLinkAbout2013-0304 Study Session PACKET
CITY OF
ASHLAND
CITY COUNCIL STUDY SESSION
AGENDA
Monday, March 4, 2013
Siskiyou Room, 51 Winburn Way
5:30 p.m. Study Session
1. Look Ahead review
2. Council evaluation and prioritization of goals and objectives for the 2013-2015
biennial budget
3. Discussion of a revised proposal for a help center in Ashland
Following the Study Session the City Council will hold an Executive Session for
performance evaluation of a public officer pursuant to ORS 190.660.(2)(i).
In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this
meeting, please contact the City Administrator's office at (541) 488-6002 (TTY phone number 1-800-735-
2900). Notification 72 hours prior to the meeting will enable the City to make reasonable arrangements to
ensure accessibility to the meeting (28 CFR 35.102-35.104 ADA Title I).
COUNCIL MEETINGS ARE BROADCAST LIVE ON CHANNEL 9
VISIT THE CITY OF ASHLAND'S WEB SITE AT W WW.ASHLAND.OR.US
• City of Ashland Cou eeting Look Ahead •
"""THIS IS A DRAFT AN BJECT TO CHANGE"*"
Departments JT MTG SS cc BDGT SCOT SS cc ss CC BDGT BDGT SS cc SS cc SS cc Ss cc
Responsible 3111 3118 3119 3120 3121 411 412 4115 4116 V17 4118 516 5a 5120 5121 613 614 617 6/18 1
~ ~JointlMeetin wi[TGouncillandTP.arks Commissio7 ~ 11
Discussion of mutual Council and Parks oats Dave/ Don Admin Parks NEW
[31187 Stutl Session in siski ou Room [30
2 Discussion of Council request for time for announcements at Admin SS
meetings (request of Councilor Slattery)
3 Discussion of Council rules regarding engaging speakers at Admin SS
public forum (request of Councilor Slattery)
4 Discussion of AFR funding 8 rant issues John Fire SS
s3ml Executive7g'Gssion €ST' 13/161
5 For litigation u date pursuant to ORS 190.660 2 h Legal EXEC
[J/16] ~Re'ular CouncillMeetin MUM,
6 Contract for police contact station (Terry) Police CONS
7 Economic Development Plan update Bill or Adam CD or Admin NEW
6 Update of financial policies Lee Finance NEW
9 AFR Cost recovery Fees John Fire ORD-2
[3207 ®Bud edGommitte-i'al secs. rants reviewIIIIIIIIIIIIIIIIII - ES1201
[3121 Feud e-Mommitte-dial svcs. rants review' 1[3/2 11
0 ~Sf'utl7$ess on7 in Siski ouTRoom C/1
Discussion of whether or not to Continue the ad hoc steering CD Admin SS
committee on homelessness for another year Bill/ Dave
11 Self insurance O&A Dave/Tina Admin HR SS
- 1 ~Re uulTCouncil[Meetin o C!21
12 Modification of water rates for 1" service Mike PW NEW
13 Resolution re: responsible banking policy Barbara Recorder RES
14 Public Hearin on Annual CDBG Grants Awards Bill CD PH
[4S5] ~St'ud'ISessbn infSiski ou Room C~sl
0161-Re uularlConcillMeti~ 41,16J
15 Presentation by Michael Cavallaro of RVCOG's annual report Admin PRES
Dave
116 Firewise Week Proclamation John Fire PROC
17 Annualappointment s for commissions/committees Barbara Recorder CONS
16 Annual report on came (Terry) Police CONS
19 Possible resolution continuing the ad hoc steering committee on CD CONS
homelessness Bill
C/:_ feud etTGom'mit-teeMEconT&TCuultual raT ntTeviewl~ ~l[1®i _ C.1 7A
EA Bud etTGommitteeMEcon &TCultuTal rants reviews ®®i ® 01.81
[§t6] Stud Session in Siski ou Room ~ tl• Is'6A
[5nl ~Reguuuinrr COUncilTMeeting IsOI
[5120]ud'TSeasion iilTSiskiROOm~~~~~~~~~~~ ~~~[5i2g1
[5r23l ~Re uiZCouncilTMeeti
p dcQ ; . u1ea,` tn~'~w ~U C ,,gyp - QYy Foy' c~rR~q revloxi ~04 tics AZL
• City of Ashland Co eeting Look Ahead .
*****THIS IS A DRAFT ABJECT TO CHANGE*****
Responsible 3111 3fl 8 3/19 3120 3121 411 412 4115 4116 4117 4118 S16 59 5120 $121 613 614 617 6/18
Stud Session In Siski ou ROOm ~~~~~~(sE37
x614 ~Re War Gounci11Meetin K6/4
20 Public hearing on ordinance to levy taxes for FY14&15 (Lee) Finance PH
ORD-t ORD-2
21 System development charges update for water, sewer, and PIN PH
transportation Mike
22 Resolution to qualify for state revenues Lee Finance RES
23 Resolution to receive state revenues Lee Finance RES
24 Resolution setting appropriations Lee Finance RES
25 Resolution adopting rate increases for all enterprise funds, as Finance PW RES
approved in the budget process Lee/ Mike/ Mark Electric
Stud Session in Siski ou Room' ~1'/
Ce Re ula7COunciliMeeti"~® r>/.e
26 Public hearing on ordinance to levy taxes for FY14&15 Lee Finance ORD-2
-Lon Ter Us..io'it~ ®®~~®S®~® I®OO®®®-
Telewm Frantliise NpreemeMS 6 Rght o1 Way Usape
D¢wssion of repulamq Me grown, or medical manryana in «silennal areas
Ominance Maness Mashes VRDO round,
Day use toothy for houneless
oiswssian of dlretllon to seat for study of water ram structure that rewards wnsefvafmn am
help mr lowmcooq indwiduals wire .,or bins
Page 2 of 2 - 227/2013
CITY OF
ASHLAND
Council Communication
March 4, 2013, Study Session
Council evaluation and prioritization of goals and objectives for the 2013-2015
biennial budget
FROM:
Dave Kanner, city administrator, dave.kanner@ashland.or.us
SUMMARY:
The City Council held a goal-setting session on February 2, 2013, at which it developed a set of draft goals
and objectives for the coming biennium. The department heads have reviewed this draft and developed
actions and tactics that can be employed to achieve the objectives. Many of these actions will require that
new resources be budgeted next year and therefore need to be prioritized in advance of budget
development. Other objectives have no actions attached to them because the City, within its current
structure, does not have the dedicated capacity to address them and these objectives warrant re-evaluation.
BACKGROUND AND POLICY IMPLICATIONS:
Attached to this Council Communication is the draft of the goals and objectives developed by the Council
at its February 2nd goal-setting session with staff-developed actions and tactics incorporated.
Accomplishing many of these actions, thereby achieving the Council's objectives, will require the
appropriation of resources in the next biennial budget. At the study session, I plan to engage the Council in
a prioritization exercise that will provide guidance for choosing between competing demands for resources
as we put the budget together. The objectives that need to be prioritized are as follows:
Review the Emergency Preparedness Plan to include food security and other shortages of
necessities. (General Fund)
Mitigate fire hazards in the urban interface (General Fund)
• Reduce risks of fire in the city via weed abatement and Firewise landscaping and building practices
(General Fund)
O Provide modern, fully equipped facilities and vehicles for city public safety functions (General
Fund)
Deliver timely life-cycle capital improvement projects (Enterprise Funds)
• Examine and improve communication tools used to communicate with the public (Central Services
Fund)
• Examine the anticipated impacts of climate change on city infrastructure (Enterprise Funds)
• Develop a fee/rate structure that encourages conservation and pays the bills (Enterprise Funds)
• Establish a permanent jobs commission (Economic Development Dept.)
• Implement Level I implementation strategies of the Economic Development Plan as approved by
Council (Economic Development Dept.)
Pagel of 2
Ir,
CITY OF
ASHLAND
There are also three objectives that would appear to be Mayor/Council direct responsibilities. Staff can
provide support as necessary, but Council is arguably the lead for the following:
• Support and assist foundational relationships with community partners
• Review and evaluate current commissions for their mission and feasibility
• Improve communication between commissions and Council
The Parks Department has developed its own goals and objectives with the idea that they will be blended
into the City's Goals and objectives at a special meeting of the City Council and Parks Commission on
March 11. In addition, the Parks Department has identified numerous tactics and actions that can be
applied to the City Council's goals. A complete list of actions and tactics developed by the departments
will be forwarded under separate cover.
FISCAL IMPLICATIONS:
N/A
STAFF RECOMMENDATION AND REQUESTED ACTION:
This item is for discussion only. Assuming Council consensus on a final draft, Council may also wish to
discuss how best to solicit public input. A joint meeting with the Parks Commission is scheduled for
March 11 to discuss melding Commission goals and Council goals.
SUGGESTED MOTIONS:
N/A
ATTACHMENTS:
Draft 2013-15 goals
Page 2 of 2
~r,
DRAFT
City Council Goals
2013
PUBLIC SAFETY GOAL L P11
Public safety and other city agencies, along with the community, collaborate effectively t
ensure security for all and improve overall livability. C,~ A
Obiectives• ~JJ~I'~~"' l/" ~
O Increase safety and security downtown - ~ - ((tjftjyLl(1'l/~ N 14 W7t'
• Review the Emergency Preparedness Plan to include food security and other shortages ofm
necessities
• Mitigate fire hazards in the urban interface
• Reduce risks of fire in the city via weed abatement and Firewise landscaping and building
practices
• Improve public communication and community partnerships re: public safety policies and
best practices
• Provide modern, fully equipped facilities and vehicles for city public safety functions
MUNICIPAL INFRASTRUCTURE GOAL
Collaborate with the community to ensure safe, cost-effective, and sustainable public
services, facilities and utilities to meet the urgent, immediate and future needs of Ashland.
Obiectives•
• Examine the anticipated impacts of climate change on city infrastructure
• Evaluate all city infrastructure regarding planning, management, and financial resources
• Implement the conservation plan for water and complete the 10-year plan for electric
• Promote conservation as a long-term strategy to protect the environment and public utility
needs
• Maintain existing infrastructure to meet regulatory requirements and minimize life-cycle
costs
• Deliver timely life-cycle capital improvement projects
• Maintain and improve infrastructure that enhances the economic vitality of the community
• Develop a fee/rate structure that encourages conservation and pays the bills
COMMUNITY QUALITY OF LIFE GOAL
Anticipate and identify opportunities to provide for the physical, social, economic, and
environmental health of the community.
Obiectives•
• Minimize the incidence and impacts of homelessness
• Provide opportunities for the poor to thrive and not just survive in Ashland
• Increase the number of internet-based businesses by 50% in two years
• Investigate land-use and funding strategies that provide affordable and workforce housing
units
• Support and assist foundational relationships with community partners
• Establish a permanent jobs commission
• Implement Level I implementation strategies of the Economic Development Plan as
approved by Council
• Review the Downtown Plan including zoning of areas around downtown and create a
roadmap for the future planning of downtown
• Encourage private development of affordable housing options
• Analyze the impacts of increased preservation of historic buildings in Ashland
ORGANIZATION AND GOVERNANCE GOAL
Provide high quality and effective delivery of the full spectrum of city service and
governance in a transparent, accessible and fiscally responsible manner.
Obiectives:
• Examine and improve communication tools used to communicate with the public
• Improve budget and financial reports to be clear, realistic, and effective
• Review and evaluate current commissions for their mission and feasibility
• Improve communication between commissions and Council
• Ensure the efficient and effective use of technology to enhance customer satisfaction
• Ensure the availability of front-line personnel for customer contact during business hours
DRAFT
City Council Goals
2013
PUBLIC SAFETY GOAL
Public safety and other city agencies, along with the community, collaborate effectively to
ensure security for all and improve overall livability.
Obiectives•.
• Increase safety and security downtown
Use a grant and reassignments this year in order to have close to seven days per week coverage
by a dedicated officer in the downtown during the summer.
Fill budgeted but vacant patrol officer position.
Increase park patrol (Parks)
• Review the Emergency Preparedness Plan to include food security and other shortages of
necessities
Continue to deliver business continuity training, in partnership with SOU and the Chamber. The
plan is to offer this training to businesses ever two years
• Fiscal Impact- Minimal, less than $2,000
Resume City employee training, which was a basic emergency preparedness training
delivered to all City employees late in 2011. All employees given basic 72-hour kits. The plan is
to review this training every two years.
• Fiscal Impact- Minimal, less than $2000 (may be more if a large number of 72-hor kits
are needed for new employees)
Conduct citizen emergency preparedness training in 2013 to educate the public with our hazard
profile and emergency preparedness suggestions. The workshop will also provide citizens the
opportunity to "build" their own 72-hour kits for a minimal fee. The hope is to partner with
several local vendors.
• Fiscal Impact- Not yet developed but should be under $4000, needs funding approval
Pursue grants for opportunities identified in the Natural Hazard Mitigation Plan Fiscal Impact-
Depends on grant requests, most hazard mitigation grants require an equal match, some allow
for in-kind contributions.
Continue periodic exercises involving the City's EOC along with major stakeholders such as ACH,
SOU, ASD, etc.
• Fiscal Impact - approximately $6000 to $9000 annually, needs funding approval
Provide for city employees basic emergency supply needs. During long-term events there is a
value to having basic supplies for the employees on site as well as the call-back members.
• Fiscal Impact - $15,631 for basic food and water, $33,297 for food, water, personal
items, sleeping equipment, protective equipment, needs funding approval
• Mitigate fire hazards in the urban interface
Continue the AFR wildfire mitigation project
• Fiscal Impact-$1,000,000 per year for the next four years for project completion. Costs
to be shared by the Stewardship partners. There will be a cost of maintenance of approximately
$175,000 annually to maintain the status of the watershed after completion of this AFR project,
plus additional areas to be identified later. Needs funding approval
Expand the Wildfire Hazard Zone to include the entire City.
• Fiscal Impact - As this requires a public hearing and notifications there will be costs
associated with that, approximately $1,500
• Currently planned to come to Council in the 2013 calendar year
Introduce and implement the Fire Adapted Communities program through Firewise which will
start the process of regulating construction and vegetation in the community.
• Fiscal Impact - $10,000 annually, needs funding approval
• Planned for 2013 to start and will be ongoing
Launch the "Map your Firewise Neighborhood" program.
• Fiscal Impact- Not yet clear, likely around $8,000 to $10,000. A grant application has
been submitted to cover the first year's costs. We're awaiting the answer.
• Planned for calendar year 2013 and will be ongoing
Continue fuels reduction efforts in parks and on parks-maintained lands (Parks)
Work with AFR to identify trails that could be used as fire breaks (Parks)
• Reduce risks of fire in the city via weed abatement and Firewise landscaping and building
practices
Continue Conservation Division assistance/coordination of Firewise landscaping program
Maintain the weed abatement officer and/or reinstate the fire inspector.
• Fiscal Impact - $15,000 annually for weed abatement officer only and an additional $63,500
annually. The inspector would be able to bring in some income through inspections fees,
amount estimated to be $10,000 to $14,000. Needs funding approval
Mow undeveloped parks twice prior to fire season to ensure safe environment (Parks)
Provide firewise example for landscaping at Parks office and other buildings (Parks)
Promote firewise landscaping through activity guide. (Parks)
• Improve public communication and community partnerships re: public safety policies and
best practices
Fire Department exploring a program that we'll call "Ashland Checking In" that will provide for
periodic contact with qualifying seniors.
• Fiscal impact will be very small.
APD will continue and strengthen partnerships with SOU, Community Works, Ashland School
District and SART.
Crisis Intervention Training with Jackson County mental health and the local branch of NAMI.
APD to host or attend four to six community meetings a year
Publish directors message that features safety issues in parks (Parks)
Maintain department safety committee and participate in city wide safety committee (Parks)
• Provide modern, fully equipped facilities and vehicles for city public safety functions
Finish the police station remodel
Replace the in-car video system (APD).
Replace all in-vehicle computers (APD).
Acquire two new fire engines to reduce down time due to our two oldest Type 1 engines
(structure firefighting) mechanical failures.
Fiscal Impact-
- First engine -funded through vehicle replacement fund, will be purchased this FY and
delivery next FY
Second engine - partially funded through vehicle replacement fund
Aerial Ladder- approximately $900,000 with a 25 year life
Determine the feasibility of developing a more effective and efficient facility for the Electric Dept.
and if feasible, finish the project.
In collaboration with public safety departments, plan and staff resources for the use of information
systems technologies in safety facilities and vehicles.
MUNICIPAL INFRASTRUCTURE GOAL
Collaborate with the community.to ensure safe, cost-effective, and sustainable public
services, facilities and utilities to meet the urgent, immediate and future needs of Ashland.
Obiectives•
• Examine the anticipated impacts of climate change on city infrastructure,
Current tactic: Monitor climate change assumptions/impacts as outlined in the 2012
adopted Water Master Plan
Amend the current storm water master plan to include a climate change evaluation at an estimated
cost of $160,000.
J .
Recommend new rate structure to fund high priority projects identified in the climate change
assessment.
Use the completed storm water master plan's climate change impact assessment to develop a
threat analysis of transportation facilities within impacted drainage ways.
Identify specific climate change related capital projects and subsequent funding options.
Use the completed storm water master plan's climate change impact assessment to study and
complete a wastewater flow sensitivity analysis at an estimated cost of $8,000.
Identify specific climate change related capital projects and subsequent rate adjustments for
funding purposes.
Use completed storm water master plan's climate change impact assessment to evaluate potential
risk to city facilities located within established flood areas.
Identify specific climate change related capital projects and potential funding options.
f
Implement systems to provide data, monitoring and grooming of electric demand.
Complete electric system GIS and inventory mapping.
Complete implementation of SCADA for the primary distribution system.
Develop a Smart Grid plan for the Electric Utility.
Complete a Ten Year Plan for the Electric Department to include the consumption effects caused by
anticipated environmental factors. Determine the effects on electrical infrastructure and how the
affects can be mitigated.
Update IT infrastructure to support current and future data acquisition, monitoring and control
systems for city systems/resources.
Develop a robust, commercial grade network to enable advanced city reporting and control of
monitored resources.
• Evaluate all city infrastructure regarding planning, management, and financial resources
Monitor and adjust the 2012 water master plan planning, management and financial plan
assumptions.
Complete the storm water master plan update which includes planning, management and financial
planning.
Monitor existing pavement management assessments of the system and complete a financial
assessment of the street users fee to determine if funding levels are adequate to maintain the
transportation system at adequate levels.
Continue to apply for federal and state grants to fund capacity related capital projects.
Add a financial component to the adopted facilities master plan
Develop spreadsheet schedule for deferred maintenance projects identifying projected years and
costs of repairs (Parks)
Electric Department
Complete a Ten Year Capital Plan to ensure the safe, reliable and efficient operation of the electric
system. s'
Implement the new Ten Year Capital Plan.
Implement technological resources to monitor, control and report system performance. Complete
system GIS and inventory mapping. Complete implementation of SCADA for the primary distribution
system.
Complete the inventory of the electric infrastructure and ensure the data resides in the City
standard GIS and data management systems. Develop standard reporting and metrics to measure
system performance.
Telecommunications Division
Conduct biannual testing of existing telecommunications network. Complete all life cycle repair and
replacement of network components.
Complete a Five Year Capital Plan to ensure the safe, reliable and efficient operation of the
telecommunications network.
Complete a five year business plan for Telecommunications Division focused on quality/type of
services, markets, financial stability, and long term growth.
Information Systems Division
Complete a five year plan for Information Systems Division focused on establishing optimal
capability, reliability, technologies, applications, security, user services, long term growth and
financial impact.
Implement the five year plan.
Implement robust network security management, monitoring and control system.
• Implement the conservation plan for water and complete the 10-year plan for electric
Continue existing water conservation program .
Implement smart controller pilot program for large irrigation user customers. (In CIP for FY'15).
Develop on-line water audit tool to allow City water account holders to provide self analysis of
consumption history/patterns, identify programs, tips and techniques to reduce consumption.
(Budget impact TBD. May use funds appropriated for .S FTE for software tool instead.)
Build industry-specific programs, i.e. restaurants, hotels, to customize program offerings to
maximize interest/uptake by customer and to maximize water savings
Conservation involvement in Electric 10-year plan as appropriate to assist in conservation related
efforts to mange future demand/infrastructure needs
Work with water and electric utilities to identify conservation tactics (Parks)
Perform a study to analyze the current electrical distribution system and make recommendations
for a ten year capital improvement plan.
Ensure the Ten Year Capital Plan provides for conservation and efficiency in addition to safety and
reliability. Incorporate provisions.in the plan for improving and expanding the present system in
orderto achieve a safe, reliable and cost effective distribution system for current and anticipated
customers.
Regularly review the Ten Year Capital Plan for adequacy and the potential for new techniques and
technologies.
• Promote conservation as a long-term strategy to protect the environment and public utility
needs
Develop a Conservation Communications/Marketing/Outreach Plan to reach all customer segments
(SFR, MFR, Comm, Industrial, rental, etc) and match program offerings to customer segment needs.
On-line software tools for Conservation program; education, outreach and program
participation/uptake. Provides self analysis of consumption history, identifies potential programs to
increase efficiency, promotes all available programs and tracks progress/savings.
• Residential energy
• Residential water
• Commercial energy, water, waste, other (sustainability)
Provide public examples for conservation of water/electric resources using actual park and rec.
practices (Parks)
Continue our "green team" meetings evaluating all of our practices to ensure sensible
environmental considerations are implemented (Parks)
Provide "Green Page" in our activity guides (Parks)
Develop conservation and efficiency incentives through electric rate design and inducement
programs.
Maintain existing infrastructure to meet regulatory requirements and minimize life-cycle
costs
Electric Department
Make capital investments to support demand and maintenance requirements.
Perform and all required safety inspections of the electrical system as routine practice. Inspect for
hazards and right-of-way encroachments through routine patrol. Remedy all violations. Safety
inspections to include overhead lines and other accessible equipment and will encompass fifty
percent of the system each year.
Perform all mandated inspections and remediation such that all facilities are inspected on the
required cyclic basis. Develop systems to provide all equipment, hardware, right-of-way, and
structures are thoroughly examined. according to regulatory requirements (i.e. PUC mandated pole
test and inspection). Maximum cycle length for detailed inspection of electrical facilities and
overhead communication lines will 'not exceed ten years or ten percent of the system per year.
Complete the inventory of the electric infrastructure and ensure the data resides in the City
standard GIS and data management systems. Develop standard reporting and statistics to measure
system integrity and conformance to regulatory requirements.
Develop and maintain regulatory compliance schedules and provide funding to support developed
schedules within the Electric Department.
Telecommunications Division
Conduct regular telecommunications equipment testing to provide more reliable service, optimize
system performance and reduce customer outages.
Conduct all PUC inspections in conformance with PUC inspection schedule. Complete inspections of
all telecommunications infrastructure in Area 6, encompassing the Nevada Substation and A2000
Business circuits in calendar year 2014.
Conduct annual aeronautical signal leakage fly over testing to conform to Federal Communications
Commission rules and regulations and file timely FCC forms and reports verifying
Telecommunications Division compliance.
Conduct routine, weekly drive-by CLI leakage testing to conform to FCC regulatory schedules.
Complete the inventory the telecommunications infrastructure and ensure the data resides in the
City standard GIS and data management systems. Develop standard reporting and statistics to
measure system integrity and conformance to regulatory requirements.
Develop and maintain regulatory compliance schedules and provide funding to support developed .
schedules within the Telecommunications Division.
Information Systems Division
Deploy standardized network upgrades to ensure current and future network performance,
reliability and security. Install systems to ensure secure monitoring and control of network use and
network assets.
Replace under-performing, un-secure equipment and provide for maintenance, licensing and
support.
Identify and consolidate production information systems assets. Implement a full lifecycle
replacement plan for all production information systems.
• Deliver timely life-cycle capital improvement projects
Complete operational sustainability plan to assist in measuring/evaluating complete life cycle costs
of CIP projects
The fire department is currently funding its apparatus fleet through payments into the vehicle
replacement fund. We would like to start this same funding model for much of our capital outlay
equipment that has a known, predictable replacement schedule and cost.
• Fiscal Impact $60,500 annually, needs funding approval
Continue to identify and fund life cycle roof, HVAC, and conservation related replacement projects.
Electric Department
Complete a Ten Year Capital Plan to ensure the safe, reliable and efficient operation of the electric
system.
Implement and fund the new Ten Year Capital Plan.
Provide technological resources to monitor, control and report system performance. Complete
system GIS and inventory mapping. Implement a SCADA system for the primary distribution system.
Complete the inventory of the electric infrastructure and ensure the data resides in the City
standard GIS and data management systems. Develop standard reporting and statistics to measure
system integrity, identify risks and focuses resources.
Information Systems Division
Deploy standardized network upgrades to ensure current and future network performance,
reliability and security. Install systems to ensure secure monitoring and control of network use and
network assets.
Replace under-performing (outdated), un-secure equipment and provide for maintenance, licensing
and support.
Identify and consolidate production information systems assets. Implement a full lifecycle
replacement plan for all production information systems.
• Maintain and improve infrastructure that enhances the economic vitality of the community
Monitor and recommend appropriate adjustments to the adopted 2012 Water Master Plan.
Complete the storm water master planning process and then implement life cycle replacement and
rate adjustment recommendations.
Monitor and adjust pavement management recommendations.
Complete a financial review of the street utility user fee to ensure adequate funding is available to
meet minimum life cycle cost goals.
Focus on bringing park infrastructure up to acceptable levels (Parks)
Electric Department
Implement systems to provide data, monitoring and grooming of electric demand. Complete system
GIS and inventory mapping. Implement a SCADA system for the primary distribution system.
Develop a Smart Grid plan.
Identify and provide new commercial and consumer services through the application of smart grid
technologies.
Telecommunications Division
Develop and fund routine maintenance to provide best in class service reliability and service speeds.
Develop new competitive products and services in response to evolving partner and customer
requirements.
Upgrade equipment, technology and skills to provide best in class fiber services to attract new
businesses and to enhance the competitiveness of existing businesses.
Information Systems Division
Upgrade appropriate network, telephony and systems platforms to ensure the timely and effective
delivery of city services.
• Develop a fee/rate structure that encourages conservation and pays the bills
Current Electric rate/cost of service study should drive improvements for progressive rates similar to
what already exist in water consumption rates. Electric consumption rates could be seasonally
adjusted to mitigate affordability issues with basic needs (heat in winter), but balance "luxury" (AC
in summer)
Complete a detailed water cost of service study at an estimated cost of $50,000.
Complete a detailed wastewater cost of service study at an estimated cost of $30,000.
Complete a detailed storm water cost of service study at an estimated cost of $30,000.
Complete a detailed street user fee cost of service study at an estimated cost of $30,000.
Electric Department
Establish electric rates to provide equitable, reliable, reasonably priced energy. Establish rates to
increase both efficiency and conservation while providing funding for both operating costs and
capital investment.
Telecommunications Division
Establish services mix and rate schedules to ensure the vitality and viability of the
Telecommunications Division.
COMMUNITY QUALITY OF LIFE GOAL
Anticipate and identify opportunities to provide for the physical, social, economic, and
environmental health of the community.
Obiectives•
• Minimize the incidence and impacts of homelessness
Continue to support development of affordable housing as this directly addresses the incidence of
homelessness.
Dedicate up to 15% in annual CDBG funding to support social services that serve homeless
populations.
Continue City Staff support for the Jackson County Homeless Task Force.
Support a Continuum of Care grant to Options for Homeless Residents of Ashland for housing
vouchers.
• Provide opportunities for the poor to thrive and not just survive in Ashland
Expand Ashland Affordable Housing Weatherization and Energy Efficiency Project (Pending award of
CDBG funding - April 2013)
Enhance Staff training through upcoming educational and training opportunities (Complete date -
June 2014)
Provide free recreational experiences in all our parks include opportunities for fitness, socialization,
and education (Parks)
Partner with food and friends to provide low cost meals at the senior center (Parks)
Allow for a homeless shelter in Pioneer Hall (Parks)
Work with RVTD to provide bus passes to low.income.seniors (Parks)
Work with the Parks Foundation to provide scholarships programs (Parks)
Electric Department
Continue funding assistance programs (currently $113k): ALIEAP -Ashland Low Income Energy
Assistance Program, Heat Assistance Program, Senior Discount.
Telecommunications Division
Provide free wireless internet services in the Plaza and in designated shelters. Provide for personal
online activities at no cost to the individual.
• Increase the number of intemet-based businesses by 50% in two years
Develop options to define and measure existing baseline, of internet based businesses. E-
commerce/E-business is a more typical industry term that has some definition but doesn't translate
well to the coding system in place for business license database (NAICS)
Telecommunications Division
Provide a technology infrastructure to retain and attract internet, systems and
application development companies.
Provide economic incentives to attract and retain internet, systems and application
development companies. Attract new business to our community with services,
reliability and support.
In cooperation with Telecommunication Divisions Retail Partners, develop and provide a
robust, competitively priced Enterprise Level cable modem service for small businesses
and home business/offices.
Actively participate with a "New Business Responle Team" within the Ashland Chamber
of Commerce. Reply to inquiries from prospective businesses with a collaborative
response. Promote the AFN brand to prospective new businesses considering relocating
to Ashland. Ensure AFN service options meet the new business's economic and service
requirements.
i
• Investigate land-use and funding strategies that provide affordable and workforce housing
units
Adopt code amendments that encourage additional affordable housing, including accessory
residential units, reduced parking, density bonuses, manufactured housing, small lot and pocket
neighborhoods, etc. (adoption - November 2013)
Establish Vertical Housing Tax Credit zones as a financial incentive to provide housing above
commercial development (Completion date-June 2014).
Evaluate public property/air rights for housing (Complete date -June 2014- Professional Services
• budget for consultant involvement)
Establish stable funding stream for the Housing Trust Fund (Complete date - July 2014; included in
FY2013-2014 Housing Program professional services budget - $10,000)
• Support and assist foundational relationships with community partners
Work with Southern Oregon Land Conservancy to preserve open spaces (Parks)
Seek grants for services provided by Parks and Recreation building on the history of the Taylor
foundation and programs that have support the Nature Center (Parks)
Work with the Ashland Parks foundation to continue seeking support for programs and facilities
(Parks)
Share facilities with SOU and School District (Parks)
Improve individual relationships with ISP Retail Partners through regular meetings and consistent
(longevity) Telecommunications Division leadership. Support bi-lateral growth and success by
actively collaborating to achieve measurable growth goals and retain existing customers.
• Establish a permanent jobs commission
Increase coordination/participation with Rogue Valley Workforce Partnership, Job Council or SBDC
to provide Ashland-centric recommendations for regional partners. (Budget impact: $5,000 for staff
support from Rogue Workforce Partnership)
• Implement Level I implementation strategies of the Economic Development Plan as
approved by Council
Six of seven Priority I actions complete. Recommend priority II strategies to work on along with
newly identified actions suggested/approved by Council
• Review the Downtown Plan including zoning of areas around downtown and create a
roadmap for the future planning of downtown
Examine an increase in the downtown building height standard as an incentive for new development
and re-development (Complete date-November 2013).
Analyze benefits of expanding C-1-D, Downtown zoning overlay (Complete date -June 2014).
Implement ways to increase public parking through parking management strategies and examine
potential locations to increase supply without impacting the downtown's character (Complete date
-January 2015; Professional Service budget for consultant Parking Turnover Study)
Conduct a financial feasibility, financing and funding analysis for implementation of the
comprehensive parking management strategy (Complete date-January 2015; Professional Services
budget for consultant review)
• Encourage private development of affordable housing options
Establish Vertical Housing Tax Credit zones as a financial incentive to provide housing above
commercial development (Completion date -June 2014).
Adopt code amendments that encourage•additional affordable housing, including accessory
residential units, reduced parking, density bonuses, manufactured housing, small lot and pocket
neighborhoods, etc. (adoption - November 2013)
Evaluate public property/air rights for housing (Complete date-June 2014-Professional Services
budget for consultant involvement)
• Analyze the impacts of increased preservation of historic buildings in Ashland
Continue discussions for potential joint program between Conservation and Planning to provide
energy efficiency incentives for voluntary participation in historic preservation projects
Increase public education materials for promotion of historic building preservation (Complete date-
September 2013
Target future Certified Local Grant (CLG) projects to meet Goal objective of increased building
preservation (Complete date -January 2014)
Examine zoning barriers and incentive based measures related to building preservation, and enact a
review process for any exterior alteration to all "contributing" residential structures (Complete date
- August 2015)
Work with Historic Commission to provide historic resource information within Lithia Park and other
park managed properties (Parks)
ORGANIZATION AND GOVERNANCE GOAL
Provide high quality and effective delivery of the full spectrum of city service and
governance in a transparent, accessible and fiscally responsible manner.
Obiectives•
• Examine and improve communication tools used to communicate with the public
Conduct a communication audit of existing communication tools to identify strengths and
weaknesses
Subscribe to Open City Hall to provide online citizen involvement (Budget impact: $4,500/yr.)
Enhance efforts to heighten awareness of the city website -the city's primary communication tool
Provide more advance notice to staff and commissions on City Source deadlines
Continue to train staff to post information on the website, to utilize outreach efforts, to identify
target audiences, to market city programs etc.
Continue to explore multimedia options to further communication efforts
Continue to keep the media, city employees, commissions and the community apprised of city
issues, news and programs
Create additional zoning and development services informational handouts (Compete date-June
2014; carryover from FY2012-2013 Budget to FY2013-2014 Budget-$7500)
Expand information provided in the three-times yearly activity guide to provide information to the
community (Parks)
• Improve budget and financial reports to be clear, realistic, and effective
Biennium '13215 budget document to include improved narratives and performance measures tied
to actions listed in these goals and objectives.
Continue working on quarterly financial reports as necessary.
Continue to earn GFOA distinguished presentation awards for budget and CAFR.
• Review and evaluate current commissions for their mission and feasibility
City Council
• Improve communication between commissions and Council
City Council
• Ensure the efficient and effective use of technology to enhance customer satisfaction
Develop a Conservation Communications/Marketing/Outreach Plan to reach all customer segments
(SFR, MFR, Comm, Industrial, rental, etc) and match program offerings to customer segment needs.
Online software tools for Conservation program; education, outreach and program
participation/uptake. Provides self analysis of consumption history, identifies potential programs to
increase efficiency, promotes all available programs and tracks progress/savings.
• Residential energy
• Residential water
• Commercial energy, water, waste, other (sustainability)
Implement modern telephony based systems to enhance the customer experience, increase
productivity and increase efficiency.
Identify and consolidate production information systems assets. Implement a full lifecycle
replacement plan for all production information systems.
• Ensure the availability of front-line personnel for customer contact during business hours
Analyze effectiveness of hands-free phone devices for Building Inspectors to improve efficiency
(Complete date -August 2013; Included in FY2013-2014 Budget)
Analyze the operational capacity and effectiveness of expanding Community Development's "one
stop" over-the-counter permits service (Complete date-August 2013)
Implement a new telephony/voice mail system to support distributed call center functionality within
city structure and capabilities.
As part of five year plan, identify opportunities where technology can be leveraged to enhance the
customer experience.
CITY OF
ASHLAND
Council Communication
March 4, 2013, Study Session
Council discussion of a revised proposal for a help center in Ashland
FROM:
Dave Kanner, City Administrator, kannerd e,ashland.or.us
SUMMARY
Councilor Marsh, with input from Mayor Stromberg and City Administrator Dave Kanner, has
prepared a concept paper (attached) that outlines how the City might structure a help/resource center
for those in need in Ashland. If approved by the Council, this could form the basis of a grant
solicitation to social service agencies interested in providing this service. The solicitation would offer
$50,000 a year for two years to a qualified grant recipient. The successful grantee would be required
to provide information and referral to existing assistance available in the community and on-site case
management; mental health and substance abuse counseling/assessments; housing assistance; credit
counseling; and job skills assessments/employment preparation. Other services, such as showers, mail
drop, internet access, etc., would be optional but not required.
Council is asked to provide direction to staff on whether to prepare and distribute a grant solicitation.
BACKGROUND AND POLICY IMPLICATIONS:
The idea of providing a resource center for the homeless and those at risk of homelessness has been
long-discussed in Ashland. At Council's direction, staff last year prepared a public solicitation for a
qualified social service provider to come to Ashland and establish a resource center for the homeless
and others in need. The solicitation offered a grant of up to $50,000 per year for two years to cover
lease and other facility costs for such a center. The City received no responses to this solicitation.
At its study session on January 14, 2013, the Council agreed that staff would work with the Mayor and
Councilor Marsh to prepare a revised proposal for a help/resource center for the homeless, those at risk
of becoming homeless and others in need in Ashland. Under this newest iteration, the grant recipient
would be required to provide information and referral to existing assistance in the community and
assure the provision of case management, mental health/substance abuse counseling, housing
assistance, credit counseling and job skills assessments through qualified individuals and community
agencies that are already providing these services. Optional services include such things as mail drop,
intemet access, secure storage, distribution of bus tokens, non-prepared food items and showers.
Unlike the last grant solicitation, which offered $50,000 a year for two years for facility costs only, this
proposal would allow the $50,000 to be used for operations. A grant applicant could propose a non-
site based model.
Page 1 of 2
CITY OF
ASHLAND
FISCAL IMPLICATIONS:
Approx. $50,000/yr. for two years. Funds have not been appropriated for this purpose in the current
fiscal year.
STAFF RECOMMENDATION AND REQUESTED ACTION:
This item is on the study session agenda for discussion only. If the Council wishes to pursue this
course of action, it can provide staff direction to prepare a new grant solicitation document.
SUGGESTED MOTIONS:
N/A
ATTACHMENTS:
Conceptual RFP: Help Center
Page 2 of 2
~r,
Conceptual RFP: HELP Center
The City of Ashland will seek proposals from qualified non-profit social service agencies to establish and
coordinate a HELP center providing services to residents at risk of, or experiencing, homelessness. The
City will make grant funding available in an amount up to $50,000 per year for two years to a qualified
grant recipient.
The Concept:
The contracting agency will be responsible for coordinating community volunteers, faith-based
institutions and other social service agencies, to provide services to Ashland residents to minimize the
risk, or impact of, homelessness. HELP Center staff will identify, schedule and manage activities and
will recruit and engage individuals and organizations from the community in a collaborative model of
service delivery.
Required services:
• Information and referral to existing assistance available in the community, i.e. Uncle Foods, local
churches, the Ashland Emergency Food Bank, shelter programs, etc.
• On site case management; mental health and substance abuse counsel ing/assessments; housing
assistance; credit counseling; and job skills assessments/employment preparation. These services
should be provided by qualified individuals and community agencies, including but not limited to
the Maslow Project, Housing Authority, Community Health Center, Department of Human
Services, OnTrack, Community Works, St. Vincent de Paul, the Listening Post, Job Council, the
Consumer Credit Agency, Legal Services, and Salvation Army.
Desired but optional services:
• Basic assistance for those with no permanent address: mail drop; internet access; phone charging;
secure storage.
• Emergency services: distribution of bus tokens, non-prepared food items, blankets, etc.
• Showers
Target audience: The grant recipient shall serve all individuals or families who are currently homeless,
with emphasis on those who are homeless by virtue of involuntary economic displacement, those who are
at risk of becoming homeless or who are otherwise in need. The grant recipient may establish standards
of behavior for users and exclude from the center those who fail to adhere to such standards.
Hours: The center shall be open 20 hours per week during time periods that are accessible to clients.
The center will provide specific and targeted programming that allows clients to efficiently access
services.
Facili : The grant recipient shall be responsible for securing a facility and insurance and on-site staff
and volunteers, all of whom shall be screened and trained by the grant recipient.
Non-facility option: As described, the HELP Center is envisioned as a facility-based program.
However, recognizing the challenges of obtaining an appropriate location, the RFP invites applicants to
submit innovative proposals that provide services in a non-site based model.
Funding: Up to $50,000 will be allocated for two years of operation. Future funding requests will be
incorporated into the city's Human Services grant process.