HomeMy WebLinkAbout2013-0304 Document Submitted at Mtg ANO ICU Municipal Infrastructure Goals Collaborate with the community to ensure safe, cost-effective and sustainable public services, facilities and utilities to meet the urgent, immediate and future needs of Ashland. Objective: Maintain existing infrastructure to meet regulatory requirements and minimize life-cycle costs. Water Fund: Action # 1. Federal Energy Regulatory Commission (FERC) annual reporting for dam Ongoing safety 2 FERC 5-year Part 12 inspection implementation 2013 3 FERC potential failure modes analysis update to current standards 2014 4 FERC security plan compliance verification Annuall 5 Environmental Protection Agency (EPA) permit renewal for total daily 2014 maximum load TMDL 6 EPA sediment removal and annual reporting Annually 7 EPA access road maintenance to Reeder -Annually 8 EPA west fork bride construction 2014 9 Piping Talent Irrigation District TID from Starlite to Terrace Street 2015 10 Oregon Health Authority OHA 3-year sanitary survey review 2014 11 OHA disinfection by-products DBP stage two compliance.. 2013 12 OHA TID taste and odor improvements 2013 13 OHA lead and copper rule LCR revisions 2013 14 OHA CT improvements in distributions stems •2013 15 OHA Source water protection study (Reeder) • 2013 16 OR Water Resources Dept OWRD TID new water rights contract (600 AF 2013 17 OWRD total coliform rule revisions 18 OWRD erchlorate rule 19 OWRD unregulated contaminant rule 20 Reservoir Cleaning 2014/2015 21 Water sampling 2014/2015 22 Backflow program and annual fee Annually 22 Lifec cle replacements of main lines Ongoing 23 Monthly and annual permit reporting Annuall 24 Sampling and lab testing Annually 25 Flow meter and lab equipment calibration Annuall 26 Hazardous materials storage Annually 27 Operator license renewals, testing and training 28 Stream gauge maintenance Annuall 29 Consumer confidence reporting Annually 30 Reservoir algae control Ongoing * Date not yet finalized C:\Documents and Settings\kannerftocaI Settings\Temporary Internet Files\Content.Outlook\G1000PC3\2014 Council Goa Is.docx Stormwater Fund Action # I National Pollution Discharge Elimination System (NPDES) permit renewal 2013 eve five years) 2 TMDL permit renewal ever five ears 2014 3 Annual re ortin for each of the above permits Ongoing 4 Bureau of Reclamation (BOR) Bear Creek biological opinion 2014 - 2018 implementation 5 Community Rating System flood lain manual revisions 2014 6 Climate change analysis 2015 7 FEMA flood lain re-mapping LIDAR TBD 2013 8 Stormwater master plan update 9 Green streets/ low impact development implementation 2013 Wastewater Fund Action # 1 Copper reduction stud and implementation 2014 2 W WTP facilities plan update 2014 3 Outfall relocation and fish screening 2014-2018 4 Stream shading of effluent receiving streams 2014-2018 5 Oxidation ditch shell 2014-2017 6 Monthly and annual permit reporting Annually 7 Sampling and lab testing Annually 8 Flow meter and lab equipment calibration Annually 9 Hazardous materials storage Annuall 10 Operator license renewals, testing and training Annually I1 Stream gauge maintenance Annually 12 Solids disposal Annually 13 Root control and cleaning of lines Ongoing 14 Equipment and infrastructure facilities upkeep Ongoing 15 Lifecycle replacements of main lines Ongoing Street Fund Action # 1 Maintain an overall condition index of 40 and above Ongoing 2 Complete 2.5 miles of slurry seal projects Annually 3 Complete a cost of service evaluation of the street user fees 2014 C:\Documents and Settings\kannerftocal Settings\Temporary Internet Files\Content.Outlook\G1000PC3\2014 COUnCII Cioals.docx