HomeMy WebLinkAbout2013-049 CONT Chg Order #7 - Pilot Rock Excavation
CITY OF
ASHLAND
DEPARTMENT OF PUBLIC WORKS
CONTRACT CHANGE ORDER NO.; #07
PROJECT: N. Main/Wimer/Hersey Intersection Realignment DATE: 02/28/13
LOCATION: Miscellaneous Locations on Project PROJECT NO.: 2002-05
CONTRACTOR: Pilot Rock Excavation, Inc.
You are requested to perform the following described work upon receipt of an approved copy of this document or as described by
the Engineer:
Item No. Description Quantity Unit Amoun[
Additional Work as Requested
1Item #1 (See Attached) 1 LS $ 17,916.50
Total this Change Order $ 17,916.50 g
Previous Change Order $ _37-546 50 +/39 3'/(0.50
Original Contract Total $ -"88545 >70 C-
1111--C7-Revised Contract Total S .6636808 Q~ G~/S~ 66
PERCENT CHANGE OF ORIGINAL CONTRACT -915%
9.8/
The time provided for completion of this contract is increased by no calendar days. This document shall become an amendment to ~ i3
the contract and all provisions of the contract w' ply. ii
Za
Recommended By: 4Dat
Project na" ' I / Approved By: t ~c sC 3 Gt
Public Works Director Date
Accepted By: Pilot Rock Excavation, Inc.
650 E. Pine Street, Suite 102E
Central Point, OR 97502
Vz.F/2Of3
ctor Representative Date
PUB LC wORISrEA'GL~EEBLCG Tel, 541488-5347
pn F.I. 54N9
20 EE.Mln Saw
Ashland, Orego0 975:0 TTY 800-]3535.2V.2900
As FEAR
uuuWlud onus
G:bub-wrkslengW-05 N. Man Hersey Wener Intenectwn ReatlaMfLAdmiMO7-05 Proi Acct Nbrklwok - Consins=n.Asx
N MAIN / WIMER / HERSEY INTERSECTION REALIGNMENT
ADDITIONAL WORK REQUEST (2/18/2013 REVISED BID SCHEDULE)
29-Feb-13
Pay Request: 1
SPEC COMPLETE COMPLETE
ITEM NCt REF. DESCRIPTION QTY. UNIT UNIT COST TO-DATE THIS BILLING AMOUNT
Section 200 Temporary Feature and Appurtances
1 210 Mobilization 1 LS 1000 1 1 $1,000.00
Temporary Protection and
2 225 Direction of Traffic 1 LS 3400 1 1
. $3,400.00
3 280 Erosion Control i IS 300 1 1 $300.00
Section 300 Roadwork
4 305 Construction Survey Work 1 LS 2450 1 1 $2,450.00
5 310 Removal of Curbs 53 LF 12 53 53 $636.00
6 330 Removal of walks and D/W 36 SF 9 36 36 $324.00
7 320 Clearing and Grubbing 1 LS 300 1 1 $300.00
Section 700 Wearing Surfaces
Mountable Concrete C & G
8 759 w/Concrete Apron 54 LF 56 54 54 $3,024.00
9 759 Concrete Walks 95 SF 12.50 95.00 95.00 $1,187.50
Section 900 Permanent Traffic Control and Illumination Systems
10 905 Remove and Reinstall Existing Signs 1 LS 200 1 1 $200.00
Section 1000 Right-of-Way Development and Control
11 1040 Sgal Boxwood 10 @ 75 10 10 $750.00
12 1050 41/2 ft Wooden Fencing 20 LF 58 20 .20 $1,160.00
13 Reconnect Existing Irrigation 1 LS 1500 1 1 $1,500.00
14 1070 Remove and Replace Mailboxes 1 LS 150 1 3 $150.00
15 W high Stack Block Wall 30 LF 42 30 30 $1,260.00
Add. Labor & equipment to
CCD 1 relocate Stack Block Wall 1 LS 275 1 1 $275.00
OVERALL BID TOTAL $17,916.50
Page 1 / 1
ASHLAND CITY O F CAT1 REMIMER
DATE PO NUMBER
20 E MAIN ST. 7/18/2012 10993
ASHLAND, OR 97520
(541) 488-5300
VENDOR: 010462 SHIP TO: Ashland Public Works
PILOT ROCK EXCAVATION (541) 488-5587
650 E PINE STREET SUITE 1028 51 WINBURN WAY
CENTRAL POINT, OR 97502 ASHLAND, OR 97520
FOB Point: Req. No.:
Terms: Net Dept.:
Req. Del. Date: Contact: Mike Fauqht - Karl Johnson
Special Inst: Confirming? NO
.Quantity Unit Description Unit Price Ext. Price
THIS IS A REVISED PURCHASE ORDER
N. Main/Wimer/Hersev Intersection 580,545.00
Realignment Project - Contractor will
complete all work associated work
involved with the completion of this
project including but not limited to
concrete work, asphalt paving,
electrical conduit installation, etc.
COA Public Improvement Contract
Effective date: July 9, 2012
Completion date: September 4, 2012
Insurance/Bonds required/On file
Processed change order 08/07/2012 8,400.00
Change Order No. 1
Processed change order 09/12/2012 8,200.00
Change Order No. 2 -'Revised'
Processed change order 09/12/2012 3,307.00
Change Order No. 3
Processed change order 10/31/2012 33,139.50
Change Order No. 4
Processed change order 10/31/2012 900.00
Change Order No. 5
Processed change order 12/07/2012 1,800.00
Change Order No. 6
Processed change order 03/13/13 17,916.50
Change Order No. 7
SUBTOTAL 637 808.00
BILL TO: Account Payable TAX 0.00
20 EAST MAIN ST. FREIGHT 0.00
541-552-2010 TOTAL 637,808.00
ASHLAND, OR 97520
Account Number Project Number Amount Account Number - Project Number Amount
E 260.08.12.00.70420 E 200205.120 637,808.00
Auth zed Sigrature VENDOR COPY
FORM #10 CITY OF
CONTRACT AMENDMENT APPROVAL REQUEST FORM PAS H LAN D
Request fot a Change Order
Name of Supplier 1 Contractor I Consultant: Pilot Rock Excavation, Inc. Total amount of this
contract amendment:
Purchase Order Number: #10993
Title I Description: N. MainMimer/Hersey Intersection Realignment Project $17,916.50
® Per attached contract amendment
Contract Amendment
Original contract amount $580,545.00 100 % of original contract
Total amount of previous contract amendments $39,346.50 6.8 % of original contract
Amount of this contract amendment $17,916.50 _ 3.0 % of original contract
TOTAL AMOUNT OF CONTRACT .$637,808.00 109.8 % of original contract
In accordance with OAR 137-047-0800: 1) The amendment is within the scope of procurement as described in the solicitation documents, Sole Source no0ce or approval of Special
Procurement. 2) The amendment is necessary to comply with a change in law that affects performance of the contract. 3) The amendment results from renegotiation of the terms and
conditions, including the contract price, of a contract and the amendment is advantageous to the City of Ashland, subject to all of the following conditions: a) goods and services
to be
provided under the amended contract are the same as the goods and services to be provided under the unamended contract b) The City determines that, with all things considered, the
amended contract is at least as favorable to the City as the unamended contract c) The amended contract does not have a total term greater than allowed in the solicitation document,
contract or approval of a Special Procurement. An amendment is not within the scope of the procurement if the City determines that it it had described the changes to be made by the
amendment in the procurement documents, it would likely have increased competifion or affected award of contract
Contract amendment is within the scope of procurement: YES X NO' (If "NO", requires Council approval I Attach copy of CC:)
Sourcing Method:
SMALL PROCUREMENT- Less than $5.000 INVITATION TO BID or COOPERATIVE PROCUREMENT. QRF or
❑ "YES', the total amount of contract and REQUEST FOR PROPOSAL EXEMPTION PURSUANT TO AMC 2.50
cumulative amendments $6,000. ® 'YES', the total amount of cumulative ❑ "YES", the total amount of original contract and
❑ If 'NO', amount exceeding authority requires amendments 25% of original contract amount or cumulative amendments $t00K for Goods &
Council approval. Attach copy of Council $250,000 whichever is less. Services, $75K for Personal Services, < $50K for
Communication. ❑ If'NO", amount exceeding authority requires Attorney Fees.
❑ Exempt- Reason: Council approval. Attach copy of Council ❑ If 'NO', amount exceeding authority requires
Communication. Council approval. Attach copy of Council
❑ Exempt-Reason: Communication.
❑ Exempt -Reason:
INTERMEDIATE PROCUREMENT SOLESOURCE EMERGENCY PROCUREMENT
Goods & Services - $5,000 to $100,000 ❑ 'YES', the total amount of cumulative ❑ Written Findings: Document the nature of the
Personal Services - $5.000 to $75.000 amendments s 25% of original contract amount or emergency, including necessity and circumstances
❑ "YES', the total amount of cumulative $250,000 whichever is less. requiring the contract amendment
amendments s 25% of original contract amount. ❑ If 'NO*, amount exceeding authority, requires ❑ Obtain direction and written approval from City
❑ If 'NO", amount exceeding authority requires Council approval. Attach copy of Council Administrator
Council approval. Attach copy of Council Communication. ❑ If applicable, attach copy of Council
Communication. El Exempt-Reason: Communication
E] Exempt-Reason* El Exempt -Reason:
SPECIAL PROCUREMENT INTERGOVERNMENTAL AGREEMENT
❑'YES', the total amount of original contract and cumulative ❑'YES', the original contract was approved by City Council.
amendments are within the amount and terms initially approved by Provide date approved by City Council: (Dale)
Council as a Special Procurement. If 'NO', Council approval is required. Attach copy of Council Communication.
❑ If"NO", amount exceeding authority requires Council approval. ❑ Contract amendment approved and signed by City Administrator.
Attach co of Council Communication.
Project Number 200205.120 Account Number 260.08.12.00.704200 Account Number
'Expenditure must be charged to f propnate account numbers for the financials to reflect the actual expenditures accurately. Attach extra pages if needed.
us R. ~
Employee Signature: - Department Head Signature: ft"C
(Equal to or greater ta 5, 0
Funds appropriated for currii 1 year: ~ / NO l~K
Finance Director (Equal to or greats an $5,000) - , e
Comments:
G:Ipub-wrks1eng102-05 N. Main Hersey Winner Intersection RealignlA_AdminlCons Vendor (Pilot Rock)IContrad DocumentslChange Orders102-05 Form #10 - Request for a Change
Order -#07.docx