ADDENDUM TO CITY OF ASHLAND CONTRACT FOR GOODS AND SERVICES
Addendum made this 12th day of March, 2013, between the City of Ashland and
Wes Norton aka Roxy Ann Rock.
Recitals:
A. On January 2, 2-13, City and Contractor entered into a "City of Ashland Contract for
Goods and Services (further referred to in this addendum as "the agreement').
B. The parties desire to amend the agreement to Increase the compensation to be paid
to Contractor including slight modifications to the project.
City and Contractor agree to amend the agreement in the following manner:
1. The maximum price as specified in Paragraph 4 of the agreement is increased to
$ 4083.00.
2. The scope of services is modified to include repairing the foundation of the Senior
Center building at the rear entry where the concrete ramp attaches to the
building.
3. Except as modified above the terms of the agreement shall remain in full force
and effect.
CONTRACTOR: n / CITY OF ASHLAND:
BY r2 ~ 4,-% N ✓~c CC- BY ( -
Department Head
Its 2 Date__ _I IL02
DATE -77,
Purchase Order#
Acct. No.:
(For City purposes only)
1- CITY OF ASHLAND, ADDENDUM TO CONTRACT FOR GOODS AND SERVICES
Wes Norton
DBA: Roxy Ann Rock
PO Box 4488
Medford, OR. 97501
Phone: 541-601-7451
Fax: 541-535-6051
www.wesnorton@aol.com
® m o o e e e e o
March 8, 2013
Steve Ennis Architect
PO Box 4051
2870 Nansen Drive
Medford, OR. 97501
RE: Hunter Park Sidewalk Replacement
City of Ashland - Project No. 000029.999
These prices are in addition to the $2,000 left on the contract for the senior ramp.
Addition #1
Attach rails to the concrete according to Ace Engineering detail:
Material $200
Hardware 150
Labor - 16hrs. 800
Previous work - Removing soil from foundation
at entrance to kitchen 150
Overhead/Profit 195 $1495
Addition #2
Install foundation block and grout per discussion on site
03/08/2013 AM.
Material - Block, grout, wood,
Simpson ties $350
Labor - (2) men - 32 hours 3200
Overhead/Profit 533 $4083
A
4
♦ i y
1 r ~a
* R~
t
4 I
1
1
1 k
f.
1.. X91+ I
Y 4
I'
y # scv~a
7 a"~.cmr
wrw ..-a.~"n M~
w
ye ..v~ f ~ ~ ~ 4R Tny vV v 4 ~ +a.
i Wi°Rvra'i•.~~a~yA\„'YM y~
y~~A Y7 ~
S s
S~
6
EXISTING HAND RAIL POST
' 4" SLAB ON GRADE
DRILL THROUGH POST & SEAL WITH #4 AT 16" OC EW
TO PREVENT CORROSION FOR
1/2"0 BOLT & FLAT WASHER
WITH COUPLER & THREADED ROD
EMBEDDED 12" IN SLAB
2-#4 CONTINUOUS AT EDGE
FINISH GRADE COMPACTED
CRUSHED ROCK
eSCALE 1
SCALE 1"=1'-O• TURN DOWN SLAB
BARS
EXISTING HAND RAIL POST
4" SLAB ON GRADE
DRILL THROUGH POST & SEAL WITH #4 AT 16. OC EW
TO PREVENT CORROSION FOR
1/2"0 BOLT & FLAT WASHER
WITH COUPLER & THREADED ROD
EMBEDDED 12" IN SLAB
2-#4 CONTINUOUS AT EDGE
COMPACTED
EXISTING CMU WALL CRUSHED ROCK
FINISH GRADE TURN DOWN SLAB
BARS & LAP WITH
EXISTING BARS
XISTING VERTICAL BARS
eDETAIL
SCALE 1
1•=1'-0•
EXISTING HAND RAIL POST
4" SLAB ON GRADE
DRILL THROUGH POST & SEAL WITH #4 AT 16" OC EW
TO PREVENT CORROSION FOR
1/2"0 BOLT & FLAT WASHER
WITH COUPLER & THREADED ROD
EMBEDDED 12" IN SLAB
2-#4 CONTINUOUS AT EDGE
COMPACTED
CRUSHED ROCK
EXISTING CMU WALL
TURN DOWN SLAB
BARS & DOWEL INTO
EXISTING CMU 4"
FINISH GRADE Fj~rE AT 48" OC
64
OR CITY OF ASHLAND
ACE En ineerin LLC ~p PARKS & RECREATION DEPARTMENT
g HUNTER PARK SENIOR CENTER
P. 0. Box 231, Ashland, Oregon ~SS ALEI1•=1'-O• 9<< T ~P REPLACEMENT
MARCH 7, 2013
Telephone (541) 552-1417 t
X8 RIM BOARD WITH 2-10d
EXISTING SIDING FACE NAILS AT EACH JOIST &
10d TOE NAILS TO SHIM AT 4" OC
10d AT 6" OC
x4 SHIM WITH 10d FACE
ANGLE GALVANIZED NAILS AT 6" OC
METAL FLASHING
ISTING FLOOR SHEATHING
4" SLAB WITH #4
AT 16" OC EW
T 2x8 WITH 1/2"0 ANCHOR
BOLTS AT 32" OC
CONTINUOUS CEMENT BOAR - EXISTING FLOOR JOISTS
15# FELT FROM SIDING
TO BELOW TOP STEM WALL
#4 CONTINUOUS AT TOP
DOWEL INTO EXISTING STEM
SOLID GROUTED WALL 4" MINIMUM
8" CMU BLOCK
a
#4 VERTICAL HOOKED DOWELS
AT 24" OC, ALTERNATE HOOKS HORE EXISTING STRUCTURE
PRIOR TO DEMOLITION OF
CONCRETE FOOTING WITH EXISTING FOUNDATION
3-#4 CONTINUOUS DOWEL m
INTO EXISTING FOOTING 4"
i+f
2'-0"
G DETAIL
tt Pf
64
OR CITY OF ASHLAND
E7ACE En ineerin , LLC PARKS & RECREATION DEPARTMENT
9 9 9 tigy a HUNTER PARK SENIOR CENTER
P. 0. Box 231, Ashland, Oregon ~44JV 7 T RAMP REPLACEMENT
3
Telephone (541) 552-1417 MARCH 7, 2013
GITI t`iCV~y `•mER Page 111
Ashland Park Commission DATE PO NUMBER
20 E MAIN ST. 1/4/2013 00189
ASHLAND, OR 97520
(541) 488-5300 _
VENDOR: 004105 SHIP TO:
ROXY ANN ROCK
PO BOX 4488
MEDFORD, OR 97501
FOB Point: Req. No.:
Terms: net Dept.:
Req. Del. Date: Contact: Bruce Dickens
Special Inst: Confirming? NO
Quantity Unit Descrip tion Unit Price. Ext. Price
THIS IS A REVISED PURCHASE ORDER
Remove, replace sidewalks, stairs and 158,677.00
railing at Hunter Park. *Complete
description in bid documents.
Public Improvement Contract
Signed January 2, 2013
Processed change order 03/01/2013 1,475.00
Scope of services is modified to add
handrail extension and curb replacement
per attached contract addendum dated
February 21, 2013.
Processed change order 03/18/2013 4,083.00
Change Order No. 2
SUBTOTAL 164 235.00
BILL TO: TAX 0.00
FREIGHT 0.00
TOTAL 164,235.00
Account Number - Project Number Amount - Account Number Project Number Amount.
E 411.12.00.00.70420 E 000029.999 164,235.00
Aut rized Signatture/~ VENDOR COPY
I Fo1uvr#lo CITY OF
CONTRACT AMENDMENT APPROVAL REQUEST FORM ASHLAND
Request for a Change Order
Name of Supplier 1 Contractor I Consultant: xLl ip m OC Total amount of this
contract amendment:
Purchase Order Number: CC) 1 `UD'C(
Title )Description: -060V T-9 (L_ PIW-> -51) ea'L111L (2-p-pir, CC. /no-71 f $
❑ Per attached contract amendment
Contract Amendment
Original contract amount $ 159, (ri7?, c-0 100 . % of original contract
Total amount of previous contract amendments 1 ( ?'.o 'o I % of original contract
Amount of this contract amendment ~1 G~`t~J• oo 2 's % of original contract
' ca
TOTAL AMOUNT OF CONTRACT $ l b( 1 2-:J~z S % of original contract
In accordance with OAR 137-047-0800: 1) The amendment is within the scope of procurement as described in the solicitation documents, Sole Source notice orapproval of Special
Procurement 2) The amendment is necessary to comply with a change in law that affects performance of the contract. 3) The amendment results from renegotiation of the tens and
conditions, including the contract price, of a contract and the amendment is advantageous to the City of Ashland, subject to all of the following conditions: a) goods and services
to be
provided under the amended contract are the same as the goods and services to be provided under the unamended contract; b) The City determines that, with all things considered, the
amended contract is at least as favorable to the City as the unamended contract c) The amended contract does not have a total term greater than allowed in the solicitation document,
contract or approval of a Special Procurement. An amendment is not within the scope of the procurement if the City determines that if it had described the changes to be made by the
amendment in the procurement documents, it would likely have increased competition or affected award of contrail.
Contract amendment is within the scope of procurement: YES Y-1 NO' (If "NO", requires Council approval I Attach copy of CC.)
Sourcing Method:
SMALL PROCUREMENT - Less than 5000 INVITATION TO BID or COOPERATIVE PROCUREMENT. QRF or
A"YES", the total amount of contract and cumulative REQUEST FOR PROPOSAL EXEMPTION PURSUANT TO AMC 2.50
amendments s $6,000. ❑ "YES", the total amount of cumulative amendments ❑ "YES", the total amount of original contract and
❑ If "NO", amount exceeding authority requires s 25% of original contract amount or $250,000 cumulative amendments s $100K for Goods & Services, s
Council approval. Attach copy of Council whichever is less. $75K for Personal Services, <$50K for Attorney Fees.
Communication. ❑ If "NO", amount exceeding authority requires ❑ If "NO", amount exceeding authority requires Council
❑ Exempt- Reason: Council approval. Attach copy of Council approval. Attach copy of Council Communiceffon
PERSONAL SERVICES Communication. ❑ Exempt-Reason:
❑'YES", Direct appointments$35,000 ❑ Exempt-Reason:-
El If "NO', requires approval.
INTERMEDIATE PROCUREMENT SOLE SOURCE E ERGENCYPROCUREMENT
Goods & Services - $5,000 to $100.000 ❑ "YES", the total amount of cumulative amendments Written Findings: Documentthe nature of the
Personal Services - $5000 to $75.000 s 25% of original contract amountor $250,000 emergency, including necessity and circumstances
❑ "YES", the total amount of cumulative whichever is less. requiring the contract amendment
amendments 5 25% of original contract amount. ❑ If ❑ If "NO", amount exceeding authority requires ❑ Obtain direction and written approval from City
"NO", amount exceeding authority requires Council Council approval. Attach copy of Council Administrator
approval. Attach copy of Council Communication Communication ❑ If applicable, attach copy of Council Communication
❑ Exempt- Reason: ❑ Exem t-Reason: ❑ Exempt- Reason:
SPECIAL PROCUREMENT INTERGOVERNMENTAL AGREEMENT -
❑ "YES", the total amount of original contract and cumulative amendments are ❑ "YES", the original contract was approved by City Council.
within the amount and terms initially approved by Council as a Special Provide date approved by City Council: (Date)
Procurement If "NO', Council approval is required. Attach copy of Council Communication.
❑ If"NO', amount exceeding authority requires Council approval. ❑ Contract amendment approved and signed by City Administrator.
Attach copy of Council Communication.
Project Number OCCO-2q-A9q Account Number411_ /z OZ-~ 70q?L_D Account Number__-_-__-__- _
'Expenditure must be charged to the appropriate account numbers for the financials to reflect the actual expend hr acc lately. Attach extra pages if needed.
Employee Signature'Fb t.41 weitw Department Head. Signature: I -
quaFtorror greater than $5,000)
City Administrator: '2
1 (Equal to orgraater r $2 '000 or 10%)
s~r
Funds appropriated for current fiscal year Cg / NO g x
Finance Director (Equal oorgreaerthan fs,ooo) 3/f9'?lD
Comments: 7711 9/ ag 4F
Form #10 -Contract Amendment Approval Request Form, Request for a Change Order, Pagel of 1, 3/11/2013