HomeMy WebLinkAbout2013-075 CMAQ Agrmt - ODOT #27871 • Misc. Contracts and Agreements No. 27871 LOCAL AGENCY AGREEMENT CONGESTION MITIGATION AND AIR QUALITY PROGRAM Walker Avenue: Ashland Street to East Main Street THIS AGREEMENT is made and entered into by and between the STATE OF OREGON, acting by and through its Department of Transportation, hereinafter referred to as "State," and the City of Ashland, acting by and through its elected officials, hereinafter referred to as "Agency," both herein referred to individually or collectively as "Party" or "Parties." RECITALS 1. Walker Avenue, Ashland Street and East Main Street are parts of the Agency street system under the jurisdiction and control of Agency. 2. By the authority granted in Oregon Revised Statutes (ORS) 190.110, 366.572 and 366.576, State may enter into cooperative agreements with counties, cities, and units of local governments for the performance of work on certain types of improvement projects with the allocation of costs on terms and conditions mutually agreeable to the contracting parties. NOW THEREFORE, the premises being in general as stated in the foregoing Recitals, it is agreed by and between the Parties hereto as follows: TERMS OF AGREEMENT 1. Under such authority, State and Agency agree to fund, design and construct sidewalks, bicycle lanes and improvements to the rail crossing on Walker Avenue, hereinafter referred to as "Project." The location of the Project is approximately as shown on the sketch map attached hereto, marked "Exhibit A," and by this reference made a part hereof. 2. This Project shall be conducted as a part of the Congestion Mitigation and Air Quality (CMAQ) Program under Title 23, United States Code. The total Project cost is estimated at $666,694, which is subject to change. The CMAQ funds are limited to $666,694. Eligible costs for the Project will be reimbursed at the full federal share or until the $666,694 limit is reached. Agency shall be responsible for any portion of the Project which is not covered by federal funding. Agency shall be responsible for determining the amount of federal funds to be applied to each phase of the Project. Agency is not guaranteed the use of unspent funds for a particular phase of work. It is Agency's responsibility to notify State in advance of State obligating the funds for Key No. 17249 02-17-11 Agency/State Agreement No. 27871 a subsequent phase if Agency wants to release funds on the current authorized phase(s) of work. 3. The federal funding for this Project is contingent upon approval by the Federal Highway Administration (FHWA). Any work performed prior to acceptance by FHWA or outside the scope of work will be considered nonparticipating and paid for at Agency expense. 4. State considers Agency a subrecipient of the federal funds it receives as reimbursement under this Agreement. The Catalog of Federal Domestic Assistance (CFDA) number for this Project is 20.205, title Highway Planning and Construction. 5. Agency shall require its contractor(s) and subcontractor(s) that are not units of local government as defined in ORS 190.003, if any, to indemnify, defend, save and hold harmless the State of Oregon, Oregon Transportation Commission and its members, Department of Transportation and its officers, employees and agents from and against any and all claims, actions, liabilities, damages, losses, or expenses, including attorneys' fees, arising from a tort, as now or hereafter defined in ORS 30.260, caused, or alleged to be caused, in whole or in part, by the negligent or willful acts or omissions of Agency's contractor or any of the officers, agents, employees or subcontractors of the contractor ("Claims"). It is the specific intention of the Parties that State shall; in all instances, except for Claims arising solely from the negligent or willful acts or omissions of State, be indemnified by the contractor and subcontractor from and against any and all Claims. 6. Any such indemnification shall also provide that neither Agency's contractor and subcontractor nor any attomey engaged by Agency's contractor and subcontractor shall defend any claim in the name of the State of Oregon or any agency of the State of Oregon, nor purport to act as legal representative of the State of Oregon or any of its agencies, without the prior written consent of the Oregon Attorney General. The State of Oregon may, at anytime at its election assume its own defense and settlement in the event that it determines that Agency's contractor is prohibited from defending the State of Oregon, or that Agency's contractor is not adequately defending the State of Oregon's interests, or that an important governmental principle is at issue or that it is in the best interests of the State of Oregon to do so. The State of Oregon reserves all rights to pursue claims it may have against Agency's contractor if the State of Oregon elects to assume its own defense. 7. The term of this Agreement shall begin on the date all required signatures are obtained and shall terminate upon completion of the Project and final payment or 2 r Agency/State Agreement No. 27871 ten (10) calendar years following the date all required signatures are obtained, whichever is sooner. 8. This Agreement may be terminated by mutual written consent of the Parties. 9. State may terminate this Agreement effective upon delivery of written notice to Agency, or at such later date as may be established by State, under any of the following conditions: a. If Agency fails to provide services called for by this Agreement within the time specified herein or any extension thereof. b. If Agency fails to perform any of the other provisions of this Agreement, or so fails to pursue the work as to endanger performance of this Agreement in accordance with its terms, and after receipt of written notice from State fails to correct such failures within ten (10) days or such longer period as State may authorize. c. If Agency fails to provide payment of its share of the cost of the Project. d. If State fails to receive funding, appropriations, limitations or other expenditure authority sufficient to allow State, in the exercise of its reasonable administrative discretion, to continue to make payments for performance of this Agreement. e. If federal or state laws, regulations or guidelines are modified or interpreted in such a way that either the work under this Agreement is prohibited or if State is prohibited from paying for such work from the planned funding source. 10.Any termination of this Agreement shall not prejudice any rights or obligations accrued to the Parties prior to termination. 11. The Special and Standard Provisions attached hereto, marked Attachments 1 and 2, respectively, are by this reference made a part hereof. The Standard Provisions apply to all federal-aid projects and may be modified only by the Special Provisions. The Parties hereto mutually agree to the terms and conditions set forth in Attachments 1 and 2. In the event of a conflict, this Agreement shall control over the attachments, and Attachment 1 shall control over Attachment 2. 3 Agency/State Agreement No. 27871 12.Agency, as a recipient of federal funds, pursuant to this Agreement with the State, shall assume sole liability for Agency's breach of any federal statutes, rules, program requirements and grant provisions applicable to the federal funds, and shall, upon Agency's breach of any such conditions that requires the State to return funds to the Federal Highway Administration, hold harmless and indemnify the State for an amount equal to the funds received under this Agreement; or. if legal limitations apply to the indemnification ability of Agency, the indemnification amount shall be the maximum amount of funds available for expenditure, including any available contingency funds or other available non-appropriated funds, up to the amount received under this Agreement. 13.Agency certifies and represents that the individual(s) signing this Agreement has been authorized to enter into and execute this Agreement on behalf of Agency, under the direction or approval of its governing body, commission, board, officers, members or representatives, and to legally bind Agency. 14. This Agreement may be executed in several counterparts (facsimile or otherwise) all of which when taken together shall constitute one agreement binding on all Parties, notwithstanding that all Parties are not signatories to the same counterpart. Each copy of this Agreement so executed shall constitute an original. 15.This Agreement and attached exhibits constitute the entire agreement between the Parties on the subject matter hereof. There are no understandings, agreements, or representations, oral or written, not specified herein regarding this Agreement. No waiver, consent, modification or,change of terms of this Agreement shall bind either Party unless in writing and signed by both Parties and all necessary approvals have been obtained. Such waiver, consent, modification or change, if made, shall be effective only in the specific instance and for the specific purpose given. The failure of State to enforce any provision of this Agreement shall not constitute a waiver by State of that or any other provision. 16. State's Project Manager for this Project is Kelli Sparkman, ODOT Region 3 Local Agency Liaison, 100 Antelope Road, White City, Oregon 97503; (541) 774-6383, or assigned designee upon individual's absence. Agency's Project Manager shall be notified in writing of any contact information changes during the term of this Agreement. 17.Agency's Project Manager for this Agreement is Morgan Wayman, Project Manager, 20 East Main Street, Ashland, OR 97520; waymanm@ashland.or.us; (541) 552- 2414; or assigned designee upon individual's absence. Agency shall notify State in writing of any contact information changes during the term of this Agreement. 4 Agency/State Agreement No. 27871 THE PARTIES, by execution of this Agreement, hereby acknowledge that its signing representatives have read this Agreement, understand it, and agree to be bound by its terms and conditions. This Project is in the 2010-2013 Statewide Transportation Improvement Program, (Key #17249) that was approved by the Oregon Transportation Commission on December 16, 2010 (or subsequently approved by amendment to the STIP). City of Ashland, by and through its STATE OF OREGON, by and through elected officials its a ent of Transportation By High ay Division Administrator Title 7 Date 6th Date By APPROVAL RECOMMENDED Title W w'^~ By 't CMAQ Program Coordinator Date Date OCT 18 2011 APPROVED AS TO LEGAL SUFFICIENCY By By ~ Technical Services Manager/Chief City Attorney Engineer Date - Q/I I Date Agency Contact B?ion Jim Olson R nager Ashland City Engineer 20 East Main Street Date Ashland, OR 97520 (541) 488-5587 APPROVED AS,TO LEGAL jimo@ashland.or.us SUFF~I(T~/gTNCY State Contact: By H/ Atl,, - Kelli Sparkman Assistant Attorney eneral (If over 5 Agency/State Agreement No. 27871 ODOT Region 3 Local Agency Liaiso $150,000) 100 Antelope Road / White City, OR 97503 Date ko, Z~L( (541) 774-6383 Kelli.sparkman@odot.state.or.us 6 Agency/State Agreement No. 27871 EXHIBIT A \1 o au 'cWinst An, E \ i J Project Limits n051 ' 3 _l,' }r =-bwa sl_, \ rJ~W¢A of ~ v II ♦ SwcNSn U.. ty I I: \ i i .I unto parq \ I i E Lee st~ _ ( ~ ~ u ~N a5 vG~' - ~ i ly I YMCI1 Pyr i . ;Websla.$r Q L N y _ C `r{by` f _ ~I t Pa SI_ i) y~Y unu n 'I+~L a ~ , '--~:i ~ /iS11,2'llf~l$ 1. 2 I /~Shld dr$t ` 6G \{.1.$$tl~t' i1 nq I~ ~_Oregon lt- 1~0 ~,I J.Le S<!1 I a i i . k,M:War~' o aSS c 1 b 5 ~i _ 4 n b '-Q t if ma:k I >t: ' oaAs U } sn 'I ! II s 6 II 1 a\`~ e li t'~~ St.9, bp~+ doss ln_. f TI~ Y~o~a JI ,._,•j ez,:a ua." cnir u time: 7 Agency/State Agreement No. 27871 ATTACHMENT NO. 1 to Agreement No. 27871 SPECIAL PROVISIONS 1. Agency or its consultant shall, as a federal-aid participating preliminary engineering function, conduct the necessary field surveys, environmental studies, traffic investigations, foundation explorations, and hydraulic studies, identify and obtain all required permits, assist State with acquisition of necessary right of way and/or easements, and perform all preliminary engineering and design work required to produce final plans, preliminary/final specifications and cost estimates. 2. Upon State's award of the construction contract, Agency, or its consultant, shall be responsible to perform all construction engineering, field testing of materials, technical inspection and project manager services for administration of the contract. 3. State may make available Region 3's On-Call Preliminary Engineering (PE), Design and Construction Engineering Services consultant for Local Agency Projects upon written request. If Agency chooses to use said services, Agency agrees to manage the work performed by the consultant and make funds available to the State for payment of those services. All eligible work shall be a federally participating cost and included as part of the total cost of the Project. 4. Indemnification language in the Standards Provisions, Paragraphs 46 and 47, shall be replaced with the following language: a. If any third party makes any claim or brings any action, suit or proceeding alleging a tort as now or hereafter defined in ORS 30.260 ("Third Party Claim") against State or Agency with respect to which the other Party may have liability, the notified Party must promptly notify the other Party in writing of the Third Party Claim and deliver to the other Party a copy of the claim, process, and all legal pleadings with respect to the Third Party Claim. Each Party is entitled to participate in the defense of a Third Party Claim, and to defend a Third Party Claim with counsel of its own choosing. Receipt by a Party of the notice and copies required in this paragraph and meaningful opportunity for the Party to participate in the investigation, defense and settlement of the Third Party Claim with counsel of its own choosing are conditions precedent to that Party's liability with respect to the Third Party Claim. b. With respect to a Third Party Claim for which State is jointly liable with Agency (or would be if joined in the Third Party.Claim), State shall contribute to the amount of expenses (including attorneys' fees), judgments, fines and amounts paid in settlement actually and reasonably incurred and paid or payable by Agency in such proportion as is appropriate to reflect the relative fault of State on the one hand and of Agency on the other hand in connection with the events which resulted in such expenses, judgments, fines or settlement amounts, as well as any other relevant equitable considerations. The relative fault of State on the one hand and of Agency on the other 8 , Agency/State Agreement No. 27871 hand shall be determined by reference to, among other things, the Parties' relative intent, knowledge, access to information and opportunity to correct or prevent the circumstances resulting in such expenses, judgments, fines or settlement amounts. State's contribution amount in any instance is capped to the same extent it would have been capped under Oregon law, including the Oregon Tort Claims Act, ORS 30.260 to 30.300, if State had sole liability in the proceeding. c. With respect to a Third Party Claim for which Agency is jointly liable with State (or would be if joined in the Third Party Claim), Agency shall contribute to the amount of expenses (including attorneys' fees), judgments, fines and amounts paid in settlement actually and reasonably incurred and paid or payable by State in such proportion as is appropriate to reflect the relative fault of Agency on the one hand and of State on the other hand in connection with the events which resulted in such expenses, judgments, fines or settlement amounts, as well as any other relevant equitable considerations. The relative fault of Agency on the one hand and of State on the other hand shall be determined by reference to, among other things, the Parties' relative intent, knowledge, access to information and opportunity to correct or prevent the circumstances resulting in such expenses, judgments, fines or settlement amounts. Agency's contribution amount in any instance is capped to the same extent it would have been capped under Oregon law, including the Oregon Tort Claims Act, ORS 30.260 to 30.300, if it had sole liability in the proceeding. d. The Parties shall attempt in good faith to resolve any dispute arising out of this Agreement. In addition, the Parties may agree to utilize a jointly selected mediator or arbitrator (for non-binding arbitration) to resolve the dispute short of litigation. 7. Agency shall, at its own expense, maintain and operate the Project upon completion at a minimum level that is consistent with normal depreciation and/or service demand. 8. Maintenance responsibilities shall survive any termination of this Agreement. 9 Agency/State Agreement No. 27871 10 Agency/State Agreement No. 27871 ATTACHMENT NO. 2 FEDERAL STANDARD PROVISIONS JOINT OBLIGATIONS PROJECT ADMINISTRATION 1. State (ODOT) is acting to fulfill its responsibility to the Federal Highway Administration (FHWA) by the administration of this Project, and Agency (i.e. county, city, unit of local government, or other state agency) hereby agrees that State shall have full authority to carry out this administration. If requested by Agency or if deemed necessary by State in order to meet its obligations to FHWA, State will further act for Agency in other matters pertaining to the Project. Agency shall, if necessary, appoint and direct the activities of a Citizen's Advisory Committee and/or Technical Advisory Committee, conduct a hearing and recommend the preferred alternative. State and Agency shall each assign a liaison person to coordinate activities and assure that the interests of both parties are considered during all phases of the Project. 2. Any project that uses federal funds in project development is subject to plans, specifications and estimates (PS&E) review and approval by FHWA or State acting on behalf of FHWA prior to advertisement for bid proposals, regardless of the source of funding for construction. PRELIMINARY & CONSTRUCTION ENGINEERING 3. State, Agency, or others may perform preliminary and construction engineering. If Agency or others perform the engineering, State will monitor the work for conformance with FHWA rules and regulations. In the event that Agency elects to engage the services of a personal services consultant to perform any work covered by this Agreement, Agency and Consultant shall enter into a State reviewed and approved personal services contract process and resulting contract document. State must concur in the contract prior to beginning any work. State's personal services contracting process and resulting contract document will follow Title 23 Code of Federal Regulations (CFR) 172, Title 49 CFR 18, ORS 279A.055, the current State Administrative Rules and State Personal Services Contracting Procedures as approved by the FHWA. Such personal services contract(s) shall contain a description of the work to be performed, a project schedule, and the method of payment. Subcontracts shall contain all required provisions of Agency as outlined in the Agreement. No reimbursement shall be made using federal-aid funds for any costs incurred by Agency or its consultant prior to receiving authorization from State to proceed. Any amendments to such contract(s) also require State's approval. 4. On all construction projects where State is the signatory party to the contract, and where Agency is doing the construction engineering and project management, Agency, subject to any limitations imposed by state law and the Oregon Constitution, agrees to accept all responsibility, defend lawsuits, indemnify and hold State harmless, for all tort claims, contract claims, or any other lawsuit arising out of the contractor's work or Agency's supervision of the project. 11 ' Agency/State Agreement No. 27871 REQUIRED STATEMENT FOR UNITED STATES DEPARTMENT OF TRANSPORTATION (USDOT) FINANCIAL ASSISTANCE AGREEMENT 5. If as a condition of assistance, Agency has submitted and the United States Department of Transportation (USDOT) has approved a Disadvantaged Business Enterprise Affirmative Action Program which Agency agrees to carry out, this affirmative action program is incorporated into the financial assistance agreement by reference. That program shall be treated as a legal obligation and failure to carry out its terms shall be treated as a violation of the financial assistance agreement. Upon notification from USDOT to Agency of its failure to carry out the approved program, USDOT shall impose such sanctions as noted in Title 49, CFR, Part 26, which sanctions may include termination of the agreement or other measures that may affect the ability of Agency to obtain future USDOT financial assistance. 6. Disadvantaged Business Enterprises (DBE) Obligations. State and its contractor agree to ensure that DBE as defined in Title 49, CFR, Part 26, have the opportunity to participate in the performance of contracts and subcontracts financed in whole or in part with federal funds. In this regard, Agency shall take all necessary and reasonable steps in accordance with Title 49. CFR, Part 26, to ensure that DBE have the opportunity to compete for and perform contracts. Neither State nor Agency and its contractors shall discriminate on the basis of race, color, national origin or sex in the award and performance of federally-assisted contracts. Agency shall carry out applicable requirements of Title 49. CFR, Part 26, in the award and administration of such contracts. Failure by Agency to carry out these requirements is a material breach of this Agreement, which may result in the termination of this contract or such other remedy as State deems appropriate. 7. The DBE Policy Statement and Obligations shall be included in all subcontracts entered into under this Agreement. 8. Agency agrees to comply with all applicable civil rights laws, rules and regulations, including Title V and Section 504 of the Rehabilitation Act of 1973, the Americans with Disabilities Act of 1990 (ADA), and Titles VI and VII of the Civil Rights Act of 1964. 9. The parties hereto agree and understand that they will comply with all applicable federal, state, and local laws, regulations, executive orders and ordinances applicable to the work including, but not limited to, the provisions of ORS 279C.505. 279C.515. 279C.520. 279C.530 and 279B.270 incorporated herein by reference and made a part hereof: Title 23 CFR Parts 1. 11, 140, 710, and 771: Title 49 CFR Parts 18. 24 and 26: 2 CFR 225, and OMB CIRCULAR NO. A-133 Title 23, USC, Federal-Aid Highway Act; Title 41, Chapter 1 USC 51-58 Anti-Kickback Act; Title 42 USC: Uniform Relocation Assistance and Real Property Acquisition Policy Act of 1970, as amended and provisions of Federal-Aid Policy Guide (FAPG). STATE OBLIGATIONS PROJECT FUNDING REQUEST 10. State shall submit a. Project funding request to FHWA with a request for approval of federal-aid participation in all engineering, right-of-way acquisition, eligible utility relocations and/or construction work for the Project. No work shall proceed on any activity in which federal-aid participation is desired until such approval has been obtained. The program shall include services to be provided by State, Agency, or others. State shall notify Agency in writing when STDPRO-201 1.doc 12 Rev. 01-18-2011 Agency/State Agreement No. 27871 authorization to proceed has been received from FHWA. Major responsibility for the various phases of the Project will be as outlined in the Special Provisions. All work and records of such work shall be in conformance with FHWA rules and regulations. FINANCE 11. State shall, in the first instance, pay all reimbursable costs of the Project, submit all claims for federal-aid participation to FHWA in the normal manner and compile accurate cost accounting records. Agency may request a statement of costs to date at any time by submitting a written request. When the actual total cost of the Project has been computed, State shall furnish Agency with an itemized statement of final costs. Agency shall pay an amount which, when added to said advance deposit and federal reimbursement payment, will equal 100 percent of the final total actual cost. Any portion of deposits made in excess of the final total costs of Project, minus federal reimbursement, shall be released to Agency. The actual cost of services provided by State will be charged to the Project expenditure account(s) and will be included in the total cost of the Project. 12. If federal funds are used, State will specify the Catalog of Federal Domestic Assistance (CFDA) number in the Agreement. State will also determine and clearly state in the Agreement if recipient is a subrecipient or vendor, using criteria in Circular A-133. PROJECT AC77VI77ES 13. State shall, if the preliminary engineering work is performed by Agency or others, review and process or approve all environmental statements, preliminary and final plans, specifications and cost estimates. State shall, if they prepare these documents, offer Agency the opportunity to review and approve the documents prior to advertising for bids. 14. The party responsible for performing preliminary engineering for the Project shall, as part of its preliminary engineering costs, obtain all Project related permits necessary for the construction of said Project. Said permits shall include, but are not limited to, access, utility, environmental, construction, and approach permits. All pre-construction permits will be obtained prior to advertisement for construction. 15_ State shall prepare contract and bidding documents, advertise for bid proposals, and award all contracts. 16. Upon State's award of a construction contract, State shall perform independent assurance testing in accordance with State and FHWA Standards, process and pay all contractor progress estimates, check final quantities and costs, and oversee and provide intermittent inspection services during the construction phase of the Project. 17. State shall, as a Project expense, assign a liaison person to provide Project monitoring as needed throughout all phases of Project activities (preliminary engineering, right-of-way acquisition, and construction). The liaison shall process reimbursement for federal participation costs. RIGHT OF WAY 18. State is responsible for proper acquisition of the necessary right of way and easements for construction and maintenance of the Project. Agency may perform acquisition of the necessary STDPRO-2011.doc 13. Rev. 01-18-2011 Agency/State r Agreement No. 27871 right of way and easements for construction and maintenance of the Project, provided Agency (or Agency's consultant) are qualified to do such work as required by the State's Right of Way Manual and have obtained prior approval from State's Region Right of Way office to do such work. 19. Regardless of who acquires or performs any of the right of way activities, a right of way services agreement shall be created by State's Region Right of Way office setting forth the responsibilities and activities to be accomplished by each party. State shall always be responsible for requesting project funding, coordinating certification of the right of way, and providing oversight and monitoring. Funding authorization requests for federal right of way funds must be sent through the State's Region Right of Way offices on all projects. All projects must have right of way certification coordinated through State's Region Right of Way offices (even for projects where no federal funds were used for right of way, but federal funds were used elsewhere on the Project). Agency should contact the State's Region Right of Way office for additional information or clarification. 20. State shall review all right of way activities engaged in by Agency to assure compliance with applicable laws and regulations. Agency agrees that right of way activities shall be in accord with the Uniform Relocation Assistance & Real Property Acquisition Policies Act of 1970, as amended, ORS Chapter 35, FHWA Federal-Aid Policy Guide, State's Right of Way Manual and the Code of Federal Regulations, Title 23, Part 710 and Title 49, Part 24. 21. If any real property purchased with federal-aid participation is no longer needed for the originally authorized purpose, the disposition of such property shall be subject to applicable rules and regulations, which are in effect at the time of disposition. Reimbursement to State and FHWA of the required proportionate shares of the fair market value may be required. 22. Agency insures that all Project right of way monumentation will be conducted in conformance with ORS 209.155. 23. State and Agency grants each other authority to enter onto the other's right of way for the performance of the Project. AGENCY OBLIGATIONS FINANCE 24. Federal funds shall be applied toward Project costs at the current federal-aid matching ratio, unless otherwise agreed and allowable by law. Agency shall be responsible for the entire match amount, unless otherwise agreed to and specified in the intergovernmental agreement. 25. Agency's estimated share and advance deposit. a) Agency shall, prior to commencement of the preliminary engineering and/or right of way acquisition phases, deposit with State its estimated share of each phase. Exception may be made in the case of projects where Agency has written approval from State to use in-kind contributions rather than cash to satisfy all or part of the matching funds requirement. b) Agency's construction phase deposit shall be 110 percent of Agency's share of the engineer's estimate and shall be received prior to award of the construction STDPRO-2011.doc 14 Rev. 01-18-2011 Agency/State Agreement No. 27871 contract. Any additional balance of the deposit, based on the actual bid must be received within forty-five (45) days of receipt of written notification by State of the final amount due, unless the contract is canceled. Any unnecessary balance of a cash deposit, based on the actual bid, will be refunded within forty-five (45) days of receipt by State of the Project sponsor's written request. c) Pursuant to ORS 366.425, the advance deposit may be in the form of 1) money deposited in the State Treasury (an option where a deposit is made in the Local Government Investment Pool, and an Irrevocable Limited Power of Attorney is sent to the Highway Finance Office), or 2) an Irrevocable Letter of Credit issued by a local bank in the name of State, or 3) cash. d) Agency may satisfy all or part of any matching funds requirements by use of in- kind contributions rather than cash when prior written approval has been given by State. 26. If the estimated cost exceeds the total matched federal funds available, Agency shall deposit its share of the required matching funds, plus 100 percent of all costs in excess of the total matched federal funds. Agency shall also pay 100 percent of the cost of any item in which FHWA will not participate. If Agency has not repaid any non-participating cost, future allocations of federal funds, or allocations of State Highway Trust Funds, to that Agency may be withheld to pay the non-participating costs. If. State approves processes, procedures, or contract administration outside the Local Agency Guidelines that result in items being declared non-participating, those items will not result in the withholding of Agency's future allocations of federal funds or the future allocations of State Highway Trust Funds. 27. Costs incurred by State and Agency for services performed in connection with any phase of the Project shall be charged to the Project, unless otherwise mutually agreed upon. 28. If Agency makes a written request for the cancellation of a federal-aid project; Agency shall bear 100 percent of all costs as of the date of cancellation. If State was the sole cause of the cancellation, State shall bear 100 percent of all costs incurred. If it is determined that the cancellation was caused by third parties or circumstances beyond the control of State or Agency, Agency shall bear all development costs, whether incurred by State or Agency, either directly or through contract services, and State shall bear any State administrative costs incurred. After settlement of payments, State shall deliver surveys, maps, field notes, and all other data to Agency. 29. Agency shall follow requirements of the Single Audit Act. The requirements stated in the Single Audit Act must be followed by those local governments and non-profit organizations receiving $500,000 or more in federal funds. The Single Audit Act of 1984, PL 98-502 as amended by PL 104-156, described in "OMB CIRCULAR NO. A-133", requires local governments and non-profit organizations to obtain an audit that includes internal controls and compliance with federal laws and regulations of all federally-funded programs in which the local agency participates. The cost of this audit can be partially prorated to the federal program. 30. Agency shall make additional deposits, as needed, upon request from State. Requests for additional deposits shall be accompanied by an itemized statement of expenditures and an estimated cost to complete the Project. STDPRO-201 1.doc 15 Rev. 01-18-2011 Agency/State Agreement No. 27871 31. Agency shall present invoices for 100 percent of actual costs incurred by Agency on behalf of the Project directly to State's Liaison Person for review and approval. Such invoices shall identify the Project and Agreement number, and shall itemize and explain all expenses for which reimbursement is claimed. Billings shall be presented for periods of not less than one-month duration, based on actual expenses to date. All billings received from Agency must be approved by State's Liaison Person prior to payment. Agency's actual costs eligible for federal-aid or State participation shall be those allowable under the provisions of Title 23 CFR Parts 1. 11, 140 and 710, Final billings shall be submitted to State for processing within three (3) months from the end of each funding phase as follows: 1) award date of a construction contract for preliminary engineering (PE) 2) last payment for right of way. acquisition and 3) third notification for construction. Partial billing (progress payment) shall be submitted to State within three (3) months from date that costs are incurred. Final billings submitted after the three months shall not be eligible for reimbursement. 32. The cost records and accounts pertaining to work covered by this Agreement are to be kept available for inspection by representatives of State and FHWA for a period of six (6) years following the date of final voucher to FHWA. Copies of such records and accounts shall be made available upon request. For real property and equipment, the retention period starts from the date of disposition (Title 49 CFR 18.42). 33. State shall request reimbursement, and Agency agrees to reimburse State, for federal-aid funds distributed to Agency if any of the following events occur: a) Right of way acquisition or actual construction of the facility for which preliminary engineering is undertaken is not started by the close of the tenth fiscal year following the fiscal year in which the federal-aid funds were authorized; b) Right of way acquisition is undertaken utilizing federal-aid funds and actual construction is not started by the close of the twentieth fiscal year following the fiscal year in which the federal-aid funds were authorized for right of way acquisition. c) Construction proceeds after the Project is determined to be ineligible for federal-aid funding (e.g., no environmental approval, lacking permits, or other reasons). 34. Agency shall maintain all Project documentation in keeping with State and FHWA standards and specifications. This shall include, but is not limited to, daily work records, quantity documentation, material invoices and quality documentation, certificates of origin, process control records, test results, and inspection records to ensure that projects are completed in conformance with approved plans and specifications. RAILROADS 35. Agency shall follow State established policy and procedures when impacts occur on railroad property. The policy and procedures are available through State's appropriate Region contact or State's Railroad Liaison_ Only those costs allowable under Title 23 CFR Part 646, subpart B and Title 23 CFR Part 140, subpart I, shall be included in the total Project costs; all other costs associated with railroad work will be at the sole expense of Agency, or others. Agency may request State, in writing, to provide railroad coordination and negotiations. However, State is under no obligation to agree to perform said duties. STDPRO-2011.doc 16 Rev. 01-18-2011 Agency/State Agreement No. 27871 UTILITIES 36. Agency shall follow State established Statutes, Policies and Procedures when impacts occur to privately or publicly-owned utilities. Only those utility relocations, which are eligible for federal-aid participation under, the,FAPG, Title 23 CFR 645A, Subpart A and B, shall be included in the total Project costs; all other utility relocations shall be at the sole expense of Agency, or others. State will arrange for utility relocations/adjustments in areas lying within jurisdiction of State, if State is performing the preliminary engineering. Agency may request State in writing to arrange for utility relocations/adjustments lying within Agency jurisdiction, acting on behalf of Agency. This request must be submitted no later than twenty-one (21) weeks prior to bid let date. However, State is under no obligation to agree to perform said duties. 37. The State utility relocation policy, procedures and forms are available through the appropriate State's Region Utility Specialist or State Utility Liaison. Agency shall provide copies of all signed utility notifications, agreements and Utility Certification to the State Utility Liaison. STANDARDS 38. Agency agrees that design standards for all projects on the National Highway System (NHS) and the Oregon State Highway System shall be in compliance to standards specified in the current "State Highway Design Manual" and related references. Construction plans shall be in conformance with standard practices of State for plans prepared by its own staff. All specifications for the Project shall be in substantial compliance with the most current "Oregon Standard Specifications for Highway Construction". 39. Agency agrees that minimum design standards for non-NHS projects shall be recommended AASHTO Standards and in accordance with the current "Oregon Bicycle and Pedestrian Plan", unless otherwise requested by Agency and approved by State. 40. Agency agrees and will verify that the installation of traffic control devices shall meet the warrants prescribed in the "Manual on Uniform Traffic Control Devices and Oregon Supplements". 41. All plans and specifications shall be developed in general conformance with the current "Contract Plans Development Guide" and the current "Oregon Standard Specifications for Highwav Construction" and/or guidelines provided. 42. The standard unit of measurement for all aspects of the Project shall be English Units. All Project documents and products shall be in English. This includes, but is not limited to, right of way, environmental documents, plans and specifications, and utilities. GRADE CHANGE LIABILITY 43. Agency, if a County, acknowledges the effect and scope of ORS 105.755 and agrees that all acts necessary to complete construction of the Project which may alter or change the grade of existing county roads are being accomplished at the direct request of the County. 44. Agency, if a City, hereby accepts responsibility for all claims for damages from grade changes. Approval of plans by State shall not subject State to liability under ORS 105.760 for change of grade. STDPRO-2011.doc 17 Rev. 01-18-2011 Agency/State Agreement No. 27871 45. Agency, if a City, by execution of Agreement, gives its consent as required by ORS 373.030(2) to any and all changes of grade within the City limits, and gives its consent as required by ORS 373.050(l to any and all closure of streets intersecting the highway, if any there be in connection with or arising out of the project covered by the Agreement. CONTRACTOR CLAIMS 46. Agency shall, to the extent permitted by state law, indemnify, hold harmless and provide legal defense for State against all claims brought by the contractor, or others resulting from Agency's failure to comply with the terms of this Agreement. 47. Notwithstanding the foregoing defense obligations under Paragraph 46, neither Agency nor any attorney engaged by Agency shall defend any claim in the name of the State of Oregon or any agency of the State of Oregon, nor purport to act as legal representative of the State of Oregon or any of its agencies, without the prior written consent of the Oregon Attorney General. The State of Oregon may, at anytime at its election assume its own defense and settlement in the event that it determines that Agency is prohibited from defending the State of Oregon, or that Agency is not adequately defending the State of Oregon's interests, or that an important governmental principle is at issue or that it is in the best interests of the State of Oregon to do so. The State of Oregon reserves all rights to pursue any claims it may have against Agency if the State of Oregon elects to assume its own defense. MAINTENANCE RESPONSIBILITIES 48. Agency shall, upon completion of construction, thereafter maintain and operate the Project at its own cost and expense, and in a manner satisfactory to State and FHWA. WORKERS' COMPENSATION COVERAGE 49. All employers, including Agency, that employ subject workers who work under this Agreement in the State of Oregon shall comply with ORS 656.017 and provide the required Workers' Compensation coverage unless such employers are exempt under ORS 656.126. Employers Liability Insurance with coverage limits of not less than $500,000 must be included. Agency shall ensure that each of its contractors complies with these requirements. LOBBYING RESTRICTIONS 50. Agency certifies by signing the Agreement that: a) No federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any federal contract, the making of any federal grant, the making of any federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any federal contract, grant, loan, or cooperative agreement. b) If any funds other than federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any STOPRO-201 1.doc 18 Rev. 01-18-2011 Agency/State Agreement No. 27871 federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions. c) The undersigned shall require that the language of this certification be included in the award documents for all subawards at all tiers (including subgrants, and contracts and subcontracts under grants, subgrants, loans, and cooperative agreements) which exceed $100,000, and that all such subrecipients shall certify and disclose accordingly. d) This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Title 31, USC Section 1352: e) Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. Paragraphs 36, 37, and 48 are not applicable to any local agency on state highway projects. STDPRO-2011.doc 19 Rev. 01-18-2011 PROJECT PROSPECTUS ? s° Part I Project Request (Page 1 of 3) Key Numbec Jurisdiction: - 17249 Local Section: Walker Ave: Ashland St. to East Main St. Region: Area: Dishi t: 3 Ro me Valle Area 08 State Highway No.: Highway Name: Mile Point 0.00 To: 0.00 Length (ml): 0 00 Rom: Urban Cityo MPO: M Within Yes Counly. RoadlSVeel Name: ❑ Rural hla d UGe ❑ No Walker Avenue Route No.: NHS ❑ Yes HPM Applicant (If Other Than Stale): 0 No FC: 17 City of Ashland US Congressional District 2 State Senate District: 03 State Rep. District: 06 Cost Estimates (x St 000) .Pro)ect Components - Right Of Way-; • , „ Preliminary Engineering $133 Grading Files 0 Right of Way Paving x Miles - 0.00 Utility Reimbursement Structures Reloradons 0 Railroad Crossing $250 Signing X Acquisitions 0 n n- ytents $256 Signals - Eusemculs 0 Structures illumination Work By Slate/Consultant/Applicant Signals Sidewalks X Preliminary Engiaeermg (S,CA) C Illumination Rail Crossing X Construction Engineering (S,C,A) C Temporary Protection $5 Right Of Way Descriptions Gn Y P (S.c.A) C Constr. Contingencies $64 Right Of Way Acquisitions (s.C.A) C Constr. Engineering $35 Pro)ect Categooesr Constructed By Envirnnmcutal Class (1,2,3yCE) 2 B Contact ❑ Counly Force -Design Category (1-7) 07 Total CE and 94struetion: ❑ Stale Force ❑ Other $610 Wor Category (1-13) 06 - Total Estimate: $743 Prin 4 STIP Work'rype: CMAQ ❑ City Force Recommended Lel a ny Fednal Fiscal Y¢ar (Quarter-Year): 2nd Qtr 2013 PE Fund: R/W Fund: UR Feud: CECN Fund: L400 L400 PE EA: RNd EA: UR EA: CE-CN EA: Rein ~ Extshng Proposed; ,item 7- Ezlshng Proposed!: Travel Lanes # 2 2 Average Daily'rraffic YR 2003 2011 Structures # 0 0 Throughway YIN N N Signals # 0 0 Bike Way Y/N Y Y Average Daily Traffic # 6050 5000 PROJECT PROSPECTUS a'~,~ (t Part I Project Request (Page 2 of 3) Key Number: Junsdidion: 17249 [.oral Section: Region: Arcs: District: Walker Ave: Ashland S[. to East Main SC 3 Rogue Valley Area 08 De fine The Problem....; c-? There are 3 different schools located on the east side of the street along this stretch of Walker Avenue. Due to the lack of sidewalks on the at side of the street in this area, many students are driven to school. This creates more vehicular traffic, more students in the street and therefore creates potential safety issues. The goal of this project is to increase the number of students that will walk or bike to school and to provide them with a safe route to do so. This will in turn also reduce vehicular traffic and congestion in the areas of the schools. Descnbe.Proposed Solution;Attach Sketch Map n= _ Construct sidewalks along the west side of Walker Ave... from Ashland Street north to East Main Street where none currently exist. improve the rail crossing by installing a new concrete panel crossing for six foot vide concrete sidewalk and five-foot wide bicycle lane on both sides of Walker Avenue. Prepared By: I Date: I O.T.C. Approval Date: I Pmgmm Year. I Appmved Funding Amount: X (07-2001) Peeled Status: STN Approved Monday, August 29, 2011 a PROJECT PROSPECTUS I KayNUmber. urisdzlion: s Part I Projccf Request (Page 3.of 3) 17249 looal Section: Region: Area: Roguc'Valley Arca District: Walker Ave: Ashland St. to East-Main St. '3 - 08 ,~u,*` 74x'. -Project JustiFlcation ~~~liF r,-~a,>_=T. Constructing a safeo route by. which students may walk or bike to school will: decrease traffic volumes and minimize vehicular congestion and. improve pedestrian, and bicycle safety in the areas: of the schools, Addrttonalanformatton For Prgeets Requested"By,-Local'lJunsAtcbons 4„:r=ar t:~..t ..:..a-_ta:m-=rte:.*s{•. Responsihle.Local Office To Be Contacted For The Following'Activities: (Conlact/OlGce) - (Phone) 1. Public Hearing) ciGren Involvement Morgan Wayman 541-552-2414 2: Environmental 7.Planning Bill Molnar 541-552-2042, 3, PnEnginaadng Morgan Wayman 591-552-2414 This Official Request is From- JurMication Name: City of Ashland andto1 Represemed By. Jim Olson BY~/- Remesenledny:, Morgan Wayman BY, Applicable Intergm ernmenlal Agreements:. IGA Number: Jurisdiction Name: Agreement Dale: riAdministrative;Recommeddatiolli1 ! 44~;=, (07-2001). p)olod Sloths: :STIP(Approved Monday; August 29; 2(111 i V PROJECT PROSPECTUS Part 2 Project Details (Page 1 of 2) Key Numbec Jurisdiction: 17249 Local section' Walker Ave: Ashland St. to East Main SL 1 Region: Area: District 3 Rogue Valley Area 08 auer.. S - State C- Consultant A- Applicant E- Existing N- No ACTIVI7YRESPONSIBILITIES PERMITS and CLEARANCES Surplus N Signs C C Airport N C Properly (PSmnanad) Sunni Sewer Clearance wetlands Citizen's C Striping C _ C land Use C Endangered C Advisory (Permanent) Landscaping Actions/Pemuts Species N C C N S Phologramenetry Project Signing Irrigation Flood Plain 1lozrnut Reconnaissance C C N N Historic - C Survey Dauer Borrow Source: Building Resource CA N N Carps Pners/DSL N Dr.Q Indirect N Public Herring Illumination material Source Rcum. Fill Seems Air C C N N UFQ Non-Point N Field Survey RR Crossing Disposal Source Coast Guard Source Wutcr C C S Gwlogyyand N Amliaeology C Vicinity Map RR Pmteelinn Local Agreement Mi.,. Survey • Suils/Gcmah C C N C N Inv¢tigatiun RR Separation Sensitive Laud Signal Warrants - Noise Study N C Vuluc N Utilities C N Hydraulic Study RR Encroachment Engineering (see below) Section t)4) Utility C Utility Verif C Cuurtlinulion Vert Horiz List of Uounes: Right-OGWay Liaison Y Arms Cnmml(YN) CNrtr Had Charter Comrn,Ashland, City of,Pacific Power& = Acqulsthons Relocations _ Light,Avista Utilities,Qwce[ Simple No Complex No. Business No. Residential No. Design SlarWards Design Speeds Excepticn(YM) 0 0 0 0 AASHTO 25 N - Suggested Base_ Design Item New Work Over Existing Item New Work Over Existing Surface (mm) Surfass (mm). Surface (mm Surface (mm dJ: - - - SVUCtures _ _ Structure Us h Width Height Cost Structure Lcnbdh Width Height Cost Approved Area Manager Date ) (07-2001) Pmlecl Status: SfIP Approved Monday, August 29, 2011 PROJECT PROSPECTUS Key Number: Jurisukaon: Part 2 Project Details Page 2 of 3 17249 Local Section: Walker Ave: Ashland St. to Fast Main SL Region: Area: DisbicC 3 Ro e Valle Area 08 Segment or Alternative 1C; Comment on Segment or Alternative: Some existing 5' walk N of RR tracks to East Main Existing (below) Units in F Comment on Existing: -Bike-- Side .Cu Parking ,Gbodder/, .Lane "`Lane lane Median Lane ,Lane., ,Lane =Shoulder/ Parking Curb'::Sxfc -Hike, P,attt ,.i Walk ,Type - Bikelane 3 2 t = t :)t2 3 '81k¢lane _Type Walk PaN 5.00 CG 5.50 11.001 1 11.00 5.501 1 CG 5.00 6.00 CG 5.50 11-001 1 11.00 5.501 1 CG 5.00 Proposed (above) Unite in: F Comment on Proposed: Segment or Alternative 2 Comment on Segment or Alternative: Sonic existing 5' walk S of RR tracks to Ashland St Existing (below) Units in: F Comment on Existing: BMe Side- Curb; Parking Sxulder/ Lane • Lane Lane. Metlran Lane Larw Lane ,$houWer/ Parking Curb (Sxfu- Btku ,PaM 'Walk Type .'Btkelane 3 2 ..'t _ t ::'2 ` , 3,• 'IB&eaane, Type ;-Walk : Path is 5.00 CG 8.00 5.00 9.001 1 9.00 5.001 1 CG 5.00 6.00 CG 8.00 5.00 9.001 1 9.00 5.001 1 CG 5.00 Proposed (above) Units in F Comment on Proposed: _Segment or Alternative 3c<~ z Comment on Segment or Altemative: Existing (below) Units in: Comment on Existing: _Bare Sitle- Curo Pa`kmg Bhotatlar/ lane :;Lana Cane- Medan lane Lane ' i5houkf¢r/ Pa big Curb :Site- Btke'a' PaN Walk Type = °e&elwe 3 2 BAeWne -LType,• 7Walk Path;.' Proposed(above) Units in: Comment on Proposed: Segment or Alternative 4'~ - Comnunt on Segment or AhemaWe: Existing (below) Units in: Comment on Existing: Bke Side- Curb Pariung Stroulderl iane :Lax Lane Medan Lane Lane -Lane ':S~Idetl Parkng Curb Ska, B&e Path Walk Type eaeFai~e _ 3 2 ,zy,:_<, 1 :2 3,_ Bikeiane, Typ¢ Walk Path,- - Proposed (above) Units in: Comment on Proposed: (07-2001) Pmiea slabs: STIP Approved Monday, August 29, 2011 Safe Routes to School Program 2010 Application for FY 2012 PART 2 Endorsements Complete all sections relevant to proposed project, or attach separate letters and documents (see page 15 of Instructions) Metropolitan Planning Organization (required if project is within MPO jurisdiction) Name: Michael G. Quilty Title: RVMPO Chair Si nature: Date: January 10, 2011 Public Agency or Indian Tribe Approval (to propose project on land not owned by applicant) Name: Title: Signature: Date: ODOT Region Manager Approval (if non-ODOT applicant is proposing project within state highway right-of-way) Name: Title: Signature: Date: City> 50,000 Population (Cities < 50,000 population must provide council resolution) I confirm that [city] supports proposed project. I have authority to commit funds and resources needed from my agency to deliver proposed project. Name: Title: Signature: Date: Railroad Endorsement (willing to accommodate project adjacent to or crossing RR property) Name: Title: Signature: Date: ODOT Rail Division Record of Contact (for proposed project at or near railroad crossing) Name: Title: Signature: Date: Maintenance Endorsement (commitment for long-term maintenance by other than applicant agency) Name: Title: Signature: Date: RESOLUTION NO. 2011- Oa A RESOLUTION SUPPORTING THE REQUEST FOR OREGON DEPARTMENT OF TRANSPORTATION'S SAFE ROUTES TO SCHOOL FUNDS IN THE AMOUNT OF $300,000 TO BE USED TO CONSTRUCT THE EAST MAIN STREET IMPROVED CROSSWALK PROJECT Recitals: A. The City of Ashland is committed to providing a safe route to school for all children attending Ashland's public and private schools. B. The City desires to enhance opportunities for children to walk or ride bicycles in order to promote a healthier lifestyle. C. To further these goals, the City of Ashland has applied for a Safe Routes to School grant to construct an improved crosswalk across East Main Street at Campus Way. THE CITY OF ASHLAND RESOLVES AS FOLLOWS: SECTION 1. The City of Ashland supports and will accept a grant offer of the State of Oregon in the amount of $300,000 for the purpose of constructing the Project. SECTION 2. The Ashland City Administrator is authorized and directed to sign the statement of acceptance of the grant offer on behalf of the City of Ashland. SECTION 3. A true copy of the grant application is attached, as Exhibit A and hereby incorporated by this reference. SS CTION 3. This resolution was duly PASSED and ADOPTED this day of , 2011, and takes effect upon signing by the Mayor. et~e4 Barbara Christensen, City Recorder SIGNED and APPROVED this day of 12011. )o n Stromberg, Mayor Reviewed as to form: Megan Th ton, Interim City Attorney Page 1 of 1 ,1tOG Vt.' AV DO _ 'R? iE! Gl Ol (N; dl IL, `T7 (R; A, 'N; $1 ()OI R: `T & T' N) ' L, A, FFY 2013. SUPPLEMENTAL PROJECT APPLICATION FORM Congestion Mitigation and Air Quality Improvement Program (CMAQ) Project Applicant: City of Ashland Project Name: Walker Avenue: Safe Routes to School Improvements Please attach additional pages if more room is needed to complete the application. PROJECT SCREENING 1. Project Eligibility -Projects must be identified as eligible in the CMAQ program guidance (attached). Is the proposed project an eligible activityfor the CMAQ program? The proposed project falls under the category of a Bicycle / Pedestrian Facility Imp 0 2. Local Match Availability - Most projects will require a 10.27% local match. Will the required match be available? Please identify likely local match sources (public, private, or multi jurisdictional). The proposed local match is $153,000 or 43.3% of the total project cost of $353,0( 0 3. Implementation Timeline - Supplemental CMAQ funds will be programmed for FFY 2013. Can the proposed project be completed within this timeframe? This project is listed under the City of Ashland's CIP as a Miscellaneous Sidewalk C v 4. Project Cost Estimate Reviewed by ODOT - Have project cost estimates been reviewed by ODOT Region 3 for adequacy? No, however City Staff is experienced in cost estimates for similar construction proje v KVMPO Supplemental CMAQ Application for FFY 2013 ' Page 1 PROJECT EVALUATION QUESTIONS & INTENT 1. Project Description - Identify the location and purpose of the project. if possible, provide information on potential air quality benefits (e.g., provide daily traffic volumes and mileage ofproposed road segment). 20 points RVCOG staff will use this information to prepare the initial air quality analysis. This project includes construction of a six foot wide concrete sidewalk along the west sid 0 2. Project Cost Effectiveness, kg reduction/ S spent (Detailed Estimate): 20 points RVCOG staff will be able identify the most efficient projects that reduce pollutants. The current weekday traffic on Walker Avenue is 5500 vpd. Traffic attributed to student d 12 3. How does the project have long-term air quality benefit potential (will the project have a positive impact on air quality in 5 years, 10 years)? 15 points RVCOG staff will measure the reduction of pollutants for future years to ensure the project/ program has continual effects on improving air quality. With the final pedestrian / bicycle improvements to both schools complete, vehicle deliver D 4. How will the project contribute to the reduction of reliance on the automobile? 15 points Reducing the use of the automobile will directly lead to a reduction of emission pollutants. If safe and convenient sidewalks and crosswalks are provided, parents who are now reluc v 5. How will the project reduce congestion? 15 points Congestion leads to idling vehicles, which emit a larger percentage of pollutants. Reducing congestion, consequently, would lead to improved air quality. Currently nearly 70% of students at Walker Elementary School arrive via single passenger 1] RVMPO Supplemental CMAQ Application for FFY 2013 Page 2 6. How will the project help to complete a multi-modal transportation system? 10 points. A multi-modal transportation system increases the users' opportunity use lower-emitting .transportation sources. This project will provide a safe and convenient alternative to delivery of students by priv 0 Z Is the project a diesel retrofit program? If so, what percent of vehicle travel will be within the RVMPO Air Quality Maintenance Area (AQMA)? 5 points Diesel retrofits area priority of SAFETEA-LU. No. 8. Is the project located within city limits or inside an Urban Containment Boundary? 5 points Air pollutant reduction should be focused on major population clusters, which will improve public health and increase quality of life. Yes. 9. Identify how the project results in the reduction of Ozone precursors (NOx and VOCs) and PM2.5. 5 points Rogue Valley is on the cusp of being non-attainment for the 8-hour ozone pollutant. Addressing the precursors will progressively lower the amounts of these pollutants. This project reduces the incidence of traffic congestion and vehicle idling around two of th 10. Does the project/program employ new technology or innovative methods, not generally used in Southern Oregon, to provide the emissions reductions? 5 points Instituting technology that directly corresponds with improved air quality would be highly beneficial to the Rogue Valley No. RVMPO Supplemental CMAQ Application for IFFY 2013 Page 3 To: Dan Moore, AICP Planning Coordinator Rogue Valley Council of Governments PO Box 3275 Central Point, OR 97502 541-423-1361, dmoorea.rvcog.ora RVMPO Supplemental CMAQ Application for FFY 2013 Page 4 d o o j z C) CL .itn f: ~ r.nr42. min ~ ~ . d. •d~, ~ } C~06v~. a. M .4. Y / ~ I X H ~ I'~ ~ 3 9 G ~ 1° f { LLJJ~~ ~I Q 1 r 1I ,I Za OM N33N7 NVWl01-+,t• OL N330 NtlWl01~ d f may. 'r ~JAtlil3NltlM { 3 a f ~ r l -ry I.m X m ~ ~ ex r=- am t y ~ re..t ~ ~k r~ " fAtl NIVlNrIoPI.N r 3 S AzO °I fpm 1 ne ,q i"~~.. t k 5 1_-3 f~ '41 Y r J ~L~1" a 1S ~O ~ ,+''j 3`~y%`.Y ,ir~~`„_ t ~ I jt..} %t~ SSS i ~ 1 j' S I j 'f' Ll j t # ➢Ir 7 N1AP, ~ ~ I~ ) e u~i l`7 r- r t_ 3 U .i C . a @: d Y I}0 33t]' ~ ~ O EXHIBIT B IOWA ST. X 1905W _ _ \ - I \1 Z ` -----tea Li X...n. ~L SIDEWALK LOCATION W v - \ loo WAU(EA I O ucuu+cwr ^ J I C/) o - \ I to _ ~ W ~9 - LL ''Q 9 V/ U) LLI I F ST. W Y ❑ J X rnmo - ry~ /y\\ • I I II Q R I I 1 ~I EXHIBIT C Walker Avenue "Safe Routes to School" Improvements Cost Estimate Quantity (Q) Unit Price (UP) Cost (Q x UP) PRELIMINARY ENGINEERING(PE) Project Administration 1. Sponsor's administrative costs 30 hours $80 $2,400 2. ODOT administrative costs $9,800 Design and Development 1. Engineering 500 Hours $150 $75,000 Environmental Process None Coordination 1. Partnering with other agencies 40 hours $80 $3,200 2. Partnering with local 50 hours $80 $4,000 neighborhood groups Information 1 Interpretive 1.Public input process 20 hours $80 $1,600 2. Commission/Council review 10 hours $80 $800 Other Project Development or PE 1. Bidding 30 hours $80 $2,400 2. Contract award 10 hours $80 $800 RIGHT-OF-WAY (ROW) None Total PE $100,000 Total ROW $0 CONSTRUCTION (CONST) 1. Mobilization Lump sum $40,000 $40,000 2. Traffic control, TP&DT Lump sum $10,000 $10,000 3. Erosion control Lump sum $5,000 $5,000 4. Remove existing AC surface 100 SF $3 $300 5. Remove concrete curb and gutter 100 LF $8 $800 6. Remove concrete surface 200 SF $4 $800 7. Clearing and grubbing Lump sum $10,000 $10,000 8. Install curb and gutter 100 LF $25 $2,500 9. Construct sidewalk 7950 SF $7 $55,650 10. Construct driveway apron 720 SF $9 $6,480 11. Adjust water meter 5 each $100 $500 12. AC patching 20 Tons $400 $6,480 13. Striping and marking Lump sum $500 $500 14. Relocate signs 5 Each $150 $750 15. Landscaping Lump sum $10,000 $10,000 G:\pub-wr1ks\eng\I0-03 Walker SRTS GranftA Admin\Bhibit C Cost Lslimalc.doc - Quantity (Q) Unit Price (UP) Cost (Q X UP) 16. Topsoil 100 CY $100 $10,000 17. Rock Excavation 10 CY $250 $1,500 18. Sidewalk access ramp 4 each $1,200 $4,800 19. Retaining Walls (MSE) 100 SF $30.00 $9,000 20. Relocate Mail Box Street 4 each $320.00 $1,300 Subtotal $176,360 Coritingencv 20-30% of total construction costs above $43,640 Construction Engineering Approx. 15% of construction with contingency $33,000 Total CONST $253,000 Total Cost: $353,000 PE + ROW + CONST G:\pub-wrksk}g\IO-(U Walker SRTS Granlb Admin\Gahibil C Cusl F.,timale.duc Page 1 / 1 c I T'Y O Fg/~, `C'ITY a~-~{ ' `ECC ✓16- -J~ C Li i A Ai i'1 -----DATE----- --PO-NUMBER--- - -'T-1--200 EE MLAIIN'1S1TV 1J--- - 4/5/2013 11530 _ ASHLAND, OR 97520 (541) 488-5300 VENDOR: 001104 SHIP TO: Ashland Public Works OREGON DEPT OF TRANSPORTATION (541) 488-5587 355 CAPITOL STREET NE 51 WINBURN WAY FINANCIAL SERVICES MS #21 ASHLAND, OR 97520 SALEM, OR 97301-3871 FOB Point: Req. No.: - Terms: Net Dept.: Req. Del. Date: contact: Morgan Wavman Special Inst: Confirming? No Quantity Unit - Description - - Unit Price Ext. Price Sidewalk and Pedestrian Improvements 83,306.00 Project 2010-03, IGA #27871 Placement of new sidewalks along the west side of Walker Avenue from Ashland Street north to E. Main Street. The project also includes pedestrain improvements to Walker Avenue railroad crossing. SUBTOTAL 83 306.00 BILL TO: Account Payable TAX 0.00 20 EAST MAIN ST FREIGHT 0.00 541-552-2010 TOTAL 83,306.00 ASHLAND, OR 97520 Account Number "Project Number Amount Account Number Project Number Amount E 260.08.12.00.70420 E 201003.999 83 306.00 Authorized Signature VENDORCOPY FORM #3 CITY OF r qu ti iar ' pu ^ 'n rt3e - - - - ASH LAN D - - - -request:-- - IZEQUISITION--.~ Date-of ' 44/5/2013 Required date for delivery: ASAP Vendor Name Oregon Department of Transportation Address, City, State, Zip 355 Capitol Street NE, MS 21, Salem, OR 97301 Contact Name & Telephone Number Colleen Hunter, Program and Funding Services; 503-986-3224 Fax Number co een.p. un er o o.s a e.or.us SOURCING METHOD ❑ Exempt from Competitive Bidding ❑ Emergency ❑ Reason for exemption: ❑ Invitation to Bid (Copies on file) ❑ Form #13, Written findings and Authorization ❑ AMC 2.50 Date approved by Council: ❑ Written quote or proposal attached ❑ Written quote or proposal attached ❑ Small Procurement Cooperative Procurement Less than $5.000 ❑ Request for Proposal (Copies on file) ❑ State of Oregon - ❑ Direct Award Date approved by Council: Contract # ❑ Verbal/Written quote(s) or proposal(s) ❑ State of Washington Intermediate Procurement ❑ Sole source Contract # . GOODS & SERVICES ❑ Applicable Farm (#5,6, 7 or 8) - ❑ Other government agency contract $5.000 to $100.000 ❑ Written quote or proposal attached Agency ❑ (3) Written quotes attached ❑ Form #4, Personal Services $5K to $75K Contract # PERSONAL SERVICES ❑ Special Procurement- Intergovernmental Agreement $5,000 to $75.000 ❑ Form #9, Request for Approval ® Agency ODOT : (IGA #27871; attached) ❑ Less than $35,000, by direct appointment ❑ Written quote or proposal attached Date original IGA approved by Council: ❑ - (3) Written proposals attached Date approved by Council 9/20/2011 (Date) ❑ Form #4, Personal Services $5K to $75K Valid until: Date Description of SERVICES Total Cost This is a CMAQ project funded through an RT rant an City o Ashland matching funds. It - is being administered by ODOT under IGA #27871. It will involve the placement of new sidewalks _ along the west side of Walker Avenue from Ashland Street north to E. Main Street. The project $83,306 will also include pedestrian improvements to the Walker Ave. Rail Road Crossing. (See attached r , i IGA #27871) _ Item # Quantity Unit Description of MATERIALS Unit Price Total Cost TOTAL COST. rr. ® Per attached: IGA #27871 11 Project Number: 2010-03 Account Number: 260.08.12.00.704200 'Expenditure must he charged to the appropriate account numbers for the financials to accurately reflect the actual expenditures. By si ning this requisite ' form, l certify that the City's public contracting tn7 sat fied_ Employee Signature:-- City Administrator: 1 ''II (Equal or grJeaJter than $25,000) rt, Funds appropriated for current fiscal year: YEi NO bfol h'Lt 7 tJt,* J I (L ~t 5 Finan i1 Director- (Equal to orgreaterthan $5,000) Date Comments: Form #3 - Requisition - CITY OF FORM #12 ASHLAND - -----REQUEST FOR BXJDGE-TREVIEW------ - - To: Lee Tuneberg, Finance Director From: Mike Faught; Director of Public fVorks Date: April 3, 2013 Re: Request for Budget Review to Verify Adequate Funds Available to accordance with AMC 2.50.080(A) for Formal Processes, the Finance Director must sign off that there are appropriate funds for. the project before the project is put out for bids. (Note: The department is to request by memo a budget review to the Finance Director to ensure adequate funds are available prior to releasing the Invitation to Bid (ITB) or Request for Proposal (RFP). If the amount of the successful bid or proposal exceeds the initial amount approved as a result of the budget review, the department is to request by memo another budget review to ensure adequate funds are available for the additional amount prior to the department requesting approval from the City Council to award and execute the intended public contract.) REQUEST FOR BUDGET REVIEW PRIOR TO RELEASE OF ITB OR RFP: Project name and number: Walker Avenue Pedestrian Improvements Description of project: This is a CMAQ project funded through an SRTS Grant and City of Ashland matching funds. It is being administered by ODOT. It will involve the placement of new sidewalks along the west side of Walker Avenue from Ashland Street north to E. Main Street. The project will also include pedestrian improvement to the Walker Ave. Rail Road Crossing. Amount budgeted: CMAQ Funds based on estimate; $666,694.00. City of Ashland budgeted match; $83,306.00 Account Number(s) and amounts if multiple accounts: 260.08.12.00.704200 Timeline of intended project: September, 2011 to November, 2014 Q 2~ Funds appropriated for current fiscal year: YES NO Department Head y 3~/3 Finance Directot Date Date Form #12 -Request for Budget Review to Verify Adequate Funds Available, Page 1 of 1,4/3/2013