ADDENDUM TO CITY OF ASHLAND
CONTRACT FOR GOODS AND SERVICES LESS THAN $25,000
Addendum made this 11th day of September, 2013, between the City of Ashland
("City") and Roxy Ann Rock ("Contractor").
Recitals:
A. On July 151, 2013, City and Contractor entered into a "City of Ashland Contract for
Goods and Services Less than $25,000" (further referred to in this addendum as "the
agreement').
B. The parties desire to amend the agreement to increase compensation for copper
roof top for 1,050.00 and to increase compensation for sandblasting rock fountain for
$350.00. A credit is included in this addendum of $400.00 due to the fact that kiln dried
material was not used.
City and Contractor agree to amend the agreement in the following manner:
1. The maximum price as specified in Paragraph 4 of the agreement is increased to $
1,000.00.
2. The scope of services is modified to add and install one copper cap, sandblasting of
fountain mineral deposit and a credit to owner based on supplied information for kiln
drying 8 logs.
3. Except as modified above the terms of the agreement shall remain in full force and
effect.
CONTRACTOR: CITY OF AS LA YD:
BY 44 Z0,9 BY ,
Dpartment Head
Its d er1 Date 2L-7/3
DATE
Purchase Order #
Acct. No.:
(For City purposes only)
1- CITY OF ASHLAND, ADDENDUM TO CONTRACT FOR GOODS AND SERVICES
> , ! IVED
SEP 0 4 7013
_,tzx _y.rrrrs P rcc.rceca. Wes Norton
1111.1k: Itoxv Ann Rork
110 Box (=488
lledlord. 011.97501
Phmm:511-601-7 ,i1
hax:541-535-6031
MVW.wosoorh a?saolxom
OR Lie #104966
CA Lie #426558
September 4, 2013
Steve Ennis Architect
PO Box 4051
Medford, OR. 97501
RE: Enders Memorial Shelter
City of Ashland
Project No. 000022.999
Copper Roof Cap
Fabricate and install cooper roof cap: $1050.00
Total $1050.00
Wes Norton
111{.~: 96~~~r .\nn 16oek
PU BUS1188
1~ G 11uAfurd.OR. 97:)111
Phunc:511-GUI-7 5I
Ali
13 2 9 L7i~ Fac 5 11 -535-6051
xw~r.~c cs n n rl o n ~u.;aoL ro m
itect
August 27, 2013 R Lic #104966
CA Lic #426558
Steve Ennis Architect
PO Box 4051
Medford OR 97501
RE: Enders Shelter:
Project No. 000022.999
Extra -No. 2
Sandblast Fountain:
Sandblast fountain to remove mineral buildup. $350.00
Total $350.00
5EP 0 4 1013 Wee Norton
~iiiLCCL lln.e: ttoxy Ann 110ek
Ltevr, tan 1918nz 1181;
llyd(ord. 011. 97501
Phony: 711-6111-51:51
fa,: 1-535-6051
OR Lic #104966
CA Lic #426558
September 4, 2013
Steve Ennis Architect
PO Box 4051
Medford, OR. 97501
RE: Enders Memorial Shelter
City of Ashland
Project No. 000022.999
Kiln Drying Credit:
Based on supplied information for kiln drying logs:
Eight logs @ $50.00 ($400.00)
Total credit ($400.00)
09/04/2013 09:13 5418266601 S S SHEETMETAL PAGE 01/01
GOMPRO4jiS
I' '%_R-COND
SHEETMETAL, INC. '0414
DBA, Oregon SU Sheetmetal, Int:MVED pater: 3
kOELLENC Sep 4, 2013
SEP 0 a IM Page: 1
,1CVC L1111151~LI1l1CCl
' Our Mission
WES NORTON We are committed to raise the bar and make our
DBA ROXY ANN ROCK team the standard others are judged by in
PO BOX 44$$ commitment of unsurpassed service, craftsmanship,
gyy~ loyalty, and integrity to our customers and team
MEDFOYR/D),, OR 97501
S a}R 9 VIl3fYVV.VGi I~~Y~~~e''Y~t ~ j~~ a"-NP K°\5 ~'M1,Y, VY~3601A1~~ VY' S Y~Y "I' 1) f`y'TJSt'~~ u f rH OIIt11 E`~,~q{t5 A~Vi\i~ 5'p
1.~~ i. 3,.1 L nr ".~~i° : 1~ r.:.. '.".]L~... ~ mo'd' a 1JJ •°f y'n ..vi Mv~ "'°`T.y S ~2 vA .w J':
y,,NvOL.y Job 13-1164 43
n'q on -
t' yJdfBl'If®rlr lR.eF rF a.~"qA vyar Y "ra z SI n " &t' 1 d t Ov 'i Vn e P;r
.a_.,, A'.'_-uLv~.
W+,u.au~iaY~aV-A.
5005
._....13 _
d 11G1 i''{. ppr < }'LLGCfit~El yi h~i r Y+Jp as+a f4y`d ey,{ v,Jb^
W v iy"r }f ..e:? 1 + 11{{ vl,➢y'Y SY
.5.+,..:a_,.,,.+ww..........Y t i1LL111141~ri V F.'"`iW IIL Y'
ENDERS MEMORIAL SHELTER
1.00 Shop fabricate copper roof cap. 750.00 $750.00
1.00 installed copper cap. 300,00 $300.00
I
I
i
Subtotal
1,050.00
Sales Tax . _
Total Invoice Amount J,050,00
Check/Credit Memo No: Payment/Credlt Applied
ay1 an"c r x w
a.~_.: kA.~~.c~
Interest charged on past due balance at 2.% per month.
CCB #72049 M CA Lic. 662160, C43, C20
912 Antelope Pond• White City, Oregon 97503 • (541) 826-6661 • Fax (541) 826-6601
Page 1 / 1
Zni . -.00RDER
Ashland Park Commissi DATE PO NUMBER
20 E MAIN ST. 7/29/2013 00243
ASHLAND, OR 97520
(541) 488-5300
VENDOR: 004105 SHIP TO:
ROXY ANN ROCK
PO BOX 4488
MEDFORD, OR 97501
FOB Point: _ 'Req. No.:
Terms: net Dept.:
Req. Del. Date: Contact: Bruce Dickens
Special Inst: Confirming? No
Chianti Unit - Description - Unit Price Ext. Price
THIS IS A REVISED PURCHASE ORDER
Reconditioning of Enders Shelter in 98,973.00
Lithia Park per Architect/Engineerinq
Specifications in Construction Documents
Processed change order 09/03/2013 1,194.00
Relocate 6" drain pipe
Processed change order 10/04/2013 1,000.00
Fabricate and install copper roof cap
$1050.00, sandblast fountain to remove
mineral buildup $350.00, includes
credit for eight kiln dried logs
($400.00)
O13 -3-3 (o
d old '3v Le
SUBTOTAL 101 167.00
31LL TO: TAX 0.00
FREIGHT 0.00
TOTAL 101,167.00
Account Number Project Number Amount. - Account Number - Project Number, .:.Amount
E 411.12.00.00.70420 E 000022.999 101,1 7.00
'°/3
Aut iced Signature VENDOR COPY
FORM #10 CITY OF
CONTRACT AMENDMENT APPROVAL REQUEST FORM ASHLAND
Request for a Change Order
Name of Supplier 1 Contractor / Consultant:, r Total amount of this
contract amendment:
Purchase Order Number:
Title 1 Description:'e
rL-~ v~j
0/per
attached contract amendment
Contract Amendment /may '
Original contract amount O ~C/ 7:3 100 % of original ccoontract
Total amount of previous contract amendments $ ~r 9 L/ 11&4F`% of original contract
Amount of this contract amendment I r % of original contract
TOTAL AMOUNT OF CONTRACT $ % of original contract
In accordance with OAR 137-047-0800: 1) The amendment is within the scope of procurement as described in the solicitation documents, Sole Source notice or approval of Special
Procurement. 2) The amendment is necessary to comply with a change in law that affects performance of the contract. 3) The amendment results from renegotiation of the terms and
conditions, including the contract price, of a contract and the amendment is advantageous to the City of Ashland, subject to all of the following conditions: a) goods and services
to be
provided under the amended contract are the same as the goods and services to be provided under the unamended contract; b) The City determines that, with all things considered, the
amended contract is at least as favorable to the City as the unamended centract; c) The amended contract does not have a total term greater than allowed in the solicitation document,
contract or approval of a Special Procurement. An amendment is not within the scone of the procurement if the City determines that if it had described the changes to be made by the
amendment in the procurement documents, it would likely have increased competition or affected award of contract.
Contract amendment is withi the scope of procurement: YES NO` (If "NO", requires Council approval I Attach copy of CC.)
Sourcin Meth
LL PROCU EMENT - ess than 5000 INVITATION TO BIO or~ - COOPERATIVE PROCUREMENT. ORF or
ES', the to amp t of contract and cumulative RE EST FOR-PF POSAL l EXEMPTION PURSUANT TO AMC 2.50
ents s $is 00. the total amount of cumulativ mendments E'YES', the total amount of original contract and
mendm
El If "NO', amount ding authority requires s 25% of original contract amount or $250,000 cumulative amendments s $10oK for Goods & Services, s
Council approval. A h ce of Council whichever is less. $75K for Personal Services, <$50K for Attorney Fees.
Communication. ❑ If'NO', amount exceeding authority requires ❑ If 'NO', amount exceeding authority requires Council
❑ Exempt- Reason: : Council approval. Attach copy of Council approval. Attach copy of Council Communication.
PERSONAL SERVICES Communication. E Exempt-Reason:
❑ 'YES', Direct appointments 5,000 ❑ Exempt-Reason:
❑ If "NO", requires aliproval:/
INTERMEDIATNor ENT- SOLE SOURCE EMERGENCY PROCUREMENT
Goods & Servio 100 000 E "YES", the total amount of cumulative amendments E Written Findings: Document the nature of the
Personal Servito 75000 s25% of original contract amount or $250,000 emergency, including necessity and circumstances
'YES", the f cumulative whichever is less. requiring the contract amendment
mendments s al contrail 8mount. ❑ If E If'NO", amount exceeding authority requires ❑ Obtain direction and written approval from City
'NO', amount exceedjng A thority requires Council Council approval. Attach copy of Council Administrator
approval. Attach cool of Council Communication. Communication. ❑ If applicable, attach copy of Council Communication
❑ Exem t-Rea bw ❑ Exempt- Reason: 0 Exempt- Reason:
SPECIAL PROCUREMENT INTERGOVERNMENTAL AGREEMENT
E] 'YES', the total amount of original contract and cumulative amendments are E'YES', the original contrail was approved by City Council.
within the amount and terms initially approved by Council as a Special Provide date approved by City Council: (Date)
Procurement . If'NO', Council approval is required. Attach copy of Council Communication.
❑ If "NO', amount exceeding authority requires Council approval. ❑ Contract amendment approved and signed by City Administrator.
Attach co of Council Communication.
Project Number _0=Q _A_Tq Account Number /~-~ZGYJ.OG 70)00gccountNumber--_-__---- -
'Expenditure must be charged / to the appropriate /ac ount numbers for the financials to reflect the actual expenditures accur ly. Attach extra pages if needed.
Employee Signature:: I ~f&_- i f=. az z Department Head Signature: .
(Equal to or greater than $5,000)
City Administrator:
~ (Equal to or greater than $25 000 or f0%)
Funds appropriated for current fiscal year: Cam' NO A DA Y, 7
Finance Director (Equal to org er than $5,000) Dater
Comments:
Form #10 - Contract Amendment Approval Request Form, Request for a Change Order, Page 1 of 1, 9/11/2013