Loading...
HomeMy WebLinkAbout2013-377 CONT Addendum - SCJ Alliance ADDENDUM TO CITY OF ASHLAND CONTRACT FOR PERSONAL SERVICES LESS THAN $35,000 Addendum made this 1st day of November, 2013, between the City of Ashland ("City") and SCJ Alliance Consulting Services ("Consultant"). Recitals: A. On May 31. 2013 City and Consultant entered into a "City of Ashland Contract for Personal Services Less than $35,000" (further referred to in this addendum as "the agreement'). B. The parties desire to amend the agreement to extend the date of completion, modify the project to incorporate additional tasks as described in the attached work scope dated November 1, 2013, and to increase compensation to the contractor for the additional tasks. City and Consultant agree to amend the agreement in the following manner: 1. The date for completion as specified in Paragraph 3 of the agreement is extended to December 6, 2013 and the maximum price as specified in Paragraph 4 of the agreement is increased to $21,135. 2. The scope of services is modified to incorporate the new tasks identified as attached. 3. Except as modified above the terms of the agreement shall remain in full force and effect. CONSULTANT: CITY OF D: BY BY `tJZ- Its D to ~rtment Head DATE ~t r0 ~t~j Purchase Order # 11612 Acct. No.: 110.09.27.00604100 (For Clty 1)f. rposes only) 1- CITY OF ASHLAND, ADDENDUM TO CONTRACT FOR PERSONAL SERVICES SCJ ALLIANCE CONSULTING SERVICES November 1, 2013 Brandon Goldman, Senior Planner City of Ashland 20 E. Main Street Ashland, OR 97520 Re: Normal Avenue Neighborhood Revised Supplemental Traffic Analysis Scope SCJ Project #0722.01 Dear Brandon: Per your request, I have prepared this revised scope of services and fee estimate to conduct additional traffic operations analysis as a part of the Normal Avenue Neighborhood Plan study. This scope includes four tasks as discussed below: Work Scope Task 1- Conduct Traffic Operations Analysis at New Locations/Under New Conditions 1. Obtain and review peak hour turning movement count data for four locations during a single peak hour. Budget estimate assumes that this data will be provided. Locations include: • E. Main Street at bus access (turning movements for the PM school peak hour will need to be estimated and relationship to PM peak established) • Ashland Street at Clay Street (PM peak) • E. Main Street at existing Normal local road extension (east/west through volumes estimated for PM peak) • Ashland Street at Tolman Creek Road (PM peak using new 2012 data) 2. Update Synchro model and conduct existing operations analysis at three locations for school or PM peak as applicable (including E. Main/bus access, Ashland/Clay and Ashland/Tolman). 3. At identified locations, prepare new or revised 2038 peak hour traffic forecasts assuming that public railroad crossing is not in place for: • 2038 baseline conditions (three intersections excluding E. Main/existing Normal local road extension) • 2038 with Phase 1 (three intersections excluding E. Main/existing Normal local road extension) • 2038 with Phase 2 (including two scenarios, one with three intersections as described above and one with all four locations which shows shift of project traffic away from bus access road to existing Normal local road extension. The second scenario will be presented as a sensitivity analysis and traffic volume data will be presented in the body of the report). 4. Conduct operations analysis at locations and for time periods identified above, evaluate, mitigation needs if any, consider roundabouts on E. Main Street. 5. Identify needed cross-section for E. Main Street and site access traffic control requirements. 315 West Mill Plain Blvd, Suite 208 Vancouver, WA 98660 • Office Cell 503.341.6248 • scjalliance.com m November 1, 2013 Page 2 of 2 Task 2 - Conduct Sensitivity Analysis of Traffic Impacts 1. Evaluate impact on establishing public rail crossing on Phase 2 traffic operations at intersection of Ashland/Normal. 2. Evaluate impact on establishing public rail crossing on Phase 2 traffic operations at intersection of Ashland/Tolman Creek Road. Task 3 - Document Findings and Submit to City 1. Prepare graphics showing revised and/or added geometrics or turning movement volumes and new street network map as a base. The following graphics would be revised: Figure 1 (add new intersections), 2 (replace with new street network), 3 (add new intersections), 4 (add new intersections and revise Ashland/Tolman), 5 (add footnote about being based on 6/25/13 land use and transportation system), 7 (add footnote about being based on 6/25/13 land use and transportation system), 8 (add new intersections and revise Ashland/Tolman), 9 (add footnote about being based on 6/25/13 land use and transportation system), 10 (add new intersections and revise Ashland/Tolman), and 11 (replace with new bike/ped network map). 2. Add new graphic to show Phase 1 and Phase 2 project traffic volumes at all site access points. 3. Incorporate findings, conclusions and recommendations into final project report which will include an executive summary and incorporate the work outcomes identified above. Report will include a discussion of multimodal travel assumptions, the benefits of a public railroad crossing on Normal Avenue, and a summary of the site access traffic control and any mitigation needs relating to East Main Street. Work will also include updating the compiled appendices to incorporate the new analysis. Task 4 - Participate in Transportation Commission Meeting 1. Assume participation by conference call, allow for 2 hours. Optional Task 5 - Participate in Planning Commission and City Council Meetings 1. Assume participation by conference call, allow for 2 hours each. Estimated Fee The foregoing (non-optional) work will be prepared by SO for a not-to-exceed amount of $3,998. The cost for Tasks 1.4, 1.5 and 4.1 would equal $1,000 with the balance allocated among the remaining tasks. This fee estimate assumes that no new traffic counts will be collected by SO and that no travel to Ashland will be required. The optional meeting participation will be provided by SG on a time-and- materials basis, not to exceed $350 for each two hour meeting for a total of $700. I f this scope and fee estimate is acceptable, please let me know. I look forward to working with you. Respectfully, SG Alliance Anne Sylvester, PTE Senior Consultant QTY RECOR1",D Eil Page 1/ 1 CITY OF DATE T-1S H LAN D PO NUMBER 20 E MAIN ST. 7/1/2013 11612 ASHLAND, OR 97520 (541) 488-5300 VENDOR: 017792 SHIP TO: Ashland Planning Department SCJ ALLIANCE (541) 488-5305 2102 CARRIAGE DRIVE SW 51 WINBURN WAY SUITE H ASHLAND, OR 97520 OLYMPIA, WA 98502 FOB Point: Req. No.: Terms: Net Dept.: Req. Del. Date: Contact: Brandon Goldman Special Inst: - Confirming? No Quantity Unit Descrip tion Unit Price Ext. Price, THIS IS A REVISED PURCHASE ORDER Project consists of obtaininq traffic 17,135.00 engineering services to complete a Future Traffic Analysis relating to the draft Normal Avenue Neighborhood Plan, Scope of Work shown as Exhibit C to attached contract. Contract for Personal Services Beginninq date: May 15, 2013 Completion date: September 30, 2013 Processed change order 11/08/2013 4,000.00 Additional traffic operations analysis as a part of the Normal Avenue Neighborhood Plan Study ($4,000.00) per attached contract addendum. SUBTOTAL 21 135.00 BILL TO: Account Payable TAX 0.00 20 EAST MAIN ST FREIGHT 0.00 541-552-2010 TOTAL 21,135.00 ASHLAND, OR 97520 Account Number - Project Number Amount Account Number Project Number Amount E 110.09.27.00.60410 21 135.00 'cty '24 -3 Authorize ignature VENDOR COPY I FORM #10 CITY OF CONTRACT AMENDMENT APPROVAL REQUEST FORM ASHLAND Request for a Change Order Name of Supplier/ Contractor) Consultant: SCJ Alliance Consulting Services Total amount of this Anne Sylvester PTE. contract amendment: Purchase Order Number: 11612 $21135 Title 1. Description: Future Traffic Analysis relating to the Normal Avenue Neighborhood Plan ® Per attached contract amendment Contract Amendment Original contract amount $17135 100 % of original contract Total amount of previous contract amendments NA % of original contract Amount of this contract amendment $4000 23 % of original contract TOTAL AMOUNT OF CONTRACT $21135 123 % of original contract In accordance with OAR 137-047-0800: 1) The amendment is within the scope of procurement as described in the solicitafion documents, Sole Source notice orapproval of Special Procurement 2) The amendment is necessary to comply with a change in law that affects performance of the contract. 3) The amendment results from renegotiation of the terms and conditions, Including the contract price, of a contract and the amendment is advantageous to the City of Ashland, subject to all of the following conditions: a) goods and services to be provided under the amended contract are the same as the goods and services to be provided under the unamended contract, b) The City determines that, with all things considered, the amended contract is at least as favorable to the City as the unamended contract c) The amended contract does not have a total term greater than allowed in the solicitation document, contract or approval of a Special Procurement. An amendment is not within the scope of the procurement if the City determines that if it had described the changes to be made by the amendment in the procurement documents, it would likely have increased competition or affected award of contract Contract amendment is within the scope of procurement: YES X NO' (If "NO", requires Council approval l Attach copy of CC.) Sourcing Method: SMALL PROCUREMENT - Less than $5,000 INVITATION TO BID or - COOPERATIVE PROCUREMENT, ORF or ❑ "YES", the total amount of contract and cumulative REQUEST FOR PROPOSAL EXEMPTION PURSUANT TO AMC 2.50 amendments s $6,000. ® 'YES', the total amount of cumulative amendments ❑ "YES", the total amount of original contract and ❑If'NO", amount exceeding authodty requires 25 25% of original contract amount or $250,000 cumulative amendments s$100Kfor Goods & Services, :5 Council approval. Attach copy of Council whichever is less. $75K for Personal Services, <$50K for Attorney Fees. Communication. ❑ If 'NO', amount exceeding authority requires ❑ If 'NO', amount exceeding authority requires Council ❑ Exempt- Reason: Council approval. Attach copy of Council approval. Attach copy of Council Communication. PERSONAL SERVICES Communication. ❑ Exempt-Reason: ❑ "YES", Direct appointments$35,000 ❑ Exempt-Reason: ❑ If "NO", requires approval. INTERMEDIATE PROCUREMENT SOLESOURCE EMERGENCY PROCUREMENT Goods & Services - $5,000 to $100.000 ❑ 'YES', the total amount of cumulative amendments ❑ Written Findings: Document the nature of the Personal Services-$5000 to $75,000 2525% of original contract amount or$250,000 emergency, including necessity and circumstances f9 "YES", the total amount of cumulative whichever is less. requiring the contract amendment amendments s 25% of original contract amount ❑ If ❑ If'NO', amount exceeding authority requires ❑ Obtain direction and written approval from City 'NO', amount exceeding authority requires Council Council approval. Attach copy of Council Administrator - approval. Attach copy of Council Communication. Communication. ❑ If applicable, attach copy of Council Communication ❑ Exempt- Reason: ❑ Exempt-Reason: ❑ Exempt-Reason: SPECIAL PROCUREMENT INTERGOVERNMENTAL AGREEMENT ❑ "YES", the total amount of original contract and cumulative amendments are ❑ "YES%the original contract was approved by City Council. within the amount and terms initially approved by Council as a Special Provide date approved by City Council: (Date) Procurement If 'NO', Council approval is required. Attach copy of Council Communication. ❑ If'NO', amount exceeding authority requires Council approval. ❑ Contract amendment approved and signed by City Administrator. Attach copy of Council Communication. Project Number Account Number 110-09-27-00-604100 Accodiunt-Nu er 'Expenditure must be charged to he pproolon to ;cc u t nu bars for the financials to reflect the actual expenditures a rately. Alta a ra pages if needed. Employee Signatu e: Department Head Sig afure• actala ou tofcontra t$5,000) City Administrator: o ~ quail or greater than $25,000or10%) Funds appropriated for current fiscal year YE / NO de 1/.- Finance Director (Equal toorg aterthan$5,000) Date Comments: Farm #10 -Contract Amendment Approval Request Form, Request for a Change Order, Page 1 of 1, 11/1/2013