Loading...
HomeMy WebLinkAbout2014-236 Funding Agrmt - RVCOG - TMDL INTERAGENCY COOPERATIVE FUNDING AGREEMENT FOR A BEAR CREEK WATERSHED NON-POINT SOURCE POLLUTION (TMDL) MONITORING AND IMPLEMENTATION PROJECT July 1, 2014 THIS AGREEMENT is made and entered into by and between the ROGUE VALLEY COUNCIL OF GOVERNMENTS, a voluntary intergovernmental association, hereinafter referred to as RVCOG, and the following state and local agencies: City of Ashland, City of Central Point, City of Jacksonville, City of Medford, City of Phoenix, City of Talent, Jackson County, Oregon State Department of Agriculture, and the Oregon State Department of Forestry hereinafter referred to collectively as the Designated Management Agencies (DMAs). All participants included in this agreement are hereinafter referred to collectively as the PARTIES, WITNESSETH THAT: WHEREAS, the DMAs have been placed under an Implementation and Compliance Schedule by the Oregon State Department of Environmental Quality which directs that they correct non-point source pollution problems in the Bear Creek Watershed in order to meet the requirements of the U.S. Clean Water Act; and WHEREAS, the Department of Environmental Quality's directive includes requirements that the DMAs work collectively by using a watershed approach to resolve the non-point source pollution problems within the Bear Creek Watershed; and WHEREAS, the DMAs have agreed to collectively employ the RVCOG to administer and manage the implementation of a TMDL Program including water quality testing which targets the identification of and reduction in non-point pollution within the Bear Creek watershed. NOW THEREFORE, for and in consideration of the terms, conditions, stipulations and covenants herein contained, the PARTIES do mutually agree as follows: A. TIME OF PERFORMANCE This agreement shall take effect on July 1, 2014 and terminates on June 30, 2015. At that time, pending available funding and a finding of continuing need, this agreement may be amended, terminated or extended per Section "E" below. B. DMAs RESPONSIBILITIES 1. Each DMA will make payment to the RVCOG not to exceed the amount allocated in the Total Cost column (Table 1 below). 2. Each DMA will make payment in full for 100% of the amount shown in the Total Cost column as designated for their jurisdiction (Table 1 below). Total payment should be received by RVCOG prior to September 30th, 2014 unless other arrangements are made prior to that date. 3. Each DMA will support the RVCOG in its administration and management of the Bear Creek Non-point Pollution (TMDL) Sampling Project by providing advisory and technical information concerning their jurisdictional area and in developing/establishing watershed based policy decisions. 4. Each DMA will send an authorized representative to the RVCOG regularly scheduled meetings to discuss the progress and the needs of the TMDL program. In addition, each DMA will send a representative to any additional meetings deemed necessary by the TMDL Committee. I writing signed by the Ashland City Administrator and an authorized representative of RVCOG; and there services to be provided by RVCOG and the funding to be provided by Ashland remain substantially the same. 5. ACCESS TO RECORDS - The DMAs and their duly authorized representatives shall have access to the books, documents, papers, and records of RVCOG which are directly pertinent to the specific contract for the purpose of making audits, examinations, excerpts and transcripts. 6. EQUIPMENT OWNERSHIP - Upon termination of this agreement all property or equipment purchased under this agreement will become the sole possession of the RVCOG. 7. CONDITIONS OF FINANCIAL NON-PARTICIPATION - The costs shown in Table I are allocated by DMA based upon the receipt of full funding provided by all DMAs listed. In the event that a DMA decides not to participate and full funding for the program is not realized, the agreement will need to be amended as per Section E(1) above. RVCOG reserves the right to terminate this contract in whole or in part, upon 30 days' notice in writing and delivered by certified mail, or in person. F. PAYMENTS 1. The DMAs certify that the funds required by their commitment under this agreement are available until June 30, 2015 at the time of the signing of this agreement. 2. The DMAs will make payment not to exceed the Total Cost column in Table 1 above as indicated for each respective DMA and noted in Section B(1) above. The payment schedule will be made in accordance with Section B(2) above. 3. Unless amended otherwise in writing, no other obligations for payments from the DMAs to RVCOG are stated or implied under this agreement. G. REPORTS and RECORDS 1. RVCOG will provide the DMAs with a copy of all documents, studies, reports, and materials developed under this agreement. H. INDEMNIFICATION 1. Subject to the limitations and conditions of the Oregon Tort Claims Act, ORS 30.260-300, the Oregon Constitution, Article XI, Section 7 and the terms of any applicable policies of insurance, the PARTIES agree to save, hold harmless and indemnify each other, including their officers, agents and employees, from any loss, damage, injury, claim, or demand by a third party against either party to this agreement arising from the activities of the other party in connection with this Agreement. Neither party shall be liable for any loss, damage, injury, claim or demand against each other arising from their respective activities in connection with this Agreement, except as otherwise expressly set forth herein. 2. RVCOG shall comply with all federal, state, and local laws and ordinances applicable to the work under this contract. 1. MERGER CLAUSE This contract and attached exhibits constitute the entire agreement between the PARTIES. No waiver, consent, modification or change of terms of this contract shall bind either party unless put in writing and signed by both parties. Such waiver, consent, modification or change, if made, shall be effective only in the specific instance and for the specific purpose given. There are no understandings, agreements, or representations, oral or written, not specified herein regarding this contract. 4 4 ATTACHMENT A - Work Detail 1. MONITORING - LOCATIONS 1. In this study RVCOG will conduct instream water quality monitoring at the following sites contingent upon being able to access the sites: * Bear Creek (I 1 sites) at: S. Valley View Road, Lynn Newbry Park, Fern Valley Road, Ninth Street, Pine Street, Kirtland Road, along the Greenway (in Talent, Phoenix, and Central Point), in Medford near 1-5, and at Table Rock Road. * Other Creeks: Neil Creek at Dead Indian Road, Ashland Creek below the Wastewater Treatment Plant, Griffin Creek at I-5, Jackson Creek at Blackwell Road, Walker Creek at Dead Indian Road, Emigrant Creek at Mouth, Neil Creek at Mouth, Ashland Creek at Granite Street, Griffin Creek at Beall Lane, Jackson Creek at Highway 238, and Jackson Creek at Jacksonville. * The Irrigation Diversions for the Talent and Medford Irrigation Districts. 2. The total number of projected regular monitoring locations is detailed below. These monitoring locations will be reviewed on approximately an annual basis with changes made only through agreement of all the PARTIES. • Phosphorus - 22 • Ammonia - 2 • E. coli - 24 • Turbidity, pH, and conductivity - 24 • Macroinvertebrates - 10 • Temperature - 24 spot samples, number of continuous stations will vary based on equipment purchased/available. 3. Additional "hot spot" monitoring will be completed on those tributaries which exhibit any unusual high readings of the parameters being measured or following report of concerns. The purpose of the "hot spot" monitoring will be limited to identifying the general location of the source of pollution contamination only. The appropriate DMA will be notified of the problem and its general location in order to take action to correct the contributing problem. 4. This program will also include the monitoring of storm drains. The numbers of sites per DMA are as follows: City of Ashland (3), City of Central Point (2), City of Jacksonville (2), City of Medford (4), City of Phoenix (2), and City of Talent (2). Some locations are currently being changed, but the number of sites per city is the same. Exact locations of sites will be determined between each DMA and RVCOG. The scope of this contract agreement does not include follow-up monitoring for identified problems. Any additional monitoring by RVCOG will need to be negotiated on a case by case basis. II. MONITORING - SAMPLING FREQUENCY 1. Sampling will be performed monthly at the sites for E. coli, pH, conductivity, and turbidity. The total number of sampling runs under this contract will be 12. 2. Sampling will be performed for phosphorus monthly from May through October at sites E 1-E 16, E 18 or E19 (depending on flow), and E20-E24. Total number of sampling runs will be 6. 3. "Hot Spot" monitoring will occur on an as needed basis. 4. The Storm Drain monitoring program will visit each sample collection site a maximum of 3 times and samples will be collected if effluent is flowing from the site. The first samples will be taken during dry weather flows before the first rains of the season. The second set of samples will be 5 collected soon after the first storm event of the season that creates surface runoff and the third sample will be taken approximately 60 days after sample number two. III. MONITORING - PARAMETERS SAMPLED 1. Sites will be analyzed for E. coli, pH, conductivity, temperature, and turbidity. 2. Sampling will be performed for phosphorus monthly from May through October at sites EI-E16, E18 or E19 (depending on flow), and E20-E24. 3. Storm Drain monitoring program will sample and analyze for total phosphate, BOD5, pH, conductivity, temperature, turbidity, and E. coli. Where practical, flow will be estimated at each site. IV. MONITORING -METHODS 1. The sampling and testing procedures used will be approved by the Department of Environmental Quality. The program will operate under a QA/QC program in collaboration with the DEQ and the results from the program will meet or exceed the requirements of the DEQ. The equipment used in the testing of these parameters has been received under a DEQ grant and approved by DEQ. The lab used for analysis will be provided by the City of Medford Wastewater Treatment Laboratory. This contract is conditional upon the availability of this lab. 2. The general analysis methods that will be employed are: * Temperature - measured by meter, calibrated thermometers and/or continuous instream recorders. * Conductivity - measured by conductivity meter. * E. coli testing will be made with the Colilert system * pH - measured by pH meter. * Turbidity - using calibrated turbidity meter. * Ammonia - phenate method with final concentration determined using spectrophotometer. * Phosphorous - modified ascorbic acid method with final concentration determined using a spectrophotometer * BOD5 - 5 day incubation at 68F using Poly Seed innoculum as described in Standard Methods * Flow - determined using calibrated staff gauges placed in the stream bed or by use of a calibrated collection device in the case of storm drain sampling. V. MONITORING - QUALITY ASSURANCE/QUALITY CONTROL (QA/QC) 1. QA/QC samples will be collected per the QA/QC plan which details internal measures (duplicates) and external measures (splits with DEQ staff). VI. IMPLEMENTATION 1. Serve as the Regional Manager for implementation portions of the TMDL Implementation Matrix. 2. Implement portions of the TMDL Matrix on a regional basis including, but not limited to, coordination of the Quarterly TMDL Meetings, participating in water quality events, providing technical assistance and resources to restore and protect riparian areas, tracking implementation activities, completing the matrix summarizing regional manager activities, education and outreach activities, providing copies of TMDL deliverables for submittal with reports as needed, and coordinating other implementation actions. VII. REPORTS 1. Reporting will be done in three formats. First, ongoing meetings (approximately quarterly) will occur with the DMAs, DEQ, and RVCOG. Second, ongoing technical meetings will be performed in conjunction with DEQ. Third, reports will be provided as per Section C(4), RVCOG RESPONSIBILITIES. 6 Scope of Work for Assistance to the City of Ashland TMDL Implementation Rogue Valley Council of Governments July 1, 2014 - June 30, 2015 Task Hours Cost Task I: Solar Radiation $1,600.00 • Inventory areas for protection regionally. Provide list and/or map of prioritized sites. (10 hours = $800.00) o Review existing maps/list of sites - 2 hours o Identify new sites (Ashland)- 4 hours o Update Maps as needed.- 4 hours • Identify restoration and planting opportunities throughout the year. Provide a planting and restoration project list for reporting. ( 12 hours = $960.00) o Meet with the City of Ashland to discuss potential planting sites, planting priorities, and planned projects. (4 hours) o Meet with partner organizations to discuss potential planting sites and planned projects in Ashland. (4 hours) o Provide a planting and restoration list to the City (4 hours) • Develop proposals and apply for funding to protect and restore riparian areas on public and private land. (8 hours = $640.00) Task VI: Rural Residential and Urban Runoff $1,463.63 • Perform hot spot and storm drain outfall monitoring. (As outlined in Attachment A. Lump sum based on total number of drains sampled, materials, estimated mileage, etc.) Task V: Urban Runoff $960.00 • Update BMP database list and add new technologies. Provide updated list annually for reporting. (4 hours = $320.00) • Inventory and map existing SW facilities regionally. Review and update priority areas for installation. (8 hours = $640.00) Task VIII: Outreach and Education $1,280.00 • Coordinate with local groups to implement outreach program. Participate in and/or promote annual water quality events. (8 hours) • Coordinate activities and strategies with the Stream Smart Program (4 hours) • Adopt, customize, develop, and/or distribute TMDL related materials. (4 hours) Task IX: Regional Water Quality Coordination $320.00 • RVCOG will facilitate quarterly TMDL meetings. Provide record of attendance and agenda topics for each meeting. (4 hours = $320.00) 7 Task X: Funding $960.00 • RVCOG will assist Ashland in establishing costs of regional implementation. (4 hours = $320.00) • RVCOG will work with DMAs to apply for regional implementation funding from outside sources. (8 hours = $640.00) Task XI: Monitoring and Reporting - Bear Creek Regional Monitoring program $4,341.45 • Implement the regional monitoring program as outlined in Attachment A. (cost is a lump sum based on the total cost of the program) Task XI: Monitoring and Reporting $800.00 • RVCOG will track implementation activities throughout the year and compile them into the matrix for annual reporting submittal. (10 hours = $800.00) Miscellaneous - Printing, Mileage, Supplies, etc. $100.45 TOTAL COST $11,825.53 Note: Costs are based on Ashland's estimated share of regional project implementation costs. E. g., it is anticipated that to write grant(s) for restoration would take more than 8 hours. 8 IN WITNESS WHEREOF, RVCOG AND CITY have caused this agreement to be executed by their authorized representatives as of the date of the last signature affixed below: PARTIES TO THE AGREEMENT I -e-~ ' '3/' / Michael Cavallaro, Executive Director Date Rogue Valley Council of Governmeryt~ 4,v 4wjlK, 1l City of Ashland Re esentative Date AP OVr-D A FORM J Mhladdtlty Attomey Date ! C/ - l~ 9