2014-239 Contract - Knife River Materials
00505 Agreement AGREEMENT THIS AGREEMENT AND CONTRACT, made and entered into at Ashland Municipal Airport this 7S day of A%5W5b't- , 2014 b and between the City of Ashland (referred to herein as Owner), and nlytrIPY(CtkS ofd oc% _ Kr, A (referred to herein as Contractor), WITNESSETH: THAT WHEREAS, Owner has heretofore caused to be prepared certain Drawings, Project Manual, and Addenda Nos. through (referred to herein as Contract Documents) for its project entitled "Taxilane Improvements at Ashland Municipal Airport - Sumner Parker Field," and Contractor did on the day of , 20, file with Owner a bid to furnish equipment, labor, material, and appurtenances for construction of said project as set forth in the Contract Documents and agreed to accept as payment therefore the sums fully stated and set forth in the bid; and, WHEREAS, the said Contract Documents and bid fully and accurately set forth and describe the terms and conditions upon which the Contractor proposes to furnish said equipment, labor, material, and appurtenances and perform said Work, together with the manner and time of furnishing same; For, and in consideration of, the payments and Agreements hereinafter mentioned: 1. Contractor will commence and complete the construction of the Project. Contractor acknowledges receipt of all Contract Documents in existence at the date the Agreement is signed; 2. Contractor will furnish all of the materials, supplies, tools, equipment, labor, and other services necessary for the construction and completion of the Project described herein; 3. Contractor will commence the work required by the Contract Documents within 7 calendar days after the date of the Notice To Proceed and will complete the same within 60 calendar days following Contractor's receipt of the Notice to Proceed, unless the Contract Period is extended otherwise modified by written notice or executed Change Order; 4. In the event Contractor fails to complete the work within the stipulated Contract period, Contractor shall be liable for and shall pay to Owner a penalty in the amount of One Thousand Five Hundred Dollars ($1,500) per calendar day to commence on the first calendar day after the required final completion date and to continue thereafter each and every calendar day until all work is satisfactorily completed as specified in the Contract Documents; 5. Contractor agrees to perform all of the Work described in the Contract Documents and comply with the terms therein for the fixed sum of'R3`17 (•dd Dollars 6. -;3!n :Ja3, 00) unless the Contract Price is modified by executed Change Order; 7. Contractor shall certify in the Contract, and it shall be a condition of the bond, as provided by ORS 279C.800 through 279C.870, that in performing this Contract, Ashland lunicipal Airport Taxilane Improvements 1 Agreement 00505 Agreement Contractor will pay and cause to be paid not less than the prevailing rate of wages as of the date of the public notice, per hour, per day, and per week for and to each and every worker who may be employed in and about the performance of this Contract; 8. All documents, or other material submitted to Owner by Contractor shall become the sole and exclusive property of Owner. All material prepared by Contractor under this Agreement may be subject to Oregon's Public Records Laws; 9. Contractor certifies and shall comply with all applicable Public Contract Laws, including ORS 279C.500 through ORS 279C.670 and any requirements of the Davis Bacon Act (40 U.S.C. §3142, formerly 40 U.S.C. 276a), and any applicable Davis Bacon Related Acts; 10. Contractor certifies that it has an employee drug testing program in place, in accordance with ORS 279C.505, that applies to all employees, and Contractor will maintain a drug- testing program at all times during the performance of the Contract awarded. Failure to maintain a program shall constitute a material breach of contract. 11. In accordance with ORS 279C.838, each worker in each trade or occupation employed in the performance of the Contract either by Contractor, subcontractor or other person doing or contracting to do or contracting for the whole or any part of the work on the Contract, shall be paid not less than the applicable state or federal prevailing rate of wage, whichever is higher. State of Oregon BOLI prevailing wages are incorporated by reference in Section 00810. Federal Davis-Bacon prevailing wage rates are attached hereto in Section 00815. 12. Contractor certifies, under penalty of perjury, that Contractor's Company is not in violation of any Oregon tax laws; 13. Contractor has read and fully understands all Solicitation Documents, Contract terms, and conditions and understands that in signing this Agreement Contractor waives all rights to plead any misunderstandings regarding the same; 14. Owner agrees to pay Contractor in the manner and at such times as set forth in the General Conditions such amounts as required by the Agreement, unless otherwise modified by written notice or executed Change Order; 15. Should any clause or section of this Contract be declared by court to be void or voidable, the remainder of this Contract shall remain in full force and effect; 16. Any attorney fees, costs and disbursements necessary to enforce this Contract through litigation including appeals shall be awarded to the prevailing parry. Any mediation or arbitration costs shall be split equally between the parties; 17. This Contract is executed in the state of Oregon and is subject to Oregon law and jurisdiction in Jackson County; 18. Failure to enforce any provision of this Contract does not constitute a continuing waiver of that provision, any other provision, or the entire Contract. Contractor waives any right to claim mistake or misrepresentation regarding the terms and conditions of the Contract Documents and the present and/or reasonably foreseeable conditions which may affect the Project site(s); Ashland .Municipal Airport Taxilane Improvements 2 Agreement 00505 Agreement 19. Contractor covenants and agrees to bind any and all subcontractor(s) for performance of work under this Contract in the same manner Contractor is bound to Owner; 20. Contractor shall save harmless, indemnify and defend Owner for any and all claims, damages, losses, and expenses, including but not limited to reasonable attorney's fees arising out of or resulting from Contractor's performance of or failure to perform the obligations of this Agreement, to the extent same are caused by the negligence or misconduct of Contractor or its employees or agents. 21. Contractor shall comply with the Oregon Workers' Compensation Law, ORS Chapter 656, for all employees who work in the state of Oregon. If Contractor hires employees, he or she shall provide Owner with certification of Workers' Compensation Insurance, with employer's liability in the statutorily required minimum. 22. No person shall be subject to discrimination in receipt of the benefits of any services or activities made possible by or resulting from this Agreement on the grounds of sex, race, color, creed, marital status, age or national origin. Any violation of this provision shall be considered a material violation of this Agreement and shall be grounds for cancellation, termination or suspension in whole or in part by Owner. 23. The rights and duties under this Contract shall not be modified, delegated, transferred or assigned, except upon written signed consent of both parties; 24. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns. IN WITNESS WHEREOF, four identical counterparts of this contract, each of which shall, for all purposes be deemed an original thereof, have been duly executed by the parties hereinbefore named on the day and year in this Agreement first above written. i C TRACT CITY OF ASHLAND By By Title ?S% D~ T Title c Date,' 21 ZO 1~ Date LTM, Incorporated dba Attest Knife River Materials an MDU Resources Company ED AS TO FORM 3Ash d t. ttomey Da y Ashland Municipal Airport Taxilane Improvements 3 Agreement LTM, Incorporated dba Knife River Materials an MDU Resources Company Bidder's List BIDDER'S LIST (All firms bidding or quoting on subcontracts for this DOT-assisted project are listed below) Certified DBE Age of Firm Name Address (Y or N) Firm GRS* roL lv + a o ~1 v Y r~~: ~ ~ D ►2 IJ l a + ~ 4- d, THIS FORM IS REQUIRED TO BE COMPLETED AND SUBMITTED WITH FIRST-TIER SUBCONTRACTOR DISCLOSURE FORM, REGARDLESS OF DBE UTILIZATION FOR THE CONTRACT *GRS - Annual Gross Receipts Enter 1 for less than $1 million Enter 2 for more than $1 million, less than $5 million Enter 3 for more than $5 million, less than $10 million Enter 4 for more than $10 million, less than $15 million Enter 5 for more than $15 million. Ashland Municipal Airport Taxilane Improvements I Bidder's List Certification Regarding Debarment, Suspension Ineligibility, and Voluntary Exclusion CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY, AND VOLUNTARY EXCLUSION - 49 CFR PART 29 (VERSION 1, 1/5/90) The bidder/offeror certifies, by submission of this proposal or acceptance of this contract, that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency. It further agrees by submitting this proposal that it will include this clause without modification in all lower tier transactions, solicitations, proposals, contracts, and subcontracts. Where the bidder/offeror/contractor or any lower tier participant is unable to certify to this statement, it shall attach an explanation to this solicitation/proposal. N e and Ti e o Signer D VE BULL, PRESIDENT JUNE 26, 2014 Signat a Date LTM, Incorporated dW Knife River Materials an MDU Resources Company Company Name P.O. BOX 1145 MEDFORD, OR 97501 Business Address Ashland Municipal Airport Taxilane Improvements I Certification Regarding Debarment, Suspension Ineligibility, and Voluntary Exclusion Oregon John A. Kitzhaber, M.D., Governor Department of Transportation Procurement Office-Construction 455 Airport Rd. SE, Bldg. K Salem, Oregon 97301-5348 Voice: (503) 986-2710 Fax: (503) 986-6910 Email: odotprocurementofficeconstruction@odot.state.or.us February 07, 2014 LTM INC DBA KNIFE RIVER MATERIALS DAVE ROSS PO BOX 1145 MEDFORD, OR 97501 Your prequalification application has been approved. This prequalification pertains only to the submission of bid proposals and does not cover your financial ability. Your bids will be considered responsive on ODOT projects on or after: February 01, 2014 Your prequalification application is valid through: January 31, 2015 Your vendor number is: CV20012835 Work Classifications: (AB)-AGGREGATE BASE (AC)-ROCK PRODUCTION (ACP)-ASPHALT CONCRETE PAVING AND OILING (BLD1)-BUILDINGS (EART)-EARTHWORK AND DRAINAGE (ELEC)-ELECTRICAL (LS)-LANDSCAPING (MHA)-MISC. HIGHWAY APPURTENANCES (PAVE)-PAVEMENT MARKINGS (PCP)-PORTLAND CEMENT CONCRETE PAVING (REIN)-BRIDGES AND STRUCTURES (SIGN)-SIGNING (PERMANENT) (TTC)-TEMPORARY TRAFFIC CONTROL Applicants must update their prequalification application with ODOT when information changes. An addendum change form and instructions are available on our web site at: http://www.oregon.gov/ODOT/CS/CONSTRUCTION/Pages/Prequalification.aspx This prequalification application covers Oregon Department of Transportation projects that are advertised on the ODOT Procurement Office - Construction Contract Unit website: http://www.oregon.gov/ODOT/CS/CONSTRUCTION/Pages/contractorplans/NTC.aspx This prequalification application does not cover Oregon Department of Transportation projects advertised in ORPIN (Oregon Procurement information Network) which maybe posted on our website. ODOT eBIDS provides free downloading of plans and specifications and related bid documents. You will need to self register as a holder of bidding plans in order for your bid to be responsive for each project for which you submit a bid. https://eem.odot.state.or.us/cf/EBIDS/ If you wish to appeal any of the conditions of this prequalification you must notify this offi in writing in accordance with ORS 279C.445 and ORS 279C.450 within three business days afte eceipt op--E*is notice. - pa tment of Transportation Procurement Office - Construction Contracts Unit 455 Airport Rd. SE, Bldg K Salem, OR 97301-5348 Phone: 503-986-2710 Fax: 503-986-6910 http://www.oregon.gov/ODOT/CS/CONSTRUCTION/Pages/index.aspx 14 EQUIPMENT, FACILITIES AND PLANTS (A, B, C, and D are all Required) (A) Equipment owned by the applicant: List only major items. Lump together small equipment and tools. Attachments are acceptable if all required information is included. Age in Quantity, Description and Capacity of Items Years Condition of Equipment 25 Dump Trucks and Trailers 2001 Excellent 36 Concrete Mixer Trucks 2000 Excellent 24 Truck Tractors/Trailers 2002 Excellent 9 Water Trucks 1986 Good 7 Crowler Dozers 2005 Excellent 18 Wheeler Loaders 2001 Excellent 5 Scrapers 1990 Good 9 Graders 1998 Good 26 Rollers 2001 Excellent - Good 19 Tractors / Backhoe 2007 Excellent 14 Excavators 2005 Excellent 23 Compressors / Generators 1992 Very Good 4 Concrete Batch Plants Varies **SEE `D' BELOW** 4 Asphalt Plants Varies **SEE `D' BELOW** 1 Rotomillin Machine 4' 2008 Excellent Misc Equipment 140 Pickups / Flatbeds / Service Trucks 2004 Excellent (B) Total market value of equipment: $23,000,000.00 (Required) (C) Does applicant intend to rent equipment? x❑ Yes ❑ No If yes, provide a general description: (Required) Additional equipment is rented on an as-needed basis *(D) Production Facility or Plant x ❑ Yes ❑ No If yes, complete below: (Required) Description Location Capacity **SEE ATTACHED* * * CITY OF ASHLAND's acceptance of this prequalification does not imply CITY OF ASHLAND's approval as material sources for CITY OF ASHLAND projects Glpub-wrkstengiOA Blank Forms\Contractor Prequalification Application Form 2013-14 Page 14 Revised July 2013 7 w ■ i r a cm, 1\ b } s E 3 cqi T _ o Z ti _ Y rV-,I a a afOi t E ° °z o rn Q E E - .2 o tO _ O y Q s d 06 0 C _ U2 v m m i - A _ oM - $ MCI ■ W mOZ Umw :gi L2 - = o o ? NN CC 2 Q! 3 _ _ c -o - m - a co A . m .a t aNi ~ ~ m w o aL~i i = .3 ? .822 3 - en v= a rn r - 8 w 4' O m - is 3 E T a 3 0° °o E o f ~ c c ¢ - ~ a> o ~ o ¢ a° ~ 3 z 3 v A H N 01 A co m a a % -22 v v e - a 15 o_ o - c A n- ~.c-.- _ c = a $ E 3 N= - v; C2 _ - U L E> IL.--E- 23.2 E m 3 a o z E m m m .m.. Eo m y - c u m 3 - CE -22 y5w - yYdEc°c°3~ `mo mq is = E _ 3 O ~m c A R u.o co C - o N E a E o y ` O r C °cc' E m a m v E E5 E .O d o .m- 3 '0 ,2°, a> `o W _ E o _ '4) 9m E c _ N D E o ~ L m E e p - l`7 m E 7 ~ s O v E 72' ? c 3 E w m o H N . O_ ~ aE UOw va'+ s Qo 2 .Jo a~ t0~ oc c.+...~o E~ 3 Si+ c 2 c e3Y?~ _3t~C _-~EVm ~--ic a e~ 2c q c °n' rv E ° L o o~HNta o.m m' ~O a m o C 6rv E=t '^,°S' ° >vO= m'O Ev°v E'° o o - h.~ m c° m~&'.°v h V o cm' $ ° ° sa ~o= md2a ~a ep..eIg a A o; ~ E c~ Euc 02,,"° E$t ~ 2h cE oc° ~E _ L~ a ~ f = m ° m~ C a o rv N m~ a A m o 3 E° a E m Q .m @ y S o m o c o m° c m m m= - E. E e m F Y:, ee ie ee ~ E m e°o a m ~ c @ eo ° c m - ~ 'a° ~ m e ~ ~ Fc, m c Z, C E v ee d m O o v" c E 3 u 'O. v l o c E@ °c - c -d E _ aeM oaE o °e~ N E N c- w- wz v-z cwa v .fie` d z 6oz v° I w v¢ v v k _E e E v C c o f o y d 2; o .o € E c e c y h ° m c° o o o A o 2 c s=r -21 Ec` =L• w of ° v o d y m2 f °rw E _ m o U" d., c e v m ° t m E N $ L 'Z'o N _ c m c o ~E e a ° ee r ° o m c o L z cm N E G ~ c~ m N ~ m c o°0 3 v 3 EP' ~ y_ o ~ E n F 2 0 2 3 c Y v 2 m W N # _ _ ■ ■ ■ ■ ° ■ a ■ ■ 41 in ~yy v` 5 ttZ'u ~ _ 1 c r _ - - E c ~ co _ m h a t m r " - _ -7 -3 - m U c c~ c_ 9 ~,k E° v • E° E L 'C c o y E y a _ d nom- E~ oosvc~ oo c • v ov E y... E~-O _ to; c_ v 3 3 tv y Z c aEi c - c E= u E-_ - o. °m ° c ~eooy - - d corn C c° y (j = c y o- ° j 2 -Z 75 O ° ° h r h E - a 2 m- o= Y U v c o c z° my - c m ~ 5 u gi a • • F ze E ] ~ • • a~ a°fr g 'aEi W~ ••1 • • 16 ,a• d••5 • UJIMW M F • • 00210 Restrictions on Federal Public Works Projects RESTRICTIONS ON FEDERAL PUBLIC WORKS PROJECTS (a) GENERAL: This clause implements provisions contained in the Airport and Airway Safety and Capacity Expansion Act of 1987, Public Law No. 100-223. (b) RESTRICTIONS ON CONTRACT AWARD: No contract will be awarded to a bidder (1) who is owned or controlled by one or more citizens or nationals of a foreign country included on the list of countries that discriminate against U.S. firms, published by the United States Trade Representative (USTR) or (2) whose subcontractors are owned or controlled by one or more citizens or nationals of a foreign country on such USTR list or (3) who incorporates in the project any product of a foreign country on such USTR list; unless a waiver to these restrictions is granted by the President of the United States or the Secretary of Transportation. (Notice of the granting of a waiver will be published in the Federal Register.) (c) CERTIFICATION: By signing this page the bidder certifies that with respect to this solicitation, and any resultant contract the bidder: (1) Is Is not X a contractor of a foreign country included on the USTR list; (2) Has Has not X entered into any contract with a subcontractor of a foreign country included on the USTR list; (3) Has Has not X entered into any contract for any product to be used on this project that is produced in a foreign country included on the USTR list. (d) The bidder may rely upon the certification of a prospective subcontractor for the above conditions, unless the bidder has knowledge that the certification is erroneous. (e) ERRONEOUS CERTIFICATION: This certification is a material representation of fact upon which reliance was placed when making the award. If it is later determined that the bidder knowingly rendered an erroneous certification, the sponsor may cancel this contract for default at no cost to the sponsor. (f) SUBCONTRACTS: The bidder shall incorporate this clause, without modification, including this paragraph (f) in all solicitations and subcontracts under this contract. (g) APPLICABILITY OF 18 U.S.C. 1001: This certification concerns a matter within the jurisdiction of the Federal Aviation Administration and the making of a false or rau t certification may render the maker subject to prosecution under Title 18, United es Co ec ' n 1001. June 26, 2014 Signature Date Ashland Municipal Airport Taxilane Improvements I Restrictions on Federal Public Works Projects 00440 Bid Bond BID BOND KNOW ALL MEN BY THESE PRESENTS: That we, LTM Incorporated dba Knife River Material , as Principal, and Liberty Mutual Insurance Company as Surety, are held and firml bound unto the City of Ashland, OR , as Obligee, in the penal sum of 100,16 of Amt. Bid ****Dollars, for the payment of which the Principal and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, by these presents. The condition of this obligation is such that if the Obligee shall make any award to the Principal fbiAshland Municipal Airport Taxilane Improvementsaccording to the terms of the proposal or bid made by the Principal therefor, and the Principal shall duly make and enter into a contract with the obligee in accordance with the terms of said proposal or bid and award and shall give bond for the faithful performance thereof, with Surety or Sureties approved by the Obligee; or, if the Principal shall in case of failure so to do, pay and forfeit to the Obligee the penal amount of the deposit specified in the call for bids, then this obligation shall be null and void; otherwise it shall be and remain in full force and effect and the Surety shall forthwith pay and forfeit to the Obligee, as penalty and liquidated damages, the amount of this bond. SIGNED AND DATED THIS 26th DAY e , 20 14 . By Principal LTM Incorporated dba Knife River Materials By S ty Liberty 7 tual Insurance Company Dana Brinkley, Attorney - n- Fact Ashland Muniaipai Airport Taxdane Improvements 1 Bid Bond THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. 5188552 This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. Certificate No. American Fire and Casualty Company Liberty Mutual Insurance Company The Ohio Casualty Insurance Company Peerless Insurance Company West American Insurance Company POWER OF ATTORNEY KNOWN ALL PERSONS BY THESE PRESENTS: That American Fire & Casualty Company and The Ohio Casualty Insurance Company are corporations duly organized under the laws of the State of Ohio, that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, that Peerless Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, and West American Insurance Company is a corporation duly organized under the laws of the State of Indiana (herein collectively called the "Companies"), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, PATRICIA C. BOYD, JACKIE ANDERBERG, DANA BRINKLEY, LINDA SHADDON . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . all of the city of MEDFORD State of OREGON each individually if there be more than one named, its true and lawful attomey-in-fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons. IN WITNESS WHEREOF, this PowerofAttomey has been subscribed by an authorized officerorofficial of the Companies and the corporate seals of the Companies have been affixed thereto this 22nd day of February 2012 -_e American Fire and Casualty Company The Ohio Casualty Insurance Company 0 g Liberty Mutual Insurance Company d CL i Peerless Insurance Company r West American Insurance Company 0 Y H CD By: STATE OF WASHINGTON ss Gregory W. Davenport, Assistant Secretary M 'a COUNTY OF KING 0 d ~ v d On this 22nd day of February 2012 before me personally appeared Gregory W. Davenport, who acknowledged himself to be the Assistant Secretary of American Fire and >,W ? Casualty Company, Liberty Mutual Insurance Company, The Ohio Casualty Company, Peerless Insurance Company and West American Insurance Company, and that he, as such, being d m authorized so to do, execute the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. O a Z M IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at Seattle, Washington, on the day and year first above written. Q CV) 0 By: O d 0 C KD Riley, Nota Public G p,G) d w O This PowerofAttomey is made and executed pursuant to and by authority of the following By-laws and Authorizations ofAmerican Fire and Casualty Company, The Ohio Casualty Insurance r c H Company, Liberty Mutual Insurance Company, West American Insurance Company and Peerless Insurance Company, which resolutions are now in full force and effect reading as follows: w e0` O a) C ARTICLE IV - OFFICERS - Section 12. Power of Attorney. Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject 0 c to such limitation as the Chairman or the President may prescribe, shall appoint such attomeys-in-fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, .a E acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attomeys-in-fact, subject to the limitations set forth in their respective 'R O powers of attorney, shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so > .0 y- executed, such instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attomey-in-fact under t E v the provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority. N W E y>., LE ARTICLE XIII - Execution of Contracts - SECTION 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, M 0 0 and subject to such limitations as the chairman or the president may prescribe, shall appoint such attomeys-in-fact, as may be necessary to act in behalf of the Company to make, execute, 00 seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attomeys-in-fact subject to the limitations set forth in their 0 respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so t0 r executed such instruments shall be as binding as if signed by the president and attested by the secretary. Certificate of Designation - The President of the Company, acting pursuant to the Bylaws of the Company, authorizes Gregory W. Davenport, Assistant Secretary to appoint such attomey-in-fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Authorization - By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and biding upon the Company with the same force and effect as though manually affixed. I, David M. Carey, the undersigned, Assistant Secretary, of American Fire and Casualty Company, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, West American Insurance Company and Peerless Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this & day of 20~''`` . By: David M. Carey, Assistant Secretary POA-AFCC, LMIC, OCIC, PIC & WAIC LMS 12873 012012 00400 Bid Form BID FORM To: City of Ashland 20 East Main Street, Ashland, OR 97520 Project: Taxilane Improvements at Ashland Municipal Airport - Sumner Parker Field FAA AIP No. 3-41-0002-010 The undersigned, as Bidder, declares: That the only persons or parties interested in this Bid as principals are those named herein; and that this Bid is made without collusion with any other person, firm, or corporation; and that the Bidder has carefully examined the Site, Solicitation Documents, Addenda (if any), Technical Specifications, Drawings, Form of Agreement, and all other Contract Documents; and in submitting this Bid, Bidder proposes and agrees: 1. To perform all of the Work and furnish all of the equipment required thereby and to supply any and all of the labor, materials, tools, expendable equipment, and utility and transportation services necessary to perform the contract; 2. To acknowledge receipt, has read and understands all Solicitation Documents in existence at the date the Bid Form is signed. The Bidder waives all rights to plead any misunderstanding regarding the same; 3. To have personally inspected the actual location of the work and all other local conditions affecting it; 4. To submit this Bid, subject to the terms and conditions stated in the Solicitation Documents; 5. That if this Bid is accepted, the Bidder shall certify in the Agreement, and it shall be a condition of the bond, as provided by ORS 279C.800 through ORS 279C.870, that in performing this Contract the Bidder will pay and cause to be paid not less than the prevailing rate of wages as of the date of the Public Notice, per hour, per day, and per week for and to each and every workman who may be employed in and about the performance of this Contract; 6. To comply with all applicable Public Contract Laws including ORS 279C.500 through ORS 279C.670 and the Oregon Workers' Compensation Law, ORS Chapter 656; 7. The Bidder's Company is properly licensed with the Oregon Contractors Board, in accordance with ORS 701 et seq. for all the work described herein. Bidders License Number is 56603 ; 8. The Bidder certifies, under penalty of perjury, that the Bidder's Company is not in violation of any Oregon tax laws; Ashland Municipal Airport Taxilane Improvements I Bid Form 00400 Bid Form 9. The Bidder is required to submit the First -Tier Subcontractor Disclosure Form and comply with ORS 279C.370; 10. ORS 279C.505 requires that all public contracts contain a provision requiring contractors to demonstrate that an employee drug testing program is in place. Bidder is therefore required to certify that Bidder has an employee drug testing program in place that applies to all employees, and will maintain a drug-testing program at all times during the performance of the Contract awarded. Failure to maintain a program shall constitute a material breach of contract; 11. The Bidder agrees upon issuance of City of Ashland's Notice to Proceed to complete the entire Contract within the contract performance period of 60 calendar days; 12. The Bidder agrees to liquidated damages paid to City of Ashland for each calendar day substantial completion is delayed beyond the contract performance period in the amount of One Thousand Five Hundred Dollars ($1,500) unless the contract performance period is extended or otherwise modified by written notice or executed Change Order; and 13. To complete all Work covered by said contract in a workmanlike manner for the prices established in the Bid Schedule, Section 00410, and summarized below: BID SUBMITTAL 14. The Bidder has examined copies of all the Solicitation Documents and the addenda numbered Ale he, through A]e" is hereby acknowledged. 15. The names of the president, treasurer and manager of the bidding corporation, or the names and residences of all persons and parties interested in this Bid as partners or principals are as follow: Name Address DAVE BULL, PRESIDENT CENTRAL POINT OR JOEL B. FRASIEUR, ASST SEC. CENTRAL POINT OR 16. The name of the surety by which the Surety Bond covering the Contract, if awarded, will be furnished, and the name and address of the surety's local agent are as follows: LIBERTY MUTUAL INSURANCE COMPANY C/O Name of Surety UNITED RISK SOLUTIONS Name of Agent: PAT BOYD Address: 2045 CARDINAL STE.300 MEDFORD, OR 97504 Ashland Municipal Airport Taxilane Improvements 2 Bid Form 00400 Bid Form 17. Accompanying this Bid is a Bid Bond or Certified Check in the amount of Dollars which amount is not less than 10 percent of the total amount of the Bid; and 18. If this Bid shall be accepted and the undersigned shall fail to, or neglect to, promptly execute a formal contract with the CITY OF ASHLAND, deliver to the CITY OF ASHLAND a performance and payment bond as required under ORS 279C.380, and deliver any required proof of insurance, the CITY OF ASHLAND will take the bid security as liquidated damages. 19. Bidder will comply with ORS 279C.838 or ORS 279C.840 or 40 U.S.C. 3141 et seq. (applicable prevailing wage rate laws). 20. Bidder acknowledges that the CITY OF ASHLAND may reject any bid not in compliance with all prescribed public contracting procedures and requirements and may reject for good cause all bids upon a finding of the CITY OF ASHLAND that it is in the public interest to do so. 21. Bidder need not be licensed under ORS 468A.720. O Sole Proprietor or Partnership of Corporation: If the Bidder is a co-partnership, so state giving the name under which business is transacted. IN WITNESS hereto the undersigned has set his (its) hand this day of 120. By: Typed Name: Title: Federal ID No. Sworn to before me this _ day of 120 Notary Public in and for the State of , residing at 2 Corporation: If the Bidder is a corporation, this Bid Form must be executed by the duly authorized officials and notarized. Ashland Municipal Airport Taxilane Improvements 3 Bid Form 00400 Bid Form IN WITNESS WHEREOF the undersigned corporation has caused this instrument to be executed and its seal affixed by its duly authorized officers this 26TH day of JUNE , 2014 ATTE~S4: NA E OF CO SST. Secretary By: Signature of Corpor ate Officer DAVE BULL Printed Name PRESIDENT Title {Corporate Seal} Federal ID No. 93-0600666 Sworn to before me this 26 day of NE , 20 4 . L~ary Vb1lic in and fort State of 0 EGON residing at JACKSON COUNTY OFFICIAL SEAL LYNDA KAY McKEE #my NOTARY PUBLIC-OREGON COMMISSION NO. 475169 COMMISSION EXPIRES FEBRUARY 26, 2011 Ashland Municipal Airport Taxilane Improvements 4 Bid Form 00410 Bid Schedule BID SCHEDULE TAXILANE IMPROVEMENTS AT ASHLAND MUNICIPAL AIRPORT - SUMNER PARKER FIELD AIP NO. 3-41-0002-010 LTM, Incorporated dba Bidder: Knife River Mateda(S an MDU Resources Company BASE BID Item Unit Bid No. Item Description Unit Quantity Price Amount Bid 1 Mobilization and Demobilization LS 1 qj 1, 6c)o Goo - GSoo 2 Demolition LS 1 (0,566 3 6~ 3 Asphalt Pavement Removal SY 900 L I, 4 Temporary Erosion Control LS 1 3 3d3' 3 3a3~ 5 Silt Fence LF 1,900 3 rrw 6 Geotextile Fabric SY 3,600 e) 90 3 alp/o to ~ 7 Unclassified Excavation On-Site Disposal CY 6,500 _ s4 ISO 8 Unclassified Excavation Off-Site Disposal CY 3,300 to S4 3GS'v 9 Unsuitable Excavation CY 170 17 a "n 10 Crushed Aggregate Base Course CY 1,100 ,5"D ' SS 060' 11 Bituminous Surface Course TON 590 t 10 G`f q~ 12 Bituminous Prime Coat TON 10 J /o 13 Pavement Markin SF 660 01 13 ~c 14 12-PVC Pie LF 300 39 r 11 7Gb~ 15 18-PVC Pie LF 180 &7' 2 oGo' 16 Catch Basin EA 3 .SOON 7 S~ 17 Manhole EA 1 3,' 18 3-Inch PVC Conduit LF 400 19 Concrete Encasement of Duct LF 230 3 $ r - ?~/o 20 Electrical Handhole EA 1 GL"~ Gig 21 Retroreflective Marker EA 29 qD ' t Lis r TOTAL OF EXTENDED UNIT PRICE ITEMS AND ~c~~~ -193 LUMP SUM ITEMS LISTED ABOVE $ Ashland Municipal Airport Taxilane Improvements I Bid Schedule 004255 First-Tier Subcontractor Disclosure Form FIRST-TIER SUBCONTRACTOR DISCLOSURE FORM ASHLAND MUNICIPAL AIRPORT - SUMNER PARKER FIELD Bidder Name: LTM, INCORPORATED DBA KNIFE RIVER MATERIALS Contact Name: PHILIP GRAFF Phone No.: 541-770-2960 Project Name: TAXILANE IMPROVEMENTS AIP Number: 3-41-0002-010 Bid Number: KA1512-1000-14 Bid Closing Date/Time: 2.00 PM June 26, 2014 Bidder shall submit this form to the CITY OF ASHLAND on or before 4:00 pm on June 26, 2014, as their disclosure of first-tier subcontractors. Name & Address Dollar Value $ Cate or of Work ore Bidder hereby submits this First-Tier Subcontractor Disclosure form pursuant to ORS 279C.370, which applies only to public improvements with a contract value of more than $100,000, and is not for public improvements that have been exempted from competitive bidding requirements under ORS 279C.335. The name of each subcontractor who will be furnishing labor or materials in connection with this project (and that is required), having a contract value equal to or greater than five percent of the total project bid or $15,000, whichever is greater, or $350,000 regardless of the percentage of the total project bid, shall be disclosed in the above form. Disclosure requirements do not apply to subcontractors who only provide materials. If the contract price is in excess of $100,000 and the first-tier subcontractors do not meet the above criteria, enter NONE' to indicate there are no subcontractors that need to be disclosed. ATTACH ADDITIONAL SHEETS IF NEEDED. Contract is less than $100,000; therefore, it does not meet ORS 279C.370 and First-Tier Disclosure is not required. (Sign if applicable) Bids must be submitted to the CITY OF ASHLAND by the bid closing date and time. Failure to submit this form by the disclosure deadline will result in a nonresponsive bid. A nonresponsive bid will not be considered for award. Ashland Municipal Airport Taxilane Improvements I First-Tier Subcontractor Disclosure Form 00430 Bidder's Qualifications BIDDER'S QUALIFICATIONS Each bidder submitting a bid on Work included in these Bidding Documents shall prepare and submit the data requested in the following schedule as part of the bid. LTM,..INCORPORATED DBA 1. Name of Bidder: KNIFE RIVER MATERIALS 2. Business Address: P.O. BOX 1145 MEDFORD, OR 97501 3. Telephone/Fax Nos.: 541-770-2960 4. E-mail Address: PHILIP. GRAFF KNIFERIVER. COM 5. Business License No.: 56603 6. How many years has said Bidder been engaged in the contracting business under the present firm name: 21 7. Contracts now in hand (Gross Amount): $ 25, 000, 000.00 8. General character of work performed by said company: PAVING, EXCAVATION, UNDERGROUND SEE ODOT PREQUALIFICATION LETTER - ATTACHED 9. The following is a partial list of the construction our organization has completed which is similar in character and magnitude to that required in the proposed contract: Submit added sheet if necessary. Owner Contract Year Include Contact Person and Phone No. Location Amount 2012 MEDFORD/JACKSON COUNTY AIRPORT MEDFORD ,496,226 KEN SCHOENING 541-608-3583 2010 JOSEPHINE ALEX GROSSI 541-955-4535 2010 ASHLAND AIRPORT ASHLAND 1,285,969 SCOTT FLEURY 541-488-5587 Ashland Municipal Airport Taxilane Improvements 1 Bidder's Qualifications 00430 Bidder's Qualifications 10. The following is a listing of all projects we have undertaken in the last two years that have resulted in partial or final settlement of the contract by arbitration or litigation: Original Total Claims Amount of Name of Client Contract Arbitrated or Settlement of and Project Amount Litigated Claims N/A 11. List of Company's major equipment to be used in the work: Submit added sheet if necessary. EQUIPMENT LIST ATTACHED 12. List of Company's key personnel that would be available for the work: Years of Similar Name Title Project Experience JOE SOARES CONSTRUCTION OPER MGR Q + SEAN MCCLAFFERTY CONSTRUCTION FOREMAN c~0 JUSTIN RICHARDSON ASPHALT FOREMAN_ I Ashland Municipal Airport Taxilane Improvements 2 Bidder's Qualifications 00430 Bidder's Qualifications 13. Bank References: SEE ATTACHED 14. Evidence of Financial Responsibility: Attach statement or report of bidder's financial resources and liabilities as of the last calendar year or the Contractor's last fiscal year, as certified by a public accountant, in accordance with Section 00710, Article 20-02. At the time of submitting this bid, I certify that the company's financial responsibility is approximately the same as stated or reported by the public accountant. ❑R Yes ❑ No. Bidder shall qualify the public accountant's statement or report to reflect his/her (bidder's) true financial condition at the time such qualified statement or report is submitted to the owner. By DAVE BULL Title PRESIDENT Date JUNE 26, 2014 FORM OF BID SECURITY Herewith find deposit in the form of BID BOND (state whether certified check, cashier's check, cash or bid bond he amount of $ , which amount is not less than 10 percent (10% of the tot bi . Signature Ashland Municipal Airport Taxilane Improvements 3 Bidder's Qualifications C7~~KN I FE ROVER MATERIALS AN MOU R~OURCES COMPANY southern Oregon Division M tM nwxl - CIA MU 41D/SAPPLICATION FOR CREDIT LTM, incomorated dba Knife River Materials Medford Operations Tax Identification Number. 93-0600666 THIS BUSINESS IS AN OREGON CORPORATION ENGAGED IN READY MIX CONCRETE, AGGREGATE SALES, AND CONSTRUCTION. Corporate Officers: insurance Anent: Division President: Dave BUII Mars cLen an Region Controller 8 333 S. Street. Suite 1600 Assistant Secretary: Joel Frasieur Minneapolis, MN 55402 Trade References: Ferguson Enterprises, Inc. Albina Asphalt Peterson Machinery Lockbox 043090 MIS 90 801 Main Street P.O. Box 2218 PO Box 4300 Vancouver, WA 98660 San Leandro, CA 94577 Portland, OR 97208 Ph: (360) 816-8016 Ph: (800) 772-2340 Ph: (503) 283-3333 Fax: (360) 816-8017 Fax: (510) 357-2407 Fax: (503) 283-3326 Bank Reference: U S National Bank of Oregon, Main Branch Medford Oregon 97501 Bank Officer: Sheri Schmelzer Phone: (541) 776-2578 Purchase orders are Issued for all orders of merchandise and/or services. The above Information is for the purpose of obtaining credit and is warranted to be true. WE HEREBY AUTHORIZE the firm to whom this application is made to investigate the references listed pertaining to our credit and financial responsibility. By;-~-^--- Titre: Region Controller & Assistant Secretary Joel B. Frasieur Coati Opers"one Klamath Oparadons Medford OperaBons Roadug Operatlona P.O. aox 1720 4815 71t** Ln P.O. Box 1145 P.O. Box 1427 Cope Day, OR 97420 Klamath Fa%. OR 97603 Madfotd, OR 97501 Roaebarg, OR 97470 (541) 269.1915 (541) 880.7400 (541) 7796304 (541) 679.6744 00445 Non-Collusion Affidavit NON-COLLUSION AFFIDAVIT STATE OF OREGON ) )ss COUNTY OF JACKSON ) DAVE BULL , being first duly sworn, on her/his oath says that the bid above submitted is a genuine and not a sham or collusive bid, or made in the interest or on behalf of any person not therein named; and s/he further says that the said bidder has not directly or indirectly induced or solicited any bidder on the above work or supplies to put in a sham bid, or any other person or corporation to r in from bidding; and that said bidder has not in any manner sought by collusion to sec a an advan a over an other bidder or bidders. LTM, Incorporated d nl a ver Materials an MDU Resources Company (Contractor) Subscribed and sworn to before me this 26 day of JUNE , 2014 ;ary lic in and fort S ate of OREG , res>< ing at JACKSON COUNTY My commission expires: OFFICIAL SEAL LYNDA KAY McKEE l NOTARY PUBLIC-OREGON yd~P 17 COMMISSION NO. 475169 MY COMMISSION EXPIRES FEBRUARY 26, 2017 Ashland Municipal Airport Taxilane Improvements I Non-Collusion Affidavit 00450 Certification of Nonsegregated Facilities CERTIFICATION OF NONSEGREGATED FACILITIES The Federally assisted construction contractor certifies that segregated facilities are not maintained at any establishments, and that employees are not permitted to perform services at any location, under the contractor's control, where segregated facilities are maintained. The Federally assisted construction contractor agrees that a breach of this certification is a violation of the Equal Opportunity clause in this contract. As used in this certification, the term "segregated facilities" means any waiting rooms, work areas, restrooms and washrooms, restaurants and other eating areas, time-clocks, locker rooms and other storage and dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees which are segregated by explicit directive or are in fact segregated on the basis of race, color, religion, sex, or national origin, because of habit, local custom, or any other reason. The federally assisted construction contractor agrees that (except where obtained identical certification from proposed subcontractors for specific time periods) he/she will obtain identical certifications from proposed subcontractors prior to the award of subcontracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity clause, and that he/she will retain such certifications in the files. Certification - The information above is true and complete to the best of my knowledge and belief. B SIDENT T e nd Title of Signer (Please Type) JUNE 26, 2014 -0,Q-- Signature Date NOTE: The penalty for making false statements in offers is prescribed in 18 U.S.C. 1001. Ashland Municipal Airport Taxilane Improvements I Certification of Nonsegregated Facilities 00460 Bidder's Statement on Previous Contracts Subject to EEO Clause BIDDER'S STATEMENT ON PREVIOUS CONTRACTS SUBJECT TO EEO CLAUSE The Bidder has X has not participated in a previous contract subject to the nondiscrimination clause prescribed by Section 202 of Executive Order No. 11246 dated September 24,1965. The Bidder has x has not submitted compliance reports in connection with any such contract as required by applicable instructions. If the Bidder has participated in a previous contract subject to the nondiscrimination clause and has not submitted compliance reports as required by applicable instructions, the Bidder shall submit Standard Form 100 with the bid or proposal indicating current compliance. VE BULL, PRESIDENT me nd Title of Signer (Please Type) JUNE 26, 2014 - Z~ Signature Date Ashland Municipal Airport Taxilane Improvements I Bidder's Statement on Previous Contracts Subject to EEO Clause 00495 Buy American Certificate and Notice to Bidders BUY AMERICAN CERTIFICATION (Reference: 49 USC § 50101) The contractor agrees to comply with 49 USC § 50101, which provides that Federal funds may not be obligated unless all steel and manufactured goods used in AIP-funded projects are produced in the United States, unless the FAA has issued a waiver for the product; the product is listed as an Excepted Article, Material Or Supply in Federal Acquisition Regulation subpart 25.108; or is included in the FAA Nationwide Buy American Waivers Issued list. CERTIFICATE OF BUY AMERICAN COMPLIANCE FOR MANUFACTURED PRODUCTS (Non-building construction projects, equipment acquisition projects) As a matter of bid responsiveness, the bidder or offeror must complete, sign, date, and submit this certification statement with their proposal. The bidder or offeror must indicate how they intend to comply with 49 USC § 50101 by selecting one on the following certification statements. These statements are mutually exclusive. Bidder must select one or the other (not both) by inserting a checkmark or the letter "X". ® Bidder or offeror hereby certifies that it will comply with 49 USC § 50101 by: a) Only installing steel and manufactured products produced in the United States, or; b) Installing manufactured products for which the FAA has issued a waiver as indicated by inclusion on the current FAA Nationwide Buy American Waivers Issued listing, or; c) Installing products listed as an Excepted Article, Material or Supply in Federal Acquisition Regulation Subpart 25.108. By selecting this certification statement, the bidder or offeror agrees: 1. To provide to the Owner evidence that documents the source and origin of the steel and manufactured product. 2. To faithfully comply with providing US domestic product 3. To furnish US domestic product for any waiver request that the FAA rejects 4. To refrain from seeking a waiver request after establishment of the contract, unless extenuating circumstances emerge that the FAA determines justified. ❑ The bidder or offeror hereby certifies it cannot comply with the 100% Buy American Preferences of 49 USC § 50101(a) but may qualify for either a Type 3 or Type 4 waiver under 49 USC § 50101(b). By selecting this certification statement, the apparent bidder or offeror with the apparent low bid agrees: 1. To the submit to the Owner within 15 calendar days of the bid opening, a formal waiver request and required documentation that support the type of waiver being requested. Ashland Municipal Airport Taxilane Improvements 1 Buy American Certificate and Notice to Bidders 00495 Buy American Certificate and Notice to Bidders 2. That failure to submit the required documentation within the specified timeframe is cause for a non-responsive determination may result in rejection of the proposal. 3. To faithfully comply with providing US domestic products at or above the approved US domestic content percentage as approved by the FAA. 4. To refrain from seeking a waiver request after establishment of the contract, unless extenuating circumstances emerge that the FAA determines justified. Required Documentation Type 3 Waiver - The cost of the item components and subcomponents produced in the United States is more that 60% of the cost of all components and subcomponents of the "item". The required documentation for a type 3 waiver is: a) Listing of all product components and subcomponents that are not comprised of 100% US domestic content (Excludes products listed on the FAA Nationwide Buy American Waivers Issued listing and products excluded by Federal Acquisition Regulation Subpart 25.108; products of unknown origin must be considered as non-domestic products in their entirety) b) Cost of non-domestic components and subcomponents, excluding labor costs associated with final assembly at place of manufacture. c) Percentage of non-domestic component and subcomponent cost as compared to total "item" component and subcomponent costs, excluding labor costs associated with final assembly at place of manufacture. Type 4 Waiver - Total cost of project using US domestic source product exceeds the total project cost using non-domestic product by 25%. The required documentation for a type 4 of waiver is: a) Detailed cost information for total project using US domestic product b) Detailed cost information for total project using non-domestic product False Statements: Per 49 USC § 47126, this certification concerns a matter within the jurisdiction of the Federal Aviation Administration and the making of a false, fictitious or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code. JUNE 26, 2014 Date LTM, Incorporated dba Signature Knife River Materials an MDU Resources Company DAVE BULL, PRESIDENT Company Name Title Ashland Municipal Airport Taxilane Improvements 2 Buy American Certificate and Notice to Bidders 00495 Buy American Certificate and Notice to Bidders NOTICE TO BIDDERS BUY AMERICAN - STEEL AND MANUFACTURED PRODUCTS FOR CONSTRUCTION CONTRACTS (JAN 1991) (a) The Aviation Safety and Capacity Expansion Act of 1990 provides that preference be given to steel and manufactured products produced in the United States when funds are expended pursuant to a grant issued under the Airport Improvement Program. The following terms apply: 1. Steel and manufactured products. As used in this clause, steel and manufactured products include (1) steel produced in the United States or (2) a manufactured product produced in the United States, if the cost of its components mined, produced or manufactured in the United States exceeds 60 percent of the cost of all its components and final assembly has taken place in the United States. Components of foreign origin of the same class or kind as the products referred to in subparagraphs (b)(1) or (2) shall be treated as domestic. 2. Components. As used in this clause, components means those articles, materials, and supplies incorporated directly into steel and manufactured products. 3. Cost of Components. This means the costs for production of the components, exclusive of final assembly labor costs. (b) The successful bidder will be required to assure that only domestic steel and manufactured products will be used by the Contractor, subcontractors, materialmen, and suppliers in the performance of this contract, except those - 1. that the U.S. Department of Transportation has determined, under the Aviation Safety and Capacity Expansion Act of 1990, are not produced in the United States in sufficient and reasonably available quantities and of a satisfactory quality; 2. that the U.S. Department of Transportation has determined, under the Aviation Safety and Capacity Expansion Act of 1990, that domestic preference would be inconsistent with the public interest; or 3. that inclusion of domestic material will increase the cost of the overall project contract by more than 25 percent. (End of Clause) Ashland Municipal Airport Taxilane Improvements 3 Buy American Certificate and Notice to Bidders Employee Drug Testing Program Certification EMPLOYEE DRUG TESTING PROGRAM CERTIFICATION ORS 279C.505 requires that bidders shall demonstrate and disclose to the CITY OF ASHLAND that he/she has an employee drug testing program in place before a public contract can be awarded. Therefore, by signing this Certification, the Bidder does hereby certify and confirm that, as the proposed general contractor for the CITY OF ASHLAND, TAXILANE IMPROVEMENTS AT ASHLAND MUNICIPAL AIRPORT - SUMNER PARKER FIELD, AIP NO. 3-41-0002-010, that he/she has an employee drug testing program in place that is consistent with, and satisfies the intent of, the above-referenced legislation. CONTRACTOR: LTM, Incorporated dba Knife River Materials an MDU Resources Company BY: DAVE BULL TITLE: PRESIDENT DATE: JUNE 26, 2014 Ashland Municipal Airport Taxilane Improvements I Employee Drug Testing 006 10 Performance Bond and Payment Bond PERFORMANCE BOND The undersigned LTM, Incorporated dba Knife River Materials , as principal, further referred to in this bond as Contractor, and Liberty Mutual Insurance Company AND Travelers Casualty and Surety as surety, further referred to in this bond as Surety, are jointly and severally bound unto City of Ashland, as obligee, further referred to in this bond as City, in the sum of Three Hundred Ninety Seven Thousand Seven Hundred Ninety Three Dollars and 001100 Dollars (S397,793.00**********). * Company of America Contractor and City have entered into a written contract dated , 20 , for the following project: Taxilane Improvements at Ashland Municipal Airport - Sumner Parker Field. This contract is further referred to in this bond as the Contract and is incorporated into this bond by this reference. The conditions of this bond are: 1. If Contractor faithfully performs the Contract in accordance with the plans, specifications and conditions of the contract within the time prescribed by the Contract, as required by ORS 279C. 380 through 279C.385, then this obligation is null and void; otherwise it shall remain in full force and effect. 2. If Contractor is declared by City to be in default under the Contract, the Surety shall promptly remedy the default, perform all of Contractor's obligations under the contract in accordance with its terms and conditions and pay to City all damages that are due under the Contract. 3. This bond is subject to claims under ORS 279C.380 through 279C.390. 4. This obligation jointly and severally binds Contractor and Surety and their respective heirs, executors, administrators, successors. 5. Surety waives notice of modification of the Contract or extension of the Contract time. 6. Nonpayment of the bond premium shall not invalidate this bond. 7. The bond number and the name, address, and telephone number of the agent authorized to receive notices concerning this bond are as follows. Bond Number: 190-031-058 AND 106076025 Bond Agent: United Risk Solutions, Inc. Address: 2045 Cardinal Avenue, Suite 300 Medford, OR 97504 Telephone: 541-245-1111 Ashland Municipal Airport Taxilane Improvements I Performance Bond and Payment Bond 006 10 Performance Bond and Payment Bond SIGNED this 15th day of August 2014. WITNESS: (Corporate Seal) CONTRACTOR: LTM, incorporated dba Knife rver Materi By: u_ Title:? ec"I dPd7 Legal Address: P- O- 00X ol-4s 1"Mf6d , 0►2 115o1 Attest: Corporate Secretary WITNESS: (Corporate Seal) Liberty Mutual Insurance Company AND SURETY: Travelers Casualty and Surety Company of America By: Title: Lois Weathers, Attorney-in-Fact Legal Address: 2045 Cardinal Avenue, Suite 300 Medford, Oregon 97504 Attest: Corporate Secretary Ashland Municipal Airport Taxilane Improvements 2 Performance Bond and Payment Bond 006 10 Performance Bond and Payment Bond PAYMENT BOND The undersigned LTM, Incorporated dba Knife River Materials , as principal, further referred to in this bond as Contractor,.and Liberty Mutual Insurance Company AND * , as surety, further referred to in this bond as Surety, are jointly and severally bound unto City of Ashland, as obligee, further referred to in this bond as City, in the sum of Three Hundred Ninety Seven Thousand Seven Hundred Ninety Three Dollars and 00/100-Dollars 397,793.00*******). *Travelers Casualty and Surety Company of America Contractor and City have entered into a written contract dated , 20 , for the following project: Taxilane Improvements at Ashland Municipal Airport - Sumner Parker Field. This contract is further referred to in this bond as the Contract and is incorporated into this bond by this reference. The conditions of this bond are: 1. If Contractor faithfully performs the Contract within the time prescribed by the Contract, and promptly makes payment to all claimants, as defined in ORS 279C.600 through 279C.620, then this obligation is null and void; otherwise it shall remain in full force and effect. 2. If Contractor is declared by City to be in default under the Contract, the Surety shall promptly remedy the default, perform all of Contractor's obligations under the contract in accordance with its terms and conditions and pay to City all damages that are due under the Contract. 3. This bond is subject to claims under ORS 279C.600 through 279C.620. 4. This obligation jointly and severally binds Contractor and Surety and their respective heirs, executors, administrators, successors. 5. Surety waives notice of modification of the Contract or extension of the Contract time. 6. Nonpayment of the bond premium shall not invalidate this bond. 7. The bond number and the name, address, and telephone number of the agent authorized to receive notices concerning this bond are as follows: Bond Number: 190-031-0581 106076025 Bond Agent: United Risk Solutions Address: 2045 Cardinal Avenue, Suite 300 Medford, OR 97504 Telephone: 541-245-2111 SIGNED this 15th day of August , 2014. Ashland.Municipal Airport Taxilane Improvements 3 Performance Bond and Payment Bond 00610 Performance Bond and Payment Bond WITNESS: (Corporate Seal) CONTRACTOR: TM, Incor ated d a nif River Materials By: Title: Legal Address: _ T.! AfyJ Attest: C~a Corporate Secretary WITNESS: (Corporate Seal) Liberty Mutual Insurance Company AND SURETY: Travelers Casualty and Surety Company of America By: „ Et ,ftr~c~ Title: Lois Weathers, Attorney-in-Fact Legal Address: 2045 Cardinal Avenue, Suite 300 Medford, OR 97504 Attest: Corporate Secretary (Insert here in conjunction with Contract Award Documentation) Ashland Hunicipal Airport Taxilane Improvements 4 Performance Bond and Payment Bond THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. Certificate No. 6618322 American Fire and Casualty Company Liberty Mutual Insurance Company The Ohio Casualty Insurance Company West American Insurance Company POWER OF ATTORNEY KNOWN ALL PERSONS BY THESE PRESENTS: That American Fire & Casualty Company and The Ohio Casualty Insurance Company are corporations duty organized under the laws of the State of New Hampshire, that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized under the laws of the State of Indiana (herein collectively called the "Companies"), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Dana Brinkley; Jackie Anderberg: Linda Shaddon: Lois Weathers; Patricia G Bovd all of the city of Medford state of OR each individually if there be more than one named, its true and lawful attomey-in-fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents and shall be as binding upon the Companies as if they have been duty signed by the president and attested by the secretary of the Companies in their own proper persons. IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this 20th day of June 2014 American Fire and Casualty Company •a The Ohio Casualty Insurance Company H Liberty Mutual Insurance Company 4) West American Insurance Company N N .D w By: David M. Care; Assistant secretary = O STATE OF PENNSYLVANIA ss C COUNTY OF MONTGOMERY . ° d On this 20th day of June , 2014 , before me personalty appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of American Fire and t.. v d Casualty Company, Liberty Mutual Insurance Company, The Ohio Casualty Insurance Company, and West American Insurance Company, and that he, as such, being authorized so to do, W 0.2 execute the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. L at > IN WITNESS WHEREOF, I have hereunto subscribed rrTrmme and affixed my notarial seat at Plymouth Meeting. Pennsylvania, on the day and year first above written. O a M By: C •L ° Teresa Pastella , Notary Public d C 3 60 a° E C m Rr This Power of Attorney is made and executeftursuant to and by authority of the following By-laws and Authorizations ofAmerican Fire and Casualty Company, The Ohio Casualty Insurance N pG Company, Liberty Mutual Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows: . . m N ` ARTICLE IV- OFFICERS -Section 12. Power of Attorney. Any officer or other official of the Corporation authorized for that purpose in writing by the Chaimlan or the President, and subject O r m to such limitation as the Chairman or the President may prescribe, shall appoint such attomeys-in-fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, 4) O C acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attomeys-in-fact, subject to the limitations set forth in their respective ~p E 4 powers of attorney, shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so 0) p executed, such instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attomey-in-fact under > o the provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority. Z q N ARTICLE All - Execution of Contracts - SECTION 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, > i and subject to such limitations as the chairman or the president may prescribe, shall appoint such attomeys-in-fact, as may be necessary to act in behalf of the Company to make, execute, M O = seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such aftomeys-in-fact subject to the limitations set forth in their = Z v respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so 0 ~ executed such instruments shall be as binding as if signed by the president and attested by the secretary. FO Certificate of Designation - The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attomeys-in- fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Authorization - By unanimous consent of the Companys Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with the same force and effect as though manually affixed. I, Gregory W. Davenport, the undersigned, Assistant Secretary, of American Fire and Casualty Company, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attomey executed by said Companies, is in full force and effect and has not been revoked. p IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this / day of AuGuS-r 20 . By: Gregory W. Davenport, Assistant Secretary LMS 12873 122013 8 of 200 WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER ,A. POWER OF ATTORNEY TRAVELERS Farmington Casualty Company St. Paul Mercury Insurance Company Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company Fidelity and Guaranty Insurance Underwriters, Inc. Travelers Casualty and Surety Company of America St. Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company St. Paul Guardian Insurance Company Attorney-In Fact No. 228127 Certificate No. 005958219 KNOW ALL MEN BY THESE PRESENTS: That Farmington Casualty Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company are corporations duly organized under the laws of the State of Connecticut, that Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters, Inc., is a corporation duly organized under the laws of the State of Wisconsin (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint Jackie Anderberg, Patricia C. Boyd, Dana Brinkley, Linda Shaddon, and Lois Weathers of the City of Medford , State of Oregon their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF, the Companies have caused this instrument to be signed and their corporate seals to be hereto affixed, this 23rd day of June 2014 Farmington Casualty Company St. Paul. Mercury Insurance Company Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company Fidelity and Guaranty Insurance Underwriters, Inc. Travelers Casualty and Surety Company of America St. Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company St. Paul Guardian Insurance w' Company GI.SUA~~ JduF1RE•6 w,. O*~ G9 JQ'~✓•. Lqq 9JP 1v 4Np~ ®RI •O i S EAL i SEAL~~11Y! S'- , State of Connecticut By: City of Hartford ss. Robert L. Raney, enior Vice President On this the 23rd day of June 2014 before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. p,TET In Witness Whereof, I hereunto set my hand and official seal. My Commission expires the 30th day of June, 2016. AIIBI~~+ * Marie C. Tetreault, Notary Public 58440-8-12 Printed in U.S.A. WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, which resolutions are now in full force and effect, reading as follows: RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attomeys-in-Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys-in-Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys-in-Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I, Kevin E. Hughes, the undersigned, Assistant Secretary, of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 15 t#fdayof ~(S - 20 ~ . Kevin E. Hughes, Assistant Sec tary GI.SUq FIFE 6 4N..~MSG "`Y INSUq ~ ~__L :`;j . oi~ pal X896 SEA Gee 4~/ Alt~~ To verify the authenticity of this Power of Attorney, call 1-800-421-3880 or contact us at www.travelersbond.com. Please refer to the Attorney-In-Fact number, the above-named individuals and the details of the bond to which the power is attached. WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER DATE (MMIDD/YYYY) ® CERTIFICATE OF LIABILITY INSURANCE 06/22//2014 20, 4 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Marsh USA Inc. NAME: 333 South 7th Street, Suite 1400 AHCNNo Ext : (AC No Minneapolis, MN 55402-2400 E-MAIL Attn: contract.reviewCSS@marsh.com ADDRESS: INSURERS AFFORDING COVERAGE NAIC # J43750-LTM-GAWX-14-15 INSURER A : Liberty Mutual Fire Ins Co 23035 INSURED LTM, INCORPORATED INSURER B : Associated Electric & Gas Ins Services Ltd 3190004 DBA KNIFE RIVER MATERIALS INSURER C : Liberty Mutual Insurance Company 23043 PO BOX 1145 INSURER D : MEDFORD, OR 97501 INSURER E : INSURER F : COVERAGES CERTIFICATE NUMBER: CHI-004985688-01 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDLSUBR POLICY NUMBER (MMIDD/YYYY) 12 LTR /YYW MMIDD//YYYY LIMITS A GENERAL LIABILITY TB2-641-005097-044 01/01/2014 01/01/2015 EACH OCCURRENCE $ 2,000,000 OM MERCIAL GENERAL LIABILITY PREMISES Ea occurrence $ qPXERPROJ DAMAGE TO RENTED 500,000 CLAIMS-MADE ~ OCCUR MED EXP (Any one person) $ 10,000 EC T T AGGREGATE PERSONAL & ADV INJURY $ 2,000,000 GENERAL AGGREGATE $ 4,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ 4,000,000 POLICY PRO LOC $ A AUTOMOBILE LIABILITY AI2-641-005097-054 01/01/2014 01/01/2015 COMBINED SINGLE LIMIT 2,000,000 Ea accident $ IX ANY AUTO BODILY INJURY (Per person) $ ALL OWNED SCHEDULED BODILY INJURY (Per accident) $ AUTOS AUTOS HIRED AUTOS X NON-OWNED PROPERTY DAMAGE $ AUTOS Per accident B UMBRELLA LIAB OCCUR XL5063403P 01/01/2014 01/01/2015 EACH OCCURRENCE $ 5,000,000 X EXCESS LAB CLAIMS-MADE AGGREGATE $ 5,000,000 DED RETENTION $ $ C WORKERS COMPENSATION WC7-641-005097-024 (Guar. Cost) 01/01/2014 01/01/2015 X WCSTATU- oTH- AND EMPLOYERS' LIABILITY TORY LIMITS G ANY PROPRIETOR/PARTNER/EXECUTIVE YIN WA7-64D-005097-014 (AOS) 01/01/2014 01/01/2015 E. L. EACH ACCIDENT $ 1'000'000 OFFICER/MEMBER EXCLUDED? N N / A (Mandatory in NH) 'Includes "Stop-Gap°' E.L. DISEASE - EA EMPLOYE $ 1,000,000 If as, describe under 1,000,000 DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT $ DESCRIPTION OF OPERATIONS / LOCATIONS I VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if more space is required) Re: Ashland Municipal Airport Taxilane Improvements, AIP Project No.3-41-0002-010 PAE Project No.ASH001, KRM Project No.1641113 City of Ashland is/are included as additional insured under general liability per the attached CG 2010 and CG 2037 endorsements and does not include professional liability coverage. Blanket Additional Insured for Automobile Liability is included per attached designated Insured Endorsement CA 20 48. Primary and Non-Contributory applies for General Liability per LN 20 01 attached. Excess liability applies to general liability, products and completed operations, automobile liability, and employers liability. CERTIFICATE HOLDER CANCELLATION City of Ashland SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Attn: Scott Fleury, Engineering Services Manager THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN 20 E. Main Street ACCORDANCE WITH THE POLICY PROVISIONS. Ashland, OR 97520 AUTHORIZED REPRESENTATIVE of Marsh USA Inc. Manashi Mukherjee ~inLUVO►~ t~r~ud e c @ 1988-2010 ACORD CORPORATION. All rights reserved. ACORD 25 (2010/05) The ACORD name and logo are registered marks of ACORD Policy Number AI2-641-005097-054 Issued by LIBERTY MUTUAL FIRE INSURANCE COMPANY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. NOTICE OF CANCELLATION TO THIRD PARTIES This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE PART MOTOR CARRIER COVERAGE PART GARAGE COVERAGE PART TRUCKERS COVERAGE PART EXCESS AUTOMOBILE LIABILITY INDEMNITY COVERAGE PART SELF-INSURED TRUCKER EXCESS LIABILITY COVERAGE PART COMMERCIAL GENERAL LIABILITY COVERAGE PART EXCESS COMMERCIAL GENERAL LIABILITY COVERAGE PART PROD UCTSICOMPLETED OPERATIONS LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART COMMERCIAL LIABILITY - UMBRELLA COVERAGE FORM Schedule Name of Other Person(s)! Email Address or mailing address: Number Days Notice: Organization (s): Per schedule of certificate 90 holders on file with the company A. If we cancel this policy for any reason other than nonpayment of premium, we will notify the persons or organizations shown in the Schedule above. We will send notice to the email or mailing address listed above at least 10 days, or the number of days listed above, if any, before the cancellation becomes effective. In no event does the notice to the third party exceed the notice to the first named insured. B. This advance notification of a pending cancellation of coverage is intended as a courtesy only. Our failure to provide such advance notification will not extend the policy cancellation date nor negate cancellation of the policy. All other terms and conditions of this policy remain unchanged. LIM 99 01 05 11 © 2011 Liberty Mutual Group of Companies. All rights reserved. Page 1 of 1 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Policy Number TB2-641-005097-044 Issued by LIBERTY MUTUAL FIRE INSURANCE COMPANY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. NOTICE OF CANCELLATION TO THIRD PARTIES This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE PART MOTOR CARRIER COVERAGE PART GARAGE COVERAGE PART TRUCKERS COVERAGE PART EXCESS AUTOMOBILE LIABILITY INDEMNITY COVERAGE PART SELF-INSURED TRUCKER EXCESS LIABILITY COVERAGE PART COMMERCIAL GENERAL LIABILITY COVERAGE PART EXCESS COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART COMMERCIAL LIABILITY - UMBRELLA COVERAGE FORM Schedule Name of Other Person(s) / Email Address or mailing address: Number Days Notice: Organization(s): Per schedule of certificate 90 holders on file with the coma n A. If we cancel this policy for any reason other than nonpayment of premium, we will notify the persons or organizations shown in the Schedule above. We will send notice to the email or mailing address listed above at least 10 days, or the number of days listed above, if any, before the cancellation becomes effective. In no event does the notice to the third party exceed the notice to the first named insured. B. This advance notification of a pending cancellation of coverage is intended as a courtesy only. Our failure to provide such advance notification will not extend the policy cancellation date nor negate cancellation of the policy. All other terms and conditions of this policy remain unchanged. LIM 99 01 05 11 © 2011 Liberty Mutual Group of Companies. All rights reserved. Page 1 of 1 Includes copyrighted material of Insurance Services Office, Inc., with its permission. THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. NOTICE OF CANCELLATION TO THIRD PARTIES A. If we cancel this policy for any reason other than nonpayment of premium, we will notify the persons or organizations shown in the Schedule below. We will send notice to the email or mailing address listed below at least 10 days, or the number of days listed below, if any, before cancellation becomes effective. In no event does the notice to the third party exceed the notice to the first named insured. B. This advance notification of a pending cancellation of coverage is intended as a courtesy only. Our failure to provide such advance notification will not extend the policy cancellation date nor negate cancellation of the policy. SCHEDULE Name of Other Person(s) I Email Address or mailing address: Number Days Notice: Organization(s): Per schedule of certificate holders on file with the company 90 All other terms and conditions of this policy remain unchanged. Issued by Liberty Insurance Corporation For attachment to Policy No. WA7-64D-005097-014 Effective Date 01/01/2014 Premium $ Issued to WM 90 18 06 11 © 2011 Liberty Mutual Group of Companies Page 1 of 1 Ed. 06101/2011 All Rights Reserved THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. NOTICE OF CANCELLATION TO THIRD PARTIES A. If we cancel this policy for any reason other than nonpayment of premium, we will notify the persons or organizations shown in the Schedule below. We will send notice to the email or mailing address listed below at least 10 days, or the number of days listed below, if any, before cancellation becomes effective. In no event does the notice to the third party exceed the notice to the first named insured. B. This advance notification of a pending cancellation of coverage is intended as a courtesy only. Our failure to provide such advance notification will not extend the policy cancellation date nor negate cancellation of the policy. SCHEDULE Name of Other Person(s) f Email Address or mailing address: Number Days Notice: Organization(s): Per schedule of certificate holders on file with the company 90 All other terms and conditions of this policy remain unchanged. Issued by Liberty Insurance Corporation For attachment to Policy No. WC7-641-005097-024 Effective Date 01/01/2014 Premium $ Issued to WM 90 18 06 11 © 2011 Liberty Mutual Group of Companies Page 1 of 1 Ed. 06/01/2011 All Rights Reserved POLICY NUMBER: AI2-641-005097-054 COMMERCIAL AUTO CA 20481013 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED INSURED FOR COVERED AUTOS LIABILITY COVERAGE This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by this endorsement. This endorsement identifies person(s) or organization(s) who are "insureds" for Covered Autos Liability Coverage under the Who Is An Insured provision of the Coverage Form. This endorsement does not alter coverage provided in the Coverage Form. SCHEDULE Name Of Person(s) Or Organization(s): Any person or organization whom you have agreed in writing to add as an additional insured, but only to coverage and minimum limits of insurance required by the written agreement, and in no event to exceed either the scope of coverage or the limits of insurance provided in this policy This policy will be primary and non-contributory to any like insurance available to the person or organization noted above. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. Each person or organization shown in the Schedule is an "insured" for Covered Autos Liability Coverage, but only to the extent that person or organization qualifies as an "insured" under the Who Is An Insured provision contained in Paragraph A.1, of Section II - Covered Autos Liability Coverage in the Business Auto and Motor Carrier Coverage Forms and Paragraph D.2. of Section I - Covered Autos Coverages of the Auto Dealers Coverage Form. CA 20 48 10 13 © Insurance Services Office, Inc., 2011 Page 1 of 1 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSONS ONE ORGANIZATION This endorsement modifies insurance provided under the following; COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Location(s) of Covered Operations ~Jr ~lr anization s : Any persons or organizations for whom you have All locations as required in writing, and agreed to agreed in writing: prior to an "occurrence" or prior to an "occurrence" or offense "offense", to provide additionai insured status, i I I Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II - Who Is An insured is amended to B, With respect to the insurance afforded to these include as an additional insured the person(s) or additional insureds. the following additional exclu- organization(s) shown in the Schedule, but only sions apply with respect to liability for "bodily injury", "property This insurance does not apply to "bodily injury" or damage" or "personal and advertising injury" ausec, in whole or in fart, by: "property damage occurr~nc after: f . All work, including materials, parts or equip- 1. Your acts or omissions; or ment furnished in connection with such work. 2. The acts or omissions of those acting on your on the project (other than service, maintenance behalf; or repairs) to be per'ormed by or on behalf of in the performance of your ongoing operations for the additional insured(s) at the location of the the additional insureds) at the location(s) desig- covered operations has been completed; or hated above. CG 20 10 07 04 U ISO Properties, Inc., 2004 Page 1 of 2 2. That portion of "your work" out of which the injury or damage arises has been put to is in- tended use by any person or organization other than another contractor ar subcontractor en- gaged in pe forrn,ing opei ations for a principal as a par: of the saute proiect. -'his vndorsemer.F is executed by the -iBERTY 1VlU-^U.AL FIRE INSURANCE CON1DANY ?reffiiurr $ cffeotive Date Exniration Gate Fc- attachment to Policy No. T52-64 0050.?-G44 Audi: Basis issued l-c Ceuntemiguned by Fta.t1`arrzed Reoi~sentaiiv_ Issued Sales Office and No. E-n=. Sena: No. Page 2 of 2 C ISO Properties, inc., 2004 CG 20 10 07 04 TINS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS This endorsement modifies insuranre provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional insured Person(s) I Location And Description of Completed Operations Or Organization(s): l Any persons or organizations for wham you have All locations as required in writing, and nd agreed to ; agreed in writing, prior to an "occurrence" or prior to an "Occurrance" or offense offense'; tc provide additionai insured status . Information required to complete this Schedule, if not shown above: will be shown in the Declarations. Section tl - Who Is An insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "badly injury" or "property dam- age" caused, in whole or in part, by "your work" at the location designated and described in the sched- ule of this endorsement performed for that additional insured and included in the "products-completed operations hazard". Tris endcrserrient is executed by the LIBERTY MMAL FIRE INSURANCE COMPANY Premium $ Effective Datc Expiration Uato For attachment to Policy No. T132-6411-405097-044 Audit Oasis Issued Tc Countersigned by Aufhori~ed Repress~tstivE slued Sales Office and No. end. Serial No. C% 20 37 07 04 g) ISO Properties, Inc., 2004 Rage 9 of I Policy Number T52-641-005097-044 Issued by Liberty Mutual Fire Insurance Co. THIS ENDORSEMENT CHANGES THE POLICY. PLEASE (LEAD ITCAREPULLY. BLANKET ADDITIONAL INSURED This endorser tent modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE FORM SECTION If - WHO IS AN INSURED is amended to include as an insured any person or organization for whom you have agreed in writing to provide liability insurance. But: The insurance provided by this amendment: 1, Applies only to "bodily injury" or "property damage" arising out of (a) "your work" or (b) premises or other property owned by or rented to you; 2. Applies only to coverage and minimum limits of insurance required by the written agreement, but in no event exceeds either the scope of coverage or the limits of insurance provided by this policy: and 3. Does not apply to any person or organdation for whom you have procured separate liability insurance while such insurance is in effect, regardless of whether the scope of coverage or limits of insurance of this policy exceed those of such other insurance or whether such other insurance is valid and collectible. The following provisions also apply: Where the applicable written agreement requires the insured to provide liability insurance on a primary, excess, contingent„ or any other basis, this policy will apply solely on the basis required by such written agreement and Item 4. Other Insurance of SECTION IV of this policy will not apply. 2. Where the applicable written agreement does not specify on what basis the liability insurance will apply, the provisions of Item 4. Other Insurance of SECTION IV of this policy will govern. 3 This endorsement shall not apply to any person or organization for any 'bodily injury" or "property damage" if any other additional insured endorsement on this policy applies to that person or organization with regard to the "bodily injury" or "property damage". 4. If any other additional insured endorsement applies to any person or organization and you are obligated under a written agreement to provide liability insurance on a primary, excess, contingent, or any other basis for that additional insured, this policy will apply solely on the basis required by such written agreement and Item 4. Other Insurance of SECTION IV of this policy will not apply, regardless of whether the person or organization has available other valid and collectible insurance. If the applicable written agreement does not specify on what basis the liability insurance will apply, the provisions of Item 4. Other Insurance of SECTION IV of this policy will govern- LN 20 01 06 05 CONDITIONS OF CONTRACT 00710 FAA General Provisions FAA GENERAL PROVISIONS SECTION 10 DEFINITION OF TERMS Whenever the following terms are used in these specifications, in the contract, or in any documents or other instruments pertaining to construction where these specifications govern, the intent and meaning shall be interpreted as follows: 10-01 AASHTO. The American Association of State Highway and Transportation Officials, the successor association to AASHO. 10-02 ACCESS ROAD. The right-of-way, the roadway and all improvements constructed thereon connecting the airport to a public highway. 10-03 ADVERTISEMENT. A public announcement, as required by local law, inviting bids for work to be performed and materials to be furnished. 10-04 AIP. The Airport Improvement Program, a grant-in-aid program, administered by the Federal Aviation Administration. 10-05 AIR OPERATIONS AREA. For the purpose of these specifications, the term air operations area shall mean any area of the airport used or intended to be used for the landing, takeoff, or surface maneuvering of aircraft. An air operation area shall include such paved or unpaved areas that are used or intended to be used for the unobstructed movement of aircraft in addition to its associated runway, taxiway, or apron. 10-06 AIRPORT. Airport means an area of land or water which is used or intended to be used for the landing and takeoff of aircraft; an appurtenant area used or intended to be used for airport buildings or other airport facilities or rights of way; and airport buildings and facilities located in any of these areas, and includes a heliport. 10-07 ASTM. The American Society for Testing and Materials. 10-08 AWARD. The acceptance, by the owner, of the successful bidder's proposal. 10-09 BIDDER. Any individual, partnership, firm, or corporation, acting directly or through a duly authorized representative, who submits a proposal for the work contemplated. 10-10 BUILDING AREA. An area on the airport to be used, considered, or intended to be used for airport buildings or other airport facilities or rights-of-way together with all airport buildings and facilities located thereon. 10-11 CALENDAR DAY. Every day shown on the calendar. 10-12 CHANGE ORDER. A written order to the Contractor covering changes in the plans, specifications, or proposal quantities and establishing the basis of payment and contract time adjustment, if any, for the work affected by such changes. The work, covered by a change order, shall be within the scope of the contract. 10-13 CONTRACT. The written agreement covering the work to be performed. The awarded contract shall include, but is not limited to: The Advertisement; The Contract Form; The Proposal; The Performance Bond; The Payment Bond; any required insurance certificates; The Specifications; The Plans, and any addenda issued to bidders. 10-14 CONTRACT ITEM (PAY ITEM). A specific unit of work for which a price is provided in the contract. Ashland Municipal Airport Taxilane Improvements 1 FAA General Provisions 00710 FAA General Provisions 10-15 CONTRACT TIME. The number of calendar days or working days, stated in the proposal, allowed for completion of the contract, including authorized time extensions. If a calendar date of completion is stated in the proposal, in lieu of a number of calendar or working days, the contract shall be completed by that date. 10-16 CONTRACTOR. The individual, partnership, firm, or corporation primarily liable for the acceptable performance of the work contracted and for the payment of all legal debts pertaining to the work who acts directly or through lawful agents or employees to complete the contract work. 10-17 DRAINAGE SYSTEM. The system of pipes, ditches, and structures by which surface or subsurface waters are collected and conducted from the airport area. 10-18 ENGINEER. The individual, partnership, firm, or corporation duly authorized by the Owner to be responsible for engineering observation of the contract work and acting directly or through an authorized representative. 10-19 EQUIPMENT. All machinery, together with the necessary supplies for upkeep and maintenance, and also all tools and apparatus necessary for the proper construction and acceptable completion of the work. 10-20 EXTRA WORK. An item of work not provided for in the awarded contract as previously modified by change order or supplemental agreement, but which is found by the Engineer to be necessary to complete the work within the intended scope of the contract as previously modified. 10-21 FAA. The Federal Aviation Administration of the U.S. Department of Transportation. When used to designate a person, FAA shall mean the Administrator or his/her duly authorized representative. 10-22 FEDERAL SPECIFICATIONS. The Federal Specifications and Standards, Commercial Item Descriptions, and supplements, amendments, and indices thereto are prepared and issued by the General Services Administration of the Federal Government. 10-23 FORCE ACCOUNT. Force account construction work is construction that is accomplished through the use of material, equipment, labor, and supervision provided by the owner or by another public agency pursuant to an agreement with the Owner. 10-24 INSPECTOR. An authorized representative of the Engineer assigned to make all necessary inspections and/or tests of the work performed or being performed, or of the materials furnished or being furnished by the Contractor. 10-25 INTENTION OF TERMS. Whenever, in these specifications or on the plans, the words "directed," "required," "permitted," "ordered," "designated," "prescribed," or words of like import are used, it shall be understood that the direction, requirement, permission, order, designation, or prescription of the Engineer is intended; and similarly, the words "approved," "acceptable," "satisfactory," or words of like import, shall mean approved by, or acceptable to, or satisfactory to the Engineer, subject in each case to the final determination of the Owner. Any reference to a specific requirement of a numbered paragraph of the contract specifications or a cited standard shall be interpreted to include all general requirements of the entire section, specification item, or cited standard that may be pertinent to such specific reference. 10-26 LABORATORY. The official testing laboratories of the Owner or such other laboratories as may be designated by the Engineer. 10-27 LIGHTING. A system of fixtures providing or controlling the light sources used on or near the airport or within the airport buildings. The field lighting includes all luminous signals, markers, Ashland Municipal Airport Taxilane Improvements 2 FAA General Provisions 00710 FAA General Provisions floodlights, and illuminating devices used on or near the airport or to aid in the operation of aircraft landing at, taking off from, or taxiing on the airport surface. 10-28 MAJOR AND MINOR CONTRACT ITEMS. A major contract item shall be any item that is listed in the proposal, the total cost of which is equal to or greater than 20 percent of the total amount of the award contract. All other items shall be considered minor contract items. 10-29 MATERIALS. Any substance specified for use in the construction of the contract work. 10-30 NOTICE TO PROCEED. A written notice to the Contractor to begin the actual contract work on a previously agreed to date. If applicable, the Notice to Proceed shall state the date on which the contract time begins. 10-31 OWNER. The term "Owner" shall mean the party of the first part or the contracting agency signatory to the contract. For AIP contracts, the term "sponsor" shall have the same meaning as the term "Owner." Where the term "Owner" is capitalized in this document, it shall mean airport owner or sponsor only. 10-32 PAVEMENT. The combined surface course, base course, and subbase course, if any, considered as a single unit. 10-33 PAYMENT BOND. The approved form of security furnished by the Contractor and his/her surety as a guaranty that he will pay in full all bills and accounts for materials and labor used in the construction of the work. 10-34 PERFORMANCE BOND. The approved form of security furnished by the Contractor and his/her surety as a guaranty that the Contractor will complete the work in accordance with the terms of the contract. 10-35 PLANS. The official drawings or exact reproductions which show the location, character, dimensions and details of the airport and the work to be done and which are to be considered as a part of the contract, supplementary to the specifications. 10-36 PROJECT. The agreed scope of work for accomplishing specific airport development with respect to a particular airport. 10-37 PROPOSAL. The written offer of the bidder (when submitted on the approved proposal form) to perform the contemplated work and furnish the necessary materials in accordance with the provisions of the plans and specifications. 10-38 PROPOSAL GUARANTY. The security furnished with a proposal to guarantee that the bidder will enter into a contract if his/her proposal is accepted by the Owner. 10-39 RUNWAY. The area on the airport prepared for the landing and takeoff of aircraft. 10-40 SPECIFICATIONS. A part of the contract containing the written directions and requirements for completing the contract work. Standards for specifying materials or testing which are cited in the contract specifications by reference shall have the same force and effect as if included in the contract physically. 10-41 SPONSOR. See definition above of "Owner." 10-42 STRUCTURES. Airport facilities such as bridges; culverts; catch basins, inlets, retaining walls, cribbing; storm and sanitary sewer lines; water lines; underdrains; electrical ducts, manholes, handholes, lighting fixtures and bases; transformers; flexible and rigid pavements; navigational aids; Ashland Municipal Airport Taxilane Improvements 3 FAA General Provisions 00710 FAA General Provisions buildings; vaults; and, other manmade features of the airport that may be encountered in the work and not otherwise classified herein. 10-43 SUBGRADE. The soil that forms the pavement foundation. 10-44 SUPERINTENDENT. The Contractor's executive representative who is present on the work during progress, authorized to receive and fulfill instructions from the Engineer, and who shall supervise and direct the construction. 10-45 SUPPLEMENTAL AGREEMENT. A written agreement between the Contractor and the owner covering (1) work that would increase or decrease the total amount of the awarded contract, or any major contract item, by more than 25 percent, such increased or decreased work being within the scope of the originally awarded contract; or (2) work that is not within the scope of the originally awarded contract. 10-46 SURETY. The corporation, partnership, or individual, other than the Contractor, executing payment or performance bonds that are furnished to the Owner by the Contractor. 10-47 TAXIWAY. For the purpose of this document, the term taxiway means the portion of the air operations area of an airport that has been designated by competent airport authority for movement of aircraft to and from the airport's runways or aircraft parking areas. 10-48 WORK. The furnishing of all labor, materials, tools, equipment, and incidentals necessary or convenient to the Contractor's performance of all duties and obligations imposed by the contract, plans, and specifications. 10-49 WORKING DAY. A working day shall be any day other than a legal holiday, Saturday, or Sunday on which the normal working forces of the Contractor may proceed with regular work for at least 6 hours toward completion of the contract. When work is suspended for causes beyond the Contractor's control, Saturdays, Sundays and holidays on which the Contractor's forces engage in regular work, requiring the presence of an inspector, will be considered as working days. END OF SECTION 10 SECTION 20 PROPOSAL REQUIREMENTS AND CONDITIONS 20-01 ADVERTISEMENT (Notice to Bidders). 20-02 PREQUALIFICATION OF BIDDERS. Each bidder shall furnish the owner satisfactory evidence of his/her competency to perform the proposed work. Such evidence of competency, unless otherwise specified, shall consist of statements covering the bidder's past experience on similar work, a list of equipment that would be available for the work, and a list of key personnel that would be available. In addition, each bidder shall furnish the owner satisfactory evidence of his/her financial responsibility. Such evidence of financial responsibility, unless otherwise specified, shall consist of a confidential statement or report of the bidder's financial resources and liabilities as of the last calendar year or the Contractor's last fiscal year. Such statements or reports shall be certified by a public accountant. At the time of submitting such financial statements or reports, the bidder shall further certify whether his/her financial responsibility is approximately the same as stated or reported by the public accountant. If the bidder's financial responsibility has changed, the bidder shall qualify the public accountant's statement or report to reflect his/her (bidder's) true financial condition at the time such qualified statement or report is submitted to the Owner. Ashland Municipal Airport Taxilane Improvements 4 FAA General Provisions 00710 FAA General Provisions Unless otherwise specified, a bidder may submit evidence that he is prequalified with the State Highway Division and is on the current "bidder's list" of the state in which the proposed work is located. Such evidence of State Highway Division prequalification may be submitted as evidence of financial responsibility in lieu of the certified statements or reports hereinbefore specified. Each bidder shall submit "evidence of competency" and "evidence of financial responsibility" to the Owner at the time of bid opening. 20-03 CONTENTS OF PROPOSAL FORMS. The Owner shall furnish bidders with proposal forms. All papers bound with or attached to the proposal forms are necessary parts and must not be detached. The plans specifications, and other documents designated in the proposal form shall be considered a part of the proposal whether attached or not. 20-04 ISSUANCE OF PROPOSAL FORMS. The Owner reserves the right to refuse to issue a proposal form to a prospective bidder should such bidder be in default for any of the following reasons: a. Failure to comply with any prequalification regulations of the Owner, if such regulations are cited, or otherwise included, in the proposal as a requirement for bidding. b. Failure to pay, or satisfactorily settle, all bills due for labor and materials on former contracts in force (with the Owner) at the time the Owner issues the proposal to a prospective bidder. c. Contractor default under previous contracts with the Owner. d. Unsatisfactory work on previous contracts with the Owner. 20-05 INTERPRETATION OF ESTIMATED PROPOSAL QUANTITIES. An estimate of quantities of work to be done and materials to be furnished under these specifications is given in the proposal. It is the result of careful calculations and is believed to be correct. It is given only as a basis for comparison of proposals and the award of the contract. The Owner does not expressly or by implication agree that the actual quantities involved will correspond exactly therewith; nor shall the bidder plead misunderstanding or deception because of such estimates of quantities, or of the character, location, or other conditions pertaining to the work. Payment to the Contractor will be made only for the actual quantities of work performed or materials furnished in accordance with the plans and specifications. It is understood that the quantities may be increased or decreased as hereinafter provided in the subsection titled ALTERATION OF WORK AND QUANTITIES of Section 40 without in any way invalidating the unit bid prices. 20-06 EXAMINATION OF PLANS, SPECIFICATIONS, AND SITE. The bidder is expected to carefully examine the site of the proposed work, the proposal, plans specifications, and contract forms. He shall satisfy himself as to the character, quality, and quantities of work to be performed, materials to be furnished, and as to the requirements of the proposed contract. The submission of a proposal shall be prima facie evidence that the bidder has made such examination and is satisfied as to the conditions to be encountered in performing the work and as to the requirements of the proposed contract, plans, and specifications. Boring logs and other records of subsurface investigations and tests are available for inspection of bidders. It is understood and agreed that such subsurface information, whether included in the plans, specifications, or otherwise made available to the bidder, was obtained and is intended for the owner's design and estimating purposes only. Such information has been made available for the convenience of all bidders. It is further understood and agreed that each bidder is solely responsible for all assumptions, deductions, or conclusions which he may make or obtain from his/her examination of the boring logs and other records of subsurface investigations and tests that are furnished by the Owner. Ashland Municipal Airport Taxilane Improvements 5 FAA General Provisions 00710 FAA General Provisions 20-07 PREPARATION OF PROPOSAL. The bidder shall submit his/her proposal on the forms furnished by the Owner. All blank spaces in the proposal forms must be correctly filled in where indicated for each and every item for which a quantity is given. The bidder shall state the price in numerals (written in ink or typed) for which he proposes to do each pay item furnished in the proposal. The bidder shall sign his/her proposal correctly and in ink. If the proposal is made by an individual, his/her name and post office address must be shown. If made by a partnership, the name and post office address of each member of the partnership must be shown. If made by a corporation, the person signing the proposal shall give the name of the state under the laws of which the corporation was chartered and the name, titles, and business address of the president, secretary, and the treasurer. Anyone signing a proposal as an agent shall file evidence of his/her authority to do so and that the signature is binding upon the firm or corporation. 20-08 IRREGULAR PROPOSALS. Proposals shall be considered irregular for the following reasons: a. If the proposal is on a form other than that furnished by the Owner, or if the Owner's form is altered, or if any part of the proposal form is detached. b. If there are unauthorized additions, conditional or alternate pay items, or irregularities of any kind that make the proposal incomplete, indefinite, or otherwise ambiguous. c. If the proposal does not contain a unit price for each pay item listed in the proposal, except in the case of authorized alternate pay items, for which the bidder is not required to furnish a unit price. d. If the proposal contains unit prices that are obviously unbalanced. e. If the proposal is not accompanied by the proposal guaranty specified by the Owner. The Owner reserves the right to reject any irregular proposal and the right to waive technicalities if such waiver is in the best interest of the Owner and conforms to local laws and ordinances pertaining to the letting of construction contracts. 20-09 BID GUARANTEE. Each separate proposal shall be accompanied by a certified check, or other specified acceptable collateral, in the amount specified in the proposal form. Such check, or collateral, shall be made payable to the Owner. 20-10 DELIVERY OF PROPOSAL. Each proposal submitted shall be placed in a sealed envelope plainly marked with the project number, location of airport, and name and business address of the bidder on the outside. When sent by mail, preferably registered, the sealed proposal, marked as indicated above, should be enclosed in an additional envelope. No proposal will be considered unless received at the place specified in the advertisement before the time specified for opening all bids. Proposals received after the bid opening time shall be returned to the bidder unopened. 20-11 WITHDRAWAL OR REVISION OF PROPOSALS. A bidder may withdraw or revise (by withdrawal of one proposal and submission of another) a proposal provided that the bidder's request for withdrawal is received by the Owner in writing or by telegram before the time specified for opening bids. Revised proposals must be received at the place specified in the advertisement before the time specified for opening all bids. 20-12 PUBLIC OPENING OF PROPOSALS. Proposals shall be opened, and read, publicly at the time and place specified in the advertisement. Bidders, their authorized agents, and other interested persons are invited to attend. Proposals that have been withdrawn (by written or telegraphic request) or received after the time specified for opening bids shall be returned to the bidder unopened. Ashland Municipal Airport Taxilane Improvements 6 FAA General Provisions 00710 FAA General Provisions 20-13 DISQUALIFICATION OF BIDDERS. A bidder shall be considered disqualified for any of the following reasons: a. Submitting more than one proposal from the same partnership, firm, or corporation under the same or different name. b. Evidence of collusion among bidders. Bidders participating in such collusion shall be disqualified as bidders for any future work of the Owner until any such participating bidder has been reinstated by the Owner as a qualified bidder. c. If the bidder is considered to be in "default" for any reason specified in the subsection titled ISSUANCE OF PROPOSAL FORMS of this section. END OF SECTION 20 Ashland Municipal Airport Taxilane Improvements 7 FAA General Provisions 00710 FAA General Provisions SECTION 30 AWARD AND EXECUTION OF CONTRACT 30-01 CONSIDERATION OF PROPOSALS. After the proposals are publicly opened and read, they will be compared on the basis of the summation of the products obtained by multiplying the estimated quantities shown in the proposal by the unit bid prices. Until the award of a contract is made, the Owner reserves the right to reject a bidder's proposal for any of the following reasons: a. If the proposal is irregular as specified in the subsection titled IRREGULAR PROPOSALS of Section 20. b. If the bidder is disqualified for any of the reasons specified in the subsection titled DISQUALIFICATION OF BIDDERS of Section 20. In addition, until the award of a contract is made, the Owner reserves the right to reject any or all proposals, waive technicalities, if such waiver is in the best interest of the Owner and is in conformance with applicable state and local laws or regulations pertaining to the letting of construction contracts; advertise for new proposals; or proceed with the work otherwise. All such actions shall promote the Owner's best interests. 30-02 AWARD OF CONTRACT. The award of a contract, if it is to be awarded, shall be made within 60 calendar days of the date specified for publicly opening proposals, unless otherwise specified herein. Award of the contract shall be made by the Owner to the lowest, qualified bidder whose proposal conforms to the cited requirements of the owner. 30-03 CANCELLATION OF AWARD. The Owner reserves the right to cancel the award without liability to the bidder, except return of proposal guaranty, at any time before a contract has been fully executed by all parties and is approved by the Owner in accordance with the subsection titled APPROVAL OF CONTRACT of this section. 30-04 RETURN OF PROPOSAL GUARANTY. All proposal guaranties, except those of the two lowest bidders, will be returned immediately after the Owner has made a comparison of bids as hereinbefore specified in the subsection titled CONSIDERATION OF PROPOSALS of this section. Proposal guaranties of the two lowest bidders will be retained by the Owner until such time as an award is made, at which time, the unsuccessful bidder's proposal guaranty will be returned. The successful bidder's proposal guaranty will be returned as soon as the Owner receives the contracts bonds as specified in the subsection titled REQUIREMENTS OF CONTRACT BONDS of this section. 30-05 REQUIREMENTS OF CONTRACT BONDS. At the time of the execution of the contract, the successful bidder shall furnish the Owner a surety bond or bonds that have been fully executed by the bidder and the surety guaranteeing the performance of the work and the payment of all legal debts that may be incurred by reason of the Contractor's performance of the work. The surety and the form of the bond or bonds shall be acceptable to the Owner. Unless otherwise specified in this subsection, the surety bond or bonds shall be in a sum equal to the full amount of the contract. 30-06 EXECUTION OF CONTRACT. The successful bidder shall sign (execute) the necessary agreements for entering into the contract and return such signed contract to the owner, along with the fully executed surety bond or bonds specified in the subsection titled REQUIREMENTS OF CONTRACT BONDS of this section, within 15 calendar days from the date mailed or otherwise delivered to the successful bidder. If the contract is mailed, special handling is recommended. Ashland Municipal Airport Taxilane Improvements 8 FAA General Provisions 00710 FAA General Provisions 30-07 APPROVAL OF CONTRACT. Upon receipt of the contract and contract bond or bonds that have been executed by the successful bidder, the Owner shall complete the execution of the contract in accordance with local laws or ordinances, and return the fully executed contract to the Contractor. Delivery of the fully executed contract to the Contractor shall constitute the Owner's approval to be bound by the successful bidder's proposal and the terms of the contract. 30-08 FAILURE TO EXECUTE CONTRACT. Failure of the successful bidder to execute the contract and furnish an acceptable surety bond or bonds within the 15 calendar day period specified in the subsection titled REQUIREMENTS OF CONTRACT BONDS of this section shall be just cause for cancellation of the award and forfeiture of the proposal guaranty, not as a penalty, but as liquidation of damages to the Owner. END OF SECTION 30 Ashland Municipal Airport Taxilane Improvements 9 FAA General Provisions 00710 FAA General Provisions SECTION 40 SCOPE OF WORK 40-01 INTENT OF CONTRACT. The intent of the contract is to provide for construction and completion, in every detail, of the work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the work in accordance with the plans, specifications, and terms of the contract. 40-02 ALTERATION OF WORK AND QUANTITIES. The owner reserves and shall have the right to make such alterations in the work as may be necessary or desirable to complete the work originally intended in an acceptable manner. Unless otherwise specified herein, the Engineer shall be and is hereby authorized to make such alterations in the work as may increase or decrease the originally awarded contract quantities, provided that the aggregate of such alterations does not change the total contract cost or the total cost of any major contract item by more than 25 percent (total cost being based on the unit prices and estimated quantities in the awarded contract). Alterations that do not exceed the 25 percent limitation shall not invalidate the contract nor release the surety, and the Contractor agrees to accept payment for such alterations as if the altered work had been a part of the original contract. These alterations that are for work within the general scope of the contract shall be covered by "Change Orders" issued by the Engineer. Change orders for altered work shall include extensions of contract time where, in the Engineer's opinion, such extensions are commensurate with the amount and difficulty of added work. Should the aggregate amount of altered work exceed the 25 percent limitation hereinbefore specified, such excess altered work shall be covered by supplemental agreement. If the owner and the Contractor are unable to agree on a unit adjustment for any contract item that requires a supplemental agreement, the owner reserves the right to terminate the contract with respect to the item and make other arrangements for its completion. 40-03 OMITTED ITEMS. The Engineer may, in the Owner's best interest, omit from the work any contract item, except major contract items. Major contract items may be omitted by a supplemental agreement. Such omission of contract items shall not invalidate any other contract provision or requirement. Should a contract item be omitted or otherwise ordered to be nonperformed, the Contractor shall be paid for all work performed toward completion of such item prior to the date of the order to omit such item. Payment for work performed shall be in accordance with the subsection titled PAYMENT FOR OMITTED ITEMS of Section 90. 40-04 EXTRA WORK. Should acceptable completion of the contract require the Contractor to perform an item of work for which no basis of payment has been provided in the original contract or previously issued change orders or supplemental agreements, the same shall be called "Extra Work." Extra Work that is within the general scope of the contract shall be covered by written change order. Change orders for such Extra Work shall contain agreed unit prices for performing the change order work in accordance with the requirements specified in the order, and shall contain any adjustment to the contract time that, in the Engineer's opinion, is necessary for completion of such Extra Work. When determined by the Engineer to be in the Owner's best interest, he may order the Contractor to proceed with Extra Work by force account as provided in the subsection titled PAYMENT FOR EXTRA AND FORCE ACCOUNT WORK of Section 90. Ashland Municipal Airport Taxilane Improvements 10 FAA General Provisions 00710 FAA General Provisions Extra Work that is necessary for acceptable completion of the project, but is not within the general scope of the work covered by the original contract shall be covered by a Supplemental Agreement as hereinbefore defined in the subsection titled SUPPLEMENTAL AGREEMENT of Section 10. Any claim for payment of Extra Work that is not covered by written agreement (change order or supplemental agreement) shall be rejected by the Owner. 40-05 MAINTENANCE OF TRAFFIC. It is the explicit intention of the contract that the safety of aircraft, as well as the Contractor's equipment and personnel, is the most important consideration. It is understood and agreed that the Contractor shall provide for the free and unobstructed movement of aircraft in the air operations areas of the airport with respect to his/her own operations and the operations of all his/her subcontractors as specified in the subsection titled LIMITATION OF OPERATIONS of Section 80. It is further understood and agreed that the Contractor shall provide for the uninterrupted operation of visual and electronic signals (including power supplies thereto) used in the guidance of aircraft while operating to, from, and upon the airport as specified in the subsection titled CONTRACTOR'S RESPONSIBILITY FOR UTILITY SERVICE AND FACILITIES OF OTHERS in Section 70. With respect to his/her own operations and the operations of all his/her subcontractors, the Contractor shall provide marking, lighting, and other acceptable means of identifying: personnel; equipment; vehicles; storage areas; and any work area or condition that may be hazardous to the operation of aircraft, fire-rescue equipment, or maintenance vehicles at the airport. When the contract requires the maintenance of vehicular traffic on an existing road, street, or highway during the Contractor's performance of work that is otherwise provided for in the contract, plans, and specifications, the Contractor shall keep such road, street, or highway open to all traffic and shall provide such maintenance as may be required to accommodate traffic. The Contractor shall furnish erect, and maintain barricades, warning signs, flag person, and other traffic control devices in reasonable conformity with the manual of Uniform Traffic Control Devices for Streets and Highways (published by the United States Government Printing Office), unless otherwise specified herein. The Contractor shall also construct and maintain in a safe condition any temporary connections necessary for ingress to and egress from abutting property or intersecting roads, streets or highways. Unless otherwise specified herein, the Contractor will not be required to furnish snow removal for such existing road, street, or highway. The Contractor shall make his/her own estimate of all labor, materials, equipment, and incidentals necessary for providing the maintenance of aircraft and vehicular traffic as specified in this subsection. The cost of maintaining the aircraft and vehicular traffic specified in this subsection shall not be measured or paid for directly, but shall be included in the various contract items. 40-06 REMOVAL OF EXISTING STRUCTURES. All existing structures encountered within the established lines, grades, or grading sections shall be removed by the Contractor, unless such existing structures are otherwise specified to be relocated, adjusted up or down, salvaged, abandoned in place, reused in the work or to remain in place. The cost of removing such existing structures shall not be measured or paid for directly, but shall be included in the various contract items. Should the Contractor encounter an existing structure (above or below ground) in the work for which the disposition is not indicated on the plans, the Engineer shall be notified prior to disturbing such structure. The disposition of existing structures so encountered shall be immediately determined by the Engineer in accordance with the provisions of the contract. Except as provided in the subsection titled RIGHTS IN AND USE OF MATERIALS FOUND IN THE WORK of this section, it is intended that all existing materials or structures that may be encountered (within the Ashland Municipal Airport Taxilane Improvements 11 FAA General Provisions 00710 FAA General Provisions lines, grades, or grading sections established for completion of the work) shall be used in the work as otherwise provided for in the contract and shall remain the property of the Owner when so used in the work. 40-07 RIGHTS IN AND USE OF MATERIALS FOUND IN THE WORK. Should the Contractor encounter any material such as (but not restricted to) sand, stone, gravel, slag, or concrete slabs within the established lines, grades, or grading sections, the use of which is intended by the terms of the contract to be either embankment or waste, he may at his/her option either: a. Use such material in another contract item, providing such use is approved by the Engineer and is in conformance with the contract specifications applicable to such use; or, b. Remove such material from the site, upon written approval of the Engineer; or c. Use such material for his/her own temporary construction on site; or, d. Use such material as intended by the terms of the contract. Should the Contractor wish to exercise option a., b., or c., he shall request the Engineer's approval in advance of such use. Should the Engineer approve the Contractor's request to exercise option a., b., or c., the Contractor shall be paid for the excavation or removal of such material at the applicable contract price. The Contractor shall replace, at his/her own expense, such removed or excavated material with an agreed equal volume of material that is acceptable for use in constructing embankment, backfills, or otherwise to the extent that such replacement material is needed to complete the contract work. The Contractor shall not be charged for his/her use of such material so used in the work or removed from the site. Should the Engineer approve the Contractor's exercise of option a., the Contractor shall be paid, at the applicable contract price, for furnishing and installing such material in accordance with requirements of the contract item in which the material is used. It is understood and agreed that the Contractor shall make no claim for delays by reason of his/her exercise of option a., b., or c. The Contractor shall not excavate, remove, or otherwise disturb any material, structure, or part of a structure which is located outside the lines, grades, or grading sections established for the work, except where such excavation or removal is provided for in the contract, plans, or specifications. 40-08 FINAL CLEANING UP. Upon completion of the work and before acceptance and final payment will be made, the Contractor shall remove from the site all machinery, equipment, surplus and discarded materials, rubbish, temporary structures, and stumps or portions of trees. He shall cut all brush and woods within the limits indicated and shall leave the site in a neat and presentable condition. Material cleared from the site and deposited on adjacent property will not be considered as having been disposed of satisfactorily, unless the Contractor has obtained the written permission of such property owner. END OF SECTION 40 Ashland Municipal Airport Taxilane Improvements 12 FAA General Provisions 00710 FAA General Provisions SECTION 50 CONTROL OF WORK 50-01 AUTHORITY OF THE ENGINEER. The Engineer shall decide any and all questions which may arise as to the quality and acceptability of materials furnished, work performed, and as to the manner of performance and rate of progress of the work. The Engineer shall decide all questions that may arise as to the interpretation of the specifications or plans relating to the work. The Engineer shall determine the amount and quality of the several kinds of work performed and materials furnished which are to be paid for the under contract. The Engineer does not have the authority to accept pavements that do not conform to FAA specification requirements. 50-02 CONFORMITY WITH PLANS AND SPECIFICATIONS. All work and all materials furnished shall be in reasonably close conformity with the lines, grades, grading sections, cross sections, dimensions, material requirements, and testing requirements that are specified (including specified tolerances) in the contract, plans or specifications. If the Engineer finds the materials furnished, work performed, or the finished product not within reasonably close conformity with the plans and specifications but that the portion of the work affected will, in his/her opinion, result in a finished product having a level of safety, economy, durability, and workmanship acceptable to the Owner, he will advise the Owner of his/her determination that the affected work be accepted and remain in place. In this event, the Engineer will document his/her determination and recommend to the Owner a basis of acceptance that will provide for an adjustment in the contract price for the affected portion of the work. The Engineer's determination and recommended contract price adjustments will be based on good engineering judgment and such tests or retests of the affected work as are, in his/her opinion, needed. Changes in the contract price shall be covered by contract modifications (change order or supplemental agreement) as applicable. If the Engineer finds the materials furnished, work performed, or the finished product are not in reasonably close conformity with the plans and specifications and have resulted in an unacceptable finished product, the affected work or materials shall be removed and replaced or otherwise corrected by and at the expense of the Contractor in accordance with the Engineer's written orders. For the purpose of this subsection, the term "reasonably close conformity" shall not be construed as waiving the Contractor's responsibility to complete the work in accordance with the contract, plans, and specifications. The term shall not be construed as waiving the Engineer's responsibility to insist on strict compliance with the requirements of the contract, plans, and specifications during the Contractor's prosecution of the work, when, in the Engineer's opinion, such compliance is essential to provide an acceptable finished portion of the work. For the purpose of this subsection, the term "reasonably close conformity" is also intended to provide the Engineer with the authority, after consultation with the FAA, to use good engineering judgment in his/her determinations as to acceptance of work that is not in strict conformity but will provide a finished product equal to or better than that intended by the requirements of the contract, plans and specifications. The Engineer will not be responsible for the Contractor's means, methods, techniques, sequences, or procedures of construction or the safety precautions incident thereto. 50-03 COORDINATION OF CONTRACT, PLANS, AND SPECIFICATIONS. The contract, plans, specifications, and all referenced standards cited are essential parts of the contract requirements. A requirement occurring in one is as binding as though occurring in all. They are intended to be complementary and to Ashland Municipal Airport Taxilane Improvements 13 FAA General Provisions 00710 FAA General Provisions describe and provide for a complete work. In case of discrepancy, calculated dimensions will govern over scaled dimensions; contract technical specifications shall govern over contract general provisions, plans, cited standards for materials or testing, and cited FAA advisory circulars; contract general provisions shall govern over plans, cited standards for materials or testing, and cited FAA advisory circulars; plans shall govern over cited standards for materials or testing and cited FAA advisory circulars. If any paragraphs contained in the Special Provisions conflict with General Provisions or Technical Specifications, the Special Provisions shall govern. From time to time, discrepancies within cited standards for testing occur due to the timing of changing, editing, and replacing of standards. In the event the Contractor discovers any apparent discrepancy within standard test methods, he shall immediately call upon the Engineer for his/her interpretation and decision, and such decision shall be final. The Contractor shall not take advantage of any apparent error or omission on the plans or specifications. In the event the Contractor discovers any apparent error or discrepancy, he shall immediately call upon the Engineer for his/her interpretation and decision, and such decision shall be final. 50-04 COOPERATION OF CONTRACTOR. The Contractor will be supplied with five copies each of the plans and specifications. He shall have available on the work at all times one copy each of the plans and specifications. Additional copies of plans and specifications may be obtained by the Contractor for the cost of reproduction. The Contractor shall give constant attention to the work to facilitate the progress thereof, and he shall cooperate with the Engineer and his/her inspectors and with other contractors in every way possible. The Contractor shall have a competent superintendent on the work at all times who is fully authorized as his/her agent on the work. The superintendent shall be capable of reading and thoroughly understanding the plans and specifications and shall receive and fulfill instructions from the Engineer or his/her authorized representative. 50-05 COOPERATION BETWEEN CONTRACTORS. The Owner reserves the right to contract for and perform other or additional work on or near the work covered by this contract. When separate contracts are let within the limits of any one project, each Contractor shall conduct his/her work so as not to interfere with or hinder the progress of completion of the work being performed by other Contractors. Contractors working on the same project shall cooperate with each other as directed. Each Contractor involved shall assume all liability, financial or otherwise, in connection with his/her contract and shall protect and save harmless the Owner from any and all damages or claims that may arise because of inconvenience, delays, or loss experienced by him because of the presence and operations of other Contractors working within the limits of the same project. The Contractor shall arrange his/her work and shall place and dispose of the materials being used so as not to interfere with the operations of the other Contractors within the limits of the same project. He shall join his/her work with that of the others in an acceptable manner and shall perform it in proper sequence to that of the others. 50-06 CONSTRUCTION LAYOUT AND STAKES. The Engineer shall establish horizontal and vertical control only. The Contractor must establish all layout required for the construction of the work. Such stakes and markings as the Engineer may set for either his/her own or the Contractor's guidance shall be preserved by the Contractor. In case of negligence on the part of the Contractor, or his/her employees, resulting in Ashland Municipal Airport Taxilane Improvements 14 FAA General Provisions 00710 FAA General Provisions the destruction of such stakes or markings, an amount equal to the cost of replacing the same may be deducted from subsequent estimates due the Contractor at the discretion of the Engineer. The Contractor will be required to furnish all lines, grades and measurements from the control points necessary for the proper prosecution and control of the work contracted for under these specifications. The contractor must give copies of survey notes to the Engineer for each area of construction and for each placement of material as specified. This will allow the Engineer to make periodic checks for conformance with plan grades, alignments and grade tolerances required by the applicable material specifications. All surveys must be provided to the Engineer prior to commencing work items that will cover or disturb the survey staking as set by the Contractor's surveyor. Surveys and survey notes must be on local coordinate system shown on the plans, based on plan stations and offsets and plan vertical control. In the case of error, on the part of the Contractor their surveyor, employees or subcontractors, resulting in established grades, alignment or grade tolerances that do not concur with those specified or shown on the plans, the Contractor is solely responsible for correction, removal, replacement and all associated costs at no additional cost to the Owner. No direct payment will be made, unless otherwise specified in contract documents, for this labor, materials, or other expenses therewith. The cost thereof shall be included in the price of the bid for the various items of the Contract. Construction Staking and Layout includes but is not limited to: Clearing and Grubbing perimeter staking. Rough Grade slope stakes at 100-foot stations. Drainage Swales slope stakes and flow line blue tops at SO-foot stations. Subgrade blue tops at 25-foot stations and 25-foot offset distance (max.) for the following section locations: a. Runway - minimum 5 per station b. Taxiways - minimum 3 per station c. Holding apron areas - minimum 3 per station d. Roadways - minimum 3 per station Base Course blue tops at 25 foot stations and 25-foot offset distance (max.) for the following section locations: a. Runway - minimum 5 per station b. Taxiways - minimum 3 per station c. Holding apron areas - minimum 3 per station Pavement areas: a. Edge of Pavement hubs and tacks (for stringline by Contractor) at 100-foot stations b. Between Lifts at 25-foot stations for the following section locations: (1). Runways - each paving lane width (2). Taxiways - each paving lane width (3). Holding areas - each paving lane width Ashland Municipal Airport Taxilane Improvements 15 FAA General Provisions 007 10 FAA General Provisions c. After finish paving operations at 50-foot stations (1). All paved areas - Edge of each paving lane prior to next paving lot d. Shoulder and safety area blue tops at 50-foot stations and at all break points with maximum of 50 foot offsets Fence lines at 100-foot stations Electrical and Communications System locations, lines and grades including but not limited to duct runs, connections, fixtures, signs, lights, VASIs, PAPIs, REILs, Wind Cones, Distance Markers (signs), pull boxes and manholes. Drain lines, cut stakes and alignment on 25-foot stations, inlet and manholes. Painting and Striping layout (pinned with 1.5 in PK nails) marked for paint Contractor. (All nails shall be removed after painting) Laser, or other automatic control devices, shall be checked with temporary control point or grade hub at a minimum of once per 400 feet per pass (that is, paving lane). Note: Controls and stakes disturbed or suspect of having been disturbed shall be checked and/or reset as directed by the Engineer without additional cost to the Owner. Establishment of Survey Control for Construction 1. Utilization of a State Licensed Land Surveyor is required. 2. Horizontal closure accuracy of at least 1:40,000 is required. 3. Vertical loop closure of at least 0.03 foot per mile is required. NAVD-88 Vertical Datum must be utilized where available. It is strongly recommended that a digital level be utilized in obtaining vertical loop closure. 4. The construction survey must use the same primary control as used for the Design Survey. 5. Prior to performing the initial survey, prepare a methodology statement, complete with survey equipment to be utilized and with information as to the accuracy of the equipment. The methodology statement is to be submitted to the project manager for review and approval. 6. Secondary control monuments shall have a minimum foundation depth of 6feet. Elevations shall be set on secondary control using the NGS style 3D monument set for project primary control. Utility locates are required prior to installing secondary control monuments. 7. Contractor must verify his internal secondary control monuments a minimum of once per month by looping back into primary control. 50-07 AUTOMATICALLY CONTROLLED EQUIPMENT. Whenever batching or mixing plant equipment is required to be operated automatically under the contract and a breakdown or malfunction of the automatic controls occurs, the equipment may be operated manually or by other methods for a period 48 hours following the breakdown or malfunction, provided this method of operations will produce results which conform to all other requirements of the contract. SO-08 AUTHORITY AND DUTIES OF INSPECTORS. Inspectors employed by the Owner shall be authorized to inspect all work done and all material furnished. Such inspection may extend to all or any part of the work and to the preparation, fabrication, or manufacture of the materials to be used. Inspectors are not authorized to revoke, alter, or waive any provision of the contract. Inspectors are not authorized to issue instructions contrary to the plans and specifications or to act as foreman for the Contractor. Ashland Municipal Airport Taxilane Improvements 16 FAA General Provisions 00710 FAA General Provisions Inspectors employed by the Owner are authorized to notify the Contractor or his/her representatives of any failure of the work or materials to conform to the requirements of the contract, plans, or specifications and to reject such nonconforming materials in question until such issues can be referred to the Engineer for his/her decision. 50-09 INSPECTION OF THE WORK. All materials and each part or detail of the work shall be subject to inspection by the Engineer. The Engineer shall be allowed access to all parts of the work and shall be furnished with such information and assistance by the Contractor as is required to make a complete and detailed inspection. If the Engineer requests it, the Contractor, at any time before acceptance of the work, shall remove or uncover such portions of the finished work as may be directed. After examination, the Contractor shall restore said portions of the work to the standard required by the specifications. Should the work thus exposed or examined prove acceptable, the uncovering, or removing, and the replacing of the covering or making good of the parts removed will be paid for as extra work; but should the work so exposed or examined prove unacceptable, the uncovering, or removing, and the replacing of the covering or making good of the parts removed will be at the Contractor's expense. Any work done or materials used without supervision or inspection by an authorized representative of the Owner may be ordered removed and replaced at the Contractor's expense unless the Owner's representative failed to inspect after having been given reasonable notice in writing that the work was to be performed. Should the contract work include relocation, adjustment, or any other modification to existing facilities, not the property of the (contract) Owner, authorized representatives of the owners of such facilities shall have the right to inspect such work. Such inspection shall in no sense make any facility owner a party to the contract, and shall in no way interfere with the rights of the parties to this contract. 50-10 REMOVAL OF UNACCEPTABLE AND UNAUTHORIZED WORK. All work that does not conform to the requirements of the contract, plans, and specifications will be considered unacceptable, unless otherwise determined acceptable by the Engineer as provided in the subsection titled CONFORMITY WITH PLANS AND SPECIFICATIONS of this section. Unacceptable work, whether the result of poor workmanship, use of defective materials, damage through carelessness, or any other cause found to exist prior to the final acceptance of the work, shall be removed immediately and replaced in an acceptable manner in accordance with the provisions of the subsection titled CONTRACTOR'S RESPONSIBILITY FOR WORK of Section 70. No removal work made under provision of this subsection shall be done without lines and grades having been given by the Engineer. Work done contrary to the instructions of the Engineer, work done beyond the lines shown on the plans or as given, except as herein specified, or any extra work done without authority, will be considered as unauthorized and will not be paid for under the provisions of the contract. Work so done may be ordered removed or replaced at the Contractor's expense. Upon failure on the part of the Contractor to comply forthwith with any order of the Engineer made under the provisions of this subsection, the Engineer will have authority to cause unacceptable work to be remedied or removed and replaced and unauthorized work to be removed and to deduct the costs (incurred by the Owner) from any monies due or to become due the Contractor. 50-11 LOAD RESTRICTIONS. The Contractor shall comply with all legal load restrictions in the hauling of materials on public roads beyond the limits of the work. A special permit will not relieve the Contractor of liability for damage that may result from the moving of material or equipment. Ashland Municipal Airport Taxilane Improvements 17 FAA General Provisions 007 10 FAA General Provisions The operation of equipment of such weight or so loaded as to cause damage to structures or to any other type of construction will not be permitted. Hauling of materials over the base course or surface course under construction shall be limited as directed. No loads will be permitted on a concrete pavement, base, or structure before the expiration of the curing period. The Contractor shall be responsible for all damage done by his/her hauling equipment and shall correct such damage at his/her own expense. 50-12 MAINTENANCE DURING CONSTRUCTION. The Contractor shall maintain the work during construction and until the work is accepted. This maintenance shall constitute continuous and effective work prosecuted day by day, with adequate equipment and forces so that the work is maintained in satisfactory condition at all times. In the case of a contract for the placing of a course upon a course or subgrade previously constructed, the Contractor shall maintain the previous course or subgrade during all construction operations. All costs of maintenance work during construction and before the project is accepted shall be included in the unit prices bid on the various contract items, and the Contractor will not be paid an additional amount for such work. 50-13 FAILURE TO MAINTAIN THE WORK. Should the Contractor at any time fail to maintain the work as provided in the subsection titled MAINTENANCE DURING CONSTRUCTION of this section, the Engineer shall immediately notify the Contractor of such noncompliance. Such notification shall specify a reasonable time within which the Contractor shall be required to remedy such unsatisfactory maintenance condition. The time specified will give due consideration to the exigency that exists. Should the Contractor fail to respond to the Engineer's notification, the Owner may suspend any work necessary for the Owner to correct such unsatisfactory maintenance condition, depending on the exigency that exists. Any maintenance cost incurred by the Owner, shall be deducted from monies due or to become due the Contractor. 50-14 PARTIAL ACCEPTANCE. If at any time during the prosecution of the project the Contractor substantially completes a usable unit or portion of the work, the occupancy of which will benefit the Owner, he may request the Engineer to make final inspection of that unit. If the Engineer finds upon inspection that the unit has been satisfactorily completed in compliance with the contract, he may accept it as being completed, and the Contractor may be relieved of further responsibility for that unit. Such partial acceptance and beneficial occupancy by the Owner shall not void or alter any provision of the contract. 50-15 FINAL ACCEPTANCE. Upon due notice from the Contractor of presumptive completion of the entire project, the Engineer and Owner will make an inspection. If all construction provided for and contemplated by the contract is found to be completed in accordance with the contract, plans, and specifications, such inspection shall constitute the final inspection. The Engineer shall notify the Contractor in writing of final acceptance as of the date of the final inspection. If, however, the inspection discloses any work, in whole or in part, as being unsatisfactory, the Engineer will give the Contractor the necessary instructions for correction of same and the Contractor shall immediately comply with and execute such instructions. Upon correction of the work, another inspection will be made which shall constitute the final inspection, provided the work has been satisfactorily completed. In such event, the Engineer will make the final acceptance and notify the Contractor in writing of this acceptance as of the date of final inspection. Ashland Municipal Airport Taxilane Improvements 18 FAA General Provisions 00710 FAA General Provisions 50-16 CLAIMS FOR ADJUSTMENT AND DISPUTES. If for any reason the Contractor deems that additional compensation is due him for work or materials not clearly provided for in the contract, plans, or specifications or previously authorized as extra work, he shall notify the Engineer in writing of his/her intention to claim such additional compensation before he begins the work on which he bases the claim. If such notification is not given or the Engineer is not afforded proper opportunity by the Contractor for keeping strict account of actual cost as required, then the Contractor hereby agrees to waive any claim for such additional compensation. Such notice by the Contractor and the fact that the Engineer has kept account of the cost of the work shall not in any way be construed as proving or substantiating the validity of the claim. When the work on which the claim for additional compensation is based has been completed, the Contractor shall, within 10 calendar days, submit his/her written claim to the Engineer who will present it to the Owner for consideration in accordance with local laws or ordinances. Nothing in this subsection shall be construed as a waiver of the Contractor's right to dispute final payment based on differences in measurements or computations. END OF SECTION 50 Ashland Municipal Airport Tazilane Improvements 19 FAA General Provisions 00710 FAA General Provisions SECTION 60 CONTROL OF MATERIALS 60-01 SOURCE OF SUPPLY AND QUALITY REQUIREMENTS. The materials used on the work shall conform to the requirements of the contract, plans, and specifications. Unless otherwise specified, such materials that are manufactured or processed shall be new (as compared to used or reprocessed). In order to expedite the inspection and testing of materials, the Contractor shall furnish complete statements to the Engineer as to the origin, composition, and manufacture of all materials to be used in the work. Such statements shall be furnished promptly after execution of the contract but, in all cases, prior to delivery of such materials. At the Engineer's option, materials may be approved at the source of supply before delivery is stated. If it is found after trial that sources of supply for previously approved materials do not produce specified products, the Contractor shall furnish materials from other sources. The Contractor shall furnish airport lighting equipment that conforms to the requirements of cited materials specifications. In addition, where an FAA specification for airport lighting equipment is cited in the plans or specifications, the Contractor shall furnish such equipment that is: a. Listed in FAA Advisory Circular (AC) 150/5345-S3, Airport Lighting Equipment Certification Program, and Addendum that is in effect on the date of advertisement; and, b. Produced by the manufacturer as listed in the Addendum cited above for the certified equipment part number. The following airport lighting equipment is required for this contract and is to be furnished by the Contractor in accordance with the requirements of this subsection: EQUIPMENT NAME CITED FAA SPECIFICATIONS EFFECTIVE FAA AC OR APPROVAL LETTER FOR EQUIPMENT AND MANUFACTURER 60-02 SAMPLES, TESTS, AND CITED SPECIFICATIONS. Unless otherwise designated, all materials used in the work shall be inspected, tested, and approved by the Engineer before incorporation in the work. Any work in which untested materials are used without approval or written permission of the Engineer shall be performed at the Contractor's risk. Materials found to be unacceptable and unauthorized will not be paid for and, if directed by the Engineer, shall be removed at the Contractor's expense. Unless otherwise designated, tests in accordance with the cited standard methods of ASTM, AASHTO, Federal Specifications, Commercial Item Descriptions, and all other cited methods, which are current on the date of advertisement for bids, will be made by and at the expense of the Engineer. The testing organizations performing on site field tests shall have copies of all referenced standards on the construction site for use by all technicians and other personnel, including the Contractor's representative at his/her request. Unless otherwise designated, samples will be taken by a qualified representative of the Engineer. All materials being used are subject to inspection, test, or rejection at any time prior to or during incorporation into the work. Copies of all tests will be furnished to the Contractor's representative at his/her request. The Contractor shall employ a testing organization to perform all Contractor required tests. The Contractor shall submit to the Engineer resumes on all testing organizations and individual persons who will be performing the tests. The Engineer will determine if such persons are qualified. All the test data Ashland Municipal Airport Taxilane Improvements 20 FAA General Provisions 00710 FAA General Provisions shall be reported to the Engineer after the results are known. A legible, handwritten copy of all test data shall be given to the Engineer daily, along with printed reports, in an approved format, on a weekly basis. After completion of the project, and prior to final payment, the Contractor shall submit a final report to the Engineer showing all test data reports, plus an analysis of all results showing ranges, averages, and corrective action taken on all failing tests. 60-03 CERTIFICATION OF COMPLIANCE. The Engineer may permit the use, prior to sampling and testing, of certain materials or assemblies when accompanied by manufacturer's certificates of compliance stating that such materials or assemblies fully comply with the requirements of the contract. The certificate shall be signed by the manufacturer. Each lot of such materials or assemblies delivered to the work must be accompanied by a certificate of compliance in which the lot is clearly identified. Materials or assemblies used on the basis of certificates of compliance may be sampled and tested at any time and if found not to be in conformity with contract requirements will be subject to rejection whether in place or not. The form and distribution of certificates of compliance shall be as approved by the Engineer. When a material or assembly is specified by "brand name or equal" and the Contractor elects to furnish the specified "brand name," the Contractor shall be required to furnish the manufacturer's certificate of compliance for each lot of such material or assembly delivered to the work. Such certificate of compliance shall clearly identify each lot delivered and shall certify as to: a. Conformance to the specified performance, testing, quality or dimensional requirements; and, b. Suitability of the material or assembly for the use intended in the contract work. Should the Contractor propose to furnish an "or equal" material or assembly, he shall furnish the manufacturer's certificates of compliance as hereinbefore described for the specified brand name material or assembly. However, the Engineer shall be the sole judge as to whether the proposed "or equal" is suitable for use in the work. The Engineer reserves the right to refuse permission for use of materials or assemblies on the basis of certificates of compliance. 60-04 PLANT INSPECTION. The Engineer or his/her authorized representative may inspect, at its source, any specified material or assembly to be used in the work. Manufacturing plants may be inspected from time to time for the purpose of determining compliance with specified manufacturing methods or materials to be used in the work and to obtain samples required for his/her acceptance of the material or assembly. Should the Engineer conduct plant inspections, the following conditions shall exist: a. The Engineer shall have the cooperation and assistance of the Contractor and the producer with whom he has contracted for materials. b. The Engineer shall have full entry at all reasonable times to such parts of the plant that concern the manufacture or production of the materials being furnished. c. If required by the Engineer, the Contractor shall arrange for adequate office or working space that may be reasonably needed for conducting plant inspections. Office or working space should be conveniently located with respect to the plant. It is understood and agreed that the Owner shall have the right to retest any material that has been tested and approved at the source of supply after it has been delivered to the site. The Engineer shall Ashland Municipal Airport Taxilane Improvements 21 FAA General Provisions 00710 FAA General Provisions have the right to reject only material which, when retested, does not meet the requirements of the contract, plans, or specifications. 60-05 ENGINEER'S FIELD OFFICE. See Technical Specifications, Mobilization and Demobilization. 60-06 STORAGE OF MATERIALS. Materials shall be so stored as to assure the preservation of their quality and fitness for the work. Stored materials, even though approved before storage, may again be inspected prior to their use in the work. Stored materials shall be located so as to facilitate their prompt inspection. The Contractor shall coordinate the storage of all materials with the Engineer. Materials to be stored on airport property shall not create an obstruction to air navigation nor shall they interfere with the free and unobstructed movement of aircraft. Unless otherwise shown on the plans, the storage of materials and the location of the Contractor's plant and parked equipment or vehicles shall be as directed by the Engineer. Private property shall not be used for storage purposes without written permission of the owner or lessee of such property. The Contractor shall make all arrangements and bear all expenses for the storage of materials on private property. Upon request, the Contractor shall furnish the Engineer a copy of the property owner's permission. All storage sites on private or airport property shall be restored to their original condition by the Contractor at his/her entire expense, except as otherwise agreed to (in writing) by the owner or lessee of the property. 60-07 UNACCEPTABLE MATERIALS. Any material or assembly that does not conform to the requirements of the contract, plans, or specifications shall be considered unacceptable and shall be rejected. The Contractor shall remove any rejected material or assembly from the site of the work, unless otherwise instructed by the Engineer. Rejected material or assembly, the defects of which have been corrected by the Contractor, shall not be returned to the site of the work until such time as the Engineer has approved its used in the work. 60-08 OWNER FURNISHED MATERIALS. The Contractor shall furnish all materials required to complete the work, except those specified herein (if any) to be furnished by the Owner. Owner-furnished materials shall be made available to the Contractor at the location specified herein. All costs of handling, transportation from the specified location to the site of work, storage, and installing Owner-furnished materials shall be included in the unit price bid for the contract item in which such Owner-furnished material is used. After any owner-furnished material has been delivered to the location specified, the Contractor shall be responsible for any demurrage, damage, loss, or other deficiencies that may occur during the Contractor's handling, storage, or use of such Owner-furnished material. The Owner will deduct from any monies due or to become due the Contractor any cost incurred by the Owner in making good such loss due to the Contractor's handling, storage, or use of Owner-furnished materials. END OF SECTION 60 Ashland Municipal Airport Taxilane Improvements 22 FAA General Provisions 00710 FAA General Provisions SECTION 70 LEGAL REGULATIONS AND RESPONSIBILITY TO PUBLIC 70-01 LAWS TO BE OBSERVED. The Contractor shall keep fully informed of all Federal and state laws, all local laws, ordinances, and regulations and all orders and decrees of bodies or tribunals having any jurisdiction or authority, which in any manner affect those engaged or employed on the work, or which in any way affect the conduct of the work. He shall at all times observe and comply with all such laws, ordinances, regulations, orders, and decrees; and shall protect and indemnify the Owner and all his/her officers, agents, or servants against any claim or liability arising from or based on the violation of any such law, ordinance, regulation, order, or decree, whether by himself or his/her employees. 70-02 PERMITS, LICENSES, AND TAXES. The Contractor shall procure all permits and licenses, pay all charges, fees, and taxes, and give all notices necessary and incidental to the due and lawful prosecution of the work. 70-03 PATENTED DEVICES, MATERIALS, AND PROCESSES. If the Contractor is required or desires to use any design, device, material, or process covered by letters of patent or copyright, he shall provide for such use by suitable legal agreement with the patentee or owner. The Contractor and the surety shall indemnify and save harmless the Owner, any third party, or political subdivision from any and all claims for infringement by reason of the use of any such patented design, device, material or process, or any trademark or copyright, and shall indemnify the Owner for any costs, expenses, and damages which it may be obliged to pay by reason of an infringement, at any time during the prosecution or after the completion of the work. 70-04 RESTORATION OF SURFACES DISTURBED BY OTHERS. The Owner reserves the right to authorize the construction, reconstruction, or maintenance of any public or private utility service, FAA or National Oceanic and Atmospheric Administration (NOAA) facility, or a utility service of another government agency at any time during the progress of the work. The Contractor shall not permit any individual, firm, or corporation to excavate or otherwise disturb such utility services or facilities located within the limits of the work without the written permission of the Engineer and Owner. Should the owner of public or private utility service, FAA, or NOAA facility, or a utility service of another government agency be authorized to construct, reconstruct, or maintain such utility service or facility during the progress of the work, the Contractor shall cooperate with such owners by arranging and performing the work in this contract so as to facilitate such construction, reconstruction or maintenance by others whether or not such work by others is listed above. When ordered as extra work by the Engineer, the Contractor shall make all necessary repairs to the work which are due to such authorized work by others, unless otherwise provided for in the contract, plans, or specifications. It is understood and agreed that the Contractor shall not be entitled to make any claim for damages due to such authorized work by others or for any delay to the work resulting from such authorized work. 70-05 FEDERAL AID PARTICIPATION. For AIP contracts, the United States Government has agreed to reimburse the Owner for some portion of the contract costs. Such reimbursement is made from time to time upon the Owner's request to the FAA. In consideration of the United States Government's (FAA's) agreement with the Owner, the Owner has included provisions in this contract pursuant to the requirements of Title 49 of the United States Code (USC) and the Rules and Regulations of the FAA that pertain to the work. As required by the USC, the contract work is subject to the inspection and approval of duly authorized representatives of the Administrator, FAA, and is further subject to those provisions of the rules and regulations that are cited in the contract, plans, or specifications. Ashland Municipal Airport Taxilane Improvements 23 FAA General Provisions 00710 FAA General Provisions No requirement of the USC, the rules and regulations implementing the USC, or this contract shall be construed as making the Federal Government a party to the contract nor will any such requirement interfere, in any way, with the rights of either party to the contract. 70-06 SANITARY, HEALTH, AND SAFETY PROVISIONS. The Contractor shall provide and maintain in a neat, sanitary condition such accommodations for the use of his/her employees as may be necessary to comply with the requirements of the state and local Board of Health, or of other bodies or tribunals having jurisdiction. Attention is directed to Federal, state, and local laws, rules and regulations concerning construction safety and health standards. The Contractor shall not require any worker to work in surroundings or under conditions that are unsanitary, hazardous, or dangerous to his/her health or safety. 70-07 PUBLIC CONVENIENCE AND SAFETY. The Contractor shall control his/her operations and those of his/her subcontractors and all suppliers, to assure the least inconvenience to the traveling public. Under all circumstances, safety shall be the most important consideration. The Contractor shall maintain the free and unobstructed movement of aircraft and vehicular traffic with respect to his/her own operations and those of his/her subcontractors and all suppliers in accordance with the subsection titled MAINTENANCE OF TRAFFIC of Section 40 hereinbefore specified and shall limit such operations for the convenience and safety of the traveling public as specified in the subsection titled LIMITATION OF OPERATIONS of Section 80 hereinafter. 70-08 BARRICADES, WARNING SIGNS, AND HAZARD MARKINGS. The Contractor shall furnish, erect, and maintain all barricades, warning signs, and markings for hazards necessary to protect the public and the work. When used during periods of darkness, such barricades, warning signs, and hazard markings shall be suitably illuminated. Unless otherwise specified, barricades, warning signs, and markings for hazards that are in the air operations area shall be a maximum of 18 in high. Unless otherwise specified, barricades shall be spaced not more than 25 feet apart. Barricades, warning signs, and markings shall be paid for under Section 40-05. For vehicular and pedestrian traffic, the Contractor shall furnish, erect, and maintain barricades, warning signs, lights and other traffic control devices in reasonable conformity with the Manual of Uniform Traffic Control Devices for Streets and Highways (published by the United States Government Printing Office). When the work requires closing an air operations area of the airport or portion of such area, the Contractor shall furnish, erect, and maintain temporary markings and associated lighting conforming to the requirements of AC 150/5340-1, Standards for Airport Markings. The Contractor shall furnish, erect, and maintain markings and associated lighting of open trenches, excavations, temporary stock piles, and his/her parked construction equipment that may be hazardous to the operation of emergency fire-rescue or maintenance vehicles on the airport in reasonable conformance to AC 150/5370-2, Operational Safety on Airports During Construction. The Contractor shall identify each motorized vehicle or piece of construction equipment in reasonable conformance to AC 150/5370-2. The Contractor shall furnish and erect all barricades, warning signs, and markings for hazards prior to commencing work that requires such erection and shall maintain the barricades, warning signs, and markings for hazards until their dismantling is directed by the Engineer. Open-flame type lights shall not be permitted within the air operations areas of the airport. Ashland Municipal Airport Taxilane Improvements 24 FAA General Provisions 00710 FAA General Provisions 70-09 USE OF EXPLOSIVES. When the use of explosives is necessary for the prosecution of the work, the Contractor shall exercise the utmost care not to endanger life or property, including new work. The Contractor shall be responsible for all damage resulting from the use of explosives. All explosives shall be stored in a secure manner in compliance with all laws and ordinances, and all such storage places shall be clearly marked. Where no local laws or ordinances apply, storage shall be provided satisfactory to the Engineer and, in general, not closer than 1,000 feet (300 m) from the work or from any building, road, or other place of human occupancy. The Contractor shall notify each property owner and public utility company having structures or facilities in proximity to the site of the work of his/her intention to use explosives. Such notice shall be given sufficiently in advance to enable them to take such steps as they may deem necessary to protect their property from injury. The use of electrical blasting caps shall not be permitted on or within 1,000 feet (300 m) of the airport property. 1 70-10 PROTECTION AND RESTORATION OF PROPERTY AND LANDSCAPE. The Contractor shall be responsible for the preservation of all public and private property, and shall protect carefully from disturbance or damage all land monuments and property markers until the Engineer has witnessed or otherwise referenced their location and shall not move them until directed. The Contractor shall be responsible for all damage or injury to property of any character, during the prosecution of the work, resulting from any act, omission, neglect, or misconduct in his/her manner or method of executing the work, or at any time due to defective work or materials, and said responsibility will not be released until the project shall have been completed and accepted. When or where any direct or indirect damage or injury is done to public or private property by or on account of any act, omission, neglect, or misconduct in the execution of the work, or in consequence of the non-execution thereof by the Contractor, he shall restore, at his/her own expense, such property to a condition similar or equal to that existing before such damage or injury was done, by repairing, or otherwise restoring as may be directed, or he shall make good such damage or injury in an acceptable manner. 70-11 RESPONSIBILITY FOR DAMAGE CLAIMS. The Contractor shall indemnify and save harmless the Engineer and the Owner and their officers, and employees from all suits actions, or claims of any character brought because of any injuries or damage received or sustained by any person, persons, or property on account of the operations of the Contractor; or on account of or in consequence of any neglect in safeguarding the work; or through use of unacceptable materials in constructing the work; or because of any act or omission, neglect, or misconduct of said Contractor; or because of any claims or amounts recovered from any infringements of patent, trademark, or copyright; or from any claims or amounts arising or recovered under the "Workmen's Compensation Act," or any other law, ordinance, order, or decree. Money due the Contractor under and by virtue of his/her contract as may be considered necessary by the Owner for such purpose may be retained for the use of the Owner or, in case no money is due, his/her surety may be held until such suits, actions, or claims for injuries or damages as aforesaid shall have been settled and suitable evidence to that effect furnished to the Owner, except that money due the Contractor will not be withheld when the Contractor produces satisfactory evidence that he is adequately protected by public liability and property damage insurance. 70-12 THIRD PARTY BENEFICIARY CLAUSE. It is specifically agreed between the parties executing the contract that it is not intended by any of the provisions of any part of the contract to create the public or any member thereof a third party beneficiary or to authorize anyone not a party to the contract to Ashland Municipal Airport Taxilane Improvements 25 FAA General Provisions 00710 FAA General Provisions maintain a suit for personal injuries or property damage pursuant to the terms or provisions of the contract. 70-13 OPENING SECTIONS OF THE WORK TO TRAFFIC. Should it be necessary for the Contractor to complete portions of the contract work for the beneficial occupancy of the Owner prior to completion of the entire contract, such "phasing" of the work shall be specified herein and indicated on the plans. When so specified, the Contractor shall complete such portions of the work on or before the date specified or as otherwise specified. The Contractor shall make his/her own estimate of the difficulties involved in arranging his/her work to permit such beneficial occupancy by the Owner as described below: Phase or Description Required Date or Sequence of Owner's Beneficial Occupancy Work Shown on Plan Sheet Upon completion of any portion of the work listed above, such portion shall be accepted by the Owner in accordance with the subsection titled PARTIAL ACCEPTANCE of Section 50. No portion of the work may be opened by the Contractor for public use until ordered by the Engineer in writing. Should it become necessary to open a portion of the work to public traffic on a temporary or intermittent basis, such openings shall be made when, in the opinion of the Engineer, such portion of the work is in an acceptable condition to support the intended traffic. Temporary or intermittent openings are considered to be inherent in the work and shall not constitute either acceptance of the portion of the work so opened or a waiver of any provision of the contract. Any damage to the portion of the work so opened that is not attributable to traffic which is permitted by the owner shall be repaired by the Contractor at his/her expense. The Contractor shall make his/her own estimate of the inherent difficulties involved in completing the work under the conditions herein described and shall not claim any added compensation by reason of delay or increased cost due to opening a portion of the contract work. Contractor shall be required to conform to safety standards contained AC 150/5370-2, Operational Safety on Airports During Construction (See Special Provisions.) Contractor shall refer to the approved Construction Safety and Phasing Plan to identify barricade requirements and other safety requirements prior to opening up sections of work to traffic. 70-14 CONTRACTOR'S RESPONSIBILITY FOR WORK. Until the Engineer's final written acceptance of the entire completed work, excepting only those portions of the work accepted in accordance with the subsection titled PARTIAL ACCEPTANCE of Section 50, the Contractor shall have the charge and care thereof and shall take every precaution against injury or damage to any part due to the action of the elements or from any other cause, whether arising from the execution or from the non-execution of the work. The Contractor shall rebuild, repair, restore, and make good all injuries or damages to any portion of the work occasioned by any of the above causes before final acceptance and shall bear the expense thereof except damage to the work due to unforeseeable causes beyond the control of and without the fault or negligence of the Contractor, including but not restricted to acts of God such as earthquake, tidal wave, tornado, hurricane or other cataclysmic phenomenon of nature, or acts of the public enemy or of government authorities. If the work is suspended for any cause whatever, the Contractor shall be responsible for the work and shall take such precautions necessary to prevent damage to the work. The Contractor shall provide for normal drainage and shall erect necessary temporary structures, signs, or other facilities at his/her Ashland Municipal Airport Taxilane Improvements 26 FAA General Provisions 00710 FAA General Provisions expense. During such period of suspension of work, the Contractor shall properly and continuously maintain in an acceptable growing condition all living material in newly established planting, seedings, and soddings furnished under his/her contract, and shall take adequate precautions to protect new tree growth and other important vegetative growth against injury. 70-1S CONTRACTOR'S RESPONSIBILITY FOR UTILITY SERVICE AND FACILITIES OF OTHERS. As provided in the subsection titled RESTORATION OF SURFACES DISTURBED BY OTHERS of this section, the Contractor shall cooperate with the owner of any public or private utility service, FAA or NOAA, or a utility service of another government agency that may be authorized by the owner to construct, reconstruct or maintain such utility services or facilities during the progress of the work. In addition, the Contractor shall control his/her operations to prevent the unscheduled interruption of such utility services and facilities. To the extent that such public or private utility services, FAA, or NOAA facilities, or utility services of another governmental agency are known to exist within the limits of the contract work, the approximate locations have been indicated on the plans. It is understood and agreed that the Owner does not guarantee the accuracy or the completeness of the location information relating to existing utility services, facilities, or structures that may be shown on the plans or encountered in the work. Any inaccuracy or omission in such information shall not relieve the Contractor of his/her responsibility to protect such existing features from damage or unscheduled interruption of service. It is further understood and agreed that the Contractor shall, upon execution of the contract, notify the owners of all utility services or other facilities of his/her plan of operations. Such notification shall be in writing addressed to THE PERSON TO CONTACT as provided hereinbefore in this subsection and the subsection titled RESTORATION OF SURFACES DISTURBED BY OTHERS of this section. A copy of each notification shall be given to the Engineer. In addition to the general written notification hereinbefore provided, it shall be the responsibility of the Contractor to keep such individual owners advised of changes in his/her plan of operations that would affect such owners. Prior to commencing the work in the general vicinity of an existing utility service or facility, the Contractor shall again notify each such owner of his/her plan of operation. If, in the Contractor's opinion, the owner's assistance is needed to locate the utility service or facility or the presence of a representative of the owner is desirable to observe the work, such advice should be included in the notification. Such notification shall be given by the most expeditious means to reach the utility owner's PERSON TO CONTACT no later than two normal business days prior to the Contractor's commencement of operations in such general vicinity. The Contractor shall furnish a written summary of the notification to the Engineer. The Contractor's failure to give the two day's notice hereinabove provided shall be cause for the Owner to suspend the Contractor's operations in the general vicinity of a utility service or facility. Where the outside limits of an underground utility service have been located and staked on the ground, the Contractor shall be required to use excavation methods acceptable to the Engineer within 3 feet (90 cm) of such outside limits at such points as may be required to ensure protection from damage due to the Contractor's operations. Should the Contractor damage or interrupt the operation of a utility service or facility by accident or otherwise, he shall immediately notify the proper authority and the Engineer and shall take all reasonable measures to prevent further damage or interruption of service. The Contractor, in such Ashland Municipal Airport Taxilane Improvements 27 FAA General Provisions 00710 FAA General Provisions events, shall cooperate with the utility service or facility owner and the Engineer continuously until such damage has been repaired and service restored to the satisfaction of the utility or facility owner. The Contractor shall bear all costs of damage and restoration of service to any utility service or facility due to his/her operations whether or not due to negligence or accident. The Owner reserves the right to deduct such costs from any monies due or which may become due the Contractor, or his/her surety. 70-15.1 FAA FACILITIES AND CABLE RUNS. N/A 70-16 FURNISHING RIGHTS-OF-WAY. The Owner will be responsible for furnishing all rights-of-way upon which the work is to be constructed in advance of the Contractor's operations. 70-17 PERSONAL LIABILITY OF PUBLIC OFFICIALS. In carrying out any of the contract provisions or in exercising any power or authority granted to him by this contract, there shall be no liability upon the Engineer, his/her authorized representatives, or any officials of the Owner either personally or as an official of the Owner. It is understood that in such matters they act solely as agents and representatives of the Owner. 70-18 NO WAIVER OF LEGAL RIGHTS. Upon completion of the work, the Owner will expeditiously make final inspection and notify the Contractor of final acceptance. Such final acceptance, however, shall not preclude or stop the Owner from correcting any measurement, estimate, or certificate made before or after completion of the work, nor shall the Owner be precluded or stopped from recovering from the Contractor or his/her surety, or both, such overpayment as may be sustained, or by failure on the part of the Contractor to fulfill his/her obligations under the contract. A waiver on the part of the Owner of any breach of any part of the contract shall not be held to be a waiver of any other or subsequent breach. The Contractor, without prejudice to the terms of the contract, shall be liable to the Owner for latent defects, fraud, or such gross mistakes as may amount to fraud, or as regards the owner's rights under any warranty or guaranty. 70-19 ENVIRONMENTAL PROTECTION. The Contractor shall comply with all Federal, state, and local laws and regulations controlling pollution of the environment. He shall take necessary precautions to prevent pollution of streams, lakes, ponds, and reservoirs with fuels, oils, bitumens, chemicals, or other harmful materials and to prevent pollution of the atmosphere from particulate and gaseous matter. 70-20 ARCHAEOLOGICAL AND HISTORICAL FINDINGS. Unless otherwise specified in this subsection, the Contractor is advised that the site of the work is not within any property, district, or site, and does not contain any building, structure, or object listed in the current National Register of Historic Places published by the United States Department of Interior. Should the Contractor encounter, during his/her operations, any building, part of a building, structure, or object that is incongruous with its surroundings, he shall immediately cease operations in that location and notify the Engineer. The Engineer will immediately investigate the Contractor's finding and the Owner will direct the Contractor to either resume his/her operations or to suspend operations as directed. Should the Owner order suspension of the Contractor's operations in order to protect an archaeological or historical finding, or order the Contractor to perform extra work, such shall be covered by an appropriate contract modification (change order or supplemental agreement) as provided in the subsection titled EXTRA WORK of Section 40 and the subsection titled PAYMENT FOR EXTRA WORK AND FORCE ACCOUNT WORK of Section 90. If appropriate, the contract modification shall include an Ashland Municipal Airport Taxilane Improvements 28 FAA General Provisions 00710 FAA General Provisions extension of contract time in accordance with the subsection titled DETERMINATION AND EXTENSION OF CONTRACT TIME of Section 80. END OF SECTION 70 Ashland Municipal Airport Taxilane Improvements 29 FAA General Provisions 00710 FAA General Provisions SECTION 80 PROSECUTION AND PROGRESS 80-01 SUBLETTING OF CONTRACT. The Owner will not recognize any subcontractor on the work. The Contractor shall at all times when work is in progress be represented either in person, by a qualified superintendent, or by other designated, qualified representative who is duly authorized to receive and execute orders of the Engineer. Should the Contractor elect to assign his/her contract, said assignment shall be concurred in by the surety, shall be presented for the consideration and approval of the Owner, and shall be consummated only on the written approval of the owner. In case of approval, the Contractor shall file copies of all subcontracts with the Engineer. The Contractor shall perform, with his organization, an amount of work equal to at least 25 percent of the total contract cost. 80-02 NOTICE TO PROCEED. The notice to proceed shall state the date on which it is expected the Contractor will begin the construction and from which date contract time will be charged. The Contractor shall begin the work to be performed under the contract within 10 days of the date set by the Engineer in the written notice to proceed, but in any event, the Contractor shall notify the Engineer at least 24 hours in advance of the time actual construction operations will begin. 80-03 PROSECUTION AND PROGRESS. Unless otherwise specified, the Contractor shall submit his/her progress schedule for the Engineer's approval within 10 days after the effective date of the notice to proceed. The Contractor's progress schedule, when approved by the Engineer, may be used to establish major construction operations and to check on the progress of the work. The Contractor shall provide sufficient materials, equipment, and labor to guarantee the completion of the project in accordance with the plans and specifications within the time set forth in the proposal. If the Contractor falls significantly behind the submitted schedule, the Contractor shall, upon the Engineer's request, submit a revised schedule for completion of the work within the contract time and modify his/her operations to provide such additional materials, equipment, and labor necessary to meet the revised schedule. Should the prosecution of the work be discontinued for any reason, the Contractor shall notify the Engineer at least 24 hours in advance of resuming operations. For AIP contracts, the Contractor shall not commence any actual construction prior to the date on which the notice to proceed is issued by the owner. 80-04 LIMITATION OF OPERATIONS. The Contractor shall control his/her operations and the operations of his/her subcontractors and all suppliers so as to provide for the free and unobstructed movement of aircraft in the AIR OPERATIONS AREAS (AOA) of the airport. When the work requires the Contractor to conduct his/her operations within an AOA of the airport, the work shall be coordinated with airport operations (through the Engineer) at least 48 hours prior to commencement of such work. The Contractor shall not close an AOA until so authorized by the Engineer and until the necessary temporary marking and associated lighting is in place as provided in the subsection titled BARRICADES, WARNING SIGNS, AND HAZARD MARKINGS of Section 70. When the contract work requires the Contractor to work within an AOA of the airport on an intermittent basis (intermittent opening and closing of the ACA), the Contractor shall maintain constant communications as hereinafter specified; immediately obey all instructions to vacate the ACA; immediately obey all instructions to resume work in such AOA. Failure to maintain the specified communications or to obey instructions shall be cause for suspension of the Contractor's operations in the AOA until the satisfactory conditions are provided. The following AOA cannot be closed to operating Ashland Municipal Airport Taxilane Improvements 30 FAA General Provisions 00710 FAA General Provisions aircraft to permit the Contractor's operations on a continuous basis and will therefore be closed to aircraft operations intermittently as follows: Existing Taxilanes, See Construction Safety and Phasing Plans for additional information. Contractor shall be required to conform to safety standards contained in AC 150/5370-2, Operational Safety on Airports During Construction (See Special Provisions). 80-04.1 OPERATIONAL SAFETY ON AIRPORT DURING CONSTRUCTION. All Contractors' operations shall be conducted in accordance with the Construction Safety and Phasing Plan and the provisions set forth within the current version of Advisory Circular 150/S370-2. The Construction Safety and Phasing Plan included within the contract documents conveys minimum requirements for operational safety on the airport during construction activities. The Contractor shall prepare and submit a plan that details how it proposes to comply with the requirements presented within the Construction Safety and Phasing Plan. The Contractor shall implement all necessary Construction Safety and Phasing Plan measures prior to commencement of any work activity. The Contractor shall conduct routine checks of the Construction Safety and Phasing Plan measures to assure compliance.. The Contractor is responsible to the Owner for the conduct of all subcontractors it employs on the project. The Contractor shall assure that all subcontractors are made aware of the requirements of the Construction Safety and Phasing Plan and that they implement and maintain all necessary measures. No deviation or modifications may be made to the approved Construction Safety and Phasing Plan unless approved in writing by the Owner or Engineer. 80-05 CHARACTER OF WORKERS, METHODS, AND EQUIPMENT. The Contractor shall, at all times, employ sufficient labor and equipment for prosecuting the work to full completion in the manner and time required by the contract, plans, and specifications. All workers shall have sufficient skill and experience to perform properly the work assigned to them. Workers engaged in special work or skilled work shall have sufficient experience in such work and in the operation of the equipment required to perform the work satisfactorily. Any person employed by the Contractor or by any subcontractor who violates any operational regulations and, in the opinion of the Engineer, does not perform his work in a proper and skillful manner or is intemperate or disorderly shall, at the written request of the Engineer, be removed forthwith by the Contractor or subcontractor employing such person, and shall not be employed again in any portion of the work without approval of the Engineer. Should the Contractor fail to remove such persons or person, or fail to furnish suitable and sufficient personnel for the proper prosecution of the work, the Engineer may suspend the work by written notice until compliance with such orders. All equipment that is proposed to be used on the work shall be of sufficient size and in such mechanical condition as to meet requirements of the work and to produce a satisfactory quality of work. Equipment used on any portion of the work shall be such that no injury to previously completed work, adjacent property, or existing airport facilities will result from its use. When the methods and equipment to be used by the Contractor in accomplishing the work are not prescribed in the contract, the Contractor is free to use any methods or equipment that will accomplish the work in conformity with the requirements of the contract, plans, and specifications. When the contract specifies the use of certain methods and equipment, such methods and equipment shall be used unless others are authorized by the Engineer. If the Contractor desires to use a method or Ashland -Municipal Airport Taxilane Improvements 31 FAA General Provisions 00710 FAA General Provisions type of equipment other than specified in the contract, he may request authority from the Engineer to do so. The request shall be in writing and shall include a full description of the methods and equipment proposed and of the reasons for desiring to make the change. If approval is given, it will be on the condition that the Contractor will be fully responsible for producing work in conformity with contract requirements. If, after trial use of the substituted methods or equipment, the Engineer determines that the work produced does not meet contract requirements, the Contractor shall discontinue the use of the substitute method or equipment and shall complete the remaining work with the specified methods and equipment. The Contractor shall remove any deficient work and replace it with work of specified quality, or take such other corrective action as the Engineer may direct. No change will be made in basis of payment for the contract items involved nor in contract time as a result of authorizing a change in methods or equipment under this subsection. 80-06 TEMPORARY SUSPENSION OF THE WORK. The Owner shall have the authority to suspend the work wholly, or in part, for such period or periods as he may deem necessary, due to unsuitable weather, or such other conditions as are considered unfavorable for the prosecution of the work, or for such time as is necessary due to the failure on the part of the Contractor to carry out orders given or perform any or all provisions of the contract. In the event that the Contractor is ordered by the Owner, in writing, to suspend work for some unforeseen cause not otherwise provided for in the contract and over which the Contractor has no control, the Contractor may be reimbursed for actual money expended on the work during the period of shutdown. No allowance will be made for anticipated profits. The period of shutdown shall be computed from the effective date of the Engineer's order to suspend work to the effective date of the Engineer's order to resume the work. Claims for such compensation shall be filed with the Engineer within the time period stated in the Engineer's order to resume work. The Contractor shall submit with his/her claim information substantiating the amount shown on the claim. The Engineer will forward the Contractor's claim to the Owner for consideration in accordance with local laws or ordinances. No provision of this article shall be construed as entitling the Contractor to compensation for delays due to inclement weather, for suspensions made at the request of the Owner, or for any other delay provided for in the contract, plans, or specifications. If it should become necessary to suspend work for an indefinite period, the Contractor shall store all materials in such manner that they will not become an obstruction nor become damaged in any way. He shall take every precaution to prevent damage or deterioration of the work performed and provide for normal drainage of the work. The Contractor shall erect temporary structures where necessary to provide for traffic on, to, or from the airport. 80-07 DETERMINATION AND EXTENSION OF CONTRACT TIME. The number of calendar or working days allowed for completion of the work shall be stated in the proposal and contract and shall be known as the CONTRACT TIME. Should the contract time require extension for reasons beyond the Contractor's control, it shall be adjusted as follows: a. CONTRACT TIME based on WORKING DAYS shall be calculated weekly by the Engineer. The Engineer will furnish the Contractor a copy of his/her weekly statement of the number of working days charged against the contract time during the week and the number of working days currently specified for completion of the contract (the original contract time plus the number of working days, if any, that have been included in approved CHANGE ORDERS or SUPPLEMENTAL AGREEMENTS covering EXTRA WORK). Ashland Municipal Airport Taxilane Improvements 32 FAA General Provisions 00710 FAA General Provisions The Engineer shall base his/her weekly statement of contract time charged on the following considerations: (1) No time shall be charged for days on which the Contractor is unable to proceed with the principal item of work under construction at the time for at least 6 hours with the normal work force employed on such principal item. Should the normal work force be on a double-shift, 12 hours shall be used. Should the normal work force be on a triple-shift, 18 hours shall apply. Conditions beyond the Contractor's control such as strikes, lockouts, unusual delays in transportation, temporary suspension of the principal item of work under construction or temporary suspension of the entire work which have been ordered by the Owner for reasons not the fault of the Contractor, shall not be charged against the contract time. (2) The Engineer will not make charges against the contract time prior to the effective date of the notice to proceed. (3) The Engineer will begin charges against the contract time on the first working day after the effective date of the notice to proceed. (4) The Engineer will not make charges against the contract time after the date of final acceptance as defined in the subsection titled FINAL ACCEPTANCE of Section 50. (5) The Contractor will be allowed 1 week in which to file a written protest setting forth his/her objections to the Engineer's weekly statement. If no objection is filed within such specified time, the weekly statement shall be considered as acceptable to the Contractor. The contract time (stated in the proposal) is based on the originally estimated quantities as described in the subsection titled INTERPRETATION OF ESTIMATED PROPOSAL QUANTITIES of Section 20. Should the satisfactory completion of the contract require performance of work in greater quantities than those estimated in the proposal, the contract time shall be increased in the same proportion as the cost of the actually completed quantities bears to the cost of the originally estimated quantities in the proposal. Such increase in contract time shall not consider either the cost of work or the extension of contract time that has been covered by change order or supplemental agreement and shall be made at the time of final payment. b. CONTRACT TIME based on CALENDAR DAYS shall consist of the number of calendar days stated in the contract counting from the effective date of the notice to proceed and including all Saturdays, Sundays, holidays, and nonwork days. All calendar days elapsing between the effective dates of the owner's orders to suspend and resume all work, due to causes not the fault of the Contractor, shall be excluded. At the time of final payment, the contract time shall be increased in the same proportion as the cost of the actually completed quantities bears to the cost of the originally estimated quantities in the proposal. Such increase in the contract time shall not consider either cost of work or the extension of contract time that has been covered by a change order or supplemental agreement. Charges against the contract time will cease as of the date of final acceptance. c. When the contract time is a specified completion date, it shall be the date on which all contract work shall be substantially completed. If the Contractor finds it impossible for reasons beyond his/her control to complete the work within the contract time as specified, or as extended in accordance with the provisions of this subsection, he may, at any time prior to the expiration of the contract time as extended, make a written request to the Engineer for an extension of time setting forth the reasons which he believes will justify the granting of his/her request. Requests for extension of time on calendar day projects, caused by inclement weather, Ashland Municipal Airport Taxilane Improvements 33 FAA General Provisions 00710 FAA General Provisions shall be supported with National Weather Bureau data showing the actual amount of inclement weather exceeded which could normally be expected during the contract period. The Contractor's plea that insufficient time was specified is not a valid reason for extension of time. If the Engineer finds that the work was delayed because of conditions beyond the control and without the fault of the Contractor, he may extend the time for completion in such amount as the conditions justify. The extended time for completion shall then be in full force and effect, the same as though it were the original time for completion. 80-08 FAILURE TO COMPLETE ON TIME. For each calendar day or working day, as specified in the contract, that any work remains uncompleted after the contract time (including all extensions and adjustments as provided in the subsection titled DETERMINATION AND EXTENSION OF CONTRACT TIME of this Section) the sum specified in the contract and proposal as liquidated damages will be deducted from any money due or to become due the Contractor or his/her surety. Such deducted sums shall not be deducted as a penalty but shall be considered as liquidation of a reasonable portion of damages including but not limited to additional engineering services that will be incurred by the Owner should the Contractor fail to complete the work in the time provided in his/her contract. Schedule Liquidated Damages Cost Allowed Construction Time Phase 1 $500 per day 30 days Phase 2 $1,500 per day 30 days The maximum construction time allowed will be 60 days. See the Construction Safety and Phasing Plan (CSPP) for additional information. Permitting the Contractor to continue and finish the work or any part of it after the time fixed for its completion, or after the date to which the time for completion may have been extended, will in no way operate as a wavier on the part of the owner of any of its rights under the contract. 80-09 DEFAULT AND TERMINATION OF CONTRACT. The Contractor shall be considered in default of his/her contract and such default will be considered as cause for the Owner to terminate the contract for any of the following reasons if the Contractor: a. Fails to begin the work under the contract within the time specified in the "Notice to Proceed," or b. Fails to perform the work or fails to provide sufficient workers, equipment or materials to assure completion of work in accordance with the terms of the contract, or c. Performs the work unsuitably or neglects or refuses to remove materials or to perform anew such work as may be rejected as unacceptable and unsuitable, or d. Discontinues the prosecution of the work, or e. Fails to resume work which has been discontinued within a reasonable time after notice to do so, or f. Becomes insolvent or is declared bankrupt, or commits any act of bankruptcy or insolvency, or g. Allows any final judgment to stand against him unsatisfied for a period of 10 days, or h. Makes an assignment for the benefit of creditors, or i. For any other cause whatsoever, fails to carry on the work in an acceptable manner. Ashland Municipal Airport Taxilane Improvements 34 FAA General Provisions 00710 FAA General Provisions Should the Engineer consider the Contractor in default of the contract for any reason hereinbefore, he shall immediately give written notice to the Contractor and the Contractor's surety as to the reasons for considering the Contractor in default and the owner's intentions to terminate the contract. If the Contractor or surety, within a period of 10 days after such notice, does not proceed in accordance therewith, then the owner will, upon written notification from the Engineer of the facts of such delay, neglect, or default and the Contractor's failure to comply with such notice, have full power and authority without violating the contract, to take the prosecution of the work out of the hands of the Contractor. The Owner may appropriate or use any or all materials and equipment that have been mobilized for use in the work and are acceptable and may enter into an agreement for the completion of said contract according to the terms and provisions thereof, or use such other methods as in the opinion of the Engineer will be required for the completion of said contract in an acceptable manner. All costs and charges incurred by the Owner, together with the cost of completing the work under contract, will be deducted from any monies due or which may become due the Contractor. If such expense exceeds the sum which would have been payable under the contract, then the Contractor and the surety shall be liable and shall pay to the Owner the amount of such excess. 80-10 TERMINATION FOR NATIONAL EMERGENCIES. The Owner shall terminate the contract or portion thereof by written notice when the Contractor is prevented from proceeding with the construction contract as a direct result of an Executive Order of the President with respect to the prosecution of war or in the interest of national defense. When the contract, or any portion thereof, is terminated before completion of all items of work in the contract, payment will be made for the actual number of units or items of work completed at the contract price or as mutually agreed for items of work partially completed or not started. No claims or loss of anticipated profits shall be considered. Reimbursement for organization of the work, and other overhead expenses, (when not otherwise included in the contract) and moving equipment and materials to and from the job will be considered, the intent being that an equitable settlement will be made with the Contractor. Acceptable materials, obtained or ordered by the Contractor for the work and that are not incorporated in the work shall, at the option of the Contractor, be purchased from the Contractor at actual cost as shown by receipted bills and actual cost records at such points of delivery as may be designated by the Engineer. Termination of the contract or a portion thereof shall neither relieve the Contractor of his/her responsibilities for the completed work nor shall it relieve his/her surety of its obligation for and concerning any just claim arising out of the work performed. 80-11 WORK AREA, STORAGE AREA AND SEQUENCE OF OPERATIONS. The Contractor shall obtain approval from the Engineer prior to beginning any work in all areas of the airport. No operating runway, taxiway, or Air Operations Area (AOA) shall be crossed, entered, or obstructed while it is operational. The Contractor shall plan and coordinate his/her work in such a manner as to insure safety and a minimum of hindrance to flight operations. All Contractor equipment and material stockpiles shall be stored a minimum of 500 feet from the centerline of an active runway. No equipment will be allowed to park within the approach area of an active runway at any time. No equipment shall be within 200 feet of an active runway at any time. END OF SECTION 80 Ashland Municipal Airport Taxilane Improvements 35 FAA General Provisions 00710 FAA General Provisions SECTION 90 MEASUREMENT AND PAYMENT 90-01 MEASUREMENT OF QUANTITIES. All work completed under the contract will be measured by the Engineer, or his/her authorized representatives, using United States Customary Units of Measurement or the International System of Units. The method of measurement and computations to be used in determination of quantities of material furnished and of work performed under the contract will be those methods generally recognized as conforming to good engineering practice. Unless otherwise specified, longitudinal measurements for area computations will be made horizontally, and no deductions will be made for individual fixtures (or leave-outs) having an area of 9 sq ft (0.8 square meter) or less. Unless otherwise specified, transverse measurements for area computations will be the neat dimensions shown on the plans or ordered in writing by the Engineer. Structures will be measured according to neat lines shown on the plans or as altered to fit field conditions. Unless otherwise specified, all contract items which are measured by the linear foot such as electrical ducts, conduits, pipe culverts, underdrains, and similar items shall be measured parallel to the base or foundation upon which such items are placed. In computing volumes of excavation the average end area method or other acceptable methods will be used. The thickness of plates and galvanized sheet used in the manufacture of corrugated metal pipe, metal plate pipe culverts and arches, and metal cribbing will be specified and measured in decimal fraction of in. The term "ton" will mean the short ton consisting of 2,000 lb (907 km) avoirdupois. All materials that are measured or proportioned by weights shall be weighed on accurate, approved scales by competent, qualified personnel at locations designated by the Engineer. If material is shipped by rail, the car weight may be accepted provided that only the actual weight of material is paid for. However, car weights will not be acceptable for material to be passed through mixing plants. Trucks used to haul material being paid for by weight shall be weighed empty daily at such times as the Engineer directs, and each truck shall bear a plainly legible identification mark. Materials to be measured by volume in the hauling vehicle shall be hauled in approved vehicles and measured therein at the point of delivery. Vehicles for this purpose may be of any size or type acceptable to the Engineer, provided that the body is of such shape that the actual contents may be readily and accurately determined. All vehicles shall be loaded to at least their water level capacity, and all loads shall be leveled when the vehicles arrive at the point of delivery. When requested by the Contractor and approved by the Engineer in writing, material specified to be measured by the cubic yard (cubic meter) may be weighed, and such weights will be converted to cubic yards (cubic meters) for payment purposes. Factors for conversion from weight measurement to volume measurement will be determined by the Engineer and shall be agreed to by the Contractor before such method of measurement of pay quantities is used. Bituminous materials will be measured by the gallon (liter) or ton (kg). When measured by volume, such volumes will be measured at 60 °F (15 °C) or will be corrected to the volume at 60 °F (15 °C) using ASTM D 1250 for asphalts or ASTM D 633 for tars. Ashland Municipal Airport Taxilane Improvements 36 FAA General Provisions 00710 FAA General Provisions Net certified scale weights or weights based on certified volumes in the case of rail shipments will be used as a basis of measurement, subject to correction when bituminous material has been lost from the car or the distributor, wasted, or otherwise not incorporated in the work. When bituminous materials are shipped by truck or transport, net certified weights by volume, subject to correction for loss or foaming, may be used for computing quantities. Cement will be measured by the ton (kg) or hundredweight (km). Timber will be measured by the thousand feet board measure (MFBM) actually incorporated in the structure. Measurement will be based on nominal widths and thicknesses and the extreme length of each piece. The term "lump sum" when used as an item of payment will mean complete payment for the work described in the contract. When a complete structure or structural unit (in effect, "lump sum" work) is specified as the unit of measurement, the unit will be construed to include all necessary fittings and accessories. Rental of equipment will be measured by time in hours of actual working time and necessary traveling time of the equipment within the limits of the work. Special equipment ordered by the Engineer in connection with force account work will be measured as agreed in the change order or supplemental agreement authorizing such force account work as provided in the subsection titled PAYMENT FOR EXTRA AND FORCE ACCOUNT WORK of this section. When standard manufactured items are specified such as fence, wire, plates, rolled shapes, pipe conduit, etc., and these items are identified by gauge, unit weight, section dimensions, etc., such identification will be considered to be nominal weights or dimensions. Unless more stringently controlled by tolerances in cited specifications, manufacturing tolerances established by the industries involved will be accepted. Scales for weighing materials which are required to be proportioned or measured and paid for by weight shall be furnished, erected, and maintained by the Contractor, or be certified permanently installed commercial scales. Scales shall be accurate within one-half percent of the correct weight throughout the range of use. The Contractor shall have the scales checked under the observation of the inspector before beginning work and at such other times as requested. The intervals shall be uniform in spacing throughout the graduated or marked length of the beam or dial and shall not exceed one-tenth of 1 percent of the nominal rated capacity of the scale, but not less than 1 pound (454 grams). The use of spring balances will not be permitted. Beams, dials, platforms, and other scale equipment shall be so arranged that the operator and the inspector can safely and conveniently view them. Scale installations shall have available ten standard 50-pound (2.3 km) weights for testing the weighing equipment or suitable weights and devices for other approved equipment. Scales must be tested for accuracy and serviced before use at a new site. Platform scales shall be installed and maintained with the platform level and rigid bulkheads at each end. Scales "overweighing" (indicating more than correct weight) will not be permitted to operate, and all materials received subsequent to the last previous correct weighting-accuracy test will be reduced by the percentage of error in excess of one-half of 1 percent. Ashland Municipal Airport Taxilane Improvements 37 FAA General Provisions 00710 FAA General Provisions In the event inspection reveals the scales have been underweighing (indicating less than correct weight), they shall be adjusted, and no additional payment to the Contractor will be allowed for materials previously weighed and recorded. All costs in connection with furnishing, installing, certifying, testing, and maintaining scales; for furnishing check weights and scale house; and for all other items specified in this subsection, for the weighing of materials for proportioning or payment, shall be included in the unit contract prices for the various items of the project. When the estimated quantities for a specific portion of the work are designated as the pay quantities in the contract, they shall be the final quantities for which payment for such specific portion of the work will be made, unless the dimensions of said portions of the work shown on the plans are revised by the Engineer. If revised dimensions result in an increase or decrease in the quantities of such work, the final quantities for payment will be revised in the amount represented by the authorized changes in the dimensions. 90-02 SCOPE OF PAYMENT. The Contractor shall receive and accept compensation provided for in the contract as full payment for furnishing all materials, for performing all work under the contract in a complete and acceptable manner, and for all risk, loss, damage, or expense of whatever character arising out of the nature of the work or the prosecution thereof, subject to the provisions of the subsection titled NO WAIVER OF LEGAL RIGHTS of Section 70. When the "basis of payment" subsection of a technical specification requires that the contract price (price bid) include compensation for certain work or material essential to the item, this same work or material will not also be measured for payment under any other contract item which may appear elsewhere in the contract, plans, or specifications. 90-03 COMPENSATION FOR ALTERED QUANTITIES. When the accepted quantities of work vary from the quantities in the proposal, the Contractor shall accept as payment in full, so far as contract items are concerned, payment at the original contract price for the accepted quantities of work actually completed and accepted. No allowance, except as provided for in the subsection titled ALTERATION OF WORK AND QUANTITIES of Section 40 will be made for any increased expense, loss of expected reimbursement, or loss of anticipated profits suffered or claimed by the Contractor which results directly from such alterations or indirectly from his/her unbalanced allocation of overhead and profit among the contract items, or from any other cause. 90-04 PAYMENT FOR OMITTED ITEMS. As specified in the subsection titled OMITTED ITEMS of Section 40, the Engineer shall have the right to omit from the work (order nonperformance) any contract item, except major contract items, in the best interest of the Owner. Should the Engineer omit or order nonperformance of a contract item or portion of such item from the work, the Contractor shall accept payment in full at the contract prices for any work actually completed and acceptable prior to the Engineer's order to omit or nonperform such contract item. Acceptable materials ordered by the Contractor or delivered on the work prior to the date of the Engineer's order will be paid for at the actual cost to the Contractor and shall thereupon become the property of the Owner. In addition to the reimbursement hereinbefore provided, the Contractor shall be reimbursed for all actual costs incurred for the purpose of performing the omitted contract item prior to the date of the Engineer's order. Such additional costs incurred by the Contractor must be directly related to the deleted contract item and shall be supported by certified statements by the Contractor as to the nature the amount of such costs. Ashland -ldunicipal Airport Taxilane Improvements 38 FAA General Provisions 00710 FAA General Provisions 90-05 PAYMENT FOR EXTRA AND FORCE ACCOUNT WORK. Extra work, performed in accordance with the subsection titled EXTRA WORK of Section 40, will be paid for at the contract prices or agreed prices specified in the change order or supplemental agreement authorizing the extra work. When the change order or supplemental agreement authorizing the extra work requires that it be done by force account, such force account shall be measured and paid for based on expended labor, equipment, and materials plus a negotiated and agreed upon allowance for overhead and profit. a. Miscellaneous. No additional allowance will be made for general superintendence, the use of small tools, or other costs for which no specific allowance is herein provided. b. Comparison of Record. The Contractor and the Engineer shall compare records of the cost of force account work at the end of each day. Agreement shall be indicated by signature of the Contractor and the Engineer or their duly authorized representatives. c. Statement. No payment will be made for work performed on a force account basis until the Contractor has furnished the Engineer with duplicate itemized statements of the cost of such force account work detailed as follows: (1) Name, classification, date, daily hours, total hours, rate and extension for each laborer and foreman. (2) Designation, dates, daily hours, total hours, rental rate, and extension for each unit of machinery and equipment. (3) Quantities of materials, prices, and extensions. (4) Transportation of materials. (5) Cost of property damage, liability and workman's compensation insurance premiums, unemployment insurance contributions, and social security tax. Statements shall be accompanied and supported by a receipted invoice for all materials used and transportation charges. However, if materials used on the force account work are not specifically purchased for such work but are taken from the Contractor's stock, then in lieu of the invoices the Contractor shall furnish an affidavit certifying that such materials were taken from his/her stock, that the quantity claimed was actually used, and that the price and transportation claimed represent the actual cost to the Contractor. 90-06 PARTIAL PAYMENTS. Partial payments will be made to the Contractor at least once each month as the work progresses. Said payments will be based upon estimates, prepared by the Engineer, of the value of the work performed and materials complete and in place in accordance with the contract, plans, and specifications. Such partial payments may also include the delivered actual cost of those materials stockpiled and stored in accordance with the subsection titled PAYMENT FOR MATERIALS ON HAND of this section. No partial payment will be made when the amount due to the Contractor since the last estimate amounts to less than five hundred dollars. The Contractor is required to pay all subcontractors for satisfactory performance of their contracts no later than 30 days after the Contractor has received a partial payment. The Owner must ensure prompt and full payment of retainage from the prime contractor to the subcontractor within 30 days after the subcontractor's work is satisfactorily completed. A subcontractor's work is satisfactorily completed when all the tasks called for in the subcontract have been accomplished and documented as required by the Owner. When the Owner has made an incremental acceptance of a portion of a prime contract, the work of a subcontractor covered by that acceptance is deemed to be satisfactorily completed. Ashland Municipal Airport Taxilane Improvements 39 FAA General Provisions 00710 FAA General Provisions From the total of the amount determined to be payable on a partial payment, 5 percent of such total amount will be deducted and retained by the Owner until the final payment is made, except as may be provided (at the Contractor's option) in the subsection titled PAYMENT OF WITHHELD FUNDS of this section. The balance {(insert balance)) of the amount payable, less all previous payments, shall be certified for payment. Should the Contractor exercise his/her option, as provided in the subsection titled PAYMENT OF WITHHELD FUNDS of this section, no such percent retainage shall be deducted. When at least 95 percent of the work has been completed, the Engineer shall, at the owner's discretion and with the consent of the surety, prepare estimates of both the contract value and the cost of the remaining work to be done. The Owner may retain an amount not less than twice the contract value or estimated cost, whichever is greater, of the work remaining to be done. The remainder, less all previous payments and deductions, will then be certified for payment to the Contractor. It is understood and agreed that the Contractor shall not be entitled to demand or receive partial payment based on quantities of work in excess of those provided in the proposal or covered by approved change orders or supplemental agreements, except when such excess quantities have been determined by the Engineer to be a part of the final quantity for the item of work in question. No partial payment shall bind the Owner to the acceptance of any materials or work in place as to quality or quantity. All partial payments are subject to correction at the time of final payment as provided in the subsection titled ACCEPTANCE AND FINAL PAYMENT of this section. The Contractor shall deliver to the Owner a complete release of all claims for labor and material arising out of this contract before the final payment is made. If any subcontractor or supplier fails to furnish such a release in full, the Contractor may furnish a bond or other collateral satisfactory to the Owner to indemnify the Owner against any potential lien or other such claim. The bond or collateral shall include all costs, expenses, and attorney fees the owner may be compelled to pay in discharging any such lien or claim. 90-07 PAYMENT FOR MATERIALS ON HAND. Partial payments may be made to the extent of the delivered cost of materials to be incorporated in the work, provided that such materials meet the requirements of the contract, plans, and specifications and are delivered to acceptable sites on the airport property or at other sites in the vicinity that are acceptable to the Owner. Such delivered costs of stored or stockpiled materials may be included in the next partial payment after the following conditions are met: a. The material has been stored or stockpiled in a manner acceptable to the Engineer at or on an approved site. b. The Contractor has furnished the Engineer with acceptable evidence of the quantity and quality of such stored or stockpiled materials. c. The Contractor has furnished the Engineer with satisfactory evidence that the material and transportation costs have been paid. d. The Contractor has furnished the Owner legal title (free of liens or encumbrances of any kind) to the material so stored or stockpiled. e. The Contractor has furnished the Owner evidence that the material so stored or stockpiled is insured against loss by damage to or disappearance of such materials at any time prior to use in the work. Ashland Municipal Airport Taxilane Improvements 40 FAA General Provisions 00710 FAA General Provisions It is understood and agreed that the transfer of title and the Owner's payment for such stored or stockpiled materials shall in no way relieve the Contractor of his/her responsibility for furnishing and placing such materials in accordance with the requirements of the contract, plans, and specifications. In no case will the amount of partial payments for materials on hand exceed the contract price for such materials or the contract price for the contract item in which the material is intended to be used. No partial payment will be made for stored or stockpiled living or perishable plant materials. The Contractor shall bear all costs associated with the partial payment of stored or stockpiled materials in accordance with the provisions of this subsection. 90-08 PAYMENT OF WITHHELD FUNDS. At the Contractor's option, if an Owner withholds retainage in accordance with the methods described in subsection 90-06 PARTIAL PAYMENTS, the Contractor may request that the Owner deposit the retainage into an escrow account. The Owner's deposit of retainage into an escrow account is subject to the following conditions: a. The Contractor shall bear all expenses of establishing and maintaining an escrow account and escrow agreement acceptable to the Owner. b. The Contractor shall deposit to and maintain in such escrow only those securities or bank certificates of deposit as are acceptable to the Owner and having a value not less than the retainage that would otherwise be withheld from partial payment. c. The Contractor shall enter into an escrow agreement satisfactory to the Owner. d. The Contractor shall obtain the written consent of the surety to such agreement. 90-09 ACCEPTANCE AND FINAL PAYMENT. When the contract work has been accepted in accordance with the requirements of the subsection titled FINAL ACCEPTANCE of Section 50, the Engineer will prepare the final estimate of the items of work actually performed. The Contractor shall approve the Engineer's final estimate or advise the Engineer of his/her objections to the final estimate which are based on disputes in measurements or computations of the final quantities to be paid under the contract as amended by change order or supplemental agreement. The Contractor and the Engineer shall resolve all disputes (if any) in the measurement and computation of final quantities to be paid within 30 calendar days of the Contractor's receipt of the Engineer's final estimate. If, after such 30-day period, a dispute still exists, the Contractor may approve the Engineer's estimate under protest of the quantities in dispute, and such disputed quantities shall be considered by the Owner as a claim in accordance with the subsection titled CLAIMS FOR ADJUSTMENT AND DISPUTES of Section 50. After the Contractor has approved, or approved under protest, the Engineer's final estimate, final payment will be processed based on the entire sum, or the undisputed sum in case of approval under protest, determined to be due the Contractor less all previous payments and all amounts to be deducted under the provisions of the contract. All prior partial estimates and payments shall be subject to correction in the final estimate and payment. If the Contractor has filed a claim for additional compensation under the provisions of the subsection titled CLAIMS FOR ADJUSTMENTS AND DISPUTES of Section 50 or under the provisions of this subsection, such claims will be considered by the Owner in accordance with local laws or ordinances. Upon final adjudication of such claims, any additional payment determined to be due the Contractor will be paid pursuant to a supplemental final estimate. END OF SECTION 90 Ashland Municipal Airport Taxilane Improvements 41 FAA General Provisions 00710 FAA General Provisions SECTION 100 CONTRACTOR QUALITY CONTROL PROGRAM 100-01 GENERAL. When the specification requires a Contractor Quality Control Program, the Contractor shall establish, provide, and maintain an effective Quality Control Program that details the methods and procedures that will be taken to assure that all materials and completed construction required by this contract conform to contract plans, technical specifications and other requirements, whether manufactured by the Contractor, or procured from subcontractors or vendors. Although guidelines are established and certain minimum requirements are specified herein and elsewhere in the contract technical specifications, the Contractor shall assume full responsibility for accomplishing the stated purpose. The intent of this section is to enable the Contractor to establish a necessary level of control that will: a. Adequately provide for the production of acceptable quality materials. b. Provide sufficient information to assure both the Contractor and the Engineer that the specification requirements can be met. c. Allow the Contractor as much latitude as possible to develop his or her own standard of control. The Contractor shall be prepared to discuss and present, at the preconstruction conference, his/her understanding of the quality control requirements. The Contractor shall not begin any construction or production of materials to be incorporated into the completed work until the Quality Control Program has been reviewed by the Engineer. No partial payment will be made for materials subject to specific quality control requirements until the Quality Control Program has been reviewed. The quality control requirements contained in this section and elsewhere in the contract technical specifications are in addition to and separate from the acceptance testing requirements. Acceptance testing requirements are the responsibility of the Engineer. 100-02 DESCRIPTION OF PROGRAM. a. General Description. The Contractor shall establish a Quality Control Program to perform inspection and testing of all items of work required by the technical specifications, including those performed by subcontractors. This Quality Control Program shall ensure conformance to applicable specifications and plans with respect to materials, workmanship, construction, finish, and functional performance. The Quality Control Program shall be effective for control of all construction work performed under this Contract and shall specifically include surveillance and tests required by the technical specifications, in addition to other requirements of this section and any other activities deemed necessary by the Contractor to establish an effective level of quality control. b. Quality Control Program. The Contractor shall describe the Quality Control Program in a written document that shall be reviewed by the Engineer prior to the start of any production, construction, or off-site fabrication. The written Quality Control Program shall be submitted to the Engineer for review at least within the first 15 calendar days of Phase 1, Submittal Review and Approval Period. The Quality Control Program shall be organized to address, as a minimum, the following items: a. Quality control organization b. Project progress schedule c. Submittals schedule d. Inspection requirements Ashland Municipal Airport Taxilane Improvements 42 FAA General Provisions 00710 FAA General Provisions e. Quality control testing plan f. Documentation of quality control activities g. Requirements for corrective action when quality control and/or acceptance criteria are not met The Contractor is encouraged to add any additional elements to the Quality Control Program that he/she deems necessary to adequately control all production and/or construction processes required by this contract. 100-03 QUALITY CONTROL ORGANIZATION. The Contractor Quality Control Program shall be implemented by the establishment of a separate quality control organization. An organizational chart shall be developed to show all quality control personnel and how these personnel integrate with other management/production and construction functions and personnel. The organizational chart shall identify all quality control staff by name and function, and shall indicate the total staff required to implement all elements of the Quality Control Program, including inspection and testing for each item of work. If necessary, different technicians can be used for specific inspection and testing functions for different items of work. If an outside organization or independent testing laboratory is used for implementation of all or part of the Quality Control Program, the personnel assigned shall be subject to the qualification requirements of paragraph 100-03a and 100-03b. The organizational chart shall indicate which personnel are Contractor employees and which are provided by an outside organization. The quality control organization shall consist of the following minimum personnel: a. Program Administrator. The Program Administrator shall be a full-time employee of the Contractor, or a consultant engaged by the Contractor. The Program Administrator shall have a minimum of 5 years of experience in airport and/or highway construction and shall have had prior quality control experience on a project of comparable size and scope as the contract. Additional qualifications for the Program Administrator shall include at least 1 of the following requirements: (1) Professional engineer with 1 year of airport paving experience acceptable to the Engineer. (2) Engineer-in-training with 2 years of airport paving experience acceptable to the Engineer. (3) An individual with 3 years of highway and/or airport paving experience acceptable to the Engineer, with a Bachelor of Science Degree in Civil Engineering, Civil Engineering Technology or Construction. (4) Construction materials technician certified at Level III by the National Institute for Certification in Engineering Technologies (NICET). (5) Highway materials technician certified at Level III by NICET. (6) Highway construction technician certified at Level III by NICET. (7) A NICET certified engineering technician in Civil Engineering Technology with 5 years of highway and/or airport paving experience acceptable to the Engineer. The Program Administrator shall have full authority to institute any and all actions necessary for the successful implementation of the Quality Control Program to ensure compliance with the contract plans and technical specifications. The Program Administrator shall report directly to a responsible officer of the construction firm. The Program Administrator may supervise the Quality Control Program on more Ashland Municipal Airport Taxilane Improvements 43 FAA General Provisions 00710 FAA General Provisions than one project provided that person can be at the job site within 2 hours after being notified of a problem. b. Quality Control Technicians. A sufficient number of quality control technicians necessary to adequately implement the Quality Control Program shall be provided. These personnel shall be either engineers, engineering technicians, or experienced craftsman with qualifications in the appropriate field equivalent to NICET Level II or higher construction materials technician or highway construction technician and shall have a minimum of 2 years of experience in their area of expertise. The quality control technicians shall report directly to the Program Administrator and shall perform the following functions: (1) Inspection of all materials, construction, plant, and equipment for conformance to the technical specifications, and as required by Section 100-06. (2) Performance of all quality control tests as required by the technical specifications and Section 100-07. Certification at an equivalent level, by a state or nationally recognized organization will be acceptable in lieu of NICET certification. c. Staffing Levels. The Contractor shall provide sufficient qualified quality control personnel to monitor each work activity at all times. Where material is being produced in a plant for incorporation into the work, separate plant and field technicians shall be provided at each plant and field placement location. The scheduling and coordinating of all inspection and testing must match the type and pace of work activity. The Quality Control Program shall state where different technicians will be required for different work elements. 100-04 PROJECT PROGRESS SCHEDULE. The Contractor shall submit a coordinated construction schedule for all work activities. The schedule shall be prepared as a network diagram in Critical Path Method (CPM), PERT, or other format, or as otherwise specified in the contract. As a minimum, it shall provide information on the sequence of work activities, milestone dates, and activity duration. The Contractor shall maintain the work schedule and provide an update and analysis of the progress schedule on a twice monthly basis, or as otherwise specified in the contract. Submission of the work schedule shall not relieve the Contractor of overall responsibility for scheduling, sequencing, and coordinating all work to comply with the requirements of the contract. 100-05 SUBMITTALS SCHEDULE. The Contractor shall submit a detailed listing of all submittals (for example, mix designs, material certifications) and shop drawings required by the technical specifications. The listing can be developed in a spreadsheet format and shall include: a. Specification item number b. Item description c. Description of submittal d. Specification paragraph requiring submittal e. Scheduled date of submittal 100-06 INSPECTION REQUIREMENTS. Quality control inspection functions shall be organized to provide inspections for all definable features of work, as detailed below. All inspections shall be documented by the Contractor as specified by Section 100-07. Ashland Municipal Airport Taxilane Improvements 44 FAA General Provisions 00710 FAA General Provisions Inspections shall be performed daily to ensure continuing compliance with contract requirements until completion of the particular feature of work. These shall include the following minimum requirements: a. During plant operation for material production, quality control test results and periodic inspections shall be used to ensure the quality of aggregates and other mix components, and to adjust and control mix proportioning to meet the approved mix design and other requirements of the technical specifications. All equipment used in proportioning and mixing shall be inspected to ensure its proper operating condition. The Quality Control Program shall detail how these and other quality control functions will be accomplished and used. b. During field operations, quality control test results and periodic inspections shall be used to ensure the quality of all materials and workmanship. All equipment used in placing, finishing, and compacting shall be inspected to ensure its proper operating condition and to ensure that all such operations are in conformance to the technical specifications and are within the plan dimensions, lines, grades, and tolerances specified. The Program shall document how these and other quality control functions will be accomplished and used. 100-07 QUALITY CONTROL TESTING PLAN. As a part of the overall Quality Control Program, the Contractor shall implement a quality control testing plan, as required by the technical specifications. The testing plan shall include the minimum tests and test frequencies required'by each technical specification Item, as well as any additional quality control tests that the Contractor deems necessary to adequately control production and/or construction processes. The testing plan can be developed in a spreadsheet fashion and shall, as a minimum, include the following: a. Specification item number (for example, P-401) b. Item description (for example, Plant Mix Bituminous Pavements) c. Test type (for example, gradation, grade, asphalt content) d. Test standard (for example, ASTM or AASHTO test number, as applicable) e. Test frequency (for example, as required by technical specifications or minimum frequency when requirements are not stated) f. Responsibility (for example, plant technician) g. Control requirements (for example, target, permissible deviations) The testing plan shall contain a statistically-based procedure of random sampling for acquiring test samples in accordance with ASTM D 3665. The Engineer shall be provided the opportunity to witness quality control sampling and testing. All quality control test results shall be documented by the Contractor as required by Section 100-08. 100-08 DOCUMENTATION. The Contractor shall maintain current quality control records of all inspections and tests performed. These records shall include factual evidence that the required inspections or tests have been performed, including type and number of inspections or tests involved; results of inspections or tests; nature of defects, deviations, causes for rejection, etc.; proposed remedial action; and corrective actions taken. These records must cover both conforming and defective or deficient features, and must include a statement that all supplies and materials incorporated in the work are in full compliance with the terms of the contract. Legible copies of these records shall be furnished to the Engineer daily. The records shall Ashland _Wunicipal Airport Taxilane Improvements 45 FAA General Provisions 00710 FAA General Provisions cover all work placed subsequent to the previously furnished records and shall be verified and signed by the Contractor's Program Administrator. Specific Contractor quality control records required for the contract shall include, but are not necessarily limited to, the following records: a. Daily Inspection Reports. Each Contractor quality control technician shall maintain a daily log of all inspections performed for both Contractor and subcontractor operations on a form acceptable to the Engineer. These technician's daily reports shall provide factual evidence that continuous quality control inspections have been performed and shall, as a minimum, include the following: (1) Technical specification item number and description; (2) Compliance with approved submittals; (3) Proper storage of materials and equipment; (4) Proper operation of all equipment; (5) Adherence to plans and technical specifications; (6) Review of quality control tests; and (7) Safety inspection. The daily inspection reports shall identify inspections conducted, results of inspections, location and nature of defects found, causes for rejection, and remedial or corrective actions taken or proposed. The daily inspection reports shall be signed by the responsible quality control technician and the Program Administrator. The Engineer shall be provided at least one copy of each daily inspection report on the work day following the day of record. b. Daily Test Reports. The Contractor shall be responsible for establishing a system that will record all quality control test results. Daily test reports shall document the following information: (1) Technical specification item number and description (2) Test designation (3) Location (4) Date of test (5) Control requirements (6) Test results (7) Causes for rejection (8) Recommended remedial actions (9) Retests Test results from each day's work period shall be submitted to the Engineer prior to the start of the next day's work period. When required by the technical specifications, the Contractor shall maintain statistical quality control charts. The daily test reports shall be signed by the responsible quality control technician and the Program Administrator. 100-09 CORRECTIVE ACTION REQUIREMENTS. The Quality Control Program shall indicate the appropriate action to be taken when a process is deemed, or believed, to be out of control (out of Ashland Municipal Airport Taxilane Improvements 46 FAA General Provisions 00710 FAA General Provisions tolerance) and detail what action will be taken to bring the process into control. The requirements for corrective action shall include both general requirements for operation of the Quality Control Program as a whole, and for individual items of work contained in the technical specifications. The Quality Control Program shall detail how the results of quality control inspections and tests will be used for determining the need for corrective action and shall contain clear sets of rules to gauge when a process is out of control and the type of correction to be taken to regain process control. When applicable or required by the technical specifications, the Contractor shall establish and use statistical quality control charts for individual quality control tests. The requirements for corrective action shall be linked to the control charts. 100-10 SURVEILLANCE BY THE ENGINEER. All items of material and equipment shall be subject to surveillance by the Engineer at the point of production, manufacture or shipment to determine if the Contractor, producer, manufacturer or shipper maintains an adequate quality control system in conformance with the requirements detailed herein and the applicable technical specifications and plans. In addition, all items of materials, equipment and work in place shall be subject to surveillance by the Engineer at the site for the same purpose. Surveillance by the Engineer does not relieve the Contractor of performing quality control inspections of either on-site or off-site Contractor's or subcontractor's work. 100-11 NONCOMPLIANCE. a. The Engineer will notify the Contractor of any noncompliance with any of the foregoing requirements. The Contractor shall, after receipt of such notice, immediately take corrective action. Any notice, when delivered by the Engineer or his/her authorized representative to the Contractor or his/her authorized representative at the site of the work, shall be considered sufficient notice. b. In cases where quality control activities do not comply with either the Contractor Quality Control Program or the contract provisions, or where the Contractor fails to properly operate and maintain an effective Quality Control Program, as determined by the Engineer, the Engineer may: (1) Order the Contractor to replace ineffective or unqualified quality control personnel or subcontractors. (2) Order the Contractor to stop operations until appropriate corrective actions are taken. END OF SECTION 100 Ashland Municipal Airport Taxilane Improvements 47 FAA Genera! Provisions 00710 FAA General Provisions SECTION 110 METHOD OF ESTIMATING PERCENTAGE OF MATERIAL WITHIN SPECIFICATION LIMITS (PWL) 110-01 GENERAL. When the specifications provide for acceptance of material based on the method of estimating percentage of material within specification limits (PWL), the PWL will be determined in accordance with this section. All test results for a lot will be analyzed statistically to determine the total estimated percent of the lot that is within specification limits. The PWL is computed using the sample average (X) and sample standard deviation (Sn) of the specified number (n) of sublots for the lot and the specification tolerance limits, L for lower and U for upper, for the particular acceptance parameter. From these values, the respective Quality index, QL for Lower Quality Index and/or Qu for Upper Quality Index, is computed and the PWL for the lot for the specified n is determined from Table 1. All specification limits specified in the technical sections shall be absolute values. Test results used in the calculations shall be to the significant figure given in the test procedure. There is some degree of uncertainty (risk) in the measurement for acceptance because only a small fraction of production material (the population) is sampled and tested. This uncertainty exists because all portions of the production material have the same probability to be randomly sampled. The Contractor's risk is the probability that material produced at the acceptable quality level is rejected or subjected to a pay adjustment. The Owner's risk is the probability that material produced at the rejectable quality level is accepted. It is the intent of this section to inform the contractor that, in order to consistently offset the contractor's risk for material evaluated, production quality (using population average and population standard deviation) must be maintained at the acceptable quality specified or higher. In all cases, it is the responsibility of the contractor to produce at quality levels that will meet the specified acceptance criteria when sampled and tested at the frequencies specified. 110-02 METHOD FOR COMPUTING PWL. The computational sequence for computing PWL is as follows: a. Divide the lot into n sublots in accordance with the acceptance requirements of the specification. b. Locate the random sampling position within the sublot in accordance with the requirements of the specification. c. Make a measurement at each location, or take a test portion and make the measurement on the test portion in accordance with the testing requirements of the specification. d. Find the sample average (X) for all sublot values within the lot by using the following formula: X = (X1 + X2 + X3 + ...Xn) / n Where: X = Sample average of all sublot values within a lot x1, x2= Individual sublot values n = Number of sublots e. Find the sample standard deviation (Sn) by use of the following formula: Sn = ((d12 + d22 + d32 + Ant)/(n-1)]1/2 Where: Sn = Sample standard deviation of the number of sublot values in the set d1, d2 = Deviations of the individual sublot values x1i x2, from the average value X that is: d1= (x1- X), d2 = (x2 - X) do = (xn - X) n = Number of sublots Ashland Municipal Airport Taxilane Improvements 48 FAA General Provisions 00710 FAA General Provisions f. For single sided specification limits (that is, L only), compute the Lower Quality Index QL by use of the following formula: QL = (X - L) / Sn Where: L = specification lower tolerance limit Estimate the percentage of material within limits (PWL) by entering Table 1 with QL, using the column appropriate to the total number (n) of measurements. If the value of QL falls between values shown on the table, use the next higher value of PWL. g. For double-sided specification limits (that is, L and U), compute the Quality Indexes QL and QU by use of the following formulas: QL = (X - L) / Sn AND QU=(U-X)/Sn Where: L and U = specification lower and upper tolerance limits Estimate the percentage of material between the lower (L) and upper (U) tolerance limits (PWL) by entering Table 1 separately with QL and QU, using the column appropriate to the total number (n) of measurements, and determining the percent of material above PL and percent of material below PU for each tolerance limit. If the values of QL fall between values shown on the table, use the next higher value of PL or PU. Determine the PWL by use of the following formula: PWL = (PU + PL) - 100 Where: PL = percent within lower specification limit PU = percent within upper specification limit EXAMPLE OF PWL CALCULATION Project: Example Project Test Item: Item P-401, Lot A. A. PWL Determination for Mat Density. 1. Density of four random cores taken from Lot A. A-1 = 96.60 A-2 = 97.55 A-3 = 99.30 A-4 = 98.35 n=4 2. Calculate average density for the lot. X = (X1+X2+X3+...Xn) / n X = (96.60 + 97.55 + 99.30 + 98.35) / 4 X = 97.95 percent density 3. Calculate the standard deviation for the lot. Sn = [((96.60 - 97.95)2 + (97.55 - 97.95)' +(99.30 -97.95) + (98.35 -97.95)')) / (4 - 1)]1/2 Sn= [(1.82+0.16+1.82+0.16)/3]1/2 Ashland Municipal Airport Taxilane Improvements 49 FAA General Provisions 00710 FAA General Provisions Sn = 1.15 4. Calculate the Lower Quality Index QL for the lot. (L=96.3) QL = (X -L) / Sn QL = (97.95 - 96.30) / 1.15 QL = 1.4348 5. Determine PWL by entering Table 1 with QL= 1.44 and n= 4. PWL=98 B. PWL Determination for Air Voids. 1. Air Voids of four random samples taken from Lot A. A-1 = 5.00 A-2 = 3.74 A-3 = 2.30 A-4 = 3.25 2. Calculate the average air voids for the lot. X=(X1+X2+X3...n)/n X= (5.00+3.74+2.30+3.25)/4 X = 3.57 percent 3. Calculate the standard deviation Sn for the lot. Sn = [((3.57 - 5.00)2 + (3.57 - 3.74)2 + (3.57-2.30 )2 + (3.57-3.25 )2) / (4 - 1)] 1/2 Sn= [(2.04+0.03+1.62+0.10 3]1/2 Sn = 1.12 4. Calculate the Lower Quality Index QL for the lot. (L= 2.0) QL =(X-L)/Sn QL = (3.57 - 2.00) / 1.12 QL = 1.3992 5. Determine PL by entering Table 1 with QL = 1.41 and n = 4. PL =97 6. Calculate the Upper Quality Index Qu for the lot. (U= 5.0) Qu=(U-X)/Sn Qu = (S.00 - 3.57) / 1.12 Qu = 1.2702 7. Determine Pu by entering Table 1 with Qu = 1.29 and n = 4. Pu = 93 8. Calculate Air Voids PWL PWL = (PL + Pu) - 100 PWL = (97 + 93) - 100 = 90 Ashland Municipal Airport Taxilane Improvements 50 FAA General Provisions 00710 FAA General Provisions EXAMPLE OF OUTLIER CALCULATION (REFERENCE ASTM E 178) Project: Example Project Test Item: Item P-401, Lot A. A. Outlier Determination for Mat Density. 1. Density of four random cores taken from Lot A arranged in descending order. A-3 = 99.30 A-4 = 98.35 A-2 = 97.55 A-1 = 96.60 2. Use n=4 and upper 5 percent significance level of to find the critical value for test criterion = 1.463. 3. Use average density, standard deviation, and test criterion value to evaluate density measurements. a. For measurements greater than the average: If (measurement - average)/(standard deviation) is less than test criterion, then the measurement is not considered an outlier For A-3, check if ( 99.30 - 97.95 ) / 1.15 is greater than 1.463. Since 1.174 is less than 1.463, the value is not an outlier. b. For measurements less than the average: If (average - measurement)/(standard deviation) is less than test criterion, then the measurement is not considered an outlier. For A-1, check if ( 97.95 - 96.60 ) / 1.15 is greater than 1.463. Since 1.435 is less than 1.463, the value is not an outlier. NOTE: In this example, a measurement would be considered an outlier if the density were: Greater than (97.95 + 1.463 x 1.15) = 99.63 percent OR less than (97.95 - 1.463 x 1.15) = 96.27 percent. Ashland Municipal Airport Taxilane Improvements 51 FAA General Provisions 00710 FAA General Provisions Table 1. Table for Estimating Percent of Lot Within Limits (PWL) Percent Within Positive Values of Q (QL and Qu) Limits (PLand Pu) n=3 n=4 n=5 n=6 n=7 n=8 n=9 n=10 99 1.1541 1.4700 1.6714 1.8008 1.8888 1.9520 1.9994 2.0362 98 1.1524 1.4400 1.6016 1.6982 1.7612 1.8053 1.8379 1.8630 97 1.1496 1.4100 1.5427 1.6181 1.6661 1.6993 1.7235 1.7420 96 1.1456 1.3800 1.4897 1.5497 1.5871 1.6127 1.6313 1.6454 95 1.1405 1.3500 1.4407 1.4887 1.5181 1.5381 1.5525 1.5635 94 1.1342 1.3200 1.3946 1.4329 1.4561 1.4717 1.4829 1.4914 93 1.1269 1.2900 1.3508 1.3810 1.3991 1.4112 1.4199 1.4265 92 1.1184 1.2600 1.3088 1.3323 1.3461 1.3554 1.3620 1.3670 91 1.1089 1.2300 1.2683 1.2860 1.2964 1.3032 1.3081 1.3118 90 1.0982 1.2000 1.2290 1.2419 1.2492 1.2541 1.2576 1.2602 89 1.0864 1.1700 1.1909 1.1995 1.2043 1.2075 1.2098 1.2115 88 1.0736 1.1400 1.1537 1.1587 1.1613 1.1630 1.1643 1.1653 87 1.0597 1.1100 1.1173 1.1192 1.1199 1.1204 1.1208 1.1212 86 1.0448 1.0800 1.0817 1.0808 1.0800 1.0794 1.0791 1.0789 85 1.0288 1.0500 1.0467 1.0435 1.0413 1.0399 1.0389 1.0382 84 1.0119 1.0200 1.0124 1.0071 1.0037 1.0015 1.0000 0.9990 83 0.9939 0.9900 0.9785 0.9715 0.9671 0.9643 0.9624 0.9610 82 0.9749 0.9600 0.9452 0.9367 0.9315 0.9281 0.9258 0.9241 81 0.9550 0.9300 0.9123 0.9025 0.8966 0.8928 0.8901 0.8882 80 0.9342 0.9000 0.8799 0.8690 0.8625 0.8583 0.8554 0.8533 79 0.9124 0.8700 0.8478 0.8360 0.8291 0.8245 0.8214 0.8192 78 0.8897 0.8400 0.8160 0.8036 0.7962 0.7915 0.7882 0.7858 77 0.8662 0.8100 0.7846 0.7716 0.7640 0.7590 0.7556 0.7531 76 0.8417 0.7800 0.7535 0.7401 0.7322 0.7271 0.7236 0.7211 75 0.8165 0.7500 0.7226 0.7089 0.7009 0.6958 0.6922 0.6896 74 0.7904 0.7200 0.6921 0.6781 0.6701 0.6649 0.6613 0.6587 73 0.7636 0.6900 0.6617 0.6477 0.6396 0.6344 0.6308 0.6282 72 0.7360 0.6600 0.6316 0.6176 0.6095 0.6044 0.6008 0.5982 71 0.7077 0.6300 0.6016 0.5878 0.5798 0.5747 0.5712 0.5686 70 0.6787 0.6000 0.5719 0.5582 0.5504 0.5454 0.5419 0.5394 69 0.6490 0.5700 0.5423 0.5290 0.5213 0.5164 0.5130 0.5105 68 0.6187 0.5400 0.5129 0.4999 0.4924 0.4877 0.4844 0.4820 67 0.5878 0.5100 0.4836 0.4710 0.4638 0.4592 0.4560 0.4537 66 0.5563 0.4800 0.4545 0.4424 0.4355 0.4310 0.4280 0.4257 65 0.5242 0.4500 0.4255 0.4139 0.4073 0.4030 0.4001 0.3980 64 0.4916 0.4200 0.3967 0.3856 0.3793 0.3753 0.3725 0.3705 63 0.4586 0.3900 0.3679 0.3575 0.3515 0.3477 0.3451 0.3432 62 0.4251 0.3600 0.3392 0.3295 0.3239 0.3203 0.3179 0.3161 61 0.3911 0.3300 0.3107 0.3016 0.2964 0.2931 0.2908 0.2892 60 0.3568 0.3000 0.2822 0.2738 0.2691 0.2660 0.2639 0.2624 59 0.3222 0.2700 0.2537 0.2461 0.2418 0.2391 0.2372 0.2358 58 0.2872 0.2400 0.2254 0.2186 0.2147 0.2122 0.2105 0.2093 57 0.2519 0.2100 0.1971 0.1911 0.1877 0.1855 0.1840 0.1829 56 0.2164 0.1800 0.1688 0.1636 0.1607 0.1588 0.1575 0.1566 55 0.1806 0.1500 0.1406 0.1363 0.1338 0.1322 0.1312 0.1304 54 0.1447 0.1200 0.1125 0.1090 0.1070 0.1057 0.1049 0.1042 53 0.1087 0.0900 0.0843 0.0817 0.0802 0.0793 0.0786 0.0781 52 0.0725 0.0600 0.0562 0.0544 0.0534 0.0528 0.0524 0.0521 51 0.0363 0.0300 0.0281 0.0272 0.0267 0.0264 0.0262 0.0260 50 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Ashland Municipal Airport Taxilane Improvements 52 FAA General Provisions 00710 FAA General Provisions Percent Negative Values of Q (QL and Qu) Within Limits n=3 n=4 n=5 n=6 n=7 n=8 n=9 n=10 (PL and Pu) 49 -0.0363 -0.0300 -0.0281 -0.0272 -0.0267 -0.0264 -0.0262 -0.0260 48 -0.0725 -0.0600 -0.0562 -0.0544 -0.0534 -0.0528 -0.0524 -0.0521 47 -0.1087 -0.0900 -0.0843 -0.0817 -0.0802 -0.0793 -0.0786 -0.0781 46 -0.1447 -0.1200 -0.1125 -0.1090 -0.1070 -0.1057 -0.1049 -0.1042 45 -0.1806 -0.1500 -0.1406 -0.1363 -0.1338 -0.1322 -0.1312 -0.1304 44 -0.2164 -0.1800 -0.1688 -0.1636 -0.1607 -0.1588 -0.1575 -0.1566 43 -0.2519 -0.2100 -0.1971 -0.1911 -0.1877 -0.1855 -0.1840 -0.1829 42 -0.2872 -0.2400 -0.2254 -0.2186 -0.2147 -0.2122 -0.2105 -0.2093 41 -0.3222 -0.2700 -0.2537 -0.2461 -0.2418 -0.2391 -0.2372 -0.2358 40 -0.3568 -0.3000 -0.2822 -0.2738 -0.2691 -0.2660 -0.2639 -0.2624 39 -0.3911 -0.3300 -0.3107 -0.3016 -0.2964 -0.2931 -0.2908 -0.2892 38 -0.4251 -0.3600 -0.3392 -0.3295 -0.3239 -0.3203 -0.3179 -0.3161 37 -0.4586 -0.3900 -0.3679 -0.3575 -0.3515 -0.3477 -0.3451 -0.3432 36 -0.4916 -0.4200 -0.3967 -0.3856 -0.3793 -0.3753 -0.3725 -0.3705 35 -0.5242 -0.4500 -0.4255 -0.4139 -0.4073 -0.4030 -0.4001 -0.3980 34 -0.5563 -0.4800 -0.4545 -0.4424 -0.4355 -0.4310 -0.4280 -0.4257 33 -0.5878 -0.5100 -0.4836 -0.4710 -0.4638 -0.4592 -0.4560 -0.4537 32 -0.6187 -0.5400 -0.5129 -0.4999 -0.4924 -0.4877 -0.4844 -0.4820 31 -0.6490 -0.5700 -0.5423 -0.5290 -0.5213 -0.5164 -0.5130 -0.5105 30 -0.6787 -0.6000 -0.5719 -0.5582 -0.5504 -0.5454 -0.5419 -0.5394 29 -0.7077 -0.6300 -0.6016 -0.5878 -0.5798 -0.5747 -0.5712 -0.5686 28 -0.7360 -0.6600 -0.6316 -0.6176 -0.6095 -0.6044 -0.6008 -0.5982 27 -0.7636 -0.6900 -0.6617 -0.6477 -0.6396 -0.6344 -0.6308 -0.6282 26 -0.7904 -0.7200 -0.6921 -0.6781 -0.6701 -0.6649 -0.6613 -0.6587 25 -0.8165 -0.7500 -0.7226 -0.7089 -0.7009 -0.6958 -0.6922 -0.6896 24 -0.8417 -0.7800 -0.7535 -0.7401 -0.7322 -0.7271 -0.7236 -0.7211 23 -0.8662 -0.8100 -0.7846 -0.7716 -0.7640 -0.7590 -0.7556 -0.7531 22 -0.8897 -0.8400 -0.8160 -0.8036 -0.7962 -0.7915 -0.7882 -0.7858 21 -0.9124 -0.8700 -0.8478 -0.8360 -0.8291 -0.8245 -0.8214 -0.8192 20 -0.9342 -0.9000 -0.8799 -0.8690 -0.8625 -0.8583 -0.8554 -0.8533 19 -0.9550 -0.9300 -0.9123 -0.9025 -0.8966 -0.8928 -0.8901 -0.8882 18 -0.9749 -0.9600 -0.9452 -0.9367 -0.9315 -0.9281 -0.9258 -0.9241 17 -0.9939 -0.9900 -0.9785 -0.9715 -0.9671 -0.9643 -0.9624 -0.9610 16 -1.0119 -1.0200 -1.0124 -1.0071 -1.0037 -1.0015 -1.0000 -0.9990 15 -1.0288 -1.0500 -1.0467 -1.0435 -1.0413 -1.0399 -1.0389 -1.0382 14 -1.0448 -1.0800 -1.0817 -1.0808 -1.0800 -1.0794 -1.0791 -1.0789 13 -1.0597 -1.1100 -1.1173 -1.1192 -1.1199 -1.1204 -1.1208 -1.1212 12 -1.0736 -1.1400 -1.1537 -1.1587 -1.1613 -1.1630 -1.1643 -1.1653 11 -1.0864 -1.1700 -1.1909 -1.1995 -1.2043 -1.2075 -1.2098 -1.2115 10 -1.0982 -1.2000 -1.2290 -1.2419 -1.2492 -1.2541 -1.2576 -1.2602 9 -1.1089 -1.2300 -1.2683 -1.2860 -1.2964 -1.3032 -1.3081 -1.3118 8 -1.1184 -1.2600 -1.3088 -1.3323 -1.3461 -1.3554 -1.3620 -1.3670 7 -1.1269 -1.2900 -1.3508 -1.3810 -1.3991 -1.4112 -1.4199 -1.4265 6 -1.1342 -1.3200 -1.3946 -1.4329 -1.4561 -1.4717 -1.4829 -1.4914 5 -1.1405 -1.3500 -1.4407 -1.4887 -1.5181 -1.5381 -1.5525 -1.5635 4 -1.1456 -1.3800 -1.4897 -1.5497 -1.5871 -1.6127 -1.6313 -1.6454 3 -1.1496 -1.4100 -1.5427 -1.6181 -1.6661 -1.6993 -1.7235 -1.7420 2 -1.1524 -1.4400 -1.6016 1.6982 -1.7612 -1.8053 -1.8379 -1.8630 1 -1.1541 -1.4700 -1.6714 -1.8008 -1.8888 -1.9520 -1.9994 -2.0362 END OF SECTION 110 Ashland Municipal Airport Taxilane Improvements 53 FAA General Provisions 00710 FAA General Provisions SECTION 120 NUCLEAR GAUGES 120-01 TESTING. When the specifications provide for nuclear gauge acceptance testing of material for Items P-152, P-154, P-208, and P-209, the testing shall be performed in accordance with this section. At each sampling location, the field density shall be determined in accordance with ASTM D 6938 using the Direct Transmission Method. The nuclear gauge shall be calibrated in accordance with ASTM D 6938. Calibration and operation of the gauge shall be in accordance with the requirements of the manufacturer. The operator of the nuclear gauge must show evidence of training and experience in the use of the instrument. The gauge shall be standardized daily in accordance with ASTM standards. When using the nuclear method, ASTM D 6938 shall be used to determine the moisture content of the material. The calibration curve furnished with the nuclear gauges shall be checked in accordance with ASTM standards. The calibration checks shall be made at the beginning of a job and at regular daily intervals. The material shall be accepted on a lot basis. Each Lot shall be divided into eight (8) sublots when ASTM D 6938 is used. 120-02 VERIFICATION TESTING. (For Items P-152 and P-154 only.) The Engineer will verify the maximum laboratory density of material placed in the field for each lot. A minimum of one test will be made for each lot of material at the site. The verification process will consist of; (1) compacting the material and determining the dry density and moisture-density in accordance with ASTM D 698 for aircraft gross weights less than 60,0000 pounds, and (2) comparing the result with the laboratory moisture-density curves for the material being placed. This verification process is commonly referred to as a "one-point Proctor". If the material does not conform to the existing moisture-density curves, the Engineer will establish the laboratory maximum density and optimum moisture content for the material in accordance with ASTM D 698 for aircraft gross weights less than 60,0000 pounds. Additional verification tests will be made, if necessary, to properly classify all materials placed in the lot. The percent compaction of each sampling location will be determined by dividing the field density of each sublot by the laboratory maximum density for the lot. END OF SECTION 120 Ashland Municipal Airport Taxilane Improvemenis 54 FAA General Provisions 00801 SPECIAL PROVISIONS SPECIAL PROVISIONS 1. OR EQUAL The term "or equal" shall be understood to indicate that the "equal" product is the same or better than the product named in function, performance, reliability, quality, and general configuration. Determination of equality in reference to the project design requirements will be made by the Engineer. Such equal products shall not be purchased or installed by the Contractor without written authorization. 2. SUBSTANTIAL COMPLETION "Substantial completion" shall be that degree of completion of the project or a defined portion of the project, as evidenced by the Engineer's written notice of Substantial Completion, sufficient to provide the Owner, at his discretion, the full-time use of the project or defined portion of the project for the purposes for which it was intended. "Substantial Completion" of an operating facility shall be that degree of completion that has provided a minimum of 7 continuous days of successful, trouble-free, unrestricted operation, which period shall begin after all performance and acceptance testing has been successfully demonstrated to the Engineer. All equipment contained in the work, plus all other components necessary to enable the Owner to operate the facility in the manner that was intended, shall be complete on the substantial completion date. 3. DISCREPANCIES AND OMISSIONS Any discrepancies or omissions found in the Contract Documents shall be reported to the Engineer immediately. The Engineer will clarify discrepancies or omissions, in writing, within a reasonable time. In resolving inconsistencies among two or more sections of the Contract Documents, precedence shall be given in the following order: • Calculated dimensions shall govern over scaled dimensions; • Contract technical specifications shall govern over contract general provisions, plans, cited standards for materials or testing, and cited FAA advisory circulars; • Contract general provisions shall govern over plans, cited standards for materials or testing, and cited FAA advisory circulars; • Plans shall govern over cited standards for materials or testing and cited FAA advisory circulars If any paragraphs contained in the Special Provisions conflict with General Provisions or Technical Specifications, the Special Provisions shall govern. Addenda shall take precedence over all sections referenced therein. Figure dimensions on Drawings shall take precedence over scale dimensions. Detailed Drawings shall take precedence over general Drawings. 4. OWNERSHIP OF CONTRACT DOCUMENTS All portions of the Contract Documents, and copies thereof furnished by the Engineer are the property of the Engineer. They are not to be used on other work and are to be returned to the Engineer on request at the completion of the work. Any reuse of these materials without specific written verification or adaptation by the Engineer will be at the risk of the user and without liability or legal Ashland Wunicipal Airport Taxilane Improvements 1 Special Provisions 00801 SPECIAL PROVISIONS expense to the Engineer. Such user shall hold the Engineer harmless from any and all damages, including reasonable attorneys' fees, from any and all claims arising from any such reuse. Any such verification and adaptation shall entitle the Engineer to further compensation at rates to be agreed upon by the user and the Engineer. 5. INSURANCE AND LIABILITY a. GENERAL The Contractor shall provide (from insurance companies acceptable to the Owner) the insurance coverage designated hereinafter and pay all costs. Before commencing work under this Contract, Contractor shall furnish the Owner with certificates of insurance specified herein showing the type, amount, class of operations covered, effective dates, and date of expiration of policies, and containing substantially the following statement: "The insurance covered by this certificate shall not be canceled or materially altered, except after 30 days' written notice has been received by the Owner." In case of the breach of any provision of this Article, the Owner, at his option, may take out and maintain, at the expense of the Contractor, such insurance as the Owner may deem proper and may deduct the cost of such insurance from any monies which may be due or become due the Contractor under this Contract. b. CONTRACTOR AND SUBCONTRACTOR The Contractor shall not commence work under this Contract until he has obtained all the insurance required hereunder and such insurance has been reviewed by the Owner, nor shall the Contractor allow any Subcontractor to commence work on his subcontract until insurance specified below has been obtained. Review of the insurance by the Owner shall not relieve or decrease the liability of the Contractor hereunder. 6. COMPENSATION AND EMPLOYER'S LIABILITY INSURANCE Provide Worker's Compensation coverage for all persons employed on the work to be done under the Contract. Assure that all workers will receive the compensation for compensable injuries provided in ORS Chapter 656 either by: 1) Contributing to the Industrial Accident Fund as a contributing employer; or 2) Qualifying as a direct responsibility employer as provided in ORS Chapter 656. In the event that Contractor or any of his subcontractors shall elect to fulfill this responsibility by qualifying as a direct responsibility employer as in (2) above, satisfactory proof of such fact shall be required. In the event that the certification as a direct responsibility employer is withdrawn, as provided in ORS Chapter 656, the Contractor or any subcontractor shall thereafter, on the effective date of the withdrawal or certification, become a contributing employer. All compensation insurance policies shall bear an endorsement or shall have attached a rider whereby it is provided that, in the event of expiration or proposed cancellation of such policies for any Ashland Municipal Airport Taxilane Improvements 2 Special Provisions 00801 SPECIAL PROVISIONS reason whatsoever, the Owner shall be notified by registered mail not less than 30 days before expiration or cancellation is effective. 7. GENERAL LIABILITY INSURANCE INCLUDING AUTOMOBILE At all times during the Contract, maintain such public liability and property damage insurance as will protect the Contractor, Owner, and Engineer from any and all claims for damage or personal injury including death, which may arise from operations under this Contract or in connection therewith, including all operations of subcontractors. Such insurance shall provide coverage for not less than that required by law, or the following, whichever is higher: For Personal Injury: $633,300 for one claimant $1,266,700 from one occurrence For Property Damage: $S00,000 one occurrence Such insurance shall be without prejudice to coverage otherwise existing, and shall name as additional insured the Owner and all other governmental bodies with jurisdiction in the area involved in the project, their officers and employees, and shall further provide that the policy shall not be terminated or be canceled prior to the completion of this Contract without 30 days' written notice to the Owner, which notice shall be subject to the approval of the Attorney; said notice to commence to run from the date notice is actually received by the Owner. Notwithstanding the naming of additional insured, said policy shall protect each insured in the same manner as though a separate policy had been issued to each; but nothing herein shall operate to increase the insurer's liability asset forth elsewhere in the policy beyond the amount or amounts for which the insurer would have been liable if only one person or interest had been named as insured. The Contractor shall not commence work under this Contract until he has furnished the Owner with satisfactory Proof of Insurance specified herein. 8. BUILDERS RISK ALL RISK INSURANCE Insure the work for 100 percent of the replaceable value thereof for the life the Contract against all loss or damage by fire and against all loss or damage covered by the Standard Extended Coverage Insurance endorsement, including theft, vandalism, and malicious mischief, with an insurance company or companies acceptable to Owner. The amount of the insurance may vary with the extent of the work completed, but shall at all times be at least equal to the replaceable value of the amount furnished or delivered, but not yet accepted by Owner. The insurance policy or policies shall be held jointly in the name of the Owner and Contractor as their respective interests may appear. The loss, if any, shall be made adjustable with, and payable to Owner as trustee for whom it may concern. Any payments made under such policy shall insure to the benefit of owner to the extent of any loss suffered by owner and to Contractor as to any remaining balance, for replacement of the loss suffered. The policy of insurance shall provide that it shall not be terminated or be canceled prior to completion of this Contract without 30 days' written notice to the Owner. Be responsible for all damage to the work under construction, whether from fire, water, high winds, theft, vandalism, or other cause, during construction and until final completion and acceptance, even though partial payments or progress payments have been made under the Contract. Ashland Municipal Airport Taxilane Improvements 3 Special Provisions 00801 SPECIAL PROVISIONS 9. INDEMNITY The Contractor shall defend, indemnify, and hold harmless the Owner, the Engineer, and their agents and employees from and against any and all suits, actions, legal or administrative proceedings, claims, demands, damages, losses, penalties, fines, costs, and expenses of whatsoever kind or character, including, but not limited to, attorneys' fees and expenses, whether for bodily injury, sickness, disease or death, or to injury to or destruction of property, including the loss of use resulting therefrom, arising out of or in any manner caused or occasioned or claimed to be caused or occasioned by any act, error, omission, fault, or negligence of Contractor or any person or entity employed by or acting on his behalf, including, but not limited to, Subcontractors and vendors, their Subcontractors and subvendors, and the employees and agents of any of the foregoing, in connection with or incident to this Contract or the work to be performed hereunder, except where caused by the sole negligence of the indemnitee. Without limiting the foregoing, Contractor shall defend, indemnify, and hold harmless the owner, the Engineer, and their agents and employees from and against any and all suits, actions, legal or administrative proceedings, claims, demands, damages, penalties, fines, costs, and expenses of whatsoever kind or character, including, but not limited to, attorneys' fees and expenses, arising out of or by reason of any damage or injuries (including death) to any person or entity employed by or acting on Contractor's behalf under this Contract, except where caused by the sole negligence of the indemnitee. The obligation of the Contractor under this Article shall not extend to the liability of the Engineer and his agents or employees arising out of the preparation or approval of maps, drawings, report, surveys, Change Orders, designs, or Specifications. 10. TAXES AND CHARGES The Contractor shall withhold and pay any and all sales and use taxes and all withholding taxes, whether State or Federal, and pay all Social Security charges and also all State Unemployment Compensation charges, and pay or cause to be withheld, as the case may be, any and all taxes, charges, or fees or sums whatsoever, which are now or may hereafter be required to be paid or withheld under any laws. 11. REQUIREMENTS OF STATE LAW FOR PUBLIC WORKS PROJECTS When the Contract Documents concern public works of the state or any county, municipality, or political subdivision created by its laws, the applicable statutes shall apply. All parties to this Contract shall determine the contents of all applicable statutes and comply with their provisions throughout the performance of the Contract. 12. MATERIALS AND APPLIANCES Unless otherwise stipulated, the Contractor shall provide and pay for all materials, labor, water, tools, equipment, heat, light, fuel, power, transportation, construction equipment and machinery, appliances, telephone, sanitary facilities, temporary facilities and other facilities and incidentals necessary for the execution and completion of the work. Unless otherwise specified, all materials shall be new, and both workmanship and materials shall be of good quality. The Contractor shall, if required, furnish satisfactory evidence as to the kind and quality of materials. Ashland Municipal Airport Taxilane Improvements 4 Special Provisions 00801 SPECIAL PROVISIONS In selecting and/or approving equipment for installation in the project, the Owner and Engineer assume no responsibility for injury or claims resulting from failure of the equipment to comply with applicable federal, state, and local safety codes or requirements, or the safety requirements of a recognized agency, or failure due to faulty design concepts, or defective workmanship and materials. 13. CONTRACTORS' AND MANUFACTURERS' COMPLIANCE WITH STATE SAFETY, OSHA, AND OTHER CODE REQUIREMENTS The completed work shall include all necessary permanent safety devices, such as machinery guards and similar ordinary safety items required by the state and federal (OSHA) industrial authorities and applicable local and national codes. Further, any features of the work subject to such safety regulations shall be fabricated, furnished, and installed (including Owner-furnished equipment) in compliance with these requirements. Contractors and manufacturers of equipment shall be held responsible for compliance with the requirements included herein. Contractors shall notify all equipment suppliers and Subcontractors of the provisions of this Article. 14. TESTS, SAMPLES, AND OBSERVATIONS The Contractor shall furnish, without extra charge, the necessary test pieces and samples, including facilities and labor for obtaining the same, as requested by the Engineer. When required, the Contractor shall furnish certificates of tests of materials and equipment made at the point of manufacture by a recognized testing laboratory. The Owner, Engineer, and authorized government agents, and their representatives shall at all times be provided safe access to the work wherever it is in preparation or progress, and the Contractor shall provide facilities for such access and for observations, including maintenance of temporary and permanent access. If the Specifications, laws, ordinances, or any public authority require any work to be specially tested or approved, the Contractor shall give timely notice of its readiness for observations. If any work should be covered up without approval or consent of the Engineer, it shall, if required by the Engineer, be uncovered for examination at the Contractor's expense. Reexamination of questioned work may be ordered by the Engineer, and, if so ordered, the work shall be uncovered by the Contractor. If such work is found to be in accordance with the Contact Documents, the Owner will pay the cost of uncovering, exposure, observation, inspection, testing, and reconstruction. If such work is found to be not in accordance with the Contract Documents, the Contractor shall correct the defective work, and the cost of reexamination and correction of the defective work shall be paid by the Contractor. 15. OTHER CONTRACTS The Owner reserves the right to let other Contracts in connection with the work. The Contractor shall afford other Contractors reasonable opportunity for the introduction and storage of their materials and the execution of their work and shall properly connect and coordinate his work with theirs. Ashland Municipal Airport Taxilane Improvements 5 Special Provisions 00801 SPECIAL PROVISIONS If any part of the work under this Contract depends for proper execution or results upon the work of any other Contractor, utility service company or Owner, the Contractor shall inspect and promptly report to the Engineer in writing any patent or apparent defects or deficiencies in such work that render it unsuitable for such proper execution and results. The Contractor's failure to so report shall constitute an acceptance of the work by others as being fit and proper for integration with work under this Contract, except for latent or nonapparent defects and deficiencies in the work. 16. SUBSTANTIAL COMPLETION DATE The Engineer may issue a written notice of substantial completion for the purpose of establishing the starting date for specific equipment guarantees, and to establish the date that the Owner will assume the responsibility for the cost of operating such equipment. Said notice shall not be considered as final acceptance of any portion of the work or relieve the Contractor from completing the remaining work within the specified time and in full compliance with the Contract Documents. 17. OWNER'S USE OF PORTIONS OF THE WORK Following issuance of the written notice of Substantial Completion, the Owner may initiate operation of the facility. Such use shall not be considered as final acceptance of any portion of the work, nor shall such use be considered as cause for an extension of the Contract completion time, unless authorized by a Change Order issued by the owner. 18. CUTTING AND PATCHING The Contractor shall do all cutting, fitting, and patching of his work that may be required to make its several parts come together properly and fit it to receive or be received by work of other Contractors shown upon or reasonably implied by the Drawings. 19. NO WAIVER OF RIGHTS Neither the inspection by the Owner, through the Engineer or any of his employees, nor any order by the Owner for payment of money, nor any payment for, or acceptance of, the whole or any part of the work by the Owner or Engineer, nor any extension of time, nor any possession taken by the Owner or its employees, shall operate as a waiver of any provision of this Contract, or any power herein reserved to the Owner, or any right to damages herein provided, nor shall any waiver of any breach in this Contract be held to be a waiver of any other or subsequent breach. Acceptance or final payment shall not be final and conclusive with regard to latent defects, fraud, or such gross mistakes as may amount to fraud, or as regards the Owner's rights under the warranty. 20. PROTECTION OF CABLES, CONTROLS, NAVAIDS, AND WEATHER BUREAU FACILITIES a. The Contractor is hereby informed that there may be installed on the airport FAA NAVAIDS, including, without limitation, ASR, UHF, and VHF receivers and transmitters, U.S. Weather Bureau facilities, electric cables and controls relating to NAVAIDS and facilities, and other electric power cables serving other facilities. Such NAVAIDS, Weather Bureau and other facilities, and electric cables must be fully protected during the entire construction time. Work under this Contract can be accomplished in the vicinity of these facilities and cables only at approved periods of time. Approval is subject to withdrawal at any time because of changes in weather, emergency conditions on the existing airfield Ashland Municipal Airport Taxilane Improvements 6 Special Provisions 00801 SPECIAL PROVISIONS areas, anticipation of emergency conditions, and for any other reason determined by the Engineers acting under the orders and instructions of the airport management and/or the designated FAA representative. Any instructions to this Contractor to clear any given area at any time, by the Engineers, the airport management, or the FAA control tower (by radio or other means) shall be immediately executed. Construction work will be commenced in the cleared area only when additional instructions are issued by the proper authorities. b. The location of power and control cables leading to and from any FAA NAVAIDS, Weather Bureau, and other facilities will be the Contractor's responsibility and shall be marked before any work in their general vicinity is started. Thereafter, through the entire time of this construction they shall be protected from any possible damage, including with unauthorized equipment, etc. C. These special provisions intend to make perfectly clear the need for protection of FAA NAVAIDS, Weather Bureau and other facilities, and cables by this Contractor at all times. d. The Contractor shall immediately repair, with identical material by skilled workmen, any underground cables serving FAA NAVAIDS, Weather Bureau, and other airport facilities which are damaged by his workmen, equipment, or work. Prior approval of the FAA must be obtained for the materials, workmen, time of day or night, method of repairs, and for any temporary or permanent repairs the Contractor proposes to make to any FAA NAVAIDS and facilities damaged by the Contractor. Prior approval of the Engineer or of the representative designated by the airport management must be obtained for the materials, workmen, time of day or night, and for the method of repairs for any temporary or permanent repairs the Contractor proposes to make to any other airport facilities and cables damaged by this Contractor. e. It is recognized that the Owner of the damaged cable or equipment, hereafter referred to as the "Owner," will incur costs for employees' salaries, engineering fees, and otherwise in connection with the damage, inspection, and repair of any such damage, caused by the Contractor, and consequently that the airport owner, hereafter referred to as the "Owner," may incur loss of income by reason of the diversion of aircraft traffic from the airport resulting from interruptions of the use of airport facilities, and that such expenses and loss of income are not measurable now and may not be reasonably ascertainable at the time of any incident caused by this Contractor. The Owner and the Contractor hereby agree to the assessment pf liquidated damages in lieu of such expenses of other damages incurred by the Owner. In addition to the obligation of this Contractor to immediately repair any cables or facilities damaged by the Contractor within 3 feet of the location defined on the ground, as set forth above, the sum for liquidated damages shall be deducted from any money due the Contractor, or if no money is due the Contractor, the Owner shall have the right to recover said sum or sums from the Contractor, from the Surety, or from both. The amount of these deductions are to cover liquidated damages to the Owner incurred by additional and other expenses and damages arising from the incident or incidents caused by the Contractor, and such deductions are not considered penalties. f. If damage to or cutting of FAA cables results from this project, the cables must be repaired or spliced in accordance with FAA Specifications 1391a, "Installation and Splicing of Underground Cable," current edition. (Only pressure-resin encapsulation splice envelopes will be allowed.) Ashland Municipal Airport Taxilane Improvements 7 Special Provisions 00802 FAA SPECIAL PROVISIONS FAA SPECIAL PROVISIONS (Required Contract Provisions for Airport Improvement Program and for Obligated Sponsors) (Updated by FAA Feb 10, 2014) Contents ACCESS TO RECORDS AND REPORTS. (Reference: 2 CFR § 200.326, 2 CFR § 200.333) AFFIRMATIVE ACTION REQUIREMENT. (Reference: 41 CFR part 60-4, Executive Order 11246) BREACH OF CONTRACT TERMS. (Reference 2 CFR § 200 Appendix II(A)) BUY AMERICAN PREFERENCE. (Reference: 49 USC § 50101) CIVIL RIGHTS -GENERAL. (Reference: 49 USC § 47123) CIVIL RIGHTS-TITLE VI ASSURANCES. CLEAN AIR AND WATER POLLUTION CONTROL. (Reference: 2 CFR § 200 Appendix II(G)) CONTRACT WORKHOURS AND SAFETY STANDARDS ACT REQUIREMENTS. (Reference: 2 CFR § 200 Appendix II (E)) COPELAND "ANTI-KICKBACK" ACT (Reference: 2 CFR § 200 Appendix II(D), 29 CFR parts 3 & 5) DAVIS-BACON REQUIREMENTS. (Reference: 2 CFR § 200 Appendix II(D)) DEBARMENT AND SUSPENSION (NON-PROCUREMENT). (Reference: 2 CFR part 180 (Subpart C), 2 CFR part 1200, DOT Order 4200.5 DOT Suspension & Debarment Procedures & Ineligibility) DISADVANTAGED BUSINESS ENTERPRISE. (Reference: 49 CFR part 26) ENERGY CONSERVATION REQUIREMENTS. (Reference 2 CFR § 200 Appendix II(H)) EQUAL OPPORTUNITY CLAUSE AND SPECIFICATIONS. (Reference 41 CFR § 60-1.4, Executive Order 11246) FEDERAL FAIR LABOR STANDARDS ACT (FEDERAL MINIMUM WAGE) (Reference: 29 USC § 201, et seq.) LOBBYING AND INFLUENCING FEDERAL EMPLOYEES. (Reference: 49 CFR part 20, Appendix A) NONSEGREGATED FACILITIES REQUIREMENT. (Reference: 41 CFR § 60-1.8) OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970 (Reference 20 CFR part 1910) RIGHT TO INVENTIONS. (Reference 2 CFR § 200 Appendix II(F)) TERMINATION OF CONTRACT. (Reference 2 CFR § 200 Appendix II(B)) TRADE RESTRICTION (Reference: 49 CFR part 30) VETERAN'S PREFERENCE (Reference: 49 USC § 47112(c)) Ashland Municipal Airport Taxilone Improvements 1 FAA Special Provisions 00802 FAA SPECIAL PROVISIONS ACCESS TO RECORDS AND REPORTS (Reference: 2 CFR § 200.326, 2 CFR § 200.333) The Contractor must maintain an acceptable cost accounting system. The Contractor agrees to provide the Sponsor, the Federal Aviation Administration, and the Comptroller General of the United States or any of their duly authorized representatives access to any books, documents, papers, and records of the contractor which are directly pertinent to the specific contract for the purpose of making audit, examination, excerpts and transcriptions. The Contractor agrees to maintain all books, records and reports required under this contract for a period of not less than three years after final payment is made and all pending matters are closed. NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION (Reference: 41 CFR part 60-4, Executive Order 11246) 1. The Offeror's or Bidder's attention is called to the "Equal Opportunity Clause" and the "Standard Federal Equal Employment Opportunity Construction Contract Specifications" set forth herein. 2. The goals and timetables for minority and female participation, expressed in percentage terms for the contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows: A. Timetables B. Goals for minority participation for each trade (Vol. 4S Federal Register pg. 65984 10/3/80) C. Goals for female participation in each trade (6.9%) These goals are applicable to all of the contractor's construction work (whether or not it is Federal or federally-assisted) performed in the covered area. If the contractor performs construction work in a geographical area located outside of the covered area, it shall apply the goals established for such geographical area where the work is actually performed. With regard to this second area, the contractor is also subject to the goals for both federally funded and non-federally funded construction regardless of the percentage of federal participation in funding. The contractor's compliance with the Executive Order and the regulations in 41 CFR Part 60-4 shall be based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the specifications set forth in 41 CFR 60-4.3(a), and its efforts to meet the goals. The hours of minority and female employment and training shall be substantially uniform throughout the length of the contract, and in each trade, and the contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from contractor to contractor or from project to project, for the sole purpose of meeting the contractor's goals, shall be a violation of the contract, the Executive Order, and the regulations in 41 CFR Part 60-4. Compliance with the goals will be measured against the total work hours performed. 3. The contractor shall provide written notification to the Director, Office of Federal Contract Compliance Programs (OFCCP), within 10 working days of award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the name, address, and telephone number of the subcontractor; employer Ashland Municipal Airport Taxilone Improvements 2 FAA Special Provisions 00802 FAA SPECIAL PROVISIONS identification number of the subcontractor; estimated dollar amount of the subcontract; estimated starting and completion dates of subcontract; and the geographical area in which the subcontract is to be performed. 4. As used in this notice and in the contract resulting from this solicitation, the "covered area" is City of Ashland, Jackson County, Oregon. BREACH OF CONTRACT TERMS (Reference 2 CFR § 200 Appendix II(A)) Any violation or breach of terms of this contract on the part of the contractor or its subcontractors may result in the suspension or termination of this contract or such other action that may be necessary to enforce the rights of the parties of this agreement. The duties and obligations imposed by the Contract Documents and the rights and remedies available thereunder are in addition to, and not a limitation of, any duties, obligations, rights and remedies otherwise imposed or available by law. BUY AMERICAN CERTIFICATION (Reference: 49 USC § 50101) The contractor agrees to comply with 49 USC § 50101, which provides that Federal funds may not be obligated unless all steel and manufactured goods used in AIP-funded projects are produced in the United States, unless the FAA has issued a waiver for the product; the product is listed as an Excepted Article, Material Or Supply in Federal Acquisition Regulation subpart 25.108; or is included in the FAA Nationwide Buy American Waivers Issued list. Certificate of Buy American Compliance for Manufactured Products (Non-building construction projects, equipment acquisition projects) As a matter of bid responsiveness, the bidder or offeror must complete, sign, date, and submit this certification statement with their proposal. The bidder or offeror must indicate how they intend to comply with 49 USC § 50101 by selecting one on the following certification statements. These statements are mutually exclusive. Bidder must select one or the other (not both) by inserting a checkmark or the letter "X". ❑ Bidder or offeror hereby certifies that it will comply with 49 USC § 50101 by: a) Only installing steel and manufactured products produced in the United States, or; b) Installing manufactured products for which the FAA has issued a waiver as indicated by inclusion on the current FAA Nationwide Buy American Waivers Issued listing, or; c) Installing products listed as an Excepted Article, Material or Supply in Federal Acquisition Regulation Subpart 25.108. By selecting this certification statement, the bidder or offeror agrees: 1. To provide to the Owner evidence that documents the source and origin of the steel and manufactured product. Ashland Municipal Airport Taxilane Improvements 3 FAA Special Provisions 00802 FAA SPECIAL PROVISIONS 2. To faithfully comply with providing US domestic product 3. To furnish US domestic product for any waiver request that the FAA rejects 4. To refrain from seeking a waiver request after establishment of the contract, unless extenuating circumstances emerge that the FAA determines justified. ❑ The bidder or offeror hereby certifies it cannot comply with the 100% Buy American Preferences of 49 USC § 50101(a) but may qualify for either a Type 3 or Type 4 waiver under 49 USC § 50101(b). By selecting this certification statement, the apparent bidder or offeror with the apparent low bid agrees: 1. To the submit to the Owner within 15 calendar days of the bid opening, a formal waiver request and required documentation that support the type of waiver being requested. 2. That failure to submit the required documentation within the specified timeframe is cause for a non-responsive determination may result in rejection of the proposal. 3. To faithfully comply with providing US domestic products at or above the approved US domestic content percentage as approved by the FAA. 4. To refrain from seeking a waiver request after establishment of the contract, unless extenuating circumstances emerge that the FAA determines justified. Required Documentation Type 3 Waiver - The cost of the item components and subcomponents produced in the United States is more that 60% of the cost of all components and subcomponents of the "item". The required documentation for a type 3 waiver is: a) Listing of all product components and subcomponents that are not comprised of 100% US domestic content (Excludes products listed on the FAA Nationwide Buy American Waivers Issued listing and products excluded by Federal Acquisition Regulation Subpart 25.108; products of unknown origin must be considered as non-domestic products in their entirety) b) Cost of non-domestic components and subcomponents, excluding labor costs associated with final assembly at place of manufacture. c) Percentage of non-domestic component and subcomponent cost as compared to total "item" component and subcomponent costs, excluding labor costs associated with final assembly at place of manufacture. Type 4 Waiver - Total cost of project using US domestic source product exceeds the total project cost using non-domestic product by 25%. The required documentation for a type 4 of waiver is: Ashland Municipal Airport Taxilane Improvements 4 FAA Special Provisions 00802 FAA SPECIAL PROVISIONS a) Detailed cost information for total project using US domestic product b) Detailed cost information for total project using non-domestic product False Statements: Per 49 USC § 47126, this certification concerns a matter within the jurisdiction of the Federal Aviation Administration and the making of a false, fictitious or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code. Date Signature Company Name Title GENERAL CIVIL RIGHTS PROVISIONS (Reference: 49 USC § 47123) The contractor agrees that it will comply with pertinent statutes, Executive Orders and such rules as are promulgated to ensure that no person shall, on the grounds of race, creed, color, national origin, sex, age, or handicap be excluded from participating in any activity conducted with or benefiting from Federal assistance. This provision binds the contractors from the bid solicitation period through the completion of the contract. This provision is in addition to that required of Title VI of the Civil Rights Act of 1964. This provision also obligates the tenant/concessionaire/lessee or its transferee for the period during which Federal assistance is extended to the airport through the Airport Improvement Program, except where Federal assistance is to provide, or is in the form of personal property; real property or interest therein; structures or improvements thereon. In these cases the provision obligates the party or any transferee for the longer of the following periods: (a) the period during which the property is used by the airport sponsor or any transferee for a purpose for which Federal assistance is extended, or for another purpose involving the provision of similar services or benefits; or (b) the period during which the airport sponsor or any transferee retains ownership or possession of the property. Ashland Municipal Airport Taxilane Improvements 5 FAA Special Provisions 00802 FAA SPECIAL PROVISIONS CIVIL RIGHTS - TITLE VI ASSURANCES 7.2.1 Title VI Solicitation Notice (Source: Appendix 4 of FAA Order 1400.11, Nondiscrimination in Federally-Assisted Programs at the Federal Aviation Administration) Title VI Solicitation Notice: The CITY OF ASHLAND, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. 7.2.2 Title VI Clauses for Compliance with Nondiscrimination Requirements (Source: Appendix A of Appendix 4 of FAA Order 1400.11, Nondiscrimination in Federally-Assisted Programs at the Federal Aviation Administration) Compliance with Nondiscrimination Requirements During the performance of this contract, the contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the "contractor") agrees as follows: 1. Compliance with Regulations: The contractor (hereinafter includes consultants) will comply with the Title VI List of Pertinent Nondiscrimination Statutes and Authorities, as they may be amended from time to time, which are herein incorporated by reference and made a part of this contract. 2. Non-discrimination: The contractor, with regard to the work performed by it during the contract, will not discriminate on the grounds of race, color, or national origin in the selection and retention of subcontractors, including procurements of materials and leases of equipment. The contractor will not participate directly or indirectly in the discrimination prohibited by the Acts and the Regulations, including employment practices when the contract covers any activity, project, or program set forth in Appendix B of 49 CFR part 21. 3. Solicitations for Subcontracts, Including Procurements of Materials and Equipment: In all solicitations, either by competitive bidding, or negotiation made by the contractor for work to be performed under a subcontract, including procurements of materials, or leases of equipment, each potential subcontractor or supplier will be notified by the contractor of the contractor's obligations under this contract and the Acts and the Regulations relative to Non-discrimination on the grounds of race, color, or national origin. 4. Information and Reports: The contractor will provide all information and reports required by the Acts, the Regulations, and directives issued pursuant thereto and will permit access to its books, Ashland Municipal Airport Taxilane Improvements 1 FAA Special Provisions 00802 FAA SPECIAL PROVISIONS records, accounts, other sources of information, and its facilities as may be determined by the sponsor or the Federal Aviation Administration to be pertinent to ascertain compliance with such Acts, Regulations, and instructions. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish the information, the contractor will so certify to the sponsor or the Federal Aviation Administration, as appropriate, and will set forth what efforts it has made to obtain the information. 5. Sanctions for Noncompliance: In the event of a contractor's noncompliance with the Non- discrimination provisions of this contract, the sponsor will impose such contract sanctions as it or the Federal Aviation Administration may determine to be appropriate, including, but not limited to: a. Withholding payments to the contractor under the contract until the contractor complies; and/or b. Cancelling, terminating, or suspending a contract, in whole or in part. 6. Incorporation of Provisions: The contractor will include the provisions of paragraphs one through six in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Acts, the Regulations and directives issued pursuant thereto. The contractor will take action with respect to any subcontract or procurement as the sponsor or the Federal Aviation Administration may direct as a means of enforcing such provisions including sanctions for noncompliance. Provided, that if the contractor becomes involved in, or is threatened with litigation by a subcontractor, or supplier because of such direction, the contractor may request the sponsor to enter into any litigation to protect the interests of the sponsor. In addition, the contractor may request the United States to enter into the litigation to protect the interests of the United States. 7.2.3 Title VI Clauses for Deeds Transferring United States Property (Source: Appendix B of Appendix 4 of FAA Order 1400.11, Nondiscrimination in Federally-Assisted Programs at the Federal Aviation Administration) CLAUSES FOR DEEDS TRANSFERRING UNITED STATES PROPERTY The following clauses will be included in deeds effecting or recording the transfer of real property, structures, or improvements thereon, or granting interest therein from the United States pursuant to the provisions of the Airport Improvement Program grant assurances. NOW, THEREFORE, the Federal Aviation Administration as authorized by law and upon the condition that the CITY OF ASHLAND will accept title to the lands and maintain the project constructed thereon in accordance with (Name of Appropriate Legislative Authority), for the (Airport Improvement Program or other program for which land is transferred), and the policies and procedures prescribed by the Federal Aviation Administration of the U.S. Department of Transportation in accordance and in compliance with all requirements imposed by Title 49, Code of Federal Regulations, U.S. Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Non-discrimination in Federally-assisted programs of the U.S. Department of Transportation pertaining to and effectuating the provisions of Title VI of the Civil Rights Ashland Municipal Airport Taxilane Improvements 2 FAA Special Provisions 00802 FAA SPECIAL PROVISIONS Act of 1964 (78 Stat. 252; 42 U.S.C. § 2000d to 2000d-4), does hereby remise, release, quitclaim and convey unto the CITY OF ASHLAND all the right, title and interest of the U.S. Department of Transportation/Federal Aviation Administration in and to said lands described in (ExhibitA attached hereto or other exhibit describing the transferred property) and made a part hereof. (HABENDUM CLAUSE) TO HAVE AND TO HOLD said lands and interests therein unto CITY OF ASHLAND and its successors forever, subject, however, to the covenants, conditions, restrictions and reservations herein contained as follows, which will remain in effect for the period during which the real property or structures are used for a purpose for which Federal financial assistance is extended or for another purpose involving the provision of similar services or benefits and will be binding on the CITY OF ASHLAND, its successors and assigns. The CITY OF ASHLAND, in consideration of the conveyance of said lands and interests in lands, does hereby covenant and agree as a covenant running with the land for itself, its successors and assigns, that (1) no person will on the grounds of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination with regard to any facility located wholly or in part on, over, or under such lands hereby conveyed [and]* (2) that the CITY OF ASHLAND will use the lands and interests in lands and interests in lands so conveyed, in compliance with all requirements imposed by or pursuant to Title 49, Code of Federal Regulations, U.S. Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Non-discrimination in Federally-assisted programs of the U.S. Department of Transportation, Effectuation of Title VI of the Civil Rights Act of 1964, and as said Regulations and Acts may be amended[, and (3) that in the event of breach of any of the above-mentioned non-discrimination conditions, the Department will have a right to enter or re-enter said lands and facilities on said land, and that above described land and facilities will thereon revert to and vest in and become the absolute property of the Federal Aviation Administration and its assigns as such interest existed prior to this instruction].* (*Reverter clause and related language to be used only when it is determined that such a clause is necessary in order to make clear the purpose of Title VI.) 7.2.4 Title VI Clauses for Transfer of Real Property Acquired or Improved Under the Activity, Facility, or Program (Source: Appendix C of Appendix 4 of FAA Order 1400.11, Nondiscrimination in Federally-Assisted Programs at the Federal Aviation Administration) CLAUSES FOR TRANSFER OF REAL PROPERTY ACQUIRED OR IMPROVED UNDER THE ACTIVITY, FACILITY, OR PROGRAM The following clauses will be included in deeds, licenses, leases, permits, or similar instruments entered into by the CITY OF ASHLAND pursuant to the provisions of the Airport Improvement Program grant assurances. A. The (grantee, lessee, permittee, etc. as appropriate) for himself/herself, his/her heirs, personal representatives, successors in interest, and assigns, as a part of the consideration hereof, does hereby covenant and agree [in the case of deeds and leases add "as a covenant running with the land"] that: Ashland Municipal Airport Taxilane Improvements 3 FAA Special Provisions 00802 FAA SPECIAL PROVISIONS 1. In the event facilities are constructed, maintained, or otherwise operated on the property described in this (deed, license, lease, permit, etc.) for a purpose for which a Federal Aviation Administration activity, facility, or program is extended or for another purpose involving the provision of similar services or benefits, the (grantee, licensee, lessee, permittee, etc.) will maintain and operate such facilities and services in compliance with all requirements imposed by the Nondiscrimination Acts and Regulations listed in the Pertinent List of Nondiscrimination Authorities (as may be amended) such that no person on the grounds of race, color, or national origin, will be excluded from participation in, denied the benefits of, or be otherwise subjected to discrimination in the use of said facilities. B. With respect to licenses, leases, permits, etc., in the event of breach of any of the above Nondiscrimination covenants, CITY OF ASHLAND will have the right to terminate the (lease, license, permit, etc.) and to enter, re-enter, and repossess said lands and facilities thereon, and hold the same as if the (lease, license, permit, etc.) had never been made or issued.* C. With respect to a deed, in the event of breach of any of the above Nondiscrimination covenants, the CITY OF ASHLAND will have the right to enter or re-enter the lands and facilities thereon, and the above described lands and facilities will there upon revert to and vest in and become the absolute property of the CITY OF ASHLAND and its assigns.* (*Reverter clause and related language to be used only when it is determined that such a clause is necessary to make clear the purpose of Title VI.) 7.2.5 Title VI Clauses for Construction/Use/Access to Real Property Acquired Under the Activity, Facility or Program (Source: Appendix D of Appendix 4 of FAA Order 1400.11, Nondiscrimination in Federally-Assisted Programs at the Federal Aviation Administration) CLAUSES FOR CONSTRUCTION/USE/ACCESS TO REAL PROPERTY ACQUIRED UNDER THE ACTIVITY, FACILITY OR PROGRAM The following clauses will be included in deeds, licenses, permits, or similar instruments/agreements entered into by CITY OF ASHLAND pursuant to the provisions of the Airport Improvement Program grant assurances. A. The (grantee, licensee, permittee, etc., as appropriate) for himself/herself, his/her heirs, personal representatives, successors in interest, and assigns, as a part of the consideration hereof, does hereby covenant and agree (in the case of deeds and leases add, "as a covenant running with the land") that (1) no person on the ground of race, color, or national origin, will be excluded from participation in, denied the benefits of, or be otherwise subjected to discrimination in the use of said facilities, (2) that in the construction of any improvements on, over, or under such land, and the furnishing of services thereon, no person on the ground of race, color, or national origin, will be excluded from participation in, denied the benefits of, or otherwise be subjected to discrimination, (3) that the (grantee, licensee, lessee, permittee, etc.) will use the premises in compliance with all other requirements imposed by or pursuant to the List of Pertinent Nondiscrimination Authorities. Ashland Municipal Airport Taxilane Improvements 4 FAA Special Provisions 00802 FAA SPECIAL PROVISIONS B. With respect to (licenses, leases, permits, etc.), in the event of breach of any of the above nondiscrimination covenants, CITY OF ASHLAND will have the right to terminate the (license, permit, etc., as appropriate) and to enter or re-enter and repossess said land and the facilities thereon, and hold the same as if said (license, permit, etc., as appropriate) had never been made or issued.* C. With respect to deeds, in the event of breach of any of the above nondiscrimination covenants, CITY OF ASHLAND will there upon revert to and vest in and become the absolute property of CITY OF ASHLAND and its assigns.* (*Reverter clause and related language to be used only when it is determined that such a clause is necessary to make clear the purpose of Title VI.) 7.2.6 Title VI List of Pertinent Nondiscrimination Authorities (Source: Appendix E of Appendix 4 of FAA Order 1400.11, Nondiscrimination in Federally-Assisted Programs at the Federal Aviation Administration) During the performance of this contract, the contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the "contractor") agrees to comply with the following non-discrimination statutes and authorities; including but not limited to: • Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252), (prohibits discrimination on the basis of race, color, national origin); • 49 CFR part 21 (Non-discrimination In Federally-Assisted Programs of The Department of Transportation-Effectuation of Title VI of The Civil Rights Act of 1964); • The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. § 4601), (prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or Federal-aid programs and projects); • Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. § 794 etseq.), as amended, (prohibits discrimination on the basis of disability); and 49 CFR part 27; • The Age Discrimination Act of 1975, as amended, (42 U.S.C. § 6101 et seq.), (prohibits discrimination on the basis of age); • Airport and Airway Improvement Act of 1982, (49 USC § 471, Section 47123), as amended, (prohibits discrimination based on race, creed, color, national origin, or sex); • The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage and applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms "programs or activities" to include all of the programs or activities of the Federal-aid recipients, sub-recipients and contractors, whether such programs or activities are Federally funded or not); Ashland Municipal Airport Taxilane Improvements 5 FAA Special Provisions 00802 FAA SPECIAL PROVISIONS • Titles II and III of the Americans with Disabilities Act of 1990, which prohibit discrimination on the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodation, and certain testing entities (42 U.S.C. 12131- 12189) as implemented by Department of Transportation regulations at 49 CFR parts 37 and 38; • The Federal Aviation Administration's Non-discrimination statute (49 U.S.C. § 47123) (prohibits discrimination on the basis of race, color, national origin, and sex); • Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations, which ensures discrimination against minority populations by discouraging programs, policies, and activities with disproportionately high and adverse human health or environmental effects on minority and low-income populations; • Executive Order 13166, Improving Access to Services for Persons with Limited English Proficiency, and resulting agency guidance, national origin discrimination includes discrimination because of limited English proficiency (LEP). To ensure compliance with Title VI, you must take reasonable steps to ensure that LEP persons have meaningful access to your programs (70 Fed. Reg. at 74087 to 74100); • Title IX of the Education Amendments of 1972, as amended, which prohibits you from discriminating because of sex in education programs or activities (20 U.S.C. 1681 et seq). CLEAN AIR AND WATER POLLUTION CONTROL (Reference: 2 CFR § 200 Appendix II(G)) Contractors and subcontractors agree: 1. That any facility to be used in the performance of the contract or subcontract or to benefit from the contract is not listed on the Environmental Protection Agency (EPA) List of Violating Facilities; 2. To comply with all the requirements of Section 114 of the Clean Air Act, as amended, 42 U.S.C. 1857 et seq. and Section 308 of the Federal Water Pollution Control Act, as amended, 33 U.S.C. 1251 et seq. relating to inspection, monitoring, entry, reports, and information, as well as all other requirements specified in Section 114 and Section 308 of the Acts, respectively, and all other regulations and guidelines issued thereunder; 3. That, as a condition for the award of this contract, the contractor or subcontractor will notify the awarding official of the receipt of any communication from the EPA indicating that a facility to be used for the performance of or benefit from the contract is under consideration to be listed on the EPA List of Violating Facilities; 4. To include or cause to be included in any construction contract or subcontract which exceeds $100,000 the aforementioned criteria and requirements. Ashland Municipal Airport Taxilane Improvements 6 FAA Special Provisions 00802 FAA SPECIAL PROVISIONS CONTRACT WORKHOURS AND SAFETY STANDARDS ACT REQUIREMENTS (Reference: 2 CFR § 200 Appendix II (E)) 1. Overtime Requirements. No contractor or subcontractor contracting for any part of the contract work which may require or involve the employment of laborers or mechanics shall require or permit any such laborer or mechanic, including watchmen and guards, in any workweek in which he or she is employed on such work to work in excess of forty hours in such workweek unless such laborer or mechanic receives compensation at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of forty hours in such workweek. 2. Violation; Liability for Unpaid Wages; Liquidated Damages. In the event of any violation of the clause set forth in paragraph (1) above, the contractor and any subcontractor responsible therefor shall be liable for the unpaid wages. In addition, such contractor and subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth in paragraph 1 above, in the sum of $10 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in paragraph 1 above. 3. Withholding for Unpaid Wages and Liquidated Damages. The Federal Aviation Administration or the Sponsor shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any monies payable on account of work performed by the contractor or subcontractor under any such contract or any other Federal contract with the same prime contractor, or any other Federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph 2 above. 4. Subcontractors. The contractor or subcontractor shall insert in any subcontracts the clauses set forth in paragraphs 1 through 4 and also a clause requiring the subcontractor to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in paragraphs 1 through 4 of this section. Ashland Municipal Airport Taxilane Improvements 7 FAA Special Provisions 00802 FAA SPECIAL PROVISIONS COPELAND "ANTI-KICKBACK" ACT (Reference: 2 CFR § 200 Appendix II(D), 29 CFR parts 3 & 5) The United States Department of Labor Wage and Hours Division oversees the Copeland "Anti-Kickback" Act requirements. All contracts and subcontracts must meet comply with the Occupational Safety and Health Act of 1970. United States Department of Labor Wage and Hours Division can provide information regarding any specific clauses or assurances pertaining to the Copeland "Anti-Kickback" Act requirements required to be inserted in solicitations, contracts or subcontracts. DAVIS-BACON REQUIREMENTS (Reference: 2 CFR § 200 Appendix II(D)) 1. Minimum Wages (i) All laborers and mechanics employed or working upon the site of the work will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by the Secretary of Labor under the Copeland Act (29 CFR Part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalent thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. Contributions made or costs reasonably anticipated for bona fide fringe benefits under section 1(b)(2) of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of paragraph (1)(iv) of this section; also, regular contributions made or costs incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or programs which cover the particular weekly period, are deemed to be constructively made or incurred during such weekly period. Such laborers and mechanics shall be paid the appropriate wage rate and fringe benefits on the wage determination for the classification of work actually performed, without regard to skill, except as provided in 29 CFR Part 5.5(a)(4). Laborers or mechanics performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein: Provided, That the employer's payroll records accurately set forth the time spent in each classification in which work is performed. The wage determination (including any additional classification, and wage rates conformed under (1)(ii) of this section) and the Davis-Bacon poster (WH-1321) shall be posted at all times by the contractor and its subcontractors at the site of the work in a prominent and accessible place where it can easily be seen by the workers. (ii)(A) The contracting officer shall require that any class of laborers or mechanics, including helpers, which is not listed in the wage determination and which is to be employed under the contract shall be classified in conformance with the wage determination. The contracting officer shall approve an additional classification and wage rate and fringe benefits therefore only when the following criteria have been met: (1) The work to be performed by the classification requested is not performed by a classification in the wage determination; and Ashland Municipal Airport Taxilane Improvements 8 FAA Special Provisions 00802 FAA SPECIAL PROVISIONS (2) The classification is utilized in the area by the construction industry; and (3) The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination. (B) If the contractor and the laborers and mechanics to be employed in the classification (if known), or their representatives, and the contracting officer agree on the classification and wage rate (including the amount designated for fringe benefits where appropriate), a report of the action taken shall be sent by the contracting officer to the Administrator of the Wage and Hour Division, Employment Standards Administration, U.S. Department of Labor, Washington, D.C. 20210. The Administrator, or an authorized representative, will approve, modify, or disapprove every additional classification action within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30-day period that additional time is necessary. (C) In the event the contractor, the laborers or mechanics to be employed in the classification or their representatives, and the contracting officer do not agree on the proposed classification and wage rate (including the amount designated for fringe benefits where appropriate), the contracting officer shall refer the questions, including the views of all interested parties and the recommendation of the contracting officer, to the Administrator for determination. The Administrator, or an authorized representative, will issue a determination within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30-day period that additional time is necessary. (D) The wage rate (including fringe benefits where appropriate) determined pursuant to subparagraphs (1)(ii) (B) or (C) of this paragraph, shall be paid to all workers performing work in the classification under this contract from the first day on which work is performed in the classification. (iii) Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the contractor shall either pay the benefit as stated in the wage determination or shall pay another bona fide fringe benefit or an hourly cash equivalent thereof. (iv) If the contractor does not make payments to a trustee or other third person, the contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program, Provided, That the Secretary of Labor has found, upon the written request of the contractor, that the applicable standards of the Davis-Bacon Act have been met. The Secretary of Labor may require the contractor to set aside in a separate account assets for the meeting of obligations under the plan or program. 2 Withholding. The Federal Aviation Administration or the Sponsor shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld from the contractor under this contract or any other Federal contract with the same prime contractor, or any other Federally-assisted contract subject to Davis-Bacon prevailing wage requirements, which is held by the same prime contractor, so much of the accrued payments or advances as may be considered necessary to pay laborers and mechanics, including apprentices, trainees, and helpers, employed by the contractor or any subcontractor the full amount of wages required by the contract. In the event of failure to pay any laborer or mechanic, including any apprentice, trainee, or helper, employed or working on the site of work, all or part of the wages required by the contract, the Federal Aviation Administration may, after written notice to the contractor, sponsor, applicant, or owner, take such Ashland Municipal Airport Taxilane Improvements 9 FAA Special Provisions 00802 FAA SPECIAL PROVISIONS action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased. 3. Payrolls and basic records. (i) Payrolls and basic records relating thereto shall be maintained by the contractor during the course of the work and preserved for a period of three years thereafter for all laborers and mechanics working at the site of the work. Such records shall contain the name, address, and social security number of each such worker, his or her correct classification, hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in 1(b)(2)(B) of the Davis-Bacon Act), daily and weekly number of hours worked, deductions made and actual wages paid. Whenever the Secretary of Labor has found under 29 CFR 5.5(a)(1)(iv) that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in section 1(b)(2)(B) of the Davis-Bacon Act, the contractor shall maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual costs incurred in providing such benefits. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs. (ii)(A) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the Federal Aviation Administration if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the Federal Aviation Administration. The payrolls submitted shall set out accurately and completely all of the information required to be maintained under 29 CFR 5.5(a)(3)(i), except that full social security numbers and home addresses shall not be included on weekly transmittals. Instead the payrolls shall only need to include an individually identifying number for each employee (e.g. , the last four digits of the employee's social security number). The required weekly payroll information may be submitted in any form desired. Optional Form WH-347 is available for this purpose from the Wage and Hour Division Web site at http://www.dol.gov/esa/whd/forms/wh347instr.htm or its successor site. The prime contractor is responsible for the submission of copies of payrolls by all subcontractors. Contractors and subcontractors shall maintain the full social security number and current address of each covered worker, and shall provide them upon request to the Federal Aviation Administration if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit them to the applicant, sponsor, or owner, as the case may be, for transmission to the Federal Aviation Administration, the contractor, or the Wage and Hour Division of the Department of Labor for purposes of an investigation or audit of compliance with prevailing wage requirements. It is not a violation of this section for a prime contractor to require a subcontractor to provide addresses and social security numbers to the prime contractor for its own records, without weekly submission to the sponsoring government agency (or the applicant, sponsor, or owner). (B) Each payroll submitted shall be accompanied by a "Statement of Compliance," signed by the contractor or subcontractor or his or her agent who pays or supervises the payment of the persons employed under the contract and shall certify the following: Ashland Municipal Airport Taxilane Improvements 10 FAA Special Provisions 00802 FAA SPECIAL PROVISIONS (1) That the payroll for the payroll period contains the information required to be provided under 29 CFR § 5.5(a)(3)(ii), the appropriate information is being maintained under 29 CFR § 5.5 (a)(3)(i) and that such information is correct and complete; (2) That each laborer and mechanic (including each helper, apprentice and trainee) employed on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set forth in Regulations 29 CFR Part 3; (3) That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification of work performed, as specified in the applicable wage determination incorporated into the contract. (C) The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH-347 shall satisfy the requirement for submission of the "Statement of Compliance" required by paragraph (3)(ii)(B) of this section. (D) The falsification of any of the above certifications may subject the contractor or subcontractor to civil or criminal prosecution under Section 1001 of Title 18 and Section 231 of Title 31 of the United States Code. (iii) The contractor or subcontractor shall make the records required under paragraph (3)(i) of this section available for inspection, copying or transcription by authorized representatives of the Sponsor, the Federal Aviation Administration or the Department of Labor, and shall permit such representatives to interview employees during working hours on the job. If the contractor or subcontractor fails to submit the required records or to make them available, the Federal agency may, after written notice to the contractor, sponsor, applicant or owner, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds. Furthermore, failure to submit the required records upon request or to make such records available may be grounds for debarment action pursuant to 29 CFR 5.12. 4. Apprentices and Trainees. (i) Apprentices. Apprentices will be permitted to work at less than the predetermined rate for the work they performed when they are employed pursuant to and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Employment and Training Administration, Bureau of Apprenticeship and Training, or with a State Apprenticeship Agency recognized by the Bureau, or if a person is employed in his or her first 90 days of probationary employment as an apprentice in such an apprenticeship program, who is not individually registered in the program, but who has been certified by the Bureau of Apprenticeship and Training or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment as an apprentice. The allowable ratio of apprentices to journeymen on the job site in any craft classification shall not be greater than the ratio permitted to the contractor as to the entire work force under the registered program. Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated above, shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any apprentice performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. Where a contractor is performing construction on a project in a locality other than that in which its program is registered, the ratios and wage rates (expressed in percentages of the journeyman's hourly rate) Ashland Municipal Airport Taxilane Improvements 11 FAA Special Provisions 00802 FAA SPECIAL PROVISIONS specified in the contractor's or subcontractor's registered program shall be observed. Every apprentice must be paid at not less than the rate specified in the registered program for the apprentice's level of progress, expressed as a percentage of the journeymen hourly rate specified in the applicable wage determination. Apprentices shall be paid fringe benefits in accordance with the provisions of the apprenticeship program. If the apprenticeship program does not specify fringe benefits, apprentices must be paid the full amount of fringe benefits listed on the wage determination for the applicable classification. If the Administrator determines that a different practice prevails for the applicable apprentice classification, fringes shall be paid in accordance with that determination. In the event the Bureau of Apprenticeship and Training, or a State Apprenticeship Agency recognized by the Bureau, withdraws approval of an apprenticeship program, the contractor will no longer be permitted to utilize apprentices at less than the applicable predetermined rate for the work performed until an acceptable program is approved. (ii) Trainees. Except as provided in 29 CFR 5.16, trainees will not be permitted to work at less than the predetermined rate for the work performed unless they are employed pursuant to and individually registered in a program which has received prior approval, evidenced by formal certification by the U.S. Department of Labor, Employment and Training Administration. The ratio of trainees to journeymen on the job site shall not be greater than permitted under the plan approved by the Employment and Training Administration. Every trainee must be paid at not less than the rate specified in the approved program for the trainee's level of progress, expressed as a percentage of the journeyman hourly rate specified in the applicable wage determination. Trainees shall be paid fringe benefits in accordance with the provisions of the trainee program. If the trainee program does not mention fringe benefits, trainees shall be paid the full amount of fringe benefits listed on the wage determination unless the Administrator of the Wage and Hour Division determines that there is an apprenticeship program associated with the corresponding journeyman wage rate on the wage determination which provides for less than full fringe benefits for apprentices. Any employee listed on the payroll at a trainee rate that is not registered and participating in a training plan approved by the Employment and Training Administration shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any trainee performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. In the event the Employment and Training Administration withdraws approval of a training program, the contractor will no longer be permitted to utilize trainees at less than the applicable predetermined rate for the work performed until an acceptable program is approved. (iii) Equal Employment Opportunity. The utilization of apprentices, trainees and journeymen under this part shall be in conformity with the equal employment opportunity requirements of Executive Order 11246, as amended, and 29 CFR Part 30. 5. Compliance With Copeland Act Requirements. The contractor shall comply with the requirements of 29 CFR Part 3, which are incorporated by reference in this contract. 6. Subcontracts. The contractor or subcontractor shall insert in any subcontracts the clauses contained in 29 CFR Part 5.5(a)(1) through (10) and such other clauses as the Federal Aviation Administration may by appropriate instructions require, and also a clause requiring the subcontractors to include these clauses in any lower Ashland Municipal Airport Taxilane Improvements 12 FAA Special Provisions 00802 FAA SPECIAL PROVISIONS tier subcontracts. The prime contractor shall be responsible for the compliance by any subcontractor or lower tier subcontractor with all the contract clauses in 29 CFR Part 5.5. 7. Contract Termination: Debarment. A breach of the contract clauses in paragraph 1 through 10 of this section may be grounds for termination of the contract, and for debarment as a contractor and a subcontractor as provided in 29 CFR 5.12. 8. Compliance With Davis-Bacon and Related Act Requirements. All rulings and interpretations of the Davis-Bacon and Related Acts contained in 29 CFR Parts 1, 3, and 5 are herein incorporated by reference in this contract. 9. Disputes Concerning Labor Standards. Disputes arising out of the labor standards provisions of this contract shall not be subject to the general disputes clause of this contract. Such disputes shall be resolved in accordance with the procedures of the Department of Labor set forth in 29 CFR Parts 5, 6 and 7. Disputes within the meaning of this clause include disputes between the contractor (or any of its subcontractors) and the contracting agency, the U.S. Department of Labor, or the employees or their representatives. 10. Certification of Eligibility. (i) By entering into this contract, the contractor certifies that neither it (nor he or she) nor any person or firm who has an interest in the contractor's firm is a person or firm ineligible to be awarded Government contracts by virtue of section 3(a) of the Davis-Bacon Act or 29 CFR 5.12(a)(1). (ii) No part of this contract shall be subcontracted to any person or firm ineligible for award of a Government contract by virtue of section 3(a) of the Davis-Bacon Act or 29 CFR 5.12(a)(1). CERTIFICATE REGARDING DEBARMENT AND SUSPENSION (BIDDER OR OFFEROR) (Reference: 2 CFR part 180 (Subpart C), 2 CFR part 1200, DOT Order 4200.5 DOT Suspension & Debarment Procedures & Ineligibility) By submitting a bid/proposal under this solicitation, the bidder or offeror certifies that at the time the bidder or offeror submits its proposal that neither it nor its principals are presently debarred or suspended by any Federal department or agency from participation in this transaction. CERTIFICATION REGARDING DEBARMENT AND SUSPENSION (SUCCESSFUL BIDDER REGARDING LOWER TIER PARTICIPANTS) The successful bidder, by administering each lower tier subcontract that exceeds $25,000 as a "covered transaction", must verify each lower tier participant of a "covered transaction" under the project is not presently debarred or otherwise disqualified from participation in this federally assisted project. The successful bidder will accomplish this by: Ashland Municipal Airport Taxilane Improvements 13 FAA Special Provisions 00802 FAA SPECIAL PROVISIONS 1. Checking the System for Award Management at website: http://www.sam.gov 2. Collecting a certification statement similar to the Certificate Regarding Debarment and Suspension (Bidder or Offeror), above. 3. Inserting a clause or condition in the covered transaction with the lower tier contract If the FAA later determines that a lower tier participant failed to tell a higher tier that it was excluded or disqualified at the time it entered the covered transaction, the FAA may pursue any available remedy, including suspension and debarment. DISADVANTAGED BUSINESS ENTERPRISES (Reference: 49 CFR part 26) Contract Assurance 26.13) - The contractor or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of DOT assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy, as the recipient deems appropriate. Prompt Payment (§26.29))- The prime contractor agrees to pay each subcontractor under this prime contract for satisfactory performance of its contract no later than {specify number} days from the receipt of each payment the prime contractor receives from {Name of recipient). The prime contractor agrees further to return retainage payments to each subcontractor within {specify the same number as above) days after the subcontractor's work is satisfactorily completed. Any delay or postponement of payment from the above referenced time frame may occur only for good cause following written approval of the {Name of Recipient). This clause applies to both DBE and non-DBE subcontractors. ENERGY CONSERVATION REQUIREMENTS (Reference 2 CFR § 200 Appendix II(H)) The contractor agrees to comply with mandatory standards and policies relating to energy efficiency that are contained in the state energy conservation plan issued in compliance with the Energy Policy and Conservation Act (Public Law 94-163). EQUAL OPPORTUNITY CLAUSE (Reference 41 CFR § 60-1.4, Executive Order 11246) During the performance of this contract, the contractor agrees as follows: (1) The contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, religion, sex, or national origin. such action shall include, but not be limited to the following: Ashland Wunicipal Airport Taxilane Improvements 14 FAA Special Provisions 00802 FAA SPECIAL PROVISIONS Employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause. (2) The contractor will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that all qualified applicants will receive considerations for employment without regard to race, color, religion, sex, or national origin. (3) The contractor will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers' representatives of the contractor's commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment. (4) The contractor will comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor. (5) The contractor will furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders. (6) In the event of the contractor's noncompliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, this contract may be canceled, terminated, or suspended in whole or in part and the contractor may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Executive Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulation, or order of the Secretary of Labor, or as otherwise provided by law. (7) The contractor will include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The contractor will take such action with respect to any subcontract or purchase order as the administering agency may direct as a means of enforcing such provisions, including sanctions for noncompliance: Provided, however, That in the event a contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the administering agency the contractor may request the United States to enter into such litigation to protect the interests of the United States. Ashland Municipal Airport Taxilane Improvements 15 FAA Special Provisions 00802 FAA SPECIAL PROVISIONS STANDARD FEDERAL EQUAL EMPLOYMENT OPPORTUNITY CONSTRUCTION CONTRACT SPECIFICATIONS 1. As used in these specifications: a. "Covered area" means the geographical area described in the solicitation from which this contract resulted; b. "Director" means Director, Office of Federal Contract Compliance Programs (OFCCP), U.S. Department of Labor, or any person to whom the Director delegates authority; c. "Employer identification number" means the Federal social security number used on the Employer's Quarterly Federal Tax Return, U.S. Treasury Department Form 941; d. "Minority" includes: (1) Black (all) persons having origins in any of the Black African racial groups not of Hispanic origin); (2) Hispanic (all persons of Mexican, Puerto Rican, Cuban, Central or South American, or other Spanish culture or origin regardless of race); (3) Asian and Pacific Islander (all persons having origins in any of the original peoples of the Far East, Southeast Asia, the Indian Subcontinent, or the Pacific Islands); and (4) American Indian or Alaskan native (all persons having origins in any of the original peoples of North America and maintaining identifiable tribal affiliations through membership and participation or community identification). 2. Whenever the contractor, or any subcontractor at any tier, subcontracts a portion of the work involving any construction trade, it shall physically include in each subcontract in excess of $10,000 the provisions of these specifications and the Notice which contains the applicable goals for minority and female participation and which is set forth in the solicitations from which this contract resulted. 3. If the contractor is participating (pursuant to 41 CFR 60-4.5) in a Hometown Plan approved by the U.S. Department of Labor in the covered area either individually or through an association, its affirmative action obligations on all work in the Plan area (including goals and timetables) shall be in accordance with that Plan for those trades which have unions participating in the Plan. Contractors shall be able to demonstrate their participation in and compliance with the provisions of any such Hometown Plan. Each contractor or subcontractor participating in an approved plan is individually required to comply with its obligations under the EEO clause and to make a good faith effort to achieve each goal under the Plan in each trade in which it has employees. The overall good faith performance by other contractors or subcontractors toward a goal in an approved Plan does not excuse any covered contractor's or subcontractor's failure to take good faith efforts to achieve the Plan goals and timetables. 4. The contractor shall implement the specific affirmative action standards provided in paragraphs 18.7a through 18.7p of these specifications. The goals set forth in the solicitation from which this contract resulted are expressed as percentages of the total hours of employment and training of minority and female utilization the contractor should reasonably be able to achieve in each construction trade in which it has employees in the covered area. Covered construction contractors performing construction work in a geographical area where they do not have a Federal or federally assisted construction contract Ashland Municipal Airport Taxilane Improvements 16 FAA Special Provisions 00802 FAA SPECIAL PROVISIONS shall apply the minority and female goals established for the geographical area where the work is being performed. Goals are published periodically in the Federal Register in notice form, and such notices may be obtained from any Office of Federal Contract Compliance Programs office or from Federal procurement contracting officers. The contractor is expected to make substantially uniform progress in meeting its goals in each craft during the period specified. 5. Neither the provisions of any collective bargaining agreement nor the failure by a union with whom the contractor has a collective bargaining agreement to refer either minorities or women shall excuse the contractor's obligations under these specifications, Executive Order 11246 or the regulations promulgated pursuant thereto. 6. In order for the non-working training hours of apprentices and trainees to be counted in meeting the goals, such apprentices'and trainees shall be employed by the contractor during the training period and the contractor shall have made a commitment to employ the apprentices and trainees at the completion of their training, subject to the availability of employment opportunities. Trainees shall be trained pursuant to training programs approved by the U.S. Department of Labor. 7. The contractor shall take specific affirmative actions to ensure equal employment opportunity. The evaluation of the contractor's compliance with these specifications shall be based upon its effort to achieve maximum results from its actions. The contractor shall document these efforts fully and shall implement affirmative action steps at least as extensive as the following: a. Ensure and maintain a working environment free of harassment, intimidation, and coercion at all sites, and in all facilities at which the contractor's employees are assigned to work. The contractor, where possible, will assign two or more women to each construction project. The contractor shall specifically ensure that all foremen, superintendents, and other onsite supervisory personnel are aware of and carry out the contractor's obligation to maintain such a working environment, with specific attention to minority or female individuals working at such sites or in such facilities. b. Establish and maintain a current list of minority and female recruitment sources, provide written notification to minority and female recruitment sources and to community organizations when the contractor or its unions have employment opportunities available, and maintain a record of the organizations' responses. c. Maintain a current file of the names, addresses, and telephone numbers of each minority and female off-the-street applicant and minority or female referral from a union, a recruitment source, or community organization and of what action was taken with respect to each such individual. If such individual was sent to the union hiring hall for referral and was not referred back to the contractor by the union or, if referred, not employed by the contractor, this shall be documented in the file with the reason therefore along with whatever additional actions the contractor may have taken. d. Provide immediate written notification to the Director when the union or unions with which the contractor has a collective bargaining agreement has not referred to the contractor a minority person or female sent by the contractor, or when the contractor has other information that the union referral process has impeded the contractor's efforts to meet its obligations. e. Develop on-the-job training opportunities and/or participate in training programs for the area which expressly include minorities and women, including upgrading programs and apprenticeship and trainee programs relevant to the contractor's employment needs, especially those programs Ashland Municipal Airport Taxilane Improvements 17 FAA Special Provisions 00802 FAA SPECIAL PROVISIONS funded or approved by the Department of Labor. The contractor shall provide notice of these programs to the sources compiled under 7b above. f. Disseminate the contractor's EEO policy by providing notice of the policy to unions and training programs and requesting their cooperation in assisting the contractor in meeting its EEO obligations; by including it in any policy manual and collective bargaining agreement; by publicizing it in the company newspaper, annual report, etc.; by specific review of the policy with all management personnel and with all minority and female employees at least once a year; and by posting the company EEO policy on bulletin boards accessible to all employees at each location where construction work is performed. g. Review, at least annually, the company's EEO policy and affirmative action obligations under these specifications with all employees having any responsibility for hiring, assignment, layoff, termination, or other employment decisions including specific review of these items with onsite supervisory personnel such a superintendents, general foremen, etc., prior to the initiation of construction work at any job site. A written record shall be made and maintained identifying the time and place of these meetings, persons attending, subject matter discussed, and disposition of the subject matter. h. Disseminate the contractor's EEO policy externally by including it in any advertising in the news media, specifically including minority and female news media, and providing written notification to and discussing the contractor's EEO policy with other contractors and subcontractors with whom the contractor does or anticipates doing business. i. Direct its recruitment efforts, both oral and written, to minority, female, and community organizations, to schools with minority and female students; and to minority and female recruitment and training organizations serving the contractor's recruitment area and employment needs. Not later than one month prior to the date for the acceptance of applications for apprenticeship or other training by any recruitment source, the contractor shall send written notification to organizations, such as the above, describing the openings, screening procedures, and tests to be used in the selection process. j. Encourage present minority and female employees to recruit other minority persons and women and, where reasonable provide after school, summer, and vacation employment to minority and female youth both on the site and in other areas of a contractor's workforce. k. Validate all tests and other selection requirements where there is an obligation to do so under 41 CFR Part 60-3. 1. Conduct, at least annually, an inventory and evaluation at least of all minority and female personnel, for promotional opportunities and encourage these employees to seek or to prepare for, through appropriate training, etc., such opportunities. m. Ensure that seniority practices, job classifications, work assignments, and other personnel practices do not have a discriminatory effect by continually monitoring all personnel and employment related activities to ensure that the EEO policy and the contractor's obligations under these specifications are being carried out. n. Ensure that all facilities and company activities are non-segregated except that separate or single user toilet and necessary changing facilities shall be provided to assure privacy between the sexes. Ashland Municipal Airport Taxilane Improvements 18 FAA Special Provisions 00802 FAA SPECIAL PROVISIONS o. Document and maintain a record of all solicitations of offers for subcontracts from minority and female construction contractors and suppliers, including circulation of solicitations to minority and female contractor associations and other business associations. p. Conduct a review, at least annually, of all supervisor's adherence to and performance under the contractor's EEO policies and affirmative action obligations. 8. Contractors are encouraged to participate in voluntary associations, which assist in fulfilling one or more of their affirmative action obligations (18.7a through 18.7p). The efforts of a contractor association, joint contractor union, contractor community, or other similar groups of which the contractor is a member and participant, may be asserted as fulfilling any one or more of its obligations under 18.7a through 18.7p of these specifications provided that the contractor actively participates in the group, makes every effort to assure that the group has a positive impact on the employment of minorities and women in the industry, ensures that the concrete benefits of the program are reflected in the contractor's minority and female workforce participation, makes a good faith effort to meet its individual goals and timetables, and can provide access to documentation which demonstrates the effectiveness of actions taken on behalf of the contractor. The obligation to comply, however, is the contractor's and failure of such a group to fulfill an obligation shall not be a defense for the contractor's noncompliance. 9. A single goal for minorities and a separate single goal for women have been established. The contractor, however, is required to provide equal employment opportunity and to take affirmative action for all minority groups, both male and female, and all women, both minority and non-minority. Consequently, if the particular group is employed in a substantially disparate manner (for example, even though the contractor has achieved its goals for women generally,) the contractor may be in violation of the Executive Order if a specific minority group of women is underutilized. 10. The contractor shall not use the goals and timetables or affirmative action standards to discriminate against any person because of race, color, religion, sex, or national origin. 11. The contractor shall not enter into any subcontract with any person or firm debarred from Government contracts pursuant to Executive Order 11246. 12. The contractor shall carry out such sanctions and penalties for violation of these specifications and of the Equal Opportunity Clause, including suspension, termination, and cancellation of existing subcontracts as may be imposed or ordered pursuant to Executive Order 11246, as amended, and its implementing regulations, by the Office of Federal Contract Compliance Programs. Any contractor who fails to carry out such sanctions and penalties shall be in violation of these specifications and Executive Order 11246, as amended. 13. The contractor, in fulfilling its obligations under these specifications, shall implement specific affirmative action steps, at least as extensive as those standards prescribed in paragraph 18.7 of these specifications, so as to achieve maximum results from its efforts to ensure equal employment opportunity. If the contractor fails to comply with the requirements of the Executive Order, the implementing regulations, or these specifications, the Director shall proceed in accordance with 41 CFR 60-4.8. 14. The contractor shall designate a responsible official to monitor all employment related activity to ensure that the company EEO policy is being carried out, to submit reports relating to the provisions hereof as may be required by the Government, and to keep records. Records shall at least include for Ashland Municipal Airport Taxilane Improvements 19 FAA Special Provisions 00802 FAA SPECIAL PROVISIONS each employee, the name, address, telephone number, construction trade, union affiliation if any, employee identification number when assigned, social security number, race, sex, status (e.g., mechanic, apprentice, trainee, helper, or laborer), dates of changes in status, hours worked per week in the indicated trade, rate of pay, and locations at which the work was performed. Records shall be maintained in an easily understandable and retrievable form; however, to the degree that existing records satisfy this requirement, contractors shall not be required to maintain separate records. 1S. Nothing herein provided shall be construed as a limitation upon the application of other laws which establish different standards of compliance or upon the application of requirements for the hiring of local or other area residents (e.g., those under the Public Works Employment Act of 1977 and the Community Development Block Grant Program). FEDERAL FAIR LABOR STANDARDS ACT (FEDERAL MINIMUM WAGE) (Reference: 29 USC § 201, et seq.) All contracts and subcontracts that result from this solicitation incorporate the following provisions by reference, with the same force and effect as if given in full text. The contractor has full responsibility to monitor compliance to the referenced statute or regulation. The contractor must address any claims or disputes that pertain to a referenced requirement directly with the Federal Agency with enforcement responsibilities. Requirement Federal Agency with Enforcement Responsibilities Federal Fair Labor Standards Act (29 USC 201) U.S. Department of Labor- Wage and Hour Division LOBBYING AND INFLUENCING FEDERAL EMPLOYEES (Reference: 49 CFR part 20, Appendix A) The Bidder or offeror certifies by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that: 1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the bidder or offeror, to any person for influencing or attempting to influence an officer or employee of an agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement. 2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions. Ashland -Witnicipal Airport Taxilane Improvements 20 FAA Special Provisions 00802 FAA SPECIAL PROVISIONS This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by section 1352, title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. NOTICE OF NONSEGREGATED FACILITIES REQUIREMENT (Reference: 41 CFR § 60-1.8) Notice to Prospective Federally Assisted Construction Contractors 1. A Certification of Non-segregated Facilities shall be submitted prior to the award of a federally- assisted construction contract exceeding $10,000 which is not exempt from the provisions of the Equal Opportunity Clause. 2. Contractors receiving federally-assisted construction contract awards exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity Clause will be required to provide for the forwarding of the following notice to prospective subcontractors for supplies and construction contracts where the subcontracts exceed $10,000 and are not exempt from the provisions of the Equal Opportunity Clause. 3. The penalty for making false statements in offers is prescribed in 18 U.S.C. § 1001. Notice to Prospective Subcontractors of Requirements for Certification of Non-Segregated Facilities 1. A Certification of Non-segregated Facilities shall be submitted prior to the award of a subcontract exceeding $10,000, which is not exempt from the provisions of the Equal Opportunity Clause. 2. Contractors receiving subcontract awards exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity Clause will be required to provide for the forwarding of this notice to prospective subcontractors for supplies and construction contracts where the subcontracts exceed $10,000 and are not exempt from the provisions of the Equal Opportunity Clause. 3. The penalty for making false statements in offers is prescribed in 18 U.S.C. § 1001. CERTIFICATION OF NONSEGREGATED FACILITIES The federally-assisted construction contractor certifies that she or he does not maintain or provide, for his employees, any segregated facilities at any of his establishments and that she or he does not permit his employees to perform their services at any location, under his control, where segregated facilities are maintained. The federally-assisted construction contractor certifies that she or he will not maintain or provide, for his employees, segregated facilities at any of his establishments and that she or he will not permit his employees to perform their services at any location under his control where segregated facilities are maintained. The federally-assisted construction contractor agrees that a breach of this certification is a violation of the Equal Opportunity Clause in this contract. Ashland Municipal Airport Taxilane Improvements 21 FAA Special Provisions 00802 FAA SPECIAL PROVISIONS As used in this certification, the term "segregated facilities" means any waiting rooms, work areas, restrooms, and washrooms, restaurants and other eating areas, time clocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees which are segregated by explicit directives or are, in fact, segregated on the basis of race, color, religion, or national origin because of habit, local custom, or any other reason. The federally-assisted construction contractor agrees that (except where she or he has obtained identical certifications from proposed subcontractors for specific time periods) she or he will obtain identical certifications from proposed subcontractors prior to the award of subcontracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity Clause and that she or he will retain such certifications in his files. OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970 (Reference 20 CFR part 1910) All contracts and subcontracts that result from this solicitation incorporate the following provisions by reference, with the same force and effect as if given in full text. The contractor has full responsibility to monitor compliance to the referenced statute or regulation. The contractor must address any claims or disputes that pertain to a referenced requirement directly with the Federal Agency with enforcement responsibilities. Requirement Federal Agency with Enforcement Responsibilities Occupational Safety and Health Act of 1970 (20 CFR Part 1910) U.S. Department of Labor - Occupational Safety and Health Administration RIGHT TO INVENTIONS (Reference 2 CFR § 200 Appendix II(F)) All rights to inventions and materials generated under this contract are subject to requirements and regulations issued by the FAA and the Sponsor of the Federal grant under which this contract is executed. TERMINATION OF CONTRACT (Reference 2 CFR § 200 Appendix II(B)) a. The Sponsor may, by written notice, terminate this contract in whole or in part at any time, either for the Sponsor's convenience or because of failure to fulfill the contract obligations. Upon receipt of such notice services must be immediately discontinued (unless the notice directs otherwise) and all materials as may have been accumulated in performing this contract, whether completed or in progress, delivered to the Sponsor. b. If the termination is for the convenience of the Sponsor, an equitable adjustment in the contract price will be made, but no amount will be allowed for anticipated profit on unperformed services. Ashland Municipal Airport Taxilane Improvements 22 FAA Special Provisions 00802 FAA SPECIAL PROVISIONS c. If the termination is due to failure to fulfill the contractor's obligations, the Sponsor may take over the work and prosecute the same to completion by contract or otherwise. In such case, the contractor is liable to the Sponsor for any additional cost occasioned to the Sponsor thereby. d. If, after notice of termination for failure to fulfill contract obligations, it is determined that the contractor had not so failed, the termination will be deemed to have been effected for the convenience of the Sponsor. In such event, adjustment in the contract price will be made as provided in paragraph 2 of this clause. e. The rights and remedies of the sponsor provided in this clause are in addition to any other rights and remedies provided by law or under this contract. TRADE RESTRICTION (Reference: 49 CFR part 30) The contractor or subcontractor, by submission of an offer and/or execution of a contract, certifies that it: a. is not owned or controlled by one or more citizens of a foreign country included in the list of countries that discriminate against U.S. firms published by the office of the United States Trade Representative (USTR); b. has not knowingly entered into any contract or subcontract for this project with a person that is a citizen or national of a foreign country on said list, or is owned or controlled directly or indirectly by one or more citizens or nationals of a foreign country on said list; c. has not procured any product nor subcontracted for the supply of any product for use on the project that is produced in a foreign country on said list. Unless the restrictions of this clause are waived by the Secretary of Transportation in accordance with 49 CFR 30.17, no contract shall be awarded to a contractor or subcontractor who is unable to certify to the above. If the contractor knowingly procures or subcontracts for the supply of any product or service of a foreign country on said list for use on the project, the Federal Aviation Administration may direct through the Sponsor cancellation of the contract at no cost to the Government. Further, the contractor agrees that, if awarded a contract resulting from this solicitation, it will incorporate this provision for certification without modification in each contract and in all lower tier subcontracts. The contractor may rely on the certification of a prospective subcontractor unless it has knowledge that the certification is erroneous. The contractor shall provide immediate written notice to the sponsor if the contractor learns that its certification or that of a subcontractor was erroneous when submitted or has become erroneous by reason of changed circumstances. The subcontractor agrees to provide written notice to the contractor if at any time it learns that its certification was erroneous by reason of changed circumstances. This certification is a material representation of fact upon which reliance was placed when making the award. If it is later determined that the contractor or subcontractor knowingly rendered an erroneous certification, the Federal Aviation Administration may direct through the Sponsor cancellation of the contract or subcontract for default at no cost to the Government. Ashland Municipal Airport Taxilane Improvements 23 FAA Special Provisions 00802 FAA SPECIAL PROVISIONS Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render, in good faith, the certification required by this provision. The knowledge and information of a contractor is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. This certification concerns a matter within the jurisdiction of an agency of the United States of America and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001. VETERAN'S PREFERENCE (Reference: 49 USC § 47112(c)) In the employment of labor (except in executive, administrative, and supervisory positions), preference must be given to Vietnam era veterans, Persian Gulf veterans, Afghanistan-Iraq war veterans, disabled veterans, and small business concerns owned and controlled by disabled veterans as defined in Title 49 United States Code, Section 47112. However, this preference shall apply only where the individuals are available and qualified to perform the work to which the employment relates. Ashland Municipal Airport Taxilane Improvements 24 FAA Special Provisions 0810 State Prevailing Wage Rate Schedules STATE OF OREGON BOLI PREVAILING WAGE RATES THIS PROJECT IS A PUBLIC WORK SUBJECT TO ORS 279C.800 TO 279C.870 AND THE DAVIS- BACON ACT (40 U.S.C. 276A). ORS 279C.838 REQUIRES STATE PREVAILING WAGE RATES TO BE PAID ON PROJECTS SUBJECT TO BOTH THE STATE PREVAILING WAGE RATE LAW AND THE FEDERAL DAVIS- BACON ACT, IF THE STATE PREVAILING RATE OF WAGE IS HIGHER THAN THE FEDERAL PREVAILING RATE OF WAGE. STATE PREVAILING WAGE RATES, AS SET FORTH IN THE JANUARY 1,2014, BUREAU OF LABOR AND INDUSTRY (BOLI) PUBLICATION "PREVAILING WAGE RATES FOR PUBLIC CONTRACTS IN OREGON SUBJECT TO BOTH STATE PWR LAW AND THE FEDERAL DAVIS- BACON ACT" ARE INCORPORATED INTO THIS PACKET BY REFERENCE AND APPLICABLE RATES (INCLUDING CURRENT AMENDMENTS AND CORRECTIONS TO THAT PUBLICATION) ARE AVAILABLE AT: HTTP://W WW.OREGON.GOVBOLI/WHD/PWR/PAGES/fNDEX.ASPX Ashland Municipal Airport Taxilane Improvements I State BOLI Prevailing Wage Rates 0815 Federal Prevailing Wage Rate Schedule FEDERAL PREVAILING WAGE RATES FOLLOW THIS PAGE (and are available at WageDeterminationsOnline. ov (http://www.wdol.gov/Index.aspx) Ashland Municipal Airport Taxilane Improvements Federal Prevailing Wage Rates General Decision Number: OR140001 04/25/2014 OR1 Superseded General Decision Number: OR20130001 State: Oregon Construction Type: Highway Counties: Oregon Statewide. HIGHWAY CONSTRUCTION PROJECTS Modification Number Publication Date 0 01/03/2014 1 01/17/2014 2 01/24/2014 3 02/07/2014 4 02/21/2014 5 04/25/2014 BROR0001-006 06/01/2013 BAKER, BENTON (NORTH), CLACKAMAS, CLATSOP, COLUMBIA, GILLIAM, HARNEY, HOOD RIVER, LINCOLN (NORTH), LINN (NORTH), MALHEUR (NORTH), MARION, MORROW, MULTNOMAH, POLK, SHERMAN, TILLAMOOK, UMATILLA, UNION, WALLOWA, WASCO (NORTH), WASHINGTON AND YAMHILL COUNTIES Rates Fringes BRICKLAYER $ 32.75 16.15 BROR0001-007 06/01/2013 BENTON (SOUTH), CROOK, DESCHUTES, GRANT, JACKSON, JEFFERSON, KLAMATH, LAKE, LANE, LINCOLN (SOUTH), LINN (SOUTH), MALHEUR (SOUTH), WASCO (SOUTH) AND WHEELER COUNTIES Rates Fringes BRICKLAYER $ 31.53 15.80 CARP9001-001 06/01/2012 ZONE 1: Rates Fringes Carpenters: CARPENTERS $ 32.61 14.44 DIVER STANDBY $ 34.42 14.44 DIVERS TENDERS $ 36.97 14.44 Ashland Municipal Airport Taxilane Improvements Davis-Bacon Wage Rates I Oregon Highway Statewide OR] DIVERS $ 78.38 14.44 MANIFOLD AND/OR DECOMPRESSION CHAMBER OPERATORS $ 30.28 14.44 MILLWRIGHTS $ 33.11 14.44 PILEDRIVERS $ 33.61 14.44 DEPTH PAY: 50 to 100 feet $1.00 per foot over 50 feet 101 to 150 feet 1.50 per foot over 101 feet 151 to 200 feet 2.00 per foot over 151 feet Zone Differential (Add to Zone 1 rates): Zone 2 - $0.85 Zone 3 - 1.25 Zone 4 - 1.70 Zone 5 - 2.00 Zone 6 - 3.00 ZONE 1 - All jobs or projects located within 30 miles of the respective City Hall ZONE 2 - More than 30 miles and less than 40 miles from the respective City Hall ZONE 3 - More than 40 miles and less than 50 miles from the respective City Hall ZONE 4 - More than 50 miles and less than 60 miles from the respective City Hall ZONE 5 - More than 60 miles and less than 70 miles from the respective City Hall ZONE 6 - More than 70 miles from the respective City Hall. BASEPOINTS CITIES FOR CARPENTERS (EXCLUDING MILLWRIGHTS, PILEDRIVERS AND DIVERS) ALBANY ASTORIA BAKER BEND BROOKINGS BURNS COOS BAY CORVALLIS EUGENE GOLDENDALE GRANTS PASS HERMISTON HOOD RIVER KLAMATH FALLS LAGRANDE LAKEVIEW LONGVIEW MADRAS MEDFORD MCMINNVILLE NEWPORT OREGON CITY ONTARIO PENDLETON PORTLAND PORT ORFORD REEDSPORT ROSEBURG SALEM ST. HELENS THE DALLES TILLAMOOK VANCOUVER BASEPOINTS FOR MILLWRIGHTS EUGENE NORTH BEND LONGVIEW Ashland Municipal Airport Taxilane Improvements Davis-Bacon Wage Rates 2 Oregon Highway Statewide OR] PORTLAND MEDFORD THE DALLES VANCOUVER BASEPOINTS FOR PILEDRIVERS AND DIVERS ASTORIA BEND COOS BAY EUGENE KLAMATH FALLS LONGVIEW MEDFORD NEWPORT PORTLAND ROSEBURG SALEM THE DALLES * ELECO048-006 01/01/2014 CLACKAMAS, CLATSOP, COLUMBIA, HOOD RIVER, MULTNOMAH, TILLAMOOK, WASCO, WASHINGTON, SHERMAN AND YAMHILL (NORTH) COUNTIES Rates Fringes CABLE SPLICER $ 42.63 19.11 ELECTRICIAN $ 38.75 19.11 HOURLY ZONE PAY: Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities: Portland, The Dalles, Hood River, Tillamook, Seaside and Astoria Zone Pay: Zone 1: 31-50 miles $1.50/hour Zone 2: 51-70 miles $3.50/hour Zone 3: 71-90 miles $5.50/hour Zone 4: Beyond 90 miles $9.00/hour *These are not miles driven. Zones are based on Delorrne Street Atlas USA 2006 plus. ELEC0112-001 07/01/2013 BAKER, GILLIAM, GRANT, MORROW, UMATILLA, UNION, WALLOWA, AND WHEELER COUNTIES Rates Fringes CABLE SPLICER $ 38.90 17.35 ELECTRICIAN $ 37.05 17.29 ELEC0280-003 01/01/2014 Ashland Municipal Airport Taxilane Improvements Davis-Bacon Wage Rates 3 Oregon Ilighway Statewide ORl BENTON, CROOK, DESCHUTES, JEFFERSON, LANE (EAST OF A LINE RUNNING NORTH AND SOUTH FROM THE NORTHEAST CORNER OF COOS. COUNTY TO THE SOUTHEAST CORNER OF LINCOLN COUNTY), LINN, MARION, POLK AND YAMHILL (SOUTHERN HALF) COUNTIES Rates Fringes CABLE SPLICER $ 40.88 16.69 ELECTRICIAN $ 37.16 16.69 ELEC0291-006 06/01/2012 MALHEUR COUNTY Rates Fringes CABLE SPLICER $ 30.47 526+10.76 ELECTRICIAN $ 27.70 50+10.76 * ELEC0659-004 01/01/2014 DOUGLAS (EAST OF A LINE RUNNING NORTH AND SOUTH FROM THE NE CORNER OF COOS COUNTY TO THE SE CORNER OF LINCOLN COUNTY), HARNEY, JACKSON, JOSEPHINE, KLAMATH AND LAKE COUNTIES Rates Fringes CABLE SPLICER $ 33.30 14.96 ELECTRICIAN $ 30.27 14.96 ZONE PAY: BASE POINTS ARE FROM THE DOWNTOWN POST OFFICE IN GRANTS PASS, KLAMATH FALLS, ROSEBURG AND MEDFORD. ZONE 1: 0-20 MILES $0.00 PER HOUR ZONE 2: > 20-30 MILES $1.50 PER HOUR ZONE 3: >30-40 MILES $3.30 PER HOUR ZONE 4: >40-50 MILES $5.00 PER HOUR ZONE 5: >50-60 MILES $6.80 PER HOUR ZONE 6: >60 MILES $9.50 PER HOUR *THESE ARE NOT MILES DRIVEN. zONES ARE BASED ON DELORNE STREET ATLAS USA 5.0. ELEC0932-004 01/01/2014 COOS, CURRY, LINCOLN, DOUGLAS AND LANE COUNTIES (AREA LYING WEST OF A LINE NORTH AND SOUTH FROM THE N.E. CORNER OF COOS COUNTY TO THE S.E. CORNER OF LINCOLN COUNTY) Rates Fringes Ashland Municipal Airport Taxilane Improvements Davis-Bacon Wage Rates 4 Oregon Highway Statewide OR] ELECTRICIAN $ 34.00 14.77 ENGI0701-005 01/01/2014 ZONE 1: POWER EQUIPMENT OPERATORS (See Footnote C) Rates Fringes Power equipment operators: GROUP 1 $ 38.25 13.70 GROUP 1A $ 40.16 13.70 GROUP 1B $ 42.08 13.70 GROUP 2 $ 36.56 13.70 GROUP 3 $ 35.54 13.70 GROUP 4 $ 34.56 13.70 GROUP 5 $ 33.43 13.70 GROUP 6 $ 30.34 13.70 Zone Differential (add to Zone 1 rates): Zone 2 - $3.00 Zone 3 - $6.00 For the following metropolitan counties: MULTNOMAH; CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA; CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS INDICATED: All jobs or projects located in Multnomah, Clackamas and Marion Counties, West of the western boundary of Mt. Hood National Forest and West of Mile Post 30 on Interstate 84 and West of Mile Post 30 on State Highway 26 and West of Mile Post 30 on Highway 22 and all jobs or projects located in Yamhill County, Washington County and Columbia County and all jobs or porjects located in Clark & Cowlitz County, Washington except that portion of Cowlitz County in the Mt. St. Helens "Blast Zone" shall receive Zone I pay for all classifications. All jobs or projects located in the area outside the identified boundary above, but less than 50 miles from the Portland City Hall shall receive Zone II pay for all classifications. All jobs or projects located more than 50 miles from the Portland City Hall, but outside the identified border above, shall receive Zone III pay for all classifications. For the following cities: ALBANY; BEND; COOS BAY; EUGENE; GRANTS PASS; KLAMATH FALLS; MEDFORD; ROSEBURG All jobs or projects located within 30 miles of the Ashland Municipal Airport Taxilane Improvements Davis-Bacon Wage Rates 5 Oregon Highway Statewide ORI respective city hall of the above mentioned cities shall receive Zone I pay for all classifications. All jobs or projects located more than 30 miles and less than 50 miles from the respective city hall of the above mentioned cities shall receive Zone II pay for all classifications. All jobs or projects located more than 50 miles from the respective city hall of the above mentioned cities shall receive Zone III pay for all classifications. POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: CONCRETE: Batch Plant and/or Wet Mix Operator, three units or more, CRANE: Helicopter Operator, when used in erecting work; Whirley Operator, 90 ton and over; LATTICE BOOM CRANE: Operator 200 tons through 299 tons, and/or over 200 feet boom. HYDRAULIC CRANE: Hydraulic Crane Operator 90 tons through 199 tons with luffing or tower attachments; FLOATING EQUIPMENT: Floating Crane, 150 ton but less than 250 ton GROUP 1A: HYDRAULIC CRANE: Hydraulic Operator, 200 tons and over (with luffing or tower attachment); LATTICE BOOM CRANE: Operator, 200 tons through 299 tons, with over 200 feet boom; FLOATING EQUIPMENT: Floating Crane 250 ton and over GROUP 1B: LATTICE BOOM CRANE: Operator, 300 tons through 399 tons with over 200 feet boom; Operator 400 tons and over; FLOATING EQUIPMENT: Floating Crane 350 ton and over GROUP 2: ASPHALT: Asphalt Plant Operator (any type); Roto Mill, pavement profiler, operator, 6 foot lateral cut and over; BLADE: Auto Grader or "Trimmer" (Grade Checker required); Blade,Operator, Robotic; BULLDOZERS: Bulldozer operator over 120,000 lbs and above; Bulldozer operator, twin engine; Bulldozer Operator,tandem, quadnine, D10, Dll, and similar type; Bulldozere Robotic Equipment (any type; CONCRETE: Batch Plant and/or Wet Mix Operator, one and two drum; Automatic Concrete Slip Form Paver Operator; Concrete Canal Line Operator; Concrete Profiler, Diamond Head; CRANE: Cableway Operator, 25 tons and over; HYDRAULIC CRANE: Hydraulic crane operator 90 tons through 199 tons (without luffing or tower attachment); TOWER/WHIRLEY OPERATOR: Tower Crane Operator; Whirley Operator, under 90 tons; LATTICE BOOM CRANE: 90 through 199 tons and/or 150 to 200 feet boom; CRUSHER: Crusher Plant Operator; FLOATING EQUIPMENT: Floating Clamshell, etc.operator, 3 cu. yds. and over; Floating Crane (derrick barge) Operator, 30 tons but less than 150 tons; LOADERS: Loader operator, 120,000 lbs. and above; REMOTE CONTROL: Remote controlled earth-moving equipment; RUBBER-TIRED SCRAPERS: Rubber- Ashland Municipal Airport Taxilane Improvements Davis-Bacon Wage Rates 6 Oregon Highway Statewide OR] tired scraper operator, with tandem scrapers, multi-engine; SHOVEL, DRAGLINE, CLAMSHELL, SKOOPER OPERATOR: Shovel, Dragline, Clamshell, operator 5 cu. yds and over; TRENCHING MACHINE: Wheel Excavator, under 750 cu. yds. per hour (Grade Oiler required); Canal Trimmer (Grade Oiler required); Wheel Excavator, over 750 cu. yds. per hour; Band Wagon (in conjunction with wheel excavator); UNDERWATER EQUIPMENT: Underwater Equipment Operator, remote or otherwise; HYDRAULIC HOES-EXCAVATOR: Excavator over 130,000 lbs.; HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (with luffing or tower attachment); GROUP 3: BULLDOZERS: Bulldozer operator, over 70,000 lbs. up to and including 120,000 lbs.; HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (without luffing or tower attachment); LATTICE BOOM CRANES: Lattice Boom Crane-50 through 89 tons (and less than 150 feet boom); FORKLIFT: Rock Hound Operator; HYDRAULIC HOES-EXCAVATOR: excavator over 80,000 lbs. through 130,000 lbs.; LOADERS: Loader operator 60,000 and less than 120,000; RUBBER-TIRED SCRAPERS: Scraper Operator, with tandem scrapers; Self-loading, paddle wheel, auger type, finish and/or 2 or more units; SHOVEL, DRAGLINE, CLAMSHELL,SKOOPER OPERATOR: Shovel, Dragline, Clamshell operators 3 cu. yds. but less than 5 cu yds. GROUP 4: ASPHALT: Screed Operator; Asphalt Paver operator (screeman required); BLADE: Blade operator; Blade operator, finish; Blade operator, externally controlled by electronic, mechanical hydraulic means; Blade operator, multi-engine; BULLDOZERS: Bulldozer Operator over 20,000 lbs and more than 100 horse up to 70,000 lbs; Drill Cat Operator; Side-boom Operator; Cable-Plow Operator (any type); CLEARING: Log Skidders; Chippers; Incinerator; Stump Splitter (loader mounted or similar type); Stump Grinder (loader mounted or similar type; Tub Grinder; Land Clearing Machine (Track mounted forestry mowing & grinding machine); Hydro Axe (loader mounted or similar type); COMPACTORS SELF-PROPELLED: Compactor Operator, with blade; Compactor Operator, multi-engine; Compactor Operator, robotic; CONCRETE: Mixer Mobile Operator; Screed Operator; Concrete Cooling Machine Operator; Concrete Paving Road Mixer; Concrete Breaker; Reinforced Tank Banding Machine (K-17 or similar types); Laser Screed; CRANE: Chicago boom and similar types; Lift Slab Machine Operator; Boom type lifting device, 5 ton capacity or less; Hoist Operator, two (2) drum; Hoist Operator, three (3) or more drums; Derrick Operator, under 100 ton; Hoist Operator, stiff leg, guy derrick or similar type, 50 ton and over; Cableway Operator up to twenty (25) ton; Bridge Crane Operator, Locomotive, Gantry, Overhead; Cherry Picker or similar type crane hoist five (5) ton capacity or less; Hydraulic Crane Operator, under 50 tons; LATTICE BOOM CRANE OPERATOR: Lattice Boom Crane Operator, under 50 tons; CRUSHER: Generator Operator; Ashland Municipal Airport Taxilane Improvements Davis-Bacon YVage Rates 7 Oregon Highway Statewide OR] Diesel- Electric Engineer; Grizzley Operator; DRILLING: Drill Doctor; Boring Machine Operator; Driller-Percussion, Diamond, Core, Cable, Rotary and similar type; Cat Drill (John Henry); Directional Drill Operator over 20,000 lbs pullback; FLOATING EQUIPMENT: Diesel-electric Engineer; Jack Operator, elevating barges, Barge Operator, self-unloading; Piledriver Operator (not crane type) (Deckhand required); Floating Clamshelll, etc. Operator, under 3 cu. yds. (Fireman or Diesel-Electric Engineer required); Floating Crane (derrick barge) Operator, less than 30 tons; GENERATORS: Generator Operator; Diesel-electric Engineer; GUARDRAIL EQUIPMENT: Guardrail Punch Operator (all types); Guardrail Auger Operator (all types); Combination Guardrail machines, i.e., punch auger, etc.; HEATING PLANT: Surface Heater and Planer Operator; HYDRAULIC HOES EXCAVATOR: Robotic Hydraulic backhoe operator, track and wheel type up to and including 20,0000 lbs. with any or all attachments; Excavator Operator over 20,000 lbs through 80,000 lbs.; LOADERS: Belt Loaders, Kolman and Ko Cal types; Loaders Operator, front end and overhead, 25,000 lbs and less than 60,000 lbs; Elevating Grader Operator by Tractor operator, Sierra, Euclid or similar types; PILEDRIVERS: Hammer Operator; Piledriver Operator (not crane type); PIPELINE, SEWER WATER: Pipe Cleaning Machine Operator; Pipe Doping Machine Operator; Pipe Bending Machine Operator; Pipe Wrapping Machine Operator; Boring Machine Operator; Back Filling Machine Operator; REMOTE CONTROL: Concrete Cleaning Decontamination Machine Operator; Ultra High Pressure Water Jet Cutting Tool System Operator/Mechanic; Vacuum Blasting Machine Operator/mechanic; REPAIRMEN, HEAVY DUTY: Diesel Electric Engineer (Plant or Floating; Bolt Threading Machine operator; Drill Doctor (Bit Grinder); H.D. Mechanic; Machine Tool Operator; RUBBER-TIRED SCRAPERS: Rubber-tired Scraper Operator,single engine, single scraper; Self-loading, paddle wheel, auger type under 15 cu. yds.; Rubber-tired Scraper Operator, twin engine; Rubber-tired Scraper Operator, with push-pull attachments; Self Loading, paddle wheel, auger type 15 cu. yds. and over, single engine; Water pulls, water wagons; SHOVEL, DRAGLINE, CLAMSHELL, SKOOPER OPERATOR: Diesel Electric Engineer; Stationay Drag Scraper Operator; Shovel, Dragline, Clamshell, Operator under 3 cy yds.; Grade-all Operator; SURFACE (BASE) MATERIAL: Blade mounted spreaders, Ulrich and similar types; TRACTOR-RUBBERED TIRED: Tractor operator, rubber-tired, over 50 hp flywheel; Tractor operator, with boom attachment; Rubber-tired dozers and pushers (Michigan, Cat, Hough type); Skip Loader, Drag Box; TRENCHING MACHINE: Trenching Machine operator, digging capacity over 3 ft depth; Back filling machine operator; TUNNEL: Mucking machine operator GROUP 5: ASPHALT: Extrusion Machine Operator; Roller operator (any asphalt mix); Asphalt Burner and Ashland Municipal Airport Taxilane Improvements Davis-Bacon Wage Rates 8 Oregon Highway Statewide OR] Reconditioner Operator (any type); Roto-Mill, pavement profiler, ground man; BULLDOZERS: Bulldozer operator, 20,000 lbs. or less or 100 horse or less; COMPRESSORS: Compressor Operator (any power), over 1,250 cu. ft. total capacity; COMPACTORS: Compactor Operator, including vibratory; Wagner Pactor Operator or similar type (without blade); CONCRETE: Combination mixer and Compressor Operator, gunite work; Concrete Batch Plant Quality Control Operator; Beltcrete Operator; Pumpcrete Operator (any type); Pavement Grinder and/or Grooving Machine operator (riding type); Cement Pump Operator, Fuller-Kenyon and similar; Concrete Pump Operator; Grouting Machine Operator; Concrete mixer operator, single drum, under (5) bag capacity; Cast in place pipe laying machine; maginnis Internal Full slab vibrator operator; Concrete finishing mahine operator, Clary, Johnson, Bidwell, Burgess Bridge deck or similar type; Curb Machine Operator, mechanical Berm, Curb and/or Curb and Gutter; Concrete Joint Machine Operator; Concrete Planer Operator; Tower Mobile Operator; Power Jumbo Operator setting slip forms in tunnels; Slip Form Pumps, power driven hydraulic lifting device for concrete forms; Concrete Paving Machine Operator; Concrete Finishing Machine Operator; Concrete Spreader Operator; CRANE: Helicopter Hoist Operator; Hoist Operator, single drum; Elevator Operator; A-frame Truck Operator, Double drum; Boom Truck Operator; HYDRAULIC CRANE OPERATOR: Hydraulic Boom Truck, Pittman; DRILLING: Churm Drill and Earth Boring Machine Operator; Directional Drill Operator over 20,000 lbs pullback; FLOATING EQUIPMENT: Fireman; FORKLIFT: Lull Hi-Lift Operator or similar type; Fork Lift, over 5 ton and/or robotic; HYDRAULIC HOES EXCAVATORS: Hydraulic Backhoe Operator, wheel type (Ford, John Deere, Case type); Hydraulic Backhoe Operator track type up to and including 20,000 lbs.; LOADERS: Loaders, rubber-tired type, less than 25,000 lbs; Elevating Grader Operator, Tractor Towed requiring operator or Grader; Elevating loader oeprator, Athey and similar types; OILERS: Service Oiler (Greaser); PIPELINE-SEWER WATER: Hydra hammer or simialr types; Pavement Breaker Operator; PUMPS: Pump Operator, more than 5 (any size); Pot Rammer Operator; RAILROAD EQUIPMENT: Locomotive Operator, under 40 tons; Ballast Regulator Operator; Ballast Tamper Multi-Purpose Operator; Track Liner Operator; Tie Spacer Operator; Shuttle Car Operator; Locomotive Operator, 40 tons and over; MATERIAL HAULRS: Cat wagon DJB's Volvo similar types; Conveyored material hauler; SURFACING (BASE) MATERIAL: Rock Spreaders, self-propelled; Pulva-mixer or similar types; Chiip Spreading machine operator; Lime spreading operator, construction job siter; SWEEPERS: Sweeper operator (Wayne type) self-propelled construction job site; TRACTOR-RUBBER TIRED: Tractor operator, rubber-tired, 50 hp flywheel and under; Trenching machine operator, maximum digging capacity 3 ft depth; TUNNEL: Dinkey Ashland Municipal Airport Taxilane Improvements Davis-Bacon Wage Rates 9 Oregon Highway Statewide OR1 GROUP 6: ASPHALT: Plant Oiler; Plant Fireman; Pugmill Operator (any type); Truck mounted asphalt spreader, with screed; COMPRESSORS: Compressor Operator (any power), under 1,250 cu. ft. total capacity; CONCRETE: Plant Oiler, Assistant Conveyor Operator; Conveyor Operator; Mixer Box Operator (C.T.B., dry batch, etc.); Cement Hog Operator; Concrete Saw Operator; Concrete Curing Machine Operator (riding type); Wire Mat or Brooming Machine Operator; CRANE: Oiler; Fireman, all equipment; Truck Crane Oiler Driver; A-frame Truck Operator, single drum; Tugger or Coffin Type Hoist Operator; CRUSHER: Crusher Oiler; Crusher Feederman; CRUSHER: Crusher oiler; Crusher feederman; DRILLING: Drill Tender; Auger Oiler; FLOATING EQUIPMENT: Deckhand; Boatman; FORKLIFT: Self-propelled Scaffolding Operator, construction job site (excluding working platform); Fork Lift or Lumber Stacker Operator, construction job site; Ross Carrier Operator, construction job site; GUARDRAIL EQUIPMENT: Oiler; Auger Oiler; Oiler, combination guardrail machines; Guardrail Punch Oiler; HEATING PLANT: Temporary Heating Plant Operator; LOADERS: Bobcat, skid steer (less than 1 cu yd.); Bucket Elevator Loader Operator, BarberGreene and similar types; OILERS: Oiler; Guardrail Punch Oiler; Truck Crane Oiler- Driver; Auger Oiler; Grade Oiler, required to check grade; Grade Checker; PIPELINE-SEWER WATER: Tar Pot Fireman; Tar Pot Fireman (power agitated); PUMPS: Pump Operator (any power); Hydrostatic Pump Operator; RAILROAD EQUIPMENT: Brakeman; Oiler; Switchman; Motorman; Ballast Jack Tamper Operator; SHOVEL, DRAGLINE, CLAMSHELL, SKOOPER, ETC. OPERATOR: Oiler, Grade Oiler (required to check grade); Grade Checker; Fireman; SWEEPER: Broom operator, self propelled, construction job site; SURFACING (BASE) MATERIAL: Roller Operator, grading of base rock (not asphalt); Tamping Machine operartor, mechanical, self-propelled; Hydrographic Seeder Machine Operator; TRENCHING MACHINE: Oiler; Grade Oiler; TUNNEL: Conveyor operator; Air filtration equipment operator FOOTNOTE C: HANDLING OF HAZARDOUS WAST MATERIALS - Personnel in all craft classifications subject to working inside a federally designated Hazardous Waste perimeter shall be eligible for compensation in accordance with the following group schedule relative to the level of Hazardous Waste as outline in the specific Hazardous Waste Project Site Safety Plan: H-1 Base Wage Rate when on a hazardous waste site when not outfitted with protective clothing. H-2 Class "C" Suit - Basic hourly wage rate plus $1.00 per hour, fringes plus $0.15. H-3 Class "B" Suit - Basic hourly wage rate plus $1.50 per Ashland Municipal Airport Taxilane Improvements Davis-Bacon GVage Rates 10 Oregon Highway Statewide OR] hour, fringes plus $0.15. H-4 Class "A" Suit -Basic hourly wage rate plus $2.00 per hour, fringes plus $0.15. IRON0029-004 07/01/2013 Rates Fringes IRONWORKER $ 34.12 21.35 LAB00001-006 09/01/2013 Rates Fringes Mason Tender/Hod Carrier Tenders to Bricklayers, Tile Setters, Marble Setters and Terrazzo Workers, Topping for Cement Finishers and Mortar Mixers $ 27.63 12.85 LAB00003-003 06/01/2013 ZONE 1: LABORERS (SEE FOOTNOTE C) Rates Fringes Laborers: GROUP 1 $ 26.09 12.85 GROUP 2 $ 27.09 12.85 GROUP 3 $ 22.57 12.85 Zone Differential (Add to Zone 1 rates): Zone 2 - $0.65 Zone 3 - 1.15 Zone 4 - 1.70 Zone 5 - 2.75 ZONE 1 - All jobs or projects located within 30 miles of the respective City Hall ZONE 2 - More than 30 miles and less than 40 miles from the respective City Hall ZONE 3 - More than 40 miles and less than 50 miles from the respective City Hall ZONE 4 - More than 50 miles and less than 80 miles from the respective City Hall Ashland Municipal Airport Taxilane Improvements Davis-Bacon Wage Rates 11 Oregon Highway Statewide ORI ZONE 5 - More than 80 miles from the respective City Hall. BASEPOINTS: ALBANY ASTORIA BAKER CITY BEND BURNS COOS BAY EUGENE GRANTS PASS HERMISTON KLAMATH FALLS MEDFORD PENDLETON PORTLAND ROSEBURG SALEM THE DALLES LABORER CLASSIFICATIONS GROUP 1: Applicator (including Pot Tender for same) applying protective material by hand or nozzle on utility lines or storage tanks on project, Asphalt Plant; Asphalt Spreader; Batch Weighman; Broomers; Brush Burners and Cutters; Choker Setter; Choker Splicer; Clary Power Spreader; Clean-up Laborer; Clean up Nozzleman (concrete, rock, etc); Concrete Laborer; Crusher Feeder; Curing, Concrete; Demolition, wrecking, and moving; Dopping and Wrapping Pipe; Dumpman (for Grading Crew); Erosion Control Specialist; Fine Graders; Fence Builders; Form Strippers; Guard Rail, Median Rail, Barriers, Reference Post, Guide Post, Right of Way Marker; Remote Control (Dry Pack Machine, Jackhammer, Chipping Guns, Compaction, Paving Breakers, Hand Held Concrete Saw, Demo Saw, Core Drill); Precast Concrete Setter; Pressure Washer; Railroad Track Laborer; Ribbon Setter; Rip Rap Map; Sand Blasting (Wet); Scaffold Tender; Self Propelled Concrete Buggy; Sewer Laborer; Sign Erector; Signalman; Scissor and Manlift; Skipman; Slopers; Sprayman; Stake Chaser; Stake Setter; Tamper; Timber Faller and Bucker; Tool Operators (Hand Held, Walk Behind) GROUP 2: Asbestos Removal; Asphalt Rakers, Bit Grinder, Concrete Core Drill, Concrete Pump Nozzleman, Concrete Saw Operator (Walk Behind, Walk Saw, Rail Mounted, Wire); Drill Operator; Grade Checker; Gunite Nozzleman; Hazardous Waste Laborer; High Scalers; Laser Bean (Pipe Laying); Loop Installation; Manhole Builder; Mold Remediation Laborer; Nippers and Timberman; Pipelayer; Powderman; Power Saw Operators (Bucking and Falling); Pumpcrete Nozzleman; Sand Blasting (Dry); Sewer Timberman; Tugger Operator; Vibrators; Water Blaster GROUP 3: Final Clean-up(detailed clean-up, limited to cleaning up floors, ceilings, walls, windows-prior to acceptance by the owner); Fire Watch; Landscaper; Traffic Flagger FOOTNOTE C: Ashland Municipal Airport Taxilane Improvements Davis-Bacon Wage Rates 12 Oregon Highway Statewide OR] HANDLING OF HAZARDOUS WAST MATERIALS - Personnel in all craft classifications subject to working inside a federally designated Hazardous Waste perimeter shall be eligible for compensation in accordance with the following group schedule relative to the level of Hazardous Waste as outline in the specific Hazardous Waste Project Site Safety Plan: H-1 Base Wage Rate when on a hazardous waste site when not outfitted with protective clothing. H-2 Class "C" Suit - Basic hourly wage rate plus $1.00 per hour, fringes plus $0.15. H-3 Class "B" Suit - Basic hourly wage rate plus $1.50 per hour, fringes plus $0.15. H-4 Class "A" Suit -Basic hourly wage rate plus $2.00 per hour, fringes plus $0.15. * PAIN0055-002 07/01/2013 Rates Fringes PAINTER HIGHWAY & PARKING LOT STRIPER $ 33.41 10.36 * PAIN0055-033 01/01/2014 Rates Fringes Painters: BAKER, BENTON, CLATSOP, CROOK, DESCHUTES, GRANT, GILLIAM, HARNEY, JEFFERSON, LAKE, LANE, LINN, LINCOLN, MALHEUR, MARION, POLK, TILLAMOOK, SHERMAN, UNION, WHEELER AND YAMHILL COUNTIES High work-All work 60 feet or higher $ 19.56 9.06 Painters $ 20.01 9.06 CLACKAMAS, COLUMBIA, HOOD RIVER, MULTNOMAH, MORROW, UMATILLA, WALLOWA, WASCO AND WASHINTON COUNTIES High work-All work 60 feet or higher $ 21.76 9.06 Painters $ 21.01 9.06 JACKSON AND KLAMATH Ashland Municipal Airport Taxilane Improvements Davis-Bacon Wage Rates 13 Oregon Highway Statewide OR] COUNTIES High Work-All Work 60 feet or higher $ 17.56 9.06 Painters $ 16.81 9.06 PLAS0555-001 06/01/2012 ZONE 1: Rates Fringes Cement Masons: (ZONE 1) CEMENT MASONS DOING BOTH COMPOSITION/POWER MACHINERY AND SUSPENDED/HANGING SCAFFOLD..$ 29.98 17.76 CEMENT MASONS ON SUSPENDED, SWINGING AND/OR HANGING SCAFFOLD $ 30.58 17.76 CEMENT MASONS $ 30.58 17.76 COMPOSITION WORKERS AND POWER MACHINERY OPERATORS...$ 31.18 17.76 Zone Differential (Add To Zone 1 Rates): Zone 2 - $0.65 Zone 3 - 1.15 Zone 4 - 1.70 Zone 5 - 3.00 BASE POINTS: BEND, CORVALLIS, EUGENE, MEDFORD, PORTLAND, SALEM, THE DALLES, VANCOUVER ZONE 1: Projects within 30 miles of the respective city hall ZONE 2: More than 30 miles but less than 40 miles from the respective city hall. ZONE 3: More than 40 miles but less than 50 miles from the respective city hall. ZONE 4: More than 50 miles but less than 80 miles from the respective city hall. ZONE 5: More than 80 miles from the respective city hall TEAM0037-004 06/01/2013 ZONE 1: TRUCK DRIVERS (See Footnote C): Rates Fringes Ashland Municipal Airport Taxilane Improvements Davis-Bacon Wage Rates 14 Oregon Highway Statewide ORI Truck drivers: GROUP 1 $ 26.90 13.75 GROUP 2 $ 27.02 13.75 GROUP 3 $ 27.15 13.75 GROUP 4 $ 27.41 13.75 GROUP 5 $ 27.63 13.75 GROUP 6 $ 27.99 13.75 GROUP 7 $ 27.99 13.75 Zone Differential (add to Zone 1 rates): Zone 2 - $0.65 Zone 3 - 1.15 Zone 4 - 1.70 Zone 5 - 2.75 Zone 1 - All jobs or projects located within 30 miles of the respective City Hall Zone 2 - More than 30 miles and less than 40 miles from the respective City Hall Zone 3 - More than 40 miles and less than 50 miles from the respective City Hall Zone 4 - More than 50 miles and less than 80 miles from the respective City Hall Zone 5 - More than 80 miles from the respective City Hall BASEPOINTS: ALBANY ASTORIA BAKER BEND BINGEN BROOKINGS BURNS COOS BAY CORVALLIS EUGENE GOLDENDALE GRANTS PASS HERMISTON HOOD RIVER KLAMATH FALLS LAGRANDE LAKEVIEW LONGVIEW MADRAS MEDFORD MCMINNVILLE OREGON CITY NEWPORT ONTARIO PENDLETON PORTLAND PORT ORFORD REEDSPORT ROSEBURG SALEM THE DALLES TILLAMOOK VANCOUVER TRUCK DRIVER CLASSIFICATIONS GROUP 1: A-frame or hydra-lift truck w/load bearing surface; Articulated dump truck; Battery rebuilders; Bus or manhaul driver; Concrete buggies (power operated); Concrete pump truck; Dump trucks, side, end and bottom dumps, including semi-trucks and trains or combinations thereof: up to and including 10 cu. yds.; Lift jitneys, fork lifts (all sizes in loading, unloading and transporting material on job site); Loader and/or leverman on concrete dry batch plant (manually operated); Lubrication man, fuel truck driver, tireman, wash rack, steam cleaner or combination; Pilot Ashland Municipal Airport Taxilane Improvements Davis-Bacon Wage Rates 15 Oregon Highway Statewide OR] car; Pickup truck; Slurry truck driver or leverman; Solo flat bed and misc. body truck, 0-10 tons; Team drivers.; Tireman; Transit mix and wet or dry mix trucks: 5 cu yds. and under; Water wagons (rated capacity) up to 3,000 gallons GROUP 2: Boom truck/hydra-lift or retracting crane; Challenger; Dumpsters or similar equipment-all sizes; Dump trucks/articulated dumps 6 cu to 10 cu.; Flaherty spreader driver or leverman; Low bed equipment, flat bed semi-truck and trailer or doubles transporting equipment or wet or dry materials; Lumber carrier, driver-straddle carrier (used in loading, unloading and transporting of materials on job site); Oil distributor driver or leverman; Transit mix and wet or dry mix trucks: over 5 cy yds and including 7 cu. yds; Vacuum trucks; Water Wagons (rated capacity) over 3,000 to 5,000 gallons GROUP 3: Ammonia nitrate distributor driver; Dump trucks, side, end and bottom dumps, including semi-trucks and trains or combinations thereof: over 10 cu. yds. and including 30 cu. yds., includes articulated dump trucks; Self-Propelled street sweeper; Transit mix and wet or dry mix trucks, over 7 cu. yds. and including 11 cu. yds.; truck mechanic-Welder-Body repairman; Utility and clean-up truck; Water wagons (rated capacity) 5,000 to 10,000 gallons. GROUP 4: Asphalt Bruner; Dump trucks, side, end and bottom dumps, including semi-trucks and trains or combinations thereof: over 30 cu. yds. and including 50 cu. yds. includes articulated dump trucks; Fire guard; Transit Mix and Wet or Dry Mix Trucks, over 11 cu. yds. and including 15 cu. yds.; Water Wagon (rated capacity) over 10,000 gallons to 15,000 gallons GROUP 5: Composite Crewman; Dump trucks, side, end and bottom dumps, including semi-trucks and trains or combinations thereof: over 50 cu. yds. and including 60 cu. yds., includes articulated dump trucks GROUP 6: Bulk cement spreader w/o auger; Dry Pre-Batch concrete mix trucks; Dump trucks, side, end and bottom dumps, including semi-trucks and trains of combinations thereof: over 60 cu. yds. and including 80 cu. yds. and includes articulated dump trucks; Skid truck GROUP 7: Dump trucks, side, end and bottom dumps, including semi-trucks and trains or combinations thereof: over 80 cu. yds. and including 100 cu. yds. includes articulated dump trucks; Industrial lift truck (mechanical tailgate) FOOTNOTE C: HANDLING OF HAZARDOUS WAST MATERIALS -(LABORERS, POWER Ashland Municipal Airport Taxilane Improvements Davis-Bacon Wage Rates 16 Oregon Highway Statewide ORI EQUIPMENT OPERATORS, AND TRUCK DRIVERS): Personnel in all craft classifications subject to working inside a federally designated Hazardous Waste perimeter shall be eligible for compensation in accordance with the following group schedule relative to the level of Hazardous Waste as outline in the specific Hazardous Waste Project Site Safety Plan: H-1 Base Wage Rate when on a hazardous waste site when not outfitted with protective clothing. H-2 Class "C" Suit - Basic hourly wage rate plus $1.00 per hour, fringes plus $0.15. H-3 Class "B" Suit - Basic hourly wage rate plus $1.50 per hour, fringes plus $0.15. H-4 Class "A" Suit -Basic hourly wage rate plus $2.00 per hour, fringes plus $0.15. SUOR1991-003 04/01/1991 Rates Fringes Timber Sales Roads: LABORERS $ 8.35 4.30 OPERATING ENGINEERS $ 10.37 4.15 POWER SAW, DRILLER, POWDERMAN $ 9.12 4.30 TEAMSTERS $ 9.74 3.74 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union. Ashland Municipal Airport Taxilane Improvements Davis-Bacon Wage Rates 17 Oregon Highway Statewide ORl Union Identifiers An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example. Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates. 0000/9999: weighted union wage rates will be published annually each January. Non-Union Identifiers Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date. Survey wage rates will remain in effect and will not change until a new survey is conducted. WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a wage and Hour Division letter setting forth a position on Ashland Municipal Airport Taxilane Improvements Davis-Bacon Wage Rates 18 Oregon Highway Statewide OR] a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION Ashland Municipal Airport Taxilane Improvements Davis-Bacon Wage Rates 19 Oregon Highway Statewide ORI General Decision Number: OR140056 04/25/2014 OR56 Superseded General Decision Number: OR20130056 State: Oregon Construction Type: Heavy County: Jackson County in Oregon. HEAVY CONSTRUCTION PROJECTS Modification Number Publication Date 0 01/03/2014 1 01/17/2014 2 04/25/2014 CARP0001-036 06/01/2012 Rates Fringes Carpenters: Including Form Work $ 32.61 14.44 ELEC0659-012 01/01/2014 Rates Fringes ELECTRICIAN $ 30.27 14.96 ENGI0701-032 01/01/2014 Rates Fringes Power equipment operators: GROUP 1 $ 38.25 13.70 GROUP 1A $ 40.16 13.70 GROUP 1B $ 42.08 13.70 GROUP 2 $ 36.56 13.70 GROUP 3 $ 35.54 13.70 GROUP 4 $ 34.56 13.70 GROUP 5 $ 33.43 13.70 GROUP 6 $ 30.34 13.70 POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: CRANE: Helicopter Operator, when used in erecting work; Whirley Operator, 90 ton and over; LATTICE BOOM CRANE: Operator 200 tons through 299 tons, and/or over 200 feet boom; HYDRAULIC CRANE: Hydraulic Crane Operator 90 tons through 199 tons with luffing or tower attachments; GROUP 1A: HYDRAULIC CRANE: Hydraulic Operator, 200 tons and over (with luffing or tower attachment); LATTICE BOOM Ashland Municipal Airport Taxilane Improvements Davis-Bacon tiVage Rates I Oregon Heavy Construction - Jackson County OR56 CRANE: Operator, 200 tons through 299 tons, with over 200 feet boom; GROUP 1B: LATTICE BOOM CRANE: Operator, 300 tons through 399 tons with over 200 feet boom; Operator 400 tons and over GROUP 2: CRANE: Cableway Operator, 25 tons and over; HYDRAULIC CRANE: Hydraulic crane operator 90 tons through 199 tons (without luffing or tower attachment); TOWER/WHIRLEY OPERATOR: Tower Crane Operator; Whirley Operator, under 90 tons; LATTICE BOOM CRANE: 90 through 199 tons and/or 150 to 200 feet boom; HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (with luffing or tower attachment); Rubber tired scraper with tandom scrapers; Bulldozer over 120,000 lbs and above; CRANE: Derrick Barge Operator 30 ton but less than 150 ton; Blade Operator-Robotic GROUP 3: HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (without luffing or tower attachment); LATTICE BOOM CRANES: Lattice Boom Crane-50 through 89 tons (and less than 150 feet boom); Rubber Tired Scraper: with tandom scrapers; self loading, paddle wheel, auger type, finish and/or 2 or more units; Bulldozer over 70,000 lbs up to and including 120,000 lbs GROUP 4: CRANE: Hydraulic Crane Operator, under 50 tons; LATTICE BOOM CRANE OPERATOR: Lattice Boom Crane Operator, under 50 tons; TRACKHOE-ROBOTIC: up to and including 20,0000 lbs. with any or all attachments; DRILLING: Churm Drill and Earth Boring Machine Operator; Directional Drill Operator over 20,000 lbs pullback; CRANE: Chicago boom and similar types; Boom type lifting device, 5 ton capacity or less; Asphalt Paver; Rubber-Tired Scraper, single engine, single scraper; Compactor-Self Propelled; Bulldozer over 20,000 lbs and more than 100 horse up to 70,000 lbs; CRANE: Derrick Barge Operator less than 30 ton; Piledriver; Screed; Blade operator GROUP 5: TRACKHOE HYDRAULIC: up to and including 20,000 lbs.; Boom truck operator; DRILLING: Churm Drill and Earth Boring Machine Operator; Directional Drill Operator less than 20,000 lbs pullback; Concrete Pumper; Concrete Paver: Compactor; Forklift over 5 ton, Bulldozer 20,000 lbs or 100 horses or less; Mixer operator; Roller GROUP 6: Oiler; Bobcat/Skid Loader; Grade Checker; Crane oiler; Asphalt Spreader; Broom Operator; Forklift; Roller (non-asphalt) Zone Differential (add to Zone 1 rates): Zone 2 - $3.00 Zone 3 - $6.00 Ashland Municipal Airport Taxilane Improvements Davis-Bacon Wage Rates 2 Oregon Heavy Construction - Jackson County OR56 For the following metropolitan counties: MULTNOMAH; CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA; CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS INDICATED: All jobs or projects located in Multnomah, Clackamas and Marion Counties, West of the western boundary of Mt. Hood National Forest and West of Mile Post 30 on Interstate 84 and West of Mile Post 30 on State Highway 26 and West of Mile Post 30 on Highway 22 and all jobs or projects located in Yamhill County, Washington County and Columbia County and all jobs or porjects located in Clark & Cowlitz County, Washington except that portion of Cowlitz County in the Mt. St. Helens "Blast Zone" shall receive Zone I pay for all classifications. All jobs or projects located in the area outside the identified boundary above, but less than 50 miles from the Portland City Hall shall receive Zone II pay for all classifications. All jobs or projects located more than 50 miles from the Portland City Hall, but outside the identified border above, shall receive Zone III pay for all classifications. For the following cities: ALBANY; BEND; COOS BAY; EUGENE; GRANTS PASS; KLAMATH FALLS; MEDFORD; ROSEBURG All jobs or projects located within 30 miles of the respective city hall of the above mentioned cities shall receive Zone I pay for all classifications. All jobs or projects located more than 30 miles and less than 50 miles from the respective city hall of the above mentioned cities shall receive Zone II pay for all classifications. All jobs or projects located more than 50 miles from the respective city hall of the above mentioned cities shall receive Zone III pay for all classifications. IRON0029-011 07/01/2013 Rates Fringes IRONWORKER (Ornamental, Reinforcing, and Structural) $ 34.12 21.35 LAB00001-030 09/01/2013 Rates Fringes Laborers: (Mason Ashland Municipal Airport Taxilane Improvements Davis-Bacon Wage Rates 3 Oregon Heavy Construction - Jackson County OR56 Tender-Cement/Concrete) $ 27.63 12.85 LAB00001-031 06/01/2013 Rates Fringes Laborers: (Mason Tender-Brick) $ 27.63 12.85 LAB00003-021 06/01/2013 Rates Fringes Laborers: GROUP 1 $ 26.09 12.85 GROUP 2 $ 27.09 12.85 GROUP 3 $ 22.57 12.85 LABORER CLASSIFICATIONS GROUP 1: Blaster, Demolition; General Laborer; Chain Saw GROUP 2: Vibrating Plate GROUP 3: Flagger, Traffic Control-Cone Setter * PAIN0055-030 07/01/2013 Rates Fringes Painters: Including Brush and Roller..$ 18.01 8.83 PLAS0555-006 06/01/2012 Rates Fringes CEMENT MASON/CONCRETE FINISHER 29.98 17.76 TEAM0037-011 06/01/2013 Rates Fringes TRUCK DRIVER GROUP 1 $ 26.90 13.75 TRUCK DRIVERS CLASSIFICATIONS GROUP 1: Flatbed Truck SUOR2009-054 11/23/2009 Rates Fringes Ashland Municipal Airport Taxilane Improvements Davis-Bacon Wage Rates 4 Oregon Heavy Construction - Jackson County OR56 HIGHWAY/PARKING LOT STRIPING: Painter $ 23.79 6.57 LABORER: Asphalt Spreader $ 22.18 9.39 LABORER: Form-Stripping $ 19.27 6.32 LABORER: Grade Checker $ 20.02 7.22 LABORER: Landscape $ 10.60 1.80 LABORER: Pipelayer $ 18.57 6.24 OPERATOR: Backhoe $ 21.68 5.88 OPERATOR: Excavator $ 21.61 7.05 OPERATOR: Loader $ 22.91 7.72 OPERATOR: Mechanic $ 26.57 9.97 OPERATOR: Tractor $ 20.00 0.73 PAINTER: Spray $ 19.77 0.00 TRUCK DRIVER: Dump Truck $ 16.00 4.33 TRUCK DRIVER: Lowboy Truck $ 17.07 5.50 TRUCK DRIVER: Off the Road Truck $ 21.86 7.08 TRUCK DRIVER: Water Truck $ 18.41 6.58 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical Ashland Municipal Airport Taxilane Improvements Davis-Bacon YYage Rates 5 Oregon Heavy Construction - Jackson County OR56 order of "identifiers" that indicate whether the particular rate is union or non-union. Union Identifiers An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example. Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates. 0000/9999: weighted union wage rates will be published annually each January. Non-Union Identifiers Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date. Survey wage rates will remain in effect and will not change until a new survey is conducted. WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination Ashland Municipal Airport Taxilane Improvements Davis-Bacon Wage Rates 6 Oregon Heavy Construction - Jackson County OR56 * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION Ashland Municipal Airport Taxilane Improvements Davis-Bacon Wage Rates 7 Oregon Heavy Construction - Jackson County OR56 00820 Wage Rate Affidavit WAGE RATE AFFIDAVIT STATE OF OREGON ) ss COUNTY OF JACKSON ) I, the undersigned, having been duly sworn, depose, say and certify that in connection with the performance of the work, payment for which this voucher is submitted, I have paid the following rate per hour for each classification of laborers, workers, or mechanics, as indicated upon the attached list, now referred to and by such reference incorporated in and made an integral part hereof, for all such employed in the performance of such work; and no laborer, worker, or mechanic so employed upon such work has been paid less than the prevailing rate of wages or less than the minimum rate of wages as specified in the principal contract; that I have read the above and foregoing statement and certificate, know the contents thereof and the substance as set forth therein is true to my knowledge and belief. Contractor Company Name Contractor's Signature Subscribed and sworn to before me on this day of 120-. Notary Public in and for the State of residing at: My commission expires: Ashland Municipal Airport Taxilane Improvements I Wage Rate Affidavit Page 1 / 1 . C I T Y OF ASHLAND DATE PO NUMBER 20 E MAIN ST. 8/28/2014 12469 ASHLAND, OR 97520 (541) 488-5300 VENDOR: 013200 SHIP TO: Ashland Public Works KNIFE RIVER MATERIALS, LTM (DBA) (541) 488-5587 PO BOX 1145 51 WINBURN WAY MEDFORD, OR 97501 ASHLAND, OR 97520 FOB Point: Req. No.: Terms: Net 15 davs Dept.: Req. Del. Date: Contact: Scott Fleury Special Inst: Confirming? No Quanti Unit Description Unit Price Ext. Price Municipal Airport Taxilane Extension 397,793.00 Aqreement signed by City Auqust 25, 2014 Approved by Council Auqust 5, 2014 SUBTOTAL 397 793.00 BILL To: Account Payable TAX 0.00 20 EAST MAIN ST FREIGHT 0.00 541-552-2010 TOTAL 397,793.00 ASHLAND, OR 97520 Account Number Project Number Amount Account Number Project Number Amount E 410.08.24.00.70420 E 201312.120 397,793.00 VENDOR COPY FORM#3 CITY OF ASHLAND REQUISITION Date of request: zS O I y Required date for delivery: Ab*p Vendor Name I~vEZ /1nA~E~I+~~S Address, City, State, Zip Po e;t.'J,4 tt45 rJL oe%ol Contact Name & Telephone Number F~-tcuIP r ~ q32 _ 2~(oZ Fax Number .-,4t - 4S V4 SOURCING METHOD ❑ Exempt from Competitive Bidding ❑ Emergency ❑ Reason for exemption: Invitation to Bid (Copies on file) ❑ Form #13, Written findings and Authorization ❑ AMC 2.50 Date approved by Council: S ❑ Written quote or proposal attached ❑ Written quote or proposal attached ❑ Small Procurement Cooperative Procurement Less than $5,000 ❑ Request for Proposal (Copies on file) ❑ State of Oregon ❑ Direct Award Date approved by Council: Contract # ❑ Verbal/Written quote(s) or proposal(s) ❑ State of Washington Intermediate Procurement ❑ Sole Source Contract # GOODS & SERVICES ❑ Applicable Form (#5,6, 7 or 8) ❑ Other government agency contract $5,000 to $100,000 ❑ Written quote or proposal attached Agency ❑ (3) Written quotes and solicitation attached ❑ Form #4, Personal Services $5K to $75K Contract # PERSONAL SERVICES El Special Procurement Intergovernmental Agreement $5,000 to $75,000 ❑ Form #9, Request for Approval ❑ Agency ❑ Less than $35,000, by direct appointment ❑ Written quote or proposal attached Date original contract approved by Council: ❑ (3) Written proposals/written solicitation Date approved by Council: (Date) ❑ Form #4, Personal Services $5K to $75K Valid until: Date Description of SERVICES Total Cost $ 3~~ ~`t3 Item # Quantity Unit Description of MATERIALS Unit Price Total Cost Per attached quotelproposal TOTAL COST Project Number Account Number Account Number,410 -46 -Zq -CD *+0420 ? Account Number Expenditure must be charged to the appropriate account numbers for the financials to accurately reflect the actual expenditures. IT Director in collaboration with department to approve all hardware and software purchases: ITDirector Date Support-Yes/No By signing this requisition form, I certify that the City's public contracting requirements have been satisfied. Employee: C Department Head \ (Equal to or g ,eaterthan $5,000) Department erviso City Administrator:' a~ (Equal to or greater than $25,000) Funds appropriated for current fiscal year. K' NO Finance Director- (Equal to orgrearthan $5,000) Date Comments: CITY OF ASHLAND Council Communication August 5, 2014 Business Meeting Award of a Construction Contract to the Apparent Low Bidder for the Ashland Municipal Airport Taxilane Extension FROM: Scott A. Fleury, Engineering Services Manager, Public Works/Engineering, fleurys@ashland.or.us SUMMARY Before the Council is a construction contract for a taxilane extension at the Ashland Municipal Airport. On June 26, 2014 bids submitted for the taxilane extension were opened and publicly read. One responsive bid was received for the project, provided by Knife River Materials. BACKGROUND AND POLICY IMPLICATIONS: Bidding Procedure: The taxilane extension project was publicly bid on June 3, 2014. The project plans and specifications were placed on the Oregon Procurement Information Network (ORPIN) and the project was advertised in the Mail Tribune and the Daily Journal of Commerce. A non-mandatory pre-bid meeting was held on June 17, to answer contractor's specific questions. Three contractors were present for the meeting. Bids were opened on June 26, at 2:00 pm with one contractor responding with an appropriate bid in the amount of $397,793. Bidding information is shown on the attached proposed summary. The bid and supporting documentation were subsequently reviewed by the consulting engineer and approved by the Federal Aviation Administration (FAA). Project History: Following master plan recommendations and meeting the goals of the Airport Commission, staff created and advertised a request for proposal for engineering services for the taxilane extension and security fencing project. The primary goals of the Airport Commission are to increase operating revenue and provide for a safe facility. The primary method of increasing revenue is through hangar rentals and ground leases. At any given time there are 15 to 25 individuals on a waiting list to rent or lease an enclosed hangar. The proposed construction of the taxilane is the last pavement extension that will allow for construction of new hangars to meet demand. The taxilane extension project would allow for the construction of approximately 50 new hangars and provide a significant revenue increase, reference map attachment. The project also enhances safety onsite for aircraft taxiing to the runway by providing an alternate travel route that will minimize potential incursions. Project Engineering: At the January 7, 2014 meeting the engineering design contract was awarded to Precision Approach Engineering (PAE). PAE was tasked with the design development and future construction administration of the project. The project required a topographic site survey, biological and cultural resources review along with design of the taxilane to meet FAA requirements. Page 1 of 2 IMA-al CITY OF ASHLAND http://ashland.or.us/Agendas.asp?Displqy=Minutes&AMID=5542 The final design includes the taxilane extension, storm drains, sleeves for future water lines and electrical conduit connections. All design work was approved by the City and FAA prior to public bidding of the associated construction work. FISCAL IMPLICATIONS: The current estimated project total is $640,767. This estimate includes engineering, construction and administration fees. Based on a 90% grant award of $576,690 the City's obligation will be $64,077. The City is required to contribute the 10% in the form of a hard match. The Airport fund will pay the 10% match through an interfund loan with the equipment fund. STAFF RECOMMENDATION AND REQUESTED ACTION: Staff recommends that the Council accept the bid and authorize the award of contract to Knife River Materials for the taxilane extension project. SUGGESTED MOTION: Move to approve the bid and award of contract to Knife River Materials in the amount of $397,793 for the Airport Taxilane Extension Project. ATTACHMENTS: 1. Summary of bid 2. Taxilane extension map Page 2 of 2