Loading...
HomeMy WebLinkAboutA_485_PA-2014-02206 T Y 0 February 20, 2015 Notice of Final Decision On February 20, 2015, the Community Development Director approved the request for the following: i Planning Action: 2014-02206 Subject Property: 485 A Street Applicant: Steve & Kathy Hoxmeier Description: A request for Site Design Review approval to add approximately 200 sq. feet to the existing mixed use commercial building located at 485 A Street. COMPREHENSIVE PLAN DESIGNATION: Employment; ZONING: E-1 ASSESSOR'S MAP: 39 1 E 04AB; TAX LOTS: 6500 The Community Development Director's decision becomes final and is effective on the 13th day after the Notice of Final Decision is mailed. Approval is valid for a period of one year and all conditions of approval identified on the attached Findings are required to be met prior to project completion. The application, all associated documents and evidence submitted, and the applicable criteria are available for review at the Ashland Community Development Department, located at 51 Winburn Way. Copies of file documents can be requested and are charged based on the City of Ashland copy fee schedule. Prior to the final decision date, anyone who was mailed this Notice of Final Decision may request a reconsideration of the action as set forth in the Ashland Land Use Ordinance (ALUO) 18.108.070(B)(2)(b) and/or file an appeal to the Ashland Planning Commission as provided in ALUO 18.108.070(B)(2)(c). The ALUO sections covering reconsideration and appeal procedures are attached. The appeal may not be made directly to the Oregon Land Use Board of Appeals. If you have any questions regarding this decision, please contact Amy Gunter in the Community Development Department at (541) 488-5305. cc: Parties of record and property owners within 200 ft COMMUNITY DEVELOPMENT DEPARTMENT Tel: 541-488-5305 51 Winburn Way Fax: 541-552-2050 7 Ashland, Oregon 97520 TTY: 800-735-2900 www,ash1,md.oi-.us L /(XJ SECTION 18.108.070(6)2 Effective Date of Decision and Appeals. B. Actions subject to appeal: 2. Type I Planning Actions. a. Effective Date of Decision. The final decision of the City for planning actions resulting from the Type I Planning Procedure shall be the Staff Advisor decision, effective on the 13th day after notice of the decision is mailed unless reconsideration of the action is approved by the Staff Advisor or appealed to the Commission as provided in section 18.108.070(B)(2)(c). b. Reconsideration. The Staff Advisor may reconsider Type I planning actions as set forth below, i. Any party entitled to notice of the planning action, or any City Agency may request reconsideration of the action after the decision has been made by providing evidence to the Staff Advisor that a factual error occurred through no fault of the party asking for reconsideration, which in the opinion of the staff advisor, might affect the decision. Reconsideration requests are limited to factual errors and not the failure of an issue to be raised by letter or evidence during the opportunity to provide public input on the application sufficient to afford the Staff Advisor an opportunity to respond to the issue prior to making a decision, ii. Reconsideration requests shall be received within five (5) days of mailing. The Staff Advisor shall decide within three (3) days whether to reconsider the matter. iii. If the Planning Staff Advisor is satisfied that an error occurred crucial to the decision, the Staff Advisor shall withdraw the decision for purposes of reconsideration. The Staff Advisor shall decide within ten (10) days to affirm, modify, or reverse the original decision. The Staff Advisor shall send notice of the reconsideration decision to affirm, modify, or reverse to any party entitled to notice of the planning action. iv. If the Staff Advisor is not satisfied that an error occurred crucial to the decision, the Staff Advisor shall deny the reconsideration request. Notice of denial shall be sent to those parties that requested reconsideration. C. A eal. i. Within twelve (12) days of the date of the mailing of the Staff Advisor's final decision, including any approved reconsideration request, the decision may be appealed to the Planning Commission by any party entitled to receive notice of the planning action. The appeal shall be submitted to the Planning Commission Secretary on a form approved by the City Administrator, be accompanied by a fee established pursuant to City Council action, and be received by the city no later than 4:30 p.m. on the 12th day after the notice of decision is mailed. ii. If an appellant prevails at the hearing or upon subsequent appeal, the fee for the initial hearing shall be refunded. The fee required in this section shall not apply to appeals made by neighborhood or community organizations recognized by the city and whose boundaries include the site. iii. The appeal shall be considered at the next regular Planning Commission or Hearings Board meeting. The appeal shall be a de novo hearing and shall be considered the initial evidentiary hearing required under ALUO 18.108.050 and ORS 197.763 as the basis for an appeal to the Land Use Board of Appeals. The Planning Commission or Hearings Board decision on appeal shall be effective 13 days after the findings adopted by the Commission or Board are signed by the Chair of the Commission or Board and mailed to the parties. iv. The appeal requirements of this section must be fully met or the appeal will be considered by the city as a jurisdictional defect and will not be heard or considered. COMMUNITY DEVELOPMENT DEPARTMENT Tel: 541488-5305 51 Winburn Way Fax: 541-552-2050 1 Ashland, Oregon 97520 TTY: 800-735-2900 evww.ashland.or.us A", ASHLAND PLANNING DIVISION FINDINGS & ORDERS PLANNING ACTION: PA-2014-02206 SUBJECT PROPERTY: 485 A Street APPLICANT: Steve & Kathy Hoxmeier DESCRIPTION: A request for Site Design Review approval to add approximately 200 sq. feet to the existing mixed use commercial building located at 485 A Street. COMPREHENSIVE PLAN DESIGNATION: Employment; ZONING: E-1 ASSESSOR'S MAP: 39 lE 04AB; TAX LOTS: 6500 SUBMITTAL DATE: January 16, 2015 DEEMED COMPLETE DATE: January 27, 2015 STAFF APPROVAL DATE: February 19, 2015 FINAL DECISION DATE: March 4, 2015 APPROVAL EXPIRATION DATE: March 4, 2016 DECISION: The application is a request for a Site Review approval to add approximately 200 square feet to the rear of the existing building to add storage area for the property at 485 A Street. Additionally, the existing porch facing Fourth Street is proposed to be extended across the fagade of the existing structure including the new addition. No additional modifications to the site beyond the proposal are being considered with this application, and any future development or modification of the site would require a separate Site Review application. The subject property is located on the northwest corner of the intersection of A Street and Fourth Street, within the Railroad Addition Historic District and just south of the Southern Pacific Railroad right-of-way. The lot itself was part of the Southern Pacific Railroad property that was partitioned in 1993, and comprises approximately 14,982 square feet in area. The site is relatively flat and has no significant natural features. The eastern portion of the site currently contains a mixed-use building oriented toward Fourth Street. The building has served as a yoga studio and retail space for some time, and is considered "non-historic/non-contributing" in the Railroad Addition Historic District inventory document. This building was originally constructed in 1995 at 1,104 square feet, and was supplemented with an addition consisting of 924 square feet of downstairs commercial space and 924 square feet of upstairs residential space that was approved as part of Planning Action #2000-120. The proposed Site Review approval to enclose a .small porch area at the rear of the property to additional office area (PA2011-0244). The proposal is to add approximately 200 square feet to the north side of the existing building. Additionally, the existing front porch will be extended across the fa9ade of the building to the north. The applicant has proposed to construct the addition and porch extension with the same materials including siding, window and door materials that match the existing structure. The existing structure and site complies with the Site Review chapter and the Site Design and Use i PA #2014-02206 485 A St./adg Page 1 Standards and the proposed addition will also comply. Utilities exist on the parcel to serve the existing uses and the proposed addition 200 square feet. There are 16 parking spaces not including the on-street spaces to serve the existing and proposed future uses of the site. Access from the parking area is a raised sidewalk extending from the rear to the sidewalk along Fourth Street, and a trash and recycling enclosure is situated on the property's northwest corner. Vehicular access to the parking lot is from A Street via a 20-foot wide driveway located adjacent to the driveway serving the Grange Co-Op to the west. Overall site and parking lot landscaping meet or exceed required coverage percentages. Access to existing and future buildings will be from a five-foot walkway along the south and east perimeters of the parking lot. Covered bicycle parking for four bicycles are provided at the southeast corner of the lot, with two bicycle spaces located adjacent to the plaza space at the corner of Fourth and A Streets. A Street is an Avenue or Collector Street; and Fourth Street is a Neighborhood Street. Both are paved, with curbs and gutters in place in the vicinity of the subject property, and sidewalks are installed along the subject property's frontages to satisfy conditions of the previous planning approval. Utilities including water, sanitary sewer, storm drainage and electric are in place on the property and in the adjacent rights-of-way to serve the project. The Historic Commission considered the request at their February 4, 2015 meeting. Commissioners noted that the applicant's efforts in the past have been generally well- received. The Commission recommended approval of the request. The criteria for Site Review approval are described in AMC Chapter 18.72.070 as follows: A. All applicable City ordinances have been met or will be niet by the proposed development. B. All requirements of the Site Review Chapter have been met or will be n7et. C. The development complies with the Site Design Standards adopted by the City Council for implementation of this Chapter. D. That adequate capacity of City facilities for water, sewer, paved access to and through the developnent, electricity, urban storm drainage, and adequate transportation can and will be provided to and through the subject property. The application with the attached conditions complies with all applicable City ordinances. Planning Action #2014-02206 is approved with the following conditions. Further, if any one or more of the following conditions are found to be invalid for any reason whatsoever, then Planning Action #2014-02206 is denied. The following are the conditions and they are attached to the approval: 1) That all proposals of the applicants shall be conditions of approval unless otherwise modified herein. PA #2014-02206 4&5 A St./adg Page 2 2) That all conditions of Planning Action #2000-120 and 2007-00579 shall remain in effect unless specifically modified -herein. i 3) That prior to the issuance of a building permit: a) The plans submitted for the building permit shall be in substantial conformance with those approved as part of this application. If the plans submitted for the building permit are not in substantial conformance with those approved as part of this application, an application to modify the Site Review shall be submitted and approved prior to issuance of a building permit. 4) That the exterior siding, windows, doors, porch railing material and colors shall match the existing structure. . 2~ . Z-0 r 5illM ar,Director Date nt of Community Development PA #2014-02206 485 A St./adg Page 3 PA-2014-02206 391 E09AB 9500 PA-2014-02206 391 E09AB 9700 PA-2014-02206 391 E09AB 6501 BHADRA TANIMA ET AL BRISCOE JAMES CHRISTOPHER BRUNNER PETER B TRUSTEE ET AL 2651 NEWCASTLE RD TRUSTEE 566 FARIVIEW ST NEWCASTLE, CA 95658 6625 CAMINITO BLYTHEFIELD ASHLAND, OR 97520 LA JOLLA, CA 92037 PA-2014-02206 391 E09AB 6604 PA-2014-02206 391 E09AB 5300 PA-2014-02206 391 E09AB 6603 COMSTOCK PAUL DAVIS CAROL HORN TRSTEE FBO FOWLER GERARD STEPHEN TRUSTEE PO BOX 35 8003 S LAKE DR 309 KENT ST PHOENIX, OR 97535 DABLIN, CA 94568 ASHLAND, OR 97520 L , PA-2014-02206 391 E09AB 10000 PA-2014-02206 391 E09AB 10200 PA-2014-02206 391 E09AB 6500 GARSON THOMAS UCYNTHIA H GRANGE CO-OP SUPPLY ASN INC HOXMEIER STEVE/KATHY P O BOX 966 P O BOX 3637 435 B ST ASHLAND, OR 97520 CENTRAL POINT, OR 97502 ASHLAND, OR 97520 PA-2014-02206 391 E09AB 9600 PA-2014-02206 391 E09AB 5400 PA-2014-02206 391 E09AB 5500 JONES LARRY D PALACE PROPERTIES LLC PAPEN FRANK CONRAD TRUSTEE 1188 TYLER CREEK RD PO BOX 3606 267 MEADE ASHLAND, OR 97520 CENTRAL POINT, OR 97502 ASHLAND, OR 97520 PA-2014-02206 391 E09AB 5200 PA-2014-02206 391 E09AB 6502 PA-2014-02206 391 E09AB 9200 POWELL GARY DEAN SACHS JAMES D TRUSTEE ET AL TRES STARS LLC 562 A ST 253 THIRD ST 243 FOURTH ST ASHLAND, OR 97520 ASHLAND, OR 97520 ASHLAND, OR 97520 PA-2014-02206 391 E09AB 90005 PA-2014-02206 391 E09BA 14800 PA-2014-02206 391 E09AB 5600 TTW LLC UNION PACIFIC RR CO WELCH WILLIAM L TRUSTEE ET AL 117 ALMOND ST 1400 DOUGLAS ST STOP 1640 260 4TH ST ASHLAND, OR 97520 OMAHA, NE 68179 ASHLAND, OR 97520 485 A Street 2/20/2015 NOD 18 I AFFIDAVIT OF MAILING STATE OF OREGON ) County of Jackson ) The undersigned being first duly sworn states that: 1. I am employed by the City of Ashland, 20 East Main Street, Ashland, Oregon 97520, in the Community Development Department. 2. On February 20, 2015 1 caused to be mailed, by regular mail, in a sealed envelope with postage fully prepaid, a copy of the attached planning action notice to each person listed on the attached mailing list at such addresses asset forth on this list under each person's name for Planning Action #2014-02206, 485 A Street. ~&n M . 63pp Si ture of Employee i G Documentl 2120/2015 ASHLAND HISTORIC COMMISSION Meeting Minutes I February 4, 2015 Community Development/Engineering Services Building - 51 Winburn Way - Siskiyou Room REGULAR MEETING - CALL TO ORDER 6:03p.m. - SISKIYOU ROOM in the Community Development/Engineering Services Building, located at 51 Winburn Way Historic Commissioners Present: Mr. Skibby, Mr. Swink, Mr. Shostrom, Mr. Giordano, Ms. Renwick, Mr. Whitford, Mr. Emery, Mr. Ladygo Commission Members Absent: Ms. KenCairn (U) Council Liaison : Carol Voisin Staff Present: Staff Liaison: Amy Gunter, Clerk: Regan Trapp APPROVAL OF MINUTES: Mr. Whitford motioned to approve minutes from January 7, 2015. Mr. Swink seconded. Mr. Giordano abstained. No one opposed. PUBLIC FORUM: There was no one in the audience wishing to speak. COUNCIL LIAISON REPORT: Mr. Skibby introduced Ms. Voisin to the Commission. Ms. Voisin gave the council liaison report. She stated that the City Council discussed the welcome center at ODOT but clarified that no decision was made. Ms. Voisin noted that there was a study session, regarding a group of citizens that would like to start a Culture of Peace Commission. She announced that they are meeting with the City Council and discussing how to move forward with this. She also noted that the City Council passed a height restriction, to be raised to 55 feet, in the D-1 & C-1 zones(downtown and some historic). The fire chief expressed concern regarding this change as they only have aerial ladders that reach up to two stories high. The City Council will be looking into this issue. Ms. Voisin went on to say that, on February 17, 2015, the City Council will be discussing hanging baskets on the downtown streetlights and they will also be giving a risk management report. She announced that the annual presentation to City Council, from the Historic Commission is April 21, 2015. They will also be discussing quorum requirements for City Commissions at this time. Ms. Voisin also added that the Police Department gave an update on the Hannah Thomas-Garner case. She reported that the City is looking for and recruiting for a Chief of Police. She added that the budget process is beginning and they will start discussing it on Feb 19, 2015. PLANNING ACTION REVIEW: PLANNING ACTION: 2014-02206 SUBJECT PROPERTY: 485 A Street OWNERIAPPLICANT: Steve & Kathy Hoxmeier DESCRIPTION: A request for Site Design Review approval to add approximately 200 sq, feet to the existing mixed use commercial building located at 485 A Street. COMPREHENSIVE PLAN DESIGNATION: Employment; ZONING: E-1; ASSESSOR'S MAP: 391 E 04AB; TAX LOTS: 6500 Ms. Gunter gave the staff report on PA-2014-02206. Mr. Skibby opened the public hearing to the applicant. Mr. Steve Hoxmeier, of 485 A Street, presented to the Commission. Mr. Hoxmeier stated that nothing has changed since his submittal and this was the same plan that was presented earlier to the commission. Mr. Skibby closed the public hearing and opened up to the commission for comments. Mr. Whitford motioned to approve PA-2014-02206 and Ms. Renwick seconded. No one opposed. OLD BUSINESS: There was no old business to discuss. NEW ITEMS: A. Review Board Schedule B. Project Assignments for planning actions Ms. Renwick reported on the project at 270 N. First Street. She stated that they have roofed the front porch in metal. C. Historic Preservation Week Ms. Gunter gave the Commission an update on Historic Preservation Week. She conveyed to the commissioners that they should divide up the list of nominees and report back on what should be removed or added. They discussed the different awards and possible award recipients. Nominations need to be finalized for the March meeting. Mr. Skibby pointed out that he would like the walking tour to be a different neighborhood, possibly Downtown. Historic Preservation Awards Nominees: Dale/Terry - 568 Fairview, 522 & 528 Rock, 247 Oak Tom/Andrew-117 Helman, 175 Lithia, 14 Calle Guanajuato, 66 Water Bill/Allison - 469 Allison, 201 Gresham, 315 High, 374 Hargadine Keith/Sam - 5 Scenic, 368 Scenic, 83 Morton, 56 Church DISCUSSION ITEMS: A. Chautauqua Square: (Terry/Carol) Mr. Skibby reported on the Chautauqua Square fountain. He presented pictures of the fountain to the Commission. He stated that the fountain is in pretty bad condition (water leakage and maintenance of the marble are big factors) but that the city would like to save the gargoyle piece off the fountain. Mr. Skibby pointed out that the decision to save it is up to OSF and their lease says that they can do whatever they want with the fountain. Ms. Voisin reported that the lease says that if OSF asks for removal of the fountain then they have to pay for it. She also pointed out that the responsible party for upkeep of the fountain was OSF and they did not maintain it at all. According to Ms. Voisin, the cost would be around $2,000 to $3,000 to remove it, Ms. Voisin suggested to the Commission that they send emails of support to City Council if they would like to keep the fountain. She added that if needed, they could make a bid on the fountain but they would have to remove it themselves. Mr. Giordano asked for an extension on the date for salvage (date for salvage is by 4pm on February 12, 2015) and would like it to be relocated. Mr. Shostrom suggested that they Planning Department, 51 Winburn Way, Ashland, Oregon 97520 CITY F 541-488-5305 Fax:541-552-2050 www.ashland.or.us TTY:1-800-735-2900 ASHLAND' NOTICE OF APPLICATION PLANNING ACTION: 2014-02206 SUBJECT PROPERTY: 485 A Street OWNER/APPLICANT: Steve & Kathy Hoxmeier DESCRIPTION: A request for Site Design Review approval to add approximately 200 sq. feet to the existing mixed use commercial building located at 485 A Street. COMPREHENSIVE PLAN DESIGNATION: Employment; ZONING: E-1; I ASSESSOR'S MAP: 39 1 E 04AB; TAX LOTS: 6500 NOTE: The Ashland Historic Commission will also review this Planning Action on Wednesday, February 4, 2015 at 6:00 PM in the Community Development and Engineering Services building (Siskiyou Room), located at 51 Winburn Way. i NOTICE OF COMPLETE APPLICATION: January 27, 2015 DEADLINE FOR SUBMISSION OF WRITTEN COMMENTS: February 10, 2015 sj ECTPROPERTY 486ASREET J91E 04AB 6500 S7- /-z- 0 15 30 60 Feet Propory fin:a arej r r krmce enty, net ual<able The Ashland Planning Division Staff has received a complete application for the property noted above. Any affected property owner or resident has a right to submit written comments to the City of Ashland Planning Division, 51 Winburn Way, Ashland, Oregon 97520 prior to 4:30 p.m. on the deadline date shown above. Ashland Planning Division Staff determine if a Land Use application is complete within 30 days of submittal. Upon determination of completeness, a notice is sent to surrounding properties within 200 feet of the property submitting application which allows for a 14 day comment period. After the comment period and not more than 45 days from the application being deemed complete, the Planning Division Staff shall make a final decision on the application. A notice of decision is mailed to the same properties within 5 days of decision. An appeal to the Planning Commission of the Planning Division Staffs decision must be made in writing to the Ashland Planning Division within 12 days from the date of the mailing of final decision. (AMC 18.108.040) The ordinance criteria applicable to this application are attached to this notice. Oregon law states that failure to raise an objection concerning this application, by letter, or failure to provide sufficient specificity to afford the decision maker an opportunity to respond to the issue, precludes your right of appeal to the Land Use Board of Appeals (LUBA) on that issue. Failure to specify which ordinance criterion the objection is based on also precludes your right of appeal to LUBA on that criterion. Failure of the applicant to raise constitutional or other issues relating to proposed conditions of approval with sufficient specificity to allow this Department to respond to the issue precludes an action for damages in circuit court. A copy of the application, all documents and evidence relied upon by the applicant and applicable criteria are available for inspection at no cost and will be provided at reasonable cost, if requested. All materials are available at the Ashland Planning Division, Community Development & Engineering Services Building, 51 Winburn Way, Ashland, Oregon 97520. If you have questions or comments concerning this request, please feel free to contact the Ashland Planning Division at 541-488-5305. 0ex SITE DESIGN AND USE STANDARDS 18.72.070 Criteria for Approval The following criteria shall be used to approve or deny an application: A. All applicable City ordinances have been met or will be met by the proposed development. B. All requirements of the Site Review Chapter have been met or will be met. C. The development complies with the Site Design Standards adopted by the City Council for implementation of this Chapter. D. That adequate capacity of City facilities for water, sewer, paved access to and through the development, electricity, urban storm drainage, and adequate transportation can and will be provided to and through the subject property. All improvements in the street right-of-way shall comply with the Street Standards in Chapter 18.88, Performance Standards Options. I i i; i aµ L I GAcomm-dev\planning\Planning Actions\Noticing FolderWailed Notices & Signs\2015\PA-2014-02206.docx PA-2014-02206 391 E09AB 9500 PA-2014-02206 391 E09AB 9700 PA-2014-02206 391 E09AB 6501 BHADRA TANIMA ET AL BRISCOE JAMES CHRISTOPHER BRUNNER PETER B TRUSTEE ET AL 2651 'NEWCASTLE RD TRUSTEE 566 FARIVIEW ST NEWCASTLE, CA 95658 6625 CAMINITO BLYTHEFIELD ASHLAND, OR 97520 LA JOLLA, CA 92037 PA-2014-02206 391 E09AB 6604 PA-2014-02206 391 E09AB 5300 PA-2014-02206 391 E09AB 6603 COMSTOCK PAUL DAVIS CAROL HORN TRSTEE FBO FOWLER GERARD STEPHEN TRUSTEE PO BOX 35 8003 S LAKE DR 309 KENT ST PHOENIX, OR 97535 DABLIN, CA 94568 ASHLAND, OR 97520 i PA-2014-02206 391 E09AB 10000 PA-2014-02206 391 E09AB 10200 PA-2014-02206 391 E09AB 6500 GARSON THOMAS L/CYNTHIA H GRANGE CO-OP SUPPLY ASN INC HOXMEIER STEVE/KATHY P O BOX 966 P O BOX 3637 435 B ST ASHLAND, OR 97520 CENTRAL POINT, OR 97502 ASHLAND, OR 97520 PA-2014-02206 391 E09AB 9600 PA-2014-02206 391 E09AB 5400 PA-2014-02206 391 E09AB 5500 JONES LARRY D PALACE PROPERTIES LLC PAPEN FRANK CONRAD TRUSTEE 1188 TYLER CREEK RD PO BOX 3606 267 MEADE ASHLAND, OR 97520 CENTRAL POINT, OR 97502 ASHLAND, OR 97520 PA-2014-02206 391 E09AB 5200 PA-2014-02206 391 E09AB 6502 PA-2014-02206 391 E09AB 9200 POWELL GARY DEAN SACHS JAMES D TRUSTEE ET AL TRES STARS LLC 562 A ST 253 THIRD ST 243 FOURTH ST ASHLAND, OR 97520 ASHLAND, OR 97520 ASHLAND, OR 97520 PA-2014-02206 391 E09AB 90005 PA-2014-02206 391 E09BA 14800 PA-2014-02206 391 E09AB 5600 TTW LLC UNION PACIFIC RR CO WELCH WILLIAM L TRUSTEE ET AL 117 ALMOND ST 1400 DOUGLAS ST STOP 1640 260 4TH ST ASHLAND, OR 97520 OMAHA, NE 68179 ASHLAND, OR 97520 485 A Street 1/27/2015 NOC 18 AFFIDAVIT OF MAILING STATE OF OREGON ) County of Jackson ) The undersigned being first duly sworn states that: 1. I am employed by the City of Ashland, 20 East Main Street, Ashland, Oregon 97520, in the Community Development Department. 2. On January 27, 2015 1 caused to be mailed, by regular mail, in a sealed envelope with postage fully prepaid, a copy of the attached planning action notice to each person listed on the attached mailing list at such addresses as set forth on this list under each person's name for Planning Action #2014-02206, 485 A Street. " M, Q" E-) Sign t re of Employee Documentl 1/27/2015 r ,,°4,y ®rvar {,Sd' ,~~U ~ ~ra4_,`1,J d'1 ~ "MUD t' 0 ' , ~ ~'d s 5'11 u a aid v. 1 CID a a'~ 3 :1'1{.4 2'U91' ~'d d~ ,11~U U3 ~ ~ D '~d d d a d'a D 1441 11 L. t 14 21i'U 403, hi ju W ~111d1' BUY 11~ 216 Ali s t ~ t, 2u$ U d' , a 11 X11+ I T m f]' ~ 'a U= i16 U's d'D2 T4 ND Atli 1 t111o il,pa, '911 a U4. dJ d' it 615 l h i" I d J h o a 4,61aml on U ED D (11='ii 1F l~;1111 ~ !~a 4,~ :.1,a a, .1 ~U1 1 U ikdJ d' d+ d a' 34'U, 1502 a'>;I" 1 510, 3 05 Vol U01 13'Ua+ % off s 5'U d 12 ID fl 514 2400 SUB hat a i,'U a 'app ~ 1'a ll' ~ i a J =4100A, , 1 I UUa , Iva ms AS" ~101 2UN A ~ ~5i1~'~ _ ddJ:~ oAll'y . ~f 9 1• '111 ms NUB a~k7 ~ 1 3 5~ 3 5 T40O 340a 'a 'U~1 ta']d'91 '~~d~ ~ ;a5.a:3, 35dil 3'd1J11' ~F € 3'm X9111 UUita-U'' . 11H U. ' 3 1 U'U .iIOD a 'u D iSav, >3' uila k E 35,1!3' 53'U~1aFTl 'auto 5 ~dl+l' ~,~'CIU' I la A awl ~ € 1 I 5 d'd"U' X sa`ay ~ 3'a 3'd co tai! iJ ~ U'U' q. 1 3 ~"dd11 11.3 1Ua>' {j 1 ~'i D ,yy'~:. t'~{~~ 'Him Gli I ;AMID ~i1~tl0 '1'L11~1~ N . 1 ~~'~0P MA 1`'yy 'il'~Ir cj,~L~~'LI"L1';U'711{'d, 6"02 .L~d'll,2 ~ a a, L fi 1 vv.54U N a W02 OS05 , , '1 ~ 1•i-ib9 11 as aaa 14001 Da. 121 a dl' :1 I ~.j,U2 1 10 p, zs~~d 5'U d ~197 ~ ~5'a>~ , t2m WIN 4 a 1lda 2W q 5A.D, 960 5W a'aU' ~Jad' GSA& &'U'd d, 5.1. D A, . 4 dl "p ~ •a 4S A a UO U q ~ rU p U' tp'tU 0' ] I III r a'a~lil' ar 'UPUd' put 1900 Z410A _ l dil' . ~517 t1 ~'a ~7 i1 h. 6041' r ; ma w0hud e~tdla,, 4400 20DO 61100, QUA 1}7~ :-:1'z]oq~~7~7 QUA indU ~ r1211 ] a U' ~ 1' '4a'UU' 92tRa' . B40 d~a~ld' tld]' Ala ~.3~at, SIG 2,UInA, ~a~n~' 'Uq . ~d7dlttlr 11dUU, .a~'aa~~,Ua' 7~naa.~~air ~ aeo, d~i~U U' , f t~d~i-~U' HAD 'H20 : a~ DR a'3t{d ImUU .y: - qua t1-A-'U-U' . 11 Q U ~ END 011 il' iHui 24 a 4400 kap aux 0100 45aUp 2 uv' 'aa[N a 741D .ateUil ,qg 44J U, U a~ 4195 3d'aU', QU, 210119llO $EDD hem; 1910, ;~~'U11•, ~11~1~111' ~'~'UU d~i~ai1 a i 4100. NO ilea 11111 1`90 r ~?2Ua .aap 3[I~N 169a too . 54'UU ~1'UU{1 .3Uad'' ITBa~ +`~~11Fj11a a SUa' U11Udi' . Am gut i13pU° 2#0 5trda' dtdd' 240D .k?'UJ 'U'UUa3 ~~aa `3M~1 s .~'ad d _ r ggjD.. 120>~ U, ~5al1 t~~lp', k~`a~a ~]aU - ~t~lla 11;~d1i1 3d1~ a aUdl' 5S'U~~ 840D ~4'pad 3~U11 49D ~3'' otl* . i SO{1O ~ , 6700, - .03Da' 13U5 84UD 30U11~:' , dU 5:+ d d ~Udl1 ~,,~,Up ~5-UU D 6600 A 26~7 0 ;,,U, 1! Most, .1104 ik ~ 'f'a't 'gy`p a p, 5U'Ua'uaa11' G5'UD 60D slot 171 fld! ditAa' 11aitd MUD - 3214 it k, AT 1,a p 3 b't7'z 11 pUi1' a~Ualr V45300 tIU00, ~14902 - fiat MAUD BID a a,0~1 , 12100 ''v~.lw 96 91'U1p 61dld' `1209 10011 -a `AUUU' ~ 20 3'1; `t11~ I`G o j ad' 10200 7100[1' t'4,;SU' U-0 DA, t 3 o a da.~ a 9 ON p t 1~u d' ~ a, 410 D L 4 W 110 HO a in a .U 5 at1' 14401070 9 mda t ~Tla' a {1 ll d 4 20 11, PU D Hd'11a' NUAD 14SOD 14100 S= I ll S 9~G a' Ui~ 1! 7 4 d 11~. ; 'Ut i~ t~~ 0 a ~,''~UD ~'~k t'~~i'p 1 ~ ~ d lad ~I ~ J N l6nth d:d m. To the City of Ashland, January 16, 2015 We, Steve and Kathy Idoxmeier, the applicants, would like to submit the amended application for Planning Action 42014-02206. We propose to add 200 sq ft. to the north side of the Ashland Yoga Center. This 8 ft. extension (8' x 23') will provide additional storage space for both the Center and personal use. Storage for ' equipment, lockers, & supplies. I The "attic" area of this extension will provide additional storage for, and accessed by the upstairs, 1-bedroom apartment. Tenants have often commented on the lack of adequate closet space. The extra storage unit will be welcomed immensely. j The proposed addition will have the minimal visual impact on the neighborhood. Beyond construction, no one may be aware of any change! The changes in the submitted elevation revisions are very subtle. The East, north, and west elevations are shown as Oxisting, and as proposed. They may seem old but they are accurate and to scale. They provide correct representations of the proposed addition. From the east, the building is shown to be longer, and shows a smaller, auxiliary entrance off of the 4`h St. porch. This entrance certainly is not necessary for the new storage area, however, it is proposed for future (lobby) potential. From the north, the elevation drawing reflects the completed, (and originally intended), design. Two small windows have been added. The change in the west elevation is only noticeable from the rear of the parking lot. Landscaping areas have more than met the required minimums, as previous approved plans have shown. Total area of landscaping at 4,000+ sq ft is about 25-30% of total lot area. This 200 sgft. Addition may require an additional parking space. Fortunately, the parking lot is presently designed to accommodate a much larger building, The energy demands generated by this expansion will be limited to 3-4 extra lights and 6-8 outlets. All components of the addition - siding, windows , doors, trim, paint, and roof shall match that of the existing building. ' i Enclosed: Site Plan, East, North, & West Elevations U tU U W e ~t..l. uLm u cn OIJ0. U,1 • Li._J n~ , • E t L-Sl fic i w LE it I ; 11..1 '~vrj LI..J FEZ I v DID - o . , CON T 62 I F NEW ER ~'B Decking rc J,,D.5ed 1J R.B I - t=xn510 i~ COWACI COMPACT COACT COUPACI I ~ .i CLASS I°C,I. AC. ~0 6 -D11 CRUSHED ROCK CY) .,NG) STABILIZATION FABRIC Iry 90 C i 1870.5 N 1.871 C) 11.0 z T `1 Separate _ 7 I Gas & Electric service (485 A St) Q j ,3=~ into existing 2 units (479 A St & 485 A St L ) z ' d - J Screen utility meters with trellis & solar p anal a , 0 o I 72 6U 6 Q proposed ' W Pav,f;r lag~aosun96eOpane~s4 Q ' ~ A ~®va F-' W Hen~h ~~~tfl ~ z a Shrub Date~rmll * 0 0 W {I? anaina ,W ° U {2) ockrose appEi aak Sect o€c C) ' . C:) ~ d+m dVzo Coile O i~ Sidewalk Bench p ? N ~o Qo O 6 ~D72' 0 RAMP-VP . TREE N'E~N CO I WALK TREE I Il. TREE G k- -____S T STD _ oN9 _ IGH~T Cup, ~i~% CITY OF ASHLAND January 8, 2015 Steve and Kathy Hoxmeier 435 B Street Ashland, OR 97520 RE: Planning Action #2014-02206, Property located at 485 A Street Incompleteness Determination Dear Steve and Kathy: I have reviewed your application received on December 22, 2014 for a Commercial Site Review located at 485 A Street. After examining the materials presented, I have determined that the application is incomplete because the information listed below was not provided. Incomplete applications are subject to delay in accordance with ORS 227.178. The application cannot be further processed and deemed complete until the missing information is submitted or the applicant indicates that the missing information will not be provided. The following items should be addressed by January 22, 2015, if the application is to be included on the February 4th Historic Commission agenda. 1. Written Findings - Written findings addressing the criteria of approval from the Site Design and Use Standards and the Historic District Design Standards are required to be submitted with the application. The written findings are the applicant's burden of proof to demonstrate how the proposal complies with the criteria. Please see page 3 of the pre-application conference for the Site Review criteria. I have enclosed the pre-application conference document. The other criteria are available in the Site Design and Use Standards handbook. They can be found on the City of Ashland website at http://www.ashland.or.us/Files/SDUS-Revised-6.1.2012.pdf 2. Elevations of proposed modification - It is difficult to discern from the information submitted what the proposal is for. It is unclear from the documents submitted if the addition is going to look the same as the existing structure (N elevation has same windows in the drawing as existing). The plans submitted have an old approval stamp from the City of Ashland; it is unclear if these are to depict what exists or what is proposed. There is a porch rail shown across the front of the building adjacent to the existing porch but the footprint of the building is not being modified to accommodate a porch. Is a covered front porch proposed? 1 Community Development Dept. Tel: 541488-5305 20 E. Main Street Fax: 541488-6006 l Ashland, Oregon 97520 TTY: 800-735-2900 ` I = www.ashland.or.us Additionally, the west elevation submitted appears to be what is already constructe depicted a new proposal? d. Is the work To continue review of your application, you must select and complete one of the follow' options: mg three I. Submit all of the missing information; 2. Submit some of the requested information and give the City.of Ashland Planning Division written notice that no other information will be provided; or 3. Submit written notice to the City of Ashland Planning Division indicating that no other information will be provided. Please note that failure to complete one of the three options within 180 days of the application date (December 22, 2015) will result in your application being deemed void. The application Submittal deemed void if the additional information is not submitted by June 19, 2016. will be If you have questions, please contact me at 541-552-2044 or amy.gunter ashland. @ onus. Sincerely, Array Gunte Assistant Planner Encl: Pre-Application Conference document Cc: File Community Development Dept. Tel: 541-488-5305 2 20 E. Main Street Fax: 541-488-6006 Ashland, Oregon 97520 TTY: 800-735-2900 ~q 1 v, w.ashland.or,us 1 To the City of Ashland, December 22, 2014 i' We, Steve and Kathy Noxmeier, the applicants, would like to submit the enclosed plans and elevations for the pre-conference application. We propose to add 200 sq ft. to the north side of the Ashland Yoga Center. The 8 ft. extension will have matching siding, windows, trim, foundation, roof, and wall construction. Additional lighting, switches, and outlets. This space will serve as storage for AYC supplies & materials. Enclosed: Site Plan Floor & Foundation Plan East, West, and North Elevation East-West Section Roof Framing Plan CIO _ 01 L~ I: - x / L 1 i 00 f •I L ~ - r } 6 CON T 62 I F NEW ►R_BDecking ER i CB - ~rep~s 6 - ~ f Sion COMPACT I COMPACT CMPACT CM:PACI I ~ it t z - U CLASS AC. I 10 CRUSHED ROCK Id. a "G► STABILIZAT!0N FABRIC C? c 1870.5 W 0- 1871 ro LO ° T- T Separate K I Gas & Electric service (485 A St , 'moo into existing 2 units (479 A St &485 A St Screen utility meters .6u with trellis & solar panel a a ' W proposed: I J ) V) Paver lag a mua aveiopment Q W Ahrova BenchXa in Z Q DeEe ,o W ) hhrub ~rmit .e U , r-) u lD andina (2) ackrase aPP=sbEesicE'aaso€tt€e r~ v and Und so G Sidewalk Bench 1 . CV. o o a v~7LO RAMPUP TREE & NEW CO WALK I TREE & -~S T S TD- ord9 - - a 4 IGHT CUI ' I FE-1 -11 !=V . ~T~w co 'I lw 07 . _Ut-l hi lad i ,a I 7"A LLI ~ i ®a j i CUD it LLL I • / I r t r 1 ' 3 . 1 ~J . mn-~. 11) n Ir"ll f~'7 Composition shingles 15# Felt over M. Plywood 4W I Bracket/joist hanger d. - 2x12 Rafter 24" oc w wall Brackets 44 Skylight w/flashing 4 R-23 Insulation 2x4 Rafter tail---- rt 3/4 Plywood subfloor, 2x8 Joists w/ hangers 24 oc 2x6 Fascia Double 2x6 Plate 1x6 T&G Cedar siding Tyvec wrap over % Plywood 2x6 Studs 16" oc. I 46 window Header- 7/8 T&G plywood subfloor R-16 Insulation 9" BCI Joists 16 oc 5/8 Drywall 48 Girder 2x6 PT Sill (5) 44 Posts and Piers i 8x14 conc. pier pads 12" Anchor bolt 48" oc - 8x8x16 Concrete block t 4 H - Rebar48" oc 8x16 Footing w/ horiz. % rebar _ 5m (Plastic) Vapor barrier_„~ IUp1 Ir® I _~l l C~) 2x12 Rafter 24" oc., 2x6 Fascia ` 2x4 Rafter tail 2x12 Hip rafter.- 1 e %1 ---2x6 Fascia 2x12 Rafter 24" oc. ---2x4 Rafter tail u ate 2x6 PI 4' x 4' Skylight 2x12 Blocking where needed 7= - - 1 i 1 I Existing eave Y-Y\ I V^11 10, V) fr _ C) Ct C l To the City of Ashland, August 22, 2014 We, Steve and Kathy Hoxmeier, the applicants, would like to submit the enclosed plans and elevations for the pre-conference application. We propose to add 200 sq ft. to the north side of the Ashland Yoga Center. The 8 ft. extension will have matching siding, windows, trim, foundation, roof, and wall construction. Additional lighting, switches, and outlets. This space will serve as storage for AYC supplies & materials. Enclosed: Site Plan Floor & Foundation Plan East, West, and North Elevation East-West Section Roof Framing Plan . ,t A[ _ Y U v v 1 s--~ ] i CON T 62 t F NEW h~ IRB Decking ER g - rcP,:sc,_c I I 6 - ~x°~en.5' is ~ ACl CACI ACT C IMPACT ~zn 1 / ul a LL 1 CLASS "C"' AC. I.~ 10 6 -0" CRUSHED ROCK ` '"Gi N STAgILI.ZAT!ON FABRIC 1870.5 W • 3 1871 ` 7' C\1 > ~ L0 r i 0 D € rT' 1 L0 Separate r- c~d Gas & Electric service (485 A Sf) Into existing 2 units (479 A St & 485 A St Z a - I- - Screen utility meters 6U d with trellis & solar panel as°I J C F 1 F U, proposed, I J {n Paver lags a muns avetpment Q . ' U) ~ m (bench ova z D to Shrub ~fmlt # (n D U F) U (I> Andina (2) ockrose sgpti:abicstanso€the t~ (V Sidewalk Bench 1 • D n ~D7-0 RAMPVP p D o TREE & NEW C4 i a o WALK TREE & I I ;l _MEE ST STD 0 J r r; IGHT CUB J t Composition shingles 15# Felt over % Plywood 'Bracket/joist hanger y l 2x12 Rafter 24" oc w wall Brackets 4x4 Skylight w/flashing R-23 Insulation 2x4 Rafter tail Plywood subfloor 2x81oists w/ hangers 24 oc 2x6 Fascia' I Double 2x6 Plate 1x6 T&G Cedar siding Tyvec wrap over % Plywood- 2x6 Studs 16" oc 4x6 window Header 7/8 i ~ 7/8 T&G plywood subfloor R-16 Insulation E9" BCI Joists 16 oc . ` 5/8 Drywall so-. 48 Girder 2x6 PT Sill r (5) 44 Posts and Piers 8x14 conc. pier pads, 12" Anchor bolt 48" oc 8x8x16 Concrete block , - - ..,~°Q r Rebar 48" oc - 8x16 Footing w/ horiz. % rebar, 5m (Plastic) Vapor barrier - ~~e' m t 2x12 Rafter 24" oc,, 2x6 Fascia 2x4 Rafter tail , 2x12 Hip rafter 1 ;i. y , 2x6 Fascia 2x12 Rafter 24" oc. - - G -.2x4 Rafter tail 2x6 Plate 4' x 4' Skylight 2x12 Blocking where needed r - i Existing eave C-x 1) M0 I . ~ f 1 0000 DOD (1- 0 w 1 -,j9 m n x r . (o D f a l i I I i 1 i.. 0 0 ~ 9-0 .I • h~ 00 a X e I , I rr~ ff . 1 V ~F~ LLTT • r . . Ell v DJ i • ~ ` ~ Ira . I n ' T-j III i f 1 I 1 FFJ IL+ • i i I. p l - I ~f I 6 ~ I I , r~ 1 ~ ~J a ill II ~ , I ' I I i - ZONING PERMIT APPLICATION I Planning Department C I T Y o ' F _ 51 Winbum Way, Ashland OR 97520 ASHLAND 541-488-5305 Fax 541-488-6006 FILE ~ ' DESCRIPTION OF PROJECT DESCRIPTION OF PROPERTY Street Address Assessor's Map No. 39 1 E (M6 Tax Lot(s) hG! 0D Zoning L Comp Plan Designation APPLICANT Name Phone , E-Mail Address City Zip PROPERTY OWNER Name' Phone E-Mail Address City Zip SURVEYOR. ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OTHER Title Name Phone E-Mail Address City Zip Title Name Phone E-Mail Address City Zip I hereby certify that the statements and information contained in this application, including the enclosed drawings and the required findings of fact, are in all respects, true and correct. I understand that all property pins must be shown on the drawings and visible upon the site inspection, In the event the pins are not shown or their location found to be incorrect, the owner assumes full responsibility. I further understand that if this request is subsequently contested, the burden will be on me to establish: 1) that I produced sufficient factual evidence at the hearing to support this request; 2) that the findings of fact furnished justifies the granting of the request; 3) that the findings of fact furnished by me are adequate; and further 4) that all structures or improvements are properly located on the ground, Failure in this regard will result most likely in not only the request being set aside, but also possibly in my structures being built in reliance thereon being required to be removed at my expense. If I have any doubts, I am advised to seek competent professional advice and assistance. Applicant's Signature Date As owner of the property involved in this request, I have read and understood the complete application and its consequences to me as a property owner. Property Owner's Signature (required) Date fro be completed by City Staff] Date Received Zoning Permit Type Gh u Filing Fee $ ll f OVER 0 (7 \rnmm-d-\nlannin,AFn-, R Handnnt67nninn Prrmit Annlirntinn Fnrm dnr Job Address: 485 A ST Contractor: ASHLAND OR 97520 Address: C A Owner's Name: HOXMEIER STEVE/KATHY 0 Phone: P Customer 02366 N State Lic-No: P HOXMEIER STEVEXKATHY T City Lic No: L Applicant: 435 B ST R Address: ASHLAND OR 97520 A C C Sub-Contractor: A Phone: T Address: N Applied: 12/23/2014 0 T Issued: Expires: 06/21/2015 R Phone: State Lic No: Maplot: 391 E09AB6500 City Lic No: DESCRIPTION: Type 1 site review VALUATION Occupancy Type Construction Units Rate Amt Actual Amt Constuction Description I Total for Valuation: MECHANICAL ELECTRICAL STRUCTURAL i PERMIT FEE DETAIL Fee Description Amount Fee Description Amount Commercial Site Review (type1) 1,087.00 CONDITIONS OF APPROVAL COMMUNITY DEVELOPMENT Tel: 541-488-5305 20 East Main St. Fax: 541-488-5311 Ashland, OR 97520 TTY: 800-735-2900 www.ashland.or.us Inspection Request Line: 541-552-2080 CITY OF