HomeMy WebLinkAbout2001-131 CONT Chg Orders - Slayden Construction CITY OF ASHLAND REQUISITION No. PW246A - 2002 Department PW - WWTP Construction Date September 6, 2001 Vendor Slayden Construction, Inc Requested Delivery Date current PO Box 625 Deliver To Paula Brown Stayton, OR 97383 Via PAULA BROWN Account No. 675 . 08. 30. 00. 704200 Note: Please allow approximately two(2) weeks for delivery on items not generally caried in stored, and approximately two (2) months on printing jobs.) Item No. Quantity Change Description Use of Purchasing Office Only date signed Order No. Unit Price Total Price PO No. 8/12/98 1 original On-site Process Improvements - ox ditch, u/v, $12,374,000 00083 varies 1-19 Changes per Feb 29, 2000 Requisition $2,780,073 prior varies 20-29 Changes per Aug 15, 2000 Requisition $461,219 prior 01391 varies 30-44 Changes per Apr 2, 2001 Requisition $343,067 prior 01391 04/24/01 45-46 Changes per Jun 11, 2001 Requisition $502,969 prior 01391 06/21/01 47 Membrane Filter Bldg - Zenon Coordination $100,000 prior 01391 07/30/01 48 Membrane Filter Bldg - Div 2, 3, 4, and 5 $1,457,115 prior 01391 08/20/01 49 Membrane Filter Bldg - Bridge Crane $47,090 new 09/04/01 50 Misc Ops Bldg and Process Completions $14,325 new 09/04/01 51 Membrane Filter Bldg - HVAC and Div 15 $929,188 new 0 NEW TOTAL S 19,009,046 Job No. I hereby certify that the above items are necessary for the operation of this department and are budgeted Department Head or Authorized Person Issued By Date Received By for Kari: BID /RFP /EXEMPT: exempt change orders Contract Start Date: 01-Sep-98 MAkall Contract Completion Date: 02-Jun-02 Insurance on file: Yes / No / Not Required Project No: n/a CAROLLO ENGINEERS, P.C. Project No. 4411 B30 CONTRACT CHANGE ORDER NO. 49 OWNER: City of Ashland, Oregon PROJECT: Wastewater Treatment Plant Process Improvements SRF # 11750 CONTRACTOR: Slayden Construction, Inc. ENGINEER: Carollo Engineers, P.C. The following changes, additions to or deletions from the work described in the Contract Documents are hereby authorized: Item Description Cost Time No. See attachment dollars (days) 1 RFP-255 Membrane Filter Building - Bridge Crane $47,090.00 -0- Original Contract Amount $12,374,000.00 Net Change by Previous Change Orders 5,644,433.00 Contract Amount prior to this Change Order 18,018,433.00 Net Change due to this Change Order 47,090.00 New Contract Amount $18,065,523.00 The Contract Time is (unchanged) by -0- calendar days. The Contract completion date will be June 15, 2002. The amounts indicated above shall be compensation in full for the work described and shall include all costs, direct and indirect, including extended overhead. r/ Accepted by: Date: (Contractor) Recommended by: / Date: U U9 (Engineer) Approved by: ~(-t Date: '2_0 -11-dG Q) (City) 1 CONTRACT CHANGE ORDER NO. 49 City of Ashland WWTP Process Improvements SRF # 11750 Description of Items in Change Order 1. RFP-255 Membrane Filter Building - Bridge Crane. During the past year, there were discussions of the need to provide effluent filtration and phosphorous removal facilities for the wastewater treatment plant. Pilot testing took place in the fall of 2000 and design of the membrane filtration facilities commenced. The City decided to proceed with construction of these facilities on a fast-track basis to meet the State-mandated operational completion date of May 1, 2002. This will be accomplished utilizing a series of change orders so that construction can proceed on portions of the Work while design is completed. Construction of the facility includes installation of a bridge crane to handle the membrane filter cassettes. By letter of June 8, 2001, the Engineer provided specifications for the bridge crane to the Contractor. In a subsequent facsimile transmittal on July 9, the Engineer provided requested drawing information to the proposed supplier. In a letter dated July 19, the contractor submitted proposed costs of $47,090.00 for this work. After review, the Engineer informed the Contractor by letter of August 8, 2001 that the costs were acceptable and would be included in a forthcoming change order. 2 CAROLLO ENGINEERS, P.C. Project No. 4411 B30 CONTRACT CHANGE ORDER NO. 50 OWNER: City of Ashland, Oregon PROJECT: Wastewater Treatment Plant Process Improvements SRF # 11750 CONTRACTOR: Slayden Construction, Inc. ENGINEER: Carollo Engineers, P.C. The following changes, additions to or deletions from the work described in the Contract Documents are hereby authorized: Item Description Cost Time No. (See attachment) (dollars) (days) 1 RFP-217 Operations Building Laboratory Arrangement 176.00 -0- 2 RFP-246 Revised Equipment Support for Influent Temperature Probe Panel 1,372.00 -0- 3 RFP-249 Operations Building Corner Guards 433.00 -0- 4 RFP-250 Revision to Paving Section - Cross Section and Timing 10,000.00 -0- 5 RFP-251 Operations Building ADA Revisions to Fire Alarm System 1,681.00 -0- 6 RFP-252 Operations Building Door Kick Plates -0- -0- 7 RFP-253 Add Handrail at Operations Building Fan Room Ladder 421.00 -0- 8 RFP-254 Install Fla Valve on Drain Line at Scum Wet Well 242.00 -0- 9 RFP-262 Extension of Phase 3 Milestone Date -0- -0- Original Contract Amount $12,374,000.00 Net Change by Previous Change Orders 5,691,523.00 Contract Amount prior to this Change Order 18,065,523.00 Net Change due to this Change Order 14,325.00 New Contract Amount $18,079,848.00 The Contract Time is (unchanged) by -0- calendar days. The Contract completion date will be June 15, 2002. The amounts indicated above shall be compensation in full for the work described and shall include all costs, direct and indirect, includi g extended overhead. Accepted by: / Date: T~ / o"ontractor) f Recommended by: Date: 5d,67 (Engi er) Approved by: Date: (City) 1 CONTRACT CHANGE ORDER NO. 50 City of Ashland WWTP Process Improvements SRF # 11750 Description of Items in Change Order 1. RFP-217 Operations Building Laboratory Arrangement. In RFI-1112, dated November 11, 2000, the Engineer noted that revisions in the layout of the Laboratory were desired. These changes included minor relocation of sinks in several lab stations, modification of cabinets in Lab Station 3 to allow installation of an under-the-counter BOD incubator, and relocation of a fume hood from Lab Station 3 to Lab Station 4, all with concomitant cabinet revisions. These revisions were also the subject of RFI-170 and RFI-171 from the Contractor. By letter of December 8, 2000, the Engineer provided the Contractor with completed details of these changes, including necessary electrical and mechanical work. In a letter dated April 20, 2001, the Contractor submitted proposed costs of just $176.00 for this work. After review, the Engineer informed the Contractor by letter of April 27 that the costs were acceptable and would be included in a forthcoming change order. 2. RFP-246 Revised Equipment Support for Influent Temperature Probe Panel. By letter of April 9, 2001, the Engineer informed the Contractor that a modified equipment support was necessary for mounting the influent temperature probe at the Headworks. The existing automatic sampler receptacle support would not suffice. In a letter dated May 16, 2001, the Contractor submitted proposed costs of $1,372.00 for this work, which included removal of the existing support and re-installation of the sampler receptacle. After review, the Engineer informed the Contractor by letter of May 16 that the costs were acceptable and would be included in a forthcoming change order. 3. RFP-249 Operations Building Corner Guards. By letter of May 4, 2001, the Engineer informed the Contractor that it was desired to install plastic corner guards on all "outer" corners in gypsum board walls, to avoid damage to the wall corners. In a letter dated May 7, 2001, the Contractor submitted proposed costs of $433.00 for this work. After review, the Engineer informed the Contractor by letter of May 8 that the costs were acceptable and would be included in a forthcoming change order. 4. RFP-250 Revision to Paving Section - Cross Section and Timing. During the spring of 2001, there were discussions in the field and at several Monthly Progress Meetings of the desirability to modify the paving installation by installing 1-1/2 to 2 inches less aggregate base course material while placing the initially-intended thickness of asphaltic concrete. This would lower the pavement surface by a like amount. Following completion of the Membrane Filter Building and Dewatering Building, when additional paving is done, the presently-paved area would be cleaned and given an additional thickness of AC. By letter of May 4, 2001, the Engineer formally informed the Contractor of this work, and noted that a total additional cost of $10,000.00 would be acceptable to the City. On May 7, the Contractor confirmed this agreement; by subsequent letter of May 8, the Engineer informed the contractor that this amount would be included in a forthcoming change order. 5. RFP-251 Operations Building ADA Revisions to Fire Alarm System. By letter of May 10, 2001, the Engineer informed the Contractor of the need to install ADA-compliant visual alarm signaling devices as part of the Operations Building fire alarm system, based on a 2 letter from the Fire Marshall. In a letter dated May 11, the Contractor submitted proposed costs of $1,681.00 for this work. After review, the Engineer informed the Contractor by letter of May 14, 2001, that the costs were acceptable and would be included in a forthcoming change order. 6. RFP-252 Operations Building Door Kick Plates. By letter of May 10, 2001, the Engineer informed the Contractor that minor cosmetic damage the wood veneer door from the Laboratory to the Sample Receiving Room could be tolerated if kick plates could be installed on the "push" sides of all wood veneer doors, and proposed that this be considered a "no-cost" change. After receiving the Contractor's concurrence, the Engineer informed the Contractor by letter of May 14 that this work would be included as such in a forthcoming change order. 7. RFP-253 Add Handrail at Operations Building Fan Room Ladder. By letter of May 17, 2001, the Engineer informed the Contractor of the need to add aluminum handrail at the top of the ladder in the Mechanical Room of the Operations building, leading to the Vestibule and Fan Room; this to provide rigidity to the ladder top rails and to close off the opening to one side of the ladder. In a letter dated June 11, 2001 the Contractor submitted proposed costs of $421.00 for this work. After review, the Engineer informed the Contractor by letter of June 14 that the costs were acceptable and would be included in a forthcoming change order. 8. RFP-254 Install Flap Valve on Drain Line at Scum Wet Well. By letter of May 18, 2001, the Engineer informed the Contractor of the need to install a flap valve on the end of the 6-inch drain line from the pig launcher area to the scum wet well at the RAS/WAS Pump Station, using one of the 6-inch flap valves not used in the old Primary Clarifier. In a letter dated June 12, 2001 the Contractor submitted proposed costs of $242.00 for this work. After review, the Engineer informed the Contractor by letter of June 14 that the costs were acceptable and would be included in a forthcoming change order. 9. RFP-262 Extension of Phase 3 Milestone Date. By letter of August 10, 2001, the Engineer informed the Contractor of the need to revise the Milestone Completion date for Phase 3 of the Work. The Final Completion Date for all Work was extended, in Change Order 46 (from RFP-245), to allow construction of the Membrane Filter Building. That change order did not revise the Milestone Dates for Phases 2 and 3. Substantial completion of Phase 2 was achieved within the time necessary. The need to expedite construction of the Membrane Filter Building required that the Contractor utilize his resources for construction of that facility. This resulted in delays in completion of Phase 3 work by the time previously set forth in Change Order 35 (i.e., substantial completion by April 29, 2001). After discussions with the Contractor and City, it was considered appropriate to extend the milestone date for completion of Phase 3 work to the actual dates when portions of the Work were put into use and/or were completed for use by the City. Following is a table of original, present and proposed milestone times and dates for completion of the Work, as set forth in the Agreement and in Specification Section 01110: 3 Milestone Initial Time/ ate Present Time/Date Proposed Time/Date Phase 1 500 days 693 days (C.O. #31) N/A January 20, 2000 July 31, 2000 Phase 2 700 days 933 days (C.O.#35) N/A August 7, 2000 March 28, 2001 Phase 3 800 days 965 days (C.O.#35) Operations Building: November 15, 2000 April 29, 2001 974 days May 8, 2001 NaOH System: 1,017 days June 20, 2001 Landscaping: 1,017 days June 20, 2001 SCADA System. 1,022 days June 22, 2001 Phase 4 N/A N/A 1,332 days (C.O.#46) May 1, 2002 FFinal 860 days 1,377 days (C.O.#46) 1,377 days (C.O.#46) Completion January 14, 2001 June 15, 2002 June 15, 2002 4 CAROLLO ENGINEERS, P.C. Project No. 4411 B30 CONTRACT CHANGE ORDER NO. 51 OWNER: City of Ashland, Oregon PROJECT: Wastewater Treatment Plant Process Improvements & Membrane Filtration SRF # 11750 CONTRACTOR: Slayden Construction, Inc. ENGINEER: Carollo Engineers, P.C. The following changes, additions to or deletions from the work described in the Contract Documents are hereby authorized: Item Description Cost Time No. (See attachment) (dollars) (days) 1 RFP-248 Membrane Filter Building - HVAC 108,344.00 -0- 2 RFP-265 Membrane Filter Building - Division 15 (except HVAC 820,844.00 -0- Original Contract Amount $12,374,000.00 Net Change by Previous Change Orders 5705,848.00 Contract Amount prior to this Change Order 18,079,848.00 Net Change due to this Change Order 929,188.00 New Contract Amount $19,009,036.00 The Contract Time is (unchanged) by -0- calendar days. The Contract completion date will be June 15, 2002. The amounts indicated above shall be compensation in full for the work described and shall include all costs, direct and indirect, including extended overhead. Accepted by' ~ , / Date: o ontractor) Recommended by: Date: 081-30-01 ( gineer) ,,y Approved by: Date: (City) 1 CONTRACT CHANGE ORDER NO. 51 City of Ashland WWTP Process Improvements & Membrane Filtration SRF # 11750 Description of Items in Change Order 1. RFP-248 Membrane Filter Building - HVAC. During the past year, there were discussions of the need to provide effluent filtration and phosphorous removal facilities for the wastewater treatment plant. Pilot testing took place in the fall of 2000 and design of the membrane filtration facilities commenced. The City decided to proceed with construction of these facilities on a fast-track basis to meet the State-mandated operational completion date of May 1, 2002. This will be accomplished utilizing a series of change orders so that construction can proceed on portions of the Work while design is completed. Construction of the facility requires installation of heating, ventilating and air conditioning systems, equipment and controls. By letter of April 24, 2001, the Engineer informed the Contractor of this need and provided specifications and schedules for air conditioning equipment, electric unit heaters, fans and controls, and drawings for duct work. In a letter dated July 19, the Contractor submitted proposed costs of $106,353.00 for this work. This was discussed with the Contractor at a negotiating meeting on July 20. Subsequently, RFI- 532 clarified some questions regarding the fans. In a letter dated August 8, 2001, the Engineer informed the Contractor of the need to extend the air supply duct in the Lower Level of the building. On August 27, the Contractor submitted additional costs for this duct extension, totaling $1,991.00. After review, the Engineer informed the Contractor by letter of August 27 that total costs of $108,344.00 for HVAC work would be included in a forthcoming change order. 2. RFP-265 Membrane Filter Building - Division 15 (except HVAC). As indicated above, construction of membrane filter facilities will be accomplished utilizing a series of change orders so that construction can proceed on portions of the Work while design is completed. As the design of facilities progressed, the Contractor was provided with drawings of the proposed building and concomitant site work. In a series of letters, the Contractor submitted proposed costs for portions of the Work. In a letter dated May 14, 2001, the Contractor submitted proposed costs for site (yard) piping; at an August 7 negotiating meeting, this was reduced somewhat; when OH&P was included, revised costs were $132,196.00. In a letter dated June 14, 2001, the Contractor submitted proposed costs of $662,724.00 for all interior mechanical piping and related work; this was discussed and agreed upon at a negotiating meeting on July 20. In a letter dated June 29, the Contractor submitted proposed costs of $25,924.00 for all plumbing and fixtures; this was also discussed and agreed upon at the July 20 meeting. In a letter dated August 28, the Engineer established this RFP to include all Division 15 work on the Membrane Filter Building, except HVAC systems covered by RFP-248, and indicated that the cumulative total amount of $820,844.00 would be included in a forthcoming change order. 2 ca rO LLO wPrd 's ponhid In llolib rs q crvc./ nhNinns e n G 1 n e e r- S foiir rh llin.ei' uos(' 11 'r' .cr'I't'r'. August 30, 2001 W.O. 4411 B.30 Slayden Construction, Inc. P.O. Box 625 Stayton, Oregon 97383 Attention: Zack Secrest, Superintendent/Project Engineer Re: City of Ashland WWTP Process Improvements Request for Proposal RFP-265 Membrane Filter Building - Division 15 (except HVAC) As noted in RFP-245, the City needs to provide membrane filtration of secondary effluent; new filtration facilities must be operational by May 1, 2002. The City has decided to proceed with construction utilizing a series of change orders to allow work to proceed rapidly. This RFP is established to cover work under Specification Division 15, including all piping, valves, accessories and specialties, couplings, identification, testing, plumbing and plumbing fixtures. The exception is work relating to HVAC systems, equipment, controls and testing, adjusting and balancing; all HVAC work was covered under RFP-248. Your proposed costs for this work have been received and are summarized on the attached sheet. The costs were discussed at negotiating meetings on July 20 and August 7, 2001; the resulting total proposed costs of $820,844.00 are acceptable. Please confirm your understanding of this total amount so it can be included in a forthcoming change order as an increase in Contract Price. Please contact us if you have any questions. Very truly yours, CAROLLO ENGINEERS, P.C. G"'A~ Peter C. Williams, P.E. Enclosure cc: land - Paula Brown (w/ enclosure & Slayden letters) Ashland - Building Division (w/ enclosure) Carollo - Portland (w/ enclosure & Slayden letters) ASHLAND VWVTP 1295 OAK STREET ASHLAND, OREGON 97520 541-488-4339 fax: 541-488-4379 ASHLAND WWTP PROCESSIMPROVEMENTS & MEMBRANE FILTRATION RFP-265 Membrane Filter Building - Division 15 (except HVAC) Following is a summary of the proposed costs for work under Specification Division 15, except for HVAC work, for the Membrane Filter Building: Item Slayden Letter Proposed Date Costs Site (yard) piping May 14, 2001 132,196.00 Interior piping & mechanical work June 14, 2001 662,724.00 Plumbing - piping & fixtures June 29, 2001 25,924.00 TOTAL PROPOSED COSTS - 820,844.00 1 RL ~w ~ MM 1 s ZQ~ ONSTRUCTION, !N May 14, 2001 Letter # 205-200-500- Mr. Paul Schuler - - Carollo.EDgineers 5100-S.W. MacAdam Ave. ; Portland Or, 97201 Re: City of Ashland WWTP Improvements Filtration Building - Dear Paul, After. receiving your E-mail questioning some of.o cost structure for the above mentioned project we have-completed our review of division 15 yard piping. Please note we have.iDcltided Carollo site plans with our layoiT of the various services required to.. operate the new Filtration process. Also note the pipe material takeoff, estimated.'labor budget for the various tasks, and the equipment sp ead sheet detailing costs and durations. We are concerned that the Carollo budgets do not accurately reflect the amount of, labor or materials required.to. perform the various scopeof work. Currently we. are preparing the same-level of documentation for the remaining ~portion of division 15 (Mechanical package) and division 5 (Metals). -However we w uld ask that your office revisit ,division- 3_ We feel that not only are the uantities'offbut the per and rice is louver thawindu standard and that our 15% mark-up per the contract documents has not been refle~te~iri j the budgets.. We look forward to finalizing this. RFP and movin ahead with the pray ot,: 1e9" "do -It hesitate to contact us if we can be of assistance, j - Sincerely Greg Huston.///-~ _ Project Manager ec~ J//! / ~ - P.O. Box 625 Stayton. Oregon 97383 (503) 769-1969. Fax; (503 769=4525 - _ OR C Estimate Recap Division 15 Yard Piping 15050 SITE PIPING INSTALLATION 118,453 Site piping installation labor 952 mh 41.92 39,908 Pipe Materials 30,110 Site equipment & Fuel 29,250 Maintenance 5,000 Pipe Zone crushed granular V 1,146 ton 10.8 12,377 Loose spec pipe rock 0 ton 9 0 Expendables 1,808 Mobilization in div. 1 TOTAL ESTIMATE 118,453 I 1 ~f~ Rs3 ~5~ a~lfP - r7,ZS~3. Ti3~, X96: Ashland Filtration Yard Piping Materials ASHLAND YARD SEWER 3034 6" SCH 3034 140 LF $1.38 $192.92 10" x 6" WYE 1 EA $50.27 $50.27 10" FERNCO 2 EA $18.12 $36.24 61. WYE 2 EA $11.26 $22.52 6" 45 DEGREES 4 EA $5.77 $23.09 CLEAN OU BOX W/ LID 2 EA 534.70 $69.39 6" FMTHRD ADT 2 EA $9.09 $18.17 6" THRD PLUGS 2 EA $5.88 $11.75 6'' TWIST PLUGS 2 EA $13.08 $26.16 48" x 6'-0" MH 1 EA $1,800.00 $1,800.00 1_ 2" Cu 2" Cu PIPE 100 LF $4.85 $484.90 2" CV 90 DEGREES 6 EA $7.85 $47.11 2" CV COUPLINGS 6 EA $3.94 $23.63 2" CV UNIONS 2 EA $29.67 $59.33 2" TEE 1 EA $13.86 $13.86 2" GATE VALVE 1 EA $38.65 $38.65 REJECT SCH 80 PVC 8" SCI-I 80 PVC 140 LF $7.10 $993.72 8" COUPLERS 10 EA $26.73 $267.28 8" 90 DEGREES 1 EA $64.99 $64.99 8" 45 DEGREES 2 EA $61.44 $122.88 8" MJ SLEEVE W/ MEGA LUG 2 EA $136.84 $273.68 8" MJ TEE W/ MEGA LUG 1 EA $218.34 $218.34 8" DIP X SCH 80 PVC TRANS 1 EA $140.57 $140.57 8" MJ GV 1 EA $513.45 $513.45 24„ FE SCH 3034 24" 3034 40 LF $32.27 $1,290.64 24" 90 DEGREES 1 EA $740.35 $740.35 24" DRESSERS 3034 X DIP 1 EA $1,359.93 $1,359.93 24" 45 DEGREES 1 EA $574.74 $574.74 6„4W 6" DIP 130 LF $9.56 $1,242.15 6" MJ SLEEVE W/ MEGA LUGS 3 EA $119.64 $358.92 6" MJ TEE W/ MEGA LUGS 1 EA $175.72 $175.72 6" MJ GV 1 EA $322.92 $322.92 VALVE BOX W1 LID 3 EA $34.70 $104.09 6" MJ 45 DEGREES W/ MEGA LUGS 2 EA $114.41 $228.83 FAST-TITE GASKETS 8 EA $56.02 $448.16 Ashland Filtration Yard Piping Materials SPD 3" SCH 80 PVC 140 LF $2.63 $368.20 3" COUPLERS 10 EA $7.29 $72.93 3" 90 DEGREES 2 EA $5.46 $10.92 3" 45 DEGREES 2 EA $12.49 $24.99 6" MJ TEE W/ MEGA LUG 1 EA $175.72 $175.72 6" MJ SLEEVES W/ MEGA LUG 2 EA $119.64 $239.28 6" MJ PLUG W/ 3" TAP 1 EA $74.01 $74.01 3" MTAD 1 EA $7.19 $7.19 GAL GLUE/PRIMER 1 EA $47.78 $47.78 BRUSHES 10 EA $1.95 $19.50 5TD 8" 3034 200 LF $2.38 $475.80 8" x 4" WYE 2 EA $14.85 $29.69 4" 3034 40 LF $0.68 $27.04 PRECAST CB 5 EA $747.50 $3,737.50 4" SAND COLLAR 3 EA $5.66 $16.97 4" FERNCO 3 EA $3.97 $11.90 10" x 8" WYE 1 EA $79.46 $79.46 10" x 6" WYE 1 EA $50.27 $50.27 6" 3034 60 LF $1.38 $82.68 1o" FERNCO 4 EA $18.12 $72.49 8" 45 DEGREES 3 EA $16.16 $48.48 6" 45 DEGREES 2 EA $5.77 $11.54 6" FERNCO 3 EA $8.48 $25.43 8" 45 DEGREES 6 EA $16.16 $96.95 TRACER TAPE 1000 LF $0.03 $26.00 RF JFQT SCH 80 PVC 8" WYE 2 EA $360.62 $721.24 8" x 4" WYE 1 EA $300.69 $300.69 8" x 4" TEE 3 EA $190.13 $570.38 8" 45 DEGREE BEND 1 EA $61.44 $61.44 8" 90 DEGREE 1 EA $64.99 $64.99 8" SCH 80 PVC 80 LF $7.10 $567.84 4" SCH 80 PVC 20 LF $2.38 $47.58 4" 90 DEGREE 1 EA $8.28 $8.28 4" x 5-0" VIC X FL SR 3-0 FROM VIC SS SCH 10 4 EA $296.01 $1,184.04 4" VANSTONE FL 4 EA $11.44 $45.76 8" x 5'-0" VIC X FL SR 3-0 FROM VIC SS SCH 10 1 EA $331.88 $331.88 8" VANSTONE FL 1 EA $29.29 $29.29 4" SS NBG 4 EA $11.77 $47.06 8' SS NBG 1 EA $20.10 $20.10 8" SLIP PLUG W/ 2" TAP 2 EA $201.50 $403.00 2" SS SCH 40 20 LF $5.24 $10478 RfP Ashland Filtration Yard Piping Materials REJECT SCH 80 PVC (cont) 4" X 2'-0" HDG SLEEVE W/ SR 1 EA $87.19 $87.19 4" x 2" SS LINK SEAL 1 EA $20.51 $20.51 2" SS BALL VALVE 1 EA $97.18 $97.18 2" SCH 40 SS THRD 90 DEGREE 3 EA $7.38 $22.15 8" COUPLERS 2 EA $26.73 553.46 ['~CK PULE SCH 80 PVC 8" x 10" RED 1 EA $72.66 $72.66 10" 45 DEGREE 1 EA $386.83 $386.83 10" TEE 1 EA $607.65 $607.65 10" 90 DEGREE 2 EA $581.70 $1,163.40 10" x 4'-0" VIC X FL W/ SR 1-10" FROM VIC 2 EA $700.10 $1,400.20 10" SCH 80 PVC 60 LF $10.65 $638.82 GAL GLUE & PRIMER 2 EA $47.78 $95.55 10" VANSTONE FL 2 EA $75.84 $151.68 DRAIN PUMP DIP CL SI 10" MJ TEE 4 EA $182.39 $729.56 10" MJ 90 DEGREE 5 EA $141.28 5706.42 10" x 18'-0" DIP CL SI 5 EA $15.99 579.95 10" x 5'-0" VIC X PE W/ SR 2-0 FROM VIC 1 EA $257.36 $257.36 10" x 5-0" TFL X PE W/ SR 10" FROM FL 1 EA $346.78 $346.78 10" BF 1 EA $92.69 $92.69 10" SS NBG 8 EA $28.60 $228.80 10" MJ ACCESS 18 EA $23.04 $414.65 $30,110.66 ra. .rrr».vi [i[' T I.n '~T Tn /n'! nn Ashland Filtration Division 15 Yard Piping Equipment Budgets Description Duration / Month Rate Totals PC 220 Trackhoe 2.5 $ 6,500.00 $ 16,250.00 580 K Backhoe 2.5 $ 1,800.00 $ 4,500.00 Misc. Rental 2.5 $ 1,500.00 $ 3,750.00 Fuel 2.5 $ 1,900.00 $ 4,750.00 Pickup (in div. 1) 0 $ - Mob (in div. 1) 0 $ - Equipment Totals $ 29,250.00 Ashland Filtration Division 15 Yard Piping Labor Budgets Description Man Days Hours $41.92/hr Yard Pile San. Sewer 12 96 $ 4,024.32 8" Reject 11 88 $ 3,688.96 2" 1 water 6 48 $ 2,012.16 6" 4 water 8 64 $ 2,682.88 3" PD 9 72 $ 3.018.24 Storm Drain 22 176 $ 7,377.92 Alum Drain 3 24 $ 1,006.08 24" FE 6 48 $ 2,012.16 Sub Total 77 616 $25,822.72 UnderStab Backwash 15 120 $ 5,030.40 Reject 15 120 $ 5,030.40 Drains 12 96 $ 4,024.32 Sub Total 42 336 $14,085.12 Total Labor Budget $39,907.84 R~P1~s YCQNSTPt~_)C'7I1C, -June 147-2001 Letter # 228-200-506 Mr.-Paul Schuler Carollo Engineers 5100 S.W.' MacAdam Ave. Portland Or. 97201 Re:. City of Ashland WWTP P-Improvements Filtration Building Division 15 Interior Mechanical Piping System Dear Paul: - We have re=co" fumed our inside Mechanical piping cost structure. - Over the past month we were able to procure several. quotes for Carbon Steel pipe. and misc. biiy out items that have verified our original budgets. Bare in mind this is an.extremely complex. niechaxiical system, which requires full comprehension of the PI&D documents.. For your. convenience we have attached a bid summary detailing labor; materials, equipm6nt, and any subcontractors: Also included is a specific labor break down per piping system and various material quotes. ~ Please review-our attached spreadsheet detailing costs for this scope. We .look forward to finalizing this RFP and moving ahead with the project, Please don't hesitate to contact if we can be of fuither assistance. Sincerely Greg Huston Project Manager.. j~ i, P.O, Box 625 Stayton, Oregon 97383 (503) 769-1969 Fax: (503 769-4525 - O 08;2'8101 121:29 FAX ASHLAND 4 005 • I I 0 a U [1 C I b U D I n n 7 N f!7 rn O o o Ln O m m 0 0 0 OV O~ ~n Q1 h lD N 6 m I~ h i ID U N m m ^ M C iv N v m m (a E o E m td N E N ENc r c C b D w v E E tp to ~ N ~D V O O O 10 N R] O ~ D ~ ^ J h Q Q N Lo N m o , N pW~ q 1[7 C9 N ~n V N N ~ h N C, - Ln h I' ~ co (o m C ir, lD 1° ~O ~0 T C C'• ` ~ m O O c c H fO `E° Cf 7 au N N ;loo Ln omulo m o U" °o oooUl lDh111 O -+CJT O ON O 01 N 1D h to N O CD h h ,V m ~ ~D N m m ~ .-i m M C _ 0NEo S vp in p C ~ ~ N I V h] J d J r ~ H ~ H C N LL"] rH ~9 h M H O' C C - - lU Q d ~ E 7 C '~y~ 41 a t D 7 N u m a d U .v iv v. C , b Y V rJ vi m a y m y a Q C o w w m c h aC E .v _ o E rj- E-1 N c v y o U) Cl- a_ W v~i vNi o C U'~ IY1 lIt N 4 N I, Ashland Filtration Division 15 Yard Piping Labor Budgets Description Man Days Hours 45.85/hr I' Pine ,sy.stem Eff fittings and flare 9 72 5 3,301.20 4w Piping - Suction & Discharge 12 96 $ 4,401.60 i Back pulse - Suction 14 112 S 5,135-20 Back pulse - Discharge 36 288 $ 13,204.80 Permeate - Suction 28 224 $ 10,270.40 Permeate - Discharge' 22 176 $ 8,069.60 Vacuum system r 7 56 $ 2,567.60 Dip Tank Water 16 128 $ 5,868.80 15 120 S 5,502.00 Dip Tank Waste . Dip Tank Drain 9 72 $ 3,301.20 Dip Tank Air 9 72 $ 3,301.20 LPA @ Blower room 16 128 $ 5,868.80 LPA System i. 39 312 $ 14,305.20 Reject System 46 368 $ 16,872.80 r. Dist. Channel 17 136 $ 6,235.60 SPD System 3 24 $ 1,100.40 Air service to Valve operators 31 248 $ 11,370.80 Service Air system 18 144 $ 6,602.40 Alum System 34 272 $ 12,471.20 Chemical Piping 42 336 $ 15,405.60 Transfer - Suction & Discharge i 15 120 $ 5,502.00 Total Labor Budget 438, 3504 $160,658.40 I ASHLAND FILTRATION MECHANICAL DISTRUBUTION DIE Unit Cost 12" x 2-0" TFL X TFL W/ SR 4 EA $593.18 $2,372.71 12" x V-0" FL X FL 4 EA $296.04 $1,184.14 12" SS NBG 8 EA $51.00 $407.99 16" x 2'-0" TFL X TFL W/ SR 1 EA $1,355.29 51,35529 16" x 2'-0" FL X FL 1 EA $705.07 $705.07 16" FL 90 DEGREE 1 EA $962.78 $962.78 16" x 5'-0" FL X PE 1 EA $594.28 $594.28 16" MJ 90 DEGREE W/ MEGA LUG 1 EA $807.90 $807.90 16" SS NBG 3 EA $112.42 $337.27 DRAIN UMP S 1 .TION ME 10" FL 90 DEGREE 5 EA $273.59 $1,367.93 14" x 2'-0" HDG SLEEVE W/ SR 4 EA $432.33 $1,729.31 14" x 10" SS LINK SEALS 8 EA $103.84 $830.75 10" x 2'-0" FL X FL 9 EA $277.51 $2,497.60 10" x 2'-0" TFL X TFL W/SR 4 EA $424.97 $1,699.88 10" FLARCO 90 DEGREE FL 4 EA $517.50 $2,070.02 10" x 3'-0" FL X FL 4 EA $316.04 $1,264.17 10" SS NBG 8 EA $50.00 $399.98 10" NBG 20 EA $16.37 $327.34 10" FLA W/ RESTRAINTS 1 EA $559.08 $559.08 REJECT PUMP SUCTION SS SCH 10 4" VIC 90 DEGREE 8 EA $65.43 $523.43 4" x 2'-0" VIC X FL 4 EA $88.75 $355.00 6" x 2'-0" HDG SLEEVE W/ SR 8 EA $275.30 $2,202.41 6" x 4" SS LINK SEAL 8 EA $54.12 $432.95 4" x 10'-0" VXV 4 EA $162.12 $648.49 4" x T-0" VXV 4 EA $75.67 $302.69 4" VIC COUPLER 20 EA $38.04 $760.80 4" SS EXPANSION JOINTS W/ RESTANTS 8 EA $1,230.45 $9,843.60 4" x 5-0" V X FL 4 EA $125.80 $503.20 4" FL 90 DEGREE 8 EA $94.16 $753.27 4" x 2'-0" FL X FL 4 EA $114-18 $456.72 4" x 4'-0" FL X PE 4 EA $101.86 $407.42 4" SS FLA EPOXY COATED W/ STAINLESS BOLTS 8 EA $108.36 $866.84 BACKPUI~SE SCH 10 SS 10" x 4" VIC TEE 2 EA $601.32 $1,202.63 10" VIC 90 DEGREE 4 EA $598.94 $2,395.74 10" x 2'-0" V X FL 2 EA $311.05 $622.10 4" x 2'-0" V X FL 2 EA 588.75 $177.50 10" X 61-0" V X V 2 EA 5391.70 $783.41 10" VIC COUPLER 8 EA $108.02 $864.16 10" SS NBG 2 EA $50.00 $100.00 4" SS NBG 2 EA $11.77 $23.53 4" VIC 90 DEGREE 2 EA $65.43 $130.86 4" FLA EPOXY SS 2 EA $155.57 $311.14 4" x 5'-0" VIC X PE 2 EA $125.80 $251.60 4" VIC COUPLER 4 EA $38.04 $152.16 4" VIC X FL ADT 2 EA $76.40 $152.80 10" VIC X FL ADT 4 EA $265.60 $1,062.41 10" VIC TEE 2 EA $422.49 $844.97 10" x 4'-0" VIC X VIC 5 EA $300.82 $1,504.10 10" FL 90 DEGREE 2 EA $478.08 $956.15 10" VIC X FL ADT 2 EA $265.60 $531.21 10" x 8" FL RED 2 EA $288.17 $576.34 8" EXPANSION JTS W/ RESTRAINTS 2 EA $1,757.21 $3,514.42 10" VIC TEE 1 EA $422.49 3422.49 10" VIC FL ADT 3 EA $265.60 $796.81 10" x 6'-0" VXV 1 FA $391.70 $391.70 10" x 9'-0" VXV 2 EA $528.05 $1,056.09 10" SS NBG 14 EA $50.00 $699.97 10" VIC COUPLERS 10 EA $108.02 $1,080.20 6" x 8" FL RED 2 EA $224.39 $448.79 8" x 2'-0" VXV 2 EA $157.12 $314.24 8" VIC X FL ADT 4 EA $188.81 $755.25 8" VIC 90 DEGREE 2 EA $302.95 $605.90 8" VIC TEE 1 EA $366,05 $366.05 8" x 6'-0" VXV 1 EA $287.12 $287.12 8" x 3'-0" VXV 1 EA $189.62 $189.62 8" x 13'-0" VXV 1 EA $514.62 $514.62 8" x 6-0" V X X 1 EA $253.70 $253.70 8" VIC X FL ADT 5 EA $188.81 $944.06 8" x 9'-0" VXV 2 EA $384.62 $769.24 8" VIC TEE 1 EA $366.05 $366.05 8" VIC CROSS 4 EA N/A N/A 8" VIC 90 DEGREE 8 EA $302.95 $2,423.62 12" x 2'-0" HDG SLEEVE W/ SR 4 EA $234.65 $938.60 12" x 3" SS LINKSEAL 4 EA $171.99 $687.96 8" VIC COUPLERS 40 EA $89.32 $3,572.80 BACK PU~ SCH 10 SS CONT 8" x 12'-0" V X V 2 EA $352.12 $704.24 8" x 4'-0" VXV 5 EA $222.12 S1,110,59 8" x 7'-0" VXV 1 EA $319.62 $319.62 8" x V-0" VXV 4 EA $124.62 $498.47 8" x 7'-0" V X FL W/ 1 EA THD TAP 1" THR TAP 4 EA $266.85 51,067.40 PERMEAT_ E SCH 10 SS 8" x 4'-0" V X FL Wl 1/2" THR TAP 4 EA $296.67 51,186.69 8" x 5-0" VXV 4 EA $254.62 $1,018.47 8" VIC X FL ADT 8 EA $188.81 $1,510.50 8" VIC COUPLER 8 EA $89.32 $714.56 12" x 2'-0" HDG SLEAVE W/ SR 4 EA $234.65 $938.60 12" x 8" SS LINK SEAL 4 EA $171.99 $687.96 8" SS NBC 16 EA $20.10 $321.57 8" x 6" FL RED 4 EA $224.39 $897.57 6" EXPANSION JOINTS W/ RODS 4 EA $1,664.91 $6,659.64 6" EXPANSION JOINTS W/ RODS 4 EA $1,664.91 $6,659.64 6" x 6'-0" FL X FL 4 EA $326.08 $1,304.32 6" SS NBG 20 EA $19.59 $391.82 12" x 6" VIC TEE 3 EA $980.17 $2,940.52 6" VIC PL ADT 4 EA $158.81 $63523 12" x 10" VIC TEE 1 EA $863.06 $863.06 12" x 12" VIC TEE 1 EA $732.23 $732.23 12" x 4" VIC RED 1 EA $1,401.06 $1,401.06 12" x 6" VIC RED 1 EA $1,169.61 $1,169.61 6" VIC 90 DEGREE 1 EA $173.91 $173.91 12"x12'-0" VXV 1 EA $842.54 $842.54 12" x 9'-0" VXV 1 EA $671.28 $671.28 6" x 12'-0" VXV 1 EA $303.24 $303.24 12"x13'-0" V X V 3 EA $899.64 $2,698.92 12" x 2'-0" TFL X TFL W/ SR 1 EA $1,537.30 $1,537.30 12" VIC X FL ADT 1 EA $340.95 $340.95 12" SS NBG 1 EA $51.00 $51.00 12" VIC 90 DEGREE 3 EA $939.32 $2,817.95 12" VIC COUPLING 20 EA $168.54 $3,370.80 6" VIC COUPLING 2 EA $68.45 $136-90 4" TO DIP TUNKS 4" VIC 90 DEGREE 9 EA $58.06 $522.52 4" x 12'-0" VXV 4 EA $230.09 $920.35 4" x 15'-0" VXV 3 EA $286.40 $859.21 4" x 6'-0" VXV 4 EA $131.90 $527.59 4" x 4'-0" VXV 4 EA $104.10 $416.42 4" VIC COUPLING 35 EA $38.04 $1,331.40 i DRAIN PUMP 8" FLA 1 EA $272.57 $272.57 8" EXPANSION JT W/ RODS 1 EA $1,757.21 $1,757.21 8" x 2'-0" FXF 2 EA $258.74 $517.48 8" VIC 90 DEGREE 1 EA $145.65 $145.65 8" VIC FL ADT 7 EA $136.34 $954.41 8" x 8'-0" V X V W/ 1" THR TAP 1 EA $269.37 $269.37 8" x 6'-0" V X V W/ 1" THR TAP 1 EA $187.85 $187.85 8" x 2'-0" V X V W/ 1" THR TAP 1 EA $9,427.60 $9,427.60 8" x 14'-0" V X V W/ 1" THR TAP 1 EA $364.57 $364.57 8" VIC 45 DEGREE 1 EA $133.82 $133.82 8" VIC TEE. 5 EA $178.92 $894.60 8" VIC CAP 2 EA $69.10 $138.19 8" VIC 90 DEGREE 13 EA $145.65 $1,893.48 12" x 2'-0" NDG SLEEVE W/ SR 4 EA $234.65 $938.60 12" x 10" SS LINKSEALS 4 EA $10184 $415.38 8" x 6'-0" VXV 2 EA $187.85 $375.70 8" x 16'-0" VXV 1 EA $426.45 $426.45 8" x 12'-0" VXV 1 EA $319.75 $319.75 8" x 2'-0" VXV 2 EA $100.78 $201.55 8" VIC COUPLERS 80 EA $89.32 $7,145.60 8" x 8'-0" VXV _ 4 EA $238.60 $954.41 8" VIC 45 DEGREE 4 EA $133.82 $535.29 8" VIC X 3'-0" V X V W/ 2 EA 1" TAPS 4 EA $202.85 $811.41 VIC X 51-0" 4 EA $166.36 $665.44 AlS CARBON STL EPOXY GATED 8" FL TEES 1 EA 8" FL LR 90 DEGREE 3 EA 8" x 12'-0" F X F 3 EA 8" x 40'-0" F X F 1 EA 8" x 5'-0" F X F 4 EA 12" x 2'-0" HDG WALL SLEEVE W/ SR 4 EA $234.65 $938.60 12" x 8" LINK SEAL 4 EA $124.62 $498.47 8" SS 90 DEGREE SCH 10 FL 8 EA $453.18 $3,625,44 8" x 4'-0" F X F 10 EA 8" INSULATION KIT 8 EA 527.12 $216.94 8" CARBON STL LR 90 DEGREE 2 EA 8" x 4" CARBON STL WYE 3 EA 8" x 6" CARBON STL WYE 2 EA 8" x 9'-0" STL F X F 6 EA 6" 45 DEGREE STL F X F 6 EA 6" 90 DEGREE STEEL F X F 6 EA 6" x 10'-0" STL F X F 4 EA 6" EXPANSION JT 6 EA $1,664.91 $9,989.46 4" EXPANSION JT 6 EA $1,230.45 $7,382.70 6" SS NBG 40 EA $19.59 $783.64 8" SS NBG 40 EA $20.10 $803.92 PERMEATE SCH 10 SS i~~ 1? EBNIEAIE SCH 10 SS 6" x 5-0" F X F 4 EA $306.59 $1,226.37 6" x 3'-0" F X F 4 EA $267.63 $1,070.52 6" FL 90 DEGREE 4 EA $199.75 5798.98 6" x 4" FL RED 4 EA $123.06 $492.23 4" EXPANSION JTS W/ RODS 4 FA $1,230.45 $4,921.80 8" LP FL 90 DEGREE W/ BASE SUPPORT 4 FA $468.72 $1,874.88 8" SS NBG 8 EA $20.10 $160.78 10" x l'-0" HDG SLEEVE W/ SR 6 EA $234.14 $1,404.86 10" x 8' LINK SEAL 6 EA $171.99 $1,031.94 PJa l?11.>mas 2" CHECK VALVES 2 EA $92.53 $185.07 2" BALL VALVES 2 EA $30.36 $60.71 2" GALV PIPE 60 LF $1.86 $111.54 2" UNION 2 EA $6.50 $13.00 2" 90 DEGREE 8 EA $178 $30.26 AL W 112" PULSATION DAMPNER 2 EA $69.03 $138.06 1/2" PRESSURE RED VALVE 2 EA $47.85 $95.71 1/2" PRESSURE REG VALVE 2 EA $0.00 $0.00 1/2" BALL CHECK VALVES 2 EA $16.56 $33.12 1/2" PVC SCH 80 200 LF $0.17 $33.80 PRESSURE GAGE W/ DIAPHRAM SEALS 2 EA $458.58 $91715 1" UNIONS 10 EA $3.13 $31.33 1" PVC SCH 80 200 LF $0.35 $70.20 1" BALL VALVES 10 EA $22.59 $225.94 CALIBRATION CHAMBERS 2 EA $0.00 $0.00 1 112" BALL VALVE 10 EA $37.51 $375.05 2" BALL VALVE 6 EA $49.28 $295.70 2" WYE STRAINER 2 EA $120.64 $241.28 2" BALL CHECK VALVES 2 EA $91.59 $183.17 2" FLANGES 4 EA $5.29 $21.16 1" NEDDLE VALVES 6 EA $238.73 $1,432.39 1 112" ROTOMETER 1 EA $0.00 $0.00 1 1/2" CU TYPE L 200 LF $2.39 $478.40 1 1/2" PRV 1 EA $241.92 $241.92 1 112" SOLI NODE VALVE 1 EA $425.10 $425.10 3" SCH 80 PVC 400 LF $1.63 $650.00 1" SCH 80 PVC 400 LF $0.35 $140.40 2" UNIONS 6 EA $9.53 157.17 2" DIAPHRAM VALVE 10 EA $500.50 $5,005.00 CHEM 51.2 1" SCH 80 PVC 1000 LF $0.35 $351.00 1 112" SCH 80 PVC 1000 LF $0.57 $572.00 1" SCH 80 PVC 1000 LF $0.35 $351.00 1" 90 DEGREE 50 EA $1.20 $59.80 1 112" 90 DEGREE 50 EA $1.72 $85.80 ill MTAD 50 EA $2.35 $117.65 1 1/2" MTAD 50 EA $3.94 $196.95 1" UNIONS 50 EA $3.13 $156.65 DIP TANKS 2" SCH 40 SS 400 LF $7.07 $2,828.80 2" FL 16 EA $27.51 $440.13 2" SS NBG 16 EA $5.06 $80.91 2" THIRD 90 DEGREE 20 EA $7.38 $147.68 2" UNION 10 EA $28.54 $285.35 AIR 1/2" SS TUBING 1000 LF $2.78 $2,782.00 1" SS TUBING 1000 LF $5.59 $5,590.00 1/4" SS TUBING 1000 LF $1.55 $1,547.00 1" SS COMPRESSON COUPLERS 100 EA $47.68 $4,768.40 112" SS COMPRESSON COUPLERS 100 EA $16.95 $1,695.20 VACUUM PUMPS 1/2" SCH 40 SS THRD 600 LF $2.05 $1,232.40 112" SCH 40 SS TEE 12 EA $2.98 $35.72 1/2" SCH 40 SS 90 DEGREE 12 EA $1.99 $23.87 2" SCH 10 SS TUBING 1000 LF $5-24 $5,239.00 2" x 11i4" RED 6 EA $11-38 $68.25 2" COUPLERS 50 EA $8.32 $416.00 2" TEE 20 EA $9.59 $191.88 1/4" SCH 40 316L SS 200 LF $1.40 $280.80 AI UM TANK 3" SCH 80 PVC 200 LF $1.63 $325.00 3" VANSTONE 6 EA $9.04 $54.21 3" 90 DEGREE 10 PA $5.46 $54.60 3" QUICK LUNN W/ CAP 2 EA $49.48 $98.96 3" DIAPHRAM VALVES 4 EA $868.40 $3,473.60 2" SCH 80 PVC 100 LF $0,79 $79.30 2" 6 EA $5.29 $31.75 GAL OF GLUE/ 5 EA $47.78 $238.88 TOTAL; $237,189.15 ■■>pr-02-O1 02:30P RB FAB 0 OR 503-638-o5o6 P_01 OEM loo ►1_ _ ll~I= Iii. ~ iG V~SE~ Attachmont "A" Estimate t#: 2001-040281 Project Name: City of Ashlond Tertiary Treatment Plant Date: April 2, 2001 Item Description Unit Price 1 - Lot 6", 8", $ 12" welded steel air piping From the 6" flange connections to the blowers, increasing to 8", then going through the 12" headers- Then the 12" piping to the filters and stopping with the 8" flanged e1190 connections to other piping- Ref. Sheets M-26,M-27, & M-28 Notes: Welded steel PIPe per C200/A53 STD. WT. ' Flanges per C207 CL.D Bolts and nuts per A307 Galvanized NO Lining Prime coated with a High Temp Epoxy 4" welded steel air piping From outlet connection off 12" piping, coming up through the floor, and stopping with four 4" flanged e1190's turned down. Lump Sum..._$ S2/100 FOB Jobsite X Estimator: Brad Goode 475 5W Borland Rd. West Linn, OR 97068 (503) 638-8827 " (503) 638-0506 Fax (R:PP--7 nTn 17, nrrTrr..r Apr1-02-01 01:48P RB FAB 0 OR 5o3-638-0506 P-01 r - I I I 0 Il INC. April 2. 2001 Estm # 2001-040281 Attn: Estimating Dept. Project: City of Ashland Tertiary Treatment Plant Gentlemen: We are pleased for the opportunity to quote you on furnishing all labor, materials, services, and equipment required to shop fabricate the welded steel pipe and fittings with specified shop linings and coatings as hereinafter described in Attachment "A". This scope. the General Terms and Conditions, and all attachments, shall become part of our contract should our proposal be accepted. Included in our proposal is the preparation of engineered assembly drawings, manifolds, reducers, wyes, outlets, threaded-outlets, elbows, steel rings and flange bolt-ups and couplings at mating connections. Specifically excluded (unless specifically described hereinafter) but not limited to ' are all: Field Finish painf, pumps, valves, metering devices, pipe supports (unless shop welded to pipe). gouges, tanks, vents. wall sleeves, pipe and fittings other than steel, gates, anchor bolts, expansion joints, insulating devices, cathodic protection, and flange bolt-ups and couplings required for the installation of pumps, valves, equipment and other items furnished by others. We trust you will find our proposal attractive, and we would like the pleasure of serving your needs. Sincerely, Brad Goode RE FAB INC. BS:cg Enclosures: Attachment "A"- Items of Sale Attachment "B"- Terms and Conditions 475 SW Borland Rd. West Linn, OR 97068 (503) 638-5827 ' (503) 638-0506 Fax RECEI'•"ED TIME PPR. 2. 2: Rapi'll PRINT TIME nPR. 2. Z: 02PM - - I CONS R . C June 29, 2001 Letter # 228-200-513 Mr. Paul Schuler Carollo Engineers 5100 S-W. MacAdam Ave. Portland Or. 97201. -Re: City of Ashland WWTP Improvements . Filtration Building Divisioif 15 Dordestic Plumbing Dear Paul: We have finalized our pricing for Plumbing of the above-mentioned project. McLaughlin Plumbing-has performed the-under slab work for the attached quotation. Modern Plumbing will complete the project on not.~o exceed price structure. If they are!'able to complete their scope under budget these f- rods will be credited back to the Owner in a deductive change order. Please review the attached quotations detailing the different-scopes. The subcontractor package totals $24,690, with our 5% OH&P added it brings the total to $25,924. We look forward to finalizing this RFP and moving ahead.with the project. Please don't1esitate. to contact us if we can be of further assistance.. Sincerely Greg Huston / Project Manager P.O. Box 625 Stayton, Orogon 97363 (503) 769-1969 . Fax: (503 769-4525 OR - ~z6S_ 4.......JUN-27`01 WED 14:40 I D _ MODERN PUUMB I NB TEL NO - 503-'773-2043 4316 Pol............ I[:kf'R IN I I rC39t'. IT,1(;FS (54 1) 77(t E7 CA Modern _ P. u I h 4esldenllel tomme►clal Remodeling • NcaUtig PKOPOSAL 317 East Jackson P?O, (fox 338 AND Medror'd, Oregon 97501 CONTRACT (541) 773-5366 Fax (541) 773-2043 1` U('OSnL SUeMllltn TO PH()WF b."t Sl~syden Construction Inc. 503-769-1969 6-27-01 zs- P..0. Bo;: 625 Ashaand Waste water Treatment Plant _....w..... alY, sin(€ AiJi; r r ~ti~' ~bo iocti25N.,.... Stayton, OR. 97363 1295 Oak 5t. Ashland, OR. - We hereby subnd( spucllicatlona and eclirr)ale, ror; Ne,w l -umbing. for RPstroo7~ on second floor wiLb the tollowin scope of work: - - i, All waste _an-ci vent._...~_or .toilet_, _Lavr, and..__floor drains ~p.P:i.~~~..~.~.._..,..._ M-33. A..._11_p )pe and f it a_.ik.~n.._....- - _ -_--...tfi~~la.....~ hv ~ no hub (S.S-) sewe.r......pi >itig_only . No (D.).......lp.lp_ nS_.__.._......_ _ , - onl all i ink t ' e I, cp ter. 2. TDouiestic cold Water to Restrpotn V__....,x,.~_ p....... kJ~._,,................_ PL_-._. No oLhpr water piping but for unisex Restroont, nstiXal zon of all hot and cold water with fiberc].ass Insulation( byT P--2 Tnsultion. - - - - - - - 4. Add for water heater for Rest room only,~Eleet 10 Gal: (not shovi!) - - - - - Tota] not to exceed: WC NOpose hereby to furnish materlal and labor-complete to accordance with above sgacf►icatiotls, tot the sum of: 11600.00 Progress billing on 25th of each month and du.e 101-31 dollars (g Ptti~n~el~7 to M madn ~e Inllt~e'. , following. Net upa►'t C°o:r(pletian. mAllanmnaler earial 1v dccordlntl3rAnieed to be os 9pecillad. All work to be t~m ? In a workmanlike Authorizod fl 11D pro cilrns. MY Ulter411on or dovlaflon from shove 9pbClnca- $i(J, na1UfB---...---_-.. W ----....._........v. standard r lions irlvomou rixt,a com will be a■eculed only Oun wrlltph ordora;. and will become on uxUe tharge over and Abmv Iho ottimale, All F1grOonlenle contingent upon ctdkss. acct. Note: TMs prooossf may be dan(e or dolayg beyond ol,rconlrtsl, Owner to terry tire, tornado and other necgssaty Insvr- willidmwn by Us 11 not acc eplod willlln day9. srM.o, y~ VUf dotkml6 kra lully odvared by Wotkmerie Cormr.AllFalinn Inturinoa. A*cce(7taTICS Of prOpOS81....The nhovo Prices, sneciflcarlons end con- dillon5 are sal]slE aOoTT and are hereby accepted. You ere Huthorlied In do the Signature- work as specified. Poymhnr will be made, es ovltined Abovo- °'r" °RECEIVED TIME JUN,27. 2;15PM Pinn"°PRINT TIME JUN. 27. 2=17PM n I- 06/29 01 FRI 03:32 F_U 15414884040 S1RTden-Aeblanrl r'1VTF 31~?den oYPic:± [~jo02 SENT'8Yc MCLAUGHLIN PLUIMING SA19301756; SAAR-21-01 17:01; PAGE {f1 ;o.' sLAY~EPJ AT: i a1~ee~aafl McLaughlin Plumbing & Heating Co. Inc. Mechanical Contractors OR 0057 84 CA*2101 8 -1~II3E/WBEa~9 ~i Pt) BOX 340 Medford, OR 97501-0023 CSr}1) 830-1755 - FAX (541) 930-1756 Slayden Construction, Inc. 21 March 2001 PQ Box 625 Stayton, OR 97383 Attn; Zack Secrest Project; Ashland WWTP - Ashland, OR - Project NO. 205-15899 Tertiary Treatment Building GerRiernen: Listed below is oue budga price lo furnlsh and InsLall the underground soil pipe floor drain system as outlined ckn Plan Sheet M-26. We Include: Z Soil Piped end Fittings 2- Floor Drains 3. Floor Cleanouts 4. Testing 5. Link Seal cans and links at sump pit. 6. Soil lines and primmer lines required t0 be above besement slab will be Installed aT 8" above finish slab. Iota l......,.._....... .............$~.,~,4g0.OQ We Exclude: 1. FeeS, FeMiLE and SySttm D~velop-nPnt Chi3rge9 2. Excavation, bolding and back-PH 3, Concrete encasemerrt of soil lines. NOTE: We will require dimensional laXout of floor drains before starting excavation- If you have any questions pertelrling to the budget please call Dick McLaughlin, Yours truly, aughlin Plumbing & Heating Co InG_ Marie C. McLaughlin F'reslCienL/CEO . I) car LL~ rdiralvrl in rrPnlir o, e Il G 1 rl e e r s rc~pnn.eirr, ryrmlilt/.tnlniinn.e (ol.111osr NW .scrvc. August 27, 2001 W. 0. 4411 B.30 Slayden Construction, Inc. P.O. Box 625 Stayton, Oregon 97383 Attention: Zack Secrest, Superintendent/Project Engineer Re: City of Ashland WWTP Process Improvements Request for Proposal RFP-248 Membrane Filter Building - HVAC Our letter of August 8 requested inclusion of slightly more HVAC ducting in the Lower Level of the Membrane Filter Building; today we received the proposed additional costs for this work by your subcontractor. These additional costs are acceptable and will be added to the costs shown in your letter of July 19, 2001, as follows: Costs in July 19 letter (discussed at July 20 meeting) $106,353. Additional costs for duct extension 1,991. Total HVAC Costs $108,344. This revised total amount will be included in a forthcoming change order as an increase in Contract Price. Please contact us if you have any questions. Very truly yours, CAROLLO ENGINEERS, P.C. 04V?0~a Peter C. Williams, P.E. Enclosure cc: ~hland - Paula Brown (w/ enclosure) Carollo - Portland (w/ enclosure) ASHLAND WWTP 1295 OAK STREET ASHLAND. OREGON 97520 541-488-4339 fax: 541-488-4379 AUC 13 01 04:00p smith air & metal 541 899 7491 p l i SMITH AIR ~ METAL P.O. I iOX 1655 363 C A G1 LCH RD. JACKSO VU LE OR 91530 Phone 541 899-7491 F"!;fF- ~t I I SLAYDEN CONST. AUG 2 7 2001 j 8 113/01 GAROLLO ENGINEER'S iE ASHLAND WWTP FIELD OFFICE I EXTEND SUPPLY DUCT MEMBRANE FILTER BUIt1 ING BASEMENT. K.F.P. 248 LABOR $ 630 SUPPOR'T'S & HARDWARE $ 775 ALUMINUM $ 336 II IE TOTAL $ 1,896.00 1 I 9V. Irb Ma.rkuP 990.80 ,5ar ; 4.~l. ,f Ij Ij k f ~i I~ I, !j I ,t q I E 2 F PAGE 1 / 2 CITY OF ASHLAND - 20 E MAIN ST. DPO NUMBER ry ASHLAND, OR 97520 E 01391 (541) 488-5300 OREGON. VENDOR: 000134 SHIP TO: Ashland Public Works SLAYDEN CONSTRUCTION, INC (541) 488-5587 P O BOX 625 27-1/2 N MAIN STREET SLAYTON, OR 97383 ASHLAND, OR 97520 FOB Point: Req. No.: Terms: Net 30 days Dept.: PUBLIC WORKS Req. Del. Date: 9/1/98 Contact: Paula Brown Special Inst: Confirming? No Quantity Unit Description Unit Price Ext. Price THIS IS A REVISED PURCHASE ORDER WWTP Improvements- PO 00083 1,501,556.95 $3,693.835.45-- Paid partial $316,753.80 & Closed - PO 00321 $4,220,423.30- Paid $4,244,722.65 & Closed- PO 01391 issued for balance of project including change orders and payments - Balance of project as of 10-19-2000- $1,501,556.95- Balance includes Change Orders 1-31 Change Orders 32 - 44- 166,898.00 Per Requsition dated 04/02/2001 Revised purchase order June 13, 2001 12,717.00 Change Order 45- Credit Haz Waste Removal- New Sample Pumps Revised purchase order June 13, 2001 515,686.00 Change Order 46- Membrane Facility - General Conditions Revised purchase order June 28, 2001 100, Change Order 47- Membrane Filter Bldg- Zenon Coordination ~I Revised purchase order August 23, 2001 1,457,115 .00 Change Order 48-- Membrane Filter Bldg j Division 2,3,4, and 5 I SUBTOTAL BILL TO: Account Payable TAX 20 EAST MAIN ST FREIGHT 541-552-2010 TOTAL ASHLAND, OR 97520 Account Number Amount Account Number Amount E 675.08.30.00.704200 3,718,064.51 VENDOR COPY _ orized oig-afu e PAGE 2 / 2 OF ASy a CITY OF ASHLAND - 20 E MAIN ST. DATE PO NUMBER _ ASHLAND, OR 97520 7/1/01 01391 tQ~ ' ry (541) 488-5300 ,0REGG~ VENDOR: 000134 SHIP TO: Ashland Public Works SLAYDEN CONSTRUCTION, INC (541) 488-5587 P O BOX 625 27-1/2 N MAIN STREET SLAYTON, OR 97383 ASHLAND, OR 97520 FOB Point: Req. No.: Terms: Net 30 days Dept.: PUBLIC WORKS Req. Del. Date: 9/1/98 Contact: Paula Brown Special Inst: Confirming? No r Quantity Unit Description Unit Price Ext. Price Revised purchase order August 2} 2001-- 1,001,077.44 FY change over not complete- Required payment processed w/o po Revised purchase order Sept 13, 2001-- 47,090.00 Change Order #49-- Membrane Filter Bldg Bridge Crane Revised purchase order Sept 13, 2001 14,325.00 Change Order #50- Misc Ops Bldg and Process- Completions Revised purchase order Sept 13, 2001 929,188.00 Change Order #51-- Membrane filter Bldg- HVAC and Div 15 ~I I~ SUBTOTAL 3,718,064.51 BILL TO: Account Payable TAX 0.00 20 EAST MAIN ST FREIGHT 0.00 541-552-2010 TOTAL 3,718,064.51 ASHLAND, OR 97520 Account Number Amount Account Number Amount VENDOR COPY orizec 5igr aU e r, CAROLLO ENGINEERS, P.C. Project No. 4411 B30 CONTRACT CHANGE ORDER NO. 52 OWNER: City of Ashland, Oregon PROJECT: Wastewater Treatment Plant Process Improvements & Membrane Filtration SRF # 11750 CONTRACTOR: Slayden Construction, Inc. ENGINEER: Carollo Engineers, P.C. The following changes, additions to or deletions from the work described in the Contract Documents are hereby authorized: Item Description Cost Time No. See attachment dollars (days)_ 1 RFP-264 Membrane Filter Building - Divisions 6,7,8 and 9 280,037.00 -0- Original Contract Amount $12,374,000.00 Net Change by Previous Change Orders 6,635,036.00 Contract Amount prior to this Change Order 19,009,036.00 Net Change due to this Change Order 280,037.00 New Contract Amount $19,289,073.00 The Contract Time is (unchanged) by -0- calendar days. The Contract completion date will be June 15, 2002. The amounts indicated above shall be compensation in full for the work described and shall include all costs, direct and indirect, including extended overhead. Accepted by Date: (Contractor) Recommended by: Date: 09 ~9-O[ (Engineer) ae Approved by: X /i Date: r ity) 1 CONTRACT CHANGE ORDER NO. 52 City of Ashland WWTP Process Improvements & Membrane Filtration SRF # 11750 Description of Items in Change Order 1. RFP-264 Membrane Filter Building - Divisions 6 7 8 and 9. During the past year, there were discussions of the need to provide effluent filtration and phosphorous removal facilities for the wastewater treatment plant. Pilot testing took place in the fall of 2000 and design of the membrane filtration facilities commenced. The City decided to proceed with construction of these facilities on a fast-track basis to meet the State-mandated operational completion date of May 1, 2002. This will be accomplished utilizing a series of change orders so that construction can proceed on portions of the Work while design is completed. This RFP is established to cover work under Specification Divisions 6 (Wood, Carpentry & Plastic), 7 (Insulation, Roofing, Siding, Sealants), 8 (Doors, Windows, Hardware & Glazing) and 9 (Finishes). Under Division 6, work consists primarily of rough carpentry for wood stud walls and the ceiling structure for the Electrical Room, Office and Blower Room. Under Division 7, work includes waterproofing and insulation (rigid and Batt), the standing seam sheet metal roof, metal siding and soffits. Division 8 work includes doors and frames, coiling doors, windows, glass and glazing, hardware and skylights. Division 9 work includes gypsum board, resilient base, resilient sheet flooring, metal faced acoustical panels, and paints and high performance coatings (but not including the underside of the roof decking) . A series of cost proposals were provided to the Engineer for review. The Engineer contracted with an independent cost estimating firm to review these proposals for price evaluation. Costs were discussed at a negotiating meeting on July 20 and at the Monthly Progress meeting on August 23, 2001; the Contractor and the Engineer agreed in resulting total costs of $280,037.00 for work under these four Specification Divisions. In a subsequent letter of August 27, 2001, the Engineer reiterated the agreement and indicated that the total negotiated amount would be included in a forthcoming change order. 2 y PAGE 1 /2 F ASy~ _ --s CITY OF ASHLAND 20 E MAIN ST. DATE PO NUMBER ASHLAND, OR 97520 07/01/2001 01391 o (541) 488-5300 REGO VENDOR: 000134 SHIP TO: Ashland Public Works SLAYDEN CONSTRUCTION, INC (541) 488-5587 P O BOX 625 27-1/2 N MAIN STREET SLAYTON, OR 97383 ASHLAND, OR 97520 FOB Point: Req. No.: Terms: Net 30 days Dept.: PUBLIC WORKS Req. Del. Date: 09/01/1998 Contact: Paula Brown Special Inst: Confirming? NO Quantity Unit Description Unit Price Ext. Price THIS IS A REVISED PURCHASE ORDER WWTP Improvements 1,501,556.95 $3,693.835.45 $316,753.80 & Closed $4,220,423.30 & Closed of project including change orders and payments 10-19-2000 Balance includes Change Orders 1-31 Change Orders 32 - 44 166,898.00 Per Requsition dated 04/02/2001 Revised purchase order June 13, 2001 12,717.00 Change Order 45 Credit Haz Waste Removal New Sample Pumps Revised purchase order June 13, 2001 515,686.00 Change Order 46 Membrane Facility - General Conditions Revised purchase order June 28, 2001 100,000.00 Change Order 47 Membrane Filter Bldg Zenon Coordination Revised purchase order August 23, 2001 1,457,115.00 Change Order 48 Membrane Filter Bldg Division 2,3,4, and 5 SUBTOTAL BILL TO: Account Payable TAX 20 EAST MAIN ST FREIGHT 541-552-2010 TOTAL ASHLAND, OR 97520 Account Number Amount Account Number Amount E 675.08.30.00.704200 3,998,101.51 Authorized Signature VENDOR COPY y° pF1ASPAGE 2 / 2 CITY OF ASHLAND 20 E MAIN ST. DATE PO NUMBER ' ASHLAND, OR 97520 07/01/2001 01391 a (541) 488-5300 OREGON. VENDOR: 000134 SHIP TO: Ashland Public Works SLAYDEN CONSTRUCTION, INC (541) 488-5587 P O BOX 625 27-1/2 N MAIN STREET SLAYTON, OR 97383 ASHLAND, OR 97520 FOB Point: Req. No.: Terms: Net 30 days Dept.: PUBLIC WORKS Req. Del. Date: 09/01/1998 Contact: Paula Brown Special Inst: Confirming? NO Quantity Unit Description Unit Price Ext. Price Revised purchase order August 23, 2001 1,001,077.44 FY change over not complete Required payment processed w/o po Revised purchase order Sept 13, 2001 47,090.00 Change Order #49 Membrane Filter Bldg - Bridge Crane Revised purchase order Sept 13, 2001 14,325.00 Change Order #50 Misc Ops Bldg and Process Completions Revised purchase order Sept 13, 2001 929,188.00 Change Order #51 Membrane filter Bldg HVAC and Div 15 Revised Purchase Order 10/09/2001 280,037.00 Change Order #52 Membrane Filter Bldg - Division 6,7,8, and 9 I I SUBTOTAL 3.998.101.51 BILL TO: Account Payable TAX 0.00 20 EAST MAIN ST FREIGHT 0.00 541-552-2010 TOTAL 3,998,101.51 ASHLAND, OR 97520 Account Number Amount Account Number Amount horized Signature VENDOR COPY CITY OF ASHLAND REQUISITION No. PW276A - 2002 Department PW - WWTP Construction Date October 3, 2001 Vendor Slayden Construction, Inc Requested Delivery Date current PO Box 625 Deliver To Paula Brown Stayton, OR 97383 Via PAULA BROWN Account No. 675 . 08 . 30 . 00 . 704200 Note: Please allow approximately two(2) weeks for delivery on items not generally caried in stored, and approximately two (2) months on printing jobs.) Item No. Quantity Change Description Use of Purchasing Office Only date signed Order No. Unit Price Total Price PO No. 08/12/98 1 original On-site Process Improvements - ox ditch, u/v, $12,374,000 00083 varies 1-19 Changes per Feb 29, 2000 Requisition $2,780,073 prior varies 20-29 Changes per Aug 15, 2000 Requisition $461,219 prior 01391 varies 30-44 Changes per Apr 2, 2001 Requisition $343,067 prior 01391 04/24/01 45-46 Changes per Jun 11, 2001 Requisition $502,969 prior 01391 06/21/01 47 Membrane Filter Bldg - Zenon Coordination $100,000 prior 01391 07/30/01 48 Membrane Filter Bldg - Div 2, 3, 4, and 5 $1,457,115 prior 01391 08/20/01 49 Membrane Filter Bldg - Bridge Crane $47,090 prior 01391 09/04/01 50 Misc Ops Bldg and Process Completions $14,325 prior 01391 09/04/01 51 Membrane Filter Bldg - HVAC and Div 15 $929,188 prior 01391 09/28/01 52 Membrane Filter Bldg - Div 6, 7, 8, and 9 $280,037 new NEW TOTAL $ 19,289,083 Job No. t hereby certify that the above items are necessary for the operation of this department and are budgeted Department Head or Authorized Person Issued By Date Received By for Kari: BID /RFP / EXEMPT: exempt change orders Contract Start Date: 01-Sep-98 Contract Completion Date: 02-Jun-02 Insurance on file: Yes / No / Not Required Project No: n/a ORIGINAL