HomeMy WebLinkAbout2015-359 CONT Chg Order #1 - Carols Colors
CITY OF
-ASHLAND
DEPARTMENT OF PUBLIC WORKS
CONTRACT CHANGE ORDER NO. 1
PROJECT: Helman/North Main Median Landscaping Improvemem DATE: 12/28/15
LOCATION: Heiman / North Main Median PROJECT NO.: 13251
CONTRACTOR Carols Colors
This additional work is associated with the required installation and landscape improvements at Heiman /
North Main Median, aka "Gilligan's Island. This Change Order extends the contract completion date to
January 15, 2016.
Item No. 11 Description Quantity Unit Price 11 Amount
Item #1 Cover gravel edge along curb
Per attached with mulch and revisit in spring
Invoice to bring up grade if too much I LS $100.00 $ 100.00
Item 42 Remove soil and mulch along
Per attached sidewalk to approximately 4"
Quote deep x 4" wide and replace with I LS $130.00 $ 130.00
Item 43 Install suggested irrigation
Per attached modifications per Hunter
Quote Irrigation suggestions. (see task I LS $70.00 $ 70.00
Total Change Order
Original Contract Total $ 18,697.00
Revised Contract Total $ 300.00
PERCENT CHANGE OF ORIGINAL CONTRACT 1.6%
Prepared By: ~ l y 5~r yr w 112- IL~- (5
1 r, ect Manager Date
Recommended By: l 124 Lt->It-
eri Servic Manager Date
j~c-Tl N y «
Approved By:
blic Wo s Direct Date
Accepted By: Carols Colors Landscaping
87 West Nevada
Ashland, O 975 0
L Z c~ 15~
Contract r esenta ' e Date
ENGINEERING Tel: 541-488-5347
20 E_ Main Street Fax: 541-488-6006
Ashland. Oregon 97520 TTY: 800-735-2900
poi- ashland.or. us
11 AJuliesVGilligan's IslandACarols Colors Change Order 12.28. 15 .Jsy
CAROL'S COLORS
LANDSCAPING
Maintenance and Construction
87 W. Nevada St, Ashland, OR 97520 541-535-7074 www.carolscolors.com FAX 541-708-0946 CityAshland 12-23-15
Date: December 23, 2015
Name: City of Ashland: Gilligan's Island
Property Address:
Billing Address:
Contact Information: Julie Smitherman:
Landscape Development Proposal: Costs of New Tasks for Gilligan's Island
➢ Cover gravel edge along curb with mulch and revisit in spring to bring up grade if too
much settling has occurred
Bid: $100.00
➢ Remove soil and mulch along sidewalk to approximately 4" deep x 4" wide and replace
with drain rock and cover with 2" of mulch to help direct run off
Bid: $130.00
➢ Regrade soil and mulch around plantings to smooth existing shoe impressions, in late
spring if needed
➢ Contact LA and Julie Smitherman at irrigation start up to review installation, timer
schedule and watering details
➢ Contact Julie Smitherman regularly to review watering schedule and needs throughout
summer months 2016
Bid: The above are covered in original bid: One Year Maintenance
➢ Install suggested irrigation modifications per Hunters suggestions
Bid: $70.00
On task list #3 & #6 will be handled by the City of Ashland. Hunter does not make a battery
operated moisture sensor
ACCEPTANCE
You are hereby authorized to furnish all material, equipment and labor required to complete the work
described in the above proposal, for which the undersigned agrees to pay the amount stated in said
proposal and according to the terms thereof. Any change involving extra cost of labor or materials will be
executed upon submission and acceptance of a written change order. In the event this account is
referred to collection you agree to pay all costs of collection. The proposal is accepted by the client
signing and returning this contract or by accepting any of the work described on the proposal.
Accepted by the City of Ashland
Date
Accepted by Penny Fullmer for Carol's Colors
Date
Page 1 of 2
Licensing-
We are a fully licensed and insured company holding the following licenses:
• Oregon Landscape Contractors License #9055 (including Irrigation and Backflow categories)
• Oregon Pesticide Applicators License #AG-L1 020578CPO (including Ornamental Insecticide &
Fungicide and Herbicide categories)
Warranty-
All plant material will be guaranteed for 1 year from date of completion based on a fully functional
irrigation system. Damage or loss of plant materials due to vandalism, freezing or acts of neglect by
others, is exempt from Contractor's replacement responsibility.
Irrigation parts, low voltage lighting and workmanship are guaranteed for 1 year from date of project
completion.
Follow ups for complete irrigation installation-
We will provide you with a laminated legend of your system listing the zone numbers and what areas
they cover to be placed in your control box for easy reference.
We will either winterize or turn-on your system the first year- free of charge.
-The winterization phase of this service protects your system against freezing by draining the
water from vulnerable areas.
-The Turn-on phase of this service includes manually running through the system and checking
for breaks and/or coverage adjustments. (Repairs are free if they are a result of faulty materials or
workmanship on our part, otherwise they can be done at a rate of $65/hr.)
References:
Oregon Shakespeare Festival Susan Sullivan
P.O. Box 158 305 Stoneridge
Ashland, Oregon Ashland, Oregon 97520
Scott 541-482-2111 ext 385 541-512-9684
Reid Hanna Peter & Sharon Potemkin
1101 Siskiyou 195 Carolyn Court
Ashland, Oregon Talent, Oregon
Tom Reid 541-944-4149
541-482-3711
David Bryant & Mary Zarc Rick & Alison Penfield
551 Strawberry Lane 100 Ridge Rd.
Ashland, OR 97520 Ashland, OR
415-786-5589 541-482-7557
Please call our references. We are proud of our track record.
Landscape/Irrigation Contractors License #9055
Landscape Contractors Board
2111 Front Ste NE Ste 2-101
Salem, Oregon 97301
(503) 967-6291
Page 2 of 2
Julie Smitherman
From: Laurie Sager [lauriesager@lauriesager.com]
Sent: Monday, December 21, 2015 2:37 PM
To: Julie Smitherman
Cc: Mike Faught; 'Clint Brown'
Subject: Gilligan's Island Walk through
Julie,
Great to see you on Friday and to see the project installed at N Main. Per our walk through, here is a draft punch list for
your review and adds as needed. If all looks good, I can forward on a final to Carols Colors, or you can send on, just let
me know.
1. Cover gravel edge along curb with mulch and revisit in spring to bring up grade is too much settling has occurred.
2. Remove soil and mulch along sidewalk to approximately 4" deep x 4" wide and replace with drain rock and cover with
2" of mulch to help direct run off.
3. Coordinate with Parks to decommission controller wires for one year.
4. Regrade soil and mulch around plantings to smooth existing shoe impressions, in late spring if needed.
4. Contact LA and Julie Smitherman at irrigation start up to review installation, timer schedule and watering details.
5. Contact Julie Smitherman regularly to review watering schedule and needs throughout summer months 2016.
6. City Public Works shall research and repair drain at low point crossing.
7. Carols Colors shall install suggested irrigation modifications per Hunters suggestions to Ben (see email) in
coordination with Julie Smitherman.
Laurie Thornton
Laurie Sager & Associates
700 Mistletoe Road Suite 201
Ashland, Oregon 97520
P 541 488 1446 F 541 488 0636
www.lauriesager.com
1
Julie Smitherman
From: Ben Graffis [ben@caro[scolorslandscaping.com]
Sent: Friday, December 18, 2015 11:06 AM
To: Julie Smitherman
Cc: lauriesager@lauriesager.com
Subject: Gilligan's island
Hello,
I spoke with Danny at hunter regarding auto flush valve, air relief valve and soil moisture meters. Danny said
we only need to flush system one time in the spring for two minutes and then if any repairs are done to flush the
system after repairs are completed. His thoughts were to have a ball valve to flush system and install a sprinkler
head as an indicator where the air relief valve is to indicate when irrigation system is operating and or indicate
when the system has a leak. Hunter is willing to donate soil moisture meters and a controller if we can provide
AC power for controller. We will go ahead with switching out the flush valve and air relief valve to a ball valve
and sprinkler head. Let me know about the power availability for the soil moisture meters and we can move
forward with them.
Thanks
Ben Graffis
Carols colors
i
Page 1 / 1
CITY OF
ASHLAND DATE PO NUMBER
20 E MAIN ST. 11/20/2015 13251
ASHLAND, OR 97520
(541) 488-5300
VENDOR: 006991 SHIP i o: Ashland Public Works
CAROL'S COLORS (541) 488-5587
P 0 BOX 1169 51 WINBURN WAY
PHOENIX, OR 97535 ASHLAND, OR 97520
FOB Point: Ashland, Oregon Req. No.:
Terms: Net Dept.:
Req. Del. Date: contact: Julie Smitherman
Special Inst: Confirming? No
Quantity Unit Description Unit Price Ext. Price
Landscape improvements on the 18,697.00
Main/Helman Street median
Contract for Goods and Services
Beginning date: 12/11/2015
Completion date: 12/31/2015
i
SUBTOTAL 18 697.00
BILL TO: Account Payable TAX 0.00
20 EAST MAIN ST FREIGHT 0.00
541-552-2010 TOTAL 18,697.00
ASHLAND, OR 97520
Account Number Project Number Amount Account ,Dumber Project Number Amount
E 670.08.15.00.60410 18,697.00
i
t
Authorj*d Signature { VENDOR COPY
Page 1 / 1
y. CITY OF
ASHLAND DATE PO NUMBER
'A& 20 E MAIN ST. 11/20/2015 13251
ASHLAND, OR 97520
(541) 488-5300
VENDOR: 006991 SHIP TO: Ashland Public Works
CAROL'S COLORS (541) 488-5587
87 W NEVADA 51 WINBURN WAY
ASHLAND, OR 97520 ASHLAND, OR 97520
FOB Point: Ashland, Oreqon Req. No.:
Terms: Net Dept.:
Req. Del. Date: Contact: Julie Smitherman
Special Inst: Confirming? NO
Quantity Unit Description Unit Price Ext. Price
THIS IS A REVISED PURCHASE ORDER
Landscape improvements on the 18,697.00
Main/Helman Street median
Contract for Goods and Services
Beqinninq date: 12/11/2015
Completion date: 12/31/2015
Processed chanqe order 01/05/2016 300.00
Chanqe Order No. 1
(Also chanqed a/c # for line item #2
per Julie's email, Jamie corrected a/c
# for line item #1 prior to processing
payment)
i
SUBTOTAL 18 997.00
BILL TO: Account Payable TAX 0.00
20 EAST MAIN ST FREIGHT 0.00
541-552-2010 TOTAL 18, 997.00
ASHLAND, OR 97520
Account Number Project Number Amount Account Number Project Number Amount
E 260.08.11.00.60410 .300.00
E 670.08.15.00.60410 18 697.00
AuthoriZ~`8 Signat re VENDOR COPY
FORM #io CITY OF
CONTRACT AMENDMENT APPROVAL REQUEST FORM S H LA
Request for a Change Order N
Name of Supplier / Contractor ) Consultant: Carols Colors „Total amount of this
contract amendment:
Purchase Order Number: 13251
Title 1 Description: Landscape improvements on the Main/Helman Street Median $300.00
® Per attached contract amendment
OContract Amendment
Original contract amount $ $18,697 100 % of original contract
Total amount of previous contract amendments $0 0 % of original contract
Amount of this contract amendment $300 1.6 % of original contract
TOTAL AMOUNT' OF CONTRACT $ $18,997 101.6 % of original contract
In accordance with OAR 137-047-0800: 1) The amendment is within the scope of procurement as described in the solicitation documents, Sole Source notice or approval of Special
Procurement. 2) The amendment is necessary to comply with a change in law that affects performance of the contract. 3) The amendment results from renegotiation of the terms and
conditions, including the contract price, of a contract and the amendment is advantageous to the City of Ashland, subject to all of the following conditions: a) goods and services
to be
provided under the amended contract are the same as the goods and services to be provided under the unamended contract; b) The City determines that, with all things considered,
the
amended contract is at least as favorable to the City as the unamended contract; c) The amended contract does not have a total term greater than allowed in the solicitation document,
contract or approval of a Special Procurement. An amendment is not within the scope of the procurement if the City determines that if it had described the changes to be made by
the
amendment in the procurement documents, it would likely have increased competition or affected award of contract.
Contract amendment is within the scope of procurement: YES X NO* (If "NO", requires Council approval 1 Attach copy of CC.)
Sourcing Method:
SMALL PROCUREMENT - Less than $5,000 INVITATION TO BID or COOPERATIVE PROCUREMENT, QRF or
❑ "YES", the total amount of contract and cumulative REQUEST FOR PROPOSAL EXEMPTION PURSUANT TO AMC 2.50
amendments :s $6,000. ❑ "YES", the total amount of cumulative amendments ❑ "YES", the total amount of original contract and
❑ If 'NO", amount exceeding authority requires s 25% of original contract amount or $250,000 cumulative amendments :5 $100K for Goods & Services, s
Council approval. Attach copy of Council whichever is less. $75K for Personal Services, < $50K for Attorney Fees.
Communication. ❑ If "NO", amount exceeding authority requires ❑ If "NO", amount exceeding authority requires Council
❑ Exempt-Reason: Council approval. Attach copy of Council approval. Attach copy of Council Communication
PERSONAL SERVICES Communication. ❑ Exempt- Reason:
❑ "YES", Direct appointments $35,000 ❑ Exempt-Reason:
❑ If "NO", requires approval.
INTERMEDIATE PROCUREMENT SOLE SOURCE EMERGENCY PROCUREMENT
Goods & Services - $5.000 to $100.000 ❑ "YES", the total amount of cumulative amendments ❑ Written Findings: Document the nature of the
Personal Services - $5,000 to $75,000 s 25% of original contract amount or $250,000 emergency, including necessity and circumstances
® "YES", the total amount of cumulative whichever is less. requiring the contract amendment
amendments :5 25% of original contract amount. ❑ If ❑ If "NO", amount exceeding authority requires ❑ Obtain direction and written approval from City
"NO", amount exceeding authority requires Council Council approval. Attach copy of Council Administrator
approval. Attach copy of Council Communication. Communication. ❑ If applicable, attach copy of Council Communication
❑ Exempt- Reason: ❑ Exem t-Reason:
❑ Exempt-Reason:
SPECIAL PROCUREMENT INTERGOVERNMENTAL AGREEMENT
❑ "YES", the total amount of original contract and cumulative amendments are ❑ "YES", the original contract was approved by City Council.
within the amount and terms initially approved by Council as a Special Provide date approved by City Council: (Date)
Procurement. If "NO", Council approval is required. Attach copy of Council Communication.
❑ If "NO", amount exceeding authority requires Council approval. ❑ Contract amendment approved and signed by City Administrator.
Attach co of Council Communication.
Project Number Account Number Account NumberL?C-C9- 6 -CC-(vo,/100
*Expenditure must be charged to the appropriate account numbers for the financials to reflect the actual expenditures accurately. Attach extra pages if needed.
Employee Signature: Department Head Signature: t< < (P - ~Zf -261 t~
(FFNaL y of cor tract.? $5,000)
City Administrator:
(Equal to or greater than 700, or 10%)
Funds appropriated for current fiscal year NO f / /
Finance Director (Equal to or greater than $5,000) / bate
Comments:
Form #10 - Contract Amendment Approval Request Form, Request for a Change Order, Page 1 of 1, 12/28/2015