HomeMy WebLinkAbout2016-051 CONT Chg Order #1 - Minton Construction LLC
CITY OF
ASHLAND
CONTRACT CHANGE ORDER NO. I
PROJECT: DATE: CL~
LOCATION: PROJECT NO.:
CONTRACTOR: /Irl ; },4„ Co.4s4-faZ4-,~.W%
You are requested to perform the following described work upon receipt of an approved copy of this document or as described by the
I'.ri inter:
Item No. Description Quantity Unit Price Amount
Item # 1 11 t, V00 14w~ 30x / 1$ -goo vo , c~v
Item #2,►u, s ~~SU CArs -E ;.~F.11 1 3~ $ / y'35~-~
Item #3 $ -
Item #4 $ -
Item #5 $ -
Total this Change Order $ a7 3 s~ - bu
Previous Change Order $ -
Original Contract Total S10:5 W
Revised Contract Total
PERCENT CHANGE OF ORIGINAL CONTRACT .5,-, o/G #DIV/0!
The time provided for completion of this contract is increased by no calendar days. This document shall become an amendment to
the contract and all provisions of the contrac will apply.
Recommended By:2 G r
Pr ject Manager Date
Approved By: V !
Michael Black Date
Accepted By: ` 2'
Date
l 7 ~ '
f
V
20 E MaERI\et Tel Sd1--188- ~.,t
?0 E Stain Street Fax. 541--388-600 6006
:Ashland. Oregon 975'_0 TTY 800-735-2900
%v~v~cashland or us
C 1 scrs`minical AppData Local`%licrosoft`windotis'Temporarv Intemet Files,Content Out look '0066w028`Prolect Accounting, worksheet and PaNment Alemo Template ( 7) \ IS\
Minton Construction LLC CCB# 196124 1 608 W. Stewart Ave I Medford OR, 97501
Rick 1 541-261-1376 1 rm28640@gmail.COM
CUSTOMER QUANTITY DESCRIPTION SUB AMOUNT
DESCRIPTION
City Of Ashland
Purchase Order #
000056.120 The Grove & Pioneer Interior Remodel
The Grove Change Order
DATE Water Damage Repair Under Exterior $600.00
Window In Conference Room
1/19/16 Construct Chase For Electrical & Data @ $200.00
Vestibule
ADDRESS
1175 E Main
Ashland OR, 97520
PHONE
541-488-6002
SUBTOTAL $800.00
OTHER
TOTAL $800.00
Thank you for your business!
Ror ueValle AGREEMENT
Electric
Servicing all your electrical needs
P.O. Box 475
Phoenix, OR 97535
CCB #51466
PH. / FAX (541) 512-0530
To: Date: 1/26/16
Rick Minton Construction Project Name: Change Order
608 West Stewart Ave Address: Same
Medford , OR 97501
Phone: 541-261-1376
E-Mail rm28640(Dgmail.com
E-Mail minicae(&ashland.or.us
Schedule for Completion of Work: Fax:
Approximate Starting Date:
Approximate Ending Date:
Description of Work:
Additional electrical work requested to the Grove renovation project:
#1 Installation of 12 CATS-E lines from IT room to three desk locations on wood framed common wall.
#2 Installation of low voltage PVC chaseway from T bar ceiling to IT room.
#3 Installation of two 1" chaseways from desk locations on window wall to T bar ceiling.
#4 Installation of one 1" chaseway from entry desk to attic space above music room.
#5 Installation of one 2" EMT chaseway from wood framed division wall to attic space above music room.
#6 Provide 2" D Rings for above division wall.
#7 Installation of a concrete floor box with brass cover in office space. Provide 120 volt receptacle
and chaseway for low voltage wiring.
Payment Schedule:
Owner will pay the Contractor the sum of $1,935 in installments as follows:
Date Amount of Work / Services to be Performed Amount of Payment
Upon completion of electrical work $1,935
Terms and Conditions:
The terms and conditions on the reverse side of this document are expressly incorporated into this Agreement.
Exceptions:
Special Provisions:
Additional electrical work requested by electrical inspector to be billed at $78 per man hour plus materials.
Acceptance of Agreement:
Authorized Signature Date Owner Signature Date
Additional Agreement Provisions on reverse
Page 1 / 1
ASHLAND PARK COMMISSION
20 E MAIN ST. DATE PO NUMBER
ASHLAND, OR 97520 1/13/2016 00527
(541) 488-5300
VENDOR: 004711 SHIP TO:
MINTON CONSTRUCTION LLC
608 W STEWART AVENUE
MEDFORD, OR 97501
FOB Point: Req. No.:
Terms: net Dept.:
Req. Del. Date: Contact: Michael Black
Special Inst: Confirming? NO
Quantity Unit Description Unit Price Ext. Price
THIS IS A REVISED PURCHASE ORDER
Renovate The Grove, 1195 E. Main Street 35,000.00
Protect #000065.120
Renovate Parks Office, 340 S. Pioneer 13,563.00
Proiect #000056.120
Processed chanqe order 03/3/2016 2,735.00
Repair water damaqe $800.00
Additional electrical work $1,935.00
SUBTOTAL 51 298.00
BILL TO: TAX 0.00
FREIGHT 0.00
TOTAL 51,298.00
Account Number Project Number Amount Account Number Project Number Amount
E 411.12.00.00.70410 E 000065.120 37 735.00
E 411.12.00.00.70410 E 000056.120 13,563.00
2~ . r 311
Authfdrized Signature VENDOR COPY
Qom! ,/J,
FORM #10 CITY OF
CONTRACT AMENDMENT APPROVAL REQUEST FORM
Request for a Change Order ASHLAND
Name of Supplier/ Contractor/ Consultant: Total amount of this
contract amendment:
Purchase Order Number: i~
Title 1 Description: t~~kr=~1 tea}'~^ De-" Q- $ 2,-735-.c>6
❑ Per attached contract amendment
Contract Amendment
Original contract amount $ ~J 5 100 % of original contract
Total amount of previous contract amendments b O % of original contract
Amount of this contract amendment
`7 3S S, ~3 % of original contract
TOTAL AMOUNT OF CONTRACT $ 1-1:2,949 % of original contract
In accordance with OAR 137-047-0800: 1) The amendment is within the scone of procurement as described in the solicitation documents, Sole Source notice or approval of Special
Procurement. 2) The amendment is necessary to comply with a change in law that affects performance of the contract. 3) The amendment results from renegotiation of the terms and
conditions, including the contract price, of a contract and the amendment is advantageous to the City of Ashland, subject to all of the following conditions: a) goods and services
to be
provided under the amended contract are the same as the goods and services to be provided under the unamended contract; b) The City determines that, with all things considered,
the
amended contract is at least as favorable to the City as the unamended contract; c) The amended contract does not have a total term greater than allowed in the solicitation document,
contract or approval of a Special Procurement. An amendment is not within the scope of the procurement if the City determines that if it had described the changes to be made by
the
amendment in the procurement documents, it would likely have increased competition or affected award of contract.
Contract amendment is within the scope of procurement: YES X_ NO* (If "NO", requires Council approval I Attach copy of CC.)
Sourcing Method:
SMALL PROCUREMENT - Less than $5,000 INVITATION TO BID or COOPERATIVE PROCUREMENT . QRF or
"YES", the total amount of contract and cumulative REQUEST FOR PROPOSAL EXEMPTION PURSUANT TO AMC 2.50
amendments :5 $6,000. ❑ "YES", the total amount of cumulative amendments ❑ "YES", the total amount of original contract and
❑ If "NO", amount exceeding authority requires s 25% of original contract amount or $250,000 cumulative amendments :5 $100K for Goods & Services, s
Council approval. Attach copy of Council whichever is less. $75K for Personal Services, < $50K for Attorney Fees.
Communication. ❑ If "NO", amount exceeding authority requires ❑ If "NO", amount exceeding authority requires Council
❑ Exempt-Reason: Council approval. Attach copy of Council ! approval. Attach copy of Council Communication.
PERSONAL SERVICES Communication.
❑ Exempt-Reason:
❑ "YES", Direct appointment s $35,000 ❑ Exempt-Reason:
❑ If "NO", requires approval.
INTERMEDIATE PROCUREMENT SOLE SOURCE EMERGENCY PROCUREMENT
Goods & Services - $5,000 to $100,000 ❑ "YES", the total amount of cumulative amendments ❑ Written Findings: Document the nature of the
Personal Services - $5.000 to $75,000 s 25% of original contract amount or $250,000 emergency, including necessity and circumstances
❑ "YES", the total amount of cumulative whichever is less. requiring the contract amendment
amendments 5 25% of original contract amount. ❑ If ❑ If "NO", amount exceeding authority requires ❑ Obtain direction and written approval from City
"NO", amount exceeding authority requires Council Council approval. Attach copy of Council Administrator
approval. Attach copy of Council Communication. Communication. ❑ If applicable, attach copy of Council Communication
❑ Exempt-Reason: ❑ Exempt-Reason: ❑ Exempt - Reason:
SPECIAL PROCUREMENT INTERGOVERNMENTAL AGREEMENT
❑ "YES", the total amount of original contract and cumulative amendments are ❑ "YES", the original contract was approved by City Council.
within the amount and terms initially approved by Council as a Special Provide date approved by City Council: (Date)
Procurement. If "NO", Council approval is required. Attach copy of Council Communication.
❑ If "NO", amount exceeding authority requires Council approval. ❑ Contract amendment approved and signed by City Administrator.
Attach co of Council Communication.
Project Numbero o &K>105' _ ! Zn Account NumberV/ -40 - C'0-_76#1b0 Account Number _ _ - - - _ - _
*Expenditure must be charged to the appropriate account numbers for the financials to reflect the actual expenditures accurately. Attach extra pages if needed.
Employee Signature: ac~m G2uutt,.~ Department Head Signature:
l (Total amount of contract? $5,000)
City Administrator:
(Equal to orgreater th $2 ,000 or 10%)
Funds appropriated for current fiscal year YE I NO 7/
Finance Director (Equal to or greater than $5,000) 'Date
Comments:
Form #10 - Contract Amendment Approval Request Form, Request for a Change Order, Page 1 of 1, 1/25/2016