Loading...
HomeMy WebLinkAbout2016-058 Emergency Action Plan - Hosler Dam EMERGENCY ACTION PLAN HOSLER DAM - REEDER GULCH FERC PROJECT NO. 1107 - OREGON NATDAM NO. O R00110 PF CITY OF ASHLAND 20 E. MAIN STREET ASHLAND, OREGON 97520 Printed: March 2016 FOR OFFICIAL USE ONLY HOSLER DAM EMERGENCY ACTION PLAN PROJECT NO. 1107 - OREGON This Page Intentionally Left Blank March 2016 City of Ashland Revision 0 G:\pub-wrks\eng\15-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc iii FOR OFFICIAL USE ONLY FOR OFFICIAL USE ONLY HOSLER DAM EMERGENCY ACTION PLAN PROJECT NO. 1107 - OREGON Table of Contents Part I: EAP Information A. Summary of EAP Responsibilities ......................................................................1 B. Notification Flowcharts 3 C. Statement of Purpose ...........................................................................................9 D. Project Description .............................................................................................10 E. EAP Response Process .....................................................................................11 Step 1: Incident Detection, Evaluation, and Emergency Level Determination Step 2: Notification and Communication Step 3: Emergency Actions Step 4: Termination and Follow-up F. General Responsibilities ....................................................................................18 F- 1. Licensee Responsibilities F-2. Notification and Communication Responsibilities F-3. Evacuation Responsibilities F-4. Monitoring, Security, Termination, and Follow-up Responsibilities F-5. EAP Coordinator Responsibilities G. Preparedness ......................................................................................................20 G- 1. Surveillance and Monitoring G-2. Evaluation of Detection and Response Timing G-3. Access to the Site G-4. Response during Periods of Darkness G-5. Response during Weekends and Holidays Response during Adverse Weather G-6. Alternative Sources of Power G-7. Emergency Supplies and Information Stockpiling Materials and Equipment G-8. Coordination of Information G-9. Training and Exercise G-10. Alternative Systems of Communication G-11. Public Awareness and Communication H. Inundation Maps 22 Part II: Appendices Appendix-A. Investigation and Analyses of Dam Break Floods .........................35 Appendix-B. Plans for Training, Exercising, Updating, and Posting the EAP 37 Appendix-C. Site Specific Concerns .....................................................................39 Appendix-D. Documentation ..................................................................................40 March 2016 City of Ashland Revision 0 GApub-wrks\eng\15-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc FOR OFFICIAL USE ONLY iiii FOR OFFICIAL USE ONLY HOSLER DAM EMERGENCY ACTION PLAN PROJECT NO. 1107 - OREGON This Page Intentionally Left Blank March 2016 City of Ashland Revision 0 G:\pub-wrks\eng\15-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc iv FOR OFFICIAL USE ONLY FOR OFFICIAL USE ONLY HOSLER DAM EMERGENCY ACTION PLAN PROJECT NO. 1107 - OREGON Verification Page The undersigned, being first duly sworn, states that he has read the following document and knows the contents of it, and that all of the statements contained in that document are true and correct, to the best of his knowledge and belief. .a Michael R. Faught Public Works Director City of Ashland OFFICIAL SEAL State of Oregon ) CAROLYN NOTARY UBS C O EGONR ss: COMMISSION NO. 476064 County of Jackson ) MY COMMISSION EXPIRES MARCH 20, 2011 ,Are 1L Sworn to and subscribed before me by Michael R. Faught this A Notary My Commission Expires: March ?.W-wrks\eng\15-29 2016 Dam Safety Program\engt^ P\W 40IandAP - PNS.docGApub-wrks\eng\15-29 2016 Dam SEiavfSlon 0 Program\engr,EAP\2016.03.10 - EAP - PNS.doc FOR OFFICIAL USE ONLY v FOR OFFICIAL USE ONLY HOSLER DAM EMERGENCY ACTION PLAN PROJECT NO. 1107 - OREGON This Page Intentionally Left Blank March 2016 City of Ashland Revision 0 G:\pub-wrks\eng\15-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc Vii FOR OFFICIAL USE ONLY FOR OFFICIAL USE ONLY HOSLER DAM EMERGENCY ACTION PLAN PROJECT NO. 1107 - OREGON A. Notification Flow Charts Summary of EAP Responsibilities Dam Owner / 1. Verify and assess emergency conditions Operator 2. Notify other participating emergency management agencies 3. Take corrective action at facility 4. Declare termination of emergency at facility 5. Update EAP on at least an annual basis 6. Respond to emergencies at the facility 7. Receive condition status reports from Dam Operator City of Ashland 1. Receive condition status reports from Dam Owner Police, Fire & 2. Notify Public within Ashland City limits Rescue 3. Conduct evacuation from inundation areas within town limits, if required 4. Render assistance to Jackson County, as necessary 5. Render assistance to Dam Owner, as necessary Jackson County 1. Receive condition status reports from Dam Owner Police, Fire & 2. Notify public within Jackson County Rescue, and 3. Conduct evacuation from inundation areas in Emergency Services Jackson County, if required Note: March 2016 City of Ashland Revision 0 G:\pub-wrks\eng\15-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc FOR OFFICIAL USE ONLY 1 FOR OFFICIAL USE ONLY HOSLER DAM EMERGENCY ACTION PLAN PROJECT NO. 1107 - OREGON Summary of Dam Owner Responsibilities Ashland Public 1. Detect incident from alarms. Works 2. Confirm incident by camera system. Department 3. If no one is on-site, determine emergency level and dispatch Personnel operator to site. 5. Make calls on notification flow chart. 6. Coordinate with Operator and Engineering on gate operations and emergency procedures. 7. Coordinate with upstream and downstream dams on operations. 8. Provide regular status reports to senior management. On-site Dam 1. Detect/confirm incident at dam. Operator 2. Determine emergency level. 3. Make calls on notification flow chart 4. Coordinate with Command Center and Engineering on gate operations and emergency procedures. 5. Implement gate operations and other emergency procedures. 6. Provide regular status reports to senior management. Engineering 1. Support On-site Operator and Operations Command Center on Manager emergency level. 2. Make calls on notification flow chart. 3. Determine emergency operation and construction procedures. 4. Coordinate with Operator and Command Ctr. on gate operations and emergency procedures. 5. Dispatch engineers & construction crews as necessary. 6. Dispatch engineer as technical liaison to County Emergency Operations Center. 7. Provide regular status reports to senior management. Senior 1. Make calls on notification flow chart. Management 2. Initiate periodic status report conference calls with dam site, command center, engineering, and public relations. 3. Provide regular status reports to County Emergency Operations Center. 4. Coordinate with upper management. 5. Coordinate with public relations staff at County and technical liaison at County Emergency Operations Center. Public Relations 1. Mobilize to County Offices. 2. Participate in periodic status report conference calls with dam site, command center, engineering, and management. 3. Provide input to staff on emergency communications. 4. Represent utility to media. March 2016 City of Ashland Revision 0 G:\pub-wrks\eng\15-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc 2 FOR OFFICIAL USE ONLY O M N N O p S- O ~ Q1 N ~ N ~ r C ~ W O r N lf1 Lp ~ M 0~ r" O~ N N ~ X ~ X In O r r ~ L I.n Ln CON ONf~ •>~[f (Dr ~.,d'Ln~~OtnLl~ (dd'b' ~C`7d' U XO~Or O ONC~~tn > Z >OC`7tp ~cOCOtncO C U~tNC~ CN00 COQ CNd' C_00 Co000 ~ NchcOChCO O L C NONInI.f) Ol~Nlp (UNM Rjf~Ch._D)C'9 ANN OCnN ONtpO ~ Q C~ O N r Q. ' i i i ~ L i i i i i 00 d' 'p N~ ~ Q. CO i +J i i L i p i i O _O rNOCO OONCO,_NO ~ i i L i ~ 0 O•CON ~ OrN~+- Q n'tp ~ ~ O lp lO (A O0 ~ Q r to 00 L ~ Cb O N O N , tp w N _N(Arn~nco~ L N~~ °~w ~ rno0 moo r~arn a~o~o~ 0 a~n~noo~.o ~Ln00 ~ i i i i I i i Ll i i ~ _Cn~ O W E V U~ i Q. i i C~lnd'~ r r r ~ I .r+ .r+ .ra. .r.1. .rF .r4 .rrt ~ .r+ .ry , , U , , (I~~ .r4 ~ yr ~ .r.L .r4 .r+ .rrt 0 ' V V V V iii V V V~ V V O O r r r r J.t `j V ~ O V L ~ V V V V ~ D 0 pu~~~~ 0 ~ ~ i~~r I 0 mr~n~N~n d t4 r LY ~ Gm m OU~~ N~~ ~ ~a _N > y/ L _ r ~ N N W O L~ ° N > d p 7 ~ ~ O ~ ~ ~ o. L E ~ mY W ..~(A Y rterr!! Y ~ ~ ° U L U L - L L L ~y L ~ - L U >1 U (U."-O ~NOOC N~OLO(U OO 00 ~Up7~U (U0~7 Uo= U~=o Uo~m3U U~ U~ ~U U~ U~oo C ~ ~ L ~ L N O W ~ +/~jNMI~M,NON 0 ~OC~D~OC~ QOrCrD X00 ~ ~rrm~~ L'OOd' ~fDO ~O~ ~ ~ lil'Jl'J jOCh ~-~rN UOL() ~ UCOOQC9C~ ~ p~CO ~t~N ~W NCO r(~ C(A~ ENO iON L Nr Nr 0 Nf~ NN G~C• NCO.~NCD OQ ~(OO (d0 7 (C tp0 O)lA ~ lACO•-SAO i CAN try~~N ~E(ry~~IM~ C W..,-. , M~ ~ NO)CO a /I\ ~ r r~ r r ~ ~ r r~ r r ~ I r r Q r r ~ C ~ J N ~U l'J l'/ W C O O W M~ r r CO N~~~~~ ~ ~N~ W~~~ ~L~A~ ~ G Ct0[)N~~t~ ~ NNN~~~ NO~~ _ C N ~ L L L O .C.1C~ ~ 'd C ~ 'a= J WU~ N = ~ ~ ~ O Q 0~ N ~Y ~ ~ m ~ ~ ~ N~ ~ Q~ a ~ ~ ~ ~ ~ o ~ ~ L- oU Uo ~U ~U oU~o~ ~UW~U cnoU Uo 0°U0 U 0 N Z d a W W ~ O o ~ *r O C O mo ~V/ Ir~1 ~ T ~ C r ~ ~ ~ i` Y I r W~ r >1 V I ~.y T~ O ~ ~ r X O r ~ L ~ d' Ch f~ O CD r O O ~ d d' N c X N C'9 J J Odd' ~f~~ NO~~Ch NCh Q->,O CAd'rt O NON E~-tn~ L a Z ~ 0 UCAN ~CAN~rNNIn ~UNO fll 00 CO(b C ~ NN L OC~Cn OLD QZ 0 ~ ~ O(AN ON ~CDNNr ANN 0 C~ N 0 ~ ~~~i (fl ~ r~ aUr w0 L(ALf~~OLt~~NCOlntn ~ NCO = Nr~rO ~ Unto aU ' ' ~ I In ~ irW ,0~~~~N~~r~cr~rn WW~~ ,0 ~o~o~ ~ 0 ~ ~ C# ~ rn~ d I M~ ~ L~ ~~lA ~ rr C-rr ~rrrr U i i C (U ~ ~ ~ ~ 0 ~ ~ ~ L i i 0 tl)N ~ , , ~ E~ +.d'~LLld'~D~d'~t~t V rr ~ r~,rr ~ ~ rr C i i rr ~ J L Or~~ I ~ ~'ro~~r 01~ ~r 0 V C~V d err V NmJ ~ r a ~ ~ C~~~ LW~n~~n~n 41 0 ~ V+r V O~~ 'Om~~ QaM L LL Z c~ a~ ~ Qo w~~s N'p~ a~ a~ °roLL LL W c~~ ~ E N~ d= - ~ o C ~ K L ~~LL 0 ~ N~ ~ cA QW CN ~ G 0~ ~ ~ C~ Uro0 oG m° m~ m m a 0 E m U N 0 ~ ai ~ ni 0 ai ~ 0 LL G UO UO~U20U ~ • o~ a ~~o~ ~o ~ o~ a o~ N m N Y 3 c~ ~ O! N ~ C_ ~ChNU~CO ~ 01~~ ~~N ,i O~ C Q~ .C (D d' N r- C ~ ,a L G~ USN O-NN V CrC~DUO~m d MN ,C ~N ~ L V+++%~N OrN C ! ~COd• X00 N ~ ' ' O .C ~ C ~f~(C1~ (OLn ~ L ~rl~ pC~l~ L ~~p N ALA _ l O!T~1 y 0 G~ ~ ~u~ I cv~n 0 d I cv~~oco~ O~~co W 0 V~ ~ a~ r r e r r V N r r L r r .C C' ' N L ~ ~ ~ > d ~ lOC Q~ ~ 0 C ~ ~ d ~ ~ m ca a~ a~ Q ~~ac a L ~ ~ o~ ~ W W I o o 0 Y- N U~~U~ UO~UO Z OU Z Q J d 0 O M O ~ N Q lO ~ I~ O In ~ 00 C In M 0 ~ O N f~ O L~tC9tfld' 0000 ~ V ~-N~N~N ~ NMO[000 CO CO (D Z U ~ ~ NNNChNON ~ a ~~N000 NOC4+-• W ~ ~ ~ ~U~~m~~ W = ~o00ocC0v~r `p~rrn n C3 0 s. 'p ~ ~ ~~~o~ > O~ctoornc~ ~mcorn ~ N r r r~ r W C i r r r r r r r W ~ ,V ~ O C d' d' ~t ~ ~ G ~ d' d' d' ~ 0 ~ ~ ~ w 0 ~ ~ ~ ~~n~~nr~ O ~ ~ c~~~~ou~~~ Y ~ L ~ ~ v Q~ ~L ~ U Z L~ 0~ ~ c ~ O i C 0 ~ Q~ Q Q p r 0 Q >Q2Um ~2U Q0~ c~ 2 ~ ~ ~ ~ Y~~F d 4: f: A = 0 r m 0 D m m m z D n 0 z 0 ~ ~ D 0 z n a r C m 0 Z r 3 w s N O T1T VJ L/ s Q F N 7 N N N W ~ O TOT ~ ~ ry w 3 ~ ~ m n rr ~1 ~ ~ ~ 0 7 w v D N G r 3 ~ ~ C ~ ~ m 'm a ~ D Z ~ r o ~ ~ m ~h o ~ w T o W m ~ D v Z N a 0 n N N_ O 7 O JJ L m z 0 J J v TOT r~J m 0 z ~ ~ f ; ~ ~ M ~ M C 00 ~ ~ o acorn ~ cir N a~oo-moo d ~~N 0 000 ~ M d O 01~'~ Otn d md'rn ~rnN ~ OON Xpp X ~'O (0000 ~ (0~1~ O(Drn ~`t"tn Ncj ~ p ~ ~cNV ~r~coUooo ~ UrNid~' ~•~Mrn ~r~ ~ ~O ~(0~ CO d' 00 ~ d'N (O'C~c! Q.U~ 0 mo~orn ~ 7 ~g.-r ~Mr +''N I ~M Q.U ~ m ~ ~ 'a ONyNOO ~~tico 0 d I Nfi OcDti C~ crnN N I mN ~ t_m ~ ~ ~ UN 3~ ~ ~ ~'vv O V Cln~ Nln 0 I =W~~~N ~~au~i ~ ~ ~tntndtntn V'C~t~nu~i N ~ ~d~ c OCR I CyN ~otn '-Otntn ° Q 0 ~ 3 Y ~ 00~ 0~ am ~ o ~ o ~ ~ dY ~ 0 CN p r 7~N 2 ~ N C~ 'CN Z °o m~oa~~ ~ ~a~ r ~m Q ~~pU pU UO~UO UO OU d OU a ~ ~ o N ~ ~ Q~ C Od'tO~.CINAN m O N U~O•DO~ O ONM'ci'N C U~Ntn ~NM ~ ~ X •`00 C0000 ~ ~MMM00 ~ i i i C i i C~~.CM~ O Q_NN ~tnN ~ •~ONNO OONCO'CNO ~O~~oO~ 0 i ~O CON ~ O~NCO~ p~tnCO NN07 ~~M ~-rnM LY ~ M'Laoao d lZ~~otn NNd' D_NO 00~ ONd' NO Md• ~ rn~~rn ON ON ~ r 0-00 ~ (n~-~~~ QY~~~~~~ Q-rnooUrnao N~~~ 3o~r ~ = vv~v ~ ~ tnNtn I NN Q OaOd' I o0~ C O~tn(/~Ntn Q~ ~ ~ tOlnNtn m ~ ~~r ~ ++a In ~ ~ ~v~ ~-a ~ a~ ~ m Y Utntn~tntn ~U ~ ~ ~ ai -p c O ~ > _ ~ ~ +r o a ~ ~ a~ ~ a~ = N ~ ~ a~~oLoa~ mo mo o~~~o ~ m°~~ Uo~003U U~ U~ ~~U~U~ U3op U 0 R II ~~IIIrM'MIIrIIWYYrMN~ d W ~ o J OMNU~00 ~tOf~ ~N Or(O NO C.-O o} J ~ LNd~ aNO~ COtn N ~+NN O(ON UO~-(40 ~J Z G1 UtnN NN ~rnti ~ fl.MM•~~tM WN(fl ~rn aZ 0 Q V_+++~ ~ ~ ~ ~ ~ O~ ~ ENO OIL N ~ Qo00~(DO w0 00 N ~ N ~ ~ tV ~ O N ~ I M N~ C~ W ~ C ct~tn~cotn N ~+r I torn ~-~tn O NW~rnW~M ~mW IA .O ~ ~ N I N ~ ''t~n~ U) p~ pp ~ (C to 0) 00 ~ ~ a ~ Mtn C m (J) ~ a E I C~e~ V Q~~ Q. ~ C~~~~~ ~ O> (0O ~ ~ ~E~ Q ~ C ~ ~N~ +~+ON~ ~ a.N~t~ NON ~ ~ ANN ~lOnl00 N oQ N Q ~ ~ N OL Y 3~~ ` Qo_w LL ~ C ~>O' ZY~ f0 NC7 ~ p~tVi T '~~0 Q L ~ ~ CW ~ ~ 0 Z Q ~ ~ ~ Q Ox N U ~ Um~ LL L Q~ N W DI ~ ~ N N ~ +J ~ N Q) ~ N Q U~~U~ UO OU UO (AOU UO N N a v Y 3 a O ` ~ U C C ~ d ~ ~ C C L ~ W m oco~ ~ r•otn0o0o p,~~~'u~~tn 0• Mf~~M~- mtn~t ~,oti NM V ~I~ON00 O~(p fptn0 EO(O OOM ~ 0~~+.NM ~ UNO N'~-Nl~tnrnN O UMOQMM ~'p~N UOtn ~ C,Of~(O,Nf~N ~,NN ~ ~NNC'~d'N Q ONt~ Ct~N ~ QN~ CND ~ 0 ptN(0 NOD ~~N~ ~UtNnwr1°io~ ~puNirMi•~o00ot~ !~,~to n n ~'N~uNiro~~o WWto~ ~ tn~tn~tn tnN vrn C•-rnaD•-torn ~,N I tnN Ernti U ~ ~ N a- r- In ~ ~ I ~ ~ Q ~ ~ ~ ~ ~ ~ ~ C M N ~ M M U Itot`n ~ ~t~nt~nu~ia°ot~n ~ ct~nt~n I N~ ~ I N~ ~ ~ ~ yt°nc°vpt°nt°n ~ c~ ~ ~ ~ I c~ LLY W~ Z' Q c ~ ~ 0~ "m 'a N~ _R o U ° CY c LU n ~ Q W c ~ ~ Ri ~ ~ -p ~ ai to ~ ai ~ ai L > ~ ~ ~ c`o Q ° oa~m ~m~°~ a~om~°m IL poa~WOm ~o~ ~ =Um oU ~0 3U ~U ~U ~U g a z 0 F ~ U c ~ O1 0 Q ~ rnMrn~ oNr N ~ d L~Mtnd' (D COtb ~~NWrnCOMd ~ C f0 N U F ~ O)tpNOCO Otp~ L Otn~ C~~~MOO~f~ '(f 0 +'t 00 W O ~ Z a ~a0(p~M ~~0~ 0 ~~N ~driN ~~NNt`"r, 'L `N O C ~ ~ ~ L ~ W ~~~~(fl ~~0~ ~'rnN ONU)fDNN~ N ~ ~ d i i~ (0 i i i prnN Oro N00tptf. L O a rn W i r~-~-~- ~~-s-c- ~ln ~Ntn ~M~InO: O ~ ~ W L C L ~ lONtntn Q.lt7lntn ~ ~~W ~~p~r-~~ }t O T~ ~ d- ~ ~ c O Ost~nu~i I tr~it~n I tr~itr`~i~u~-. W N ~+'~ktn to u'. L~ am Y ~a~i o'a o z ~ ~ ~E dr ~ ~ ~ 0 ~QOo IL E ~:tN ~+0+ 0 0 ~ ~ 0 ~ w •~aL t~- ~ cn ~d ~ a a N uJi o ~ - N > N ~ ui o ai ~ ui ai ~ Q Q N ~ 0 ~2U Q~~ Q a~~ a~ o~ a uJ O ~ m = UO UO~U20(: p ~ 0t _ 0 r m 0 D m 3 m G1 m z D n 0 ~ z 0 ~ 0 Z A M a r C m 0 Z v N O v Q m ~ y. N N j ~ T~ ~ ~ ry 3 3 ~ m ~ w a ~ ~D ~ ~ ~ ~ o ~ C ~ ~ ~ C ~ ~ m a D Z o ~ rn ~ o ~ w T o W_ m ~ D ~ Z a 0 n ~1 W O 7 O ~1 L m z 0 0 J I 0 m G~ 0 z f Ca ,,y^w~ .F.i r f~ d N ~ ~ C Cfl ~ N L ~ r ~ O O O UIOdI ~ryr y NOO~(000 ~ d'N ~ rM M •N O m~~ ,L O N G1 0) ~ O ~ O N L O O N X M X Z O CEO y MN ~ V ~t~c~D 00000 lL rNN ~ Nm~ ~ N 0 i O~ i N L V~'N C~ N i i U i i UM~ ~~N~ ~Lr ~ W 'a ~-N~N00 C~'Ot~(0 C i i N~ i 0~ d I N LM ~ = Or' err Z C~~ V ~ I rr•Orr Lr-r- ~ ~c~ ~ Oln 0 ~WN~~N N~~N ~ ~+.Ca~da~ 0 y c~~t dY~r I SL N OC 0CN I CNN ~0~ O~u~i Q o ~ ~ ~ ~ 00~ 0~ am r d= _ ~ ~ /L/~,~~ rn ~y/ C a~ N y/ ~ i L ~ L z ~N c~uai.. d 'Wc~ ~ ~ ai y~ui duo U Q ~=~N Z ~m N~°N~ ~ ~N t ~N ~ I-~OU pU UO~UO UO OU 4. OU a N N L L Q O C C ~~rOIINN 0 0 N •UTAO err L 0~o0N +++,~lA~ CMS d) N C XO)~Or ~ ONMd'tn C U~tNM ONaO f4 N N •COO CopoO NMMMOp ~ O~NN+-~NM C C x NN ~t~N ~ •jONNO G o0NC0'CNO ~Od"OaO~ ~ MO CON ~ pr~noo u~~oo ~rM LrnM rY ~ M•CoOOO y Q~~oo~n N~~ a~00 o0d' ONd' UNO) Ooo~ ~ OtD~O rrr Orr ~ I ON OON ~ OMc~- fl-00~ ~ ~ QY~~~~a'v ~=rncoUrnoo y~~a' cod• ~ C~~vd'~ y ~u~u~~n ~ ~n~n 0 ooov ~ aod• C ~rln(f~Nln y CO ~ ~m ~ Oc~`~rN,'r ~a~ ada Irv=v~' y- y Uu~~n~~n~ E ~ ~ ~ i fa ° ~ ~ d ~ ~ 0 -p c lCr p L > ~ O 4. ~ m ~ ~ N ~ y ~ a Uo~ ~U U~ U~ ~U~U~ U~op U 0 4 Z a a 0 W ~ L ~ o ~ ~ ~ M N v ~t o0 ~ CJ I~ to to O f~ (0 0 ~ In C r 0 0 ~ J L (0 N r z ~ UIpN NN ~Or V Q.MM ~~M WNCO r0 aZ V ~ i ~ i ~ O V' 0 7N0 O~N E QO' O' x(00 W0 'N ~OONprN y ~d.0 ~(Vr aON l6 ~ MN~~f~ m Uf J O GCi-~~ I covut°i y I ~N cv'~n Q yW~trnWd•M 'Q~W ffnn uirno 7 !C ~m oo~ i~.... M,~ CvNI ~ ~ a ~ I C~~ V 0-~~ Q. ~ C~~~c~ ~ G~ (OCfl ~ i i ~ E~ Q Q '0~ ~N~ rU~~ ~ ~.u°iu~iu~i L~~ ~ C °~~~-~°nu°~ ~oQ w 1 d~ C jo y N yC~ ~ OWN 0 Q a~ c ~ Q 0Y ~ V L U~0 U>~U> mU0 OU UO c~OU UO N N N m C N y Y 3 a L ~ U C C L ^ L W tQ a W ONM rrONOO a' 0~(U fn~f O ~ EO(D~OM ~ C~~mtfic~ F UN0 y 4-Nf~~ON ~ UMOQMM (~-OrN VOIn ~ C,~(~(O~Nf~N ANN ~ ~NNc+?d'N 0 ONI~ C~N ~ QN~ CND ~ 0 ~N(0 ~NOO ~U~oNOr`"io~ ~puNirMi'~a°°o~ I~.?_~uNi n c~u~ d''t~~~aro~uNio W W ~r ~ ~ ~d'~d'tt~ ~ t~N~~~ = Na0•-~0 ~ y I NN Eu~I~ U~ ~ ~ r r r~ r I r r Q r r U r r W r r C M N O M M ~ ~ ~ i~~N~~ W~~N I ~ ~NU ~a~ y ~ C~NpN~ y ~ I C~c ~-Y r~ o Q C N W 0~ ~ r~ c~ ~ C2 ~ 'a ~ ~ U ° a~ yc ~co ~ ~ ~ ~Y ~ ~ ~ d Q W L~ o L c4 ~ ~ d rn 'o L ~ y ~ ~ Q~ v. c~Y v y ~Y_ ~ L_ 0 oY_ ~Y_ Q ° oN~ ~N~°~ Q~oNJON poNW°N oU ~ =Um oU ~o ~U ~U ~U ~U z z 0 ~ c C LtnMO~t ONI~ y 0 W d r U ~ N~popo~p oM0(DCO ~ LOOr [0d'N Td70pM~ ~ C ~ lp ~ ~ ~tnN0o0 O(Or Olnr C~r+~M00rr CO Z C Z a c s ~ ~ ~ N ~ ~ ~ 0 °a'v ~r~•a?o~n~r; yfA o W 0 C ~ op(prM LrOr ~ O~N~Q1N ~rNNlf. L ~ ~ r- L ~ ~d'M~O ~~C00 ~"ON ON~(ONNr L ~ ~ _ Q~ i i ~ (p ~ i i v pON ON NoO~U: ~ ~ O LLI i rrrr L rrr ~'0 ~Nt~ EM~tnU ~ IL i W ~ V CC ~ L~d'~d' N[tV'd' I i i C ~ i~ i i i t ~ r W L C G a•+ ~ ~ci N to l0 a N In N .a 0- ~ y c 0 ♦ ~ ~~~W~N~~N~~ W y 3+'~N ~ ti. Y N ~ N t N ~ ~Q V ~ ~ ~QCO ~ ~ N N ~N fO+V+ p co L0~ Y u. ;r '++a 3 y L o J BUY a; .~~L N~ ~ cn ~ a a ~ ooN aio ui~ uiai~ QQ y ~ v ~2U Qpp N~~ N~~- o o~ a ~ _ UO UO~-U=OC; p ~ 00 = 0 r m 0 D m m G~ m z D n 0 ~ z 0 ~ 0 z w n a r C N rn 0 Z r N O a c v x m ~ y, N N O O N 3 3 ~ v n ~ N 0 7 N ~ ~ w 0 r 3 ~ 7 C > > ~ m a 'm ~ D Z o (p m 0 w T o W m ~ D Z N a 0 N O 7 O 17 L m z 0 0 J I 0 m G~ 0 z M ~ o of Ri a~ V N C r Cd ~ o Q O ro~~ ,i Old O Od0'~ OWN ~ SON ~ c~~ > Z N U~ ro~~ O 07N ~rI~U(DO UNN +''"-(h[t ~Ur O O 0 ~ ~N OI~CO 000 ~ ~Md' L ~ NQi ~ N*- CC w = ~o,~orn N ~~0 7 L~~~ ~NU~~ QUu~~ d'om ~ 'a ~N ~NO~ L'pf~(D ON I Nf~ O~r ~ 41 ~ ~N Dat1~ rorr rr U rr y rr irr ~ C 0 ~w~n~~n~n C 0 ~ 0 ro~~ c} o N o ~ ~ ~ N 0~ ~ C _N3 'O~ 0 ~ r Q= ~ ~ ~ a1~ ~ No ~ a~ am ~ x d ~ ~ 0 0 ~ 'L ~ 0 cN E C~ ~ ~ o C~ ca ;r ~ ~ d f- N ~ 0 W~_ ~ o ~ ~ . ~ 0 Op w Q ~30U Z ~ ro a~~~ m~ F- w a~ _ ~'m ~ pU UO UO UO OU a OU a N O -O° L X ~ X O- X cif C _ ~~ln~ ~tNtN 00~ ~OMOd~' ON~~Or O ONC~dM•lN U~NCO+~N00 roles(`') roMC~ '0000 OMM ~ ~MMMM O 0)cnNCn.~N(~7 OOO~t ONE O~tnN*-'cnN ~ >ONt()O e i. i i i ~ i i cb i i~ i i 0 i i C i i ~ L i i i i 00 N O N N O S O N i. O N = N O 'CO N Q~ N r N Op r ~ ~ r In CO Q cA 00 O 00 Q ~ 001 00 M 0) CO 00 L Q In Ln CO In O I NNd' 7tn~ ~ ~ 00 d' 000 '/V~ ~~t~ O.OD~t ++~~t~~t01 a_Yrrr~rr O-rrUrr NQrr opr L ~ rrrr O m~~~ N~~ ~ ro~~ N~~ ~~~~~N~ *'a O ~ > C C O W U ~ 'O d Opp 0 ~ ~ 0 ~ 0 O ~ ~ O ~ O,~ ~ U0~ ~U U~ U~ ~U U3 U~Op U O Z d 0_ Q W 0 A, M w- YI O V ~ ~07NLd'CO I~~(D C ~(DI~ Q NrN ~J J ~ LN~UNr L tnOC7 (SSOIn ir(0•fAlnO COr O OC+00 ~MM QZ 0 O U<nN QNN N Nr~ L ~O~ Q VNI~QIl~N w0 V *',:ODN rorN irc7(0 ~ N~~f00 ~NCh COON p`7 W C ror~~npco~n L rool~l~ ~tN V•-lOM -Mln ~~W {A O 0-r~n Ntl~ 0 'Vptf)N Ed•~ cm{A ~ ~ a I rr I ~r ~~CDI~~ /Il Q~00 ~ i ~ ~ i i c~ E~ N ~ C ~ E~~ ~ c~~~ ♦ ~ y~~~ ~~~~~j Qd~ N ~ L LL ~ y00 2 a Q~ C~ o~~ ~~LL 0 ~ Q ~ ~ ~ ~ ~ t~~ U~0 ~ ~ y ro ~ a 0 ro_~ ai •L ai N m ro~ ro ~Q IL O O ~ N ~7- V Q O~ NIL ~3~~~ Z ~o ~o o~ 30 N N m C N Y 3 a B c~ d ~ L ~ ~ C ~ ~~o~~ ~ oar ~ W m Oc p ~ ~NNMON ~ Q1 ~..UNO) ~ pf~(p ~ ~N ~~~N 00~ A N N 0n ~ N ~L 10 N N ~ C N CO ~ N 00 Q CV r O N ~ ~ncoM N ~I-N~O d p _N ro Uln~LntnLn .Q N CClnf~ ~~00(n lN0 ~Nr CNr p~ , . . . O ~ L Q1 WW~I~ ~y I tnN ~NN~ U~OOW<n0 ern ern^ ern^ M ern/~ I ~ ~ L LIn LLl LLJr4/ > ~ U~rr OMN ro 0C~('7 I rr I rr ~ C~ ~ ro Q ~ a~ ~ ~m W 0 a~ 'a~ m c >W r~ V~ ~ 0Y ~ Q roam ~ v= Q.`.. d ~ Lro m _ N p N 0~2Um Q = ~ ~ m IL ~ ~ a~~ ~ ~ Q `o-J `o- OU ~Uw ~U ~U ~U Z Q J a Z 0 U ~ ..F M ...F ~I1 ~n ~n ran u n~ w ~n ~n rte ~f1 Q ~ L V V YI W W W i Y! r r W M~ r I~ uI u! O V~ W U ~ 0000000 0000 L ro~~ ~ 00n~t0'f N+-%C9c~.NOCh Z ~ ~ a ~1nN000 O(Or 0 UO)N ~~N~ rNNln C O-NO LON w 0 Z OOOCpCh*- ~rOr ~ OCAN ON cDNNr Q~(ur NrN C~ L ~ > O~~oNO~rn °rn~rn Op~u~i~c~vu~i ro ~~~rn ~ Rt I ~rn~ ~ i i i ro i ~ i i i i i ' p~ r r r r L i i (n i i er4 .ry .ry .r} lIL~ .ry .ry .r.4 ,ry .ry ,r.{, ,ry ~4 ...L ...F ..F a C .ri .r.F .r1. µr w ~ ~ ~ ~ i V V V V W V V V ~ I V V I I I V V I W V V V V ~ O V V ' V V ~ y = ~ai~.. ro L row ~N° ro Z L~ p~~ro C ro Lro ~ p ~ U Om QO° L~ ~ ~ a0Y > o W ~~YN ~ ~ ~ 010 N~ .U ~ u~~~:i N 0 ~IU Qo~ UO~UO~ U20U ~ = OU UO ~ 3 2 o ~ 1 ~ m 0 D m m m z D n 0 z 0 ~ ~ 0 D z M n n r C N m 0 Z r N O T1T V! rJ U C Q F N y N N (0 A+ N iY ~ O TO Q ~ ry ~ n ~ ~ n~ r+ ~ fD N n o ~ ~ ~ m ~ ~ 3 ~ ~ C w ~ ~ a _ rn m 0 ~ ~ W o D 2 a 0 n (D N~ 0 O 7J L m z 0 1 Y 1 '::Irr. J I 0 m 0 z i FOR OFFICIAL USE ONLY HOSLER DAM EMERGENCY ACTION PLAN PROJECT NO. 1107 - OREGON B. Notification Charts See previous flowcharts. C. Statement of Purpose The primary purpose of this Emergency Action Plan (EAP) is to safeguard lives and reduce damage in the unlikely event of catastrophic failure of Hosler Dam within the Ashland Creek Watershed. This EAP, in total, is one specific section of the City of Ashland's Emergency Action Plan, which identifies all types of emergency procedures for the City. This EAP specifically defines the responsibilities and notification procedures in the event of dam failure or potential hazard involving the dam. The EAP is designed to promulgate the Federal Emergency Regulatory Commission's regulations and guidelines for emergency procedures. This plan may also be used in the event of significant flooding and overtopping of the dam under extreme flooding conditions along Ashland Creek. D. Project Description Hosler Dam is a concrete arch dam constructed in 1928 in the Ashland Creek Watershed at Reeder Gulch. Hosler Dam, also known as the Reeder Gulch Project #1107-OR, is owned and operated by the City of Ashland, Department of Public Works. Hosler Dam is 118 feet tall and impounds approximately 800 acre-feet of water behind the dam (normal spillway crest) in what is commonly referred to as Reeder Reservoir. It is situated on Ashland Creek in the southwestern part of the State of Oregon, three miles south of the City of Ashland and approximately 200 miles south of Salem, Oregon. It impounds water from both the East and West Forks of Ashland Creek, which have small concrete diversion dam structures on each fork. There are no major streams or other reservoirs upstream from Hosler Dam. The City's Electric Department operates a power generation plant about one mile downstream of the dam, and the Public Works Department operates the City's Water Treatment Plant immediately downstream of the power plant. A 24-inch ductile iron transmission pipeline (penstock) supplies water from the reservoir behind the dam to the water treatment plant through the power generation plant. Downstream of the treatment plant, Ashland Creek flows to the north end of the City of Ashland to the confluence with Bear Creek 4.8 miles downstream of the dam. Bear Creek travels within Jackson County, north through the cities of Talent (approximately 3 miles downstream of the confluence of Ashland and Bear Creeks), Phoenix (approximately 4 miles downstream of Talent), Medford (approximately 5 miles downstream of Phoenix), and into the Rogue River (approximately 7 miles downstream of Medford). The inundation maps include the inundation area through the Ashland Watershed to the City of Phoenix. March 2016 City of Ashland Revision 0 G:\pub-wrks\eng\15-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc FOR OFFICIAL USE ONLY 11 FOR OFFICIAL USE ONLY HOSLER DAM EMERGENCY ACTION PLAN PROJECT NO. 1107 - OREGON At BRI CRY rte.. LIMITS ACCES LINE ROAD HOSLER DAM ENSTO ~24" DIP EEDER r SPILLWAY I RESV. I VICINITY MAP GATES i CAMERAS 8 SEISMOGRAPHS 4\ r 36" STEEL \ INTAKE TOWER j l~ REEDER GULCH t IL lJ j REEDER RESERVOFi EAST FORK ;BRIDGE NEST FORK i EAST FORK DAM DAM WEST FORK BRIDGE (proposed) HOSLER DAM SITE PLAN 370' March 2016 City of Ashland Revision 0 G:\pub-wrks\eng\15-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc 12 FOR OFFICIAL USE ONLY FOR OFFICIAL USE ONLY HOSLER DAM EMERGENCY ACTION PLAN PROJECT NO. 1107 -OREGON E. EAP Response Process Step 1:Incident Detection, Evaluation, and Emergency Level Determination The Water Treatment Plant is located on Ashland Creek a short distance below the dam. The level of water behind the dam is monitored by telemetry, as well as daily visual observation. Operators man the Water Treatment Plant ten hours a day throughout the year. In addition to the manned work hours, the on- call operator has a phone and is required to respond to plant emergencies 24-hours a day while on duty. There are alarms on the dam that notify the on-call operator by phone alarm if any abnormal rise in water level is detected. These alarms are accessible on the laptop computer so that the operators can observe any area of concern and monitor flow measurements simultaneously. Any abnormal rise in creek flow or drop in reservoir level that is measured over a period of less than one hour will be investigated by the plant operator and the plant operator will alert the Public Works Director, Public Works Superintendent, or water emergency duty person of any abnormality. The plant operator and/or the notified person(s) will then physically check the cause of the rising water. If there is true indication of abnormal conditions, notification procedures will be followed. No threat to public safety would be anticipated in the event that either the East or West Fork diversion dam should fail. These reservoirs contain a relatively small amount of water, and an uncontrolled discharge would only cause a small wave in Reeder Reservoir. In the event that Reeder Reservoir is full, there would be no problem at the spillway or in the creek channel due to failure of either of these small diversion structures. High Flow: The High Flow emergency level indicates that flooding is occurring on the creek system, but there is no apparent threat to the integrity of the dam. The High Flow emergency level is used by the licensee to convey to outside agencies that downstream areas may be affected by the dam's release. Although the amount of flooding may be beyond the control of the licensee, information on the timing and amount of release from the dam may be helpful to authorities in making decisions regarding warnings and evacuations. If this emergency level is initiated, it is important that all parties are made to understand the dam is NOT in danger of failing. Non-Failure: The Non-Failure emergency level is appropriate for an event at a dam that will not, by itself, lead to a failure, but requires investigation and notification of internal and/or external personnel. Examples are (1) new seepage or leakage on the downstream side of the dam, (2) presence of unauthorized personnel at the dam, and (3) malfunction of a gate. Some incidents, such as new seepage, may only require an internal response from the dam owner. Others, such a gate malfunction, may lead to unexpected high releases that could pose a hazard to the downstream public and would require the notification of outside agencies. Potential Failure: The Potential Failure emergency level indicates that conditions are developing at the dam that could lead to a dam failure. Some examples are (1) rising reservoir levels that are approaching the top of the non-overflow section of the dam, (2) transverse cracking of an embankment, and (3) a verified bomb threat. Potential Failure should convey that time is available for analyses, March 2016 City of Ashland Revision 0 G:\pub-wrks\eng\15-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc FOR OFFICIAL USE ONLY 13 FOR OFFICIAL USE ONLY HOSLER DAM EMERGENCY ACTION PLAN PROJECT NO. 1107 -OREGON decisions, and actions before the dam could fail. A failure may occur, but predetermined response actions may moderate or alleviate failure. Imminent Failure: The Imminent Failure emergency level indicates that time has run out, and the dam has failed, is failing, or is about to fail. Imminent Failure typically involves a continuing and progressive loss of material from the dam. It is not usually possible to detennine how long a complete breach of a dam will take. Therefore, once a decision is made that there is no time to prevent failure, the Imminent Failure warning must be issued. For purposes of evacuation, emergency management authorities should assume the worst-case condition that failure has already occurred. Event Situation Emergency Level Reservoir water surface elevation at auxiliary spillway crest or Non-failure spillway is flowing with no active erosion Earth Spillway Spillway flowing with active gully erosion Potential failure Flow Spillway flow that could result in flood of people downstream Potential failure if the reservoir level continues to rise Spillway flowing with an advancing headcut that is threatening the control section Imminent failure Embankment Reservoir level is 0.5 feet below the to of the dam Potential failure Overtopping Water from the reservoir is flowing over the to of the dam Imminent failure New seepage areas in or near dam Non-failure Seepage New seepage areas with cloudy discharge or increasing flow rate Potential failure Seepage with significant joint offset or considerably increasing Imminent failure discharge Sinkholes Observation of new sinkhole in reservoir area or on embankment Potential failure Rapidly enlarging sinkhole Imminent failure Embankment New cracks in the embankment without seepage Non-failure Cracking Cracks in the embankment with seepage Potential failure Embankment Visual movement/slippage of the embankment sloe Non-failure Movement Sudden or rapidly proceeding slides of the embankment slopes Imminent failure Instruments Instrumentation readings beyond redetermined values Non-failure Measurable earthquake felt or reported on or within 25 miles of the Non-failure Earthquake dam Earthquake resulted in visible damage to the dam or appurtenances Potential failure Earthquake resulted in uncontrolled release of water from the dam Imminent failure Verified bomb threat that, if carried out, could result in damage Potential failure Security to the dam Threat Detonated bomb that has resulted in damage to the dam or Imminent failure appurtenances Sabotage/ Damage that could adversely impact the functioning of the dam Non-failure Vandalism Damage that has resulted in seepage flow Potential failure Damage that has resulted in uncontrolled water release Imminent failure March 2016 City of Ashland Revision 1 G:\pub-wrks\eng\15-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc 14 FOR OFFICIAL USE ONLY FOR OFFICIAL USE ONLY HOSLER DAM EMERGENCY ACTION PLAN PROJECT NO. 1107 - OREGON Step 2:Notification and Communication The notification procedure will follow the sequence noted on the Flow Charts. The first line of communication will be the telephone via the automated Everbridge system, followed by manually calling on telephone as per flow charts, followed by radio communication on the City's Public Works communications frequency, followed by personal contact, if necessary. The emergency dispatch monitors all Public Works radio frequencies and can communicate on that frequency as well. In the case of sudden dam failure, direct notification of all immediately affected downstream persons and businesses within the limits of inundation may not be possible because of the lack of warning time. In the event of complete dam failure, the flood-wave would reach the City center (the Plaza) in a time period calculated to be approximately 8 to 10 minutes. Therefore, the City has installed an automated audible emergency warning system which relies on independent transceivers and will operate without reliance on the existing telephone system, which is vulnerable to failure during catastrophic events. The sensor array described in Section IV, Emergency Detection, Evaluation & Classification will transmit an alarm signal to the Water Treatment Plant. The operator at the plant will verify failure before proceeding with notification procedures to initiate the EAP. The audible sirens consist of four siren stations distributed along the edge of the inundation zone within City limits. Each station consists of four 144 db 311 Hz air powered horns mounted on 20-foot high towers. The horns are powered from 2200 psi, 125 pound air bottles and will be controlled to give a distinct intermittent sound. These horns will have a range of about 1/3 of a mile under adverse weather conditions and over 2/3 of a mile under good conditions (above background noise level of 80 db). EverBridge Messages March 2016 City of Ashland Revision 0 G:\pub-wrks\eng\15-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc FOR OFFICIAL USE ONLY 15 FOR OFFICIAL USE ONLY HOSLER DAM EMERGENCY ACTION PLAN PROJECT NO. 1107 -OREGON 40 Step 3:Emergency Actions IMMINENT FAILURE Water Treatment Plant Manager or Operator on duty will contact Fire Chief via telephone, (911), or radio, and then evacuate the premises to higher ground. "This is the Water Treatment Plant Operator. Dam failure is imminent (or has occurred). I am evacuating the area and will contact you when I am safe." The Fire Chief will take the following action: 1. If possible, determine whether the dam has failed and verify any other pertinent information. 2. Manually sound the audible alarm system and initiate any other available notification procedures to rapidly warn the public of imminent failure. 3. Activate the Everbridge automated telephone notification system with pre-canned messages for EMAs and residents of the inundation area. or Notify the Chief of Police via telephone, (911), or radio and pass on pertinent information. Since the City Hall would undoubtedly be damaged or inundated, the Ashland Police Department will take charge of all notifications and communications. The Chief of Police will take the following action: 1. Determine if City Hall is still in operation either through phone calls (see 4 below) or visibly driving to the Plaza area and observing the building and the creek. 2. Notify Public Works Director who will notify the following individuals: - City Administrator - Fire Chief - Electric Systems Distribution Manager - Public Works Superintendent Persons listed above will then notify outside agencies in accordance with the imminent failure notification flow chart. 3. Notify the following outside agencies: The National Weather Service The Ashland Community Hospital Jackson County Emergency Dispatch The Jackson County Emergency Services Manager requesting that all affected emergency services downstream from Ashland be notified. The Regional Dam Safety Engineer 4. In accordance with the City of Ashland's Emergency Management Plan, a Command Operations Center and Information Officer will be established at the Ashland Civic Center, 1175 E. Main Street - or other location if required. AIN Ai March 2016 City of Ashland Revision 0 G:\pub-wrks\eng\1 5-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc 16 FOR OFFICIAL USE ONLY FOR OFFICIAL USE ONLY HOSLER DAM EMERGENCY ACTION PLAN PROJECT NO. 1107 - OREGON Emergency Action POTENTIAL FAILURE If there is any prior indication that Hosler Dam is going to fail or that there are unknowns in which further assessment is necessary, the Water Treatment Plant Manager or Operator on duty shall contact the following personnel by telephone or radio: Notify Public Works Director who will notify the following individuals: - City Administrator at - Fire Chief at - Electric Systems Distribution Manager - Public Works Superintendent - The Regional Dam Safety Engineer Persons listed above will then notify other agency in accordance with Potential Failure notification flow chart . The Treatment Plant Manager or Operator on duty will state: "This is the Ashland Water Treatment Plant Operator. I have received (or observed) indications that Hosler Dam may be experiencing problems with overtopping, or that a hazardous situation is developing. I need your help to initiate evaluation and possible notification procedures as outlined in the Emergency Action Plan and the City's Emergency Operations Plan. You need to initiate notification procedures shown on the "Potential Failure" notification flow chart I am securing the plant and will evacuate the area. I will contact you when I am safe". 1. City personnel at the Water Treatment Plant will secure the plant to the best of their abilities without endangering themselves, and evacuate the area for higher ground. Once at a safe location, the operator will provide a full assessment to the Public Works Director as soon as time allows. If it is safe to re-enter the inundation zone, the operator may do so. 2. After assessment of the situation and if there is determination that the dam may fail or is in danger of a significant hazard developing, the Public Works Director will immediately contact the Police department by telephone (911) and/or radio. 3. The Public Works Director, City Administrator, Police Department and Public Works Superintendent will begin notifications of other agencies as per the EAP-2 notification flow chart on page 7. NOTE: In addition to the above notifications, the Public Works Director or Public Works Superintendent will determine if it would be prudent to lower the water level in the reservoir. If such determination is made, this information will be given to all agencies notified so that appropriate action can be taken by those agencies as water levels in Ashland Creek could be rising and downstream areas could be affected. March 2016 City of Ashland Revision 0 G:\pub-wrks\eng\15-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc FOR OFFICIAL USE ONLY 17 FOR OFFICIAL USE ONLY HOSLER DAM EMERGENCY ACTION PLAN PROJECT NO. 1107 -OREGON NON FAILURE If there is any prior indication that Hosler Dam is going experiencing new seepage, leakage, equipment failure, or a security situation, the Water Treatment Plant Manager or Operator on duty shall contact the following personnel by telephone or radio: Public Works Director, who may notify the following individuals if it is appropriate for the situation: - City Administrator at - Fire Chief at - Electric Systems Distribution Manager - Public Works Superintendent The Regional Dam Safety Engineer Persons listed above will notify other agency in accordance with notification flow chart for High Flow. The Treatment Plant Manager or Operator on duty will state: "This is the Ashland Water Treatment Plant Operator. I have received (or observed) indications that -(INSERT DESCRIPTION OF ISSUE HERE for example,new seepage or leak, unauthorized personnel present, equipment malfunction) Hosler Dam is not experiencing problems , but I need your help to initiate the "non-failure" notification procedures outlined in the Emergency Action Plan and the City's Emergency Operations Plan. You need to initiate notification procedures shown on flow chart. I am securing the plant and but will not be evacuating at this time." HIGH FLOW If there is any prior indication that Hosler Dam is going experience a High Flow situation, the Water Treatment Plant Manager or Operator on duty shall contact the following personnel by telephone or radio: Public Works Director, who will notify the following individuals: - City Administrator at - Fire Chief at - Electric Systems Distribution Manager - Public Works Superintendent The Regional Dam Safety Engineer Persons listed above will notify other agency in accordance with notification flow chart for High Flow. The Treatment Plant Manager or Operator on duty will state: "This is the Ashland Water Treatment Plant Operator. I have received (or observed) indications that Ashland Creek is experiencing unusually high flows. Hosler Dam is not experiencing problems , but I need your help to initiate the "High Flow" notification procedures outlined in the Emergency Action Plan and the City's Emergency Operations Plan. You need to initiate notification procedures shown on flow chart . I am securing the plant and but will not be evacuating at this time." March 2016 City of Ashland Revision 0 G:\pub-wrks\eng\15-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc 18 FOR OFFICIAL USE ONLY FOR OFFICIAL USE ONLY HOSLER DAM EMERGENCY ACTION PLAN PROJECT NO. 1107 - OREGON Table 1: High Flow Operation/Notification Table Flow (cfs) Operation Procedures Expected Impacts Organizations to Notify Inspect spillway for debris < 900 buildup and remove as None None necessary Open spillway gates (if 900- 1,400 closed) to maintain normal None Local Police and Fire water surface level Departments Open 24-inch outlets to Overtopping possible if outlet Per EAP Notification 1,400 - 1,700 prevent overtopping, monitor operation is impaired, leading Flowchart (EAP "High Flow") erosion of abutment and to erosion at left embankment foundation material if overtopping Open 60-inch outlet to Silt discharged downstream Per EAP Notification 1,700 - 2,800 prevent overtopping, monitor from 60-inch outlet; Flowchart (EAP "Potential Failure") erosion of abutment material overtopping possible if outlet if overtopping operation is impaired, leading to erosion at left embankment Activate procedures, evacuate Overtopping of parapet walls, Per EAP Notification 2,800 - 16,714 Water Treatment Plant and flooding throughout Flowchart (EAP "Iminent Failure") dam site, begin notification inundation zone, erosion of and evacuation of inundation left embankment materiat zone March 2016 City of Ashland Revision 0 G:\pub-wrks1eng\15-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc FOR OFFICIAL USE ONLY 19 FOR OFFICIAL USE ONLY HOSLER DAM EMERGENCY ACTION PLAN PROJECT NO. 1107 - OREGON F. General Responsibilities under the Emergency Action Plan F-1. Licensee Responsibilities The Water Treatment Plant Operations Division of the Ashland Public Works Department is responsible for maintenance and operations of Hosler Dam and Reeder Reservoir. As such, the Water Treatment Plant Supervisor and the plant operators are responsible for major decisions relating to emergency situations. Because of the location of the Water Treatment Plant on Ashland Creek below Hosler Dam, the Water Treatment Plant Operators are uniquely situated to observe any changes of flow in Ashland Creek which might indicate a problem or emergency situation at the dam. The plant operators have daily responsibilities that include observations of the dam and recordings of the water elevations behind the dam face. Water Treatment Plant Supervisors and Operators are the key personnel who are generally responsible under the Emergency Action Plan. These personnel have been advised of the importance of the EAP and why it is necessary. They are also exercised annually on the proper communication channels, secondary communications and how to apply proper notification procedures under this EAP. F-2. Responsibility for Notification The Water Treatment Plant Operators have primary responsibility for notification of dam failures or any significant changes in the water level behind the dam as shown in the EAR Their activities are documented in daily operations logs at the Water Treatment Plant. Plant personnel duties include knowing the location of the EAP document, thorough study and knowledge of its content, participation with other key personnel in study sessions of the EAP elements, and participation in review and test sessions of emergency communication and notification procedures. Actions the operators take after completing notification responsibilities depend upon the specific situation. There are not certain sequences predicted for opening or closing of valves or gates, and decisions will be made based upon the immediate situation. If there is any doubt as to the actions to be taken, the next level of supervisors (Water Treatment Plant Supervisor or Public Works Superintendent) is empowered to make the decision or gain additional expertise necessary to make such a decision. The chain of command and notification procedures are shown on the Notification Flow Charts. Public Works key personnel, as indicated on the Notification Flow Charts, will keep local authorities advised of conditions at the dam by use of telephone, radio and/or personal contact, as appropriate or as available. The National Weather Service will be utilized to obtain flood warning information. Jackson County, through the Southern Oregon Regional Communications Center, will be the clearinghouse and the Jackson County Emergency Operations Center will have additional coordination responsibilities for all emergency activities throughout the County. F-3. Responsibility for Evacuation Should evacuation be required, the City's Emergency Management Plan will be enforced. The Incident Commander (in this case, most likely the Public Works Director) will advise 911 Emergency Dispatch and evacuation procedures will begin. With annually-updated inundation maps and accurate aerial photography (2012) the City has detailed mapping of evacuation routes, water levels and other pertinent information available for emergency situations. March 2016 City of Ashland Revision 0 G:\pub-wrks\eng\15-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc 20 FOR OFFICIAL USE ONLY FOR OFFICIAL USE ONLY HOSLER DAM EMERGENCY ACTION PLAN PROJECT NO. 1107 -OREGON F-4. Monitoring, Security, Termination, and Follow-up Responsibilities Termination of the emergency will be at the discretion and direction of the City's Incident Commander (in this case, most likely the Public Works Director). Follow-up procedures for the dam are the responsibility of the Public Works Director. Any necessary changes to the EAP or other emergency procedures recommended, at any level, will be channeled through the Public Works Director for inclusion in the Plans. F-5. EAP Coordination Responsibility The designated EAP coordinator, who is responsible for related activities including, but not limited to preparing revisions to the EAP, coordinating EAP tests, etc. is the Public Works Director, direct 541/552- 2411 or through clerical staff assistance at 541/488-5587. The Water Treatment Plant Supervisor, 541/488-5345 is responsible for the surveillance and observations at the dam and for establishing training exercises for plant operators. March 2016 City of Ashland Revision 0 G:\pub-wrks',eng\15-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc FOR OFFICIAL USE ONLY 21 FOR OFFICIAL USE ONLY HOSLER DAM EMERGENCY ACTION PLAN PROJECT NO. 1107 - OREGON G. Preparedness G-1. Surveillance and Monitoring The dam is unmanned, and is located on Ashland Creek approximately one (1) mile above the Water Treatment Plant. The level of water behind the dam is monitored by telemetry, as well as daily visual observation. Water levels will be monitored by sensor array as part of the automated emergency audible warning system. The level of Ashland Creek is visibly monitored daily and flow gages are checked routinely. The Water Treatment Plant has operators on duty at the plant 10 hours a day seven days a week throughout the year. There is an operator on-call at all other times. There are alarms on the dam that notify the on-call operator by phone alarm if any abnormal change in water level is observed. In addition to monitoring at the Water Treatment Plant, the dam site is visited daily by the Water Treatment Plant Supervisor or Operator on duty. The frequency of surveillance of the dam by these personnel is increased during inclement weather or other critical times. The dam level is monitored by computer at the Water Treatment Plant. Should the level of the dam increase or decrease rapidly (e.g. three feet in five minutes) an alarm is activated at the Water Treatment Plant. During that part of the day when the Water Treatment Plant is unmanned, all alarms are relayed to the Duty Operator by means of an auto-dialer. The Duty Operator carries a cellular telephone that is dedicated for this purpose. The Duty Operator can monitor the alarms on the laptop computer via the SCADA system. In the event that the headwater or the tail-water alarm is activated while the Water Treatment Plant is manned, the operator on duty shall, before initiating the Emergency Action Plan, determine visually whether a problem exists or not. This includes observation of the water level on the creek and/or observation of the dam itself to rule out the possibility of a false alarm. The operator will check the Hosler Dam level readout and the tail-water level readout in the telemetry headquarters panel in order to identify any significant changes in stream level or stream flow. If there are no significant decreases in dam level or increases in stream level, the alarm will be judged as a false alarm and the operator will resume normal work duties. Should there be a significant decrease (3 feet) in the level of the reservoir and a significant increase in the level (2 feet) of the creek running through the plant, the operator will immediately initiate the Emergency Action Plan, Notification Flowcharts: FAILURE IMMINENT or HAS OCCURRED. Once this has been done, the operator will evacuate the premises for higher ground. Once confirmation is received that the alarm is valid and activation of the Emergency Action Plan has begun, the Fire Department will begin evacuating residents from the inundation zone. The automated emergency siren system may have already sounded if failure of the dam has occurred. G-2. Evaluation of Detection and Response Timing G-3. Access to the Site is generally by an unimproved, but well-maintained gravel road. In adverse weather, four-wheel drive vehicles or other equipment can access the dam. In the case where the road might be flooded or washed out, the dam is accessible by foot by way of a fire trail. Travel time by foot is generally less than 30 nunutes to reach the dam face from the Water Treatment Plant. March 2016 City of Ashland Revision 0 G:\pub-wrks\eng\15-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc 22 FOR OFFICIAL USE ONLY FOR OFFICIAL USE ONLY HOSLER DAM EMERGENCY ACTION PLAN PROJECT NO. 1107 -OREGON G-4. Response during Periods of Darkness: As previously discussed, there are on-duty personnel available 24 hours a day. Illumination is available through the use of the dam crest camera, owned and operated by the Water Quality Division. This is emergency equipment and is available at all times, day and night, for emergencies and when necessary. Other personnel can be called to assist. Response time is short since the on-duty person has a City vehicle and radio/paging equipment available to them at all times, and is required to maintain a 20-minute response time. G-5. Alternative Sources of Power: The Water Treatment Plant, Fire Station, and City Hall all have backup emergency generators, and the dam does not presently have any major electrical power loads. G-6. Emergency Supplies and Information Stockpiling Materials and Equipment The City of Ashland is well supplied with manpower, equipment and materials for use in emergency situations. In addition, the Water Quality Division can call upon other divisions of the Public Works Department as well as other departments within the City. The City also maintains a list of contract suppliers for both equipment and emergency supplies not generally maintained by the City, but used during emergency situations. In addition to supplies and equipment, the City maintains a list of available resources and professional contacts for assistance in case of emergencies. G-7. Training and Exercise See Appendix-B G-S. Alternative Systems of Communication The Water Quality Division has radio equipment in all vehicles and also has a number of portable transceivers (radios) available. This radio equipment is available for use at the dam at any time, and in many cases is the most reliable means of communication in the canyon. G-9. Public Awareness and Communication Ashland Fire and Rescue's Citizen Emergency Response Team H. Inundation Maps A study and analysis of the extent of possible inundation expected upon failure of Hosler Dam was completed by Harza Engineering Company on October 26, 2000. Two required dam break analyses were completed: one for the PMF during sunny day conditions ("fair weather"), and the second during flood ("wet weather") conditions. A copy of a reduced size (1 1" x 17") set of the inundation maps is enclosed. March 2016 City of Ashland Revision 0 G:\pub-wrks`,eng\15-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc FOR OFFICIAL USE ONLY 23 E i ti, i SSA ' ~ ff ~ ~ ~ ~ C p O O d E ~ ~ ~ ~ ~ o m ~ ~ ~ ~ v ~ i U C W (n (A W ~ E n ~ , a L 6 ~ ~ ~ N ~ ~ o LL ~ ~ ~ ~ _ o ~ E ~ ~ o ~ N0 ~ ~ a ~ ^ M, N 0 j ~ - _ W7 _ ~ O = o N Y.1 W vii AV 1 z ~ n ~ ~ , F ~ a ~ ° ~ ~ { x _ } u d C ~ ~ ~ //`~~Y - _W VI ' 0 i a ~ z , o~ O ~ > ~ ~ Y vti as M31A ,l tlA N q ww~~ ' v ~Y ~rV ~ f V J ~O ~ i . y ~ W W t s ~ ~ f ~ ~ 0 L ~ ~ ~ ~ ~ r ~ ~ ~ 0 f C vi N C a ~ ~ _ ~ ~ a ~ ~ 1 ~ ~ Q r m: W . ~ ~ l E ~ ~ , . O • r 1...---- t ~ k l~ , f f' f ~ ~ ~ ' ~ b ~ a F, ~ ' , ~ v4 N ~ d Q ~ ~e.. ~ W cam- ; , s~ , ~ ti w , ..,~.r"._. ~.r'" ` % ~ ~ 01 ~,m , -....„,4 s s ~ ~ r i c ~ , .F. r s ~ s _ ` f ~ 'Y`om "t ~w i ~ ~ F i ti 0 ~ , i ,,W _.,3 3 t r x ~ ~ s p $ ~ ' } - ~ s ~ ~ i~ ~ ~ t ~ ~ ~ ~ ~ °-w.., f ~ ~ ~ fG f f~ ~ ~ 0 y , ~ ~ ' r p1 i-° k ~ 1 r ~w ~ ~ ~ r ~ , , v. _w ~ f P t k N j f ."T...^ ~ ~ ~ ~ f . a ~ ~ a rPb 'rc. i s ~ rf Rl ~'S ) { j, I ~ f, yeM.+~"~ r e i i r ~ L ~ a c7 ' ~ ~ i C ,p~' r i % J" ~ . co ~ ~ ~ ~ ~ N ~ (I ~ ~ _ . ' < ~ v o ~ ~ v ~ o ? ~ m ~ ~ ~ _ ~ ~ } ~ ~ ~ 5 ~ *~M ~ N ~ ~ ~ ~ ~ ~ ~ ~o ~ ~ ~ Rp ~~r ~ Rp i G' . G G ~ `,ti N ~ ~ti~ ~ O ~ ♦ ~ t F+ ~ ~ W F+ ~ ~ ! 1.,.,. i ~ ~ ~ ~ r . t bR q~ar ~ia ~«.~.:1►WNEV~DAST ~ a ~E NEVAD : .w ~ stn ° i*++•' It t~ _ ~ $y I~' {a' y+t~i.x # E NEVADA~ST ~ ~~3 f .1; . r ~ rl r i ~ ~ A r~ \ i r 4r' r. rr ,i r/Mw:d^~ t.! Z~~. ~ "n a A~ ,i;,, ` .i aw,r I lr r r.( i 1 r ~ 4 1411•, ~MrH kr * r : 'i+ii i~ C~ i r df~ ♦ri~•~ ~rwid..i•••+r+ : 't.+«~ ltd ~ ~ ~ i! ~ w♦►y=+~L►+ ~,`•MAPLEST~+~~~ rw'')]j1 r, . ~ ~ ~ ~ r 3 M 3~ ~ r 4~ R~~ i ~ t 4 . 000": ~,/•d% •r~~;.~ ~ ~ :O4 r~ ~ •.,r ~ w•t' z~,~~ipjE: • ~ 1++ 1 1 ~ ~ ~ ~ 'yam ~TA~~ ~aN~ r~ ~ a~ ~ ~ ~ ~o I~t~ ,.y,,, i t.;~EI. ~ ..fit+;.Z y5,+77711~• :t Fq~',~~'2' O,.fi+ sC y i I ~ i . i ~ II ~ t11.. a 1 y.± ~jCh' • .~•r ~*I'.• ,p d ~ i 1I i ~M,~ l gI~ 1 i•~~ ~ It ay"d ^7 ~ ~ • a 1,~~~ Z~ `l ~ ~5++.~j~WIMER STt+I wi~r'~ t°'~,ti , ,i'!'k~l~~fly ► .,.w"`~~ wfl. lil~l*~,sD~ g a ~~t i • ! ~ S t M~ • ~~S 1.''~RS RS ~ lid . d4 1 ar■ ~ • ~ tr~ i 1 • ~ai^- d w' ~sr. FYS~ 1`',~~tc ~ IUI I arSc \ zs~ ~ ►e ~ t~~ • „i y.~ "`i~ J/ r~ ,:<.i{°dld' rln }iii , R! ~ ♦ ~ , ++i ~ ■5 a a ,"t y, , d•• r . < f t 1.! Rl~.ri~ I4 • ~ r+*~~4 `~'.~t OL 1 ~ 1r `~,a;~ ~ ~ : ♦ w,lii s EHERSEYSTI`113. 1k " ►p+ , • ,L tai l ti ~G t *d~ I' ~ ' ~ f ♦ ~ ' • d ~ 'L" al~ ~ ~ d wJ t lr i •i t ! •~'mF~ ~v ilioiF^t*~sa};A '9 • ,•.1 iMii► •.}ItarAi 4 ~ i I 4~ ~•~UJ. 8 • •t ~,i "y O F'... % ASr ~ 11 ~t~~r~rwn t-._..... r r ~ ~ ~ r r~~ r~~ i d, x- ~ sr~ ~ f, ~`fa► e ~ dl'"• ij- , .!IaM*~ ,r 0` 1 t y5~p y~=A ~ BS'l.' 1+~ 1 • ' w+1Rt; .71,'~~ y . 9 + i. (n . ~ ~ ' • i' r j d is ' 6 n. { e r t{ ! h dir. ti xr ♦ ~ + w►,•i+i . ~ . d I r,NUTLEY gr° ~ °.ati ~ 9~ iy~ tr~~' ~ # i+ ~ S' -{~,+y.~~~! ~o f N • lS~,•. r j f ' 4; li!+r~~ ~ A.,uy"d ,~a~,. 41E -'d• a . w' rfut~ . I ` ~ ~,n t b ~ yy ~ ~d.d~i °~r ~ ~ ~k! a d~ ~ ~ ■ L i +•~'1 r ~y ~ ~ d • Y 4'yl~~'f ct 4 i • i". fA ~y d., ,.•$~1 i \ 'A~r LN -1 ~ ~ a}d } 3 ly . y ~r £ ati :a ~ 3~;y ~ . s. ~ ~ r ra d•`!f`r ~lR. W'm ~ ~ C`'9 •y ii►~~..~ ~~~w s • ♦ ';1 ~ t to ~ t+ r.~:Atd i ,yn, •f ~ *,1 D Ii: ~'r ~ w r s .~..,d IOWAST, ~1~=d 1 •i ~ + _ ~ ~ 1, + ,.,w► .,a ~1 `z IOWA Sl.~ ~ ~ ye e ,3.. ;~1~I'•.~ir'1 rte, ~ ~,~•i~r. ►Mi r`ID r"' ~ ~i ~ ~ i ~ „HOLLY,STk, rit+ g• z a a~ 1 i f i„~ ~ . ivy + r q•1 3. - w, • ~ ~ ~ ~ '.rl!• 3. a 4; i r . d S• ~A i `N 1,, R.'~ ~ i lA . ~ ~ - E ss~, ~ t ~ v Lt+r•t`i =~!~'i ~i~i `:?~~~l~~z °'•1 Id,~i ~:.i te',1 ~`i bi N d, ~i~m ij~ ~ir+~!•±~- i yslS tt",r. m i tn' ~ cn I' ii ► ~~~~~~ta'..J.ASHLANDST; ~R~; .i c~ .aar ~ 6~~~1 1 ~s~+w '~~y 4+i~rie~~ ~t~t•r1;~M1Ey IND. ~1 . r` • of M.• 1 rP'~.". r, d NI:I,~.,.ft~° 4~.~ 1, 2,ti~, ~ ,».TC• ♦ .l ~ -e Oz ~i ~ v ] 1►••' • t►~ i ~ wy 1 4~ ~ ~ v~ u• i+ IA w. • ~ i - ~ "i d1d~ ~r Y : ~ 4 1 ~ 1 tli MI, d • C ~ 1I~ o° ' ~ t~d• ~ . ir~t•~ ii+'~o ••.•1,,11' 1: a..♦ii•,~' j/t~. r i~ r.! '~,a + a 1. W, •va, i• ~ili:+.a; .S 3 ~ 9 ► it . ~ 1g ~1 • + i1 r••*•.~, Rw dew ► ~ Z~t.w ~ w .•rt I' ~ i t lam" t r~~~ 5~, w ,IMF ~ t t r 11.X r ~ i 1'0 4• ~ " wr• f ' 1 + a 3 ~ s 3Ty ~ ; m m ~ ~ ~rw{ 3 m m c ~ ~ 't 1 g ODO rn ~ o o I GG v > > (D ~ " tD ~ ~ e . o ~ ~ R 3 ~U.q Hosler Dam Evacuation Plan _ Detail Map 3 ~ ; X •21630.20018 , Y: 89042.551212 ~ T ~ i~ r I t- s ~ I Section 0.09 Mile Data Fair Weather FloodCondttion Max. EI. (ft) 2,486.3 2,489.7 Max. Rise (ft) 38.3 29.41 Peak Q (cfs) 154,000 186,OOD ~ Arrival Time (hr) 0.04 0.04 ~ Peak Time (hr) 0.1 0.1 -,a ~ , r~ fit' ' y ~ , /r s Ir ~ 2 . X -2164250.76904 Y: 828632.361386 ~ ~ ~ ~rf„ s ;s Section 0.01 Mile Data Falr Weather Flood Condltlon Max. EI. (ft) ~ 2,809.4 2,812.7 "Max. Rise (ft) ~ 47.4 36.3 ' 0 r ~ Peak Q (cfs) ~ 201,000 229,000 (_OCatof Map „ , ( Arrival Time(hr) ~ 0.01 0.01 ~ g b Peak Time hr 0.07 0.08 p-~ 1~~~ ~1 ' Legend ~ i % .Buildings Inside Path ~ Buildings Not in Path r r Streams r r Inundation Path r f ;Fair Weather i i .Flood Condition r ,r t'~.. ~ Evacuation Route * Red Cross Shelters ~ a x: •21 ea29a aos5e Y: 827905,349163 1 inch =300 feet Document Path: M:1ProLMAP0003-1141_MapslHoslerDam2f1151mxd1RenamedlHoslerOamEvacMap2015_Yrovdi.rmcd Date: 1 211 62 01 5 G:\pub-wrks\eng\15-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc oop'SNd - dtl3 - Oi'£0'9i0Z1dtl31~6ua\wea6oad ~3a~~S wa0 9i0Z 6Z-Si16ua\s~ann-qnd\:g SLOU9l2l:ale0 P~'IMa!n 4lOZdeWaen3we0iatmHlP~1~3~VLOZedeV~pen3weaa!SOMedeW 1611-£OOZIdVW?ad1W s; , laa! 006 = 4~! L r1 N SJa}IayS ssa~ Paa + ~ a}noa uopenoen3 ~ uoq~puo~ Pool j ~ _ ~ gay}ea/N pie j I y}ed uoiaepunu) swear}g y}ed ui }oN s6wp~mg 4}ed ap!su~ s6uip~ing - puaBa~ s dew ~oaeao~ ~ . s t.szs ~rseza eseecueesu- x Oy ~py k,1~~J ~~d ~ ~ ~ sd 3 ~ ~ 100ZVS'V90068 A ~ ~ lhZSO'L8L£8lZ- x ~ ~ ~ ` ~ ~ ♦ \ j~ ~ `4 ~ ` yNda~ L ~ ; ~ i EL'0 Zl'0 (ryjaw!l~ead 80'0 BO'0 (~~ew11enwy aaa'vsL ooo'EeL lsh)o>le8d 2~OH:~uIUlU11Ms 8'6L Z'OE (y) ~b'xeW S'lSZ'Z L'86Z'Z (8)'13'xeW uog!puo~poo~j iay~eaMnej elep >.,t,~ apw g•} uogaag <1;t,. ` a~ dQO f10S ~e a)onJana~ a~tue-t~~ ~ s, "~"se IIeH 1eaN~W of ~ ~ deW I!~~aa z~LZzL~~ u~ uoi ~n~~n ~u~ ~a so esLea~esssalz-x Id 3 0 I H H xy Hosler Dam Evacuation Plan ~ F~a~ ~ Detail Map 5 ~~OJ~a To McNeal Hall To Briscoe ~ °a a~`~ Elementary School r ~~c 0 ~pNIEW g A ~ a _ STRAWBERRY LN x -2t629ea.7ao21 Y: 831705.849626 ~ F. ~i~~ T ~ 200 , Dt~30Pontl 1 Section 2.4 Mile ~ ~ ~ Data Fair Weather Flood Condition ~ ~ 1 n Max. EI. {ft) 2,028.3 2,030.5 ~ I Max. Rise (ft) 24.8 16.6 - Peak Q (cfs} 118,000 143,000 ~1 Arrival Time (hr) 0.12 0.10 t J ` Q Peak Time (hr) 0.16 0.18 I ~ f a.. ~ .F.~ r o J o t x-zts35oa.rizz Parks Offices Y, 831254.8843 '~c INTERN AtLti if ~ Ill r _ 1 Z~ ~ ~ ~ o,~ ~ff~ No OR Locator Map . ~ , r 440 510 Legend m ~ -Buildings Inside Path a-~ 1 Buildings Not in Path , . ~ 0 Streams ~ Inundation Path Fair Weather d qsk Flood Cond~ion R~ iyp AN7Tf r ST X -2163368.69753 Evacuation Route ~ Y: 830612.279952 ~ * Red Cross Shelters v 1 inch = 300 feet ~ , <:a MIProLMAP12 0 0 311 41 MapslHoslerDamEvacMaps2013lFERClrrxdlHoslerDamEvacMap2013 Viev✓3.rrad Data:1211620i5 G:\pub-wrks\eng\15-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc ~ ~ ~ ~ ~op'SNd - dtl3 - Oi'£0'9i0Z1dn31a6ua\wea6oad ~a3pS ►uea 9tOZ 6Z-Si16ua\s~ann-qnd\:g SIOZl9L2l Bu0 paPPtl6wp~mg* P~4~!A 6lOZdeWoen3wepial~HlP~w1~213j17lDZSdeµpe,ywepla~soHl~eW 1911~00Z1dVW Io~dlW v QOl aaaj OpE =yaw ~ ~allayS ssa~ Paa * , ; ~ ~ d a~naa uoiaenoen3 ~ 0~ fiV3 uoiupuo~ poo~~ - 3 0 gay}ea/N pie j a 4aed uoi~epunu~ '~y s 7 swea~lS yaed w aoN s6wp~in8 SQa¢e ~ti~ • s ~ as y;ed ap~su~ s6uippn8. OS6 pua6a~ ~ 6 b. l 9Z964B'SOLL£B'A m~l lZ0►L'486Z91Z X oEt sj ° deW ~o~eao~ tty ~ig 15 ~unN f nos ~e w ~ ~ c 0 IIeH IpaNaW of 'Cn ~a ~°~do ~ Oq S ~ \ ss ' N z' x Ada s1~xoH ~a voo is uls►n i y~,owoard~ ld MN3hyy ~5 Ay 15 Wnda ~~~a H~ bag rf Q,`" 1S 3NIOVDkVH ~y ,r~. b6 5 0 L195Z6~lZZZCB A ~ ~ 08096'666Z91Z' X 7 ~o of ~ ~o ,s ~ ~ ~s A317y ~2130N3 y js~ ( 4, S6 Yh ~ b z E, ° S l Y 0 / y~ au ~ ~ ~f ti ti` l~ z d ~ Y '~r o, 5~~i0~ Wj7. oI~O 4~ ~ ``'ga ti,14s ~ ''ld 6!y t S, MA 39000 ,•~~s` , ~ 2 ~'~,e' 6 v ~ _ 771M ~ i ~ y4 4 St ~ ° ~ ~ ~ ° °a 68~ ,e N AM VlHlll ~ a ~n a~ k °9 S ~'ys 1,6Z~0 I6Z'D (i4)awil~ead i ~ yo. 9l'0 j9l'0 (~y) awil ~enwy ~ :34175 to a° ~ tp ~C h ~000'lZL 000'66 (S1~)O~laad ~ i 2~htl39 ~ C 6'l6 L'6Z GJ)~RI'~W ~ ~ dew ~ Z j6'L68'l S'Sfi8'l Gl)'13'~W ~°wg~ ~ ~OO`2~~S,~e~uawa13 uoi~PuoO P~Id i Iay;eaM ~ie~ e~ep ~ ~ 5 ` a0~5118 Ol al!W Z'S uog~aS w s ~ 111 Z W , Z 2 Q~--~ ~ Z h a ytt ~ ~ `°,.v. ~41 X41 o~ `l 6L 4 nos ae a ~49 IIeH IeaN~W of t ~s u.. Atl ltlM1N3) `fit 44t fig'" N Yn ~ `bt 46t ~ 55 ' w 4B t~ s~ d 15 ~ so4 SlE ~y°} 1e o4.~ y f Y 4t4 $1 , 044 ab ~ ~ n° i" ti 1 S1 b114161~,o`1a1 ~ pq` S~~Y~4`19~ 69 l 4 q4 ~ ~ y1 491 ~S1 X41 5ti 4' , 5? 40~ ao~" s~; ~ ~ ~ 553N Ntlh ~ J l!- d<~ t b zr°1 w 4 r; ~ Y i ~'1 ,ram„ / , v 1 , y a 5`t 55~ s~~npo~d asz oae auid s,uosaed QS °4 15 A3583H 3 t SAS 0 5S 6n 914 ~~5 4t 4e c4 ss5 g dew ~i~~aa uZSSS sasses 9SLLl £ZZZ9lZ- x y04 u~~d uoi~~n~~n3 ~u~a ~a~soH ~ Hosler Dam Evacuation Plan Detail Map 7 x.2181751.88857 Y: 833935749145 1~5 a ~t rh4~•,. 1 ~~rr~ i 1 ~ r 1~ ~~ylp ' ~~~~~u~~,~ il~~ kl~ii y~ 4rS r{~I 6itlr~~1~~f~'~ryyrJJ~V'r~.~ i , ~ i ~I ~ I t I~~rlil' Y174'~~f ~lYf ~~i1~~19~R .r ' ~ t ` X •2162274.31422 `V Y 833935.204921 ~ _ ~ ~ Section 4.2 Mile r I ~nx , r w ~.e,.,,. f.. Data Fair Weather FlootlContlRlon Max. EI. (ft) 1,759.4 1,161.5 ~ Max. Rise (ft) 15.4 10.6 r=~ ~ ~ Peak Q (cis) 70,000 94,000 Arrival Time (hr) 0.27 0.24 a ~ Peak Time (hr) 0.37 0.35 . ~ Y 55 ~ a' 1 ALDER LN ~~,•q'~~ r I er irq~q~' a /~'1 ~ ~ r ~ ~ i x •2161932.58823 305 Y: 833453.998929 f STQNERIDGE AV ;~l „r ~ 33a a+8 CYPRESS 3 as TO B fSCOe CR RANDY ST ~ ~ <e ~ ~ c Element ry School i oax ~ a ar+ ~e r ~ q ~ ~ ~DOWS jPL Y FAIR ~ I ~O ~ OAKS AV w ase ~ 0 Z 1 J ` - 1 z ~ ~ a ~H l ans n ~ a~ =~i ~ ~ ~ MOUNTACN "VIEW DR ' x -2162369sz55s Y: 833228.506286 ~ ~ ~i~~ ~ r i sae ~1, } ~ `e~3 ~ ~BpIJ ~ Pu VER9' "SLEE~'Y ,y t' D~(LOW DR ns0 ~ L "9 ~ ~ s ~Ok WY ! OAK y 0 h ~ i LAWN AV C+v ¢2 ~ ~3~ ~ ' ~ ~ ~ 9ucrA Av 1~ ~ a~e~,t ~ # • oy~ ~ ~ ~ ~r ~ ~ ~ ~ ~ ~ w~rON St BR~CDf w ~ Locator Map CRISPIN~$p _ ~ ~ • sea ~ J ~ i•l g ~ PATTER50N ST Legend ~ , a g -Buildings Inside Path y~ 9 t x -z162223.m56 Buildings Not in Path Y 63z56s.a962n Streams Inundation Path 1 f Fair Weather ~ ~ Flood Cond~ion pp~ ~ Evacuation Route C~Fq~ * Red Cross Shelters ~F~ ~ ~ 1 inch =300 feet V MaProLMAP@003-1141 MapslHoderDamEvactvlaps2014iFERClmedlHoslerDamEvacMap2Di4_VieN5.rtad * BuildingAddad Cate. 12J16f2015 G:~pub-wrks\eng~15-29 2016 Dam Safety Program~engr\EAP~2016.03.10 - EAP - PNS.doc ~ ~ ~ ~oP'SNd - dtl3 - OI'£0'9IOZ1dtl31a6ua1wea6ad ~a~~S wed 9i0Z 6Z-ST16ua1s~ann-qnd\:~ 5107/9121:au0 P~ 9M~!A 4lOZdeY~pe~3WeaaI~H1P~+47ti3~l4LOZ~eW~eyweQia~SO~sdeW 14L1-£OOZ~dVW~ad4W ;aa100E = 4aw ~ ~ SJaIIayS ssa~ Pai! * ~s l a;noa uoi;enoen3 uo~puo~ pooh j ~ ~ , gay;eaM~iej 43ed uol~epunul d1MM ~as4ozse6sw.A _ i az4~e4~zzs~a x I swear;S ~ _ - ~ . y;ed ul;oN s6uippn8 ~ueid ~uaw~eaJj yled ap~su~ s6uippng ~ ~'a ~ Ja~2Ma~S@M puaBa~ ~ ~ dew ~o~eao~ ~ 'sse .ts xaoa \5~ ~ S£ 1d _,~UlS~3~~~ leg Q ~ dal 7 tt f. ~ __nn aoo~ is ~ ~ 0 `1_~ +'z mro 44ZWB0844£B.A ' ZZZS£Z6SZ9lZ• X ~ i i i i ~ ~ ,xt ~ r „Z sue' ~ '~`a"I'~ ~ ~ l j„ ,4,.,:.. ~ , . ; ~ ~ ~ F F•.' ~ ~ , i „ l l ~ t I I ~ t l V 44'0 'OS'0 G4) aW!1 ~IeBd ~ ~ I 4E'0 ~6f'0 U~ ewi j ~eyyy ~ OOO~LL ooO' LS (51~) 0 dead ~ L'£li'6 9'AOL'L bl)'13'%eW uoNlPuwJpoold, iay3eaM~~e~ a;ea aIIW 8'4 uogaag e r z 0 g N m ZI ~y KO 2A ~ ~ tl ~0 a O A 1 O m 14Z4Z1Z1948B~A ~ lZZBB-661E91Z' X i ~dS ~ z g daw ~ia~aQ y~nos S-~ n ~o ~°S~ u~~d uoi~~n~~n3 ~u~a ~a~soH g ~ ~ IIpH IpaN of • m Hosier Dam Evacuation Plan X.2,643,7.698,9 Y: 835920.470219 Detail Map 9 417, ♦~3~~' z X 2164518.94219 Q Y: 635302.108897 ~ " 't~~:F£ 2255 °r r z~s 2 • t To McNeal Hall e 's - at SOU Section 5.8 Mlle I via I-5 South Data Fair Weather FloodConditlon 2075 Max. EI. (fl) 1,676.9 1,682.0 Max. Rise (fl) 8.8 4.7 2073 Peak Q (cts) 32,000 74,000 Arrival Time (hr) 0.62 0.50 Peak Time (hr) 0.80 0.63 I r 1 i 1 1 1 1 1 t 1 1 1 1 1 1 1 t ~ L ~ 1, ~ `~~~I ` / ,x ~ ~ '~6t ~ '1• t ~ X -2163580.77667 Y: 835290.485564 ' ~r ~ 1705 t~ tst7 To McNeal Hall 1633 ~ 1600 dt $~lJ via I-5 South Locator Map 9~~ '~o ~ ~ , Legend ' ' - .Buildings Inside Path 9 Buildings Not in Path Streams Inundation Path Fair Weather To Briscoe ~ -Flood Condition Elementary School Evacuation Route Red Cross Shelters 1 inch =300 feet ~a~. M:IProLMAP120 0 311 41_MapslHoslerDarnEvacMaps20141FERCIrtudlHoslerDam&acMap2014_Viev7.rtxd * AddedBulkling Date:12118l2015~ G:\pub-wrks\eng\15-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc '~.r a.'` ~op'SNd - dtl3 - OT'£0'9TOZ1dtl31a6ua\wea6oad ~a~pS wed 9TOZ 6Z-Si16ua~s~ann-qnd\:g t l al P~BMa~A 4lDZderyxr.~wepie~soMpxiuga3d16LOZgdeNFe~3w~ilaoM~eW lbll-800LidVW~o~d1W 1ea1006=4~! ~ IOOl~O a13 I 6LZD1V'OZ6S£B A 61969'Ll£V9LZ~X a~)$I k S8ZZ ~ Ml SJa41ayS ssa~ paa a~noa uoi)enoen3 ~ uoi~puo~ poo!~ - ~a41ea/y~~iej , , y;ed uoi;epunu~ swea~iS y;ed w loN s6wp~mg yaed ap~su~ s6uip~ing. puaBa~ deb ~o;eao~ EEDBS4 8S6S8B.A Z9996168V91Z' X Z" r 10£Z y~no5 5-~ ein ° nos ~e flees IeaN~W of i s I ~ ~ ~ ~ i ~ ~ W 00' 1 OS' 1 G~ ew!l dead 8L'0 01'1 G~1 aw!1!enwq SO£Z 10£Z t~ 000'ZS 000'Ll (Sly) 0 ~IBad 0'b 6'8 (U) 8SR!'~W S'9Z9'1 b'819'1 61)'13'~W uo!UP~~ P~Id iay3eaM net e~ea a~iw g•1 uogoag 66ZZ ~z £ iZ I 1 9£SLSS 098969 A S89ZZ'LOBV9lZ• X ~e ~ =i: 0 ~ d~W I!~~aa used uoi~snasn3 u,sa ~a~soH z ` 5 Hosier Dam Evacuation Plan 405 Detail Map 11 4 X -2166058.87149 Y: 839075.042831 z, x~~< 405 t' ~ . i i i 4Q i ~;q' ; ~ 1' ~ Section 9.3 Mlle Data Falr Weather Fbod Condition Max. EI. (tt) i 1,569.4 1,575.2 Max. Rise (tt) 6.D 2.4 Peak Q (cfs) ~ 15,000 49,000 Artival Time (tr) 1.10 1.20 400 ~*~R", Peak Time hr ~ 2,10 1.40 33 2~. ~t ~i vu ~ ~30 X •2166184.40349 Y838381.370177 ~ ~"°'r ~s } t° ~ ; eV r:. s;s. e s y~ y i r ~ 7 s F X -2165514.8996 Y 638154.474847 Locator Map ~ ~ ~ Legend . Buildings Inside Path (j Buildings Not in Path I' Streams ` Inundation Path 1 Fair Weather -Flood Condition Evacuation Route * Red Cross Shelters m 1 inch =300 feet M:1Proj MAPt2W3-1141 MapsWoslerDamEvacMaps2014~FERClrncdWaslerDamEvacMap2014 View9.rtad * BuildingAdded Date: 12/1672015 G:\pub-wrks\eng\15-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc *r ~ ~ ~op'SNd - dtl3 - Oj'£0'9TOZ1dV31a6ua\wea6oad A}a~eS wed 9TOZ 6Z-ST16ua\s~ann-qnd\:g SIOZlBl2l alef] PxwOI~~A 4lOZdewoergweQie~SOMpttupa3~14LOZ~eyyoen3wep~al~H1~eW 1411-£OOZ1dVW?ad1W 6~(` ~ k SJa~layS ssa~ paa a~noa uogenoen3 ~ ~;y;= uoiUpuo~poo~j ~ ~~6 gay}eaM pie j 4aed uoi~epunu~ SOh ~ swear}g r i yled ui }aN s6wp~mg ~0~ y}ed ap~su~ s6uip~ing - ZZZ LZZ - ~ZZ SZZ 8E~ l£Z pua6a~ oEZ EEZ 5£Z 8bZ tbZ £bZ 8SZ tSZ 89Z :9 9LZ 6bZgbZ BLZ l LSZ,,SZ 6Sl 88Z l dew Jo~eoo~ + 96Z ~ OLZ L9Z £ 6LZ L6~ 08Z 6 6l ZtE 66Z 96Z 6Z ZZ£ 6 ZE£ 00£ 60£x/ Zb£ L££ 06£ ZsE as£ 6SlOL4 1048x8 A - S 194Z'48599 LZ- X Z£Z 9ZZ ; ~ bbZ 0 80~ 6 ~ 95Z 08Z 98~I Z6Z L6r 96£ ~ ~ ~ F ~ l £a4lZL'LZ8668 A 84S8Z 4a4991Z- X LSS 4s~asosaes~a n s4sasessss~a- x Z ~ d~W I!~~aa used uoi}sn~sn3 Musa aa~soH ~ ~ ~ Hosler Dam Evacuation Plan Detail Map 13 - ~a y h ~~,'a . u'. 119 ~ ~ K~~, ~ Q~,O w: ~ 13~ i._.. j., ' 201 ~ ~ V V~ ~0 t ; . Y w. - , ~ ~ s 6 ~ ~~R ~ _ .N ~ s 99; 9p, ' p ~ ~ 6 ~ . u ~ ~ ~ , n - } § ` ~ ~a R 2~ o ;r Yee i _ k r J ~ f. ~ 1' . ~ ~ ,v 't ~ ~ _ a ~ ~ r - a Ito ~ ` ~ ~ ~ >•a ~Pr ~ ~ a ~ z ~ ~ w. m ~ : - ~ M ~ ~ _ i , , . , 8 ~ j .,i~ - .v, f ~ a 3 f j\ I IE _ t i 4 _ ti... ~ .,.r i ed rd Locator Map d Legend ® Buildings Inside Path Streams Inundation Path IX Fair Weather ~ Wet Weather - .Estimated Worst Case Inundation Zone ~ Highways s ` _ Rd N 1 inch = 600 feet DacumenlPaih:M:lPrq_MAP~2003-11 a1 MapslHoalerDam201fiYnxdlHaslerC!amEvacMap2016 Uewl3mxd Date:3f10~2016 G:\pub-wrks\eng\15-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc ~ ~ ~,o, FOR OFFICIAL USE ONLY HOSLER DAM EMERGENCY ACTION PLAN PROJECT NO. 1107 - OREGON Appendix-A. Investigation and Analyses of Dam Break Floods Table 2: "Fair Weather" Dam-Break Results Cross Section Maximum Maximum Peak Arrival Peak Recession (miles downstream Elevation Incremental Discharge Time Time Time from dam) (feet) Rise (cfs) (minutes) (minutes) (minutes) (feet) Just Below Dam 2809.4 47.4 201,000 0.6 4.2 48 (0.01) Water Treatment 2486.3 38.3 154,000 2.4 6 54 Plant (0.9) Southern City 2248.7 30.2 133,000 4.8 7.8 60 Limit (1.6) S. Pioneer Street 2028.3 24.8 118,000 7.2 9.6 78 Bridge (2.4) Main Street Bridge 1895.5 24.7 94,000 9.6 13 90 (3.2) Nevada Street 1759.4 15.4 70,000 16 22 108 Bridge (4.2) Ashland Creek 1708.6 14.3 51,000 23 30 126 Confluence with Bear Creek (4.8) Butler Creek Inlet 1676.9 8.8 32,000 37 48 156 To Bear Creek (5.8) Meyer Creek Inlet 1618.4 8.9 17,000 66 90 210 To Bear Creek (7.6) Talent 1569.4 6.0 15,000 102 126 330 (9.3) Phoenix 1488.7 5.4 13,000 168 192 360 ( 11.9) Notes: 1. All times are measured in minutes after the initiation of the dam-break. March 2016 City of Ashland Revision 0 G:\pub-wrks\eng\15-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc 36 FOR OFFICIAL USE ONLY FOR OFFICIAL USE ONLY HOSLER DAM EMERGENCY ACTION PLAN PROJECT NO. 1107 -OREGON Table 3: "Wet Weather" Dam-Break Results Cross Section Maximum Maximum Peak Arrival Peak Recession (miles downstream Elevation Incremental Discharge Time * Time Time" from dam) (feet) Rise (cfs) (min) (min) (min) (feet) Just Below Dam 2812.7 36.3 229,000 0.6 4.8 24 (0.01) Water Treatment 2489.7 29.4 186,000 2.4 6 30 Plant (0.9) Southern City 2251.5 19.8 164,000 4.8 7.8 36 Limit (1.6) S. Pioneer Street 2030.5 16.6 143,000 6 9.6 42 Bridge (2.4) Main Street Bridge 1897.8 11.4 121,000 9.6 12.6 48 (3.2) Nevada Street 1761.6 10.6 94,000 14.4 21 54 Bridge (4.2) Ashland Creek 1713.1 7.3 77,000 20.4 26.4 78 Confluence with Bear Creek (4.8) Butler Creek Inlet 1682.0 4.7 74,000 30 37.8 102 To Bear Creek (5.8) Meyer Creek Inlet 1626.5 4.0 52,000 46.8 60 174 To Bear Creek (7.6) Talent 1575.2 2.4 49,000 72 84 198 (9.3) Phoenix 1494.2 1.9 46,000 108 120 228 (11.9) Notes: * All times are measured in minutes after the initiation of the dam-break. xx Recession time would be dependent on the extreme natural flooding that is assumed to occur simultaneously with the dam-break. March 2016 City of Ashland Revision 0 G:\pub-wrks\eng\15-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc FOR OFFICIAL USE ONLY 37 FOR OFFICIAL USE ONLY HOSLER DAM EMERGENCY ACTION PLAN PROJECT NO. 1107 - OREGON Appendix-B. Plans for Training, Exercising, Updating, and Posting the EAP Training Training of project operators and other responsible personnel will be conducted annually: Items to be covered include, but are not limited to: 1. Description and purpose of the EAP 2. Location of copies of the EAP 3. General responsibilities under the EAP 4. Notification procedure 1 chain of command 5. Communication systems and alternates 6. Audible Emergency Warning System 7. Emergency supplies and resources 8. Dam-Break Analysis and inundation maps Subsequent to each annual training session, a statement will be prepared which includes the date of the training, an attendance list of personnel involved, and a summary of topics discussed. A copy of the statement will be included with the annual review of the EAP. Exercising An annual test will be made each year. All persons, organizations and entities shown on the Flowchart will be contacted. The test will be to verify the following: 1. The chain of command works properly; 2. Personnel names and phone numbers are correct; and 3. The audible Public Emergency Warning System works properly. Items 1 and 2 will be conducted by telephone backed up by radio communication if necessary. Item 3 will be conducted after notification to the general public that a test of the audible warning system will be made. The duration of the audible warning will be very brief (i.e. on the order of 5 to 10 seconds) so that there will be a clear distinction between the test and an actual emergency. The Dam Safety Engineer will determine if the test was successful and will furnish the FERC Regional Director within 30 days of the date of the test with a statement that the EAP has been tested and it will include any revisions to the plan or a statement that no revisions are needed as a result of the test. Copies of dated revisions to the EAP resulting from the test will be furnished to all persons on the EAP distribution list. Updating Each year, the Director of Public Works will review all aspects of the EAP to determine any new developments or other changes downstream or elsewhere which would necessitate any revisions to the EAP. A statement will be furnished to the FERC Regional Director annually that the EAP has been reviewed and the date it was last tested, with inclusion of any needed revision or a statement that no revisions are needed. All plan holders listed will be provided with dated copies of all revisions. March 2016 City of Ashland Revision 0 G:\pub-wrks\eng\15-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc 38 FOR OFFICIAL USE ONLY FOR OFFICIAL USE ONLY HOSLER DAM EMERGENCY ACTION PLAN PROJECT NO. 1107 - OREGON Posting the EAP The EAP has been distributed to key supervisory and operational employees, as well as personnel listed on the flow chart. Notification flow charts are provided at the front of the Emergency Action Plan for easy access. A copy of the EAP can be found in a prominent location near the telephone and radio transmitter at the Water Treatment Plant, the closest site to the dam, and easily accessible to the WTP manager overseeing the facility. The EAP is also readily available to appropriate plant operators, responsible personnel, and the City's police and emergency (911) dispatch center. An up-to-date copy of the Emergency Action Plan and flowchart/notification list is posted in a prominent location near telephone and/or radio transmitters at the following locations: 1. The Water Treatment Plant operator's office. 2. The City Administrator's office at City Hall (20 E. Main Street). 3. The Director of Public Works' office in the Community Development & Engineering Service Building (51 Winburn Way) 4. The Water Quality Superintendent's office at the Service Center (90 N. Mountain Avenue) 5. The Director of Electric Utilities office at the Service Center (90 N. Mountain Avenue) 6. The Police Department (1175 E. Main Street) Letters of acknowledgment from contracted agencies and documentation of the most recent consultations with Federal, State and local agencies will be forwarded to the Federal Energy Regulatory Commission. March 2016 City of Ashland Revision 0 G:\pub-wrks\eng\15-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc FOR OFFICIAL USE ONLY 39 FOR OFFICIAL USE ONLY HOSLER DAM EMERGENCY ACTION PLAN PROJECT NO. 1107 - OREGON Appendix-C. Site Specific Concerns Other Concerns and Actions Creek flow into the reservoir is from natural runoff and cannot be completely managed, coordinated or manipulated. The reservoir water surface can be lowered by use of the three valved outlets. Since this reservoir is the primary source of the City's water supply, it is critical that the water level not be lowered except in the case impending disaster. Because of this, operators would not make this decision on their own, but would act only on instruction from their supervisors, who in turn would only act on orders from the responsible person in charge, such as the Public Works Director or, in the Director's absence, the City Administrator. Actions can be taken to reduce inflow in to the reservoir, as there are no significant upstream control structures. Actions can be taken to alter downstream flows by regulating the outflow of the reservoir by use of existing valves. Such action would be based upon a timely evaluation of the situation and a decision by any of the Water Division supervisors. Over the past eighty years, the dam and reservoir have withstood a number of major floods, fires, and freezing/thawing events. These emergencies were mitigated successfully by personnel and judgment of the managers of the City of Ashland. The City is prepared to handle anticipated emergency. The City is not aware of any special concerns or actions to be taken at this time. March 2016 City of Ashland Revision 0 G:\pub-wrks\eng\15-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc 40 FOR OFFICIAL USE ONLY FOR OFFICIAL USE ONLY HOSLER DAM EMERGENCY ACTION PLAN PROJECT NO. 1107 - OREGON Appendix-D. Documentation Hosler Dam was constructed in 1928 in Ashland Canyon. It impounds water from both the East and West Forks of Ashland Creek which diverts water from the 7,533 foot high Mount Ashland peak. The dam has been inspected every five years times in recent years by independent dam safety engineers and has been certified. The last inspection was by URS Corporation, an independent structural engineering consultant approved by the Federal Energy Regulatory Commission. The dam is founded on light-gray, medium-grained granite rock of the Ashland Pluton. The original design and evaluations have certified the subgrade material as hard, sound, granite with excellent bearing capacity. The dam is constructed of reinforced concrete and the foundations are sound. Earthquake activity in the area is of low to moderate frequency and intensity. With the exception of two small diversion dams, there are no structures upstream of the dam. Based upon the most recent Hosler Dam Stability Analysis prepared for the City of Ashland (URS Corporation, August 22, 2012) the results of the stress analysis using finite element method are within acceptable limits. There are no nuclear plants within a ten-mile radius of the City's reservoir. The emergency action plans address both slowly developing failure and instantaneous failure. March 2016 City of Ashland Revision 0 G:\pub-wrks\eng\15-29 2016 Dam Safety Program\engr\EAP\2016.03.10 - EAP - PNS.doc FOR OFFICIAL USE ONLY 41