February 24, 2010
In reply refer to: PSW-6
Mr. Scott Johnson
Interim Director of Electric Utilities
City of Ashland
90 North Mountain Avenue
Ashland, OR 97520
Dear Scott:
Enclosed is an original revision to Exhibit C of the City of Ashland's (Ashland) Power Sales
Agreement Contract No. 09PB-13002 (Agreement). The changes in the attached revision are
necessary to capture the contract provisions relating to Ashland's Above-RHWM elections made
in November 2009.
Exhibit C Revision No.1 reflects Ashland's Firm Requirements Power purchase obligation at
Tier 2 Rates for the first Purchase Period. Pursuant to the Agreement, this exhibit revision is
unilateral and does not require a signature. The enclosed Revision No.1 to Exhibit C is
Ashland's original copy to keep for its records.
Please feel free to contact me at 503.230.4055, if you have any questions or concerns.
Sincerely,
~5'7
/
~
Kevin S. Farleigh
Account Executive
Enclosures (I)
Revision No.1, Exhibit C
PURCHASE OBLIGATIONS
Effective March 31, 2010
This revision: (1) updates section 2 to reflect Ashland's elections Tegarding service to its
Above-RHWM Load for the first Purchase Period (FY 2012 - FY 2014) and for the FY 2012-
2013 Rate Period, and (2) incorporates the Exhibit C revisions fTOm Amendment No.1 to
the Agreement.
1. FIRM REQUIREMENTS POWER AT TIER 1 RATES
The portion of Ashland's purchase obligation that is priced at Tier 1 Rates is
established in section 8.1(1) of the body of this Agreement.
2. FIRM REQUIREMENTS POWER AT TIER 2 RATES
2.1 Notice to Purchase Zero Amounts at Tier 2 Rates
If Ashland elects not to pUTchase Firm Requirements Power at Tier 2 Rates
for a Purchase Period, then by March 31 immediately following the
corresponding Notice Deadline, BPA shall update this exhibit to indicate such
election by adding an ''X'' to the applicable cell in the following table. Such
election means that for the Purchase Period specified below, Ashland shall:
(1) purchase zero amounts of Firm Requirements Power at Tier 2 Rates, and
(2) serve all of its Above-RHWM Load that is greater than or equal to
8,760 megawatt-hours with power other than Firm Requirements Power.
Ashland may serve its Above-RHWM Load that is less than
8,760 megawatt-hours with power other than Firm Requirements Power.
Zero Tier 2 Purchase Period
FY 2012 - FY 2014
FY 2015 - FY 2019
FY 2020 - FY 2024
FY 2025 - FY 2028
2.2 Tier 2 Load Growth Rate
2.2.1 First Election Opportunity
If Ashland elects by the first Notice Deadline (November 1, 2009) to
purchase Firm Requirements Power at Tier 2 Load Growth Rates
starting October 1, 2011, then in its election Ashland shall elect one of
the three Tier 2 Load Growth Rate options listed in section 2.2.3 of
this exhibit. If Ashland elects Option 3, then Ashland shall state the
amounts to be listed in the table in section 2.2.3.3 of this exhibit and
Ashland's Tier 2 Short-Term Rate election pursuant to section 2.4.1 of
this exhibit. BPA shall amend this exhibit by March 31, 2010, to
indicate Ashland's election by adding an ''X'' to the "1" Notice
Deadline" box next to the applicable option below. If Ashland does not
elect to purchase Firm Requirements Power at Tier 2 Load Growth
Rates by the first Notice Deadline, then Ashland shall not have the
09PB-13002, Ashland 1 of 10
right to purchase Firm Requirements Power at Tier 2 Load Growth
Rates during the first PUTchase Period.
2.2.2 Second'Election Opportunity
2.2.2.1 If Ashland does not elect to purchase Finn Requirements
Power at Tier 2 Load Growth Rates starting the first
Purchase Period, then Ashland may purchase Firm
Requirements Power at Tier 2 Load Growth Rates starting
October 1, 2014, pTOvided:
(1) any elections of Tier 2 Rate alternatives or additions
of New Resources under this Agreement that extend
beyond the initial PUTchase Period shall continue to
apply for their term, and
(2) the Tier 2 Load Growth Rate applicable under this
election may be different than the Tier 2 Load Growth
Rate that was available dUTing the first Purchase
Period.
2.2.2.2 If Ashland elects by the second Notice Deadline
(September 30,2011) to purchase Finn Requirements Power
at Tier 2 Load Growth Rates, then in its election Ashland
shall elect one of the three Tier 2 Load Growth Rate options
listed in section 2.2.3 of this exhibit. In such case, Ashland
shall purchase Firm Requirements Power at Tier 2 Load
Growth Rates under such elected option starting October 1,
2014.
2.2.2.3 If Ashland elects Option 3, described in section 2.2.3.3 of this
exhibit, then Ashland shall state the amounts to be listed in
the table in section 2.2.3.3 of this exhibit and Ashland's
Tier 2 Short-Term Rate election pUTsuant to section 2.4.1 of
this exhibit. If Ashland has prior elections of rate
alternatives or resource additions that extend beyond the
first Purchase Period, then Ashland shall not have the right
to elect Options 1 or 2 below. In such case, the amounts
listed in the table in section 2.2.3.3 of this exhibit shall not be
less than the sum of Ashland's prior elections for each year.
2.2.2.4 BPA shall amend this exhibit by March 31, 2012, to indicate
Ashland's election by adding an "X" to the "2nd Notice
Deadline" box next to the applicable option below. If Ashland
does not elect to purchase Firm Requirements Power at
Tier 2 Load Growth Rates by the second Notice Deadline,
then Ashland shall not purchase Firm Requirements Power
at Tier 2 Load Growth Rates for the term of this Agreement.
09PB-13002, Ashland
Revision No.1, Exhibit C, Purchase Obligations
2 of 10
1" Notice Deadline
2nd Notice Deadline
1" Notice Deadline
2nd Notice Deadline
1" Notice Deadline
2nd Notice Deadline
2.2.3 Tier 2 Load Growth Rate Options
02.2.3.1 Option 1. Full Tier 2 Load Growth Rate
o If Ashland elects this option, then Ashland shall purchase Firm
Requirements Power at Tier 2 Load Growth Rates for all of
Ashland's Above-RHWM Load.
B 2.2.3.2 Option 2 - Shared Rate Plan
(1) Obligation
If Ashland elects this option, provided that BPA
determines Ashland qualifies under the limit for the
Shared Rate Plan as established in section 7 of the
TRM, then Ashland shall pay rates under the Shared
Rate Plan for Firm Requirements Power purchased
under this AgTeement. If BPA determines Ashland does
not qualify under such limit, then Ashland shall not
have the right to elect this option and Ashland shall
purchase Firm Requirements Power at Tier 2 Load
Growth Rates undeT Option 1 as established in
section 2.2.3.1 ofthis exhibit. For the second election
opportunity stated in section 2.2.2 of this exhibit,
availability under the limit for the Shared Rate Plan
established in section 7 of the TRM shall equal such
limit minus the amounts used by otheT customers who
elected this Option 2 by the first Notice Deadline.
(2) Terminating Participation
Ashland may terminate participation in the Shared
Rate Plan by providing BPA notice in writing by
MaTch 31 of a Forecast Year. In such case, the change
shall be effective the next Rate Period. If Ashland stops
participation in the Shared Rate Plan, then Ashland
shall not have the right to resume participation.
Ashland shall continue to purchase Firm Requirements
Power priced at Tier 2 Load Growth Rates for all of
Ashland's Above-RHWM Load.
D 2.2.3.3 Option 3 . Partial Tier 2 Load Growth Rate
o If Ashland elects this option, then Ashland shall purchase Firm
Requirements Power at Tier 2 Load Growth Rates for all of
Ashland's Above-RHWM Load minus the amounts stated in the
table below that Ashland elects are not subject to Tier 2 Load
Growth Rates. Ashland shall establish such amounts at the
time Ashland elects this option and such amounts shall not
change for the term of this AgTeement. Ashland may serve
such amounts with Dedicated Resources or with FiTm
Requirements Power purchased at other Tier 2 Rates. BPA
09PB-13002, Ashland
Revision No.1, Exhibit C, Purchase Obligations
3 of 10
shall update the table below by March 31 immediately
following Ashland's election of this option.
Load Amounts Not Sub'ect To Tier 2 Load Growth Rates (aMW)
Fiscal Year 2012 2013 2014 2015 2016 2017 2018 2019 2020
Annual aMW
Fiscal Year 2021 2022 2023 2024 2025 2026 2027 2028
Annual aMW
Note: Fill in the tahle above with annual Average Megawatts rounded to
three decimal places.
2.2.4 Modification to Tier 2 Load Growth Rate Election
2.2.4.1 Notice .
Ashland shall have the right to stop purchasing Firm Requirements
Power at Tier 2 Load Growth Rates effective the upcoming Rate
Period, except for the amount established in section 2.2.4.2 of this
exhibit. If Ashland chooses to modify its purchases at Tier 2 Load
Growth Rates in this manner, then Ashland shall notify BPA in
writing by October 31 of a Rate Case Year.
2.2.4.2 Continued Purchase Amount
For the remaining teTm ofthis Agreement, Ashland shall continue to
purchase at Tier 2 Load Growth Rates the amount afFirm
Requirements Power that Ashland purchased at Tier 2 Load Growth
Rates the year before the modification described above is effective.
2.2.4.3 Obligation to Apply Dedicated Resources
If Ashland provides notice to modify its purchases at Tier 2 Load
Growth Rates under section 2.2.4.1 of this exhibit, then for the
remainder of the effective Purchase Period and all of the next
Purchase Period, Ashland shall apply Dedicated Resources to serve
all of its Above-RHWM Load that is in excess of the sum of all Tier 2
commitments.
2.2.4.4 Charges to Modify Tier 2 Load Growth Rate Purchase
Ashland shall be liable for payment of any costs that apply as a
result of Ashland modifying its Tier 2 Load Growth Rate purchase
obligation under this section 2.2.4. Such costs shall be those that
BPA: (1) is obligated to pay and will not recover from Ashland at
Tier 2 Load Growth Rates as a result of the modification, and (2) is
unable to recover through other transactions. BPA shall determine
such costs, if any, during the 7(i) Process that follows Ashland's
notice. If BPA determines that Ashland owes payment for such
costs, then Ashland shall pay the entire amount to BPA in no more
than 24 equal monthly amounts starting the first month of the
upcoming Rate Period. In no event shall BPA make payment to
Ashland as a result of Ashland modifying its Tier 2 Load Growth
Rate purchase obligation undeT this section 2.2.4.
09PB-13002, Ashland
Revision No.1, Exhibit C, Purchase Obligations
4 of 10
2.2.4.5 Exhibit Update
By March 31 following Ashland's notice, BPA shall indicate
Ashland's election to modify its Tier 2 Load Growth Rate purchase
by filling in the table below. As established in section 2.2.4.2 of this
exhibit, Ashland shall continue to purchase the following amounts of
Firm Requirements Power at Tier 2 Load GTOwth Rates:
Continuinl! Tier 2 Load Growth Rates Purchase Obli<tation
Fiscal Year 2012 2013 2014 2015 2016
aMW
Fiscal Year 2017 2018 2019 2020 2021
aMW
Fiscal Year 2022 2023 2024 2025 2026
aMW
Fiscal.Year 2027 2028
aMW
Note: Fill in the table above with annual Average Megawatts, rounded
to three decimal places, for each year that follows Ashland's modification
be.nnnin!! with the effective year of modification
2.3 Tier 2 Vintage Rates
If Ashland elects Option lor 2 in section 2.2.3 of this exhibit, then this
section shall not apply. Otherwise:
2.3.1 Election Process
2.3.1.1 Right to Convert
Subject to the amounts of power BPA makes available at one
or more Tier 2 Vintage Rates, Ashland shall have the right to
convert some or all of the amounts of Firm Requirements
Power it has elected to purchase at Tier 2 Short-Term Rates,
as stated in section 2.4 of this exhibit, to an equal purchase
amount at Tier 2 Vintage Rates.
2.3.1.2 Statement of Intent
If Ashland elects to purchase Firm Requirements Power fTOm
BPA at Tier 2 Vintage Rates, then Ashland shall sign a
Statement of Intent offered by BPA. "Statement ofIntent"
means a statement prepared by BPA and signed by Ashland
that describes the approach and cost stTUcture that will be
used for a specific Tier 2 Cost Pool. If BP A establishes a
Tier 2 Cost Pool for a Tier 2 Vintage Rate consistent with the
Statement ofIntent, then Ashland agrees to have the portion
of its Tier 2 Rate power purchase specified in the Statement
ofIntent priced at that rate. IfBPA is unable to establish the
Tier 2 Cost Pool for the specific TieT 2 Vintage Rate, then
Ashland agrees to purchase such amount of Firm
09PB-13002, Ashland
Revision No.1, Exhibit C, Purchase Obligations
50f1O
Requirements Power at Tier 2 Short-Term Rates, except as
. stated in section 2.3.1.5 of this exhibit.
2.3.1.3 Insufficient Availability
The Statement of Intent shall include procedures to allocate
between competing applications for a specific Tier 2 Cost Pool
if requests exceed amounts available.
2.3.1.4 Conversion Costs
Upon establishment of a TieT 2 Vintage Rate for which
Ashland signed a Statement ofIntent, Ashland shall be liable
for payment of any outstanding costs under Tier 2 Short-
Term Rates that apply to Ashland. Such costs shall be those
that BPA: (1) is obligated to pay and will not recover from
Ashland under TieT 2 Short-Term Rates as a result of the
conversion, and (2) is unable to recover through other
transactions. BPA shall determine such costs, if any, in the
fiTst 7(i) Process that establishes the applicable Tier 2
Vintage Rate. In no event shall BPA make payment to
Ashland as a result of Ashland's conversion of purchase
amounts at Tier 2 Short-Term Rates to purchase amounts at
Tier 2 Vintage Rates.
2.3.1.5 Additional Offerings
In addition to the right to convert to Tier 2 Vintage Rates
established in section 2.3.1.1 of this exhibit, Ashland may
have the opportunity to purchase Firm Requirements Power
at Tier 2 Vintage Rates regardless of whether Ashland is
purchasing at Tier 2 Short-Term Rates if:
(1) BPA determines, in its sole discretion, that all
requests for seTVice at TieT 2 Vintage Rates by
purchasers of Firm Requirements Power at Tier 2
Short-Term Rates are able to be satisfied, and
(2) BPA determines, in its sole discretion, to offer Ashland
a Statement of Intent that would provide Ashland the
opportunity to purchase Firm Requirements at Tier 2
Vintage Rates.'
If Ashland signs a Statement of Intent offered by BPA
pursuant to this section 2.3.1.5, and ifBPA is unable to
establish the Tier 2 Cost Pool for the applicable Tier 2
Vintage Rate, then Ashland's current elections for seTVice to
its Above-RHWM Load shall continue to apply.
Except as provided in this section 2.3.1, any election by
Ashland to purchase Firm Requirements Power at Tier 2
09PB-13002, Ashland
Revision No.1, Exhibit C, Purchase Obligations
6 of 10
Vintage Rates shall not relieve Ashland of any obligation to
purchase Firm Requirements Power at another Tier 2 Rate.
2.3.1.6 Exhibit Updates
By SeptembeT 15 immediately following the establishment of
a Tier 2 Vintage Rate for which Ashland signed a Statement
of Intent, BPA shall amend this exhibit to show Ashland's
Tier 2 Vintage Rate purchases and remove Ashland's Tier 2
Short-Term Rate purchases by the amounts purchased at the
Tier 2 Vintage Rate, if Ashland is converting to the Tier 2
Vintage Rate from the Tier 2 Short-Term Rate. BPA shall
insert applicable tables, terms, and conditions for each Tier 2
Vintage Rate in section 2.3.2 of this exhibit.
2.3.2 Vintage Rate Elections
Ashland has no Tier 2 Vintage Rate elections at this time.
2.4 Tier 2 Short-Tenn Rate
If Ashland elects Option 1 or 2 in section 2.2.3 of this exhibit, then this
section shall not apply. Otherwise:
2.4.1 Short-Tenn Rate Purchases
Unless Ashland elects, in section 2.1 of this exhibit, not to purchase
FiTm Requirements Power at Tier 2 Rates for a given Purchase Period,
by each Notice Deadline Ashland shall elect in writing either
Alternative A or B below for the duration of the corresponding
Purchase Period. If Ashland elects Alternative A and elects to apply
Dedicated Resources to serve its Above-RHWM Load, then Ashland
shall state the amounts to be listed in the table in section 2.4.1.1(2) of
this exhibit. If Ashland elects Alternative B, then Ashland shall state
the amounts to be listed in the table in section 2.4.1.3 of this exhibit.
By March 31 immediately following each Notice Deadline, BPA shall
update the tables in this section 2.4.1 to show Ashland's Tier 2 Short-
Term Rate election for the corresponding Purchase Period.
2.4.1.1 Alternative A - Customer Planned Load Not Otherwise
Served
If Ashland elects this alternative, then Ashland shall
purchase Firm Requirements Power priced at Tier 2 Short-
Term Rates to serve all of Ashland's Above-RHWM Load that
Ashland has not otherwise agreed to serve with:
(1) Firm RequiTements Power purchased at other Tier 2
Rates, or
(2) the amounts of Dedicated Resources, stated in the
table below, that Ashland shall apply during the
Purchase Period to serve its Above-RHWM Load. If
Ashland purchases power at Tier 2 Load Growth
09PB-13002, Ashland
Revision No.1, Exhibit C, Purchase Obligations
7 of 10
Rates, then these Dedicated Resource amounts shall
not exceed the amounts stated in the table in
section 2.2.3.3 ofthis exhibit.
Purchase Period Dedicated Resource Elections
Fiscal Year 2012 2013 2014 2015 2016
Election 0.000 0.000 0.000
Fiscal Year 2017 2018 2019 2020 2021
Election
Fiscal Year 2022 2023 2024 2025 2026
Election
Fiscal Year 2027 2028
Election
Note: Insert amounts in Average Megawatts rounded to
three decimal places for each year of the applicable Purchase
Period.
2.4.1.2 Alternative B - Limited Amounts
If Ashland elects this alternative, then Ashland shall
purchase Firm Requirements Power at TieT 2 Short-Term
Rates to serve Ashland's Above-RHWM Load that Ashland
has not otherwise agreed to serve with Firm Requirements
Power purchased at other Tier 2 Rates; provided however,
that amounts purchased at Tier 2 Short-Term Rates shall not
exceed the amounts (including zero amounts) stated in the
table in section 2.4.1.3 of this exhibit. Ashland agrees to
serve any of its Temaining Above-RHWM Load with power
other than Firm Requirements Power.
2.4.1.3 Tier 2 Short-Tenn Rate Elections
If Ashland elects Alternative A above, then BPA shall
indicate that election by adding an "X" to the table below for
each year of the applicable PUTchase Period. If Ashland
elects Alternative B above, then BPA shall indicate that
election by adding amounts (in AveTage Megawatts rounded
to three decimal places) to the table below for each year of the
applicable Purchase Period.
Tier 2 Short-Term Rate Table
Fiscal Year 2012 2013 2014 2015 2016
Election X X X
Fiscal Year 2017 2018 2019 2020 2021
Election
Fiscal Year 2022 2023 2024 2025 2026
Election
Fiscal Year 2027 2028
Election
09PB-13002, Ashland
Revision No.1, Exhibit C, Purchase Obligations
8 of 10
2.4.2 Right to Reduce Tier 2 Short-Term Rate Purchase Amounts
2.4.2.1 Notice
If Ashland notifies BPA in writing by October 31 of a Rate
Case Year, then Ashland may reduce, in equal amounts for
all hours of the year, some or all of the amounts of Finn
Requirements Power that Ashland is obligated to purchase at
Tier 2 Short-Term Rates. The reduction may take effect in
either year of the upcoming Rate Period and shall be effective
for the remaining duration of the applicable Purchase
Period(s). In its written notice, AShland shall state the
amount of the reduction and the date the reduction. shall take
effect. Ashland shall replace all Teduced Tier 2 Short-Term
Rate pUTchase amounts with amounts of Dedicated Resources
applied pursuant to section 3.3 of the body ofthis Agreement.
2.4.2.2 Charges to Reduce Purchase Amounts
Ashland shall be liable for payment of any costs that apply as
a result of Ashland reducing, under section 2.4.2.1 of this
exhibit, the amounts of Firm Requirements Power that
Ashland is obligated to purchase at Tier 2 Short-Tenn Rates.
Such costs shall be those that BPA: (1) is obligated to pay
and will not recover from Ashland under Tier 2 Short- Tenn
Rates as a result of the reduction, and (2) is unable to recoveT
through other transactions. BPA shall determine such costs,
if any, during the 7(i) Process that follows Ashland's notice.
IfBPA determines that Ashland owes payment for such costs,
then Ashland shall pay the entire amount to BPA in no more
than 24 equal monthly amounts starting the first month of
the upcoming Rate Period. In no event shall BPA make
payment to Ashland as a result of Ashland reducing the
amounts of Firm Requirements Power that Ashland is
obligated to pUTchase at Tier 2 Short-Term Rates.
2.4.2.3 Exhibit Updates
By March 31 following Ashland's notice, BPA shall revise this
exhibit and Exhibit A to show Ashland's reduced Tier 2
Short-Term Rate purchase amounts and Ashland's Dedicated
Resource additions.
2.5 Amounts of Power to be Billed at Tier 2 Rates
2.5.1 Treatment for FY 2012 - FY 2013
By March 31,2010, BPA shall update the table in section 2.5.2 of this
exhibit, consistent with Ashland's elections, with amounts of Finn
Requirements Power which Ashland shall purchase at applicable
Tier 2 Rates for the FY 2012 - FY 2013 Rate Period.
09PB-13002, Ashland
Revision No.1, Exhibit C, Purchase Obligations
9 of 10
2.5.2 Amounts of Power for Subsequent Rate Periods
For each Rate Period afteT the FY 2012 - FY 2013 Rate Period, BPA
shall establish for the upcoming Rate Period consistent with Ashland's
elections: (1) the planned annual average amounts of Firm
Requirements Power which Ashland shall purchase at applicable
Tier 2 Rates, and (2) any Temarketed Tier 2 Rate purchase amounts in
accordance with section 10 of the body ofthis Agreement. By
March 31, 2013, and by March 31 of each Rate Case YeaT thereafter,
BPA shall update the table below with such amounts for each year of
the upcoming Rate Period.
Annual Amounts Priced at Tier 2 Rates (aMW)
Fiscal Year 2012 2013 2014 2015 2016 2017 2018 2019 2020
Tier 2 Short-Term 0.000 0.000
Rate
Remarketed
Amounts
Fiscal Year 2021 2022 2023 2024 2025 2026 2027 2028
No Tier 2 at this
time
Remarketed
Amounts
Notes:
1. List each applicable Tier 2 rate in the table above. For the first applicable Tier 2 rate
replace No Tier 2 at this time with the name of the applicable Tier 2 rate. For each
additional Tier 2 rate, add a new row above the Remarketed Amounts row. If Ashland
elects not to purchase at Tier 2 rates, then leave No Tier 2 at this time in the table and
leave the remainder of the table blank.
2. Fill in the table above with annual Averal(e Mel(awatts rounded to three decimal nlaces.
3. MONTHLY PF RATES
Applicable monthly TieT 1 and Tier 2 Rates are specified in BPA Wholesale Power
Rate Schedules and GRSPs.
4. REVISIONS
BPA shall revise this exhibit to reflect Ashland's elections regarding service to its
Above-RHWM Load and BPA's determinations relevant to this exhibit and made in
accordance with this Agreement.
(PSW ow: \Power\Contract \ Customer \Ashland \ 13002 \ 13002_ExhC Rev1_Final.DOC) 02116/10
09PB-13002, Ashland
Revision No.1, Exhibit C, Purchase Obligations
10 of 10