HomeMy WebLinkAbout2007-136 Agreement - PECI EnergySmart Program
p
E
c
July 2, 2007
Mr. Lee Tuneberg
City of Ashland
20 E. Main Street
Ashland, OR 97520
Dear Mr. Tuneberg:
Enclosed please find a copy ofthe service agreement signed by your utility representative
and PECl. We're excited about your participation and look forward to working with you
and your customers. If you have any questions, please do not hesitate to contact me.
Thank you.
Sincerely,
c.::: ~CA~
PECI
Sr. Project Coordinator
Ene. (1)
PORTLAND ENERGY CONSERVATION, INC.
PEel EnergySmart Program
Service Agreement
Overview
Portland Energy Conservation Incorporated (PECI) is implementing the EnergySmart Program
(ES) throughout various utility territories in the Northwest. The City of Ashland has signed and
submitted a participation letter inviting PECI to conduct the ES program in their territory. This
agreement outlines each party's involvement and commitment.
Program Timeframe
The tenn of this agreement shall commence on April 1, 2007 and continue tlrrough September 30,
2009.
PECI Commitment
A scope of work is outlined in Attaclm1ent A and provides specific details regarding PECI
services. A general listing of PECI services include:
· Scheduling audits
· Conducting audits
· Installing measures such as compact fluorescent lamps and cooler misers during site
visits where appropriate
· Managing and enrolling contractors into program
· Teclmical design reviews
· Rebate processing
· Determining installed measure savings
· Generating and submitting Carts via PTR system
· Keeping utilities abreast of program activity
PECI also commits to the following
PECI will correct any discrepancies between the measure Cart and the documentation for any
returned Carts. PECI will provide all completed project Carts to Utility in time for the bi-annual
and annual reports which occur on April 30 and October 31 of each year reporting period for the
Bonneville Power Administration (BP A) funded measures.
PECI and Utility will monitor reimbursement expenditures as the EnergySmart Program is
implemented and, in coordination with PECI, make budget adjustments as appropriate. Additional
incentives in excess of allocated funding will require written approval from Utility.
UTILITY Commitment
Utility commits to fulfill the following:
· Utility will complete and submit EnergySmart pm1icipation letter, which includes
funding mechanism and incentive allocation amount.
· Utility shall review documentation sent with the PTR Shopping Cart and verify contents
comply with prot,lTam terms and conditions and resolve any issues Utility discovers
between the PTR Cart and the documentation. Utility shall notify PECI within two (2)
PECI ES Service Agreement (v2)
weeks from receipt of the Cart with any questions regarding submitted materials.
Participating facilities must be willing to allow random inspections of measures installed
under this program conducted by BP A.
Utility will either accept or reject the submitted PTR Cart for cause. Rebates and kWh
will be reported to BP A for all accepted Carts. Rejected Carts will be returned to PECI
for modification. PECI a!:,'Tees to correct any Cart and documentation inconsistencies.
Utility and PECI will not report energy or rebates to BP A until issue(s) are resolved.
· Please initial the option under which Utility agrees to reimburse rebates. The two options
are outlined in Attachment B: Rebate Reimbursement Roles and Responsibilities.
Option One: Advanced Funding
Provide two (2) months advanced funding for rebates.
Option Two: Utility Generates Check _X_
Issue rebate check with two (2) weeks of accepted Cart.
· Select facility types that Utility would like PECI to target. Please initial next to each
facility type or initial next to "all eligible facility types."
_X _ All eligible facility types
Regional chain groceries
Food marts
Convenience stores
Specialty retailers (ice cream, butchers, etc)
Institutional kitchens (schools, hospitals,
prisons, factories, universities, assisted
living and nursing care facilities, etc.)
National chain supermarkets
Independent groceries
Corner groceries
Buffet restaurants
Sit-down restaurants
Liquor Stores
· Select methodology for PECI to use when making first contact with your customers
_X_Utility will contact customer base prior to PECI making calls. Utility will report back
to PECI regarding the specific names and addresses of interested customers. PECI
will then call customer and provide the customer with additional information if
needed and schedule date and time for audit.
Utility will generate a letter to the customer base informing them about program
opportunities. The letter will outline next steps in the process and provides program
contact information to facilitate scheduling audits. PECI will follow up the letter with
a call to the customer and provide additional information, if needed, and schedule
date and time for audit.
PECI will generate a letter to the customer base informing them about program
opportunities. The letter will outline next steps in the process and provides program
contact information to facilitate scheduling audits. PECI will then call customer and
provide additional infonnation, if needed, and schedule date and time for audit.
PECI will contact customers and inform them about program and process. PECI will
schedule audits for interested customers.
PECI ES Service Agreement (v2)
2
Indemnification
Each Party will indemnify, hold hannless, and defend the other, its officers, employees, agents,
representatives, and affiliates against any and all losses, liabilities, damages, claims, suits,
proceedings, judl:,'1l1ents, assessments, costs, and expenses (including interest and penalties), and
including reasonable attorney fees and expenses, incurred by Party and arising from and to the
proportionate extent of any (i) negligent or wrongful acts or omissions of the Party or of its
officers, employees, agents, representatives, or subcontractors, affiliates, (ii) breach by the Party
or of its officers, employees, agents, representatives, subcontractors, or affiliates of this
Agreement, or (iii) any finding, judgment or other determination or settlement whereby the Party
is deemed or considered to be the employer of the other Party.
Portland Energy Conservation, Ine
Name &Lw~
~S- /v1 7
Utility
Date:
Name: 4~ ~
,?;N-'lAlU b,1Z1E.
f!. I 7"'7 ~ /frIfUfftJ.tJ
Date: " /// /ZPP'7
PECI ES Service Agreement (v2)
3
Attachment A: Scope of Work
Attachment A outlines services PECI will perform.
Eligible Customers
The EnergySmart Grocery program defl11es eligible customers as those who have commercial
refrigeration load. Customers include:
I) National chain supermarkets
2) Independent b'Toceries
3) Comer groceries
4) Specialty shops (ice cream, butchers, etc)
5) Institutional kitchens (schools, hospitals,
prisons, factories, universities, assisted
living and nursing care facilities, etc.)
6) Regional chain groceries
7) Food marts
8) Convenience stores
9) Florists
10) Liquor Stores
11) Buffet restaurants
12) Sit-down restaurants
PEGI Program Services
Service 1. Initiating Customer Contact: PECI will contact Utility before making customer
contact. PECI will work out any of Utility's specific requirements before initial customer contact
is made. Specific actions a utility may require for initial contact may include anyone of the
following:
1. Utility will contact customer base prior to PECI making calls. Utility will report back to
PECI on their assessment of customer interest in ESG. PECI will then call retail customer
and provide additional information, if needed, and schedule date and time for audit.
2. PECI or Utility will generate a letter to be mailed to customer base informing them about
program opportunities. The letter will outline next steps in the process and provides
program contact information for scheduling audits. PECI will then call customer and
provide additional infom1ation if needed and schedule date and time for audit.
3. PECI will contact customers and inform them about program and process. PECI will
schedule audits for interested customers.
As the program gains momentum, local contractors will be interested in leveraging the program
in their calls. Contractors will see the benefits of promoting the EnergySmart Program to their
customers, which will spur market activity and result in increased energy savings. Contractor
actions are not controlled by this Service Agreement.
Service 2. Audit Appointment Scheduled: After any of the above pre-requirements are met,
PECI program staff will schedule an appointment with the customer. PECI will communicate
dates and times for all scheduled audits along with a list of customers contacted and whether they
accepted, declined or were not able to be reached. Utility is welcome to attend any ofthe audits.
Not every customer will receive an audit from the program. Experience shows that many facilities
can take action through a well trained cadre of contractors and that an audit does not deliver the
same retum in terms of energy saving activity. Soliciting audits is at the discretion ofPECI and
1
Service Agreement (v2): Attachment A
will be made on a case-by-case basis. Any audit requests made by the utility or customer will be
fulfilled.
Service 3. Conducting Audit: Store type will detem1ine the variety of audit needed to move the
customer forward. Larger facilities with complex refrigeration loads, such as national chain
supermarkets, regional chain b'TOceries and independent groceries, will receive a comprehensive
audit and report. The comprehensive audit and report include:
1. Detailed walk through of the store conditions and equipment
2. Site specific recommendations with proj ected cost savings, payback, estimate of proj ect
cost and projected incentive
3. Letter outlining recommendations
4. Pictures of store conditions (as needed)
5. Input report of store conditions
6. Program materials such as rebate applications, marketing materials, etc.
Smaller facilities such as food marts, comer groceries, convenience stores, fast food
establishments, florists, etc. will receive a site assessment. A site assessment includes the
following:
1. Detailed walk through of the store conditions and equipment
2. Discussion with store decision maker around Field Energy Analyst (FEA) assessment
3. Program materials such as rebate applications, marketing materials, etc.
These smaller facilities typically do not have the sophisticated refrigeration system loads and
therefore do not require the extensive audit report. If an FEA determines a smaller facility
warrants the comprehensive energy saving report one will be produced.
Where appropriate, the FEA may decide to install small, quick payback items on the first store
visit. These items may include but not limited to:
1. Cooler Miser controls: Cooler Misers use a passive infrared sensor to detennine
occupancy in the area of the cooler. These devices will be installed on beverage
merchandisers in stores that do not operate 24 hours a day.
2. Compact Fluorescent Lamps (CFLs): CFLs may be installed in walk-in coolers and
freezers, check-out stands, offices and other spaces that are cun'ently utilizing
incandescent bulbs.
The installation serves two purposes. First and foremost, it produces immediate success, gaining
the trust of the business and engendering good will for the program. Secondly, it ensures savings
at every site, even if the business decides not to move forward with larger retrofits. BPA is
paying for these installations and therefore claims the savings.
Service 4. Managing and Enrolling Contractors: To effectively service BPA's large ten'itory
and maximize resources PECI will train and manage a group of contractors to communicate the
Program and provide retrofits. To accomplish tlus, PECI will have two levels of contractor
relationships: Preferred and Participating. The methods for recruiting, training and overseeing
quality assurance for all contractors participating in the program is outlined below.
Preferred Contractors
Preferred Contractors will have a high level of collaboration with the Program. These contractors
will help service the small, hard to reach refrigeration businesses such as convenience, fast food,
comer markets, and others. These smaller stores typically have refrigeration systems and energy
Service A!,'Teement (v2): Attaclunent A
2
requirements that are less complicated then a full size grocery store and do not always necessitate
a full EnergySmart audit. Energy efficient measures will be identified through trained and
managed vendor relationships.
PECI has strict requirements for Preferred Contractors. Contractors are chosen for their high
quality of work, ability to understand and adapt to new processes and effectiveness in the market.
Participating Contractors
Participating Contractors will likely be the larger refrigeration contractor and supply companies.
Participating Contractors will likely follow the FEA Energy Saving Report recommendations or
generate their own leads. Some of the Participating Contractors will come from the store personal
contractor relationships. These contractors will be trained about the program and requirements as
they arise.
PECI will meet with all contractors to evaluate their skills and level of interest in working with
the ProbTfam. Interested contractors will be required to complete a Contractor Participation
Application and receive marketing materials, training and general support from the ProbTfam.
PECI cannot prevent contractors from contacting their customers and promoting the Program. If
PECI determines a contractor has been misrepresenting the Program by any means, PECI will
immediately contact the contractor to resolve the issue.
Service 5. Technical Design Review: The Program can provide a technical design review for
proposed work in a store on equipment such as multiplex, efficient compressors and efficient
condensers. A fonnal technical review is conducted on system oriented projects and a letter will
be provided noting potential rebates and whether or not proposed items meet the Program terms
and conditions. This service is designed to assist in the decision making process of purchasing
energy saving equipment. This review can be requested by the program FEA or customer.
Service 6. Process rebates and Reporting: see Attachment B
Service 7. Program Communication: PECI will keep Utility informed around program activity
and audits. PECI will provide the following information as necessary to Utility:
· Listing of customer audits perfomled
· Electronic version of audited store Energy Saving Report
· Projected monetary commitments
PECI program staff will also be in conununication with Utility in person, phone and email as
necessary .
Service 8. Determining installed kWh savings: PECI will use its Regional Technical Forum
approved proprietary modeling software, GrocerSmart, to determine energy savings by measure
installed. The energy savings are based on DOE-2 parametric runs and engil)eering calculations
which account for many variables including the facility's particular climate zone, compressor
configuration, condenser type, condenser degradation factors, and hours of operation. PECI's
software estimates are site and climate specific. PECI will use these savings calculations when
submitting measure Carts to Utility.
PECI will also derive prescriptive energy savings for measures that do not require an onsite audit.
These measures are not climate or system specific. BP A has accepted these calculations for the
purpose of PTR reporting.
Service Agreement (v2): Attaclunent A
3
Lighting savings will be estimated using the BP A Conm1ercialllndustrial Lighting Offer (CILO)
procedures.
Gaskets and auto-closers
Gaskets and auto-closers for reach-in and walk-in doors are low to no cost energy saving
measures. The program utilizes these measures to deliver immediate energy savings while
building the relationship with the store to move them forward with larger, more complex energy
opportunities.
PECI adopted the California Public Utility Commissions (CPUC) saving methodology for these
measures. The Regional Technical Forum has reviewed the CPUC's methodolob'Y and determined
that there is not enough empirical evidence to justify the proposed savings. However, they do feel
that these measures are worthwhile and save energy. The Regional Teclmical Forum has created a
subcommittee to perform onsite monitoring and lab testing in order to better understand the actual
savings for these measures.
Until the Regional Technical Forum has finalized the energy savings these measures are no
longer available for an incentive from the utility. BP A believes the test data will show good
savings and will reinstate these measures after the savings have been verified. Until the analysis is
complete BP A is offering to pay for these measures through program administrative funds. No
savings will be claimed by the utility or BP A until savings have been approved by the Regional
Technical Forum.
Service 9. Post-Installation Inspections
PECI will provide 100 percent verification that measures are installed and operating through
reviewing applications, installing contractor invoices and other technical documents (as
applicable) for all installed measures. Measures with a total project cost (installation and
materials) exceeding $5,000 will receive an on-site inspection from Program staff. A project is
defined as the installation of measures at a customer facility. A customer may have multiple
projects throughout the duration of the program, which mayor may not require an on-site
inspection.
Example of when an on-site inspection is required: Store A receives work on gaskets and auto-
closers in May and the total project cost is $3,500. PECI will verify by reviewing applications and
installing contractor invoices. In July, Store A installs night covers with a project cost of $10,000.
PECI will perfonn on-site inspection to verify night cover installation.
For all on-site inspections, the FEA will complete and sign a post-installation forn1, and rebates
are not issued until the Program receives the completed post-installation form.
Controls may have a project cost over $5,000 but not require an on-site inspection if the customer
or contractor can provide sufficient documentation that the controls are installed and performing
properly.
Under current Commercial & Industrial Lighting rules, utilities are required to perform a pre and
post inspection. Therefore, either PECI, or its representative, or the utility representative must
perform both inspections to count energy savings for measures subject to these requirements. .
Service Agreement (v2): Attaclunent Af
4
Installed measures - existing
contractor - project cost < $5,000
lnstalled refrigeration measures -
existing contractor - project cost>
$5,000
] 00% site inspections
Installed controls
] 00% site inspection OR
documentation controls have
been installed and 0 eratin y
100% site inspection either by
PECI or utility
. Installed lighting measures
Service 10. Reporting via Planning, Tracking and Reporting (PTR) system: After installation
is verified through application and invoices, PECI will generate and submit EnergySmart Cart to
Utility. The measure Cart will include the following information:
. Store infonnation including site address, store type, building identification where
applicable
. Identification of audits perfom1ed prior to the installation using the unique ill function
· Measures installed reference number
. Rebate per measure (the amount to be reimbursed/credited by BP A)
· kWh per measure(s)
. Supporting documents such as invoices, applications, spec sheets, etc. will be sent to
Utility under separate cover (email).
Measure Cart will be submitted to Utility for acceptance. Utility review process is outlined in
option one and two of Attachment B.
Measure List and Rebates
Approved measure list and specifications will be available via the PTR system. Any approved
savings values associated with a measure are also found on the PTR site. Measures without
savings values means a measure where the GrocerSmart model will be used to calculate the
savings values. For strip curtains, autocIosers, and door gaskets, BP A will also accept retroactive
savings for measures that are approved by the RTF.
Refrigeration rebate values can be found on the program rebate application. PECI may change the
rebate application and refrigeration rebate values anytime during the duration of the contract (at
the Utility service territory level, where program implementation costs justify such a change).
The incentive to the utility remains the same as provided in the PTR. PECImust work with the
retail utility to determine what the rebate to the consumer will be if it is different than that
provided in the PTR. PECI may add measures to their rebate list based on these agreements with
the utility. PECI will work with the utility customers to assure there isn't confusion regarding
measure reporting to assure that measures are not reported more than once in the PTR system.
Service Agreement (v2): Attachment A
5
PTR measure list also includes custom projects. Customers must comply with PTR specifications,
standards, process, forms and any required inspections or evaluations. CRC, CAA or HWM
willingness to pay amounts set by BP A.
Service Agreement (v2): Attaclmlent A
6
Attachment B: Rebate Reimbursement Roles
& Responsibilities
PECI is providing utilities with two options regarding rebate reimbursements. Utility is required
to select one of the options and initial the selected option on the Service Agreement form.
Option 1: Advanced Funding
Utility will provide a cash advance on two (2) months forecasted activity. Forecasted activity will
be determined by PECI based upon audits and discussions with utility customers and contractors.
Cash advance ensures that customers and contractors are paid for measures installed in a timely
manner.
The cash advance will only be used to pay rebates for probTfam measures installed in accordance
with the programs terms and conditions. The rebate will be paid to either the utility customers or
installing contractor. Utility has the right to request cash advance be returned on sixty (60) days
written notice. PECI will refund any unspent advance funds at the end of program contract.
The following flow diagram outlines Option 1 process.
II "_~------,,-~ "_~-i
, .-,
I. IAuditronducte~~,.
L~~-,,-,-,----__~
r----:::-'.,.-,"C~-.,.....,..-.-.--..-, I
I Re~~ss~ssRebat~l
I Forecast _~ji
l ......... . ........ '..'.....)
n.. . ...
"._,... ... -.. ..,
,.... "",'-' ,.." ,..
~__~:...~.~---..w
...
...
--'Report'~ckto(~1
utility. No actiol1'~ no
required at this:'
time.
Commits or
Interest?
I PEcl'~e~:s-~ 1
I approval' '''j
. d
...
Increased
Activity approved
yes
Utility invoiced for
2 month activity .;~
-- ;~ --,---:--- --::'1
Generate &0";'1
-S-UI1U~ilfrirtJQ:,'r
I
I - -~'----A----- -~-
rejected
I Work with
: customer!
,-- -contractorto"";-;
1__!E!~:>~:_is~ue __:;
_ _ '-'-'-- -------......1
PECI Gather:
Necessary 'r no
D~cument~tion .~
,.
r~-l
, J
I G'",ffi~ Ch,~
Measures
Installed/Job
Complete
...
Documentation
Submitted?
yes
1'1
~ Process Rebate 'I
I I
II
I I
Service Agreement (v2): Attachment B
Audit Conducted and Interest: PECI will conduct audits and assess EnergySmarl efficiency
measure opportunity. A PECI Field Energy Analyst will work with the store decision maker to
understand interest and outline next steps. Based on this information, PECI will forecast measures
and rebates for a two-month time period. This forecast will be a weighted assessment of the
rebate dollars required within the specified timeframe. PECI will also take into account any
known contractor activity in the region.
Invoicing: Based upon above forecast PECI will invoice utility for projected activity. Invoice
will include list of customers, projected measures and rebate amounts. These projections are
estimates and may change.
Job Completed: PECI will track the progress of the job. Once the contractor has completed the
measure installation, the contractor or utility customer will submit to PECI all pertinent
documentation. Once all required documentation is received, PECI will process the paperwork.
Process Rebate and Generate Checks: PECI will review and approve all rebate applications and
invoices to ensure they are completed in full and contain necessary inforn1ation. Once
documentation is approved data is entered into program database and sent to accounting.
Accounting will cut checks once a week. Program turn around time is within two (2) weeks of
completed application and invoices. Checks will be accompanied by letter with utility logo
explaining the reason for the check. Utility will need to provide logo to PECI.
Generate and Submit PTR Cart: PECI will generate and submit a measures Cart to Utility via
the PTR System. Submittals will specify rebates paid for installed measures and calculated
savings per measure. Utility will receive copies of the completed rebate forms, invoices and any
other documentation necessary to approve Measure Cart. PECI will notify Utility that Cart has
been submitted.
Utility will be required to review documentation sent with the PTR Shopping Cart and verify
contents comply with program terms and conditions. A site inspection by Utility is not required.
Participating facilities must be willing to allow random inspections by BP A or the utility of
measures installed under rebates funded with BP A dollars.
Utility is responsible for reviewing documentation submitted by PECI to ensure:
. The number of installed measures matches those reported in the Measure Cart.
· The measure description on the documentation is consistent with the Measure Cart
description.
. Documentation such as a signature, initial or e-mail from the retail store's
representative indicating that the items on the contractors invoice were received,
installed and operating.
· Dates are to coincide with effective dates of the program.
Utility will either accept or reject the Cart. For all approved Carts, kWh and rebates will be
reported to BP A. Rejected Carts will be sent back to PECI for clarification and no energy savings
or rebates will be reported until issue(s) are resolved.
PECI will record all approvals and rejections.
Service Agreement (v2): Attachment B
2
Reassess Rebate Forecast: PECI will reassess rebate levels and projected activity as needed.
PECI will request additional funds (not to exceed total allocation) on an as needed basis.
Additional requested funds will follow the same invoicing process as above.
Service Agreement (v2): AttaclU11ent B
3
Option 2: Utility Generates Check
Utility will cut customer or contractor the rebate check. PECl will provide all the necessary
documentation for Utility to generate rebate check. The following flow diagram outlines option
two.
Audit. Conducted,,;
". !'.:'r.
:}t.~
T
.-, . . .mm'-'-- -,' .'."'.L
Report back to' ,('
utility. No action:'
. d t th" no
r.eqUlr~. a ISj1.::
I time. d"
L.~---"-__~:""':'--_:'~ ,.,,~'
Commits or
Interest?
I ;~E;~~~ordS' a~~:::
i checks as ,'~
1 complete"
L_.~~~,~',--2
yes
T
Measures
Installed/Job
Complete
Utility sends check.:
I:~back,to_::~ij
.i..
T
PECI Gather ,~!
. Necessary)::.... no
Documentation"j:
Documentation
Submitted?
Utility cuts check) Within 2 weeks
.i..
yes
Process Rebate!
Generate PTR
Cart
Audit Conducted and Interest: PECI will conduct audits and assess EnergySmart efficiency
measure oppOliunity. A PECI Field Energy Analyst will work with the store decision maker to
understand their interest and outline next steps.
PECI will track the progress of the job: Once the contractor has completed the measure
installation, the contractor or utility customer will submit to PECl all pertinent documentation.
Once all required documentation is received, PECl will process the paperwork.
Generate and Submit PTR Cart: PECI will generate and submit a measures Cart to Utility via
the PTR System. Submittals will specify rebates paid for installed measures and calculated
savings per measure. Utility will receive copies of the completed rebate forms, invoices and any
C;:prvir.e AlITeement (v2): Attachment B
4
other documentation necessary to approve measure Cart. PECI will notify Utility that Cart has
been submitted.
Utility will be required to review documentation sent with the PTR Shopping Cart and verify
contents comply with program terms and conditions. A site inspection by Utility is not required.
Participating facilities must be willing to allow random inspections by BP A or the utility of
measures installed under rebates funded with BP A dollars.
Utility is responsible for reviewing documentation submitted by PECI to ensure:
· The number of installed measures matches those reported in the Measure Cart.
· The measure description on the documentation is consistent with the Measure Cart
description.
· Documentation such as a signature, initial or e-mail from the retail store's
representative indicating that the items on the contractors invoice were received.
· Dates are to coincide with effective dates of the program.
Utility will either accept or reject the Cart. kWh and rebates will be reported to BP A for all
approved Carts. Rejected Carts will be sent back to PECI for clarification and no energy or
rebates will be reported until issue(s) are resolved.
PECI will record all approvals and rejections.
Utility Cuts Check: The utility is required to cut the rebate check within two (2) weeks of
submitted PTR cart. Additional payee infonnation will be provided to the Utility. Information
will include:
· Unique Customer ill Number*
· Customer Name*
· Street Address*
· City*
· State*
· Zip Code*
· Utility Account Number*
· Tax Payer Info (utility responsible for 1099)
· Measure installed
· Rebate amount (per measure and total)
* Data may vary from Utility records. Data primarily gathered from rebate application.
Utility will be required to provide check infom1ation to PECI within two (2) weeks of submitted
PTR cart. PECI will provide Utility with electronic version of requirements and fom1at. Required
infonnation will include the following:
· Unique Customer ill Number
· Customer Name
· Street Address
· City
· State
· Zip Code
· Utility Account Number
· Measure install ed
· Check Number (NEW)
· Date Check was cut (NEW)
Service Agreement (v2): Attachment B
5
PEel will record and update program tr(lcking system.
Service Agreement (v2): Attachment B
6