2016-224 Contract - Minton Construction
CITY OF CITY OF ASHLAND -ASH LAN D PUBLIC IMPROVEMENT CONTRACT Oak Knoll Club House Renovations Project No. 000084 This Contract is between the CITY OF ASHLAND, a municipal corporation of the State of Oregon (hereinafter "City" ) and Minton Construction. (Hereinafter "Contractor"). The City's Project Manager for this Contract is Jason Minica. Ashland Parks and Rec Commission. WHEREAS, City caused to be prepared a certain bound Project Manual or Bid Package (including but not limited to Invitation to Bid, Bid Schedule, Bid forms, Bid, Performance and Payment Bonds, as applicable, Public Improvement Contract, Contract Standard Terms and Conditions, General Provisions, Technical Specifications, Drawings, and Addenda No. through No. more particularly described in Standard Condition 5, (hereinafter referred to as "Contract Documents") for its project entitled ``Oak Knoll Club House Renovation " and WHEREAS, Contractor did on the 5/31/16, file with City a bid to furnish equipment, labor, material, and appurtenances for construction of said project as set forth in the Contract Documents and agreed to accept as payment therefore the sums fully stated and set forth in the bid; and WHEREAS, the Contract Documents and bid fully and accurately set forth and describe the terms and conditions upon which the Contractor proposes to furnish said equipment, labor, material and appurtenances and perform said work, together with the manner and time of furnishing same; and NOW THEREFORE, for good and valuable consideration the parties mutually covenant and agree as follows: 1. Recitals. This recitals set forth above are true and correct and are incorporated herein by this reference. 2. Effective Date and Duration This contract is effective on 6/20/16 or on the date at which every party has signed this contract, whichever is later. The work under this contract shall, unless otherwise terminated or extended, be completed on or before 11/15116 or before `90_ calendar days following Contractor's receipt of the Notice to Proceed, whichever is earlier. 3. Statement of Work The work under this contract is for Oak Knoll Club House Renovation as is more fully described in the Contract Documents, incorporated herein and made a part hereof by this reference. The statement of work, including the delivery schedule for the work, is contained in the Contract Documents. Contractor acknowledges receipt of all Contract Documents in existence City of Ashland 1 C:1U ser,sltr)inicijIDesktol)iCotistrctction Contract.doc 7 • at the date the Contract is signed and further acknowledges Contractor has read and fully understands the Contract Documents, and understands that in signing this Agreement contractor waives all rights to plead misunderstandings regarding the same. Contractor shall, at its own risk and expense, perform the work described in the Contract Documents and furnish all permits, labor, tools, machinery, materials, transportation, equipment and services of all kinds required for, necessary for, or reasonable incidental to, performance of the work, that is, the construction of this ,",Oak` 1~nol'l Club Rouse: Renovation Project for the City of Ashland, Oregon, as shown in the Contract Documents. Contractor shall secure all Municipal, County, State, or Federal Permits or licenses including payment of permit fees, license fees and royalties necessary or incident to performance of the work on this contract. The risk of loss for such work shall not shift to the City until written acceptance of the work by the City. 4. Consideration a. City agrees to pay Contractor, at the times and in the manner provided in the Contract Documents, a sum of: $84,300, for accomplishing the work required by this contract, including allowable expenses. This sum cannot be modified except by Change Order approved in writing by City. Any progress payments to Contractor shall be made only in accordance with the schedule and requirements in Section 21, Standard Terms and Conditions. b. City certifies that sufficient funds have been appropriated to make payments required by this contract during the current fiscal year. Contractor understands and agrees that City's payment of amounts under this contract attributable to work performed after the last day of the current fiscal year is contingent on City appropriations, or other expenditure authority sufficient to allow City in the exercise of its reasonable administrative discretion, to continue to make payments under this contract. In the event City has insufficient appropriations, limitations or other expenditure authority, City may terminate this contract without penalty or liability to City, effective upon the delivery of written notice to Contractor, with no further liability to Contractor. CONTRACTOR DATA, CERTIFICATION, AND SIGNATURE Business Name (please print: Mint©, Ct a r. sir; T, c... L.L Contact Name: -Me, ~ Phone: Fax: Address: o lj. ~ f~.l= T A ve- jmic-- o r A- Do Not Write Federal and State Tax ID Numbers on this Agreement: One copy of W-9 is to be submitted with the signed contract to be kept on file in the City of Ashland Finance Department. Ashland Business License # b l {)03 0 J Construction Contractors Board # /'!6 2 Citizenship: Nonresident alien Yes A/- No Business Designation (check one): Individual Sole Proprietorship Partnership LL G Corporation Government/Nonprofit The above information must be provided prior to contract approval. Payment information will be reported to the Internal Revenue Service (IRS) under the name and taxpayer I.D. number provided above. (See IRS 1099 for additional instructions regarding taxpayer ID numbers.) Information not matching IRS records could subject you to 31 percent backup withholding. City of Ashland 2 C:tUserslrninicajIDesktop{Corrstruction Contract.doc I, the undersigned, understand that the Standard Terms and Conditions For Public Improvement Contracts (Exhibit A) together with Exhibits B through I together with all other Contract Documents as described in Standard Terms and Conditions Section 5 below, and the separately bound Oregon 2008 Standard Specifications for Construction, as amended by the City of Ashland's most recent Addenda to the 2008 Standard Specifications are an integral part of this contract and agree to perform the work described in the Contract Documents, including Exhibit A, in accordance with the terms and conditions of this contract. I further understand the City is prohibited from entering into a contract when the contractor has neglected or refused to file any return, pay any tax, or properly contest a tax, pursuant to ORS 305.385; I hereby certify, under penalty of perjury and false swearing, that I/my business am/is not in violation of any Oregon tax laws; I further certify that the certification and representations in Standard Term and Condition # 16 [CCB Registration Requirements] are true and correct, and further I certify that I am an independent contractor as defined in ORS 670.600. Signed by Contractor: - 44i A 0 Signature/Title -1i: Date Printed Name: R, 6114f~ #111 0. NOTICE TO CONTRACTOR: This contract does not bind the City of Ashland unless and until it has been executed by the Public Contracting Officer or designee as well as City Finance and Legal Department representatives. CITY OF ASHLAND SIGNATURE Approved: r i Michael Black, Parks and Rec Commission Director, City o - Ashland Date - Authorized by Ordinance 3013 and Delegation Order dated June 22, 2010 Coding: Reviewed: //6. City Attorney (approved as to legal form) ate City of Ashland 3 C:IUserslminicajlDesktoplConstruction Contract.doc CERTIFICATIONS OF REPRESENTATION Contractor, under penalty of perjury, certifies that: (a) The number shown on this form is its correct taxpayer ID (or is waiting for the number to be issued to it; and (b) Contractor is not subject to backup withholding because (i) it is exempt from backup withholding or (ii) it has not been notified by the Internal Revenue Service (IRS) that it is subject to backup withholding as a result of a failure to report all interest or dividends, or (iii) the IRS has notified it that it is no longer subject to backup withholding. Contractor further represents and warrants to City that (a) it has the power and authority to enter into and perform the work, (b) the Contract, when executed and delivered, shall be a valid and binding obligation of Contractor enforceable in accordance with its terms, and (c) The work under the Contract shall be performed in accordance with the highest professional standards, and (d) Contractor is qualified, professionally competent and duly licensed to perform the work. Contractor also certifies under penalty of perjury that its business is not in violation of any Oregon tax laws, and it is a corporation authorized to act on behalf of the entity designated above and authorized to do business in Oregon or is an independent contractor as defined in the contract documents, and has checked four or more of the following criteria: (1) I carry out the labor or services at a location separate from my residence or is in a specific portion of my residence, set aside as the location of the business. (2) Commercial advertising or business cards or a trade association membership are purchased for the business. (3) Telephone listing is used for the business separate from the personal residence listing. V (4) Labor or services are performed only pursuant to written contracts. (5) Labor or services are performed for two or more different persons within a period of one year. V (6) I assume financial responsibility for defective workmanship or for service not provided as evidenced by the ownership of performance bonds, warranties, errors and omission insurance or liability insurance relating to the labor or services to be provided. 7 A 'Ll I 41%.,2 Contractor ignature Date City of Ashland 4 C:lUserslminicajlDesktoplConstruction Contract.doc EXHIBIT A CITY OF ASHLAND STANDARD TERMS AND CONDITIONS FOR PUBLIC IMPROVEMENT CONTRACTS 1. Contractor is Independent Contractor a. Contractor shall perform the work required by this contract as an independent contractor. Although the City reserves the right (i) to specify the desired results; (ii) to determine (and modify) the delivery schedule for the work to be performed; and (iii) to evaluate the quality of the completed performance, the City cannot and will not control the means or manner of the Contractor's performance. The Contractor is responsible for determining the appropriate means and manner of performing the work. b. The Contractor represents and warrants that Contractor (i) is not currently an employee of the federal government or the State of Oregon, and (ii) meets the specific independent contractor standards of ORS 670.600, as certified on the Independent Contractor Certification Statement attached as Exhibit D. C. Contractor will be responsible for any federal or state taxes applicable to any compensation or payment paid to Contractor under this contract. d. Contractor is not eligible for any federal Social Security, unemployment insurance, state Public Employees' Retirement System, or workers' compensation benefits from compensation or payments to Contractor under this contract. 2. Subcontracts and Assignment Contractor shall not subcontract any of the work required by this contract, or assign, sell, dispose of, or transfer any of its interest in this contract, nor delegate duties under the contract, either in whole or in part, without the prior written consent of the City. Such consent if provided shall not relieve the Contractor of any of the obligations under the contract. Any assignee or transferee shall be considered the agent of the contractor and be bound to abide by all provisions of the contract. If the City consents in writing to an assignment, sale, disposal or transfer of the Contractor's rights or delegation of Contractor's duties, the Contractor and its Surety, if any, shall remain liable to the City for complete performance of the Contract as if no such assignment, sale, disposal, transfer or delegation had occurred unless the City otherwise agrees in writing. [OAR 137-049-0200(2)] Use of Subcontractors, material suppliers or equipment suppliers shall in no way release Contractor from any obligations of contract with City. Contractor will provide in all subcontract agreements that the Subcontractor, material supplier and equipment supplier will be bound by the terms and conditions of this Contract to the extent that they relate to the Subcontractor's work, material or equipment. All Subcontracts are assignable to the City at City's option, in the event this agreement is terminated for default of Contractor. Contractor covenants and agrees to bind any and all subcontractors for performance of work under this Contract in the same manner Contractor is bound to City. Contractor further agrees that if subcontractors are employed in the performance of this contract, the Contractor and its subcontractors are subject to the requirements and sanction of ORS Chapter 656, Workers' Compensation. 3. No Third Party Beneficiaries City and Contractor are the only parties to this contract and are the only parties entitled to enforce its terms. Nothing in this contract gives or provides any benefit or right, whether directly, indirectly, or otherwise, to third persons unless such third persons are individually identified by name herein and expressly described as intended beneficiaries of the terms of this contract. 4. Successors in Interest City of Ashland 5 C:OsersIminicajOesktoptConstroction Contract.tioc The provisions of this contract shall be binding upon and shall inure to the benefit of the parties hereto, and their respective successors and approved assigns, if any. 5. Contract Documents The Contract Documents, which comprise the entire Contract between the City and Contractor, include all sections or parts of the bid package however denominated, including all documents and plans attached or referenced therein, the Notice to Contractors - Invitation to Bid, Offer, First-Tier Subcontractors Disclosure Form, Surety Bond, Public Improvement Contract, Contract Standard Terms and Conditions and Exhibits thereto, Performance Bond, Payment Bond, Special Provisions, Plans entitled " Oak Knoll Club House Renovation", Construction Drawings, Standard Drawings, and Contract Addendums, all attached hereto, and incorporated herein by this reference, together with the Prevailing Wage (SOLI) if applicable AND any other separately bound reference, Oregon 2008 Standard Specifications for Construction, and City of Ashland Addenda, incorporated herein by this reference. All exhibits, schedules and lists attached to the Contract Documents, or delivered pursuant to the Contract Documents, shall be deemed a part of the Contract Documents and incorporated herein, where applicable, as if fully set forth herein. 6. Contractor's Representations By executing this contract, the Contractor hereby certifies that the representations made by the Contractor in the Contract Documents, including specifically the Offer, are true and correct and are incorporated herein by this reference. Contractor further certifies that Contractor has given the City written notice of conflicts, errors, ambiguities, or discrepancies that it has discovered in the Contract Documents, and the written resolution thereof by the City is acceptable to the Contractor, and the Contract Documents are generally sufficient to indicate and convey understanding of terms and conditions for performing and furnishing the project work. 7. Drug Testing [ORS 279C.505(2)] a. Contractor shall certify to the City that it has a drug-testing program in place for all its employees that includes, at a minimum, the following: i. A written employee drug-testing policy, ii. Required drug testing for all new Subject Employees or alternatively, required testing of all Subject Employees every 12 months on a random selection basis, and iii. Required testing of a Subject Employee when the Contractor has reasonable cause to believe the Subject Employee is under the influence of drugs. b. A drug-testing program that meets the above requirements will be deemed a "Qualifying Employee Drug- testing Program." For the purposes of this section, an employee is a "Subject Employee" only if that employee will be working on the Public Improvement project job site. C. By executing and returning this contract the Contractor certifies, represents and warrants to the City that a Qualifying Employee Drug-testing Program is in place at the time of execution, will continue in full force and effect for the duration of this contract, and that Contractor will comply with the provisions of subsection d below. Further, the City's performance obligation (which includes, without limitation, the City's obligation to make payment) is contingent on Contractors compliance with this representation and warranty. d. Contractor will require each subcontractor providing labor for the project to: i. Demonstrate to the Contractor that it has a Qualifying Employee Drug-testing Program for the subcontractor's Subject Employees, and represent and warrant to the Contractor that the Qualifying Employee Drug-testing Program is in place at the time of subcontract execution and will continue in full force and effect for the duration of the subcontract; or ii. Require that the subcontractor's Subject Employees participate in the Contractor's Qualifying Employee Drug-testing Program for the duration of the subcontract. City of Ashland 6 C:'.usersiminicailoesktop construction Coniraci.doc 8. Notice to Proceed Written Notice to Proceed will be given by the City after the contract has been executed and the performance bond, payment bond, and all required insurance documents approved. Notice to proceed shall not be unreasonably delayed and shall generally occur within thirty (30) days of the contract date. Reasonable delay may be occasioned by the need to obtain necessary permits or easements or utility relocation. The Contractor shall commence the project work within fifteen (15) days of the date of the written Notice to Proceed. Contractor is not to commence work under the Contract prior to such written notice. 9. Suspension of the Work The City, and its authorized representatives, may suspend portions or all of the project work due to causes including, but not limited to: a. Failure of the Contractor to correct unsafe conditions; b. Failure of the Contractor to carry out any provision of the Contract; C. Failure of the Contractor to carry out orders; d. Conditions, in the opinion of the City, which are unsuitable for performing the project work; e. Allowance of time required to investigate differing site conditions; f. Any reason considered to be in the public interest. The contract time will not be extended, nor will the Contractor be entitled to any additional compensation if the work is suspended pursuant to subsections (a), (b) or (c). If the project work is suspended pursuant to subsection (f), the Contractor is entitled to a reasonable extension of the contract time and reasonable compensation for all verified costs resulting from the suspension plus a reasonable allowance for overhead with respect to such costs. Contractor shall not be paid on account of loss of anticipated profits or revenue or other economic loss arising out of or resulting from such termination. The foregoing provision concerning compensation in the event of a suspension of Work of this contract shall not apply if such suspension occurs as a result of the Contractor's violation of any Federal, State, or Local statutes, ordinances, rules or regulations, or as a result of any violation by the Contractor of the terms of this contract, including a determination by the City that the Contractor has not progressed satisfactorily with the Work in accordance with specifications. 10. Early Termination a. The City and the Contractor, by mutual written agreement, may terminate this Contract at any time. b. The City, on 30 days written notice to the Contractor, may terminate this Contract for any reason deemed appropriate in its sole discretion. C. The City may terminate this contract, in whole or in part, at any time for any reason considered by the City, in the exercise of its sole discretion, to be in the public interest. The City will provide the Contractor, and the Contractor's surety, seven (7) days prior written notice of a termination for public convenience. d. Either the City or the Contractor may terminate this Contract in the event of a breach of the Contract by the other. Prior to such termination, however, the party seeking the termination shall give to the other party written notice of the breach and of the party's intent to terminate. If the Party has not entirely cured the breach within 15 days of the notice, then the party giving the notice may terminate the Contract at any time thereafter by giving a written notice of termination. it. Payment on Early Termination City of Ashland 7 C:lUsersWiinicajlDesktopIConstruction Contract.doc a. If this contract is terminated under 10(a)(b) or (c), the City shall pay the Contractor for work performed in accordance with the Contract prior to the termination date. b. If this contract is terminated under 10(d), by the Contractor due to a breach by the City, then the City shall pay the Contractor as provided in subsection (a) of this section. C. If this contract is terminated under 10(d), by the City due to a breach by the Contractor, then the City shall pay the Contractor as provided in subsection (a) of this section, subject to set off of excess costs, as provided for in section 12, Remedies. 12. Remedies In the event of termination under 10 (d), by the City due to a breach by the Contractor, then the City may complete the work either itself, by agreement with another contractor, or by a combination thereof. In the event the cost of completing the work exceeds the remaining unpaid balance of the total compensation provided under this contract, then the Contractor shall pay to the City the amount of the reasonable excess. After notice of termination under paragraph 10(c), the Contractor and the Contractor's surety shall provide the City with immediate and peaceful possession of the Project site and premises, and materials located on and off the Project site and premises for which the Contractor received progress payment. In no circumstances shall Contractor be entitled to lost profits due to termination. The remedies provided to the City under section 10 through 12 for a breach by the Contractor shall not be exclusive. The City also shall be entitled to any other equitable and legal remedies that are available. In the event of breach of this Contract by the City, then the Contractor's remedy shall be limited to termination of the Contract and receipt of payment as provided in section 11(b). 13. Access to Records Contractor shall maintain and the City and its authorized representatives shall have access to all books, documents, papers and records of Contractor which relate to this contract for the purpose of making audit, examination, excerpts, and transcripts for a period of three years after final payment. Copies of applicable records shall be made available upon request. Payment for cost of copies is reimbursable by the City. 14. Ownership of Work All work products of the Contractor that result frorn this contract, including but not limited to background data, documentation and staff work that is preliminary to final reports, are the property of City. Draft documents and preliminary work submitted to the City for review and comment shall not be considered as owned, used or retained by the City until the final document is submitted. The City shall own all proprietary rights, including but not limited to copyrights, trade secrets, patents and all other intellectual or other property rights in and to such work products. Preexisting trade secrets of the Contractor shall be noted as such and shall not be considered as a work product of this contract. All such work products shall be considered "works made for hire" under the provisions of the United States Copyright Act and all other equivalent laws. Use of any work product of the Contractor by the City for any purpose other than the use intended by this contract is at the risk of the City. Use of any work product by Contractor is prohibited without the written consent of the City. All documents or other materials submitted to City by Contractor shall become the sole and exclusive property of City. Such materials are subject to Oregon Public Records laws) 15. Compliance with Applicable Law Contractor certifies and shall comply and require all Subcontractors to comply with all federal, state, and local laws and ordinances, including specifically City of Ashland and State of Oregon Public contracting laws and rules applicable to the work under this contract, including without limitation ORS Chapter 279A-C, 279C.500 through 279C.670, and specifically ORS 279A.120(3), 279C.515, 279C.520, 279C.530, 279C.830 and 279C.580 as set forth City of Ashimi f 8 C:4UserslniinicajlDesktopIConstruction Contract.doc 4 on Exhibit B, attached hereto and made a part hereof by this reference In addition, the provisions of ORS 279C.360, 279C.365(4), and 279C.370 (Bid Documents and Disclosure); ORS 279A.010(p), 279A.120, 279C.375, and 279C.380(4), (Award of Contract and Bond); ORS 279A.1 10 (Prohibition on Discrimination in Subcontracting); ORS 279C.585 (Substitution first-tier Subcontractor); ORS 279C.650 to 279C.670 (Termination); ORS 279C.520, 279C.540, 2790.545 (Hours); ORS 279C.800 to 279C.870 (Oregon Prevailing Wage Law), if applicable; ORS 279C.550 to 279C.565 (Retainage); ORS 279C.4570 (Payments); and ORS 279C.600 to 279C.625 (Bonds) ORS 279A.125 (Recyclable Products) are all incorporated into this contract by this reference as though set forth in full. Without limiting the foregoing, Contractor expressly agrees to comply with: (i) any requirements of the DAVIS BACON ACT (40 U.S.C. 3142 and applicable Davis Bacon Related Acts; (ii) Title VI of the Civil Rights Act of 1964; (iii) Section V of the Rehabilitation Act of 1973; (iv) the Americans with Disabilities Act of 1990, (v) ORS 659A.142, (vi) all regulations and administrative rules established pursuant to those laws; and (vii) all other applicable requirements of federal and state civil rights and rehabilitation statues, rules and regulations. In addition, Contractor expressly agrees to comply with all federal and state tax laws. A condition or clause required by law to be in this contract shall be considered included and incorporated into the Contract and made a part hereof by these references. 16. Registration with Construction Contractor's Board The Contractor, hereby certifies that the Contractor is licensed with the Construction Contractors Board or licensed by the State Landscape Contractor's Board in accordance with ORS 701.035 to 701.055 and, further, that all subcontractors performing work as described in ORS 701.005(2) (i.e., construction work) will be licensed with the Construction Contractors Board or licensed by the State Landscape Contractor's Board in accordance with ORS 701.035 to 701.055 before the subcontractors commence work under the contract. 17. Prevailing Wages/ BOLI Fee a. Contractor shall certify in the Contract and it shall be a condition of the bond, as provided in ORS 279C.800 through 279C.870, that in performing this Contract, Contractor will pay and cause to be paid not less than the prevailing rate of wages as of the date of the Public Notice, per hour, per day, and per week for and to each and every worker who may be employed in and about the performance of the Contract. In accordance with ORS 279C.838, each worker in each trade or occupation employed in the performance of the Contract either by Contractor , subcontractor or other person doing or contracting to do or contracting for the whole or any part of the work on the Contract shall be paid not less than the applicable state or federal prevailing rate of wage, whichever is higher. Copies of the current BOLI prevailing wage schedule and federal wage rate schedule, if applicable, can be found at the following websites: www.oreaon.Qov/boli. When both federal and state prevailing wages are required to be included in the contract specifications, the City shall also include in the specifications information showing which prevailing rate of wage is higher for workers in each trade or occupation in each locality, as determined by the Commissioner of the Bureau of Labor and Industries under ORS 279C.815 (2)(c). (see attached rate schedules) b. Contractor shall be bound by and shall fully comply with ORS 279C.800 to 279C.870, Oregon's Prevailing Wage Law. CONTRACTOR AGREES TO BE BOUND BY AND WILL COMPLY WITH PROVISIONS OF ORS 279C.840. Pursuant to ORS 279C.830(1), the existing prevailing rate of wage that may be paid to workers in each trade or occupation required, in the form of a BOLI document, is included in the contract and bid documents and made a part hereof by this reference. For public works for which the contract price is $50,000 or more, all workers shall be paid not less than such specified minimum hourly rate of wage. [ORS 279C.830(1)] C. The City of Ashland shall pay the fee to the Commissioner of the Bureau of Labor and Industries pursuant to the administrative rule of the commissioner and as provided in ORS 279C.825(1). The fee shall be paid on or before the first progress payment or 60 days from the date work first begins on the Contract, or as otherwise provided by administrative rule, whichever is the earliest date. The fee is payable to the Bureau of Labor and Industries Wage and Hour Division Prevailing Wage Unit 800 N.E. Oregon Street #32 Portland Oregon 97232. d. Contractor and some subcontractors shall also file with the Construction Contractors Board a public works bond with a corporate surety authorized to do business in this state in the amount of $30,000 as required by ORS 279C.836 and shall cause all subcontractors to do the same prior to starting work on the project. [ORS 279C.830(2)] The bond must provide that the contractor or subcontractor will pay claims ordered by the Bureau of Labor and Industries to workers performing labor upon public works projects. The bond must be a continuing obligation, and the surety's liability for the aggregate of claims that may be payable from the bond may not exceed the penal sum of the City of Ashlatid 9 C:IUsersirr2inic ijtDesktolitConstructiori Contract.doc bond. The bond must remain in effect continuously until depleted by claims paid under this section, unless the surety sooner cancels the bond. Contractor shall verify that subcontractors have complied with this requirement prior to pennitting the subcontractor to start work on the project. e. If the Contract is for a public work and the Contract price is $50;000 or more, Contractor shall supply and file, and require every Subcontractor to supply and file, with the City and with the Wage and Hour Division, Bureau of Labor and Industries (BOLI), 800 NE Oregon #32, Portland, Oregon 97232 a certified statement in writing that conforms to the requirements of ORS 279C.845. 18. Hours of Labor /Overtime limitation [ORS 279C.520] [ORS 279C.540] [ORS 279C.545] Pursuant to ORS 279C.520, no person may be employed for more than 10 hours in any one day, or 40 hours in any one week, except in cases of necessity, emergency or when the public policy absolutely requires it, and in such cases, except in cases of contracts for personal services, the employee shall be paid at least time and a half pay: (a) (1) For all overtime in excess of eight hours in any one day or 40 hours in any one week when the work week is five consecutive days, Monday through Friday; or (2) For all overtime in excess of 10 hours in any one day or 40 hours in any one week when the work week is four consecutive days, Monday through Friday; and (b) For all work performed on Saturday and on any legal holiday specified in ORS 279C.540. (c) Collective bargaining and negotiated labor agreements may provide exceptions to the requirements of this section and from ORS 279C.520 and ORS 279C.540. (d) When labor is employed by the City through another as a contractor, any worker employed by the contractor shall be foreclosed from the right to collect for any overtime provided in ORS 279C.540 unless a claim for payment is filed with the contractor within 90 days from the completion of the contract, providing the contractor has: (1) Caused a circular clearly printed in boldfaced 12-point type and containing a copy of this section to be posted in a prominent place alongside the door of the timekeeper's office or in a similar place that is readily available and freely visible to workers employed on the work. (2) Maintained the circular continuously posted from the inception to the completion of the contract on which workers are or have been employed. (e) At or before the commencement of work, the Contractor shall give notice in writing to employees or by posting, of the number of hours and days per week the employees may be required to work. [279C.520(2)(5)] 19. Medical Care and Workers Compensation [ORS 279C.530] (1) Pursuant to ORS 279C.530(1), Contractor shall promptly, as due, make payment to any person, co- partnership, association or corporation furnishing medical, surgical and hospital care services or other needed care and attention, incident to sickness or injury, to the employees of the contractor, of all sums that the contractor agrees to pay for the services and all moneys and sums that the contractor collected or deducted from the wages of employees under any law, contract or agreement for the purpose of providing or paying for the services. (2) Pursuant to ORS 279C.530(2), All employers, including Contractor, that employ subject workers who work under this contract in the State of Oregon shall comply with ORS 656.017 and provide the required Workers Compensation coverage unless such employers are exempt under ORS 656.126. Contractor shall ensure that each of its subcontractors complies with these requirements.. 20. Retainage The withholding of retainage by a contractor or subcontractor on public improvement contracts shall be in accordance with ORS 701.420 and 701.430. [279C.555] "Retainage" means the difference between the amount earned by a contractor on a public improvement contract and the amount paid on the contract by the City. [279C.550] Moneys retained by a contracting agency under ORS 279C.570 (7) shall either be: (a) retained in a fund by the City and paid to the contractor in accordance with ORS 279C.570; or (b) At the election of the contractor, paid to the contractor in accordance with the two options below: ;ily of Ashland 10 C:VsersWiinlcajDesktoplConstruction Contract.doc • The contractor may deposit bonds, securities, or other instruments with the City or in any bank or trust company to be held in lieu of the cash retainage for the benefit of the contracting agency. In such event the City shall reduce the retainage in an amount equal to the value of the bonds, securities or instruments. and pay the amount of the reduction to the contractor in accordance with ORS 279C.570. Interest on the bonds or securities shall accrue to the contractor. {or} • If the contractor elects, the City shall deposit the retainage, as accumulated, in an interest-bearing account in a bank, savings bank, trust company or savings association for the benefit of the City. Earnings on the account shall accrue to the contractor. If the contracting agency incurs additional costs as a result of the exercise of the options in ORS 279C.560(1) or (5), the City may recover such costs from the contractor by reduction of the final payment. As work on the contract progresses, the contracting agency shall, upon demand, inform the contractor of all accrued costs. Bonds and securities deposited or acquired in lieu of retainage, as permitted above, shall be of a character approved by the City Attorney and City Finance Director, including but not limited to: (a) Bills, certificates, notes or bonds of the United States. (b) Other obligations of the United States or its agencies. (c) Obligations of any corporation wholly owned by the federal government. (d) Indebtedness of the Federal National Mortgage Association. (e) General obligation Bond of the State of Oregon or a political subdivision thereof. Unless the City finds that accepting a bond or instrument poses an extraordinary risk that is not typically associated with such bond or instrument, the contractor may deposit a surety bond for all or any portion of the amount of funds retained, or to be retained, by the City in a form acceptable to the City. The bond and any proceeds therefrom shall be made subject to all claims and liens and in the same manner and priority as set forth for retainage under ORS 279C.550 to 279C.570 and 279C.600 to 279C.625. The City shall reduce the retainage in an amount equal to the value of the bond and pay the amount of the reduction to the contractor in accordance with ORS 279C.570. Whenever a City accepts a surety bond from a contractor in lieu of retainage, the contractor shall accept like bonds from any subcontractor or supplier from which the contractor has retainage. The contractor shall then reduce the retainage in an amount equal to the value of the bond and pay the amount of the reduction to the subcontractor or supplier. [279C.560] 21. Progress Payments a. Payment for all work under the Contract will be made promptly by the City at the price or prices bid, and those prices shall include full compensation for all approved incidental work. b. Contractor shall make progress estimates of work performed in any calendar month and submit to the City for approval, before the fifth of the following month, or as mutually agreed between the Contractor and City. These estimates shall include value of labor performed and materials incorporated in the work since commencing work under the Contract. Such estimates need not be made by strict measurements and may be approximate only, and shall be based upon the whole amount of money that will become due according to terms of the Contract when Project has been completed. The City may include in payments eighty five percent (85%) of the cost to Contractor of materials or equipment not yet incorporated in the Work but delivered and suitably stored at the site, or at some other location agreed upon in writing. Such a payment shall be conditioned upon submission by the Contractor of bills of sale or such other documentation satisfactory to the City Attorney to establish the City's title to such materials or equipment or otherwise protect the City's interest including applicable insurance and transportation to the site, and a statement from Contractor explaining why it is necessary to procure said equipment and/or materials. When such payments are made, the Contractor warrants and guarantees that the title to all materials and equipment covered by a progress payment, whether incorporated in the project or not, will pass to the City upon receipt of such payment by the Contractor, free and clear of all liens, claims, security interests or encumbrances. Notwithstanding the above, when the progress estimate indicates that the progress payment would be less than one thousand dollars ($1,000), no progress payment will be made for that estimate period, unless approved by the City. C. If the Contract price is determined, in whole or in part, on a Lump Sum basis, Contractor shall prepare an itemized cost breakdown relating thereto and have the City approve same before commencing work; progress City of Ashland 11 C:(User-sltr)i»ic ijj Oesktoi)ICotisir-crctioti Contr wt.doc s estimates based on said itemized cost breakdown may be the basis for progress payments. Upon direction by the City, Contractor shall provide for revision of the costs breakdown to reflect the true costs of the work as it progresses. d. If the Contract price is determined wholly on a unit basis, City may use unit prices bid in making progress estimates on the work. In case said unit prices do not, in the opinion of the City, truly represent actual relative costs of different parts of work, a percentage of the Unit Price may be used in making progress estimate adjustments. e. If the City receives written notice of any unsettled claims for damage or other costs due to Contractor's operations including, without limitation, claims from any City Department or other governmental agency, an amount equal to the claim may be withheld from the progress payments, final payments or retainage until such claim has been resolved to the satisfaction of City. f. Progress payments will be made by City on a monthly basis within thirty (30) days from sign off by the Contractor of the progress payment or fifteen (15) days after the payment is approved by City of work performed, whichever is the earlier date. Failure to pay progress payments within the timeframe set forth above will result in the imposition of interest as required by ORS 279C.570(2)(3). Defective or improper invoices will be addressed as set forth in ORS 279C.570(4)(5)(6). g. Payment will be issued by City for the amount of the approved estimate, less five percent (5%) retainage. Except as provided in paragraph 19 above and the applicable ORS Sections noted herein, such amount of retainage shall be withheld and retained by City until it is included in and paid to Contractor as part of the final payment of the Contract amount. Upon Substantial Completion of the work under the Contract which shall be understood to be not less than ninety-seven and one-half percent (97.5%) of the work, the City may, at its discretion, reduce the retained amount equivalent to not less than one hundred percent (100%) of the contract value or estimated value or estimated cost, whichever is greater, of the work remaining to be done. [279C.570(7)] h. The City may decline to approve an application for payment and may withhold such approval if, in the City's opinion, and in good faith, the work has not progressed to the point indicated by the Contractor's submittal. The City may also decline to approve an application for payment or may reduce said payment or, because of subsequently discovered evidence or subsequent inspections, City may nullify the whole or any part of any payment previously made to such extent as may be necessary in their opinion to protect the City from loss because of. (1) defective work not remedied, (2) third party claims filed or failure of the Contractor to make payments properly to Subcontractors for labor, materials or equipment, unless Surety consents to such payment, (3) reasonable doubt that the work can be completed for the unpaid balance of the Contract sum, (4) damage to another contractor's work, (5) reasonable indication that the work will not be completed within the Contract time, (6) unsatisfactory prosecution of the work by the Contractor, (7) claims against the Contractor by the City, (8) failure to submit a construction schedule or failure to keep said construction schedule updated, or (9) exceeding work limits. When any or all of the criteria set forth above have been remedied satisfactorily to the City, payment shall be made for amounts withheld because of them. Withholding of progress payments or partial payments under the criteria set forth above shall not entitle the Contractor to interest on such withheld payments or partial payments, except as provided in ORS 279C.570(9). i. If Contractor fails to complete the Project within the time limit fixed in the Contract or any extension, no further estimate may be accepted or progress or other payments allowed until the Project is completed, unless approved otherwise by City. Progress estimates are for the sole purpose of determining progress payments and are not to be relied on for any other purpose. A progress payment is not considered acceptance or approval of any work or materials or waiver of any defects therein. [ORS 279.570(2)]. 22. Final Estimate and Final Payment a. SUBSTANTIAL COMPLETION. Contractor shall notify the City in writing when all or a portion of the work is considered substantially complete. If it appears to the City that the work is not substantially complete, the City shall not make an inspection. The City may make a general list of major work components remaining. If it appears that the work is substantially complete, the City shall, within fifteen (15) days after receiving notice, make an inspection and either accept the work or notify Contractor of work yet to be performed. If accepted, City shall prepare a Certificate of Substantial Completion, Exhibit F. Upon acceptance of the Certificate of Substantial Completion by both parties, the City shall be responsible for operation and maintenance of that part of the work described in the Certificate of Substantial Completion, subject to the warranty requirements and protection of the City of Asltixwwd 12 C:,U setslitiiriic~ijtDesktoptConstrirctiott Coniract.doc work and all other applicable terms of the contract documents. The date of substantial completion of all the work shall stop the accrual of liquidated damages, if applicable. b. FINAL COMPLETION. Contractor shall notify the City in writing when work is 100% complete. If it appears to the City that the work is not 100% complete, the City shall not make a final inspection. The City may make a general list of major work components remaining. If it appears that the work is 100% complete, the City shall, within fifteen (15) days after receiving notice, make a final inspection and either accept the work or notify Contractor of work yet to be performed on the Contract. A Certificate of Final Completion shall not be prepared until all provisions of the Contract have been met, including but not limited to, the submission by the Contractor of a signed Certificate of Compliance, Exhibit G and executed "Release of Liens and Claims."(Exhibit H). b. When the work is 100% complete, the City shall prepare a final pay estimate and Certificate of Final Completion accepting the work as of a certain date. The Contractor shall execute and return the final pay estimate and Certificate of Final Completion within five (5) working days of receipt. Unless otherwise provided as a Special Provision, when City accepts the Certificate of Final Completion, the date the Contractor signs the Certificate of Final Completion shall be the date the City accepts Ownership of the work and the start date of the warranty period. The contractor may substitute a Warranty Bond in replacement of the Performance and Payment Bonds in accordance with Section 29. The City shall include in the final pay estimate an addition to the contract amount for any contract deduction from the contract amount for any liquidated damages and a deduction from the contract price in a fair and equitable amount for any damages to the City or for any costs incurred or likely to be incurred by the City due to Contractor's failure to meet any contract provision or specification other than timely completion. C. If the Contractor believes the quantities and amounts specified in the final pay estimate prepared by the City to be incorrect, Contractor shall submit to the City within five (5) working days of receipt of the City's final pay estimate, an itemized statement of any and all claims for additional compensation under the Contract which are based on differences in measurements or errors of computation. Any such claim not so submitted and supported by an itemized statement within said period is expressly waived and the City shall not be obligated to pay the same. d. The Contractor shall commence any suit or action to collect or enforce the claim or claims for any additional compensation arising from errors of computation in the final estimate within a period of one (1) year following the original mailing of the City's final estimate and Certificate of Final Completion to the Contractor's last known address as shown in the records of City. The City's issuance of a revised final estimate pursuant to this subsection does not alter the original final estimate date. If said suit, action or proceeding is not commenced in said one (1) year period, the final estimate and Certificate of Final Completion or revised final estimate and Certificate of Final Completion, if revisions are made, shall be conclusive with respect to the amount earned by the Contractor, and the Contractor expressly waives any and all claims for compensation and any and all causes of suit or action for the enforcement thereof that Contractor might have had. e. Upon return of the fully executed Certificate of Final Completion from the Contractor, the City will submit the Certificate of Final Completion and final estimate to the City for approval. Upon approval and acceptance by the City, Contractor will be paid a total payment equal to the amount due under the Contract including retainage within thirty (30) days in accordance with ORS 279C.570. Failure to pay within 30 days shall implicate the interest on final payment/ retainage requirements of ORS 279C.570(8). f. Monies earned by the Contractor are not due and payable until the procedures set forth in the contract documents for inspection, approval and acceptance of the work; for determination of the work done and the amount due therefore; for the preparation of the final estimate and Certificate of Final Completion and processing the same for payment; for consideration of the Contractor's claim, or claims, if any; and for the preparing of a revised final estimate and Certificate of Final Completion and processing same for payment all have been carried out. g. As a prerequisite to final payment, if Contractor is not domiciled in or registered to do business in the State of Oregon, the Contractor will provide City with evidence that the requirement of ORS 279A.120(3) has been satisfied. h. If City declares a default of the Contract, and Surety completes said Contract, all payments made after declaration of default and all retainage held by City shall be paid to Surety and not to Contractor in accordance with the terms of the Contract. City of Ashland 13 C:IUsersln7inicajlDesktol)iCoristriiction Contract.doc i. Acceptance by Contractor of final payment shall release City from any and all claims by Contractor whether known or unknown, arising out of and relating to the work. No payment, however, final or otherwise, shall operate to release Contractor or its Sureties from warranties or other obligations required in the performance of the Contract. j. Disputes as to compensation resolved in favor of the contractor implicate the interest provisions of ORS 279.570(9). 23. Change Orders / Extra Work The Contractor agrees to complete this Contract in accordance with the attached specifications and requirements, including any change orders. A change order submitted by the City must be agreed upon by the Contractor and the City, and in the event of failure to so agree, the City may then proceed with any additional work in any manner the City may choose. A decision by the City to proceed to have work done by another party shall in no way relieve either the Contractor or City of this Contract and neither will such action be cause for collection of damages by either party to the contract, one from the other. Only the City designated Contracting Officer or individual with delegated contracting authority can authorize extra (and/or changed) work and compensation. Such authorization must be in writing. The parties expressly recognize that, except when such order is in writing by an individual with delegated authority, City personnel are not authorized to order extra (and/or) changed work or to waive contract requirements or authorize additional compensation. Failure of the Contractor to secure City authorization for extra work shall constitute a waiver of any and all claims or rights to adjustment in the contract price or contract time due to such unauthorized extra work and thereafter Contractor shall be entitled to no compensation whatsoever for the performance of such work. Contractor further expressly waives any and all right or remedy by way of restitution and quantum ineritit for any and all extra work performed by Contractor without express and prior authorization of the city. 24. Contractor/Subcontractor Payment Obligations a. The Contractor is required to include in each subcontract for property or services entered into by the Contractor and a first-tier subcontractor, including a material supplier, for the purpose of performing this contract: i. A payment clause that obligates the Contractor to pay the first-tier subcontractor for satisfactory perfonnance under its subcontract within 10 days out of such amounts as are paid to the Contractor by the City under such contract; [279C.580(3)(a)] and ii. An interest penalty clause that obligates the Contractor, if payment is not made within 30 days after receipt of payment from the City, to pay to the first-tier subcontractor an interest penalty on amounts due in the case of each payment not made in accordance with the payment clause included in the subcontract pursuant to paragraph (a)(i) above. A contractor or first-tier subcontractor shall not be obligated to pay an interest penalty if the only reason that the contractor or first-tier subcontractor did not make payment when payment was due is that the contractor or first-tier subcontractor did not receive payment from the City or contractor when payment was due. The interest penalty shall be: A. For the period beginning on the day after the required payment date and ending on the date on which payment of the amount is due made; and B. Computed at the rate specified in ORS 279C.515(2). [279C.580(3)(b)] b. The Contractor is further required to include in each of its subcontracts, for the purpose of performance of such contract condition, a provision requiring the first-tier subcontractor to include a payment clause and an interest penalty clause conforming to the standards of section a. above in each of its subcontracts and to require each of its subcontractors to include such clauses in their subcontracts with each lower-tier subcontractor or supplier. [279C.580(4)] C. The Contractor shall not request payment of any amount withheld or retained in accordance with ORS 279C.580(5) until such time as the Contractor has determined and certified to the City that the subcontractor is entitled to the payment of such amount. [279C.570(1)]. City of Ashlawl 14 C:1Usci~ stiiiiiriicijtDesktol)1Coristructic)r1 Contract.doc ti d. A dispute between the Contractor and a subcontractor relating to the amount or entitlement of a subcontractor to a payment or a late payment interest penalty under a clause included in the subcontract pursuant to subsections (3) and (4) of ORS 279C.580 does not constitute a dispute to which the City is a party. The City shall not be included as a party in any administrative or judicial proceeding involving such a dispute. [279C.580(2)] e. The Contractor shall make payment promptly, as due, to all persons supplying to the Contractor labor or material for the performance of the work provided for in the contract. [ORS 279C.505(1)(a)] The Contractor shall pay all contributions or amounts due the Industrial Accident Fund and the State Unemployment Compensation Fund from the Contractor or Subcontractor incurred in the performance of the contract. [ORS 279C.505(1)(b)] The Contractor shall not permit any claim or lien to be filed or prosecuted against the City and shall be fully responsible for any lien or claim filed against the City on account of any labor or material furnished. [ORS 279C.505(1)(c)] The Contractor shall pay to the Department of Revenue all sums withheld from employees pursuant to ORS 316.167. [ORS 279C.505(1)(d)] f. Pursuant to ORS 279C.515(1), if Contractor fails, neglects or refuses to make prompt payment of any claim for labor or services furnished to the Contractor or a subcontractor by any person in connection with the Contract as such claim becomes due, the proper officer(s) representing the City may pay the claim and charge the amount of the payment against funds due or to become due Contractor under this Contract. g. Pursuant to ORS 279C.515(2), if the Contractor or a first-tier subcontractor fails, neglects or refuses to make payment to a person furnishing labor or materials in connection with the public improvement contract within 30 days after receipt of payment from the contracting agency or a contractor, the contractor or first-tier subcontractor shall owe the person the amount due plus interest charges commencing at the end of the 10-day period that payment is due under ORS 279C.580 (4) and ending upon final payment, unless payment is subject to a good faith dispute as defined in ORS 279C.580. The rate of interest charged to the contractor or first-tier subcontractor on the amount due shall equal three times the discount rate on 90-day commercial paper in effect at the Federal Reserve Bank in the Federal Reserve district that includes Oregon on the date that is 30 days after the date when payment was received from the contracting agency or from the contractor, but the rate of interest may not exceed 30 percent. The amount of interest may not be waived. h. Pursuant to ORS 279C.515(3), if the Contractor or a subcontractor fails, neglects or refuses to make payment to a person furnishing labor or materials in connection with the public improvement contract, the person may file a complaint with the Construction Contractors Board, unless payment is subject to a good faith dispute as defined in ORS 279C.580. i. Pursuant to ORS 279C.515(4), the payment of a claim in the manner authorized in this section does not relieve the contractor or the contractor's surety from obligation with respect to any unpaid claims. j. Living Wage Rates: If the amount of this contract is $18,703 or more, and Contractor is not paying prevailing wage for the work, Contractor must comply with Chapter 3.12 of the Ashland Municipal Code by paying a living wage, as defined in this chapter, to all employees performing work under this contract and to any subcontractor who performs 50% or more of the work under this contract. Contractor must post the attached Living Wage notice predominantly in areas where it will be seen by all employees. 25. Inspection and Acceptance Inspection and acceptance of all work required under this contract shall be performed by the City. The Contractor shall be advised of the acceptance or of any deficiencies in the deliverable items. 26. Liquidated Damages City and Contractor recognize that time is of the essence of this Contract and that City will suffer substantial financial loss if the project work is not completed within the timeframe specified in Section (1) of the Public Improvement Contract. City and Contractor also recognize the delays, expense, and difficulties involved in proving in a legal or other dispute resolution preceding the actual loss suffered by City if the project work is not completed on time. Accordingly, instead of requiring any such proof, City and Contractor agree that as liquidated damages for delay (but not as a penalty) the Contractor shall pay the City Five Hundred Dollars per day ($500.00/day) for each and every City of Ashland 15 C:iUsersWiinicajOesktop4Constoiction Contract.doc: Y day that elapses in excess of the contract time or the final adjusted contract time. This amount is a genuine pre- estimation of the damages expected because of a delay in the completion of this project. Any sums due as liquidated damages shall be deducted from any money due or which may become due to the Contractor under this Contract. Payment of liquidated damages shall not release the Contractor from obligations in respect to the fulfillment of the entire contract, nor shall the payment of such liquidated damages constitute a waiver of the City's right to collect any additional damages which may be sustained by failure of the Contractor to complete the work on time. Permitting the Contractor to continue and finish the project work or any part thereof after the contract time, or adjusted contract time, has expired shall in no way operate as a waiver on the part of the City or any of its rights under this contract. The City may in its discretion grant the Contractor an extension of time upon a showing made by the Contractor that the work has been unavoidably delayed by conditions beyond the control of the parties. 27. Liability, Indemnity and Hold Harmless Contractor warrants that all its work will be performed in accordance with generally accepted practices and standards as well as the requirements of applicable federal, state, and local laws, it being understood that acceptance of Contractor's work by City shall not operate as a waiver or release. The Contractor shall hold harmless, indemnify, and defend City, its officers, agents, and employees from any and all liability, actions, claims, losses, damages or other costs of whatsoever nature, including attorney's fees and witness costs (at both trial and appeal level, whether or not a trial or appeal ever takes place) that may be asserted by any person or entity arising from, during or in connection with the performance of the work, actions or failure to perform actions, and other activities of Contractor or its officers, employees, subcontractors or agents, under this contract, including the professional negligent acts, errors, or omissions of Contractor or its officers, employees, subcontractors, or agents except liability arising out of the sole gross negligence of the City and its employees. The Contractor shall assume all responsibility for the work and shall bear all losses and damages directly or indirectly resulting to the Contractor, to the City, and to their officers, agents, and employees on account of (a) the character or performance of the work, (b) unforeseen difficulties, (c) accidents, or (d) any other cause whatsoever. The Contractor shall assume this responsibility even if (a) fault is the basis of the claim, and (b) any act, omission or conduct of the City connected with the Contract is a condition or contributory cause of the claim, loss, damage or injury. Contractor waives any and all statutory or common law rights of defense and indemnification by the City. Such indemnification shall also cover claims brought against City under state or federal workers compensation laws. Contractor shall also defend and indemnify City from all loss or damage that may result from Contractor's wrongful or unauthorized use of any patented article or process. If any aspect of this indemnity shall be found to be illegal or invalid for any reason whatsoever, such illegality or invalidity shall not affect the validity of the remainder of this indemnification. Any specific duty or liability imposed or assumed by the Contractor as may be otherwise set forth in the Contract documents shall not be construed as a limitation or restriction of the general liability or duty imposed upon the Contractor by this section. In the event any such action or claim is brought against the City, the Contractor shall, if the City so elects and upon tender by the City, defend the same at the Contractor's sole cost and expense, promptly satisfy any judgment adverse to the City or to the City and the Contractor jointly, and reimburse the City for any loss, cost, damage, or expense, including attorney fees, suffered or incurred by the City. 28. Insurance The Contractor shall provide and maintain during the life of this Contract the insurance coverage as described in Exhibit C. All costs for such insurance shall be borne by the Contractor and shall be included in the contract price. In case of the breach of any provision of this section, the City may elect to take out and maintain at the expense of the Contractor such insurance as the City may deem proper. The City may deduct the cost of such insurance from any monies that may be due or become due the Contractor under this Contract. Failure to maintain insurance as provided is also cause for immediate termination of the Contract. Contractor shall furnish City certificates of insurance acceptable to City prior to execution by the City and before Contractor or any subcontractor commences work under this Contract. The certificate shall show the name of the insurance carrier, coverage, type, amount (or limits), policy numbers, effective and expiration dates and a description of operations covered. The certificate will include the deductible or retention level and required endorsements. Insuring companies or entities are subject to City's acceptance. If requested, copies of insurance policies shall be provided to the City. Contractor shall be responsible for all deductibles, self-insured retention's, and/or self-insurance. Approval of the insurance shall not relieve or decrease the liability of the Contractor hereunder. City of Ashland 16 C:tUsei-s4itiiitictijlOeskio[)IConstriictiori Coniract.doc 29. Performance, Payment and Warranty Bonds / Notice of Bond Claims At the time of execution of the Contract, the Contractor shall furnish: (1) Performance Bond and (2) Payment Bond written by a corporate surety or other financial assurance in an amount equal to the amount of the Contract based upon the estimate of quantities or lump sum as set forth in the Contract and in accordance with ORS 279.380. The bonds shall be continuous in effect and shall remain in full force and effect until compliance with and fulfillment of all terms and provisions of the Contract, including the obligations of Sections 27 and 30, all applicable laws and the prompt payment of all persons supplying labor and/or material for prosecution of the work. The bond(s) or other financial assurance is subject to approval by the City. Contractor shall furnish a separate warranty bond written by a corporate surety or other financial assurance, in an amount equal to 10% of the final amount of the contract. The City may permit the warranty amount to be included in the initial performance and payment bonds. The warranty bond or other financial assurance shall be in effect for a period of one year from the date of Final Completion. The City may require a separate warranty bond or financial assurance for any repairs done pursuant to the warranty obligation. Such separate warranty bond or financial assurance shall be for a period of one year from the date of completion of such repairs. The notice of claim on a bond required by ORS 279C.600 must be sent by registered or certified mail or hand delivered no later than 120 days after the day the person last provided labor or furnished materials or 120 days after the worker listed in the notice of claim by the Commissioner of the Bureau of Labor and Industries last provided labor. The notice may be sent or delivered to the contractor at any place the contractor maintains an office or conducts business or at the residence of the contractor. Notwithstanding the above, if the claim is for a required contribution to a fund of any employee benefit plan, the notice required by ORS 279C.600 must be sent or delivered within 150 days after the employee last provided labor or materials. The notice of claim must be in writing substantially as set forth in ORS 279C.605(3)-(5). 30. One-Year Warranty a. In addition to and not in lieu of any other warranties required under the Contract, Contractor shall make all necessary repairs and replacements to remedy, in a manner satisfactory to the City and at no cost to the City, any and all defects, breaks, or failures of the work occurring within one year following the date of completion due to faulty or inadequate materials or workmanship. Repair damage or disturbances to other improvements under, within, or adjacent to the work, whether or not caused by settling, washing, or slipping, when such damage or disturbance is caused, in whole or in part, from activities of the Contractor in performing its duties and obligations under this Contract when such defects or damage occur within the warranty period. The one-year warranty period shall, with relation to such required repair, be extended one year from the date of completion of such repair. If Contractor, after written notice, fails within ten days to proceed to comply with the terms of this section, City may have the defects corrected, and the Contractor and Contractor's surety shall be liable for all expense incurred. In case of an emergency where, in the opinion of the City, delay would cause serious loss or damage, repairs may be made without notice being given to Contractor and Contractor or Surety shall pay the cost of repairs. Failure of the City to act in case of an emergency shall not relieve Contractor or Surety from liability and payment of all such costs. 31. Nondiscrimination in Labor No person shall be subject to discrimination in the receipt of the benefits of any services or activities made possible by or resulting from this Agreement on the grounds of sex, race, color, creed, marital status, age, sexual orientation or national origin. Contractor shall comply with provisions of Owner's Equal Opportunity Policy and comply with ORS Chapter 659 and ORS Chapter 659A relating to unlawful employment practices and discrimination by employers against any employee or applicant for employment because of race, religion, color, sex, national origin, marital status or age if the individual is 18 years of age or older. Particular reference is made to ORS 659A.030, which states that it is unlawful employment practice for any employer, because of the race, religion, color, sex, national origin, marital status or age if the individual is 18 years or older or because of the race, religion, color, sex, national origin or age of any other person with whom the individual associates, or because of a juvenile record that has been expunged pursuant to ORS 419A.260 and ORS 419A.262 of any individual, or to refuse to hire or employ or to bar or discharge City of Ashland 17 C:4User•sVminic ijtDesktoptCoiisti-zictiori Confract.doc A from employment such individual or to discriminate against such individual in compensation or in terms, conditions or privileges of employment. Any violation of this provision shall be considered a material violation of the Agreement and shall be grounds for cancellation, termination, or suspension in whole or in part.q 32. Construction Debris and Yard Waste Contractor shall salvage or recycle construction and demolition debris, if feasible and cost effective. If the contract includes lawn and landscaping maintenance, Contractor shall compost or mulch yard waste material at an approved site, if feasible and cost effective. [ORS 279C.510(1)&(2)] 33. Environmental Regulations Pursuant to ORS 279C.525(1), the following is a list of federal, state and local agencies which have enacted ordinances or regulations dealing with the prevention of environmental pollution and the preservation of natural resources that may affect the performance of the contract. Federal Agencies: Agriculture, Department of Forest Service Soil Conservation Service Commerce Department of National Oceanic and Atmospheric Administration (NOAA) National Marine Fisheries Service (NMFS) Defense, Department of Army Corps of Engineers Energy, Department of Federal Energy Regulatory Commission Environmental Protection Agency Health and Human Services Department of Housing and Urban Development, Solar Energy and Energy Conservation Bank Interior, Department of Bureau of Land Management Bureau of Indian Affairs Bureau of Mines Bureau of Reclamation Geological Survey Minerals Management Service U.S. Fish and Wildlife Service Labor, Department of Mine Safety and Health Administration Occupational Safety and Health Administration Transportation, Department of Coast Guard Federal Highway Administration Water Resources Council State Agencies: Administrative Services, Department of Agriculture, Department of Consumer & Business Services, Department of Oregon Occupational Safety & Health Division Energy, Department of Environmental Quality, Department of Fish and Wildlife, Department of Forestry, Department of Cily of Ashland 18 C:iClsor.s4iiiiiaieaijIDesklopa Coristructlart Cor,iractdoe Geology and Mineral Industries, Department of Human Resources, Department of Land Conservation and Development Commission Parks and Recreation, Department of Soil and Water Conservation Commission State Engineer State Land Board (Lands, Division of State) Water Resources Department Local Agencies: CITY of ASHLAND Ashland Parks and Rec Commission City Council (Ashland Municipal Code) County Courts County Commissioners of Jackson County, County Service Districts Sanitary Districts Water Districts Fire Protection Districts Historical Preservation Commissions Planning Commission If the Contractor awarded the project is delayed or must undertake additional work by reason of existing ordinances, rules or regulations of agencies not cited above or due to the enactment of new or the amendment of existing statutes, ordinances, rules or regulations relating to the prevention of environmental pollution and the preservation of natural resources occurring after the submission of the successful bid, the City may: (a) Terminate the contract; (b) Complete the work itself, (c) Use non-City forces already under contract with the City; (d) Require that the underlying property owner be responsible for cleanup; (e) Solicit bids for a new contractor to provide the necessary services; or (f) Issue the contractor a change order setting forth the additional work that must be undertaken. The solicitation documents make specific reference to known conditions at the construction site that may require the successful bidder to comply with the ordinances, rules or regulations identified above. If Contractor encounters a condition not referred to in the solicitation documents, not caused by the successful bidder and not discoverable by a reasonable pre-bid visual site inspection, and the condition requires compliance with the ordinances, rules or regulations enacted by the governmental entities identified above, the successful bidder shall immediately give notice of the condition to the contracting agency. Except in the case of an emergency and except as may otherwise be required by any environmental or natural resource ordinance, rule or regulation, the Contractor shall not commence work nor incur any additional job site costs in regard to the condition encountered and described in subsection (3) of this section without written direction from the contracting agency. Upon request by the City, the Contractor shall estimate the emergency or regulatory compliance costs as well as the anticipated delay and costs resulting from the encountered condition. This cost estimate shall be promptly delivered to the contracting agency for resolution. Within a reasonable period of time following delivery of an estimate of this section, the City may: (a) Terminate the contract; (b) Complete the work itself, (c) Use non-City forces already under contract with the City; (d) Require that the underlying property owner be responsible for cleanup; (e) Solicit bids for a new contractor to provide the necessary services; or (f) Issue the contractor a change order setting forth the additional work that must be undertaken. If the City chooses to terminate the contract under either subsection(a) of this section, the Contractor shall be entitled to all costs and expenses incurred to the date of termination, including overhead and reasonable profits, on the percentage of the work completed. The City shall have access to the contractor's bid documents when making the City of Ashland 19 C: Userslriiit)ic ijlDesktol)lCotistruetiUtr Contrract.doc contracting agency's determination of the additional compensation due to the contractor. If the contracting agency causes work to be done by another contractor under either subsection (c) or (e) above, the initial contractor may not be held liable for actions or omissions of the other contractor. The change order under either subsection (f) of this section shall include the appropriate extension of contract time and compensate the contractor for all additional costs, including overhead and reasonable profits, reasonably incurred as a result of complying with the applicable statutes, ordinances, rules or regulations. The City shall have access to the contractor's bid documents when making the contracting agency's determination of the additional compensation due to the contractor. Notwithstanding the above, the City has allocated all or a portion of the known environmental and natural resource risks to a Contractor by listing such environmental and natural resource risks in the solicitation documents; and 34. Waiver The failure of the City to enforce any provision of this contract shall not constitute a waiver by the City of that or any other provision. City shall not be precluded or estopped by any measurement, estimate or certificate made either before or after completion and acceptance of work or payment therefore, from showing the true amount and character of work performed and materials furnished by the Contractor, or from showing that any such measurement, estimate or certificate is untrue or incorrectly made, or that work or materials do not conform in fact to the Contract. City shall not be precluded or estopped, notwithstanding any such measurement, estimate or certificate, or payment in accordance therewith, from recovering from the Contractor and their Sureties such damages as it may sustain by reason of their failure to comply with terms of the Contract, or from enforcing compliance with the Contract. Neither acceptance by City, or by any representative or agent of the City, of the whole or any part of the work, nor any extension of time, nor any possession taken by City, nor any payment for all or any part of the project, shall operate as a waiver of any portion of the Contract or of any power herein reserved, or any right to damages herein provided. A waiver of any breach of the Contract shall not be held to be a waiver of any other breach. 35. Errors The Contractor shall perform such additional work as may be necessary to correct errors in the work required under this contract without undue delays and without additional cost. 36. Governing Law The provisions of this contract shall be construed in accordance with the laws of the State of Oregon and ordinances of the City of Ashland, Oregon. Any action or suits involving any question arising under this contract must be brought in the appropriate court in Jackson County, Oregon. If the claim must be brought in a federal forum, then it shall be brought and conducted in the United States District Court for the District of Oregon. Contractor, by the signature herein of its authorized representative, hereby consents to the in personam jurisdiction of said courts. In no event shall this section be construed as a waiver of the City of any form of defense or immunity.. 37. Severability If any term or provision of this contract is declared by a court of competent jurisdiction to be illegal or in conflict with any law, the validity of the remaining terms and provisions shall not be affected, and the rights and obligations of the parties shall be construed and enforced as if the contract did not contain the particular term or provision held invalid. 38. Attorney's Fees If a suit or action is filed to enforce any of the terms of this contract, the prevailing party shall be entitled to recover from the other party, in addition to costs and disbursements provided by statute, any sum which a court, including any appellate court, may adjudge reasonable as attorney's fees. 39. Business License The Contractor shall obtain a City of Ashland business license as required by City Ordinance prior to beginning work under this contract. The Contractor shall provide a business license number in the space provided in this contract. Cily of Ashland 20 CaUser:sltrrirriczijlOesktaplCotrstructioi7 Contract.doc 40. Notices/Bills/Payments All notices, bills, and payments shall be made in writing and may be given by personal delivery or by mail. Notices, bills, and payments sent by mail should be addressed as follows: City: Ashland Parks and Rec Commission 340 South Pioneer St Ashland, OR 97520 and when so addressed, shall be deemed given upon deposit in the United States Mail, postage prepaid. In all other instances, notices, bills, and payments shall be deemed given at the time of actual delivery. Changes may be made in the names and addresses of the person to whom notices, bills, and payments are to be given by giving notice pursuant to this paragraph. 41. Conflict of Interest Contractor covenants that it presently has no interest and shall not acquire any interest, direct or indirect, which would conflict in any manner or degree with the performance of its services. The Contractor further covenants that in the performance of this contract no person having any such interest shall be employed. 42. Merger Clause THIS CONTRACT AND ATTACHED EXHIBITS CONSTITUTE THE ENTIRE AGREEMENT BETWEEN THE PARTIES. NO WAIVER, CONSENT, MODIFICATION OR CHANGE OF TERMS OF THIS CONTRACT SHALL BIND EITHER PARTY UNLESS IN WRITING AND SIGNED BY BOTH PARTIES. SUCH WAIVER, CONSENT, MODIFICATION OR CHANGE, IF MADE, SHALL BE EFFECTIVE ONLY IN THE SPECIFIC INSTANCE AND FOR THE SPECIFIC PURPOSE GIVEN. THERE ARE NO UNDERSTANDINGS, AGREEMENTS, OR REPRESENTATIONS, ORAL OR WRITTEN, NOT SPECIFIED HEREIN REGARDING THIS CONTRACT. BY ITS SIGNATURE, CONTRACTOR ACKNOWLEDGES IT HAS READ AND UNDERSTANDS THIS CONTRACT, AND AGREES TO BE BOUND BY ITS TERMS AND CONDITIONS. ATTACHMENTS: EXHIBITS A-J EXHIBIT A STANDARD TERMS AND CONDITIONS FOR PUBLIC IMPROVEMENT CONTRACTS EXHIBIT B COMPLIANCE WITH APPLICABLE PUBLIC CONTRACT LAW EXHIBIT C INSURANCE REQUIREMENTS EXHIBIT D INDEPENDENT CONTRACTOR CERTIFICATION EXHIBIT E BONDS (BID, PAYMENT AND PERFORMANCE) EXHIBIT F CERTIFICATE OF SUBSTANTIAL COMPLETION EXHIBIT G CERTIFICATE OF COMPLIANCE EXHIBIT H RELEASE OF LIENS AND CLAIMS EXHIBIT I CERTIFICATE OF FINAL COMPLETION City of Ashland 21 C:tUserslrrriniciijlbesktoplCot7strtictiot3 Contract.doc s EXHIBIT B COMPLIANCE WITH APPLICABLE LAW PUBLIC IMPROVEMENT CONTRACT This exhibit contains the requirements for public contracting as set forth in ORS Chapter 279C.360 through and including 279C.800 and is available through the city Engineering Office at 51 Winburn Way, Ashland, Oregon or online at www.Ieg.state.or.us/ors City of Ashfawd 22 C:lUssetsltzxinic~ijlDesktoplCoristrtictioti Contract.doe EXHIBIT C PUBLIC IMPROVEMENT CONTRACT INSURANCE REQUIREMENTS To: Insurance Agent. Please provide Certificates of Insurance to the Project Manager. During the term of the contract, please provide Certificates of Insurance prior to each renewal. Insurance shall be without prejudice to coverage otherwise existing. During the term of this contract, Contractor shall maintain in force at its own expense all insurance noted below: Workers Compensation insurance in compliance with ORS 656.017. All employers, including Contractor and any subcontractors, that employ subject workers who work under this Contract in the State of Oregon shall comply with ORS 656.017 and provide the required Workers' Compensation coverage, unless such employers are exempt under ORS 656.126. Contractor shall ensure that each of its subcontractors complies with these requirements. Commercial General Liability insurance on an occurrence basis, with a combined single limit of not less than ■ $2,000,000 or ❑ $3,000,000 for each occurrence of bodily injury, personal injury and property damage. It shall include coverage for broad form contractual liability; broad form property damage; personal and advertising injury; owners and contractor protective; premises/operations; and products/completed operations. Coverage shall not exclude excavation, collapse, underground, or explosion hazards. Aggregate limits shall apply on a per-project basis. ■ Required by City ❑ Not required by City Commercial Automobile Liability insurance with a combined single limit, or the equivalent of not less than ■ $1,000,000 or ❑ $3,000,000 for each accident for Bodily Injury and Property Damage, including coverage for owned, hired and non-owned vehicles. "Symbol One" coverage shall be designated. ■ Required by City ❑ Not required by City o Builders Risk (Check here if required) insurance during construction to the extent of 100 percent of the value of the work for the benefit of the parties to the Contract as their interest may appear. Coverage shall also include: (1) formwork in place; (2) form lumber on site; (3) temporary structures; (4) equipment; and (5) supplies related to the work while at the site. Notice of Cancellation or Change. There shall be no cancellation, material change, reduction of limits or intent not to renew the insurance coverage(s) without 30 days written notice from the Contractor or its insurer(s) to the City. This notice provision shall be by endorsement physically attached to the certificate of insurance. Additional Insured. For general liability insurance and automobile liability insurance the City, and its agents, officers, and employees will be Additional Insureds, but only with respect to Contractor's services to be provided under this contract. This coverage shall be by endorsement physically attached to the certificate of insurance. The Contractor shall defend, indemnify, and hold harmless, the City and the City's officers, agents, and employees against any liability that may be imposed upon them by reason of the Contractor's or subcontractor's failure to provide workers' compensation and employers liability coverage. Certificates of Insurance. Contractor shall furnish insurance certificates acceptable to City prior to commencing work. The certificate will include the deductible or retention level and required endorsements. Insuring companies or entities are subject to City approval. If requested, copies of insurance policies shall be provided to the City. Contractor shall be responsible for all deductibles, self- insured retention's, and/or self-insurance. City of Ashland 23 C:IUserslminicajlDesktoplCoristruction Contract.doc EXHIBIT D CERTIFICATION STATEMENT FOR CORPORATION OR INDEPENDENT CONTRACTOR A. CONTRACTOR IS A CORPORATION CORPORATION CERTIFICATION: I am authorized to act on behalf of the entity named below, and certify under penalty of perjury that it is a corporation. r, l"~^~r►fv C:c.~ST~',~~c1Z L~ Entity Signature Date B. CONTRACTOR IS INDEPENDENT. Independent Contractor Standards. As used in various provisions of ORS Chapters including but not limited to 316, 656, 657, and 701, an individual or business entity that performs labor or services for remuneration shall be considered to perform the labor or services as an "independent contractor" if the standards of ORS 670.600 are met. Contractor and Project Manager certifies that the Contractor meets the following standards: 1. Contractor is free from direction and control over the means and manner of providing the labor or services, subject only to the specifications of the desired results. 2. Contractor is responsible for obtaining all assumed business registrations or professional occupation licenses required by state law or local ordinances. 3. Contractor furnishes the tools or equipment necessary for the contracted labor or services. 4. Contractor has the authority to hire and fire employees to perform the labor or services. 5. Payment to the Contractor is made upon completion of the performance or is made on the basis of a periodic retainer. 6. Contractor is registered under ORS chapter 701, if the Contractor provides labor or services for which such registration is required. 7. Contractor has filed federal and state income tax returns in the name of the business or a business Schedule C as part of the personal income tax return, for the previous year, for labor or services performed as an independent contractor in the previous year. 8. Contractor represent to the public that the labor or services are to be provided by an independently established business as four or more of the following circumstances exist. (Check four or more of the following:) A. The labor or services are primarily carried out at a location that is separate from Contractors residence or is primarily carried out in a specific portion of Contractors residence, which is set aside as the location of the business. I B. Commercial advertising or business cards are purchased for the business, or Contractor has a trade association membership. C. Telephone listing is used for the business that is separate from the personal residence listing. D. Labor or services are performed only pursuant to written contracts. City of Ash/and 24 C:lUserslmiiiicajlDesktopiConstruction Contract.doc E. Labor or services are performed for two or more different persons within a period of one year. F. Contractor assumes financial responsibility for defective workmanship or for service not provided as evidenced by the ownership of performance bonds, warranties, errors and omission insurance or liability insurance relating to the labor or services to be provided. If any action is taken by a person or enforcement agency relating to Contractor's independent contractor status in connection with this contract, Contractor shall defend, hold harmless and indemnify the CITY of ASHLAND , its elected and appointed officials, employees, volunteers and agents from any such action, claim, judgment, fine, penalty, or order to pay. Contractor shall pay any additional costs incurred by the City in defending such action or incurred as a result of such action. This indemnification is in addition to any indemnification otherwise in this agreement. Contractor Signature Date /it tt roject Manager Signature Date City of Ashland 25 C:tUserslmirlicajlDesktoptConstruction Contract.doc Ashland Parks and Rec Commission FIRST-TIER SUBCONTRACTOR DISCLOSURE FORM (As Required by ORS 279C.370 and OAR 137-049-360) Oak Knoll Restoration PROJECT 000084 Bid Closing Date: 2:00 PM May 31, 2016 NAME OF SUBCONTRACTOR CATEGORY OF WORK DOLLAR VALUE 1. 2. ff. 0 A. 3 ULt p a 4 5 6 7 8 9 10 • List above the Name, Dollar Value and Category of Work of each subcontractor that will be furnishing labor or labor and materials and that is required to be disclosed, the dollar value of the subcontract and the category of work that the subcontractor will be performing. Enter "NONE" if there are no subcontractors that need to be disclosed. (ATTACH ADDITIONAL SHEETS IF NEEDED). City of Ashland 30 xhibit E Bonds (Bid, Payment and Performance) PERFORMANCE BOND The undersigned Minton Construction, LLC , as rinci al further referred to in this bond as Contractor, and Contractors Bonding and Insurance Company as surety, further referred to in this bond as Surety, are jointly and severally bound unto City of Ashland as obligee further referred to in this bond as City, in the sum of -Eighty Four Thousand Three Hundred dollars and 00/100 Dollars 84,300.00 ) Contractor and City hgve entered into a written contract dated June 20, 2016 for the following project: Oak Knoll Renovation Project. This contract is further refpmd to i ont c an igjQ this J~Qnd b this refe c The conditions of this bond are: 1. If Contractor faithfully performs the Contract in accordance with the plans, specifications and conditions of the contract within the time prescribed by the Contract, as required by ORS 279C. 380 through 279C 385 then this obligation is null and void: otherwise it shall remain in full force gDd cffect. 2. If Contractor is declared by City to be in default under the Contract, the Surety shall promptly remedy he de aul erform all of Contractor's obi ati n under the contract in accor-dance with its terms and o itions and-120y tQ Cily W] a a es that ar Contract 3. This bond is subject to claims under ORS 279C.380 through 2790.390. 4. This obligation jointly and severally binds Contractor and Surety and their respective heirs, executors, administrators, successors. 5. Surety waives notice of modification of the Contract or extension of the Contract time. 6. Nonpayment of the bond premium shall not invalidate this bond. 7. The n number and t o me d r ss a t le h ne number of h agent QuthgriZ&d to r 've notices concerning, this bond are as follows. Bond Number: RCB0000214 a, Bond Agent: Contractors Bonding and Insurance Com an Beverly Th as, Attorney In Fact Address: 9025 N Lindbergh Dr- -Peoria, IL 61615 Telephone; (309, 6v} 92-1000 SIGNED this 15th day of July 2016. MIF Contractors Bonding and Insurance Company POWER OF ATTORNEY P.O. Box 3967 Peoria IL 61612-3967 an RLl Company Phone: (309)692-1000 Fax: (309)683-1610 Contractors Bonding and Insurance Company Bond No. RCB0000214 Know All Men by These Presents: That the Contractors Bonding and Insurance Company a corporation organized and existing under the laws of the State of Illinois , and authorized and licensed to do business in all states and the District of Columbia does hereby make, constitute and appoint: Beverly Thomas in the City of Medford , State of Oregon , as Attorney In Fact , with full power and authority hereby conferred upon him/her to sign, execute, acknowledge and deliver for and on its behalf as Surety, in general, any and all bonds, undertakings, and recognizances in an amount not to exceed Ten Million and 00/100 Dollars ( $10,000,000.00 ) for any single obligation, and specifically for the following described bond. Principal: Minton Construction LLC Obligee: Ashland Parks and Recreation Bond Amount: $ 84,300.00 The Contractors Bonding and Insurance Company further certifies that the following is a true and exact copy of a Resolution adopted by the Board of Directors of Contractors Bonding and Insurance Company , and now in force to-wit: "All bonds, policies, undertakings, Powers of Attorney or other obligations of the corporation shall be executed in the corporate name of the Company by the President, Secretary, any Assistant Secretary, Treasurer, or any Vice President, or by such other officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary, or the Treasurer may appoint Attorneys in Fact or Agents who shall have authority to issue bonds, policies or undertakings in the name of the Company. The corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney or other obligations of the corporation. The signature of any such officer and the corporate seal may be printed by facsimile." IN WITNESS WHEREOF, the Contractors Bonding and Insurance Company has caused these presents to be executed by its Vice President with its corporate seal affixed this 15th day of July 2016 ATTEST: `\.O"QxpGAND/NSGi Contractors Bonding and Insurance Company ~~°j G •DAPORgJt` m~= 0 I y- SEAL:-,a Cherie L. Montgomery fssistant Secretary ' • • • • Barton W. Davis Vice President LINO0``. On this 15th day of July 2016 before me, a Notary Public, personally appeared Barton W. Davis and Cherie L. Montgomery , who being by me duly sworn, acknowledged that they signed the above Power of Attorney as Vice President and Assistant Secretary , respectively, of the said Contractors Bonding and Insurance Company , and acknowledged said instrument to be the voluntary act and deed of said corporation. "OFFICIAL SEAL" NOTARY PUBLIC JACQUELINE M. BOCKLER Jac eline M. Bock r Notary Public SLLlNOOF COMMISSION EXPIRES 01/14/18 A0006104 BID 2 EXHIBIT F CERTIFICATE OF SUBSTANTIAL COMPLETION CITY'S Project No. 000084 Project No. N/A Project: Oak Knoll Restoration Project CONTRACTOR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Contract For Contract Date This Certificate of Substantial Completion applies to: El All Work under the Contract Documents, or ❑ To the following specified parts thereof: The Work to which this Certificate applies has been inspected by authorized representatives of CITY, CONTRACTOR and CITY, and that Work is hereby declared to be substantially complete in accordance with the Contract Documents on . . . . . . . DATE OF SUBSTANTIAL COMPLETION A tentative list of items to be completed or corrected is attached hereto. This list may not be all inclusive, and the failure to include an item in it does not alter the responsibility of CONTRACTOR to complete all the Work in accordance with the Contract Documents. The items in the tentative list shall be completed or corrected by CONTRACTOR within Days of the above date of Substantial Completion. The following documents are attached to and made a part of this Certificate: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Effective as of the last date set forth below, the responsibilities between CITY and CONTRACTOR shall be as follows: Security ❑ City ❑ Contractor Operation ❑ City ❑ Contractor Safety ❑ City ❑ Contractor Maintenance ❑ City ❑ Contractor Heat ❑ City ❑ Contractor Utilities ❑ City ❑ Contractor Insurance ❑ City ❑ Contractor Warranties ❑ City ❑ Contractor City of Ashland 66 Other Responsibilities: City Contractor This Certificate does not constitute an acceptance of Work not in accordance with the Contract Documents, nor is it a release of CONTRACTOR'S obligation to complete the Work in accordance with the Contract Documents. CONTRACTOR accepts this Certificate of Substantial Completion on: By: CITY accepts this Certificate of Substantial Completion on: By: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CITY of ASHLAND File: City of ftsWand 67 EXHIBIT G CERTIFICATE OF COMPLIANCE C I P Number: Contractor: I, (We) hereby certify that all work has been performed and materials supplied in accordance with the plans, specifications and contract documents for the above work, and that: 1. If required by law, not less than the prevailing rates of wages have been paid to laborers, workmen and mechanics employed on this work. 2. There have been no unauthorized substitutions of materials; substitutions or assignment of subcontractors; nor have any subcontracts been entered into without the names of the subcontractors having been submitted to the City prior to the start of such subcontracted work. 3. All claims and indebtedness for material and labor and other service performed in connection with these specifications have been paid. 4. All moneys due the State Industrial Accident Fund, the State Unemployment Compensation Trust Fund, the State Department of Revenue (ORS 316.162 to 316.212) hospital associations and/or others (ORS 279C.530) have been paid. 5. All private property and easement areas have been satisfactorily restored in accordance with the contract. 6. If Contractor is not domiciled in or registered to business in the State of Oregon, Contractor has reported to the Oregon Department of Revenue such information and in the manner as required by ORS 279A.120(3). Contractor: By: Date: Title: City of Ashland 68 EXHIBIT H CONTRACTOR'S RELEASE OF LIENS AND CLAIMS [THIS SWORN STATEMENT IS A PREREQUISITE TO CERTIFICATE OF FINAL COMPLETION] TO: Ashland Parks and Rec Commission 340 South Pioneer Street ASHLAND, Oregon 97520 FROM: PROJECT: In connection with our request for final payment for the above project, 1, , hereby state that: all subcontractors and suppliers on this project have been paid in full, all obligations on the project have been satisfied, all monetary claims and indebtedness on this project have been paid, and all disputes with property owners have been resolved. There are no liens or claims of any kind outstanding or threatened against the project. Furthermore, I agree to indemnify and hold harmless CITY of ASHLAND from any and all claims for labor or materials furnished under the contract for the above project. SWORN STATEMENT I hereby certify, under penalty of perjury and false swearing, that the foregoing statements are true and correct. Dated this day of , 20 Contractor: By: Title: STATE OF OREGON ) ss. County of ) On this day of , 20 , before me personally appeared whom I know personally whose identity I proved on the basis of whose identity I proved on the oath/affirmation of a credible witness to be the signer of the above document, and he/she acknowledged that he/she executed the same under oath/affirmation. Notary Public for Oregon City of Ashfat)d 69 EXHIBIT I CERTIFICATE OF FINAL COMPLETION Project Number: 000084 Project: Oak Knoll Restoration Project Contractor: Contract Signed: Contract Expires: Contract Completed: Delinquent: I hereby certify that I have completed my contract, furnished the materials, and performed the work as shown by the final estimate of the City, according to the plans and specifications. Contractor Title Date The City has determined the project is 100% complete in compliance with all contract documents. Inspector Supervisor Date Project Manager Date CITY of ASHLAND Title Date Unless otherwise provided as a Special Provision, when City accepts the Certificate of Final Completion, the date the Contractor signs the Certificate of Final Completion shall be the date the City accepts ownership of the work and the start date of the warranty period. City of Ashland 70 MINTO-2 OP ID: BC AeORt7" DATE (MM/DDrYYYY) CERTIFICATE OF LIABILITY INSURANCE 0711912016 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER. AND THE CERTIFICATE HOLDER. IMPORTANT: if the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endomemen s . PRODUCER Phone: 541-779-0177 NAME: T Insurance Marketplace, Inc. PHONE FAX 1998 Skypark Dr Suite 100 Fax: FAX 772-8235` . Ext): Arc Not Medford, OR 97504 ADDRE38: Insurance Marketplace Inc. _ INSURER(S) AFFORDING COVERAGE NAIC INSURER A : Financial Pacific Ins Co INSURED Minton Construction LLC J INSURER 8 : 608 W Stewart Ave INSURER C : Medford, OR 97501 INSURER D : INSURER E : INSURER F COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE POLICY NUMBER MiQDYNYYE DIY1fYYY LIMITS POL GENERAL LIABILITY ' EACH OCCURRENCE $ 1,000,00 A COMMERCIAL GENERAL LIABILITY X X 88324412 0212412016 0212412017 PREMISES (Ea occurte~_ $ 100,8 CLAIMS-MADE OCCUR i i MEO EXP (Any one person) X Business Owners; I I PERSONAL a ADV INJURY I $ _ 1,000,00 _ GENERAL AGGREGATE $ 2,000,00 GEN'L AGGREGATE LIMIT APPLIES PER ( PRODUCTS - COMP/OP AGG $ 2,000,00 X POLICY ; PJECT RO LOC J' $ AUTOMOBILE LIABILITY i I COMBINED SINGLE LIMIT I e Ea accident!-__ ANY AUTO ? I i BODILY INJURY (Per person) 1 $ - ALL OWNED R SCHEDULED AUTOS AUTOS BODILY INJURY (Per accdent} $ NON-OWNED PROPERTY DAMAGE HIRED S AUTOS Per ac cidents _ AUTOS X UMBRELLA LIAR OCCUR s EACH OCCURRENCE I $ 2+00ar00 A EXCESS LlAB CLAIMS-MARE '88324412 02/2412016 10212412017 AGGREGATE 2,000.00 I DED RETENTION S WORKERS COMPENSATION WC STAT T- OTH- AND EMPLOYERS LIABILITY ANY PROPRIETOR/PARTNER/EXECUTIVE Y N ! A I ! E.L. EACH ACCIDENT $ OFFICER/QtEMBER EXCLUDED? _ I (Mandatory in NH) I ! E.L. DISEASE - EA EMPLOYEE $ I K yyes describe under TSdRIPTION OF OPERATIONS below ; E.L. DISEASE -POLICY LIMIT $ PROPERTY 5,000 DESCRIPTION OF OPERATIONS ! LOCATIONS / VEHICLES (Attach ACORD 101, Additional Retnarks Schedule, It more space Is required) Additional Insured - Form BP0628 0106 Attached Waiver of Transfer of Rights of Recovery - Form BP0497 0106 Project 000064 Oak Knoll Club House, 3070 Hwy 66, Golf Club, Ashland OR CERTIFICATE HOLDER CANCELLATION ASHLAPA SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Ashland Parks & Recreation THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. City of Ashland 340 S. Pioneer Street AUTHORIZED REPRESENTATIVE Ashland, OR 97520 Insurance Marketplace Inc. ©1988.2010 ACORD CORPORATION. All rights reserved. ACORD 26 (2010/05) The ACORD name and logo are registered marks of ACORD F 1308 07-07-2016 POLICY NUMBER: 88324412 PREMIERPRO COVERAGE PART SUPPLEMENTAL DECLARATIONS - ADDITIONAL INSUREDS Schedule of Addltlonal Insureds prommn OWNERS, LESSEES OR CONTRACTORS SCHEDULED PERSON 25 BPO628 -OREGON Owners, Lessees or Contractors Location of Covered Operation CITY OF ASHLAND TYPE OF WORK: PROD #000084 OAK ASHLAND PARKS & RECREATION KNOLL CLUB HOUSE RENOVATIONS 340 S PIONEER ST. JOB LOCATION: 3070 HWY 66 - ASHLAND, OR 95720 GOLF CLUB - ASHLAND, OR BP 7125 01 10 POLICY NUMBER: BUSINESSOWNERS SP 06 28 01 06 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. OREGON - ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: BUSINESSOWNERS COVERAGE FORM SCHEDULE Name Of Additional Insured Person(s) Or Organization(s): Locations Of Covered Operations: [information required to complete this Schedule, if not shown above, will be shown in the Declarations. The following is added to Paragraph C. Who Is An With respect to the insurance afforded to these Insured in Section II - Liability: additional insureds, the following additional exclu- 3. Any person(s) or organization(s) shown in the sion applies: Schedule is also an additional insured, but only This insurance does not apply to "bodily injury" or with respect to liability for "bodily injury", "property "property damage" occurring after: damage" or "personal and advertising injury" 1. All work, including materials, parts or equip- caused by your ongoing operations for the addi• ment furnished in connection with such work, tional insured(s) at the location(s) designated on the project (other than service, mainten- above and only to the extent that such "bodily in- ance or repairs) to be performed by or on be- jury", "property damage" or "personal and adver- half of the additional insured(s) at the location tising injury" is caused by your negligence or the of the covered operations has been completed; negligence of those performing operations on your or behalf. 2. That portion of "your work" out of which the injury or damage arises has been put to its in- tended use by any person or organization other than another contractor or subcontractor en- gaged in performing operations for a principal as a part of the same project. SP 06 28 01 06 © 180 Properties, Inc., 2005 Page 1 of 1 ❑ POLICY NUMBER: 8 8 3 24412 BUSINESSOWNERS BP 04 97 01 06 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US This endorsement modifies insurance provided under the following: BUSINESSOWNERS COVERAGE FORM SCHEDULE Name Of Person Or Organization: CITY OF ASHLANDr ASHLAND PARKS & RECREATION Information re uired to com ete this Schedule If not shown above will be shown in the Declarations. Paragraph K. Transfer Of Rights Of Recovery Against Others To Us in Section III - Common Policy Conditions is amended by the addition of the following: We waive any right of recovery we may have against the person or organization shown in the Schedule above because of payments we make for injury or damage arising out of your ongoing operations or "your work" done under a contract with that person or organization and included in the "products-completed operations hazard". This waiver applies only to the person or organization shown in the Schedule above. SP 04 97 01 06 0 ISO Properties, Inc., 2004 Page 1 of 1 1 I I I , DIVIDER ,I PAGE Producer No: 67701 SAN: 45615420000000 Pol Eff Dt: 10-23-2015 Office: 99 I' Date Printed: 07-21-2016 ' Time Printed: 13:24:20 ' I i Trans Eff Dt: 12-10-2015 i Insured Name: MINTON CONSTRUCTION LLC Policy No: 9100096151 i Trans Seq No: 004 Trans Type: Certificate Only Oper Init. A96122 Company Abbr: GK 1 Release Version: 16.12 User-Selected Sets Copies Printer CERTIFICATES 01 Don't print i i I i I I ; i II I I I I ( ' i i ; 1 11 I ~ i I I i _ _ 1__i__ _ I r ACC> , V F ATE (MM/ DD/YYYY) CERTIFICATE OF LIABILITY INSURANCE ?2112016 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsements . PRODUCER CONTACT GEICO GEICO NAME One GEICO Boulevard PHONE 1-866„509-9 7TFAX7C Fredericksburg, VA 22412 AtC No Ext : No Email RICOM fM«' Address: ~•~M INSURERS AFFORDING COVERAGE NAIC # INSURER A:GOVERNMEN'I' EMPLOYEES INSURANCE COMPANY 22063 INSURED INSURER B: MINT0N 0ONSTRUCT.10M LLC hoe 'l STEWAR AVE INSURER C: MEDI`'ORD OF 501 T60 INSURER D: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADD'L SUBR POLICY NUMBER POLICY EFF POLICY EXP LIMITS LTR INSRD WVD MM/DD/YY (MM/DD/YY) COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ CLAIMS-MADE ❑ OCCUR DAMAGE TO RENTED $ PREMISES MED. EXP (Any one person) $ PERSONAL & ADV. INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ POLICY -1 PROJECT = LOC PRODUCTS-COMP/OP AGG. $ OTHER $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ - Ea accident ANY AUTO X 1 c -;(,OJ rT6i51. w 0 0 10/23/2016 BODILY INJURY iC,/23/?G15 ~ (Per person $tO,C COL ALL OWNED X SCHEDULED X BODILY INJURY AUTOS AUTOS Per accident $ X00' ,AGO HIRED AUTOS NON-OWNED X PROPERTY DAMAGE AUTOS (Per accident) $ 2), C)00 UMBRELLA LIAB OCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE AGGREGATE $ DED RETENTION $ $ WORKERS' COMPENSATION AND EMPLOYERS' PER OTH- LIABILITY Y/ N STATUTE ER ANY PROPRIETOR/PARTNER/EXECUTIVE ❑ N / A E.L. EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? (Mandatory in NH) E.L. DISEASE EACH EMPLOYEE $ If yes, describe under E.L. DISEASE-POLICY LIMIT $ DESCRIPTION OF OPERATIONS below 1 -7 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule, may be attached a more space is required) CITY O- ASHLAND IS NAMED AS ADDITIONAL INSURED. 2001,: DODGE 1500 1D7HU18Z32S521291 CERTIFICATE HOLDER CANCELLATION CITY OF ASHLAND SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE 3 4 0 S PIONEER ST WITH THE POLICY PROVISIONS. ASHLAND, OR 97520-2729 AUTHORIZED REPRESENTATIVE © 1988-2014 ACORD CORPORATION. All rights reserved. ACORD 25(2014/01) The ACORD name and logo are registered marks of ACORD CERTIFICATE OF LIABILITY INSURANCE FT;E(MM/DD/YYYY) /G1%3li16 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsements . PRODUCER CONTCCT GEICO GEICO NAME: One GEICO Boulevard PHONE 1.866-509-9444 FAX Fredericksburg, VA 22412 C No Ezt: A/C No: Email R1COMMD@(BCO.COM Address: INSURER(S AFFORDING COVERAGE NAIC # INSURER A:GGVERNMEN1' EMPLOYEES INSURANCE CCMPANY 2z063 INSURED INSURER B: MINTON CONSTRUCTi011 LLC 608 W STEWARD' AVE INSURER C: MED-FoRD OR 9%501--3760 INSURER D: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADD'L SUBR POLICY NUMBER POLICY EFF POLICY EXP LIMITS LTR INSRD WVD MM/DD/W MM/DD/YY COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ CLAIMS-MADE F] OCCUR DAM^AGETO RENTEDrence) $ MED. EXP (Any one person) $ PERSONAL & ADV. INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ F POLICY u PROJECT = LOC PRODUCTS-COMP/OP AGG. $ OTHER $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ Ea accident f r BODILY INJURY A ANY AUTO X y.100096:5.1. 00 10/23/2015 0, .'23/ , 201 F.. (Per person $ 1.(,o, C'oo ALL OWNED X SCHEDULED X BODILY INJURY $ 300, 0CQ AUTOS AUTOS Per accident NON-OWNED PROPERTY DAMAGE .,00 HIRED AUTOS AUTOS X (Per accident) $ $ UMBRELLA LIAB OCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE AGGREGATE $ DED RETENTION $ $ WORKERS' COMPENSATION AND EMPLOYERS' PER OTH- LIABILITY Y/ N STATUTE ER ANY PROPRIETOR/PARTNER/EXECUTIVE ❑ N / A E.L. EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? (Mandatory in NH) E.L. DISEASE-EACH EMPLOYEE $ If yes, describe under E.L. DISEASE-P000Y LIMIT $ DESCRIPTION OF OPERATIONS below DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule, may be attached if more space is required) CITY O!, ASITLAND IS NAMED AS ADDITIONAL, INSURED. 2002 DODGE 1500 1D7HU18Z32S521291 CERTIFICATE HOLDER CANCELLATION CITY OF ASHLAND SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE '140 S PIONEER ST WITH THE POLICY PROVISIONS. ASHLAND, OR 9'7520--2729 AUTHORIZED REPRESENTATIVE © 1988-2014 ACORD CORPORATION. All rights reserved. ACORD 25 (2014/ 01) The ACORD name and logo are registered marks of ACORD DATE/Y) A - L> CERTIFICATE OF LIABILITY INSURANCE 7/21/2016 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT GEICO GEICO NAME One GEICO Boulevard PHONE 1-866-509-9444 FAx Fredericksburg, VA 22412 C No Ext: AC No address: R1COMMBD aICO.COM INSURERS AFFORDING COVERAGE NAIC # INSURER A: GOVERNMENT EMPLOYEES INSURANCE C0)M!?ANY 220,:,3 INSURED INSURER B: MIN-TON 11_0NSTR1JC'f70 508 W S'TEWA::AV E INSURER C: MED ORD OR r O1 3'7 v0 INSURER D: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADD'L SUBR POLICY NUMBER POLICY EFF POLICY EXP LIMITS LTR INSRD WVD MM/DD/W MM/DD/YYCOMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ CLAIMS-MADE F-1 OCCUR DAMAGE TO RENTED $ PREMISES MED. EXP (Any one person) $ PERSONAL & ADV. INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ POLICY=] PROJECT = LOC PRODUCTS-COMP/OP AGG. $ OTHER $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ Ea accident ANY AUTO BODILY INJURY X 97 ,00051x1 co ,0/23/2015 11 0/232015 (Per person) $ 1-0 0,coo ALL OWNED X SCHEDULED X BODILY INJURY AUTOS AUTOS Per accident $ 300, 000 HIRED AUTOS NON-OWNED X PROPERTY DAMAGE $ 25, 000 H AUTOS (Per accident) UMBRELLA LIAR H OCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE AGGREGATE $ DED RETENTION $ $ WORKERS' COMPENSATION AND EMPLOYERS' PER OTH- LIABILITY Y/ N STATUTE ER ANY PROPRIETOR/PARTNER/EXECUTIVE ❑ N / A E.L. EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? (Mandatory in NH) E.L. DISEASE EACH EMPLOYEE $ If yes, describe under E.L. DISEASE-POLICY LIMIT $ DESCRIPTION OF OPERATIONS below DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (Allach ACORD 101, Additional Remarks Schedule, may be attached if more space is required) CITY 01- AS-=LAND IS NAMED AS ADDITIONAL INSURED. 2 02 DODGE 1500 1D7HU18Z32S521291 CERTIFICATE HOLDER CANCELLATION CITY OF ASHLAND SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE 340 S PIONEER S'1 WITH THE POLICY PROVISIONS. ASHLAND, OR 97520--2729 AUTHORIZED REPRESENTATIVE © 1988-2014 ACORD CORPORATION. All rights reserved. ACORD 25 (2014/ 01) The ACORD name and logo are registered marks of ACORD CITY OF ASHLAND TAX REGISTRATION (FOR REVENUE PURPOSES ONLY) BUSINESS LOCATION INFORMATION REGISTRATION NO. STREETADDRESS : 608 W STEWART AVE BL-009079 OWNER INFORMATION PHONE: (541) 261-1376 NAME : EDNA MINTON Barbara Christensen CITY RECORDER/TREASURER REGISTRATION EXPIRES JUNE 30. MINTON CONSTRUCTION LLC 608 W STEWART AVE MEDFORD, OR 97501 2017 TO BE POSTED IN A CONSPICUOUS PLACE. CITY OF ASHLAND TAX REGISTRATION (FOR REVENUE PURPOSES ONLY) BUSINESS LOCATION INFORMATION REGISTRATION NO. STREETADDRESS : 608 W STEWART AVE BL-009079 OWNER INFORMATION PHONE: (541) 261-1376 NAME: RICHARD MINTON Barbara Christensen CITY RECORD ERT REASURER REGISTRATION EXPIRES JUNE 30. MINTON CONSTRUCTION LLC 608 W STEWART AVE MEDFORD, OR 97501 2017 TO BE POSTED IN A CONSPICUOUS PLACE. Jason Minica From: Dave Kanner Sent: Wednesday, July 27, 2016 5:04 PM To: Jason Minica Subject: RE: Insurance Okay, I guess we can do this. Dave From: Jason Minica Sent: Wednesday, July 27, 2016 2:54 PM To: Dave Kanner Subject: Insurance Hi Dave, We have come across an issue in regards to insurance limits. Is it possible to get your approval to accept lower insurances from Rick Stevens Painting Company? He has been hired by a General Contractor to do some painting at Oak Knoll Clubhouse for approximately $5,000. At this point he would have to raise his bid in order to increase his insurance from $1,000,000 to $2,000,000, this intern would cause a change in the already approved contract by legal and cause the General Contractor to have to change his bid bond. We are set to start work on this project August 15 and I am not sure we can make all the necessary changes if we have to alter the contract. Rick Stevens has done a lot of quality work for us in the past and has stated that he will have the higher insurances after this job. Thanks, Jason Minica Jason Minica City of Ashland, Ashland Parks & Recreation Planning and Development Manager 541.324-4112; TTY: 800-735-2900 main no: 541.488.5340 fax: 541.488.5314 This email transmission is official business of the City of Ashland, and it is subject to Oregon Public Records Law for disclosure and retention. If you have received this message in error, please contact me at (541) 951-1326. Thank you. 1 DATE (MM/DD/YYYY) ACOR" CERTIFICATE OF LIABILITY INSURANCE 07/13/2016 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Pamela J Breazeale NAME: Hart Insurance Agency - Medford PHONE FAX PO Box 1240 / (541) 779-4232 A/C No E-MAIL ADDRESS: Grants Pass OR 97528 INSURERS AFFORDING COVERAGE NAIC # INSURERA:Hartford Accident & Indemnity 22357 INSURED (541) 772-8287 INSURER B: Rick Stevens Painting Co INSURER C : 107 E Main St #5 INSURER D: Medford OR 97501 INSURER E : INSURER F : COVERAGES CERTIFICATE NUMBER: Cert ID 232 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. POLICY EFF POLICY EXP INSR TYPE OF INSURANCE ADDLSUBR POLICY NUMBER MM/DD/YYYY MM LTR /DD/YYYYLIMITS A COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 11000,000 _7 DAMAGE TO RENTED CLAIMS-MADE OCCUR Y 52SBAZV6624 12/01/2015 12/01/2016 PREMISES Ea occurrence $ 1,000,000 MED EXP (Any one person) $ 10 , 000 PERSONAL & ADV INJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 POLICY F-] PRO ❑ LOC PRODUCTS - COMP/OP AGG $ 2,000,000 JECT OTHER: $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 11000,000 Ea accident A X ANY AUTO 52UECNK6616 12/01/2015 12/01/2016 BODILY INJURY (Per person) $ OWNED SCHEDULED BODILY INJURY (Per accident) $ AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY AUTOS ONLY Per accident UMBRELLA LIAB OCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE AGGREGATE $ DED RETENTION $ $ WORKERS COMPENSATION PER OTH- AND EMPLOYERS' LIABILITY Y / N STATUTE ER E.L. EACH ACCIDENT $ ANYPROPRIETOR/PARTNER/EXECUTIVE ❑ N/A OFFICER/MEMBER EXCLUDED? (Mandatory in NH) E.L. DISEASE - EA EMPLOYEE $ If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT $ $ DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) Certificate Holder is an additional insured per form # SS0008 (04/05) attached CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. Minton Construction LLC 608 W Stewart Ave AUTHORIZED REPRESENTATIVE Medford OR 97501'"'~ !dZfl~{~iz"~~ c© 1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD Page 1 of 1 www.saif.com Oregon Workers' Compensation -4. 0, PA, samif Certificate of Insurance 'corporation Certificate holder: CITY OF ASHLAND ASHLAND PARKS & RECREATION 340 S PIONEER ST ASHLAND, OR 97520 The policy of insurance listed below has been issued to the insured named below for the policy period indicated. The insurance afforded by this policy is subject to all the terms, exclusions and conditions of such policy; this policy is subject to change or cancellation at any time. Insured Producer/contact Rick Stevens Painting Co SAIF Corporation 107 E Main St Ste 5 Sharon A Joy Medford, OR 97501-6022 541.857.4209 shajoy@saif.com Issued 07/15/2016 Limits of liability Policy 499826 Bodily Injury by Accident $500,000 each accident Period 10/01/2015 to 10/01/2016 Bodily Injury by Disease $500,000 each employee Body Injury by Disease $500,000 policy limit Description of operations/locations/special items Painting Important This certificate is issued as a matter of information only and confers no rights to the certificate holder. This certificate does not amend, extend or alter the coverage afforded by the policies above. This certificate does not constitute a contract between the issuing insurer, authorized representative or producer and the certificate holder. Authorized representative ) 6~~ E~$~ Kerry Barnett President and CEO 400 High Street SE Salem, OR 97312 P: 800.285.8525 F: 503.584.9812 Policy_OLCA_CertificateOfInsurance Client#: 172363 HOAGROOFI ACORD CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DDIYYYY) 7/08/2016 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED, the policy(les) must be endorsed. If SUBROGATION IS WAIVED, subject to the terns and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER E: Linda Shaddon Propel Insurance P No ;541484-7728 AIC Ne ; 866 577-1326 DMDAIL S. Medford Commercial Insurance E- linda.shaddon@propelinsurance.com (FAX P O BOX 936 INSURER(S) AFFORDING COVERAGE NAIL o Medford, OR 87501 INSURER A : United Specialty Insurance Comp 12537 INSURED INSURER B : Burlington Insurance Company 23620 David a Cook, Inc. INSURER C : Cincinnati Insurance Company 10677 dba Hoag Roofing INSURER D, P O Box 756 INSURER E• Medford, OR 97501-0055 INSURER F COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. LTR TYPE OF INSURANCE D Umuk B POLICY NUMBER M~CY EFF MMMO EXP LIMITS A GENERAL LIABILITY BV01683650 5/0112016 051011201 EACH OCCURRENCE $1,000,000 X COMMERCIAL GENERAL LIABILITY WERE $100,000 CLAIMS-MADE a OCCUR MED EXP (Any one person sExcluded - 7 X 5,000 ded. per occ. PERSONAL a ADV INJURY $1,000,000 GENERAL AGGREGATE s2,000,000 GEM AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG 62,000,000 POLICY X PRO. LOC $ JECT CINED SINGLE LIMIT cklerd) 1,000,000 C AUTOMOBILE LIABILITY EBA0248294 510112016 05/01/201 Ea X ANY AUTO BODILY INJURY (Per person) $ ALL AUTOOV+MSEO AUTOSULED BODILY INJURY (Per accident) S NON-OWNED PROPERTY DAMAGE HIRED AUTOS AUTOS Per accidents $ B UMBRELLA LIAB X OCCUR HFF0003616 06M512016 05/011201 EACH OCCURRENCE s2,000,000 X EXCESS LIAB CLAIMS-MADE AGGREGATE s2,000,000 DED RETENTION $ Incl Em Uab $ WORKERS COMPENSATION WC STATU- OTH- AND EMPLOYERS UABWTY YIN TORY LIMITS FR ANY FIF PROPREMI BEAR EXAC NER/ ECUT~F NIA E.L. EACH ACCIDENT $ (Mandatory In NH) E.L. DISEASE - EA EMPLOYEE $ DESCRI~PTIOibeN Ounder F OPERATIONS below E.L. DISEASE - POLICY LIMIT $ DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks S&Adale, !t more space is required) Re: Oak Knoll Club House, 3070 Hwy 66, Ashland OR 975201 Minton Construction and City of Ashland, and its agents, officers & employees are Additional Insured but only with respect to Contractor's services to be provided under this contract CERTIFICATE HOLDER CANCELLATION Minton Construction SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN 608 w Stewart Ave ACCORDANCE WITH THE POLICY PROVISIONS. Medford, OR 97501 AUTHORIZED REPRESENTATIVE 01988-2010 ACORD CORPORATION. All rights reserved. ACORD 25 (2010105) 1 of 1 The ACORD name and logo are registered marks of ACORD #S2291992/M2283984 DMB00 Client: 172439 DAVIW4 A'CORDw CERTIFICATE OF LIABILITY INSURANCE DATE (MMIDD/YYYY) 7108/2016 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED, the policy(les) must be endorsed. N SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER RRJTE;cT Therese Pritchett Propel Insurance PI No -10. ;541 245-1111 866 577-1326 AIC Medford Workers Compensation E-MAIL P O Box 936 ADDRESS. therese.pritchett@propelinsurance.com INSURER(S) AFFORDING COVERAGE NAIL fl Medford, OR 97501 INSURER A : SAIF Corporation 36196 INSURED INSURER B : David W. Cook, Inc. INSURER C Hoag Roofing INSURER D P O Box 756 Medford, OR 97501 INSURER E- • INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. L, RR TYPE OF INSURANCE INSR MW- UB POLICY NUMBER MWD EFF MMPOLICY EXP IIDDIYYYYY LIMITS GENERAL LIABILITY EACH OCCURRENCE $ COMMERCIAL GENERAL LIABILITY PREM E a *mnce) $ CLAIMS-MADE FIOCCUR MED EXP (An am person) S PERSONAL 8 ADV INJURY $ GENERAL AGGREGATE $ GEWL AGGREGATE LIMIT APPLIES PER. PRODUCTS - COMPIOP AGG $ 7 POLICY PRO- LOC $ AUTOMOBILE LIABILITY OMBINED SINGLE LIMIT ANY AUTO BODILY INJURY (Per person) $ ALL OWNED SCHEDULED BODILY INJURY (Per accident) $ AUTOS AUTOS HIRED AUTOS NON-OWNED PROPERTY DAMAGE $ AUTOS Per accdent $ UMBRELLA LIAS OCCUR EACH OCCURRENCE $ EXCESS LIAR CLAIMS-MADE AGGREGATE $ DED RETENTION S $ WORKERS COMPENSATION WC STATU- OTH- A 792429 110112016 0110112017 YIN TORY LIMITS FR AND EMPLOYERS' LIABILITY ANYPROPRIETORIPARTNERIEXECUTTVE E.L. EACH $SOO O0O OFFICERIMEMBER EXCLUDED? FN-] NIA ACCIDENT (Myyaeenssdatory In NH) E.L. DISEASE - EA EMPLOYEE $500,000 under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT s600,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Attach ACORD 101. Additional Remarks Schedule, If more spaee is required) CERTIFICATE HOLDER CANCELLATION Minton Construction SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN 608 W Stewart Ave ACCORDANCE WITH THE POLICY PROVISIONS. Medford, OR 97501 AUTHORIZED REPRESENTATIVE 01988-2010 ACORD CORPORATION. All rights reserved. ACORD 25 (2010105) 1 of 1 The ACORD name and logo are registered marks of ACORD #S2291995/M2285343 DMB00 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED BY CONTRACT This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM GARAGE COVERAGE FORM This endorsement changes the policy effective on the inception date of the policy unless another date is indi- cated below. Endorsement Effective: Policy Number: 05-01-2016 ERA 024 82 94 Named Insured: DAVID W COOK INC DBA HOAG ROOFING Countersigned by: (Authorized Representative) With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement SECTION 11 - LIABILITY COVERAGE, A. Cover- age, L Who is an Insured is amended to include as an insured any person or organization with which you have agreed in a valid written contract to provide insurance as Is afforded by this policy. This provision is limited to the scope of the valid written contract. This provision does not apply unless the valid written contract has been executed prior to the "bodily injury" or "property damage". AA 4171 1105 C BV01683650 David W. Cook. Inc. POLICY NUMBER: COMMERCIAL GENERAL LIABILITY CG 20 26 07 04 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - DESIGNATED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Persons Or Organization(s) Where required by written contract Information required to complete this Schedule if not shown above will be shown in the Declarations. Section Il - Who Is An Insured is amended to in- clude as an additional insured the person(s) or organi- zation(s) shown in the Schedule, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by your acts or omissions or the acts or omis- sions of those acting on your behalf: A. In the performance of your ongoing operations; or B. In connection with your premises owned by or rented to you. CG 20 26 07 04 0 ISO Properties, Inc., 2004 Page 1 of 1 0 j STATE OF OREGON CONSTRUCTION CONTRACTORS BOARD { LICENSE CERTIFICATE LICENSE NUMBER: 172649 This document certifies that: DAVID W COOK INC PO BOX 756 MEDFORD OR 97501 is licensed in accordance with Oregon Law as a Residential General Contractor and a Commercial General Contractor Level 2. Business Names: License Details: HOAG ROOFING EXPIRATION DATE: 11/06/2016 ENTITY TYPE: Corporation INDEP. CONT. STATUS: NONEXEMPT RESIDENTIAL BOND: $20,000 COMMERCIAL BOND: $20,000 INSURANCE: $1,000,0001$2,000 000 RMI: WILLIAM H HOAG - HOME INSPECTOR CERTIFIED: NO CITY OF ASHLAND WORKERS' COMPENSATION INSURANCE CERTIFICATION [CONTRACTOR MUST INITIAL APPLICABLE BLANK BELOW] CERTIFICATION OF COVERAGE: Contractor will maintain Workers' Compensation insurance coverage for the term of the contract and will provide Certificate of Workers' Compensation Insurance before Project Beginning Date. CERTIFICATION OF EXEMPTION FROM COVERAGE: Contractor is exempt from the requirement to obtain workers compensation insurance under ORS Chapter 656 for the following reason (initial the appropriate box). SOLE PROPRIETOR • Contractor is a sole proprietor, and • Contractor has no employees, and • Contractor will not hire employees or subcontractors to perform this contract. CORPORATION - FOR PROFIT • Contractor's business is incorporated; and • All employees of the corporation are officers and directors and have a substantial ownership interest* in the corporation, and • All work will beperformed by the officers and directors; Contractor will not hire other employees or subcontractors to perform this contract. CORPORATION - NONPROFIT • Contractor's business is incorporated as a nonprofit corporation, and • Contractor has no employees; all work is performed by volunteers, and • Contractor will not hire employees or subcontractors to perform this contract. PARTNERSHIP • Contractor is a partnership, and • Contractor has no employees, and • All work will be performed by the partners; Co cmrs- tfnrm this rnntra and • Go -ntrt- -in - i Wpxaue.me n t -m ovi-ng--o -dmet iron- of i " LIMITED LIABILITY COMPANY Contractor is a limited liability company, and • Contractor has no employees, and • All work will be performed by the members; Contractor will not hire employees or subcontractors to perform this contract, and • If Contractor has more than one member, Contractor is not engaged in work performed in direct connection with the construction, alteration, repair, improvement, moving or demolition of an improv ent to real property or, appurtenances thereto. (Signature of Authoriz"ediSigner). ` (Date) (Signer'sTitle) end Asst. City A omey C 0 e--- D at *NOTE: Under OAR 436-50-050 a shareholder has a "substantial ownership" interest if the shareholder owns 10% of the corporation, or if less than 10% is owned, the shareholder has ownership that is at least equal to or greater than the average percentage of ownership of all shareholders. **NOTE: Under certain circumstances partnerships and limited liability companies can claim an exemption even when performing construction work. The requirements for this exemption are complicated. Consult with City Attorney's Office before an exemption request is accepted from a contractor who will perform construction work. { 1 www.saif.com I-O.WA samif Oregon Workers' Compensation Certificate of Insurance 0,000corporation Certificate holder: CITY OF ASHLAND ASHLAND PARKS & RECREATION 340 S PIONEER ST ASHLAND, OR 97520 The policy of insurance listed below has been issued to the insured named below for the policy period indicated. The insurance afforded by this policy is subject to all the terms, exclusions and conditions of such policy; this policy is subject to change or cancellation at any time. Insured Producer/contact Rick Stevens Painting Co SAIF Corporation 107 E Main St Ste 5 Sharon A Joy Medford, OR 97501-6022 541.857.4209 shajoy@saif.com Issued 07/15/2016 Limits of liability Policy 499826 Bodily Injury by Accident $500,000 each accident Period 10/01/2015 to 10/01/2016 Bodily Injury by Disease $500,000 each employee Body Injury by Disease $500,000 policy limit Description of operations/locations/special items Painting Important This certificate is issued as a matter of information only and confers no rights to the certificate holder. This certificate does not amend, extend or alter the coverage afforded by the policies above. This certificate does not constitute a contract between the issuing insurer, authorized representative or producer and the certificate holder. Authorized representative Kerry Barnett President and CEO 400 High Street SE Salem, OR 97312 P: 800.285.8525 F: 503.584.9812 Policy_OLCA_Certificate0fl n su ra nce Client#: 172439 DAVIW4 ACORDTM CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD/YYYY) 8/11/2016 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Therese Pritchett Propel Insurance PHONE 541 245 -1111 FAX A/C No Ext : A/c No): 866 577-1326 Medford Workers Compensation ar DRIESS: therese.pritchett@propelinsurance.com P O Box 936 INSURER(S) AFFORDING COVERAGE NAIC # Medford, OR 97501 INSURER A: SAIF Corporation 36196 INSURED INSURER B : David W. Cook, Inc. INSURER C Hoag Roofing INSURER D P O Box 756 Medford, OR 97501 INSURER E : INSURER F COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. l TRR TYPE OF INSURANCE NADDLSUBR SR WVD POLICY NUMBER MM/DDY/YYEFF YY MM/LDDYYYYY LIMITS GENERAL LIABILITY EACH OCCURRENCE $ COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED PREMISES Ea occurrence $ CLAIMS-MADE 1-1 OCCUR MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GENERAL AGGREGATE $ GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ RO LOC $ POLICY P JECT AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT Ea accident ANY AUTO BODILY INJURY (Per person) $ ALL OWNED SCHEDULED BODILY INJURY Per accident) $ AUTOS AUTOS ( ) NON-OWNED PROPERTY DAMAGE HIRED AUTOS AUTOS Per accident $ UMBRELLA LIAB HOCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE AGGREGATE $ DED RETENTION $ $ A WORKERS COMPENSATION 792429 1/01/2016 01/01/201 WCSTATU- OTH- AND EMPLOYERS' LIABILITY ANY PROPRIETOR/PARTNER/EXECUTIVE Y / N E.L. EACH ACCIDENT $500,000 OFFICER/MEMBER EXCLUDED? ❑ NIA (Mandatory in NH) E.L. DISEASE - EA EMPLOYEE $500,000 If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT $500,000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if more space is required) Re: Oak Knoll Club House 3070 Highway 66 Ashland, OR 97520 CERTIFICATE HOLDER CANCELLATION City of Ashland SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN 20 E Main St ACCORDANCE WITH THE POLICY PROVISIONS. Ashland, OR 97520 AUTHORIZED REPRESENTATIVE ©1988-2010 ACORD CORPORATION. All rights reserved. ACORD 25 (2010/05) 1 of 1 The ACORD name and logo are registered marks of ACORD #S2333271 /M2285343 LAH00 Y i CITY OF ASHLAND TAX REGISTRATION (FOR REVENUE PURPOSES ONLY) BUSINESS LOCATION INFORMATION REGISTRATION NO. STREETADDRESS. 842 ENTERPRISE DR BL-005979 OWNER INFORMATION PHOr,E : (541) 779-7743 NAME : DAVID W COOK Barbara Christensen CITY RECORDER/TREASURER REGISTRATION EXPIRES JUNE 30. HOAG ROOFING PO BOX 756 MEDFORD, OR 97501 2017 TO BE POSTED IN A CONSPICUOUS PLACE. a R Oak Knoll Club House Renovation Contractor Bid Minton Construction $ 84,300.00 Vitus Construction $ 96,700.00 Pearson Built Construction $157,808.00 Adroit Construction Declined Taylor Built Construction Declined FY 2016-17 Budget Amount Budgeted $ 7700.00 Contigency $ 1300.00 Total $ 909000.00 Total Budget $ 90,000.00 Accepted Bid $ 84,300.00 Available Contigency $ 59700.00 A a C~ O O O O C cd ~ a va d v W N O V Y O Q E L 7 a W O v a~ G 0 Z an .o O C c, 0 ~ a V ~ z 49 2 ° . O H cn t!) IW p o cG J Z d N u V r.+ 0= Q V° R °c 0 o o ell 064 V) o o C~3 " c M o-~QC~3 E a> ,x ai cd 00 V p ~ o ~ V o a~ . ~ b 1 U d Lr. N b0 c~ y U O N 0 a. O r t -r Ia. u E 'c) v O U o _ LZ N y N V N V j, V V o S G.CL1v~0.~UUG. U d H Cz. UC7L1a0~A,W~WF-v~~~ 6T4 N b O O C O O O O O O O O O C O O O O O O O O ~ ~ b~3 6/-} O O O O O O N l O O O O O O O O ~ ~ O O O N Coq G CV, U U N G c~ U ~ C ~ G G c~ cd X t'" _ fl U O cn CC 'C~3 U U U _ U `D ~ U~ N O s. U ~C O¢ cd C C vUi cad G N o0 L. U I- GC u O ~ ~ O O a r. O N p by p s, bJ1 C O U ~ 5 U U O CA CA Ln cd O cd N p U L 'C7 O C 7 .O s. G s: X x U O C a cn Lni N O 4O cv L" O Q O U n V V1 aS z 00 O c} U 4.. a . bq bf~ s v cd N Z7 'C3 p 'C3 O M N N M O X U U L=" V cd p N N u C7 :3 G cd O ^L n U -fl C , - N oO . U .fl V5 C. fl u a O ~ O U ~ p U Z U Q O R p N O a N O fl O °~~c¢'U~ M ~ ~r, ~o r oo r• 0 0 0 0 0 0 o ao C) o 0 0 0 0 0 0 0 0 0 0 0 0 00 0 o c o 0 0 00 0 o c c o 0 000 0 0 0 0 0 0 00 f6o~ 4~o~ ~oq 0 c 7o ~ O C U G U 71 U L ~ `n Q.. ~ U 73 u v O 73 r_ CA 03 cl c~ U s. O O v' > ~0 ~U U zvs N~ O N O a _ C O U¢ O C3 U x. 73 E U n O cd ' O L U a~ bq O O 4. r- d- O Yn ccz N U by U f1 p L O O 3 c7 .O ' 00 U O p y iE cd U O Q 3 U O O ^UJ cz 15- O U = 4` _O ^O CL ~ ~ p N bLil c~ O ~ U C s. ~ N • sU. O w . N U G O CL bJJ fs O cd O O U G p1J O i p O G O~ N p ! • • C ~n .U U •Q O O cz LbD. c~C E" CZ CZ C13 t+.; p p CCU p C O aJ ¢ ct V c -C :E 0 G b!l !r, Q ~bJj UCZ V r b!) 'O C E r0+ r C _ O vOi cz " O O O O O Ln ! C/~ 41 7 x C/a 4:. ~ Y u Cj CC G C% O L c~Qv~.~cGC7C'7 cxUU c.xSwaxT~ww W3c~a~.T 3 via C7 ~c 00 00 Jason Minica From: Kyle Taylor <kyle@tayloredelements.com> Sent: Monday, May 16, 2016 10:46 PM To: Jason Minica Subject: Re: Oak Knoll Hey Jason I wanted to touch base about the Oak Knoll job. I really don't think this is something that we have the time to make an appropriate bid on this. And to be perfectly honest I don't think after looking at the schedule for the end of summer I don't think we could Pull off an August timeframe. I really do appreciate the opportunity, and I hope I'm not leaving you in a bind. I would like the opportunity to look at some future work, I just want to he honest about our reality and schedule. I'd be very interested to know what that job bids out for. If it's not too much to ask would you let me know what the bids come in at? Thanks again, and we will talk soon. Kyle Taylor P: 541.621.8095 Kvle@tayloredelements.com Sent from my Whone On May 2, 2016, at 10:43 AM, Kyle Taylor <kyle a@tayloredelements.com> wrote: Thank Jason, III take a peek! I look forward to seeing you on Thursday at Sam <image001.jpg> KYLE TAYLOR MANAGING PARTNER OFFICE: 541.690.1617 MOBILE: 541.521.8095 AX: 541.608.0468 KYLE Q)TAYLOREDELEMENTS.COM WWW.TAYI-OREDELEMENT .C©M New Construction 6 Remodels / Finish Carpentry l Project gmt 1 Energy Efficiency From: Jason Minica [mailto:jason.minica ashland.or.us] Sent: Monday, May 02, 2016 9:23 AM To: kyle(-Otayloredelements.com Subject: Oak Knoll 4 Here is the Invitation to Bid Jason Minica City of Ashland, Ashland Parks & Recreation Planning and Development Manager 541.324-4112; TTY: 800-735-2900 main no: 541.488.5340 fax: 541.488.5314 This email transmission is official business of the City of Ashland, and it is subject to Oregon Public Records Law for disclosure and retention. If you have received this message in error, please contact me at (541) 951-1326. Thank you. 2 m ft- /CONSTRUCTION a INC. May 31, 2016 Jason Minica Park Technician City of Ashland 1930 Crestview Drive Ashland, OR 97520 Subject: Construction Quote Oak Knoll Clubhouse Roof Framing Repair Located in Ashland, OR Dear Mr. Minica: Vitus Construction, Inc. appreciates the opportunity to provide a construction quote for the demolition and repair of the Oak Knoll Clubhouse roof framing, located at Oak Knoll Golf Course in Ashland. The quote is based the engineering drawings (S2.1, S3.11 S3.2, S3.3 & S4.1), "Invitation to Bid", dated 4/28/16 provided by the city. It is our understanding existing framing has extensive roof framing / beam decay 49 feet of the north side; all of the west and 30 feet of the south side have exposed sawn rafters and eave glue lam beams. The exposed lumber has extensive rotting. They aren't near collapse, but they need to be replaced. The engineering plans details the removal and replaces the decayed framing and also adds 4x6 rafters with skylights, roof plywood, match comp roofing, flashing, gutters, etc. Additionally two new concrete columns and footings to match the existing ones will be installed. Our quotation includes; the material, equipment, labor and supervision necessary to complete the construction plans dated, 3/16/16. Additionally Vitus Construction Inc. assumes that the owner will provide permits, special testing, construction access and storage. If you have any questions or comments please contact me to discuss. Complete for the sum of $ 92,700.00 (ninety two thousand seven hundred and oo/1oo dollars) Respectfully Submitted, Corey E. Vitus President RO. Box 109! Gold I fill, OR 97525 llhcw--; 541Ar> 5.7177 • S'ttx: 511.£355.7520 0 l'-twill- care;y r)vittiscolistrttctlati.erotrt GC 131163613. Purchase Order 9 0 :f Fiscal Year 2017 Page: 1 of: 1 1 'P~,S EP'~yo R E GR o`' - - B Ashland Parks Commission - - L ATTN: Accounts Payable Purchase O L 20 E. Main Order # Ashland, OR 97520 T O V MINTON CONSTRUCTION LLC H CIO Oak Knoll Golf Course E 608 W STEWART AVENUE I 3070 Hwy 66 N P Ashland, OR 97520 D MEDFORD, OR 97501 Phone: 541/488-6098 O T Fax: 541/488-6099 R O M _ _en_dQrPn-on~ )umr SfendQr Fad u~7 = ' UrSi =V - - - - - 541 261-1376 Jason inica 08/10/2016 1714 FOB ASHLAND OR Parks Accounts Pa able -(tam - - - Oak Knoll Clubhouse Renovation The Above Purchase Order Number Must Appear On All Correspondence - Packing Sheets And Bills Of Lading 1 Renovate Oak Knoll Clubhouse 1.0 $84,300.00 $84,300.00 COA Public Improvement Contract Beginning date: 06/20/2016 Completion date: 11/15/2016 GL Account: $84,300.00 GL SUMMARY 123000 704200 $84,300.00 By: _~.Date: Authorized Signature T - - - _ _ $84,300.001 FOR M # CITY OF a ASHLAND a REQUISITION Date of request: Required date for delivery: Vendor Name Address, City, State, Zip t:t Contact Name & Telephone Number t Fax Number SOURCING METHOD ❑ Exempt from Competitive Bidding ❑ Emergency ❑ Reason for exemption: ❑ Invitation to Bid (Copies on file) ❑ Form #13, Written findings and Authorization ❑ AMC 2.50 Date approved by Council: ❑ Written quote or proposal attached ❑ Written quote or proposal attached _(Attach co of council communication _ If council approval required, attach co of CC ❑ Small Procurement Cooperative Procurement Less than $5,000 ❑ Request for Proposal (Copies on file) ❑ State of Oregon ❑ Direct Award Date approved by Council: Contract # ❑ Verbal/Written quote(s) or proposal(s) -(Attach copy of council communication) ❑ State of Washington Intermediate Procurement ❑ Sole Source Contract # GOODS & SERVICES ❑ Applicable Form (#5,6, 7 or 8) ❑ Other government agency contract $5,000 to $100,000 ❑ Written quote or proposal attached Agency 10' (3) Written quotes and solicitation attached ❑ Form #4, Personal Services $5K to $75K Contract # PERSONAL SERVICES ❑ Special Procurement Intergovernmental Agreement $5,000 to $75,000 ❑ Form #9, Request for Approval ❑ Agency ❑ Less than $35,000, by direct appointment ❑ Written quote or proposal attached Date original contract approved by Council: ❑ (3) Written proposals/written solicitation Date approved by Council: (Date) ❑ Form #4, Personal Services $5K to $75K Valid until: Date - (Attach copy of council communication) Description of SERVICES Total Cost f 300 Item # Quantity Unit Description of MATERIALS Unit Price Total Cost TOTAL COST Per attached quotelproposal v $ Project Number- b?q Account Number - - - Account Number _ *Expenditure must be charged to the appropriate account numbers for the financials to accurately reflect the actual expenditures. IT Director in collaboration with department to approve all hardware and software purchases: IT Director Date Support -Yes / No By signing this requi ' on form, 1 ce fy that the City's public contracting requirements have been satisfied. aEmploye Department Head: lkk~ (Equal to or greater than $5,000) DepartmentaManager/Supervisor: City Administrator: (Equal to or greater than $25,000) Funds appropriated for current fiscal year: YES / NO - Finance Director- (Equal to or greater than $5,000) Date comments: Form #3 - Requisition