HomeMy WebLinkAbout2453 Moratorium on approval of Planning Apps in geologic floodplains
ORDINANCE NO.
AN ORDINANCE OF THE CITY OF ASHLAND DECLARING A
MORATORIUM ON APPROVAL OF PLANNING APPLICATIONS
AND BUILDING PERMITS IN THE GEOLOGIC FLOODPLAINS
OF ASHLAND AND BEAR CREEK, AND DECLARING AN
EMERGENCY
I
WHEREAS, The city has identified that flooding in the floodplains of
Ashland and Bear Creek constitute an insufficiently documented
hazard, and
WHEREAS, the Council has adopted findings which identify a compelling
public need to limit new construction in the geologic floodplain
of Ashland and Bear Creek,
NOW THEREFORE THE PEOPLE OF THE CITY OF ASHLAND DO ORDAIN AS FOLLOWS:
Section 1 Title. This ordinance shall be known as the Floodplain
Moratorium Ordinance and may be so cited and pleaded.
Section 2 Purpose and Intent. The purpose and intent of this
ordinance is to prevent construction in the areas of the city that
are subject to periodic flooding, and to provide for a time period
whereby the city may develop permanent measures to limit
development or eliminate flood problems in areas subject to
periodic flooding, thereby protecting the public health, safety,
and general welfare.
Section 3 Scope. This ordinance shall be in effect in those
areas identified in the map adopted as Exhibit "A", attached to
this ordinance and by this reference herein incorporated. This
ordinance shall control the issuance of all building permits and
zoning permits within the area defined in exhibit "A". When this
ordinance is found to conflict with any other applicable
ordinances and laws, the stricter of the two shall apply.
Section 4 Building Permits. No building permits may be issued
for construction of habitable structures within the area defined
in Section 3 of this ordinance, unless they have received a
Physical and Environmental Constraints permit issued in accordance
with section 18.62.040 of the Ashland Municipal Code prior to the
effective date of this ordinance.
Section 5 Planning Actions. No applications for Planning Actions
which would permit habitable structures within the areas defined
in Section 3 of this ordinance may be processed during the time
this ordinance is in effect.
Section 6 Construction in Public Rights of Way Exempted. Any
construction performed by a public agency on the public right-of-
way is exempt from the requirements of this ordinance.
Section 7 Exemptions Exemptions to the provisions of this
ordinance may be granted by the Council when, after proper notice
and a public hearing, they find that there are no adverse impacts
to the granting of a permit for construction of a habitable
structure.
Section 8 Duration This ordinance shall be in effect for 120
days from effective date of the ordinance.
Section 9 Emergency Clause There being an immediate danger to
the public peace, health, safety, and general welfare, an
emergency is hereby declared to exist , and this ordinance shall
take effect immediately upon passage by the City Council and
approval by the Mayor.
The foregoing ordinance was first read on the 7th day of June,
1988, and duly PASSED AND ADOPTED this day of 1988
Nan E. Franklin
City Recorder
SIGNED and APPROVED this day of , 1988
C ~
L. Gordon Medaris
Mayor
J
t
1 1 ~s
c
II ,ice ! 1~
lo-
l ~ l1
1
f/
Ashland & Bear Creek
Floodplain Study
~,i mdMt'~ I
WIM"