HomeMy WebLinkAbout2015-05-07_Tree_MIN
TREE COMMISSION
Minutes May 7, 2015
–Chair Gregg Trunnell called the meeting of the Ashland Tree Commission to order at 6:00
CALL TO ORDER
p.m. on May 7, 2015 in the Siskiyou Room of the Community Development and Engineering Services Building
locatedat 51 Winburn Way, Ashland, Oregon.
Commissioners Council Liaison
Ken Schmidt Carol Voisin, absent
Gregg Trunnell Staff
Russ Neff Derek Severson, Associate Planner
Casey RolandCarolyn Schwendener, Admin
Christopher John Pete Baughman, Parks Liaison
Zechariah Heck, Assistant Planner
APPROVAL OF MINUTES
Neff/Schmidt m/s to approve the minutes of the April 9, 2015 Tree Commission meeting. Voice Vote: All Ayes, minutes were
approved as presented.
PUBLIC FORUM
No one present spoke.
TYPE 1 REVIEWS
PA-2015-00510
PLANNING ACTION:
843-855 Liberty St
SUBJECT PROPERTY:
James Juarez (855 Liberty Street)
OWNERS/APPLICANTS:
Charlie Hamilton/Suncrest Homes (843 Liberty Street)
A request for a Physical and Environmental Constraints Review Permit to allow for the construction of a fire
DESCRIPTION:
apparatus access turn-around on hillside lands to serve the properties at 843 and 855 Liberty Street. The request also
includes a request to remove one tree, a 19-inch diameter at breast height Pine Tree.
Rural Residential & Woodland Residential; RR-.5-P & WR;
COMPREHENSIVE PLAN DESIGNATION:ZONING:
39 1E 16AC; 201 & 202
ASSESSORS MAP:TAX LOTS:
All of theCommissioners did a site visit, and Roland noted that he had previously climbed this tree and others on John
Baxter’s property.
gave a staff report. He explained that this application is for a Physical and
Associate City PlannerDerek Severson
Environmental Constraints Review Permit (P & E) to construct a fire truck apparatus turn-around within an area that exceeds
25% grade and is on the City of Ashland‘s adopted Hillside Lands Overlay Map. Included in the hillside development permit is
also arequest to remove one 19” diameter Pine Tree located in the area of the turnaround. The proposed location for the
turnaround is necessary in order to serve the two lots and minimize the disturbance in the area.
was present to represent the applicants. Mr. Knox called attention to the fact that
Mark Knox, Urban Development Services
the fire department required a fire truck turnaround for these two properties before they could begin development. Due to the
dimensional requirements of the turn-around,the necessary retaining walls and the physical constraints of the area
surroundings, the Pine Tree will need to be removed as it sits at the edge of a cut bank with some exposed roots and is
directly within the cut area.
Mr. Knox said there had been some discussion regarding an easement with the neighborsat 831 Liberty. If the neighbors
granted an easement there is a possibility of adjusting the turn-around area which might allow the tree to be saved. It was
suggested that an arborist look at the tree and the exposed roots to confirm whether it could be saved or not and if the tree
roots could be avoided during construction.
spoke. Mr. Baxter expressed their concern over the removal of the
John Baxter and Kelly Weisheipl 831 Liberty Street
Pine tree. He conveyed that the area has had a beetle infestationin combination with drought killing some of the trees but this
particular Pine Tree appears to be healthy. If at all possible they would like to see it saved.Mr. Baxter pointed out that he and
Ms.Weisheiple recently met with the applicant, Mr. Hamilton,to discuss the possibility of an easement on their property. An
easement might allow adjustingthe configuration of the turn-around possiblythen saving thetree. Mr. Hamilton assured them
he is open to the possibility of an easement and reconfiguration of the turn-around but would like to have a decision made this
evening regarding the tree removal in order to move forward with the project n the event the easement does not work out.
Roland/Neffm/s to approve the plan as is with the caveat that somebody goes back out to review theplan for any adjustments
that could be made with an easement so that the tree can be saved. If its determined that the tree is to be removed the
Commission recommends mitigation on the site. Voice Vote: All Ayes, motion passed
PA-2015-00576
PLANNING ACTION:
913 Pinecrest Terrace
SUBJECT PROPERTY:
Suncrest Homes
APPLICANT:
A request for a Physical & Environmental Constraints Review Permit to construct a new single family
DESCRIPTION:
residence and associated site improvements on Hillside Lands for the property located at 913 Pinecrest Terrace. The proposal
includes the removal of 35 oak, Madrone and pine trees located within the building envelope or within the area to be
excavated for the construction of the driveway, patio and landscaped areas.
Single-Family Residential; R-1-10; 39 1E 15BC;
COMPREHENSIVE PLAN DESIGNATION:ZONING:ASSESSORS MAP #:
2700
TAX LOT:
All the Commissioners did a site visit. The Commissioners expressed their confusion over which trees were being removed
because a great deal of the trees were marked though the application just stated the removal of 35 trees.
Severson gave a staff report explaining this planning action is a Physical & Environmental Constraints Review Permit as the
applicants are requesting to construct a new residence on Hillside Lands.
was present to answer questions. Mr. Hamilton confirmed there would be a treeprotection plan
Applicant Charlie Hamilton
doneand tree verification before any of them will be removed, and that only 19 trees were proposed for removal but that some
clustered trees were identified based on their multiple trunks in the inventory. Mr. Hamilton explained this property is .8 of an
acre. Originally the owners of the property were interested in splitting the lot but then realized the creation of the required road
would take out a great deal of trees. The applicants then made the decision to not divide the lot and put the house close to
the street in order to preserve as many trees as possible. The Commissioners acknowledged their appreciation that the
owners made a great effort to save trees. Roland noted that Tree #90 was a great specimen and that its removal was
unfortuneate; it was noted that this was considered a significant tree based on its diameter and would be mitigated.
Schmidt/John m/s to approve the tree removal as presented with mitigationof the one large tree(#90). Voice Vote: All ayes,
motion passed.
2015-00194 & -00195
PLANNING ACTIONS:
545-550 Holly Street
SUBJECT PROPERTIES:
Jennifer Davis (545 Holly Street)
APPLICANT:
Chad Brown & Trisha Vaughn (550 Holly Street)
A request for a Hazard Tree Removal Permit to remove five trees from the property located at 545 Holly St,
DESCRIPTION:
including three cottonwoods and two elms, and a request for a Hazard Tree Removal Permit to remove one approximately 18-
2
inch diameter breast height Cottonwood for the property located at 550 Holly Street.
Multi-Family Residential; R-2;39 1E 09DB;
COMPREHENSIVE PLAN DESIGNATION:ZONING: ASSESSORS MAP #: TAX
8900 & 90002.
LOT:
All the Commissioners did a site visit, and Roland noted that he had previously done work on these properties.
Severson gave a staff report. He explained that this is a request for a Hazard Tree Removal for five trees locatedat 545 Holly
and one 18“diametercottonwood located at 550Holly. The applicant has concerns that the drainage has destabilized the root
systems. Other trees in the neighborhood have recently fallen. The neighbors across the street have expressed concern that
the trees might fall and damage their homes. Consequently they are encouraging theremoval of the trees.
550 Holly Street was present to answer questions.
Applicant Trisha Vaughn
The Commissioners agreed that these trees are a hazard and could fall at any time. The applicant isn’t sure at this time what
to plant. The Commissioners were concerned that when the trees are removed erosion problems might begin. They
suggested putting trees back in order to hold the bank in. The agreed not to require one for one mitigation, but recommended
that appropriate riparian vegetation be planted following tree removal to help stabilize the bank on the subject properties.
Commissioners noted that a mitigation plan to address bank stability should be provided addressing proposed plantings and
might best incorporate geo-jute matting to stabilize the bank until plantings can establish themselves. Appropriate mitigation
plantings could include, but would not be limited to, Oregon Ash or River Birch.
Trunnell/ Rolandm/s to approve the application as presented. Voice Vote: All Ayes, motion passed
DISCUSSION ITEMS
Downtown Beautification Project –Landscape Architect Kerry KenCairn is consulting with theCity of Ashland on the
Downtown Beautification project. Ms. KenCairn gave a presentation explaining three proposed projects for the downtown
area.
This project will create more soil volume for the tree
Winburn Way Tree located in front of Gateway Realtys office -
that is located thereby expanding the planter area by approximately four feet on the sides without changing grades. The
plan is to remove all the concrete surrounding the tree along with the bench and put the footing for the new bench under
the sidewalk thus providing more soil under the tree, giving more space for the tree. The goal is to maintain a sitting area.
The goal is to redesign the corner area. There is a seat/retaining wall, small planter and a larger
Pioneer at Lithia Way -
planter up against the building. Re-doing the retaining wall will provide a small amount of landscaping area. Ms.
KenCairn saidthe plan is to remove three trees and plant two giving them more soil volume. The trees currently there are
challenged due to lack ofenough water.
The plan is to replace the trees with American ash, adding walkways and a barrier along the
Pioneer Parking lot -
sidewalk to discouragepeople from walking through that area.
The Commissioners discussed the different tree options for replanting. Ms. KenCairn said they are open to recommendations.
She confirmed there will be trunk protection of the trees until their crown can take over by themselves. The Commissioners
expressed their concern over the watering of the new treesduring a drought. Ms. KenCairn acknowledgedthe planting will
take place in the fall. Somesuggestions were, planting in grow bags/gaiters for the slow release of water.
NEW BUSINESS ITEMS FROMCOMMISSIONERS
said theArbor DayTree planting at the newAshland Creek Park located at 27
Parks Department arborist Peter Baughman
E Hersey went great. He thanked everyone who made it down to take part. Currently he is hand watering the tree and taking
good care of it until irrigation is installed.
was the only person representing the Tree Commission atthe Earth Day celebration.Heck
City Planner Zachariah Heck
pointed out that his mother is a teacher and gave him tree books to hand out to kids along with Douglas Firtree cookies. Next
year he would like to encourage some of the Commissioners to attend who could provide more information about trees.
3
Severson announced the City is planning a volunteer appreciation day on August 30, 2015 at Oak Knoll golf course. Anyone
that serves on a Commission will be invited.
Severson confirmed at this time there is no application for the removal of the Clay street tree. He also announced that in the
next month or twoHeckwill be the new StaffLiaisonfor the Tree Commissioner.
Severson briefly outlined the guidelinesin regards toexpressing public opinion about any proposalthe Commission islikely to
hear asa Tree Commissioner.When Land Use Actions come before the Commission there are strict City and State
guidelines in terms of how to review the action. The Commission’sdecision is to be transparent and occursbased on
information everyone has access to atthe meeting. If as a Commissioneryoucome to the meeting and have already pre
judged the application and you are notable to make a decision based on what happens in the meeting then that’s getting rid
of the transparency of that process. Severson asked the questions“Have you formed anopinion before the meeting?”“Is
everyone considering the request based on the same information?” The concern is for the integrity of the process in the
Commissioners’ quasi-judicial roles, and he emphasized Commissioners must make clear any bias at the beginning of the
meeting and not be a part of the discussionif they cannot rule impartially.
Severson emphasized that the process needs to be handled correctly so that if any project gets challenged it needs to be
challenged on the facts not on a procedure error on somebody’s part.
ADJOURNMENT
Meeting adjourned at 7:40 p.m.
Next meeting: June 4, 2015
Respectively submitted by Carolyn Schwendener
4