11. Preliminary Report on the Canal Project
III. Extreme Weather Shelter Ordinance Discussion
IV. Rogue Valley Metropolitan Planning Organization Intergovernmental Agreement
In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this
meeting, please contact the City Administrator's office at (541) 488-6002 (TTY phone number 1-800-735-
2900). Notification 72 hours prior to the meeting will enable the City to make reasonable arrangements to
ensure accessibility to the meeting (28 CFR 35.102-35.104 ADA Title 1).
it
COUNCIL MEETINGS ARE BROADCAST LIVE ON CHANNEL 9. STARTING APRIL 15, 2014,
CHARTER CABLE WILL BROADCAST MEETINGS ON CHANNEL 180 OR 181.
VISIT THE CITY OF ASHLAND'S WEB SITE AT WWW.ASHLAND.OR.US
Council Study Session
February 4, 2019
Agenda Item Ashland Canal Piping Project Status Update (PW #2015-17)
Paula Brown, PE Public Works Director j
From Kevin Caldwell Senior Project Manager
Julie Smitherman Water Conservation Specialist
Pau Ia.brown(@-ashland.or.us 541-552-2411
Contact kevin.caldwell(aashland.or.us 541-552-2414
Julie.smitherman(aD-ashland.or.us 541-552-2062
Item Type Requested by Council ❑x Update ❑ Request for Direction ❑ Presentation ❑
SUMMARY
Before the Council is a status update on the Ashland Canal Piping Project and staff findings from the last 12
months of work. Staff has worked closely with a team of very capable engineers, surveyors, and technical
experts to analyze the complexities of this project. Staff relied on the Ashland Canal Advisory Group to
assist through the process. Tonight, staff will present Council with a summary of the engineering and natural
resources challenges, and a summary of the public comments that have been heard throughout the
preliminary engineering phase and those from the most recent January 31, 2019 listening session facilitated
by public works staff.
PROJECT GOAL
The goal of the canal piping project is to replace approximately 2 miles of the open channel concrete lined
canal with a below ground pipe to reduce the amount of contaminates that can enter the canal, conserve a
significant amount of water to assist with our water conservation and efficiency goals, and update a vital
piece of water infrastructure that delivers an alternate raw water supply to the City's water treatment plant.
POLICIES, PLANS & GOALS SUPPORTED
City Council Goals:
29 Promote conservation as a long-term strategy to protect the environment and public utility needs.
30 Deliver timely life-cycle capital improvements.
31 Maintain existing infrastructure and plan for future improvements to meet regulatory requirements
and minimum life-cycle costs.
32 Implement recommendations of adopted master and capital plans.
22 Prepare for the impact of climate change on the community.
BACKGROUND AND ADDITIONAL INFORMATION
The City of Ashland places priority on improving water quality and efficient water management. As
identified in the City's adopted 2012 Comprehensive Water Master Plan, piping the front section of the
Ashland Canal (approximately 10,000 lineal feet) from Starlite Place to Terrace Street is intended to meet the
goal of improving water quality in Ashland Creek and overall water efficiency. In years when water supplies
are limited, the Ashland Canal is used as a supplemental water source. The water is treated to drinking water
standards at the City's Water Treatment Plant (WTP). Raw water in an open canal is vulnerable to
contamination from a variety of sources. These contaminants reduce the water quality of Ashland Creek.
Page I of 3
CITY OF
ASHLAND
Ashland Creek routinely exceeds the State's maximums for E. coli bacteria in the summer months.
Additionally, open canals are susceptible to water losses through seepage and evaporation. Water losses in
the Ashland Canal are between 23% and 30%.
At the August 1, 2017 business meeting. Council authorized a DEQ Clean Water State Revolving Fund
(CWSRF) loan of $1.3 million to complete the Ashland Canal Piping project. Staff advertised the request for
qualifications for phased engineering services and received proposals in November 2017. At the January 16,
2018 business meeting, staff received Council approval to award a professional services contract to Adkins
Consulting Engineering, LLP ($192,257). In addition, staff entered into a contract with StingRay
Communications ($31,000) to assist with strategic communications and public outreach, and with Siskiyou
BioSurvey for a tree health assessment ($14,790). The Southern Oregon University assisted with a wildlife
survey. To date, the preliminary engineering and miscellaneous project expenses total $238,047.
PROJECT BACKGROUND
This project has produced a significant amount of research and information. Along with the attached detailed
staff project summery, links are available to all reports on the engineering options, ecological analysis of the
trees, wildlife impacts, ACAG meeting presentation and meeting summary notes, answers to frequently
asked questions, the project map and current trail easements locations.
FISCAL IMPACTS
Due to the complexities of working in a very narrow maintenance easement area and anticipated additional
expenses, the preliminary engineering cost estimate has grown from the original budget estimates of $1.3 to
$1.8 million. Current project estimates; design, permitting, and construction, have grown to a range between
$2.4 to 3.9 million. This range identifies the cost differences for three project alternatives including full pipe
replacement, partial piping and partial rehabilitation, or full canal lining and rehabilitation. The project costs
have increased largely due to a very constricted easement area of only 20 feet in width and the amount of tree
removal and property protection. Costs will be refined during final engineering as the engineering team can
get a better and more complete picture of the specific impacts for each property owner along the canal during
the construction phase.
The 2017-19 Biennium Capital improvement Project (CIP) budget includes System Development Charges
(SDC) funds for contracted services in the amount of $1,452,000 for this project. This project is 100% SDC
eligible. Expenses for this project will be reimbursed through a low interest (l Department of
Environmental Quality (DEQ) Clean Water State Revolving Fund loan of $1.3 million authorized by Council
at the August 1, 2017 business meeting. As noted above the preliminary engineering and miscellaneous
project expenses current total $238,047. Should Council move forward to final engineering (staff anticipates
bringing this before the March 5, 2019 Council business meeting), staff will identify additional sources of
funding for the selected alternative.
DISCUSSION QUESTIONS
Discussions will likely surround the pros and cons of water quality and watery conservation benefits as
compared to cost and the need to remove a significant number of trees. Council is not being asked to make a
decision tonight, but this discussion is in preparation for the business meeting discussion in March. Staff and
the consulting team will be available to discuss the project in detail and to discuss options available as
Council moves toward a decision in March.
Page 2 of 3
CITY OF
ASHLAND
SUGGESTED NEXT STEPS
Staff anticipates bring this item to Council for a decision to move to the next phase for final engineering on
March 5, 2019. Staff is available and can schedule tours of the canal with Council members to better
understand the concerns of community and existing conditions within the canal easements.
Should this project move forward, the alternatives will be narrowed to a preferred alternative, final
engineering will be completed with more detailed drawings, impacts and any additional right-of-way
identified, and a final cost estimate will be prepared. Staff will identify additional revenue options prior to
returning to council for approval on construction.
REFERENCES & ATTACHMENTS
I . Staff Summary (attached)
2. Atkins Engineering executive summary (Full reports available at www.ashland.or.us/ashlandcanal)
3. Siskiyou BioSurvey executive summary
4. SOU Letter (Wildlife)
5. ACAG presentation
6. ACAG meeting notes
7. FA Qs
8. Project Map
9. Trail Easement Map
Page 3 of 3
CITY OF
ASHLAND
Update - Ashland Canal Piping
•
February 4, 2019 Council Study S
Before the Council is a status update on the Ashland Canal Piping Project and Staff findings
from the last 12 months of work. The goal of the canal piping project is to replace
approximately 2 miles of the open channel concrete lined canal with a below grade pipe. This
will reduce the amount of contaminates that can enter the canal, conserve a significant amount of
water and update a vital piece of water infrastructure that delivers an alternate water supply to
our water treatment plant. With Council's authorization, staff has worked closely with Adkins
Engineering and surveying to complete the preliminary engineering phase of the Ashland Canal
Piping Project. We are prepared to report the findings of the preliminary engineering as well as
additional efforts that the project team has completed at the request of staff and the Ashland
Canal Advisory Group.
Proiect Background:
The City owns and operates a gravity fed concrete lined canal constructed in the early 1900s,
which was originally intended for irrigation purposes. The Ashland Canal receives water from
the Talent Irrigation District (TID). This water originates at Hyatt and Howard Prairie
Reservoirs. The City has a contract to receive up to 1,369 acre feet of water from the TID.
Currently the City purchases this water for $51.17 per acre foot of water delivered to the City's
point of delivery at Starlight Terrace.
The City's section of the canal is located primarily within easements on private property. The
majority of the easements describe a tract of land that is 10 feet on either side of the canal
centerline for a total width of 20 feet. These easements allow for the construction, maintenance
and operation of the canal across private property, and only grants the City access to the
property. The City's canal section within the project area is approximately 2 miles in length
beginning near Starlite Terrace and terminating at the wet well at the Terrace Street Pump
Station. The existing concrete liner varies in condition from fair to poor with isolated sections of
cracking mostly caused by tree roots or failing subgrade. Currently there are some sections that
are piped under roads or driveways, they consist of several segments totaling 3,350 linear feet. In
addition to the City's public utility easement, portions of the Ashland Canal also have
recreational trail easements granted to the Ashland Parks and Recreation District from property
owners. However, there are large sections of the Canal without trail easements.
The Canal is in operation seasonally from April through October in most years and is based on
TID's water availability. When the Canal is in operation there is continuous flow into Ashland
Creek from the Terrace Street Pump Station, which is necessary to account for the fluctuating
canal flows into our wet well, as well as fluctuations in the demand for water from the irrigation
customers along the canal.
It is a common misunderstanding that residents think they have "water rights" to the Canal water.
The City and Southern Oregon University (SOU) have water rights, whereas, the residents who
receive water from the Ashland Canal are purchasing the irrigation water from the City, but do
Page 1 of 6 CITY OF
ASHLAND
not have actual water rights. Being a municipal water right, the City can supplement the raw
water supplied to the City's Water Treatment Plant with canal water to help offset the use of
Reeder Reservoir (Ashland Creek water) and treated water purchased from Medford Water
Commission though the Talent Ashland Phoenix (TAP) pipeline. All raw water is treated
through the City's Water Treatment Plant. In recent years, Canal water has been pumped to the
Treatment Plant in 2009, 2013, 2014, 2015 and 2018.
Raw water in an open canal is vulnerable to contamination from a variety of sources and reduces
the water quality of local waterways. Additionally, open canals are susceptible to water losses
through seepage, evaporation and transpiration by vegetation. Like many other local waterways,
Ashland Creek routinely exceeds the State's maximums for E. coli bacteria in the summer
months. The City regularly samples Ashland Creek for bacteria and posts public health notices
along the Creek when Oregon Health Standards are exceeded. The Ashland Creek E. coli
Bacteria Study (2011 Rogue Riverkeeper) shows that the Ashland Canal is a major contributor of
E. coli into Ashland Creek. The Study also shows that E. coli concentrations increase gradually
from Tolman Creek Road to the Canal outfall into Ashland Creek. It is suggested that pet and/or
animal waste adjacent to the Canal may be contributing the higher than normal levels of bacteria
in the Canal which is then conveyed to Ashland Creek.
Ashland Canal Advisory Group (ACAG)
ACAG is a voluntary informal advisory group formed by members of the general public,
property owners along the Canal, members of various City Commissions and local experts on
natural resources and regional Canal piping efforts. Goals of ACAG are to provide input to Staff
through project design and ultimately make a recommendation of piping alternatives.
Project Benefits:
• Improved water quality: Minimize contaminates from entering the Canal, and therefore
local waterways.
• Improved water conservation: Reduce water loss to seepage, evaporation and
transpiration by vegetation.
• Maximize water resource: Right Water Right Use. More water will be available for our
irrigation customers, helping to conserve our potable water supplies.
• Improving a supplemental water resource: The canal water is an important supplemental
water source during times of drought and has frequently been diverted to our Water
Treatment Plant as an alternate drinking water supply.
• Reduced maintenance/operation costs: currently we spend approximately $75,000/year
for canal operation and maintenance. We expect this cost to be reduced substantially
after project completion.
• Vegetation restoration to a more ecologically stable and natural condition and reduced
fuel loading in a wildfire hazard area. The vegetation along the Canal has been
artificially augmented with water from seepage, allowing un-natural large tree growth
adjacent to the Canal.
Proiect Concerns:
• Aesthetic impacts: loss of open water channel that is attractive to neighbors and the
community
Page 2 of 6 CITY OF
-ASHLAND
• Tree removal: It's recommended that we remove nearly all vegetation within the Canal
easement (20 feet). This equates to approximately 284 trees, some of them quite large.
• Trail impacts: There is concern in the trails community that the piping project may result
in less future trail easement opportunities and/or additional sections closed to the public.
• Property owner disturbance: Removal of foot bridges, fencing, vehicle bridges and
landscaping within the easement as well as construction noise and disturbance.
• Project costs: Estimates to finish the engineering/permitting and construction are
$3,095,000, based on Staff's recommended piping alternative.
• Funding gap: our loan from DEQ is for $1.3 million to complete the project, some
additional funds still need to be secured.
• Lack of seepage from the Canal can contribute to unintended tree mortality on private
property, outside of the Canal easement.
Other Concerns from Community:
• Loss of property values from the removal of the open water source.
• Loss of property values from the removal of trees.
• There are 10+ miles of open canal before it becomes City ownership, piping the last 2
miles will have little if any impacts to water quality.
• Tree removal is very sensitive to the public, some prioritize trees over everything else.
• Negative impacts to wildlife that use the Canal as a summer water source.
• Contamination from E Coli is overstated and not really an issue.
• Water losses are overstated, actual losses are much lower than our estimates.
• Project costs outweigh any benefits, funds should be spent elsewhere or not spent at all.
Public Outreach:
Due to project complexities staff has made public outreach a priority. We hired StingRay
Communications to assist us through the public outreach process. The efforts of staff are
summarized below:
• 17 individual backyard meetings with adjoining property owners March - June 2018
• Neighborhood meeting with adjoining property owners 3/6/18
• Community meeting 4/18/18
• Trails Association Open House 5/2/18
• Formation of the Ashland Canal Advisory Group (ACAG) and meetings on 4/2/18,
10/9/18, 12/20/18
• Canal tour with Advisory Group 1 1/ 13/18
• Project website: www.ashland.or.us/ashlandcanal
• Created a project status notification sign up - 65 citizens currently
• Interview with Jefferson Public Radio 1/28/19
• Community meeting 1/31/19
• Two City Source articles about the project
• Media interviews with newspapers and television
• Multiple meetings and email/phone communications with community members and
stakeholders.
Page 3 of 6 CITY OF
ASHLAND
Results of Preliminary Engineerine:
Preliminary engineering and was performed by Adkins Engineering and Surveying. This
included survey, site review, wetland determination, preliminary geotechnical study, seepage
study, preliminary plans and cost estimates. The site review identified numerous constraints that
need to be addressed in design of this project. There are 86 properties that the Canal crosses.
Project constraints include trees, fences, bridges, driveways and vaults. Trees are the largest
project constraint with approximately 284 conflicts. 195 of those trees are between 6-12 inches
diameter at breast height, 75 are between 12-24 inches and 14 trees are 24 inches and larger.
Seepage testing results indicate that the Canal is losing 23% of its flow to seepage and
evaporation. This equates to 190 acre feet or 62 million gallons of water loss in a typical
irrigation season. This amount of water is equivalent to the summer irrigation water need for
over 800 quarter acre lots.
Four project alternatives were evaluated and presented to the City:
1. Alternative 1: Replace the entire existing canal with 24-inch corrugated HDPE pipe.
Cost for engineering/permitting/construction; $3,095,000. Recommend removing nearly
all trees within the easement; approximately 285 trees total.
2. Alternative 2: Replace only the open sections of canal with 30-inch corrugated HDPE
pipe, replace small road/driveway crossings with 24-inch pipe and retain/rehabilitate the
large piped section between Elkader Street and Beach Street.
Cost for engineering/permitting/construction; $3,950,000. Recommend removing nearly
all trees within the easement, some can be left near the large piped section, approximately
260 trees total.
3. Alternative 3: Replace the canal liner with a new concrete liner and urethane underliner
and retain/rehabilitate the existing crossings.
Cost for engineering/permitting/construction; $2,429,000. Recommend removing nearly
all trees within the easement, some can be left near the large piped section, approximately
260 trees total.
4. Alternative 4: Do nothing. This alternative will not alter the current condition of the
canal. Pollutants will continue to be added to nearby waterways, water loss will increase
as the liner and piped sections degrade, deferred tree maintenance/removal will continue
to degrade the liner and the safety of the canal and downstream properties could be
compromised. Current expenses are $75,000 annually for operation and maintenance
costs, however staff has identified some expensive repairs in the near future. One quote
for relining a small portion of the canal is $36,000 to refurbish 500 lineal feet. It is
anticipated that there will be tree removal with some of the canal maintenance and spot
refurbishments.
Of the four alternatives, staff recommends that the City complete alternative one. This
alternative has the lowest costs of the piping alternatives, prioritizes water quality and efficiency,
replaces all of the outdated system with new materials and results in a robust, low-maintenance
water delivery system. Seven of ten ACAG members chose alternative 1 as their preferred
Page 4 of 6 CITY OF
ASHLAND
alternative, the remaining 3 members voted for Alternative 4 or do nothing as their preferred
alternative.
In addition, ACAG members identified their priorities for the more subjective impacts related to
this project. Eight members prioritized their desires for project success and impacts based upon
the seven influences as shown in the table below. Five of the 8 prioritized water efficiency
(saving) as their number I priority; 4 members identified water quality as their second priority
(one member had this ad their top priority), and while trees did not make the first or second
priority on any member's list, it was a significant #3 priority for the group.
Priority 1st 2nd 3rd
Water Quality 1 4 2
Water Efficiency 5 1 0
Trails 1 0 2
Trees 0 0 3
Wildlife 0 0 0
Costs 1 1 1
Aesthetics 0 2 0
Results of Vegetation Study:
The City contracted with Siskiyou BioSurvey to complete a vegetation analysis along the canal
corridor, to better understand the impacts the project would have on surrounding vegetation as
well as impacts to wildlife. Results of this study are as follows:
• Significant large conifer and hardwood trees occur along the canal right of way. These
trees are expected to be negatively impacted from construction primarily because their
root systems extend underneath the existing Canal.
• It is recommended to remove all large conifers within the easement prior to
construction, it's much more difficult to manage tree removal after construction.
• Some small conifers and hardwoods can be left within the easement and have a greater
chance at survival than the large conifers, future monitoring is recommended.
• Large conifers downslope of the canal will be negatively impacted by the loss of canal
seepage. These trees should be evaluated regularly by a qualified arborist/forester
following construction to determine tree health and safety concerns.
• Mitigation measures can be employed to encourage forest health during and following
construction. These include thinning, placing mulch, limiting soil compaction, etc....
• It's recommended to have qualified staff or consultants monitor construction and
natural resource impacts daily during construction. It is also recommended to monitor
the forest health in the canal corridor for several years following construction and to
work closely with adjoining property owners regarding vegetation health and
maintenance.
Page 5 of 6 CITY OF
-ASHLAND
• The canal provides incidental summer watering opportunities for wildlife and does not
function as a riparian corridor. Wildlife in the area will shift to alternate water sources
as they do when the canal does not have water.
• Use trail softening techniques to help the Canal access road blend with the existing
landscape. Manage the vegetation after construction as a fuel break to increase wildfire
resilience in the area.
• The piping of the Canal can improve the forest resilience along the canal corridor,
helping to meet the environmental stresses associated with climate change and selecting
for more appropriate species composition and spacing.
Wildlife Impacts:
We asked the SOU Biology Dept. for assistance to further understand the project impacts to
wildlife. They found that the Canal does not represent important wildlife habitat. Instead, the
Canal, as an artificial water source may serve as an attractive nuisance artificially increasing the
local abundance of wildlife and artificially influencing the movement of wildlife. In addition,
the Canal does not represent a resource for native aquatic species, but instead harbors a number
or undesirable non-native species like the invasive ringed crayfish, Himalayan blackberry and
English ivy.
E. Coli Testing:
This piping project was originally recommended based on the Ashland Creek E. coli Bacteria
Study (2011) and the concerns for water quality. Staff wanted to understand the current E. coli
concentrations, so we contracted with RVCOG to complete weekly E. coli sampling at the
beginning of the project and the outfall into Ashland Creek (15 samples per location). As the
following graph shows, there is still E. coli present but there are lesser concentrations entering
Ashland Creek compared to the 2011 study. However, testing does show that the concentrations
continue to increase as the canal travels through the City, as the 2011 study suggested.
Ashland Canal E. Coli Bacteria Comparison
$0
163.7
Ifx7
140
120
1W
78
p 80
0
Z 60 54.5
48.1
0 40
20
0
2011* 2018`»
■ Pinecrest Terrace ~i Canal Outfall
All figures are geometric mean. All units are MPN/100 ML
*2011 data from Rogue Riverkeeper Study
**2018 data from City of Ashland and RVCOG
Page 6 of 6 CITY OF
ASHLAND
i
Council Study Session
February 4, 2019
Amending Resolution No. 2013-04; A Resolution setting forth policies and
Agenda Item conditions under which Ashland will provide extreme weather related
emergency shelter housing.
From Kelly Madding City Administrator
Contact Kelly. madding(a-ashland.or.us, 541-488-6002
Item Type Requested by Council ❑ Update ❑ Request for Direction ❑x Presentation
SUMMARY
Councilor Akins asked that a possible amendment to Resolution No. 2013-04, specifically increasing the
temperature at which the City would provide a space for the extreme weather shelter to be operated, be
reviewed by the City Council.
POLICIES, PLANS & GOALS SUPPORTED
Seek opportunities to enable all citizens to meet basic needs.
Support innovative programs that protect the community.
BACKGROUND AND ADDITIONAL INFORMATION
Resolution 2013-04 states that the City will provide emergency shelter when "outside temperatures
are 20 degrees or below or a combination of weather conditions, in the discretion of the City
Administrator, make conditions hazardous to human life without adequate shelter." The Resolution
states that the extreme weather shelter may be in a City building such as The Grove or Pioneer Hall
and that the shelter will be staffed by volunteers from nonprofit organizations. It does not require that
the City staff the shelter nor does it preclude a religious institution or a nonprofit, on their own, from
opening an extreme weather shelter at temperatures greater than 20 degrees. During the winter of
2017/2018, the extreme weather shelter was activated no more than seven nights. Due to the sporadic
staffing nature of the extreme weather shelter volunteers in the past have been paid the City of
Ashland's living wage.
Currently Options for Helping Residents of Ashland (OHRA) is coordinating a seven day a week
homeless shelter for approximately 34 guests. The shelter is operated in four churches: the First
Presbyterian Church, the First United Methodist Church, the Rogue Valley Unitarian Universalist
Fellowship, and Trinity Episcopal Church. In addition, there are many other volunteers that provide
meals and volunteer in a variety of ways to assist shelter guests. A seven day a week homeless
shelter staffed by volunteers is an amazing feat!
To date this winter the City Administrator has activated the extreme weather shelter one night when
the weather was around 25 degrees, but it was supposed to rain. Five guests attended the shelter.
Councilor Akins has asked staff to bring to the City Council the proposal to increase the temperature
at which the extreme weather shelter would be opened to a temperature closer to 32 degrees.
Page I of 2
CITY OF
ASHLAND
Councilor Akins has found that there are many other areas in Oregon who activate an extreme
weather shelter at temperatures from 25 to 40 degrees. It is not known at this time if those locations
provide a seven night a week shelter in addition to the extreme weather shelter.
Staff has researched the average number of days at or under 32 degrees in our area and found the
number to be, on average 50 days. With that number in hand, Staff has discussed increasing the
number of shelter dates with OHRA and at this time they are unwilling to coordinate volunteers. This
has also been discussed with a few churches providing shelter currently and they do not have capacity
at this time to add days to the seven day a week shelter they are providing and are not sure they would
have capacity for almost two months of additional shelter if the permanent shelter at 2082 E. Main is
approved. Finally, many of those staff talked to were concerned that adding close to two months of
additional shelter with paid volunteers would attract volunteers away from the current shelter model
that provides case management and whose goal it is to move guests out of homelessness.
FISCAL IMPACTS
The costs associated with increasing the extreme weather shelter activation temperature are primarily forgone
revenue for not being able to use Pioneer Hall for revenue generating activities.
DISCUSSION QUESTIONS
• Does the City Council want to change the Resolution? If so, what is the timing?
• Does the City Council wish to direct staff to work with the religious institutions and nonprofits
organizations that serve homeless citizens on a proposal to increase the activation temperature of the
extreme weather shelter? If so, what is the timing?
SUGGESTED NEXT STEPS
If the City Council wants to proceed with the idea of increasing the temperature on the extreme weather
shelter, Staff recommends that this topic be taken up with the religious institutions and the nonprofit
community serving the homeless in the late spring early summer of 2019. Staff would then bring those
results back to the City Council in the summer of 2019.
Page 2 of 2
CITY OF
ASHLAND
Council Study Session
February 4, 2019
Agenda Item Rogue Valley Metropolitan Planning Organization (RVMPO) Intergovernmental
A reement
From Kelly Madding City Administrator
Contact Kelly. madding(cD-ashland.or.us, 541-488-6002 j
Item Type Requested by Council ❑ Update ❑ Request for Direction ❑x Presentation ❑
SUMMARY
The purpose of this agenda item is to provide information to Councilor Rosenthal on an upcoming vote at the
Rogue Valley Metropolitan Planning Organization (RVMPO) on February 26, 2019. Councilor Rosenthal is
the liaison at the RVMPO. The RVMPO is proposing to enter into an intergovernmental agreement with the
Rogue Valley Transit District (RVTD) to define RVTD's annual allocation of State Transportation Block
Grant funds.
BACKGROUND AND ADDITIONAL INFORMATION
During the development of the 2000 RVMPO Regional Transportation Plan, analysis showed that the
plan failed to meet the state required Vehicle Miles Travel (VMT) reduction goal. In response, the
RVMPO developed seven Alternative Measures to bring the Regional Transportation Plan into
compliance with the Transportation Planning Rule (required by the State) and its associated VMT
reduction goal. Alternative Measure #7 directed 50% of all Surface Transportation Program (STP)
funds received by the RVMPO to "alternative transportation funding" with the funds initially
dedicated to the Rogue Valley Transportation District (RVTD).
When the alternative measures were being developed, RVTD was facing a very uncertain funding
future and service cuts and route reductions were likely. To avoid these reductions, and to help meet
VMT reduction goals, the RVMPO agreed to allocate 50% of all STP funds to RVTD to comply with
Alternative Measure 47. However, Alternative Measure 97 clearly notes that its purpose is to fund
"Alternative Transportation Projects" and is not limited to being dedicated to RVTD only. The actual
measure language reads:
"Funding committed to transit OR bicycle/pedestrian/TOD projects. Amounts
shown represent '/z of the MPO's estimated accumulation of discretionary funding
(STP)." (emphasis added)
The measure can be satisfied by utilizing 50% of STP funding to fund either transit or
bicycle/pedestrian/Transit Oriented Development (TOD) projects. The narrative in the Alternative
Measure 97 further clarifies the RVMPO's intent of the 50% STP funds by stating:
I
~I
Page 1 of 2
CITY OF
ASHLAND
"Without the additional operating revenue provided through this measure (or
through some other source), current revenue projections show that RVTD will be
required to cut service and eliminate routes in the MPO.
RVTD will be pursuing a local funding package in the near future to finance the
Tier 2 transit plan. If voters approve this package, RVTD will not require STP
funding in order to cover funding shortfalls. It is therefore proposed that, should
RVTD's new fund source become a reality, the STP transit allocation proposed in
the measure instead be directed to RTP bicycle/pedestrian projects and projects
that facilitate the development of TOD sites." (underlined added)
2013-2038 RTP, Alternative Measures Update, Appendix B, Page 9
I
In May 2016 voters passed a 13¢ / $1,000 assessed value RVTD levy and the district restored and
expanded service levels. Furthermore, the 2017 Oregon Legislature passed HI32017 which created
the Statewide Transportation Improvement Fund (STIF) which according to ODOT is estimated to
provide RVTD with an additional $1.2 million in 2019 and increasing to $3.2 million per year by
2021.
Due to RVTD's additional funding the MPO Policy Committee asked that a small group of members,
including representation from RVTD, Jackson County, the Oregon Department of Transportation and
the City of Medford to meet to discuss alternatives to the 50 percent RVTD allocation of Surface
Transportation Block Grant funds (previously called STP funds). The group met and have forwarded
an IGA to the MPO Policy Committee for approval. The IGA states that the current allocation of 50
percent will be reduced on an annual basis beginning in 2020, down to an amount of $700,000 of
STBG funds annually. However, if significant financial changes were to occur for RVTD the IGA
would be reevaluated. This agreement is supported by RVTD.
FISCAL IMPACTS
The approval of the IGA will allow additional funding to be available to Cities, including Ashland, and the
County for bicycle/pedestrian/TOD projects.
SUGGESTED NEXT STEPS
Staff recommends that the City Council provide direction to Councilor Rosenthal to vote affirmatively on the
IGA between the RVMPO and RVTD at the February 22, 2019 RVMPO Policy Committee meeting.
ATTACHMENTS
Attachment 1: Intergovernmental Agreement
Page 2 of 2
CITY OF
ASHLAND
INTERGOVERNMENTAL AGREEMENT
THIS AGREEMENT is made and entered into by and between the Rogue Valley Metropolitan
Planning Organization, hereinafter referred to as "RVMPO", and the Rogue Valley
Transportation District, hereinafter referred to as "RVTD", both of which are hereinafter referred
to collectively as "PARTIES" ;
WITNESSETH
WHEREAS, RVMPO is a voluntary association of local governments serving Jackson
County, Oregon; and
WHEREAS, RVTD is a member agency of the RVMPO; and
WHEREAS, RVMPO has, over the past several years, provided to RVTD 50% of the
MPO's annual allocation of STBG funds; and
WHEREAS, the Policy Committee of the RVMPO created a sub-committee to review this
ongoing allocation and return to the Policy Committee with recommendations; and
WHEREAS, the purpose of this agreement is to ensure that botli parties agree to and
understand the arrangement regarding the allocation of funding to the RVTD from the RVMPO's
annual allocation of STBG funds.
NOW THEREFORE, in consideration of the mutual terms, conditions, stipulations and
covenants herein contained, the PARTIES do hereby agree to the following:
A. DESCRIPTION OF AGREEMENT
RVMPO hereby agrees to reduce the current allocation of 50% of STBG funds to RVTD
on an annual basis, beginning in FY 2020, down to the amount of $700,000 of STBG funds
annually. RVTD shall be able to utilize these monies as RVTD sees fit and in accordance
with all pertinent federal and state laws and regulations.
B. DURATION OF AGREEMENT
This agreement shall take effect in Federal Fiscal Year 2020 (commencing October 1,
2019) and shall be reviewed every five years (plus or minus a year so as not to interfere
with the TIP/STIP cycle) unless one or more of the following incidents occur:
• Should the RVTD's Operating Property Tax Levy not be renewed by the voters; or
• Should a significant change to the amount of STBG funds provided to the RVMPO
occur,
-t-
If either of the above mentioned events occurs then both parties shall immediately revisit
the existing funding agreement.
C. AMENDMENTS AND TERMINATION
1. This document constitutes the entire agreement between the PARTIES and no other
agreement exists between them, either stated or implied. Any amendments or changes
to the provisions of this agreement shall be reduced to writing, approved by both
RVMPO Policy Committee and RVTD Board, and signed by both PARTIES.
IN WITNESS WHEREOF, RVMPO and RVTD have caused this agreement to be executed by
their authorized representatives as of the date of the last signature affixed below:
PARTIES TO THE AGREEMENT
Michael Quilty Date Tonia Moro Date
Chair, RVMPO Chair, RVTD
Attest:
Melissa Huhtala, RVTD Recorder Date
RVTD of Ashland
-z-