HomeMy WebLinkAbout2019-0805 Study Session MIN CITY OF
ASHLAND
CITY COUNCIL STUDY SESSION
DRAFT MINUTES
Monday,August 5,2019
Council Chambers, 1175 E. Main Street
Mayor Stromberg called the Study Session to order at 5:32 PM.
Councilors' Slattery,Graham,Jensen,Akins and Seffinger were present.
Councilor Rosenthal was absent.
Public Forum
Dr. Carol Voisin—Ashland—She spoke regarding the water master plan. She spoke that the cost
has gone up and there will probably be an increase in water rates in the future. She explained
that in 2012 it was told that by increasing rates by 10% it would give us what we need for water
infrastructure. She spoke that another review is needed by Council. She questioned what will
this do to our water rates. She spoke that it is important to assure the citizens that oversight and
accountability are in place. She explained that there is no need to rush this and the importance of
being transparent about cost.
William Shanor—Ashland—Spoke that he and his wife did a site visit. He spoke regarding E.
Coli and the importance of the more you learn the simpler it becomes. He spoke that this is not
as complicated as those appear to make it.
I. Update on Preliminary Design of a 7.5 Million Gallons a Day Water Treatment Plant
City Administrator Kelly Madding gave a background on the water treatment plant.
Seffinger arrived at 5:47 PM.
Deputy Public Works Director Scott Fleury gave a Staff report.
Akins questioned what will happen to the current water plant. Fleury explained that options
would be brought back to Council regarding the current plant. Seffinger questioned if trails can
be placed in that area. Fleury spoke that this has not been discussed yet. Council questioned
what will be done for the safety of the new area. Fleury answered that a design proposes a fence
around the area and video cameras.
Council discussed the increase in demand.
HDR representative Pierre Kwan presented Council with a PowerPoint Presentation (see attached).
Items discussed were:
• Design of 7.5 million gallons a day water treatment plant.
• Background.
• What have been doing.
• Alternatives reviewed.
• 4 Project phases:
o Alternatives Analysis and Preliminary.
o Final engineering.
o Bidding assistance.
o Construction administration.
• Building upon 2016-2018 work.
o New plant at the Granite Site.
o Existing plant will be decommissioned.
o 7.5 MGD expandable to 10.0 MGD in the future.
o Incorporate clearwell for addition future storage.
o Not membrane filtration process.
o Need to address taste and odor compounds, algae and algal toxins. Must address.
• Issues facing now.
o Defining the treatment process.
o Obtaining Oregon health authority acceptance.
o How to fit everything onto the challenging Granite site,planning what to do with
the existing plant once new plant is operational.
o Determining construction and lifecycle costs.
o Identifying permitting requirements.
o How to prepare for the unknown.
• What have we been doing?
o Phase 1 A—Alternatives evaluation.
o Phase 1B Preliminary Design.
o Meet goals and stay in budget.
• Treatment alternatives
o Conducted geotechnical investigations.
o Completed ground survey.
o Identified and evaluated treatment process.
o Completed construction and value engineering review.
o Developing the plan and process for abandoning existing water plant.
o Finalizing 30%design documents.
• Design alternatives evaluated.
o What treatment process should the plant have?
o How to incorporate water storage requirements associated with the water master
plan outcomes.
o How to fit all the facilities on the site?
o How to connect new plant to existing.
• Processes of new plant.
o Coagulation and filtration systems to remove turbidity and pathogens.
o Chlorine addition to further disinfect the water.
o Ozone addition to eliminate taste and odor issues and destroy potential algal
toxins.
o Solids removal for better filter operations and greater disinfections. Prohibited in
Oregon.
o Ozone Coalition.
• Direct filter plant.
• How to handle storm driven events.
• Storage volumes.
• Site Layout—Existing area, an initial concept.
• Challenge—Crossing Ashland creek.
o All existing pipes on the east side of the creek.
o New plant site is on the west side of the creek.
o Evaluating: Going over the creek on a new bridge.
• Cost estimating and constructability Review:
o Cost estimating services provided by Mortenson constructions.
o Four rounds of cost estimating:
• January 23
• May 24
• June 11
• July 15
• Estimated treatment construction cost.
• Look at cutting costs. How many buildings are needed, conference rooms, etc. 36 million
from 42 million.
• Additional power savings costs.
o Additional Hydropower.
o Solar power.
• Follow up activities
o Phase 2—Final engineering/permitting 2019-2020.
o Phase 3 —Bidding assistance 2020.
o Phase 4—Construction 2020-2022—Build new facilities and decommission
existing plant.
• Proposed location.
Fleury explained that each item will
Council discussed the historical value of the current plant.
Madding spoke that if Council has any further questions to send them to Staff.
Council discussed having another Study Session for this item. Madding explained that this item
is on the Look Ahead for the September 3rd Business Meeting but if Council would like another
Study Session to let Staff know.
The Study Session was adjourned at 7:00 PM
Respectfully submitted by:
City Recorder Melissa Huhtala
Attest:
4R-C"'2-Vd
Mayor Stro erg
In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this
meeting, please contact the City Administrator's office at(541)488-6002(TTY phone number 1-800-735-
2900). Notification 72 hours prior to the meeting will enable the City to make reasonable arrangements to
ensure accessibility to the meeting(28 CFR 35.102-35.104 ADA Title l).
,ASHLAND
i° ' Design of a 7.5 Million Gallon
�
g a Day Water Treatment Plant
``'''` Project #2018-20
iitherdi
Ashland City Council Study Session Briefing
August 5, 2019
F)
qiBackground and
Additional Information
02 What Have We Been
Doing?
Alternatives Reviewed
czi, Path Forward
Background and
Additional Information
Project Execution
• Four Project Phases
1 . Alternatives Analysis and Preliminary (30%)
Engineering — hired HDR
2. Final Engineering — future
3. Bidding Assistance — future
4. Construction Administration — future
City of Ashland I Design of a 7.5 MGD Water Treatment Plant
Building Upon 2016-2018 Work FYR
• New plant at the Granite Site
• Existing plant to be decommissioned
• 7.5 MGD expandable to 10.0 MGD in the future
• Incorporate clearwell for additional future storage
• Not membrane filtration processes
• Need to address taste-and-odor compounds, algae,
and algal toxins
City of Ashland I Design of a 7.5 MGD Water Treatment Plant
Issues We Are Facing Now
• Defining the treatment processes
• Obtaining Oregon Health Authority acceptance for the
future processes and regulatory requirements
• How to fit everything onto the challenging Granite site
• Planning what to do with existing plant once new plant
is operational
• Determining construction and lifecycle costs
• Identifying permitting requirements
City of Ashland I Design of a 7.5 MGD Water Treatment Plant
02 What Have We Been
Doing?
Two Phased Approach
• Phase 1A — Alternatives Evaluation
August 2018 to February 2019
• October 11 , 2018 — first alternatives workshop
• January 23, 2019 — second alternatives workshop
• Phase 1B — Preliminary (30%) Design
• February 2019 to July 2019
• Value Engineering workshop — June 11 , 2019
City of Ashland I Design of a 7.5 MGD Water Treatment Plant
Phase 1A — Treatment Alternatives
vConducted geotechnical investigations
vCompleted ground survey
✓Identified and evaluated treatment processes
✓Sized the new WTP clearwell/reservoir
✓Identified and located buried and aboveground piping
vPrepared cost estimates for alternatives
vPrepared design recommendation
City of Ashland I Design of a 7.5 MGD Water Treatment Plant
Phase 1B — Prelimina ry Design
✓Conducted additional geotechnical investigation
✓Evaluated the potential of a secondary intake
vCompleted construction and value engineering review
vDeveloping the plan and process for abandoning
existing WTP
✓Finalizing 30-percent design documents
City of Ashland I Design of a 7.5 MGD Water Treatment Plant
l i
pememaJ sangeuJe;Iv co
is
. „ panowaJ
aa� pue usy aui �i .,
q l p
Jo epis a;isoddo all uo `�"` t a o s aau
"' ale suoi�oeuuoo JeMOS ` -• . - :,�,
will sugap sey ells
pue je enn pegsluu - . b,
>' " • -..„ peal n ba l
'
eq (ew buidwnd
.«. i 4. * oS-19H ueyi Jamol
s-3 -
papaeu .. ,....y. ,,,,.s .
si eaae MI s‘aTIS
eq Aew
6ulpea6-ai . {aoapaq
Jo/pUe IN os sa is IU '
pan-wall nnoilays
Hews sl eaJe Dal daalS
II seq a}is 11aaanp
fell algel1end d ',
Design Alternatives Evaluated FY2
• What treatment process should the new plant have?
• How to incorporate water storage requirements
associated with the Water Master Plan outcomes?
• How to fit all the facilities on the site?
• How will we connect new plant to the existing system?
City of Ashland I Design of a 7.5 MGD Water Treatment Plant
Processes at New =
Plant -
Same as existing plant
• Coagulation and filtration i -•
■
systems to remove
turbidity and pathogens
• Chlorine addition to further
disinfect the water
City of Ashland I Design of a 7.5 MGD Water Treatment Plant
- ,.\
Processes at New •
Plant
New processes
4,fr
1
• Ozone addition to ~ E l
eliminate taste-and-odor • F -'
issues and destroy
potential algal toxins
• Solids removal for better
filter operations and
greater disinfection
Storage Volumes
• New clearwell at plant site
• Around 850,000 gallons
• Used for:
o Cleaning filters
o Improving pumping operations
Time to disinfect the water
• Storage for distribution system
• Emergency water storage
City of Ashland I Design of a 7.5 MGD Water Treatment Plant
Site Layout — Existing Area I-)�
Upper Site
%• - — �� Existing
—- '�' ����.. Conditions
fFp 4 `� \-----.'---
- / / = - / � __ `,�\• „..-▪ -/„, - \/ j / �
'/, - �
y .� r'w
,
J w%
i i %r � / r4 •r/
i f ti-
City of Ashland I Design of a 7.5 MGD Water Treatment Plant
-,:.� Site Layout — An Initial Concept F��,,,,,,._„:::,..,,,,..,,,,,*„..._,,__
� \.,„.,..„,,,,..,.„.._,
_ .....,..._„_.........„__,,.... ....
3'%�"„-� _��__ _� Mass
�r��'��f� = �. < ` _ �� Excavation,........„..__ ____,..„.........,„„,....,„...._...
�j y _ 1 „.„,,,,,,,,.. .,„
1
_,...•
s tr
_____
;;y \�\\`..,, 1.,,
_._._ ,--- ter,
/ � �� \y
it= — - .: :- '�- �� j,�rf/j'!��� � ��-�
s _ ./'///%7 % ( /�)
City of Ashland I Design of a 7.5 MGD Water Treatment Plant
Site Layout - An Initial Concept �)�
1
-= _ Mass
_ — = xcavatlon
s
—
mss'
1
',—_fir
00
�_`— _
;��—
City of Ashland I Design of a 7.5 MGD Water Treatment Plant
;
Crossing Ashland ,9� �� ,•
Creekramie Strget
- t Reservoir .
• All existing pipes on the .r . ,, c.
east side of the creek. •3= -
,
• New plant site is on the �°` •`^
west side of the creek. ..ikts.
,s lel• Evaluating: ` '"""mac`
Public Parking P
0 Going over the creek on -
a new bridge o
Burying pipes underneath ,
r
the creek
City of Ashland I Design of a 7.5 MGD Water Treatment Plant
Cost Estimating and Constructability Review FN
J Y
• Cost estimating services provided by Mortenson
Construction.
• Four rounds of cost estimating:
• Jan. 23 treatment alternatives workshop
May 24 alternatives workshop
J• une 11 Value engineering & constructability session
O July 15 Basis of Design Report
City of Ashland I Design of a 7.5 MGD Water Treatment Plant
Est. Treatment Construction Cost ($M)
$50 $42.1 $45.9 $43.3
$40 $36.0
$30
$20
$10
$-
Jan. 23 May 24 June 11 July 15
City of Ashland Design of a 7.5 MGD Water Treatment Plant
Y � 9
r
Additional Power-Savings Costs F)�
• Additional Hydropower
o $2.3+ million for 46 to 78 kW hydropower system
o Upgrades to Gulch Power House is a better return-on-
investment
• Solar Power
o $1 .0 million for 200 kW solar power array
o Size constrained by City's power purchase agreement
City of Ashland I Design of a 7.5 MGD Water Treatment Plant
,I . Vic- -
v X27 , ,W- .. ..
•a
:•• ;t ,4
J �?r
4°
* 7 .*',. .
`,
f;�`�f _i-�
Path Forward _ - ��-• ti : .
1
Follow-Up Activities l
Phase 2 — Final Engineering/Permitting (2019 to 2020)
Phase 3 — Bidding Assistance (2020)
Phase 4 — Construction (2020 to 2022)
• Build new facilities and decommission existing plant
City of Ashland I Design of a 7.5 MGD Water Treatment Plant
Al
'1
G '�§ _ , SHLAND
♦: .
Design of a 7.5 Million Gallon
--g a Day Water Treatment Plant
.. ply-
y Project#2018-20
' Pierre Kwan— HDR
kir
FY
i
New Site Layout I-)1
• Consolidated buildings. -.:-\.'_-1,-./-----__---'_=-rr. tr' 1 \
• Moved clearwell up to a ∎ ).= 362-`_- '' , \\_--,/ ,//','/'
flatter upper location. • \; \E� - ---_ — . - � _// /'f'.
Yy I /\.• \\ ±i', \I t��' `•l\``,�__ is/ ',/,J/
• Reduced delivery truck ` ;r'
Y I \ I 1 \\ I
driving areas. s.• 3,; :." \; „ ; 1„'
\\• \\\\ f a* _::: A.t$
.',/'� \� \\� `\/ i 1 71 f
• Switched to more \ \'1 '' '' y1 \ ' \ - ''
compact treatment ;/ i,�; '\\ - �s'(c 'i ) '-----------
processes. 0,-_,...,,,..,, ,/ , , y __- ,- ------ _-
City of Ashland I Design of a 7.5 MGD Water Treatment Plant