Chair Roger Pearce called the meeting to order at 7:01 p.m. in the Civic Center Council Chambers, 1175 East Main
Street.
Commissioners Present: Staff Present:
Troy Brown, Jr. Bill Molnar, Community Development Director
Michael Dawkins Derek Severson, Senior Planner
Alan Harper Dana Smith, Executive Assistant
Melanie Mindlin
Haywood Norton
Roger Pearce
Lynn Thompson
Absent Members: Council Liaison:
Dennis Slattery, absent
ANNOUNCEMENTS
Community Development Director Bill Molnar explained the City Council would resume the public hearing for the Transit
Triangle Overlay at their meeting November 20, 2018. The Oregon Department of Transportation reviewed the traffic
analysis and determined it would have no significant impact on the state highway system. They supported the Transit
Triangle Overlay. The Planning Commission would provide the annual commission report to the City Council at their
meeting December 4, 2018. City Council would hear the 880 Park Street appeal that night as well. The Commission
would not have a study session in December.
AD-HOC COMMITTEE UPDATES - None
CONSENT AGENDA
A.Approval of Minutes
1. September 11, 2018 Regular Meeting
2. September 25, 2018 Study Session
Commissioners Thompson/Dawkins m/s to approve the Consent Agenda. Voice Vote: all AYES. Motion
passed 7-0.
PUBLIC FORUM
Huelz Gutcheon/Ashland/Spoke on reducing fossil fuels and mandating wiring for electric vehicle charging.
UNFINISHED BUSINESS
A. Approval of Findings for PA-T2-2018-00003, 188 Garfield Street.
The Commission had no ex parte on the matter. The Commission made the following changes to the Findings:
Page 4, delete the second paragraph under 2.2
Ashland Planning Commission
November 13, 2018
Page 1 of 4
Page 5, second paragraph fourth sentence, change “building” to “build”
Page 9, add more language on allowing the applicant to use the existing curb cut
Add language to Condition 5 on the land value not counting
Remove language that adopts the applicant’s Findings as the City’s Findings
Change language “The Commission finds that the application further explains,” or similar verbiage
with, “The Planning Commission finds…”
Add more detail on how the conservation housing and outdoor recreation bonuses were met
Add language to Condition 5.0 that the final project valuation complied with the definitions
Commissioners Brown/Thompson m/s to approve the Findings for PA-T2-2018-00003, 188 Garfield
Street as amended with staff’s suggested language to Condition 5 on land value not counting.
Voice Vote: all AYES. Motion passed 7-0.
B. Approval of Findings for PA-T2-2018-00004, 1661 Ashland Street.
The Commission had no ex parte on the matter. Commissioner Thompson made the following changes to
the Findings:
Page 6, delete the second paragraph that adopted the proposed Findings by reference
Page 6, Section 2.3 second paragraph last sentence, “The application concludes…,” change to “The
Planning Commission finds…” and same paragraph second sentence, delete “The application notes
that…” and start the sentence at, “In addition…”
Page 6, Section 2.3 third paragraph under third sentence, change, “The application emphasizes…”
with “The Planning Commission finds…”
Page 6, Section 2.3 fifth paragraph second sentence change, “The application notes…” with, “The
Planning Commission finds…”
Page 6-7, last paragraph last sentence, delete “The application materials note that…” and start the
sentence at “The property…” and same paragraph second sentence, change “The application further
explains that...” to “The Planning Commission finds…”
Page 7, second paragraph second sentence, delete “The application explains that…” and start the
sentence at “A 20-foot wide…” and same paragraph last sentence, change “The applicants further
assert…” to “The Planning Commission finds…”
Page 7, third paragraph second sentence, change “The application asserts…” to “The Planning
Commission finds…” and same paragraph, last sentence, change “The application further notes…”
to “The Planning Commission finds…”
Page 7, fifth paragraph second sentence, change “The application asserts...” to “The Planning
Commission finds…”
Commissioners Thompson/Norton m/s to approve the Findings for PA-T2-2018-00004, 1661 Ashland
Street with the modifications made by Commissioner Thompson. Voice Vote: all AYES. Motion
passed 7-0.
TYPE II PUBLIC HEARINGS
A. PLANNING ACTION: PA-T2-2018-00005
SUBJECT PROPERTY: Kestrel Parkway
APPLICANT/OWNER: KDA Homes, LLC/ Jacob Robert Ayala
DESCRIPTION: A request for Outline Plan approval for a 17-lot Performance Standards Options
subdivision, a Major Amendment to the North Mountain Neighborhood Plan, a Physical & Environmental
Constraints Review Permit for improvements within the floodplain corridor, a Limited Use/Activity Permit
for activities within a wetland, and Tree Removal Permits to remove 15 trees for the three vacant parcels
located south of the end of Kestrel Parkway. The subdivision plan includes the dedication of 5.99 acres of
Ashland Planning Commission
November 13, 2018
Page 2 of 4
floodplain corridor land to the City of Ashland as park land as required in the North Mountain Neighborhood
Plan (NMNP). (Development of the multi-family zoned portions of the property would occur in a later phase
and would require Final Plan and Site Design Review approvals prior to development.) COMPREHENSIVE
PLAN DESIGNATION/ZONING: North Mountain Single Family (NM-R-1.7.5), North Mountain Multi-Family
(NM-MF), and North Mountain Greenway (NM-G); ZONING: NM-R-1-7.5; NM-MF; and NM-G; ASSESSOR’S
MAP & TAX LOTS: 39 1E 04AC 900, 39 1E 04AD 8600, and 39 1E 04DB 2000.
Chair Pearce read aloud the public hearing procedures for land use hearings.
Ex Parte Contact
Commissioners Harper and Thompson declared no ex parte. Commissioner Dawkins had an extensive site
visit and ran into the applicants the week before but did not discuss the matter. Commissioners Brown and
Mindlin had no ex parte and one site visit. Commissioner Norton had one site visit and two encounters with
people who spoke to the issue. Neither encounter created a conflict. Chair Pearce had no ex parte but was
familiar with the site.
Staff Report
Senior Planner Derek Severson provided a presentation on the project. He described the major
modifications and amendments. Staff recommended the following Conditions:
An LID for the Nevada Street Bridge
Require a minimum 22-foot width on Zare Way to accommodate fire apparatus access
Create a fire truck turn-around where the streets that will ultimately continue temporarily terminate
Questions of Staff
Staff clarified density transfers in the North Mountain Neighborhood Plan (NMNP). Mr. Severson confirmed the location
of the hammerhead and that it would work in that location.
The definition of open space was different from multi-family open space and could be used to preserve natural features.
The flood plain corridor was approximately 50% of the site and the wetland was another half-acre. The open space in
the center was not intended to be usable.
The narrative did not speak to Street Exceptions, but some areas in the plan may need them.
Applicant’s Presentation
Mark Knox/KDA Homes/Ashland/Spoke to the project. The proposal followed the North Mountain Master Plan.
Over time, changes were made to the NMNP. The applicants had no issues with the recommendations and
Conditions from the Tree Commission or staff. The application was for fifteen single family homes. The project was
laid out to be consistent with the pattern of the adjacent neighborhood.
Distribution calculations were on page 2 of the applicants Findings. The maximum units for single family were
eleven. Transferring density to the flatlands made it too tight due to the flood plain, the alley and the existing street
above the area.
Mr. Knox liked the idea of placing benches around the outside of the wetland area and 50-foot protection buffer. He
would incorporate it into the plan. There was already a well-groomed park next to the site. Having another park
would add unnecessary costs to the Home Owners Association. The applicants decided to keep the open space in a
natural state. Eventually, a bike path would extend through the property. They would remove blackberry bushes and
willows from the wetland and replace them with appropriate plants. They would also remove sediment from the 1997
flood that was stored in that location.
Ashland Planning Commission
November 13, 2018
Page 3 of 4
Questions of the Applicant
Infrastructure would determine the sections and areas of lots 3 through seven that would get built. Mr. Knox had
concerns with the NMNP allowing multi-family on the steepest parts of the area. The applicants would most likely
ask for the minimum density and possibly an Exception for the density. The slopes were steep, 22-feet wide and no
more than 800 square feet. They were looking into multiple shared vehicles for parking. The applicants would at
least meet minimum density. There was a possibility they would have to mass the garages.
Four single family homes would go in a multi-family area that normally would accommodate twelve units. The lots
were on 25%-30% slopes directly facing other houses. It would be a challenge to get two units on each lot. However,
accessory residential units could go on the lots. Street and alley patterns dictated the lots.
The applicants resolved the location of Kestrel Way by moving it five feet out of the flood plain area during the pre-
application process. A section of the sidewalk was two feet into the flood plain. They were asking for a Condition to
move the sidewalk. It would still be in the flood plain but just outside of the water resource protection zone.
They followed the standards in the NMNP for the fire truck turnaround. The alley would function as a hammer head
turnaround. Alley standards in the NMNP had shoulders 2-feet wider than the City standards. It also had a 20-foot
width right of way instead of the standard 16-feet. They could ask for an Exception at the final plan stage.
Public Testimony
Dennis Holeman/Ashland/Was the Chair for the Mountain Meadows Emergency Preparedness and Safety Group.
As North Mountain expanded, the evacuation route needed to be considered. Initially the emergency plan included
the Nevada Street Bridge. It was not in place at this time and was critical for evacuation. He referred to a letter in
the record from Lee Bowman.
Rebuttal by Applicant
Mr. Knox agreed with Mr. Holeman that the Nevada Street Bridge was key for emergency evacuation. The City
Council had made Findings the bridge was not appropriate at this time. He was not sure how to solve it since it was
a City Council decision.
Deliberations & Decision
Mr. Severson explained the application was proposed under the Proposed Performance Standards Options Chapter
and described the two tier processes.
Commission comment was concerned the area was zoned for so much density. It didn’t make sense to require that
high of density for such a steep slope. Other concerns were parking.
Commissioners Brown/Dawkins m/s to approve Planning Action PA-T2-2018-00005, Kestrel Parkway with
street width hammer heads and all of the staff Conditions and recommendations.
DISCUSSION: Commissioner Brown explained the project met the criteria before them tonight. The staff
recommendations were in conjunction with the master plan and the City. Roll Call Vote: Commissioners Thompson,
Pearce, Dawkins, Brown, Harper, Mindlin, and Norton, YES. Motion Passed 7-0.
ADJOURNMENT
Meeting adjourned at 8:46 p.m.
Submitted by,
Dana Smith, Executive Assistant