HomeMy WebLinkAbout2023-14 Miscellaneous Fees & Charges Repealing 2022-13DocuSign E
ID: 4C68F047-E6CD-4062-9C2B-D2G4503F531 D
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
RESOLUTION NO. 2023-14
A RESOLUTION ADOPTING A MISCELLANEOUS FEES AND CHARGES SCHEDULE
AND REPEALING RESOLUTION NO. 2022-13
RECITALS:
A. The City of Ashland sets its fees and charges by resolution; and
B. Miscellaneous fees and charges for the City are set forth in Resolution No.2022-13; and
C. It is necessary to make adjustments to the City's fees and charges to cover the full costs of
providing the services involved.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF ASHLAND, OREGON,
RESOLVES AS FOLLOWS:
SECTION 1. There are hereby established, and there shall be collected, fees and charges as set
forth in "Exhibit A," which is attached hereto and incorporated herein by this reference.
SECTION 2. This resolution repeals Resolution No. 2022-13, and supersedes any other
resolution to the extent such resolution enacts fees and charges of the type set forth herein.
SECTION 3. This resolution is effective upon adoption.
ADOPTED by the City Council this 6th day of June 2023.
ATTEST:
SIGNED and APPROVED this 7th
Reviewed as to form:
DocuSigned by:
SSO, (fit At&
Melissa Huhtala, City Recorder
June
day of 2023.
L"V,"
Tonya Graham, Mayor
V
RESOLUTION NO. 2023-14
Page I of 1
EFFECTIVE DATE: July 1, 2023
�S RECR-
EFFECTIVE DATE: July 1, 2023
Miscellaneous Fees and Charges
TABLE OF CONTENTS
IT vOF
ASH�`��~����
�
�-�- — MISCELLANEOUS FEES AND CHARGES
SECTION I — City Wide Fees
CopyFees ......... —...................... .....................................
—................................... Page 7
Non -Sufficient Funds Check Fee ...........................................................
.... —...... Page 7
Rates and Charges Set bySeparate Resolution
............................................................... Page 7
AFNResolution ....................... ........... ...............
.... ........... ................................. Page 7
Electric Resolution .......................... —................
.................................................... Page 7
Wastewater (3ewer)Resolution ...................................................
....... ----........ Page 7
Storm Drain Resolution .................................
—...... ............ —.... ...... ......... —........ Page 7
Transportation Resolution --......................
...... —............................ ___ ... ... ..... Page 7
WaterResolution ..... .................. ... .............
—..................... —............. .............. Page 7
ResearchFee .........................................................................................................................
Page 7
SECTION 3-Finance
Business License Fees ......................................................................................................... Page 8
Initial Business License Application Fee ......... ....... —...... --.---------...
Page 8
Temporary Business License Application Fee. .................. —......
—.......... —........ Page 8
Renewal Application Fee ................ ____ .... ................ ............. ---...........
........ Page O
Late Application Fee .............. —..... —................ —...... --....................................
Page 8
Late Renewal Fee (paid 3Udays after the due date) ................ ... ...
.................. .... Page 8
Reprint Business License .............. ...... ................. .......... ..............................
Page
Marijuana Dispensary Permit Fees ......................................................................................
Page 8
Permit Application Fees .......................................... —................ ...........
......... ..... Page 8
Permit Renewal Fee ... ............................... ....................... ........... -----............
Page O
LateApplication Fee ........................... ....... ................ ........ ...... -.........
—......... Page 8
Late Renewal Fee (paid 30days after the due date) ............. ..............
........ ........... Page 8
Utility Billing Administrative Fees .......................................................................................
Page 9
AdministrativeFees ................... .............. ......................... '—.........
—.................... Page 0
Reconnection Charge. .......... ---.................................. ............
.............. ........ Page Q
Service Connection ... .................... —... ......................... —...................................
.... Page 8
ParkingFees ..........................................................................................................................
Page S
CharoingFeesforBecthcVehicJos:------------------------.PaQaQ
PaidParking Fees .......... ........... —.................... —.........................
.................. ... Page Q
OtherOmwntownPadkingAreaFoaa---------—---------
-----'PogeA
Parking Fines and Fees o)...................................... ...............
—........ —...... Page Q
SECTION 3-City Recorder
AudioTapes ....................................... ----...........
......... ---...... --............ Page 10
LiquorLicenses .................................... ........... ..........
......... —............. ............. Page 1O
Taxicab Licenses ... ..... —..................... ........... ---......
--.... ............. ............... Page 1O
LienSearches .......... ........ ........ .................. ......
—............ ......................... .... Page 1U
Elections......... —.... ................................... ---...............................................
Pago1O
Street/Alley Vacations ...... .......... ....................................
—.... —......................... Pooe1O
Ambulance................ ...... ........... ..................................
................................... —... Page 1U
Annexation............. ...................................... ..........
....... —.............................. .... Page 10
ResearchFee ........ —...... .......... .......................................
........................ ........... Page 1O
SECTION 4 - Planning / Community Development
Pre -Application Conference --....... ..... —.................
----........................ .Pooe11
Administration Aotiona—.......... —..................................
----......... .............. . Page 11
Type|Reviewn--....... .......... --...... ........... ... —...........................
........ ....... Page 11
TypeU.U|Reviews ............................................. ................................
... —........ ... Page 12
Legislative Amendment ------------------------------page12
Appeals...... ...... .............................. ................. .............................
----.......... Page 13
Im
Solar Access ........... ......... .................................... ... .......
—
Community Development Fee ...... ................................
—'
.Community Copy Fees ........... —... ......... --......................
Research Fee ..................... ........... --..................................
Building Division Permit Fees ..........................................................
Bui|dingPqrnitFoma--------------------'
Plan Review Fee for Commercial and Residential .................
Miscellaneous Fees for Commercial .. .............. .................
Inspection Fees for Commercial and Residential ---`--�
Change ofOccupancy Fees ..............................................
—
Demolition Faas—........ --...........................................
--�
Residential Plumbing Permit Fees ..................................................
Commercial Plumbing Permit Fees .................................................
Residential Mechanical Permit Fees ...............................................
Commercial Mechanical Permit Fees—.----.---..—.—..---.
Electrical Permit Fees .......................................................................
Residential Restricted Energy Electrical Permit Fees ...................
Renewable Energy Systems .............................................................
BuiNingPermitRenstatemertFoe-----—-------.
Exoavatun/GrodingFaua------------------.
|nvestigationFeem------—-----------
----
StateofOregonSurchorge-----------------
�
Building Permit Refund Policy
How torequest orefund .... ---............ —........................
SECTION 6-Electric
Pogm13
Page
Pagm13
Pago13
.—.—.........^.......paQe 14
...................... —..... Page 14
...................... --'Page 14
.................... ---' Page 1S
—................ .......... Page 1G
—......... --.......... Page 1G
—....... --..... ... ... Page 1G
................—.—Poge 17
................................ Page 17
................................ Page 18
................................ Page 3O
................................ Page 2U
................................ Page 21
................................ Page 23
................. ......... —' Page 22
.................... ........... Page 22
—.......... .................. Page 23
—..... ...... --... ... Page 23
.................. --...... Page 23
... ........... —......... Page 23
............. --... ..... Page 23
Banner.............. ...... .......... ............ --...... —... .................
............................... Page 24
Temporary Service Drop .................. ----....................
........ ............................ Page 24
StreetLight .... —.............................. ...... —........ ..........
....... ........................... Page 24
MeterCharges ...................................................................................................................... Page 24
Non Radio Frequency Meter Charges. ... ..........................................
..... ....... ...... Page 24
ServiceCalls ........... .... ......... ... ............................................
........ ......... .... —.... Page 24
Scheduled Work After Hours ........ —.......... ..................................
—.... ... ........... Page 24
Unauthorized Connection— ............... .........................................
........ --......... Page 24
Line Extension Charges ...................................................................................................... Page 24
ENRCalculations ................................................................................................................. Page 2S
ReportFees ............... .................................. ----......................
.................... ' Page 2G
Fire Investigation mndFinaK8ereha|Noports-------------------'peye2S
ResearchFee .................................................. .......................... .......
—................ Page 2S
CostRecovery ........................ —................................................ --...
--... ......... Page 2O
Emergency Medical Services .... ----........................................
--........... ..... Page 27
Fire Marshal Review Fee ..................................................................................................... Page 27
PlanChecks ... ...................... ................ ....... ---...... ..................
--............... Page 27
Other-- ... ... .......................... —......... ---.................................
--......... Page 27
First Aid/CPR Classes ................ ............... ..........................................
...... ........ Page 28
InspectionFees .... ........ .......... ............. .............................. .................................
Page 2O
Operational Permits —..................... --...... --.................... —...........................
Page 28
Construction Permits .......................... ................... ---....................................
Page 2Q
Fire Systems Cover Up/Acceptance Test Inspection ................... ..........................
Page 2A
WeedAbatement. ....................................................... ........ ............
—.................. Page 2S
Other - Apparel |ban1s--........... ..................................................
......................... Page 2Q
TABLE {3FCONTENTS
SECTION 7 -|nforniotkonTeohnok»Qy
Installation Fees .............................................. —.......... —.........
........... .............. Page 3O
Disconnect Fees ..... ...................... ...............................................
--....... ........... Page 3O
TruckRoll --......................... .......... ................................ —........
—....... —...... Page 3U
Field Technician Hourly Rate ... ........... .......... ------........
.......................... Page 3O
Consulting and Technical Support Hourly Rate ..... ----...................................
Page 3O
Non -City Employee Staff Screening ........ —..................................................
—... Page 3O
Fiber Service Installation ............... ---........................ .....................
....... ......... Page 3O
Ethernet........... ..... .................... .....................................................
--................. Page 3O
Static|PAddress ........ —............ ......... ..........................................
..................... Page 3O
QualityofService Fee ............... ...... .................................... ........
......................... Page 3U
Business Augmented Upload Package ............................. —........
...................... ... Page 31
Non -Return of Customer Premise Equipment (CPE) Devices .................................
Page 31
CATVSeasonal Reconnects &Disconnout ............... ............ .............
--........... Page 31
CATVHouse Amp Fee ........................ —............ --.............................
....... --Page 31
Utility Billing Lobby SklnogeFee ................. ............ —................
............ —.... .... Page 31
Cable Modem Rental ------.................. —............. ..................
--................ Page 31
Non Return ofRented Modem atClosing ofAccount ............ ---........................
Page 31
Cable Modem Purchase ...... ............ ....................... ....... ---...........
............... Page 31
GISDmta & Mapping Services ............................................................................... Page 31
G|SHourly Rate ..................... ...... --............ ------................................
Page 31
PlottingFee------------------------------------'Page31
SECTION 8 ' Municipal Court
Court Administration Fees ...................... .......... -------------.......
.............. Page 32
Appeal Transcript Fee ................ ............ .... ........ .................... --------...
Page 32
City Attorney Deferred Sentence/Diversion ... ................ ........ —...........................
Page 32
Civil Compromise Costs ............ —.................. .................... .............
................ .... Page 32
Compliance Inspection Fee. ................... ............. ..................................
........ ..... . Page 32
DefaultJudgnlent....... ............................. ....... ....... ........................................
... Page 32
DiscoveryFees .................... ___ ................................. —.................. ................
...... Page 32
Traffic School Program: Classes A-D.including special zones ..........................
... Page 32
Extend/Amend City Attorney Deferred Sentence/Diversion ......... ...............
........... Page 32
Failure tVAppear for Bench Trial/Show Cause Hearing .....................
.................... Page 32
Failure to Appear for Jury Trial. ...................................... ....................
—................ Page 32
Forfeiture nfSecurity .... —.............. ----.......... .................. .............................
Page 32
CourtCosts .............................................. ............. ................ ......................
... ' Page 32
Show Cause Admission of/U|egaUon—... —................. ................ ------........
Page 32
Bench Probation Fee ....... ........... —............................. ........ —........................
... Page 32
Warrant.................. ........... —........................................... ---............
................ Page 32
SECTION 9 - Police
PoliceReports— ........ ........................... ............ ___ ... --................
.................. Page 32
ResearchFee ... ....... ............. ........ ....... ...... ... —... ................. —......................
' Page %2
VisaLetters ....................... —........... --... —................................ —
.................... Page 32
FingerPrint Cards .... ......... ---........ ............ ....... ................................
--....... Page 32
Photographs(C[)...... ... —......... --............................. —................
—................ Page 32
AudioRecordings .... ........................................... —................... .......
............... —'Page 32
Mobil Audio Video Recordings (M/V/.... ........................................ .......
...... Pmge32
Body Camera Video ......... ..................... ........... ... ................... .............
....... .... Page 32
Impound/Tow Fee ...... .......... ............. ---.......... —....... ...................
........... .... Page 33
Vehiclesfor Hire ........................ ......... _---................... --........
............... Page 33
SECTION Y0-Public Works - Miscellaneous Fees &Charges
CPI &ENRCalculations, ... ................. ---...... ........................... --................
Page 34
Plat& Plan Checks .......... .............. ---........................... —..........
.................. Page 34
Public Works/Engineering Inspections, Permit, Etc.....--------------Page35
Im
Sanitary Sewer Connection Fees ................... ............. -... ..... ........................ — Page 3G
Water Connection Fees ..... ........................ ...... ........ .............. ............... ....... Page 3O
Cemetery Fees, Sales of Liners, Markers ............................... ........ ....... .............. Page 3G
SextonFees ... ............................ ---........................ ....... .................... -...... Page 37
Vases. ................................ ..... -................................... ....... ... ........................ Page 37
AshlandAirport Fees .......................................................................................................... Page 3U
Lease Type A CityOwned-Renta|s--------------——----Pege38
LeeseTypeB-GroundLeaso City Owned Hangars ........... ................................ Page 38
Lease Type C' Ground Lease - Privately Owned Honguns—... ............................ Page 38
Hangar Reservation Fees ..................... -... -.... ............ --_............................ Page 38
Specialized Aviation Service Operations Fee— ... ............ ......... ............................ Page 38
Mobile Service Providers ([WSP)Airport User Fee ............. ........................... ......... Page 3U
FreightOperations ... -... .... .......... ..................... ........... .................................... Page 3Q
SECTION 11 - Parks and Recreation Miscellaneous Fees and Charges
Group Picnic Rentals ......... --- ................ -...........................................
.......... ... Page 4O
Deposits— ....... .................. ...... .......... ... ........ ......................... ....... ---
.......... ' Page 4O
Special Event Fees ............... ----......... ....... ............................. ..............
........ Page 4U
AlcoholFee ............................. ...... -............ -......................................
--...... Page 4O
General Building Reservations ......................................... ......... -.......... ................
Page 40
FieldUsage ........ -----............................................. --....... ........
........... Page 42
Ca||eSeating .................. ....... -...................................... .....................................
Page 42
DanielMeyer Pool ...... ...................... .................................. --.......................
.... Page 42
Youth & Adult Recreation Programs .................................... ... .... ... ... ...............
Page 42
Senior Recreation Programs & Services ........ --- ......... -....................
-......... Page.42
Ashland Rotary Centennial Ice Rink ----...........................................
-.... .... Page 42
Oak Knoll Golf Course Fees ..................................... ....... ..................... -...........
Page 42
Community Garden Fees ........................... --........... --........................
-...... ... Page 43
Nature Center School Programs ............ -.......... ............................... ........
-..... Page 43
Oak Knoll Golf Course Wedding Fees ....... -........ ............ .............. -
..... ... Page 43
SECTION 12 - Attachments
Community Development -
Excavation GnadingFeeo-Exhibit/\------------------------Page44
Public Works-
Tie
AdministnaivoSen/iomsFinonce
CitV Wide Miscellaneous Fees and Charges
Copy Fees
Black and White Copies
Letter/Legal
Single -Sided
$O.20each
Black and White Copies
Letter/Legal
Double -Sided
$O.4Oeach
Black and White Copies
Tabloid
Single -Sided
$O.40each
Black and White Copies
Tabloid
Double -Sided
$0.80each
Color Copies
Letter/Legal
Single -Sided
$1.50each
Color Copies
Tabloid
Single -Sided
$3.00eaoh
Non -Sufficient Funds Check Fee
Rates and Charges Set by Separate Resolutions
System Development Charges (SDCs)
Parks and Recreation SDCoResolution
Transportation SDCaResolution
Sewer GDCsResolution
Storm SDCsResolution
Water SDCnResolution
Utility Rates and Fees
Ashland Forest Resiliency Surcharge Resolution
Public Safety Support Fee Resolution
AFNUtility Fees Resolution
Electric Rates Resolution
Wastewater (SewahRates Resolution
Storm Drain Fees Resolution
Transportation Fees Resolution
Water Rates Resolution
Research Fee
A. The City shall charge a research fee based on the hourly wage of the staff person doing the research, and
the fee shall bebilled infifteen minute increments. The hourly wage used hocalculate the research fee shall not
include the cost ofbenefits. The City will establish a fee in its annual fee resolution that is reasonably calculated
to reimburse the City for the actual cost ofmaking public oaoonda available, including locating the requested
records, reviewing the records to delete exempt mobaha[ supervising a poreon's inspection of original
documents to protect the integrity of the records, summarizing, compiling, or tailoring a record, either in
organization of media, to meet the pomon's request.
The City may charge for search time even if it fails to locate any records responsive to the requeator even if
the records located are subsequently determined to be exempt from disclosure.
Copies of documents provided by a routine file search of 15-30 minutes or less will be charged at a copy rate
established inthe annual fee resolution.
B� The City may include a fee established to reimburse for the costs of time spent by the city attorney in reviewing
the public records, reclacting materials from the public records into exempt and nonexempt records. The City
fee may also include the coat of time spent by an attorney for the City in determining the application of the
provisions of ORS 192.505.
C. The minimum fee is$25. Any research estimate above $25will be provided inwriting tothe requester in
advance. The requester must confirm in writing that he/she wants the City to proceed with making records
available before the work ie done
Administrative Services/Finance
D. Prepayment shall be required if the amount of the request is greater than $25. |fthe actual charges are less
than the prepayment, an overpayment shall be refunded.
Administrative Billing Charge
Finance MiSGellaneous Fees and Charaes
Business License F
Initial Business License Application Fee
Licensee shall pay a prorated fee of $10 for each month,
orportion ofamonth, remaining inthe fiscal year from
the date of the application with a minimum fee of$25.UO
applicable toall businesses except for rental properties
with fewer than 2dwellings, pursuant toAMC 804.O2O.A.
Temporary Business License Application Fee
M.- 11ffiZ-Mj-U
Late Application Fee
Late Renewal Fee (paid 30 days after the due datel
Reprint Business License
(up to 10%) Per Billing
$12O.00for first 2employees*
+$5.00for each additional EE
$7S.00for first 2employees*
$iO.O0for each additional EE
$25.00
10%, minimum of $25.00
~Pursuant to AMC 6.04.020.F. Employee. Any individual who performs service for another individual or
organization having the right tocontrol the employee ootothe services tobeperformed and aetothe manner of
performance. For purposes of this ordinance employee also means a licensed naa| estate sales person or
associate real estate broker who engages in professional real estate activities only as on agent of real estate
broker ororganization.
Marijuana Dispensa!y Permit Fees
Permit Application Fee
Initial application - July 1—June 3O
Applicant shall pay aprorated fee ofG10for each month,
or portion of noonth, remaining in the fiscal year, from the date of
the application with aminimum fee of$4O.0Oand an$8U.0Umaximum.
Permit Renewal Fee
Due each July 1
Late Application Fee
After the start of business
Late Renewal Fee (paid 30 days after the due datel
$10.00/month
10%, minimum of $25.00
Am
AdministraUveSen/icooFinonne
UtillitV Billing Miscellaneous Fees and Charges
Administrative Fees:
Notification ofPending Termination $10.00
Returned Check Charge $35.00
Reconnection Charge:
During Business Hours $30.00
After Hours or Holidays $125.00
Service Connection:
Normal working hours 810.00
Other Hours orHolidays $125.00
Parking Fees - as per Resolution 2016-14
Charging Fees for Electric Vehicles: $0.20/kWh
Paid Parking Fees (where applicable):
City structure or lot:
6:00a.m. G:OOp.m. (or segment) $2.00
G:OOp.m.-2:UOa.m.(per hour) $2.00
S:OOe.m. -2:0Oa.m. (maxi mun) $10.00
Parking permit (where applicable in City structure nrlot)
Other Downtown Parking Area Fees:
PuddnoFines and Fees (uitv-wida):
Basic fine for overtime, improperly parked, non-paynnant etc.
$22.00
Additional fine for receiving 3or4tickets inacalendar year
$25.00
Additional fine for receiving 5ormore tickets inacalendar year
$50.00
Parking fine for Handicap Space violation
$10O.00(or asset bvstate law)
Disabling / Boot Removal Fee� available aonegotiated bythe City
$85�00
with tow company for 24'houravailability
City Recorder
City Recorder Miscellaneous Fees & Charges
Audio Tapes
$5.00 each
Liquor Licenses
Temporary Liquor License (processing fee)
(in addition toFire fee listed onpage 24)
Liquor License (new processing fee)
Liquor License (change ofownership processing fee)
Annual Renewal Liquor License
Lien Searches
Routine Requests
Elections (amount set byResolution #20O0-05
Required deposit for Citizens Initiative
StreeVAlley Vacations (filing fee set byResolution 1U84-24)
Required deposit offiling fee
Ambulance
Annual renewal fee
Annual ambulance fee (each vehicle)
Annexation
Processing fee for County Department ofAssessment
Research Fee
Paye1U
Planning / Community Development
Planning / Community Development Miscellaneous Fees and Charges
Pre -Application Conference $200.00
Administration Actions
Final Plat Review:
Partitions*
$185.50+$1100/lot
Subdivisions*
$420.50+$35.26/lot
New Sign Permit
$165J5+$3.00/eqft
Portable Sign Permit
$3525
Temporary Event Food Truck/Cart Permit
$32,25per event
Food Truck/Cart Permit
G420.58
Address Request Fee
$47.50per address number
Street Name Approval Fee
$121.00 per street
Street Tree Removal Permit
$100.00
Replacement Sign Permit
$35.25+$3.00/eqft
Home Occupation Permits $35.25
Zoning permit (fenoe.accessory structure, etc) $35.25
Land Use Approval Extension Request $420.50
Lot Line Adjustments $420.50
Any other Administrative Action $420.50
Tree Removal Permit (not associated with another aoton) $100.00
Solar Setback Variance $1.271.25
Amendments toConditions $1.271.25
Physical & Environmental Constraints Permit $1`271�25
Conditional Use Permit (Type |only) $1.271.25
Variance (Type |only) $1.271.25
Residential Site Review $1.271.25+$84.50/unit
Planning / Community Development
Land Partitions
Commercial Site Review
Any other Type |Review
Independent Review of Wireless Communication Facilities'
Type 11 Reviews
Conditional Use Permit (Type Uonly)
Variance (Type ||only)
Outline Plan or Preliminary Plat for Subdivisions
Final Plan with Outline/Performance Standards
Subdivision
Commercial Site Review
Any other Type ||Review
Independent Review ofWireless Communication Fao|itiee^°
$1.37125+884.50/unit
$1'271.25 +�596 (.UOS) of project
value**
$1.271.25
$5,000.00
$2,663.25
$2,663.25
$3.663.25+$170.25/lot
$3.397.00+$170.25Uot
$2.663.25+.5Y6 (D05) ofproject va|ue~^
$2,663.25
$5,000.00
'Project value includes the estimated valuation of all structures (per State of Oregon Building Code), as well as
all related project site improvements, such as grading, paving, landscaping, biosvva|au' etc.
'The initial deposit required with an application fora new wireless communication facility that is not collocated
is $5,000 and shall be used by the City for the costs of expert review of the application. If any time during the
planning application process the account balance is less than $1,000, the Applicant shall upon notification by the
City replenish the account, so the balance is at least $5,000. The maximum total consultant fees to be charged to
the Applicant shall be $1O'OOO'and any unused portion offee will berefunded.
TvmaIII Reviews
Zone/Comprehensive Plan Map Change
$3.397.00
Comprehensive Plan Change
$3.397.00
Annexation
$5.110.00
Urban Growth Boundary Amendment
$5.11O�00
Any other Type |||Review
$1.867.00
Legislative Amendments
Comprehensive Plan Map/Large Zoning Map Amendment
$5.963,50
Land Use Ordinance Amendment
$5.963.50
Comprehensive Plan Amendment $5.963.58
Planning / Community Development
Appeals
Appeal for initial Public Hearing
(Building Appeals BoardlDemolition Review8oendlfYanning Cmnvnoisok7n)
Appeal for Final Decision of City (Planning Commission or City Council)
Solar Access
Solar Access Permit (not aSolar Vohmnce)
Community Development Fee
This fee is charged concurrently with Building Permit
Fees atthe time nfbuilding permit application for all
building permits requiring a plan review.
This fee shall not exceed $30,000 per Building
Permit for the Ashland School District.
$O0.5O+$14.00per lot affected
1.2% (.U12)ofnew construction
per building code definition
of valuation.
Site Design & Use Standards
$5.00
Street Tree Guide
$5.00
Transportation Element
$5.00
Downtown P|ana(2OO1. 1998)
$5.00
Street Standards Guide
$5M
Comprehensive Plan/Land Use Code
$40.00
Mar uana/Hemp/psilocybinLendUsaCompotbi|ityStatoment(LUCS) $227.00
Zoning Verification Letter (ZVL) $50.00
Research Fee Refer hmSection 1.pg. 7
Electronic documents that can be located by a routine file search of 15 minutes or less will be provided at no
charge. Record requests that exceed 15 minutes of staff time to complete will be charged a minimum $25
research fee. Prepayment and written approval to proceed is required before any research work iadone by
staff.
Page13
Planning /Community Development
Building Division Permit Fees for Commercial and Residential
In accordance with OAR 918-050-0180: "Residential construction permit fees shall be calculated using the
following methodologies. (o) Effective January 1. 2009. m structural permit fee for new construction and additions
shall be calculated using the |CC Building Valuation Data Table current April 1 of each year, multiplied by the
square footage of the dwelling unit to determine the valuation. The valuation shall then be applied to the
municipality's fee schedule to determine the permit fee. The plan review fee shall be based on a pre -determined
percentage of the permit fee set by the municipality. (A) The square footage of dvvo||ing, addidon, or garage
shall be determined from outside exterior wall to outside exterior wall for each level. (B) The square footage ofa
carport, covered porch, ordeck shall bacalculated separately otfifty percent ofthe value ofoprivate garage from
the |CC Building Valuation Data Table current as of April 1. (C) Permit fees for on alteration or repair ohm|| be
calculated based on the fair market value as determined by the Building OfDcio|, and thanapplying the valuation
to the municipality's fee schedule.
Commercial construction permit fees shall be calculated using the following methodologies. (c) A structuralpennb
foe shall be calculated by applying the valuation to the municipality's fee schedule with a set minimum fee.
Valuation shall be the greater of either. (A) The valuation based on the ICC Building Valuation Table current as of
April 1 of each year, using the occupancy and construction type as determined by the Building Official, multiplied
by the square footage of the structure; or (B) The value as stated by the applicant and approved by the building
official. (C) When the construction or occupancy does not fit the ICC Building Valuation Data Table, the valuation
shall be determined by the Building Official with input from the applicant."
Building Permit Fees
Total Value ofWork Performed
$1.00to$500.00
Plan Review Fee for Commercial and Residential
Plan Review Fee
Fire and Line Safety Plan Review (when applicable)
Additional Plan Review required bvchanges,
additions, orrevisions
$0O.U0per hour
$0O.00for the first $6UO.UOplus $1O.UO
for each additional $1OUU.00orfraction thereof, to and
inc|uding$2.0OO.0O
$110.00 for the first $2.000.00p|us $8.00 for each
additional $1.OUO.00orfraction thereof, to and
induding$25.000.0U
$2A4.00for the first $25.0OO.OUplus $O.0Ofor each
additional $1.00O.0Oorfraction thereof, toand
ino|uding$5O.00O.00
$494.00 for the first $50.00O.00plus $5.00 for each
additional $1.OU0.O0orfraction thereof, to and
inn|uding$1OO.OUO.00
$744.00for the first $1D0.0O0.00plus $4.ODfor each
additional $1,000.00 or fraction thereof
Aplan review fee equal to85Y6ofthe structural permit
fee shall bedue atapplication
40% of permit fee
$QO.00per hour (1/2-hourminimum)
Planning / Community Development
Special Inspection Agreement (QAA)Review Fee
Foundation Only
Residential Deferred Submittal Fee
Commercial Deferred Submittal
Fees (Payable atbuilding plan
review and is inaddition h/
plan review of deferred work)
Phased Permit Fee
Shell Building and Tenant
Improvement Spaces
Foundation Only
$275M+1O96ufthe total
building permit fee for each
phase ofwork, Not k>
exceed $1'50O.00for each
phase,
65YS of the structural permit fee ookm|etad using the
total valuation ofthe deferred portion +$1OO.UOper
deferred item.
G5%ofstructural permit fee
calculated using the total valuation
ofthe deferred portion +$1OO.OUper
deferred item
$275.0Uper phase +iUY6ofthe total
building permit fee for each phase
ofwork. Not toexceed $1.50U.00for
each phase.
Permit fee for the construction of
the shell building isbased on8O%nf
the valuation determined by
building valuation data. The tenant
improvement permit fee isbased on
2U96ofthe valuation
$275M + 1096 ofthe total building
permit fee for each phase ofwork.
Not toexceed $1.5OO.00for each
phase
EM
Planning / Community Development
Miscellaneous Fees for Commercial
Commercial Fire Sprinkler/Fire Suppression/
Fire Alarm
Commercial Fire Sprinkler/Fire Suppression/
Fire Alarm Plan Review
Total value ofwork performed
(structural permit fee)
65% of structural permit fee
Note: See appendix for methodology for calculation of valuation for all permit fees utilizing valuation/value of
Inspection Fees for Commercial and Residential
Re -inspection Fee
Inspections outside normal business hours (minimum 1 hour)
Temporary Certificate ofOccupancy and Reapplication Fee (s)
Site Observation -inspection (e.g. pre permit consultation)
Change ofOccupancy (without additional work done)
Change Of OGGUpancV Fees (without additional work being done)
$90 per hour, $150 minimum
Special Inspection Roport
Re -issued Certificate ofOccupancy
Demolition Fees
Demolition Review Fee (non-exennptstructures)
Demolition Permit Fee (per building)
Demolition Capping off Sewer, Water, Rain Drain
813O.ODper hour; per
inspector
$5O.O0per
discipline/permit.
Renewal required every 3O
Days
$90/hr(1 hcminimum)
$9O1hr$15Ominimum
$G5.OUper hour
No Charge
Permit fee for verifying utilities
have been safely removed and
capped off. 1 hr.minimum.
$0U/hc
$90.00/hour (1 hour minimum)
Planning / Community Development
Residential Plumbing Permit Fees
New Residential
1bath room/kitchen (indudme: first 1OOfeet Vfwater/sewer lines; hose -bibs
ice maker; under floor low -point drains; and rain -drain packages)
2bzthnoonoe/1 kitchen
3 bathrooms/1 kitchen
Each additional bathroom (over 3)
Each additional kitchen (over 1)
Remodel I Alterations
Remodel / Alterations (minimum fee)
Each fixture, appurtenance, and first 100 ft. of piping
Miscellaneous Residential
Minimum Fee
When purchased asbathroom unit(s)—includes the first
YU0ft. ofwater service, sanitary &storm.
Piping orprivate storm drainage systems exceeding the first 100ft
BaokDowAssemb|y
Re -pipe water supply
Alternate Water Heating Systems (coils, heat pumps, etc.)
Solar
Swimming Pool Piping
Residential Fire Sprinkler (include plan review)
0-2.00OSquare Feet
2.001-3.800Square Feet
3.SO1-7.2UOSquare Feet
7.2O1+Square Feet
Manufactured Dwelling or Pre -Fab
Connections to building sewer and water supply
RV and Manufactured Dwelling Parks
Installation Fee
State Fee
Factory Manufactured Awning/Carport
Each additional 10 spaces
Commercial Plumbing Permit Fees
Commercial. Industrial. and Dxve]|inoeother than one- ortmo-ferni|
Cost Each
$400.00
$500.00
$575.00
$50.00each additional
$5O.00each additional
$75.00
$2Ueach additional
$150.00
$30.00
Fee based onvaluation of
installation cost and system
equipment. Refer to structural
permit fees.
$100.00
Minimum fee
$75.00
Each fixture
$40.00
Swimming Pool Piping
$60.00
Piping (based onnumber offeet)
$075/ft.
Plumbing Plan Review
30Y6
Sanitary Services
First 100 Feet
Rim
Poge17
Planning / Community Development
Each Additional 100 Feet or fraction thereof
Storm Services
$0.75
First 1O0Feet
$0.75
Each Additional 1O0Feet orfraction thereof
$0J5
Water Services
First 100Feet
$075
Each Additional 1OOFeet orfraction thereof
$0J5
Commercial Fire Sprinkler (include plan review)
Fee based on valuation of installation cost and system equipment
$1.00tn$500.00 $Q0.0Oper hour
$1OO'UO1.00and up
$QO.00fo«U1efirot$5OO.00plus $10.U8
for each additional $1OOO.00orfraction thereof, toand
including $2.000.00
$110.00for the first $2.00O.O0plus $8.UOfor each
additional $1.O0O.00orfraction thereof, toand
inc|uding825.U8O.0O
$294.00 for the first $25.00.00 plus $8.00for each
additional $1'000.00orfraction thereof, hoand
ino|uding$5O,0OO.O0
$494.00 for the first $50.000.00 plus $5.00 for each
additional $1.DOU.O0orfraction thereof, to and
ino|uding$1OO.0OO.00
$744.00for the first $1OU.OD0.DOplus $4.0}for each
additional $1.00O.00orfraction thereof
Fire Sprinkler/Fire Suppression/Fire Alarm Plan Review G5%nfstructural permit fee
Minimum Permit Fee
Miscellaneous
Minimum fee
Specialty fixtures
Re -inspection (no
of hrs. x fee per hour)
Special requested inspections (no. of hrs. x fee per hour)
Medical gas piping
Minimum fee
Valuation $500to$2.00O
Valuation $2'0O1to$25.00O
Valuation $25.O01to$50.DOO
Valuation $5O.8O1to$1OO.U00
Valuation greater than $1OO.0OD
$90.00
$40.00
$SO/hc (1/2 hr. minimum)
$50.00
$5O.00+$5per $1OOOofvaluation
$125.0O+$18per $1OUUofvaluation
$540.UO+$14per 81OOUofvaluation
$8AO.00+$Qper $iUOUofvaluation
Planning / Community Development
Rainwater Harvesting SVstem
Fee based onvaluation ofwork b/beperformed.
Minimum fee
Valuation $1to$5OO
Valuation $2,001 to $25,000
Valuation $25,001 to $50,000
Valuation $50,001 to $100,000
Valuation greater than $1O1.0OOand up
$75.00
$75for the first $500p|us $9fox
each additional $1OOorfraction
Mhereof, toand including $2.000
$21Ofor the first $2.000plus $1O
per$1.000. orfraction thereof, to
and including $26.OU0
$44Ofor the first $2S.0OOplus $1D
per $1.0UO.orfraction thereof, to
and including $5O.000
$60Dfor the first $GO.00Oplus $0
per $1.8OO.orfraction thereof, tV
and including $1O0.O0O
$1.14Ofor the first $1OO.000plus $9
per $1.OU0orfraction thereof
Residential Mechanical Permit Fees
Mechanical Permit Minimum Fee $75.00
Furnace/Burner including ducts & vents
Upto1O0kBTU/hc $20.00
Over 100k BTU/hr. $20.00
Unit Heater $20.00
VVood/peUet/gasotove/fluo $20.00
Ropair/o|bar/addtnheating appliance orrefrigeration unit $20.00
orcooling system/absorption system
Evaporated cooler $20.00
Vent fan with one duct/appliance vent $20.00
Hood with exhaust and duct $20.00
Floor furnace including vent $20.00
Gas Piping
One to four outlets (any number of outlets) $20.00
Air -handling Units, including Ducts
Upho1O.00OCFM $20.00
Over 1O.0OOCFK8 $20.00
Commrossnr/AbsorotkonSvstnn/HuatPum
Up to 3 hp/1 OOK BTU
$20.00
Uphz15hp/5OOKBTU
$20.00
Upto38hp/1'O0OBTU
$20.00
Upto5Ohp/1.75OBTU
$35.00
Over 5Dhp/1.75OBTU
$45.00
Incinerator
Domestic incinerator $20.00
Planning / Community Development
Commercial Mechanical Permit Fees
Valuation $1to$5OO
Valuation $5O1-$1O0.00O
Valuation $100,000+
Deferred Submittals +Fees
Plan Review Fee
Miscellaneous Fees
Re -inspection
Specially requested inspection (per hour)
Regulated equipment (un-classed)
Electrical Permit Fees
Residential per unit, service included
1.0UOsq. ft. orless
Each additional 50Osq. ft. orportion thereof
Limited energy
Each manufactured home ormodular dwelling service orfeeder
Multi -family residential
$80.00/minimum
$QO.00for the first $2'000.00
plus $1U.00for each additional
$1.00O.00orfraction thereof.
$1.O7U.00plus $i0.O0for
each additional $1.00O.U0or
fraction thereof.
$100.00oaoh
item plus 65% of
mechanical permit fee of
deferred submittal valuation.
25% of permit fee
Residential and Commercial —Services or Feeders/installation, alteration, relocation
2OOamps orless
$96.00
2O1to4OOamps
$115.00
401toSOOamps
$190.00
801 to1.UOOamps
$250.00
Over 1.00Oamps orvolts
$558.00
Reconnect Only
$75.00
TernoonyryServices orFeeders
2OOamps orless
$75.00
2O1to4O0amps
$100.00
4O1hoGOOamps
$150D0
SO1'1OOOamps
$250.00
Over 1,UOOamps orvolts
$450.00
Branch Circuits: new. alteration, extension perpanel
Branch circuits with purchase nfaservice orfeeder $8.00
Branch circuits without purchase ofa service orfeeder:
First branch circuit $65.00
Each additional branch circuit $7.50
Miscellaneous Fees: service or feeder not included
Each pump orirrigation circuit $85.00
Each sign oroutline lighting s05.00
Planning / Community Development
Signal circuit(s) or low voltage system,
alteration cvextension (each system)
$85.00
Subdivision lighting per pole inaddition toservice
$40.00
Swimming pool (pane[3circuits and bonding)
$00M
Specially requested inspection (per hour)
$00.00
Each additional inspection over the allowable inany ofthe
above, for those not covered under residential inspection caps
(per inspection)
$yO.OU/hr.
(1/2-hourmininlum)
Special Inspection ,
$90.00/hr,
(1/2'hourminimum)
Neinepection
$90.00/hr.
(1/2-hour minimum)
Field Review -Change ofuse
$QO.UO/hr.
(1/2-hour minimum)
Residential Restricted Ener-gy Electrical Permit Fees
Fee for all sVstems* $25.00
Audio and stereo systems
Burglar alarm system
Doorbell
Garage -door opener
Heating, ventilation, & air-conditioning systems
Landscape lighting & sprinkler controls
Landscape irrigation controls
Outdoor landscape lighting
Vacuum Systems
Each additional inspection $25.00
Tor new construction, this permit fee covers all systems listed or can be sold separately.
Planning / Community Development
Renewable EnerqV Systems
5 K\0Acvless
5.01 K\Alto15KVA
15.01KVAto25K}/A
25.01 K\AAand above
Engineered SVstems
(Separate Electrical application/equirec)
Plan Review
Re -Inspection Fee
Wind generation systems inexcess of25KVA:
25.01 K\6Ato 50 K\A\
$100.00
$100.00
$156.00
$156.00p|ua
$6.25/KVA for each additional
G5%ufBuilding Permit
$90.00/hr(1/2 hr. minimum)
For wind generations systems that exceed Y00KVA the permit fee shall be calculated in accordance with OAR
918-309-0040
Solar generation systems inexcess of25K}/A:
$G.25/KVA
The permit charge will not increase beyond the calculation forY00 KVA. Permits issued under this sub -section
include three inspeoti/no.Adciti7ne//napexbnnowi8bebilledatanhounlynate.
Building Permit Reinstatement Fee
Abuilding permit expires after aperiod of18Odays from the date ofissue with noinspection activity.
To reactivate an expired permit, a fee of $50.00 per construction discipline is required (Building, Plumbing,
Mechanical, Electrical).
*If the sum of the original permit fee subject to reinstatement is less than $50.00, a reinstatement fee equal to half
of the value of the original permit fee shall be accessed for permit reinstatement.
Grading Fees
Plan Review Fee
50cubic yards orless
51-1OOcubic yards
101-1.000oubio yards
1,OO1-1O.O0Ocubic yards
1O.001-1OO'OOOcubic yards
Additional plan review required
for changes, additions, or
revisions toapproved plans
Permit Fees
5Ocubic yards orless
514OUcubic yards
$AO.00per hour
No Fee
$125.00
$200.00
$400.00
$5UO.O0for the first 1O.0O1
cubic yards plus $50.00for
each additional 1O.00O
cubic yards nrfraction thereof
$10Ofor first 1D1yards plus
$35for each additional 1OO
cubic yards orfraction thereof
Planning / Community Development
Investigation Fees
Investigation Fee /\
Low effort hodetermine
Compliance
Investigation Fee B
Medium effort to gain
compliance. Stop Work order
posted. Applicant obtains
required permits within 10
business days.
Investigation Fee C
High effort to gain compliance.
Applicant failed to meet
deadline orhas had more than
one documented violation ini2
months for starting work
without permits.
State of Oregon Surcharge - ORS 455.210(4)
State of Oregon permit surcharge is 12% of otuns[ overall building permit.
p|umbing, n)eohankm| and electrical components of the
Building Permit Refund Policy
The City of Ashland Community Development Department offers partial refunds for building permits that have
been issued, have had no inspections performed and have not yet expired (six months from issue date). Refunds
for permits that have expired are limited to any Systems Development Charges (8DC'n) that were part of the
permit fees.
How to request a refund
Submit the following documents to the Community Development Department at 51 VWnbunn Way:
° Approved set ofplans (stemped)
* Job Inspection card
= Letter of refund request signed by applicant/owner with mailing address for refund check
The refund will be processed within 30 days of the date of the request letter.
The following fees are not refundable
" Building Plan Check Fee
* Fire Protection Review Fee
^ 50% of Community Development Fee (maximum equal to Building Plan Check Fee)
° 50% of Engineering Development Fee (maximum equal to Building Plan Check Fee)
The remainder ofthe permit fees are refundable. /\$50.00 administrative fee will be subtracted from the eligible
Electric
Electric Miscellaneous Fees and Charges
TemporarV Service Drop
Single Phase Underground temp 3OOamps cvless
Single Phase Overhead temp 3OOamps orless
Three Phase
Street Ligh
Install of Light Shroud
Meter Charges
Meter Tests for AccuracV
Once intwelve months
Two nrmore times intwelve months
Meter repairs/replacement (Damaged by Customer)
Non Radio FrequencV Meter Charges
Conversion from Radio Frequency (NF)toNon RFmeter
Monthly Fee to manually read Non RF meter
Service Calls
Once intwelve months
Two ormore times intwelve months
Other hours orHolidays
Service Connection for Applican
De -energize Service
Scheduled work after hours
Unauthorized Connection
Line Extension Charges
New Single -Family Residential ServiGe
Overhead service in existing developed areas
from distribution line to and including meter.
Overhead service upgrade orincreased service for 3OOamps orless
Replacement ofservice fromoverhead hounderground, 3O0amps orless
Customer provides all trenching, conduit, baokfiUing and compaction
as directed bythe City.
Underground residential service of3UOamps orless. Customer
provides conduit, trenching, back fill, compaction as directed by the City.
$125.00eaoh
$247.00
$295.00
Actual Cost
No Charge
$176.00
Actual Cost
No Charge
No Charge
No Charge
$203.00
$303.00
$254.00
Actual Cost
$215.00
Electric
*Underground Distribution Installation Charges: Per lot less house
$1.186.00
service and engineering fees.
*Subdivisions ofOto20engineering fee per lot
$171.00
^ Subdivisions of21+engineering fee per lot
$259.00
*Three Phase subdivision aerequired bvcity per lot
$259.00
Any overhead/underground service over 3OOamps
Actual Cost
Commercial, Institutional and Industrial Service
Actual CUst
°°BlovvmrDoor Leak Test (gas heat customers only) $75.00
**Duct Leak Test (gas heat customers only) $125.00
ENR Calculations
° Methodology: Current ENRRate - Old ENRRate/Old ENRRate =Y4Rate ofAdjustment
(9515.86-0289�65)/9289.65=2.44Y6
Source: Engineering News Record Construction Cost Index (ENR)
**Electric heat customers = no fee
PaOe25
Fire Miscellaneous Fees and Charges
Report Fees:
Non patient Pre -Hospital Care Reports $2O.00for 1Opages orless,
$D25each additional page
Fire Incident Reports $13.0Ufor 1Opages orless
$15.00over 1Upages
Patient Report $4U.00for 1Opages orless,
$025each additional page
Mailing Cost Actual Cost
Fire Investigation and Fire Marshal Reports
Narrative Report $2O.0Ofor 10pages orless,
$0.25each additional page
Photos $1.00eaoh
Photo Log $20.00
Investigation Drawings/Chart $20.00 each
Mailing Cost Actual Cost
Research Fee Refer to Section 1, pg. 7
COST RECOVERY FEES WVC.Haz-MatRescue):
MCVs with Enaine Responses
Level 1 MVC -Aeoesenxantand stabilization $475.00 for 1 hour. then
$235.00every hour after
Level 2MVC—Level 1 plus fluid clean-up $S0O.OUfor 1 hour, then
$275.U0every hour after
MVCwith Extrication (requires use ofextrication equipment) $1.45O.OUfor 1 hour, then
$725.OUevery hour after
Hazardous Material Incidents
Level 1—Incident command, isolate and deny entry, evacuations ifneeded $770.00
Haz-[Wut8Activation with AF&Rengine standby $440.00houdy
Huz'Mat8Activation with AF&Rambulance standby $330.00houdy
Fire
Victim Rescues
Engine Response (per engine) $450.00 hourly
Technical Rescue Team (per person) $150.00 hourly
Emergency Medical Services
AF&R Ambulance Membership -Basic $66.00 per year
AF&R Ambulance Membership -Plus $112.00 per year
Emergency Medical Service Fee — Aid Call $348.00 per patient
Ambulance Base Rate (per current rate schedule) $1,151.00 per patient
Ambulance Mileage Rate (per current rate schedule) $15.03 per mile
Ambulance Waiting Time $50.00 per 1/2 hour
Ambulance Stand By (2 hour minimum) $110.00 per hour
On scene Coordinator $55.00 per hour
Extra attendant $50.00 each
Ambulance Service Area /1/ 2022 rate schedule
Base rates will be adjusted each calendar year by the most current rate schedule posted by the Center for
MedicarelMedicaid Services (CMS) that sets the "Ambulance Inflation Factor". Other rates and mileage charges
will be updated as approved by the County Commissioners.
Emergency Medical Services/Standby Fees
Structure Engine Standby for Events $440.00 per hour
Brush Engine Standby for Events
Fire and Life Safety Division Standby
Fire Marshal Review Fee
$100.00 per hour
Plan Checks
Any Building Permit - 24% of the Building Division Structural Permit Fee and Plan Check Fee
Condominium- 24% of the Building Division Structural Permit Fee and Plan Check Fee
Survey Plat Review Fees
Partition Plats $107.00
Condominium Plats $230.00
Subdivision Plats $230.00
Other
Page 27
Fire
All Hydrant Flow Requests. To be charged to the developer or installer
False Alarm Charge
First Aid/CPR Classes
Basic Life Support (BLS) for Healthcare Providers CPR Class
Heart Saver CPR & First Aid Class
Heart Saver CPR Class
Family and Friends CPR Class
Inspection Fees
Travelers Accommodation
Occupancy Type
"B" 0-1,000 sf.
1, 001-3000 sf.
Occupancy Type "A, E, M, S" 0-3,000 sq ft
Occupancy Type "F, H, 1" 0-3,000 sq ft
3,001-10,000 sq ft
10,001-20,000 sq ft
Over 20,000 sq ft
Occupancy Type "A, B, E, M, S" 3,001-10,000 sq ft
10,001-20,000 sq ft
Over 20,000 sq ft
Occupancy Type "R, SR" 3 to 10 Units
11 to 40 Units
41 to 70 Units
Over 70 Units
Non -Compliance after 2nd Inspection: Inspection Fee +
Non -Compliance after 3rd Inspection: Inspection Fee +
Non -Compliance after 4th Inspection / Subsequent Inspections
Operational Permits:
Fire Works Public Display
Exhibits and Trade Shows
Fumigation and Thermal Insecticide Fogging
Vehicles or Equipment in Assembly Buildings
Pyrotechnic and Special Effects
Open Flame
Haunted Houses
Marijuana Processing
Fire Performances (per event):
$70.00/person
$70.00/person
$45.00/person
$7.00/person
Initial Inspection (Re -inspection Included)
Inspection Fee +
Temporary Membrane Structures, Tents and Canopies 200-400 sq ft
Temporary Membrane Structures, Tents and Canopies Above 400 sq ft
Hydrostatic Test
Underground Flush Test
$125.00
$175.00
$225.00
$75.00
$125.00
$175.00
$250.00
Base Fee +$100.00
Base Fee +$200.00
Base Fee +$400.00
$150.00
$150.00
$300.00
$50.00
$75.00
$75.00
$50.00
$500.00
$75.00
$50.00
$125.00
$75.00
$75.00
Hood System Trip Test
$75.00
Fire Acceptance Test
$150,00
Egress Light Test
$150.00
Above Ground LPTank Install
$75.00
Above Ground LPTank Removal
$150.00
Commercial LPUsage Less than 5O0gallons
$75.00
Underground Fuel Tank Install
$300.00
Underground Fuel Tank Removal
$500.00
Construction and Use Permits
Compressed Gas
$150.00
Flammable and Combustible Liquid Storage
$150.00
Hazardous Materials Storage
$300.00
Hazardous Materials Production
$300.00
Industrial Ovens
$150.00
High Piled Combustible Storage
$150.00
Permits not specifically mentioned but required byFire Code
$50.00-$500.00
depending on staff
hours and complexity
Temporary Liquor License (In addition to City Recorder fee listed on Page 10)
$15.00
Pre Application Comments
$25.00
After Hours and Weekend Inspections
$150.00
Fire SvstensCover Uo/AuuePtanceTest |nsoectona:
0-'.000eqft
$75.00
3.001 to 10.000sqft
$125.00
10.001to20.800sqft
$175.00
20.000to40.000sqft
$350.00
40.000tn80'000sqft
$700.00
Above 80.O0Osqft
$1.000.00
Weed Abatement
Staff time Refer boSection 1'pg. 7
PWai|hlg Cost Actual Cost
Weed Abatement by Contractor Actual Cost
Other
T-Shirt $25.00
Sweat Shirts $35.00
Mino.Appons| ibeme, prices may vary.
Innovation and Technology
Information Technoloav Miscellaneous Fees and Charqes
Installation Fees
Basic installation Pre -wired CATVoutlets only $20.00
(Additional charges for parts and supplies apply)
Add Trap (^fi|har') $10.00
New customer cable modem activation $10.80
Cable Modem [Refurbished 90 —day replacement warranty] $50.00
Additional materials $10.00
Ovepand-beyondregular installation including multi outlets, outletplahsa.
additional wiring, replacement ofcustomer damaged outlets.
Wi Max standard installation $20000
Disconnect Fees
Disconnect $50�00
Remove Trap ("Fi|ber") s10.00
Truck Roll $35.00
Field Technician HourIV Rate
Non-standard work such aoadvancing troubleshooting, $55.00
non-standard outlets, fishing wire inside walls, etc.
Consulting and Technical Support Hourly Rate
For support issues not related to AFN infrastructure, performance, $85.00
and reliability. Minimum charge one hour.
Non-CitV EmploVee Staff Screening
Charge for each vendor employee submitted for authorization hm $150.00
Access AFNand City Service Center facilities.
Fiber Service Installation
Overhead served connections Individual Business Case (|BC) IBC "e
Underground served connections IBC & quote
Ethernet
Transit @10OMbpe IBC "e
Static IP Address $5.00/montheooh
Maximum of5Static Internet Protocol (|P)addresses*
" Minimum level ofservice for static |Pand Quality ofService (UoS)is
"CHO|CE^orhigher service tier.
QoS Fee $3.50/nlonth
VU|P(phone)enhancement available with AFNChoice or
Innovation and Technology
Business Augmented Upload Package (additional 5 Mbps) $15.80/monih
Available exclusively mn8FN Direct Small Office/Home Office (S{)HO)orSmall Business
Must have current City ofAshland Business License
*Additional fee added tobase AFN Direct retail rates Vnspecific packages.
Maximum SOHOupload speed with augmented upload service atuptuSK8bps
Small Office/Home Office Business Augmented Upload Package @$8O/month
Maximum Small Business upload speed with augmented upload service at up to 10 Mbps
Small Business Augmented Upload Package @$iD0.00/month
Non -return of customer premise equipment (CPE) devices
CPE's must be returned on disconnect date of AFN services.
Cable TV (CATV) Seasonal Reconnects & Disconnects
Disconnects &reconnects
Service change
Install HBO filter
CATV House Amp Fee
Cable Modem Rental
Non Return of Rented Modem at Closing of Account
Cable Modem Purchase
$10.00/visit
$35.00/eooh
8100.00/month
$5.00/mnnth
$50.00/eaoh
$50.00/each
° Resolution 201O-28(Section 2.page 38)grants Information Technology management ability hoset promotional
GIS Data & Mapping Services
G|SHourly Rate
Plotting Fee
$6.00 per square foot
$96.00
Poge31
Municipal Court; Police
Municipal Court Miscellaneous Fees and Charges
Court Administration Fees
Appeal Transcript Fee
City Attorney Deferred Sentence/Diversion
Civil Compromise Costs
Compliance Inspection Fee
Default Judgment
Discovery Fees Imposed inAccordance with Miscellaneous Fees
and Police Department Resolutions
Traffic School Program: Classes ArD.including special zones
Crime
$35.00
$60.00
$75.00
Violation
$10.00
N/A
$25.00
$15.00
See Police and City Recorder Fees
N/A See Below
Presumptive Fine
Traffic School Program Fee
*special zone enhanced penalty
Extend/Amend City Attorney Deferred Sentence/Diversion
$45.00
N/A
Failure hzappear for Bench Trial/Show Cause hearing
$AO�OO
$70.00
Failure toAppear for Jury Trial
$160�00
N/A
Forfeiture cfSecurity
$35.00
$25.00
Court Costs
$35.00
$45.00
Show cause Admission ofAllegation
$25.00
NIA
Bench Probation Fee
$100.00
N/A
Warrant Bank Costs
$2500
All other fees and charges inconsistent with the fees and charges set forth herein are repealed. Nothing in the
Resolution is intended to detract from the inherent power of the Court pursuant to general law to impose fees and
charges established in state law or city ordinance in addition to the fees and charges specified herein.
Research Fee
Visa Letters
Fingerprints Cards
Police Miscellaneous Fees and Charges
$12.00for reports 1Dpages orless
816.OUfor reports over 1Opages
Refer bmSection 1.pg. 7
$19,00
$35.0Ofirst card
$10.OUeach additional card
Photographs (CD) $19�OO
Audio Recordings $1A.O0^
Mobil Audio Video Recordings (MAV) $1Q.DO°
Body Camera Video $19.00^
*Any audio or video recording requiring extensive redaction, more than 30 minutes, shall be charged
Municipal Court-, Police
Impound/Tow Fee
Vehicles for Hire (per Ordinance 3160)
Permit Fee for Transportation Network Company
Permit Fee for Taxi orLimousine Company
Permit for Vehicle for Hire Drivers
$105.00 Cash only
$5,000
$500
Poge33
Public Works Miscellaneous Fees and Charges
Existing maps printed incolor onHP1O5bCMplotter C24|bbond paper)
Arch 18x243.OUsq. ft. $18.00
Arch 24x3SS.O0sq. ft. $35.00
Arch 3Sx481Z00sq. ft. $72.00
Existing maps or copies of existing maps copied in B&W on Xerox 3030 large format copier (201b bond paper)
Arch 18x24 $2.00
Arch 24x30 $3.00
Note: Maps printed on materials other than the specified bond are double the standard print fee
March 2O23CPI value =3O1.83S(NEW)
March 2O22CPI value =287.504(OLU)
March 2O23ENRvalue =13176.3O(NEW)
March 2O22ENRvalue =127Q1A3({}LD)
(13176.30-12791.43)/12791.43=396
January 2D23CPI value =2Q1.17(NEW)
January 2U22CPI value =281�A33([)LD)
March CPI used for
Plat & Plan Checks
Public Works/Engineering Inspections, Permits, etc.
(]|S Data & Mapping Services
Cemetery Fees
January CPI used for
Airport Fees
March ENR used for
Sanitary Sewer Connection Fees
Water Connection Fees
Engineering Development Fee O.75%ofvaluation
(This fee ischarged concurrently with Building Permit Fees atthe time nf
building permit applications. Applies toall new residential dwelling units and
commercial developments. Remodels, additions and accessory buildings are not assessed this feaj
Public Works / Engineering Inspections, Permits, etc,
Subdivision Construction Inspection/ 5Y6Engineer Fee (596mfthe
Public Works Improvement Inspection public improvement cost)
Street orAlley Excavation Permit $23G.0Uplus per foot cost
based onage ofpavement
Encroachment Permit $236.00
Miscellaneous Construction Permit S78.00
(Construction of curb, sidewalk, driveway apron, etc.)
Dust Suppression Permit
$78.00
Driveway Painting Permit (includes acan ofpaint)
$17.00
Right -of VVayC|oaun+Gtreet
$236.00
Right -of Way Closure -Sidewalk (>72 hours)
$7&00
Right -of Way Closure -Sidewalk (x72hours)
$17.00
Right -of Way Closure -Parking Space (>72hours)
$78.00
Right -of Way Closure -Parking Space (<72hours)
$17.00
Block Party
$17.00
Sk1evva|h Dining —Annual Renewal (Minimum 50 sq. ft.)
$b.00/sq. ft.
Functional Item — Annual Renewal
$78.00
Specia|EvantPormit-BoseFee
$130,00
Special Event Permit ' events that require city staff overtime
SO96ofcity staff overtime
Special Event Permit Rush Fee (less than 0Odays' advance notice)
$250.00
Street Painting Permit
$17.00
Loaned Functional Item, Pennant Application Fee
$159.00
Publication Box per Publication - Annual Renewal
$33.00
Bike Rack Purchase
$156.00
Special Vehicle Permit -Initial Fee
$326.00
Special Vehicle Permit -Annual Renewal
$126
Penalty for NoPermit
15096ofpermit cost
Street orAlley Vacation
$789.00
An administrative fee of 25% will be assessed on all permit refunds. Refunds will not be issued if requested later
Public Works
Sanitary Sewer ConneGtion Fees
Sanitary sewer mainline video inspection $3OO.O0minimum charge
(cost based ontime and materials)
Water Connection Fees
The installation of all new water services and taps regardless of size will be charged on a time and materials basis,
Actual Cost
First Utility Locate otonaddress No Charge
Additional Locates atsame address $84.00
Water meter re -read
Once in12months
No Charge
Each additional re -read in12months
$39.00
Water Meter Field Test
$59.00
Water Meter Bench Test
3/4^ or 1^Water Meter $132.00
1 1/2" or3" Water Meter $24&00
Larger Meters Actual Cost
Water pressure check once in 12 months No Charge
Each additional pressure check in 12 months $47.00
Water Chlorination Test ' Subdivision retest upon failure $785.00
(cost based ontime and materials)
VVotor PrasounaTont- Subdivision retest upon failure $474.00
(cost based ontime and materials)
CemeterV Fees, Sales of Liners, Markers
Sales of grave spaces or burial plots, liners and markers: fees split, 40% to the cemetery fund and 60Y6 to the
cemetery trust fund.
Grave Space -Lawn and Monument Sections $610.00
GraveSpace-BabyLand
GraveSpooe-Nichoa(bronzm)
Grave Space -Urn garden
(]ravmopace-Crypt
Concrete cemetery box, including setting
Concrete liners
Final inscriptions
Niche Vases
Cost plus 10%
$18O.00minimum charge
$173.00
Public Works
Grave markers Wholesale cost X2.5not to
exoeed$735.O8
Grave marker setting, concrete base $192.00
Monticello burial vault (sealed concrete) $1.419.00
Sexton Fees
Opening and closing graves, ground $516.00
Opening and closing graves, double -deep $570.00
Opening and closing graves, infant $192.00
Opening and closing crypts $516.00
Opening closed crypts
$510.00
Opening and closing niches
$131.00
Opening closed niche
$131.00
Inter cnamoinningrave spaces
$192.80
Scattering ofcnemoins
$131.00
Disinterment
$1.289.00. paid in advance
Saturday. Sunday or Holiday burial
$516�00
Grave Setup Rental
$130.00/000unence
Tent Rental
$63.00/day
Perpetual care lots, sold before 1927
$131.00
Vases:
Galvanized $51.00
Cemetery fees will be subject to a 1.5% finance charge per month if not paid within 60 days of use. All above
services will be sold pre -need in instaUmente, interest free, with o minimum payment ofone'-hwolfth of the total
Public Works
Ashland Airport Fees
Lease type A - City owned - Rentals
T-Hangarswithout doors
T-Hanganswith doors vintage
T-Hanyanswith doors contemporary
Helicopter Hangar
Box Hangar with Reversionary stack door
Box Hangar "shell rental" (privately built City owned).284/sq. ft.
$226.00
$284.00
$358.00
$284�O0
.29sqk/month
.343/sq. ft.
/monUl (building footprint)
^Y\mnenibea"for any City owned hangar
Office Space 28Ssq. fL/mmnth
(office space inside dimension)
Bathroom .O3sq. ft/nonbh(building footprint)
Heat .01 sq. ft./month (building footprint)
• Heat = any upgraded heat source including gas and electric
° Building footprint = outside wall dimension
DvernightUe-dowms**
See page 48 for Tie Down Rental Policy
Lease type B - Ground Lease - City owned hangars
Ground Lease -Nom|nimumfootage
$7.00(smaU); $11.00(|arge)
Lease type C - Ground Lease - Privately owned hangars
Privately owned ground lease minimum footage 6O'x4O' 547uq. ft./yr.
Hangar reservation fees,
l-Hangar Basic Fee $1OO.00;and 75.UOieapplied hofirst months' rent
Ground Lease Space
$2.8OO.00Non Refundable space reservation fee*
*Reservation fee is wa|k1 for period of 1 year atwhich time can be renewed for an additional 12 months if
progress is shown towards development of a hangar onsite.
Specialized Aviation Service Operations (SASQ) Fee (Annual
The square footage of the hangar multiplied by1.G.multiplied bythe current BGround Lease fee rate. AHonger
keeper will have the square footage of the hangar multiplied by 1 .0, multiplied by the current B Ground Lease fee
Mobile Service Providers (IVISP) Airport User Fee (Annual)
Basic Fee
$350.00 for first two employees, plus $25.00 each
additional employee for annual operators.
$100.00 for Temporary KASPa (00 days maximum —
not renewable)
Freight Operation
(Follows Medford International Airport adjustments annually)
Tariff Rate $472/1.000|bs,
*Additional electrical surcharge of $5.00 per month will be added to this amount,
** Large aircraft defined as a single engine turbo -prop or multi-engined aircraft with agross certified aircraft
weight of8000|ba.orgreater
Attachments
Sectkon1O
Parks and Recreation
Miscellaneous Fees and Charges
Parks Miscellaneous Fees and Charges
GrouD Picnic Rentals
Cotton Memorial Area
$125.00/4houre
[WedronoArea
$75.00/4houm
Root Memorial
$75.00/4hours
Hillside Picnic Area
$75.00/4 hours
Sycamore Grove
$75.00/4hours
North Mountain Park Pavilion
$75.00/4houm
Lawn below Upper Duck Pond
$75.00/4houm
Butler Band shell
$220.00/8hourm
Garden Way Pavilion
$75.O0/4hours
Private Use/Rental Tennis/PicNebaUCourts
$20.00/hour
Picnic Areas $75�00
Butler Band shell $150.00
Buildings Security $150.00
Special Event Fees
Special Event Application Fee $75.00
Street Closure Fee $75.00
Park Booth fee $25.00/per booth (max.-25)
Alcohol Fee $150.00(non-nafundoble)
General Buildina Reservations
The Grove Full Facility
$41.5O/hconweekdays
$5O.O0/hr.onweekends
The Grove 0tb*PettereonOR Gym
$23.OU/hr.onweekdays
$35.00/hconweekends
Hunter Park Senior Center
Single Room
$23.00/hr.onweekdays
$35.00/hr.onweekends
$2O.00/hr.ifreserved
otleast Sdays/year
Ashland Senior Center - full facility (excluding kitchen &office)
$5O.O0/hronweekends only
Long Term Renters Fee &Non -Profits
$2O.0O(at least 6days/year
Pioneer Hall $23.00/hconweekdays
$35.DO/hconweekends
Miscellaneous Equipment Fee $100.00
Electricity Use Fee $25.O0per 4hours
Attachments
Field Usage
Tournaments
Ball field Lights
1 Day per week/season
2Days per week/season
3-4Days per week/season
5-7Days per week/season
Calle Seating
8-month Season
Artisans
Restaurant Seating
9.5-month Season
Artisans
Restaurant Seating
Daniel Meyer Pool
Admission
Lap Swim
Water Aerobics
Swim Lessons
Senior Only Sessions
Private Lessons
Open Swim/Lap punch card -Youth
DponSwinlLappunchcand-Adult
Water Aerobics punch card
Youth Recreation Programs
Adult Recreation Programs
Senior Recreation Programs & Services
Broadway Dance/Dancing the Oldies
Gentle Yoga
Line Dance
TaiChi. Into, Beginning orIntermediate
Walking Group
Young atArt
Art Class Series for Seniors
TouchPasaLost Card Replacement
Photocopies and printed pages
$38.50dayeach team
$34.00/hour
$100.00
$150.00
$200.00
$250.00
$S.80per sq. ft. for 2weekend days per week
$8.%2per sq. ft. /7days per week OR
$5.45 per square foot for 5 days per week
$6.0Qper sq. ft. for 2weekend days per week
$1O.38per sq,ft. /7days per week OR
$6.47per square foot for 5days per week
Youth Adult
$3.00 $4.00
$3.00 $4.00
$4.00 $4.00
$40/$42/848 (age ofohi|d/
length oflesson)
$3.0O(S5and over)
10 Punch 20Punch
$25.00 $50M
$35.00 $70.00
$7OM
60/40upto80/2Osplit wVinstructor and APRC
$50.00/8c|asses
$5.00/olaea
$3.00/o|ano
$3.00/o|aas
$1G.00/8week session
$5.00/o|aea
$10.00/o|ass hour plus nloteha|a
$2.00/cond
First 5pages free, then $O.1O/page
Page41
Attachments
Ashland RotarV Centennial lee Rink
Youth Admission
Adult Admission
Skate Rental
Adult Hockey Admission
Youth Hockey Admission
Skating Private Lesson
Helmets
Group Rental Kaba
Ashland Rotary Centennial Ice Rink Discounts
Adult Admission for Special Event
Youth Admission for Special Event
Cheap Skate -Rental
Student night Admission (includes skate rental)
Purchase ofoRec. Skate Gift Card
School Groups and Punch Cards
Youth Punch Card -All programs (5-13)
Adult Punch Card -All programs (14+)
School Groups (per group of3O)
Ashland Rota!y Centennial Ice Rink & Daniel Meyer Pool Discounts
50% off of total fee for free and reduced lunch Ashland students/punchcards
Oak Knoll Golf Course Annual Passes:
$4.00
$5.00
$3.00
$9.00
$5�OO
$28.00per 3Omin
$15.00
$6.00
Annual Pass -Single
$1.099/$110.00 o month
Veteran (55+)—Single
$999'00/$100.00a month
Couple/Domestic Partner —Couple
$12QQ.UO/$125.00amonth
Family +2'Couple Plus Two (18and under) inHousehold
$1.4QQ.UO/$14O.OUamonth
Junior -Single (17and under)
$199.00
Snowbird (ForG months) —Sing|e
$750.00
*Student SOU Winter Term —Single
$215.00
*Student SOUFaUTerm—Sing|e
$215.00
°StudentSDUSphnQTenn—Sing|e
$300.00
*Student SOU Summer Term —Single
$380.00
*All membership types require minimum 12 mo. commitment except for SOU Student memberships
Daily Adult Fees (ages 18 to 54)
*Golf Fees Effective March 1, 2020
9Ho|es November -February
$14.00
March -October
$18.00
*Weekend November -February
$14.00
*Weekend March -October
$18.00
*Weekday Twilight March -October
$12.00
*Weekend Twilight March -October
$12�00
Twi|ightNovonnbopFebruary
$10.00
Continuation March -October
$8.00
Continuation November -February
$6.00
*Replay
$10.00
18Hm|es November -February
$20.00
March -October
$26.00
Attachments
^VVmakendNovembupFebruory $20�00
*Weekend March -October $26.00
*Weekday Twilight March -October $17.00
*Weekend Twilight March -October $17.00
Twilight November -February $15.00
*Replay $15.00
.Daily Junior ees (ages 8 to 17)
SHohs
18 Holes
Driving Range
Cart Fees (per person)
SHoles
18 Holes
Communitv Garden Fees
1Ux1O
1Ox12
1Ox2O
2Oi2O
Refundable Deposit
3x6Garden Box atSenior Center
Nature Center School Programs
K-2/HalfDay
3-5/ Full Day
Oak Knoll Golf Course Weddina Fees
November -February
November -February
March -October
March -October
Year -Round $5.00
Year -Round $10.00
One token (36) boUe $3.00
Year Round $10.00 $8.00
Year Round $13.00
$22.UO-$20.00depending onlocation
$2O�80
$10.O0.nodeposit
$150.00
$225.00
$75O.00full day
$40O.UOhalf day
$1'500.O0full day
$80O.OUhalf day
Attachments
CITY OF
IrvAill
GRADING FEES
General. Fees shall be accessed in accordance with the provisions of this section.
Plan Review Fees. When aplan orother data arerequired hob ubmitted o plan review fee
shall be paid at the time of submitting plans and specifications for review. Said plan review fee
shall be as set forth in Table A. Separate plan review fees shall apply to retaining walls or major
drainage structures as required. For excavation and fill on the same site, the fee shall be based
onthe volume ofexcavation orfill, whichever iagreater.
Grading Permit Fees. Afee for each grading permit shallbe paidtnthe City ofAshland, Building
Division as set forth in Table B. Separate permits and fees shall apply to retaining mm||s or major
drainage structures as required, There shall be no separate charge for standard terrace drains
and similar facilities.
TABLE A — GRADING PLAN REVIEW FEES
50 cubic yards or less
No Fee
10,001 to 100,000 cubic yards $150.00 for the first 10,000 cubic yards, plus $25.00 for each
additional 10,000 yards or fraction thereof.
Other Fees:
Additional plan review required by changes, additions or revisions to approved plans.
1 $62.25 per hour* (minimum charge — one half hour)
*Or the total hourly cost tothe City, whichever iethe greatest. This cost shall include
supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved.
TABLE B — GRADING PERMIT FEES'
50 cubic yards or less
No Fee
101 to 1,000 cubic yards $75.00 for the first 100 cubic yards plus $25.00 for each additional
100 cubic yards or fraction thereof.
Other Inspections and Fees:
• Inspections outside of normal business hours (minimum charge —two hours) $65.25
per hour
• Re -inspection fees $65.25 per hour
• Inspections for which no fee is specifically indicated (minimum charge — one half
'The fee for agrading permit authorizing addm"na|work u,that under am|idpermit shall bethe difference
between the fee paid for the original permit and the fee shown for the entire project.
zo,the total hourly cost tuthe City, whichever i,the greatest. This cost shall include supervision, overhead
equipment, hourly wages and fringe benefits nfthe employees involved.
Attachments
"All pal -ties -utilizing tied do-wri parking are required to provide written
consent to the Airport deeming the oAviler of any stored or parked aircraft as
the last FA.A, registered owner of that aircraft. After ail under pitted failure
to pay required rent or the aircraft becomes inoperable either niechaluically
or by regulation-, and any such condition exceeds a ninety (90) day period for
storage or parking. the Ashland airport has the authority to treat the aircraft
as a nuisance under AMC 9.12 Nuisance -Junk-, and the Airport may thereby
act according to A]MC Chapter 2.31 UnIf6iin Violation Abatement Process.
-,'ury appeal to the Ashland Airport taking such action is subject to AMC
2.30 Uniform Achirinistrative Appeals Process."
Engineering Tel: 5411188-5587
2o E. Main Street Fax: 541-1488-6co6 PrIA
Ashland, Oregon 97520 TTY: 8001735-2900 IFAM&
www,ashniando.orms
Page 45
Miscellaneous Fees and Charges