Loading...
HomeMy WebLinkAbout2022-113 PO 20200365 AMND#1- Robertson Sherwood Architects, PC ASHD - qy Purchase Order 2e CIRECORDERFiscal Year 2020 Page: 1 of: 1 (........,0O"' RECS" i1-7 lig€4213111) 1 lis*aglI - -,fig 1_-moi _ B Ashland Parks Commission I ,. LTi-! ` 'giLlIVI p c-14`' '6=_ IATTN: Accounts Payable 20 E. Main Purchase L Ashland, OR 97520 Order# 20200365 T Phone: 541/552-2010 O Email: payable@ashland.or.us , 2.12 --i ✓ S C/O Parks Department E ROBERTSON SHERWOOD. ARCHITECTS, PC H Admin Office - N 132 E BROADWAY SUITE 540 I 340 South Pioneer D P Ashland, OR 97520 R• UGENE, OR 97401 T Phone: 541/488-5340 O Fax: 541/488-5314 918.__ ��ak.G =1. �2.-) -t��11 c a fl 1 Michael Black _ c6c=-_ —ga=i -1� [=Jo=ia_ =-I_Iare—W10=!,!ala! —�L[-9'`'?=!=11,=. --=e=!est tlf_!,_ ie 4 L„,4 -- _—=='s—r 1 i ''-_T- `-s- 03/26/2020 5299 Parks Accounts Payable _Ef.1,=„._ TTr:• t 5 - _ — — _—_ v E`r_iv,=_7ati - _. - __ �Lv 'IEe�P9�5�@ ..E=_ .- _ Z � ��-.__a _. --F"-fie !`i.ot_�=.'dip!8[cE-y�r_s['Si. - I Design Svcs Daniel Meyer Pool _ 1 Design Services for the rebuild of Daniel Meyer Pool 1.0 $161,130.0000 $161,130.00 Personal Services Agreement(Greater than $25,000.00) - Completion date: 02/28/2021 _ 1 . Project Account: E-000706-100 $161,130.00 2 ADDED:__Pr-ocessed- hange order 03/03/2022 1.0 $24,650.0000 $24,650.00 Arre_radnernNt - (Shcar and Geothermal Energy Study - Project Account: E-000706-100.. $24,650.00 ***************GL SUMMARY*************** 123000-704200 $185,780.00 , - ----------:----- , By: Date: Authorized Signature \________..___.—fa@m. , = $185 780.00 • • • FORM#10l r '� ® F CON`i'RAC`i'AMENDMENT APPROVAL REQUEST CORM Request for a Change Order d 1� 1vJ . Name of Supplier f Contractor!Consultant: Robertsonahenuoad,ArclrlteetsP.O. Total amount of this Purchase Qrder Number:20200100- 20200365 contract amendment; Title!Description:Design Services Dank,Meyer Pod Rebind $ 24,650.00 .• 0 Per attached contract amendment Contract Amendment Original contract amount $101,130.00 100 %of original contract Total amount of previous contract amendments 0 . 0 %of original contract Amount of.lhis contract amendment 24,050,00 - 15 . %of original contract • • . TOTAL AMOUNT OF CONTRACT . - • $105,700 116 %of original contract• / . In accordance wdih OAR 137-047.0800:1)The amendment is wdlNn lite scope of procurement as dosed]ed in the solicitation documents,Sole Source notice or approval of Special Procurement.2)The antendmenits necessary to comply vetlt a change in law thataffeels performance of the coniracl.3)The amendment results fromeenegallallon of the leans and conditions,h ciudtng the contract price,of a contract and Ore amendment is advantageous le the City of Ashland,subject to all of the following conditions:a)goods and services lobe 111 provided underlie amended contract are the same as the goods and services to be provided under the unamended contract;b)Th a(Sty deteermines that,with all things considered,the • amended contract Is al least as favorable b the City as At unamended contract;c)The amended contract does not have a Iola I term greater Oran allowed On the sotciiation document, contractor approval of Special Procurement,An amendment is nal vdlhin ihescoae of lite procurement if the Cily determines!half(it had descated the changes to be made by the amendment in tile procurement documents;It would likely have Increased competition or affected award of contract. Contract amendment is within the scope of procurement: YES tt NO I (If"NO",requires Council approval l Attach cony of CC,) Sourcing Method: • SMALL PROCUREMENT—Not exceeding$5,000 • JNVIT TION TO 1310 or ( COOPERATIVE PROCUREMENT,QRF or • ❑'YES',the total amountof contract and`cumulative. REQUEST FOR PROPOSAL EXEMPTION PURSUANT TO AMC2.50 amendments s10,000. 0 'YES',the total amount of cumulative amendments. ❑'YES,the total amount of original contract and ❑Ii'NO',amount exceeding authority requires s 25%of original contract amount or$250,000 cumulative amendments s5100Kfor Gaods.&Services, Council approval Attach cony of Council whichever Is less. i $75K for Personal Services,<550K for Attorney Fees. Communleaiion, •0 II'NO',amount exceeding authority requires 0 If'NO,amsunl exceerdingauthority requires Council ' ❑ Exempt-.Reason:_ Council approval.Attach cony of Council approval.Allachcow ofCanna Communication. . PERSONAL SERVICES(Direct Ajinointment) CommunicatIon. • • ❑ Exempt—Reason: i.7'YES',cumulative amendments s$35,000 .0 Exempt—Reason', 0 If'NO',requires council approval.(Attach CC) • INTERMEDIATE PROCUREMENT SOLE SOURCE EMERGENCY PROCUREMENT Goods a Seryices•>Sq.000 and<$.100.000 0 'YES`,the total amount of cumuiatve amendments- ❑ Written Findings:Documenithe nature of the i. Personal Services•>55.000and c$75,000 525%of original contract amonntor$250000 emergency,Including necessity and circumstances ❑ 'YES',the total amountof cumulative whichever Is less. • requiring the contract amendment amendments 425%of original contract amount, 0 II'NO',amount exceeding authoity requies ❑ ObtaIn dlrádllon and written approvai torn City • o ii'NO',amount exceeding autlroiiiy requires Connell approval.Attach cony of Coundi Administrator Council approval.Allach copy of Council Communication. 0 if applicable,attach copy of Council Communication Communication. 0 Exempt—Reason; 0 Exempt-Reason: . ❑Exempt—Reason: SPECIAL PROCUREMENT INTERGOVERNMENTAL AGREEMENT ' " . ❑'YES,the total amigo,original contract and cumulative amendments are 0 Renewal of intergovernmental Agreement:Terms modified in accordance WM initial within the amount and terms Maly approved by Connell as a Special agreement ORcost w ll not be more than 25%greater than Initial agreement.Renewal Procurement approved try City Attorney;end deparlmentiread affected by renewal and approveddsigned • 0 If'NO',amount exceeding aulhorityrequlresCouncil approval. by City Adninlstrator.AMC 2,20.045(B) Attach MD of Council Communication ❑ if'NO`Council approval isreguired llach COpy or Council Communication Project Number 040708.100 Account Number, s a o• T o n s,0 0 Account Number 'Expenditure must be chargedto the appropriate account numbers for the financials to reheat the actual expenditures accurate pt Mach extra pages 0 1,eded. , r vsir, 4 , . Employee Signature: 4"42-nc�u _Department Head Signature: �- ,Err ,orgnatoil.• $5,d00) . CityAdntinlstr or: I 4 .,y ' 0_, %.4s% • " /7 • • E. al toorereafor- an S?S,e00aa00141 - Funds appropriated for current fiscal year; YE /NO Z—77 l_e__:_____ Finance Director(Equal to or greater than 65,000) • Date Comments: • ' Form#10—Contract Amendment Approval Request Form,Request for a Change Order,Page 1 of 1,4123/2020 •. • | ` • ` . / ASHLAND PARKS & RECREATION COMMISSION 34o.5PIONEER STREET • ASHLANOREGON 97520D, • COMMISSIONERS: s Michael A.Black,^op Gardiner � Mike | Director Rick Landt Julian Bell • Leslie Eldridge • Jim Lewis • • � 541.488.5340 . STAFF MEMORANDUM x�x �MORANDUDM TO: Joe Le000niC�yK8anoQer � ` � • . FROM: Tara Kiewel,APRC Administrative Analyst DATE: February 23,ZO22 . � SUBJECT: Robertson Sherwood Archit 'P.C. Contract AmndmentForm#1OSignatureNeeded • / APRC would like to amend the contract with Robertson Sherwood Architects. In January of 2020 a RFQ was solicitedforthe professional documents for the Daniel Meyer Pool rebuild. February 10,2020 RFQforRobedsonSherwood Aroh�ect PJ�and acd the e|o ' Commission ,cal contract amboard -''-- - - approved the RRQaward onFebruary 18,2O2O https://wwvv.ash|ond.or.us endao.osp?AyN|D=7493&Diyp|av="�inutes On Septenther 8,2021,the Parks Commission approvedutaffto amendthesoopeofwmrkforthe pool design contract and secure consultants to prepare comparisons icost to resize tepoo[so|or evaluation,geothermal evaluation,and evaluate costs to enclosthe pool. | • . ' • • . •. . ' . | ! • • ' '| • • � � • • . • • • • AMENDMENT NO..1; to PERSONAL SERVICES AGREEMENT • between THE CITY OF ASHLAND,• • an Oregon municipal corporation, ("City") and Robertson Shervvood;Architects P.C.; ("Contractor") .. for • DESIGN SERVICES . • • • • RECITALS • A. The City and Contractor previously entered into a Personal Services Agreement effective March 5, 2020 (the "Agreement") to Contractor provide design services for the • new Daniel Meyer Swimming Pool;and B. The City and Provider now wish to amend the Agreement to increase the amount of • compensation to be paid to Provider. AGREEMENT • NOW THEREFORE,in consideration of the mutual benefits and obligations set forth herein,the parties agree as follows: • 1. Amend Section 2 of the Agreement as follows,with strikeout wording deleted and underscored wording added: 2.1 City shall pay Provider the sum of$185,780 (one hundred and eight five thousand seven hundred and• eighty dollars) $161,130.00 as provided herein.as full compensation for the Work as specified in the 4uote dated September 16,2021. 2.2 In no event shall Provider's total of all compensation and reimbursement under this Agreement exceed the sum of$185,780 (one hundred and eight five thousand seven hundred and eighty dollars) dollars) . $161,130.00 without the express, . • written approval from the City official whose signature appears below, or such official's successor in office. Provider.expressly acknowledges that no other person. has authority to order or authorize' additional Work which would cause this maximum sum to be exceeded and that any; authorization from the responsible official must be in writing. Provider further acknowledges that any Work delivered or expenses incurred without authorization as provided herein is done a Provider's own risk and as a volunteer without expectation of compensation or reimbursement. • Page 1 of 2: Amendment No. 1 to Personal Services Agreement—Robertson Sherwood,Architects P.C. � I • . • • • .2. This Amendment No. 1 is effective upon being signed by,both parties. . 3. Except as specifically modified by this Amendment No. 1,the terms and conditions of the Agreement remain in full force and,effect. IN WITNESS WHEREOF the parties have caused this Amendment No. 1 to be signed in their respective names by their duly authorized representatives as sof the dates set forth below: • • CITY OF ASHLAND, OREGON Roberts. 2 ood,Architects P.0 y( By: 77.-44a,' _ B dfr A /)," Printed Name: Jo t\ L-LCf.5.o ci Printed Name: _Carl Sherwood,ATA Title: (i1 l46.Y CLq er . Title: _Corporate Secretary Date: • 37/0/2 -, •Date: "November 29,2021 • • A dastoForTn • F i Douglas McGeary Assistant City Attorney • 1 • . Page 2 of 2: Amendment No. I to Personal Services Agreement—Robertson Sherwood,Architects P.C. • • Kariann Olson 'From: Tara Kiewel • 'Sent: Friday,March 11,2022 10:59 AM To: , Kariann Olson Subject Re:Contract Amendment-Robertson Sherwood Attachments: •Robertson Sherwood Architects Amendment signed 03.01.22&03.10.22.pdf Hi Kariann, I have the contract amendment with Joe's signature. Let me know if you need anything else. Have a great weekend! Tara •ram/Kte.wEL Administrative Analyst Ashland Parks&Recreation Commission 340 S. Pioneer St.,Ashland,OR 97520 Tel:541-552-2257 Fax 541-488-5314 • www.ashlandparksandrec.org This email transmission is official business of the City of Ashland,and it is subject Ito Oregon Public Records law for disclosure and retention' If you have received this message in error,please contact me at 541-552-2257. Thank you. From: Kariann Olson<kari.olson@ashland.or.us> Sent:Wednesday; March 2, 2022 1:16 PM To:Tara Kiewel<tara.kiewel@ashland.or.us> Cc: Kariann Olson<kari.olson@ashland.or.us> Subject: RE:Contract Amendment-Robertson Sherwood Hello Tara, It is my understanding that Joe/City Mgr needed to sign the actual contract amendment. The total amount of the contract exceeds the department head's$35,000 limit. Please advise. V Thank you. Kariann _ Kariann Olson Purchasing Specialist City of Ashland 90 N. Mountain Ave. Ashland, Oregon 97520 C Tel 541-488-5354 j - Fax 541-488-5320 TTY 800-735-2900 V kari.olson@ashland.or.us Visit the City's web site at: www.ashland.or.us •1 • This email transmission is official business of the City of Ashland,and it is subject to Oregon Public Records law for disclosure and retention. If you have received this message in error, please contact me at(541)488-5354.Thank you. From:Tara Kiewel<tara.kiewel@ashland.or.us> Sent:Wednesday, March 02, 2022 1:07 PM To: Kariann Olson<kari.olson@ashland.or.us> Subject:Contract Amendment-Robertson Sherwood • HI Kariann, ' Here is a signed contract amendment and Form #10. Let me know if you need anything else. Thank you Tara • rm/xi, el/ Administrative Analyst • Ashland Parks&Recreation Commission 340 S. Pioneer St.,Ashland,OR 97520 Tel:541-552-2257 Fax 541-488-5314 www.ashlandparksandrec.org This email transmission is official business of the City of Ashland,and it is subject to Oregon Public Records law for disclosure and retention. if you have received this message in error,please contact me at541-552-2257. Thank you. • • • r I 2 Kariann Olson From: Kariann Olson Sent: Wednesday,March 02,2022 1:17 PM To: Tara.Kiewel Cc: Kariann Olson Subject: RE:Contract Amendment-Robertson Sherwood I • Hello Tara, It is my understanding that Joe/City Mgr needed to sign the actual contract amendment. -The total amount of the contract exceeds the department head's$35,000 limit. Please advise. Thank you. Kariann • Kariann Olson Purchasing Specialist • City of Ashland 90 N. Mountain Ave. Ashland, Oregon 97520 Tel 541-488-5354 Fax 541-488-5320 • TTY 800-735-2900 kari.olson@ashland.or.us • Visit the City's web site at: www.ashland.or.us This email transmission is official business of the City of Ashland, and it is!subject to Oregon Public Records law for disclosure and retention. If you have received this message in error, please contact me at(541)488-5354.Thank you. From:'Tara Kiewel<tara.kiewel@ashland.or.us> Sent:Wednesday, March 02, 2022 1:07 PM To: Kariann Olson<kari.olson@ashland.or.us> • Subject:Contract Amendment- Robertson Sherwood HI Kariann, Here is a signed contract amendment and Form #10. Let me know if you need anything else. Thank you Tara Ta rcv7(CeAveXi . . Administrative Analyst • Ashland Parks&Recreation Commission • . 340 S.Pioneer St.,Ashland,OR 97520 Tel:541-552-2257 Fax 541-488-5314 www.ashlandparksandrec.org This email transmission is official business of the City of Ashland,and it is subject to Oregon Public Records law for disclosure and retention. If you have received this message in error,please contact me at 541-552-2257. Thank you. 1. • F€' i . I AMENDMENT NO. 1 ; " to • 1 • • PERSONAL SERVICES AGREEMENT 1 . between THE CITY OF ASHLAND, an Oregon municipal corporation, - • • ("City,) and ri . Robertson Sherwood,Architects P.C., • -("Contractor") for • DESIGN SERVICES . • RECITALS . A. The City and Contractor previously entered into a P, .sonal Services Agreement • i. effective March 5, 2020 (th: `"Agreement") to Contractor .rovide design services for the new Daniel Meyer Swimmin: Pool; and • B. The City and Provider now ''sh to amend the • greement to increase the amount of compensation to be paid to Provi -r. 1 •. I 3 . . , • GREE)'ENT 1.f. • . NOW THEREFORE,in considerate•j of the mutual benefits and obligations set forth `. herein,the parties agree as follows: . 1. Amend Section 2 of the Agree :nt as fo ows,with strikeout wording deleted and k underscored wording added: . . 2.I City shall pay Provi••r the sum of$18 .,780 (one hundred and eight five thousand seven hundred ,nd eigh dollars' $161,130.00 as provided herein as full 1 • ' compensation f. `the Work as specified :the quote dated'September 16,2021.` 11 2.2 In no event 1 all Provider's total of all co .sensation and reimbursement under this Agreeme f. exceed the sum'of$185 780 • o e'hundred and ei,ht five thousand seven ' ndred and eighty dollars) dollar- $161,130.00 without the express, it writte approval from the City official whos- signature appears below, or such 1I . offi•,al's successor in office. Provider expressly . knowledges that no other person - h.. authority to order or authorize additional \ ork which would cause this aximum sum to be exceeded and that any;autho ' ation from the responsible ; official must be in writing.. Provider further acknowled:: that any Work delivered ft) - or expenses incurred without authorization as'provided her='n is done.at Provider's own risk and as a volunteer without expectation of compensation or reimbursement , • 4 Page 1 of 2: Amendment No. 1 to Personal Services Agreement—Robertson Sherwood,Architects P.C. • i 1 1 • , 2. This Amend' ntNo. 1 is effective upon being signed by both parties. 3. Except as spec cally modified by this Amendment No. 1,the terms and conditions of the Agreement re ain in full force and effect. . • i IN WITNESS WHERE F the parties have caused this Amendment No. 1 to be signed in thei• d respective names by their auly authorized representatives as of the dates set forth below: CITY OF ASHLAND,OREGO Roberts • ' ood,Architects P.0 • By: �'�.cQ. gE B 40.i.�. ,t1 - • Printed Name: Michael A Black 'rinted Name: Carl Sherwood,AIA 4 I — • Title: Director, APRC Title: Corporate Secretary . Date: 11/29/21 • Date: November 29,2021 i Ap -d as to Form 4 1 Douglas McGe.. Assistant City • o'ney i I I Page 2•of 2: Amendment No. 1 to Personal Services Agreement—Robertson Sherwood,Architects P.C. l • i . • • • , � - Ili • -71�a<r'• '.. Robertson Sherwood I Architects PC 132 East Broadway, Suite 540 P 5411342.8077 www.robertsonsherwood.com Eugene,Oregon 97401 F 5411345.4302 September 16,2021' City of Ashland Parks and Recreation Commission 340 South Pioneer Street j Ashland, Oregon 97520 Attention: Michael Black,Ashland Parks and Recreation Director Re: Daniel Meyer Swimming Pool Replacement—Solar and Geothermal Energy Study Dear Michael: • Robertson/Sherwood/Architects pc is pleased to submit this fee proposal to provide additional planning and design services for the proposed Daniel Meyer Swimming Pool Replacement-Project#000706. Specifically,these services would provide•a comparative energy analysis of the scope and impact of a• . range of solar array alternatives,for both solar hot water and/or photovoltaic renewable technologies, and the potential for both low-temperature and high-temperature geothermal heat resources,on the water heating requirements for the proposed expansion. - The bulk of this analysis would be performed by Systems West'Engineers as outlined in their attached proposal. The finding would be summarized in tabular form with assumptions cited. The solarenergy study would be supplemented by Robertson Sherwood Architects with research and development of a concept design and cost estimate for the structure of the Parking Area Solar/Shade Cover alternative shown on the attached aerial photo plan. This information would then be extrapolated • to identify costs for the smaller On-Deck Solar/Shade Cover and larger Tennis Court Solar/Shade Cover. This cost information is necessary for the study in understanding the return on investment in these renewable technologies.All of the results of the study would then be incorporated into a revised report.• Proposed compensation for these services are as follows: , Systems West Engineers Solar Energy Analysis $ 8,800 Systems West Engineers Geothermal Energy Analysis $ 8,600 • • Robertson Sherwood Architects Concept Design/Revised Report $ 4,750 Construction Focus Cost Estimating $ 2.500 • Lump Sum Fee $24,650 We will provide all services in close coordination with designated City of Ashland personnel throughout the study.We are prepared to begin scheduling our work on this study immediately and would hope to have results within 4 to 6 weeks. As always and if needed,we:are prepared to adjust the scope of services to meet your needs and expectations. • If you have any questions or need additional information,please do not hesitate to contact me. Sincerely, , ip / Carl S--rwood, Corporate Secretary ' `1 • Robertson!Sherwood'Architects Ft . SYSTEMS WEST ENGINEERS "' 725 A Street �`A•4 Springfield,OR 97477 ivy541.342.7210 systemswestengineers.com1' • July 20,2021 P21-202R2 } Mr. Carl Sherwood Robertson Sherwood Architects 132 East Broadway,Suite 540 Eugene,OR 97401 ` RE: Ashland Daniel Meyer Pool Renewable Energy Study. Dear Carl: Systems West would be pleased to provide a comparative energy analysis for renewable energy alternatives at the Ashland Daniel Meyer Pool. PROJECT DESCRIPTION The Ashland Daniel Meyer Pool is considering eight options for renewable energy systems: 1. Solar photovoltaic(PV) system in array configuration A 2. Solar Hot Water(SHW)for pool preheat in array configuration A 3. PV system in array configuration B 4. SHW for pool preheat in array configuration B 5. PV system in array configuration C 6. SHW for pool preheat in array configuration C 7. Direct-use geothermal pool heating with heat pump chiller (for low-temperature heat resource) 8. Direct-use geothermal pool heating (for high-temperatureheat resource) An economic analysis of the alternatives is required to guide the design decision on the most effective option.At this time, the site's direct-use geothermal heat quality is undetermined, so the analysis breaks out options 7 and 8 separately pending a future feasibility site evaluation. BASIC SERVICES 'Systems West will analyze the relative performance, emissions reduction, and economic impact of the eight options for the Daniel Meyer Pool design.Systems West will perform the following for this scope of work: ■.` Review the design options for the Daniel Meyer Pool and associated array options. ■ Estimate the annual pool heating load profile and the amount of energy offset by each option,taking into account the local weather, solar irradiance resources, and geothermal heating quality assumptions based on independent research. ■ Calculate the pool heating energy consumption, energy costs, carbon emissions, and opinion of probable installation costs(not including structural)for each option. ■ Estimate an opinion of probable costs for geothermal well feasibility study and construction.This will include the following: i o Interviews with geothermal specialty-contractors to estimate potential heating • July 20,2021 P21-202R2 Page 2 . resources at the site as well as feasibility study costs • o Estimation of aquifer flow rates for direct heat exchange with pool heating loop. o Benchmarking of construction costs based on engineering experience and opinions of probably costs from contractor interviews. This includes the resource and injection wells. ■ Summarize the comparative findings in tabular form with assumptions cited. FEE PROPOSAL • Systems West Engineers will provide the services described above for the fixed fee listed below: • Solar Analysis(Options 1-6) $ 8,800 Geothermal Analysis(Options 7&8) 8,600 Basic Services Total ( • $ 17,400 If this is acceptable,please prepare a professional service agreement.Please give us a call if you have any questions.We are looking forward to working with you on:this project. Sincerely, SYSTE S WEST ENGI S,INC. • e N. :ngdon, 'E President • GNL/JMI/jaw Sent via Email