HomeMy WebLinkAbout2022-159 PO 20220327 Amnd #1- Andritz Separation Inc K
RECORDER Purchase Order
,M Fiscal Year 2022 Page: 1 of: 1
al_ 0IBBWaLU T P Lf=
B City of Ashland —
LI ATTN: Accounts Payable 20 E. Main Purchase
L Ashland, OR 97520 ) Order# 20220327
T Phone: 541/552-2010
O Email: payable@ashland.or.us
‘ -' 7
V ANDRITZ SEPARATION INC H C/O Wastwater Treatment Plant
EDEPT 0312 1195 Oak Street
D PO BOX 120312 P Ashland, OR 97520
OR DALLAS, TX 75312-0312 Phone: 541/488-5348
O
Fax: 541/552-2364
-- t_€rr ---- tuiran ,i 7_,-;;;•,•-;:*:av r —= .ct _p; ._. 5
i�
��=
(817)465-5611David Gies
: e-m--wst_p:AattF __ n : '" - 6
..._. 1 -'.lia i V T - '
I�- 04/20/2022 718 {} FOB ASHLAND OR/NET30 City Accounts Payable
��j�-.�,.�
FJ: Illl}`{ titi1 ]� E- k ire ..- -:°- =¢_. - .=c'rM I3I91 �--. - R'WS.
.��, hitt S9.L ,1,'`.
Rebuild Centrifuge Assembly
1 Repair and rebuild Centrifuge Rotating Assembly 1.0 $82,157.00 $82,157.00
Per attached Quotation#20758244 •
City of Ashland Contract for Repairs to WWTP Centrifuge
Completion date: 06/30/2022
Project Account:
2 ADDED: Processed change order 06/03/2022 1.0 $7,315.00 $7,315.00
Amendment No. 1 (Centrifuge Repair)
Project Account:
*************** GL SUMMARY***************
I I 086100-602400 $89,472.00
-.
By: rt / Date:fes,✓G✓ --- [;„_ _r_.„:„._.„,..7.7_, _
A th w raze• - e- "6 F g .89 472.00
FORM #10 CITY OF
CONTRACT AMENDMENT APPROVAL REQUEST FORM ASHLAND
Request for a Change Order
,
Name of Supplier l Contractor/Consultant: Mdrilz Separation Inc. lotal2amtiunt:0fthi `':. ''-
.contractarrendment:
Purchase Order Number 20220327 7
Title)Description:Centrifuge repair $'7,$1 5'00' t
l
0■ Per attached contract amendment
Contract Amendment
Original contract amount $82,157.00 100 %of original contract
Total amount of previous contract amendments 0 %of original contract
Amount of this contract amendment 7,315.00 9 %of original contract
TOTAL AMOUNT OF CONTRACT $89,472.00 109 %of original contract
In accordance with OAR 137-047-0800:1)The amendment is within the scone of procurement as described in the solicitation documents,Sole Source notice or approval of Special '
ProcuremenL 2)The amendment Is necessary to comply with a change in law that affects performance of the contract.3)The amendment results from renegotiation of the terms and
conditions,including the contract price,of a contract and the amendment is advantageous to the City of Ashland,subject to all of the following conditions:a)goods and services to be
provided under the amended contract are the same as the goods and services to be provided under the unamended contract b)Th a City determines that,with all things considered,the
amended contract is at least as favorable to the City as the unamended contract;c)The amended contract does not have a tote I term greater than allowed in the solicitation document, I
contract or approval of a Special Procurement.An amendment Is not within the scope of the procurement if the City determines that if it had described the changes lobe made by the !
amendment In the procurement documents,it would likely have increased competition or affected award of contract
Contract amendment Is within the scope of procurement: YES • NO (If"NO",requires Council approval 1 Attach copy of CC.)
Sourcing Method:
SMALL PROCUREMENT—Not exceeding$5,000 ,INVITATION TO BID or COOPERATIVE PROCUREMENT,QRF or
❑"YES°,the total amount of contract and cumulative REQUEST FOR PROPOSAL EXEMPTION PURSUANT TO AMC 2.50 I
amendments s$6,000. 0 'YET,the total amount of cumulative amendments 0°YES°,the total amount of original contract and h
❑If°NO',amount exceeding authority requires s 25%of original contract amount or$250,000 cumulative amendments s$100K for Goods&Services,s
Council approval.Attach copy of Council whichever is less. $75K for Personal Services,<$SoK forAttomey Fees.
Communication. 0 If°NO°,amount exceeding authority requires 0 If°NO",amount exceeding authority requires Council
❑ Exempt—Reason: Council approval.Attach copy of Council approval.Altach copy of Council Communication.
PERSONAL SERVICES(DirectAppolntmentt Communication. 0 Exempt—Reason:
❑ °YES",cumulative amendments s$35,000 0 Exempt—Reason:
' ❑ If'NO°,requires coundl approval.(Attach CC)
INTERMEDIATE PROCUREMENT SOLE SOURCE EMERGENCY PROCUREMENT
Goods&Services->.$5,000 and<$100,000 l] 'YES°,the total amount of cumulative amendments 0 Written Findings:Document the nature of the
Personal Services•>$5,000 and<$75,000 s 25%of original contract amount or$250,000 emergency,including necessity and circumstances
❑ °YES°,the total amount of cumulative whichever is less. requiring the contract amendment
amendments s 25%of original contract amount 0 If°NO°,amount exceeding authority requires 0 Obtain direction and written approval from City
❑If°NO',amount exceeding authority requires Council approval.Attach cope of Council Administrator
Council approval.Attach copy of Council Communication. 0 If applicable,attach copy of Council Communication I
Communication. 0 Exempt—Reason: 0 Exempt—Reason:
❑ Exempt—Reason:
SPECIAL PROCUREMENT INTERGOVERNMENTAL AGREEMENT
❑'YES°,the total amount of original contract and cumulative amendments are 0 Renewal of Intergovernmental Agreement:Terms modified in accordance with Initial
within the amount and terms initially approved by Council as a Special agreement OR cost will not be more than 25%greater than initial agreement.Renewal
Procurement. approved by City Attorney and department head affected by renewal and approved/signed
❑ If°NO",amount exceeding authority requires Council approval. by City Administrator.AMC 2.28.045(B) j 7
Attach copy of Council Communication. 0 If°NO",Council approval Is required.Attach copy of Council Communication
Project Number Account Number 0 66100- 602 4 0 o Account Number -
'Expenditure must be charged to the appropriate account numbers for the financials to reflect the actual expenditures accurately. Attach extra pages if needed.
Employee Signature:\10101VND 1NAM Q - fiRatmentHead Signature: t �� s (421
' Egnal o. ,:a• te
City Manager:
Con .rand addenda greaterthan$35,000)
Funds appropriated for current fiscal year: YES/NO 47 It' May 16. 2022
Finance Director(Equal to or greater than$5,000) Date
Comments:
Form#10—Contract Amendment Approval Request Form,Request for a Change Order,Page 1 of 1,4/2312020 '
AMENDMENT NO. I
to
GOODS AND SERVICES AGREEMENT
between
THE CITY OF ASHLAND,
an Oregon municipal corporation,
("City")
and
Andritz Separation Inc.,
("Contractor")
for
REPAIR TO WWTP CENTRIFUGE#1
RECITALS
A. The City and Contractor previously entered into a Goods and Services Agreement
effective April 6,2022(the"Agreement")to repair WWTP centrifuge#1; and
B. The City and Contractor wish to amend the Agreement to extend the term of the
Agreement.
AGREEMENT
NOW THEREFORE,in consideration of the mutual benefits and obligations set forth
herein,the parties agree as follows:
1. Amend Section 2 of the Agreement as follows,with strikeout wording deleted and
underscored wording added:
2.1 City shall pay Provider the sum of $89,472.00 (EIGHTY-NINE THOUSAND
FOUR HUNDRED SEVENTY-TWO DOLLARS) $82x0 as provided herein
as full compensation for the Work as specified in the SUPPORTING
DOCUMENTS.
2.2 In no event shall Provider's total of all compensation and reimbursement under this
Agreement exceed the sum of$89,472.00 (EIGHTY-NINE THOUSAND FOUR
HUNDRED SEVENTY-TWO DOLLARS) $82,157.00 without the express,written
approval from the City official whose signature appears below, or such official's
successor in office. Provider expressly acknowledges that no other person has
authority to order or authorize additional Work which would cause this maximum
sum to be exceeded and that any authorization from the responsible official must be
in writing. Provider further acknowledges that any Work delivered or expenses
incurred without authorization as provided herein is done at Provider's own risk and
as a volunteer without expectation of compensation or reimbursement.
Page 1 of 2: Amendment No.1 to Good and Services Agreement
2. Amend the Completion Date as follows,with strikeout wording deleted and underscored
wording added:
COMPLETION DATE: June 30,2022 November 8,2022
3. This Amendment No. 1 is effective upon being signed by both parties.
I '
4. Except as specifically modified by this Amendment No. 1,the terms and conditions of the
Agreement remain in full force and effect.
IN WITNESS WHEREOF the parties have caused this Amendment No. 1 to be signed in their
respective names by their duly authorized representatives as of the dates set forth below:
CITY OF ASHLAND,OREGON ANDRITZ SEPARATION,INC.
(CONT CTOR)
By: By: /
Printed Name: Sear .Ft.Euc../ Printed Name: Robert King
Title: putt-4:c- 1....,oz,e.s Otp.Ecrrj Title: VP Operations
Date: sit;i2z. Date:05/13/2022
i 1
I I
I �
Page 2 of 2: Amendment No.I to Good and Services Agreement
I '
AN)RJ1L
QUOTATION
Customer:127936 Supplier: Andritz Separation Inc.
City of Ashland Contact: Zachary Hanson
City Hall Phone: +1 817 375 4474
20 E. Main St. Fax: +19039563498
Ashland OR 97520 E-mail: zachary.hanson@andritz.com
Contact: Date: 04/27/2022
Fax:
Copy to: Sales BAINES,CHARLES
Your inquiry: NOT YET Responsible:
Our quote no: 20758244
Ladies and Gentlemen,
We thank you for your inquiry and are pleased to quote as follows:
1. Scope of supply
ANDRITZ JOB#1195
(2)D5LL CENTRIFUGE SERIAL#D5LLC3OCHP-0234&-0235
Item Product ID No. S!W'' Quantity Unit Unit Price Amount
10 REPAIR ASHLAND 301358820 1 PC 77,345.80 77,345.80
D5LL
SN 3360 OLD JOB 1195
Items total 77,345.80
Freight 12,126.25
Total Amount USD 89,472.05
•S=Spare Parts,W=Wear Parts
Technical contact:Ray Potter/Phone:+1 817 419 1788/ray.potter@andritz.com
s j
Terms and Conditions
Page 1 of 5
Andritz Separation Inc. Invoice to: Wire Instructions:
110 Dicicson Street Andritz Separation Inc. NordeaBankAbp
Pittsburg,TX 75686 Attn:Accounts Receivable Naw York Branch
Dept 0312,P.O.Box 120312 SIj lFT:NDEAUS3N
Tel +1(903)856-0445 Dallas.TX 75312-0.312 Account 8679433001
Fax+1(903)856-3498 Federal TaxID Number.59 3773483 ABA:026010786
•
•
AWJRi1'L
Rotating Assembly Work Scope
Customer: City of Ashland Location:Ashland,OR
Salesperson: Charles Baines Material of Construction: SS
Date Quoted:4/26/2022 Job Number: S-48-J26647
Model: D5LLC3OCHP Manufacturer/Job:ANDRITZ/1195
Serial Number: 3360 Estimated Delivery ARO: 20-24 Weeks based on Headwall
Delivery
Sales Totals
Total Labor: $ 28,930.00
Total Material: $ 48,415.80
I i
TOTAL REPAIR: $ 77,345.80
Additional Notes or Recommendations:
•Shipping and handling is included in the quote,terms are FCA Origin.
•Customer stated reported ongoing vibration issues after the cyclo was refurbished. Vibration
appeared to be coming from the solids discharge end as reported by the technician.
•The customer reported some lubricants used that should be adjusted to use the following going i.
forward: Castrol Spheerol EPL 0 grease is used in the cyclo. The redex uses Mobil SHC 627. All
high speed bearings(main bearings)lubricated with Kluber NBU 15. Scroll thrust bearings should
be lubricated with any good EP2 grease type:R.
•According to the SIMS,the customer operates at 2800 RPM bowl speed.
•Upon inspection we found the following items that could be contributing to the high vibration and
high temp reported: The thrust bearing bore in the liquids head wall is oversize 0.002". Deep wash
out in the liquid ports of the headwall behind the liquid weir dams. The conveyor contains broken
and chipped tiles,different kinds of tiles,non-OEM tiles and JB weld over the tiles. The feed end
scroll hub bearing journal is 0.008"undersize. The spline hub is slightly loose to the conveyor fit,
and shows some oxidation.
•Additional notes from inspection include: Temp sensor cap is damaged/broken.
,, ., ,,,. ---7----7 t,---:,''....'s vie_ ,, .:.:,E)..,....„..„.. ......,..77:7„:„
Illri \ \I
_____________.1, „ ..,
,,,,,,:r„.,,.5,2 ii_.,_,1 .. ?, 11.
0,..., ..i..7.. •._:.:,....--,\ ,_, ,,,3._-_.
:T'9 R 4ti .,,n 07r y.t
-„ --,,, ,,,- .1 '-.10
'''''1:'
va / rYYYrrYYY.. I ,.{-f3�'y !iI t=� �(�'"'c•' r
•.
ol v w -.. 'M1 �+��/ `� 7 l, ':°,,.1 r.$c. ..„. '4. ?.;'
AS RECEIVED SOLIDS END AS RECEIVED LIQUID END I AS RECEIVED WEIR SETTING^'275MM
I i
AWJRiTL
Component Findings 1 Recommended Scope of Supply
Bowl
•The bowl will be polished and reused.
•Balance bowl assembly for 2800 RPM to ANDRITZ tolerances.
Effluent Head(FRONT WALL PLATE)
•The effluent head was found with washed out weir ports,which contributes to uneven discharge of
liquids and increased vibration. The thrust bearing bore is oversize.
•The headwall will be replaced as there is no repair recommended to the liquid weir ports.
4''l -;'4"-X'''',,,' :;V,-101.'•-.--''
r1 1• -711,1I rI - '
•'. —' dam.. p•'
.1
*N. ,u. tI tr"1
r 1
�
trv •. "".k • ,11 �
, 't., »
I
L
F R�
EROSION/WASH OUT EROSION/WASH OUT OVERSIZE BORE
1
Conveyor
•Conveyor was found contains broken and chipped tiles,different kinds of tiles,non-OEM tiles and
JB weld over the tiles.
•Remove and replace all tiles. Remove JB weld.
•Remove and replace all feed nozzles. ,
•Assemble with balance trunnions.
•High speed balance as an assembly at 2800 RPM to ANDRITZ tolerance.
hi i ,,,.cy -.---% - --,-o&.r ,-I •! Ili I
s�v - ` ! 5 .
- ,:_.,)J J _ ,r,T+ i Sys' r- y`.-„' _ ?�. .s�-� ---=------,,7,„,:f"„„! '.,
I ty r �✓� 1
ret4-:!': _ '` r iI' -+) •�k'� t: +Ir�k}a '1,-
I
>,,,,,?:4. .,-."' , rrc 4 /`) 711 {tea , �11' ii-
c 1 Ik � LI ,r
i I
DAMAGED AND CHIPPED TILES JB WELD FOUND OVER TILES OTHER TILES INSTALLED
I ;
j I
I '
AWJPJIL
Spline Hub
•The spline hub is slightly loose to the conveyor fit,and shows some oxidation.
• Recommend to replace.
1r1 — , ?lir •(i .t.l + I rasa
r -- '' vF. r tl -i I z if '
r rr
1 1 t4 cs L"F 1.
/ _ .� 8'4 -.7:4.'9 - r .4.;
"'-i
' "
n !
• •I - -�— deh4°, s 1r -e,...c:, .S4' y.J
SPLINE HUB LOOSE FITTO CONVEYOR(SCROLL) CORROSION/OXIDATION
Scroll Hub
•The feed end scroll hub bearing journal is 0.008"undersize,this part requires replacement. ;
Bearing Housings
•The bearing housings were found in overall good condition.
•The temp sensor on the drive end housing is damaged and requires replacement.
•Clean out all thru ports and internals. Paint after testing.
_,I $3..,7,'---.6.1 _, .`• i fl; \
= o >f;
ti. ` tIA-s-.`--s i [+� -- i - , - �c-�J1 <-,.'•-..4,61,.- 1 `
l sem.. .+• S .\} yr �}j�`Y�' �•� •
Iiw
•
•
t --5__.
` ,. ; •"•
-'?'- / f Wil' I .-a1 �, � y% ' • '
CRACKED TEMP SENSOR BEARING HOUSING I BEARING HOUSING I
Cyclo Reducer
•This item was just rebuilt,will be reused as is.
Final Assembly I
•Assemble with all new bearings,seals,fasteners,and o-rings.
•Assemble to test base.
•
Test Run
•The base/case was not received from the customer,cannot test at service center.
•Could require trim balance onsite once installed,not included in this work scope.
i •
•
AWJPJTL
PARTS LIST
{
SAP NUMBER ITEM DESCRIPTION QTY
131045033 SOCKET HEAD CAP SCREW 6 =
131071335 RETAINING RING 1
131242737 ANGLE RING 1 •
100022291 RETAINING RING 1 1
131045885 CYL ROLLER BEARING 1
131128834 0-RING 1 I
131128745 0-RING 2
131071714 V-RING 1
131128821 0-RING 1
• 131128747 0-RING 2
131045575 DEEP GRV BALL BEARING 1
131073758 SEALING RING 1 •
131058741 SEAL 1 '
•
131140702 0-RING 1 ,
131320448 0-RING 1 •
131128827 0-RING 2 ,
131127988 FEED FLANGE INDICATOR _ 1 • '
131045033 SOCKET HEAD CAP SCREW 6 •
131140703 0-RING 1 ;
131027656 RETAINING RING 1
131127349 TEFLON RING 1
131750036 0-RING 1
131128795 0-RING 1
131750037 0-RING 1
131126166 SOCKET HEAD CAP SCREW 12
100022224 RETAINING RING 1 _
131045830 CYL ROLLER BEARING 1
131130061 PLUG 2 •
132057904 V-BELT 5 _
131411050 GREASE KLUBER 6
131411051 GREASE LGMT2 - 6
132767314 CASTROL SPHEEROL EPL 0 1
132281771 SEALING RING 6 ••
132120200 SEALING RING 2
131145042 CYL ROLLER BEARING 1
131396161 TEMP SENSOR 2
201821124 LIQUIDS HEADWALL(HOLLOW SHAFT) 1
202286079 SMALL TILE 30
202286081 LARGE TILE 460 ,
201821011 SCROLL HUB 1
131845162 SPLINE HUB 1
131748646 SEAL 1
131060380- BEARING 1
131481651 NILOS RING 1
r
' i
s 1
Memo
TO: Joseph Lessard
FROM: Tami De Mille-Campos(Public Works)
DATE: 5/16/2022
RE: City Manager Signature Needed for change order—Andritz
{ I I
i I
Background: i 1
The wastewater treatment plant operates two centrifuges to dewater sludge,both units are now 20 plus
years old. One of the two units was experiencing vibration issues and had to be sent to the repair facility
for repairs. The vibration issues could not be fully diagnosed until the unit arrived at the repair facility
in Texas where it could be disassembled and inspected. Upon inspection the damage was more
extensive than originally anticipated so the additional expense for this repair was approximately$4,000.
There was also a significant increase in shipping costs adding nearly$5,000 to the original repair. Parts
availability and supply chain issues have also extended the anticipated repair timeline out to six months.
Council Action: N/A '
Other Relevant Information:
{
Insurance waived or reduced?No
Who to return to if different from sender?
Are all other signatures required collected?Yes
If no,please collect before sending them to the City Manager.
Are all attachments listed included?Yes
If no,please include all attachments before sending to the City Manager.
i r
I 1
CITY OF ASHLAND
20 East Main Street Tel:541-488-6002 1.41Ashland,Oregon 97520 Fax:541-4885311
www.ashtand.or.us TTY: 800-735-2900 ,