HomeMy WebLinkAbout2024-03-18 Study Session MINASHLAND CITY COUNCIL
STUDY SESSION MINUTES
Monday, March 18, 2024
Mayor Graham called the meeting to order at 5:31 p.m.
Mayor Graham and Councilors Hyatt, Dahle, and Kaplan were present.
Councilors Hansen, Bloom and DuQuenne were absent.
1. Public Input - None
2. Fire Code Update
Ashland Fire Marshall Mark Shay gave a presentation on the planned fire code updates (see
attached)
• Code Modification (Section 3.15.28.030 Definition)
• Code Modification (Section 6 15.28.070 now at 2022 edition)
• Code Modification (Section 13.15.28.160 Code Compliance Inspection / Fees)
• Fire Marshall Accomplishments
• Fire Marshall Vision
Dahle asked for examples of critical infrastructure as mentioned in the presentation. Shay
responded that critical infrastructure were locations such as the water treatment plant, the
sewage treatment plant and power related facilities. Dahle asked what the frequency of
inspection would be for those types of facilities. Shay noted that they would be inspected
annually.
Hyatt asked how Shay and Ashland Fire felt about their preparations for the ISO review in
May of 2024. Shay felt that work was going well, and that any areas of concern would be
addressed before the May inspection. Kaplan asked if Shay was expecting the rate of
signups for Community Connect to increase or stay the same moving forward. He also
asked if the rates of building reviews, plan use reviews and fire inspections would stay at the
same or would increase. Shay felt that the current signup rate was at a good place,
predicting it to slowly increase over the next few months. Shay also mentioned that Ashland
Fire would continue to push for people to sign-up moving forward and that he foresaw both
the plan use and fire inspection to increase. Kaplan suggested utilizing the school system to
possibly increase signups for Community Connect. Dahle asked if there was anything that
either Council or the community could do to help continue progress. Shay responded that
the best way for the community and for Council to help was to continue their support and for
the community to understand that his role was to help make the community safer. Graham
thanked Shay for his work and his proactive approach to dealing with fire concerns. She
asked what was needed to ensure a consistent message and how to best coordinate that
message. Shay noted that coordination was going well with Emergency Manager Kelly Burns
and his team in the areas of both wildfire safety and updates to the fire safety code. Graham
asked about how best to enforce weed and hazardous fuel ordinances for lands that are
City Council Study session
March 4, 2024
Page 1 of 4
inside Ashland's urban growth boundary but not inside city limits. Shay noted that he wasn't
fully up to date with the specifics regarding certain properties but noted that problems will
continue to occur with those properties because of regulation issues.
3. City Forestlands Climate Ada ption Project
Ashland Fire Division Chief Chris Chambers gave a presentation (see attached)
• Tree die off rates
• Insect die off rates
• The danger of embers
• Predicted Climate Water Deficits
• Public Input and Engagement to Date
• Observer Bias and Recreational Ecology
• Infrastructure at Risk.
• Results from Tree Marking
• Wildlife Work
• Snag and Downed Wood Targets
• Balancing Habitat and Severe Fire
• Projects Operation and Budgets Options
• Next Steps
Former City Forester Marty Main joined Chambers and spoke to his experience documenting
the changes to City forestlands and the effects climate change has had on them. He also
spoke about his approach to dealing with land objectives within a particular area and
brought attention to the issue of elevated "stress" within the forest. Dahle thanked Main for
his insights and asked for clarification with section C (Carbon Sequestering) of the project
addendum. Main responded that the issue was about balancing the desire carbon
sequestering and dealing with the natural cycles of forests. Graham noted the value and
benefits of standing dead trees and asked how many were being marked and left alone for
soil and wildfire health. Chambers highlighted the solutions that Lomakatsi had implemented
within the presentation, with Main adding that information had been collected as far back as
2000 regarding standing dead trees and woody debris within various City lands. Kaplan
asked how Chambers planned to let people know about the timeline for the planned forestry
work. Chambers responded that he was hoping that the Citizen Alert message would help
with that. Graham asked if the public would see the trees marked for removal, which
Chambers confirmed. Hyatt asked if the greener trees were susceptible to bark beetles.
Chambers confirmed that all Douglas Fir trees were susceptible to the bark beetles, as there
was a huge wave of die offs within the past year. He also noted that if Lomakatsi were to
preemptively remove all the Douglas Fir trees that are considered high risk, it would remove
all the trees. The risk of bark beetles was everywhere within the forest unless the drought
improved. Graham asked for the rationale behind marking green trees even though all of
them were susceptible to the bark beetle. Main responded that the issue came down to the
finite number of resources, such as water and good soil. Fewer vegetation would allow for
more water and soil nutrients to be used by the surviving trees. The increase in drought has
City Council Study Session
March 4, 2024
Page 2 of 4
caused issues with choosing when and where to remove vegetation to allow for the surviving
trees to be more robust. The long-term goal is maintaining a green and healthy forest. Main
noted the City was in a challenging place because of its circumstances. Lomakatsi Ecological
Monitoring Associate Jordan Anderson and Lomakatsi Executive Director Marko Bey provided
an update on the tree marking project and on securing inter -tribal funding. Anderson also
highlighted the outreach methods utilized by the company for this project. Chambers
explained each of the options for the next phase of the project and provided financial
breakdowns for each. (SEE ATTACHED) Hyatt provided some clarification on the differences
between options one and two. Kaplan asked about the difference in value for log hauling.
Chambers responded that the old number was an estimate, with the new number being a
proper quote from the organization selected to work on this part of the project. Kaplan
wanted to know about routes for trucks to take to haul logs out, and how they would impact
travel through Ashland. Chambers foresaw that only one route would run through the center
of town.
Mayor Graham highlighted the complexity of the issue before opening Public Testimony
Public Testimony
Eric Navickas/Ashland - Talked about the history of flooding and land sliding within the
municipal watershed. Raised concerns that logging would cause the environmental concerns
to take a back seat to financial incentives. He wanted Chambers to post his financial
breakdown spreadsheets to the City website. Raised concerns about the increase in cost.
Brought up how fuel loads are not as significant in fire danger as temperature, time of day
and wind conditions are. Felt that leaving the trees and working to stabilize the soil would be
both environmentally strong and a decrease in cost. Wanted the Council to focus on soil
stability in the long run.
John Maurer/Ashland - Expressed support for the project. Highlighted work that had been
done by residents of help protect the watershed. Expressed his fears regarding fire safety
around Siskiyou Mountain Park and how a potential fire could damage Reeder Reservoir and
soil safety. Praised Main and his work. Wanted the City to do what's right for the forest.
Mayor Graham asked about the issue of soil stability within the work area. She wanted to
know how the project would relate to ongoing soil stability efforts. Chambers responded that
it would be difficult to stabilize the soil because of its natural composition. He also noted that
previous landslides were because of road systems as opposed to overall stability. He
suggested a road analysis throughout the watershed at a future date. He also noted that the
City was already following recommendations from the State regarding stability, although it
had to be balanced with fuel concerns. Main added historical context for soil stability that
had occurred in the 1990s and that the City had already taken steps to monitor stability
starting during that time period.
Kaplan asked when replanting would happen. Chambers responded that Phase two of the
project would be the replanting phase, adding that future work would initially focus on what
City Council study Session
March 4, 2024
Page 3 of 4
species would be best to replant to increase both biodiversity and to ensure the future
survival of the area. He estimated that work would begin either in the Spring of 2025 or during
the next biennium.
4. Adjournment of Study Session
The meeting was adjourned at 7:36 p.m.
� i(), ni "I" a
City Recorder Alissa Kolodzinski
Attest:
�� AII�-
Mayor T nya Graham
City Council study session
March 4, 2024
Page 4 of 4
Code Modifications
Section 3. 15.28.030 Definitions
11: "Fire prevention organization" (FPO) means the organization or the
individual within the City of Ashland or otherwise delegated, that has
the authority to provide fire prevention, inspection and code
enforcement, plan review, investigation, and fire and life safety
education.
onr
An
Code Modifications
Section 6. 15.28.070 City of Ashland Modifications
to the Oregon Fire Code 2919-2022 Edition
Code Modifications
Section 13. 15.28.160 Code Compliance Inspection
Fees
A --The City of Ashland will follow nationally referenced standards on fire
prevention inspection and code enforcement as provided by the National Fire
Protection Agency (NFPA 1730). This standard contains minimum requirements
relating to the organization and deployment of fire prevention inspection and
code enforcement, plan review, investigation, and public education operations.
This standard also addresses the strategic and policy issues involving the
organization and deployment of fire prevention programs and does not
address methods for carrying out specific fire prevention services, activities
and programs.
�7
Code Modifications
Section 13. 15.28.160 Code Compliance Inspection
Fees
B. The City of Ashland shall maintain a written statement or policy that
establishes the following:
c,> Existence of the FPO
(2) Services that the FPO will provide
(3) basic organizational structure
(4) EXpectecl num er ot FPO members
(5) Functions Mat FPO members are expected to perform
Code Modifications
Section 13. 15.28.160 Code Compliance Inspection
Fees
C. General Requirements: Fire prevention inspection and code enforcement
services including department personnel, equipment, and all support and
resources shall be structured to meet the organizational objectives. Fire
prevention inspection and code enforcement shall be conducted to ensure
compliance with adopted codes and standards. Personnel responsible for fire
prevention and code enforcement activities shall meet the job performance
requirements in NFPA 1031 and the certification and training requirements for
conducting fire code enforcement found in OAR 837-039-0016 for the
inenarrtinn rli itiac thaw narfnrm
Code Modifications
Section 13. 15.28.160 Code Compliance Inspection
Fees
D. Minimum Inspection Freauencv: Existina occupancv fire
prevention inspection and code enforcement inspection
frequencies shall not be less than:
Occupancy Classification Frequency of Inspections
High: Annually
Moderate: Biennially
Low: Triennially
/
Fire Marshal Accomplishments
Accomplishments over the last Four Months
• Began reviewing building plans for fire code related requirements
• Began reviewing land development pre -applications for access &
water supply
• Worked cooperatively with Community Development and Finance to
institute a Business License review process by AF&R
• Conducted fire & life safety inspections as well as fire code
consultations by request
try
Fire Marshal Accomplishments
Accomplishments over the last Four Months
• Implemented First Due and Community Connect software
• Instructing OSFM Company Inspector curriculum to AF&R and JCFD
#5 staff
• Building the Wildfire /Community Risk Reduction division
• Management oversight of large projects including; CWPP and
Ashland Wildfire Mitigation Project.
• Building relationships
Fire Marshal Vision
Looking ahead for Wildfire/CRR
• Implement proactive fire safety inspections by division staff
• Implement engine company level fire safety inspections
• Gather relevant data to assist with reducing community risk
• Provide continued leadership to the Wildfire / CRR Division staff
• Ensure efficiency and effectiveness with related programs and
processes.
We're not in Kansas Anymore.....
�•aa.,
", -, »�;�.<I -,, ;..tli FFg mortality in USES Region 6
x1�Ss_ ""r_ 2d'g0£$77ii"stu F: gc:--ii- i'- ---- -— ige����A3$�gasgers Qi
ns
•Ve�yl(Mft RI �lyNIl1OY1 .MMn�fe�11 HV +LMnIN'A41 •�.r. ti.mel•vR�
Reducing wildfire risk is the #1 priority of City Government according to our citizens
(City 2023 online and public meeting polling)
•
u
Ashland's Three Mile Island.... Three Mile Ember Travel from Proposed Project Areas
"The fuel impacts of large-scale forest mortality suggest this could
lead to a greater incidence of mass fire behavior. Mass fires
strongly contrast with historical fire regimes in frequent fire
forests, are not predictable by fire models, and risks are poorly
understood. Thus, fire departments, communities, and forest
managers likely will underestimate the wildfire threat posed to
people, homes, and natural resources following severe tree
mortality in forests adapted to frequent fire."
-Dr. Scott Stephens, U.C. Berkeley (2018 publication)
IN'-r�„�� ,,• • 4. o zs�: —,� s,.,�: sir w �s
�,,. , � ' `�• + it � .+ ` �� e.E� '_ -
kw
-�' , � ,`� •• .API" , - '�
l /
Public Input and Engagement To Date
• Forestlands MAC monthly meetings posted on City Website over past two years of Climate Adaptation Planning
• Two Public Tours took place for 2023 Climate Change Addendum to Ashland Forest Plan
• One tour with volunteers on the Forestlands Management Advisory Committee
• Council meeting and decision with public input on Climate Change Addendum
• Chris and OSU Extension Forester on Jefferson Exchange in 2023 about Douglas -fir mortality and the need for action
• Article in Ashland.news about extensive tree mortality and specifically talking about helicopter logging
• Article in the City Utility Newsletter in September 2023 on trees dying and the need to intervene with helicopter work
• Two public tours were given of proposed Phase I project implementation in October 2023
• Four field tours with APRC staff and Southern Oregon Land Conservancy in Siskiyou Mountain Park
• Two public presentations to the Ashland Parks and Recreation Commission, including one last week
• Created a recreation organization email group to update regularly composed of local groups and businesses
• USFS will put out our information on their media regarding trail/road closures
• Forestlands MAC members staffed a booth at the Farmer's Market during October and November
• A public online GIS map of open and closed areas/roads/trails will be released this week in City News blast
• Two articles in Ashland.news today as a result of discussion with Morgan Rothborne last week
• Follow up feature this week in Ashland.news is planned after the Council Meetings
• Planning has been done with the DEVO youth biking group to schedule races around work dates
• Article in City Utility Newsletter this month is circulating now to all residents
• Dedicated project website went live in early March
• Signage has been posted at trailheads since December, updated signage went out in early March with project website and QR codes.
• Will use Citizen Alert when project is imminent to push alerts to all citizens about closures and helicopter work
• City News blast will come on the heels of Council meetings this week
• Do
Infrastructure at Risk
t ..
` �•il�
L
� J..
�.'
AU,
;x-
a llk� N��
0
T 11
Ashland Forestlands Climate Change
�- Adaptation Project (AFCCAP)
Marking and Project
Funding Summary
Presentation for the City of Ashland
Lomakatsi Restoration Project
March 18, 2024
LOMAKATS1
--
POW..
DOI Office of
• Spring '23: USFWS
Wildland Fire for P
reduction projects
Wildland Fire Investment
received $23 million from DOI Office of
artners Program in support of fuels
on—94,000 acres of private land adjacent to
federal lands
• Lomakatsi has leveraged federal investment totaling $1 million
through a cooperative agreement with USFWS for ecologically
based fuels reduction work on private lands in the wildland-
urban interface of Ashland
• $150K dedicated to ecological fuels treatments on COA
municipal lands as part of AFCCAP
� I"Itill .\ 1\ II.IN Itl
1+ !t1.Na' laF.
Partners
for Fish
�� `' i 4Ylldllh
001 Office of Wildland fire
COA2
LOHA`XAT52
C6.
O! ,f 'r"'•;
C044.1
i .'C6A3 1;..
p \\\ SMP
,I
C0�45
0 0.2 0.4 0.8 1.2 Lo
qu Miles
usn
... co0.eounrr_�+ruu .. co. ,,.a: La, swo -
• Project set-up, coordination, and layout accomplished 12/15/23 -
2/2/24
• Tree marking and cruise accomplished 2/5/24 - 3/29/24
• Total project area and total treatment acres = 478 ac spread between
Siskiyou Mountain Park and COA watershed forestlands
encompassing commonly used trail systems including White Rabbit
and forestlands leading up to Reeder Reservoir A-
Unit
Acres
Net BF DF Lire
Net BF DF Dead
Net BF PP
Net BF/Acre
SMP
147.7
115,639
138,992
413
1,726
COA1
141.5
13Z087
144,442
1,920
1,968
COA2
52.4
33,230
18,964
494
1,006
COA3
26.5
21,396
13,300
0
1,309
COA4
23.1
19,038
26,713
85
1,987
COAS
86.2
177,501
18,594
1,156
2,288
Totals 1 477.4 498,891 F7 361,005 4,068 1,810
What About Wildlife?
Fisher and Humboldt Marten
Wildlife in Managed Forests — Fisher and Humboldt Marten
4.0 Current management recommendations
for fisher and Humboldt marten
Despite an incomplete understanding of the effects of forest management on fisher and marten
populations in Oregon, there are many opportunities for forest land managers to help develop and
y maintain suitable habitat fix these species. We recommend the following options for a land manager
interested in fisher and marten conservation:
• Maintain existing snags, logs and live legacy trees across the landscape. large -diameter trees
with complex structure (broken or dead tops, large limbs, complex branching, basal hollows and
multiple cavities) arc especially important to consider as leave trees.
• Strategically lave or crate large slash piles new mature stands of timber, for rat sites and dens.
• Grow wildlife leave trees to maturity, to teauit the next generation of legacy trees and logs.
• Maintain mast and fruit -bearing trees and shrubs across the landscape, to help grow the prey
base and provide food sources.
• Implement fuel -reduction projects with caution and strive to retain a mixture of conditions
across the landscape, since fisher ate often found rating and denning in mature stands that have
dense understory vegetation and abundant ladder fuels.
• Consider installing game cameras, and report findings to current carnivore researchers if fisher or
marten are detected. Also report if dad or injured fisher or marten are found on your property.
• Protect known populations by implementing voluntary timing restrictions during the denning
season, and/or habitat buffers around known dens.
• Focus habitat improvements (retention of slash piles, legacy structures and largediamcter live
trees) near or adjacent to known population sites, to encourage range expansion of the species.
• Limit rodenticide use.
• Restrict animal -control activities near occupied den sites.
• Consider enrolling in a Candidate Conservation Agreement with Assurances (CCAA) for fisher
(See section 5 for more information).
• Consider cooperating with research organizations by allowing resarch and monitoring activities
on your property, and stay informed on carnivore research.
Snags and Downed Wood Targets (Coarse Woody Debris, CWD)*
FIRE MANAGEMENT ZONES
Snag Target: 1-3 snags per acre emphasizing largest diameter trees as preferred snags. Clump snags to limit firefighter
exposure. Leave fewer snags where there is already sufficient downed wood. Leave more snags if downed wood is sparse,
small diameter, and/or in advanced decay classes.
Downed Wood: 5-8 tons emphasizing largest logs possible, where excess non -merchantable dead/dying trees exist.
REFUGIA ZONES
Snag Target: 10-15 snags per acre emphasizing largest diameters on site first.
Downed Wood: 20-30 tons per acre. Assume snag recruitment will fill downed wood quota over time.
GENERAL FOREST ZONE
Snag Targets: 2-4 snags per acre on southerly slopes, 4-8 snags per acre on northerly slopes. A diversity of snag density can
be left on westerly and easterly slopes, but not exceeding 8 snags per acre. The largest snags on site should be prioritized
for retention.
Downed Wood: 5-10 tons on southerly slopes, 10-20 tons on northerly slopes. A diversity of tonnage can be left between 5-
20 tons on easterly and westerly facing slopes.
HESE TARGETS WERE COMPROMISED BY TRAIL HAZARD TREES IN MANY CASES
Option #1: Full Footprint, Best Outcome
Spending Plan for Wildfire Division Account 072900.604160
Revenue
2023-2025 Approved Budget: $ 406,374.00
Lomakatsi Grant $ 150,000.00
Potential Log Revenue $ 686,127.00 per bid
Total Revenue: $ 1,242,501.00
Projected Costs
City Forestlands Climate Change Adaptation Project (est 400 acres)
Planning, Layout, Marking, and Cruise
$
75,000.00 Boundaries, units, prescriptions, data collection, monitoring, tree marking, tally, cruise, and sale admin
Helicopter Logging Cost
$
1,295,946.00 per bid and marked tree volume
Log Haul
$
190,080.00 4 hrs/trip @ 165/hr * 3500bf/load
Activity Fuels Pile and Burn
$
150,000.00 Rate of $1000/acre for moderate density pile and burn assuming some snag falling included
Timber Harvest Tax
$
4,802.00 Per ODF 2022 tax rate per MBF
Post Project Monitoring
$
20,000.00 Lomakatsi post -project data collection and summary
ON Fire Protection
$
10,000.00 Fixed cost for ON fire protection assessed on Forestlands
Fire Patrol
$
15,000.00 Ongoing cost for UAS based summer fire detection
Rx Burn Maintenance
$
100,000.00 Grayback Contract --Decreased by $250,000 to put more money toward the Climate Adaptation project
Total Expense $ 1,860,828.00
UNMET $ 618,327.00
5% Contingency $ 649,243.35
for rot and defect in wood
1 L L
COAT. '%Il..%°,
COA4 r
SMP
N COA5 p
4 a1
0 02 0.4 08 yL2 1.6
Mile:
ca+ '—.,.cw,icc - a,P nm�.
Las - gu
CLN_ Bauntlsy. tsroul :•:. �•• Lw oohs 1 !. S*iv
Option #2: Reduced Footprint, Minimum Needed
Spending Plan for Wildfire Division Account 072900.604160
Revenue
2023-2025 Approved Budget: $ 406,374.00
Lomakatsi Grant $ 150,000.00
Potential Log Revenue $ 524,806.60 per mill pricing, no unit COA 5
Total Revenue: $ 1,081,180.60
Projected Costs
City Forestlands Climate Change Adaptation Project (est 400 acres)
ing, Layout, Marking, and Cruise $ 75,000.00 Boundaries, units, prescriptions, data collection, monitoring, tree marking, tally, and cruise report
Helicopter Logging Cost $ 1,000,069.50 per bid
Log Haul $ 146,520,00 $150 per thousand BF
Fuels Pile and Burn $ 150,000.00 Rate of $1000/acre for moderate density pile and burn assuming some snag falling included
Timber Harvest Tax $ 4,802.00 Per ODF 2022 tax rate per MBF
Post Project Monitoring $ 20,000.00 Lomakatsi post thinning data collection and summary
ODF Fire Protection $ 10,000.00 Fixed cost for ODF fire protection assessed on forestlands
Fire Detection $ 1S,000.00 Ongoing fire season UAS detection program
Rx Burning $ 100,000.00 Decreased by $250,000 to put more money toward the Climate Adaptation project
Total Expense $ 1,521,391.50
UNMET $ 440,210.90
5% Contingency $ 462,221.45
for rot and defect in wood
"Although dealing with dead trees has become a focus of
forest management on many lands in the western US (and a
priority where human safety is compromised), for long-term
resilience and adaptation to climate change, we need to
move beyond triage (e.g., removal of dead and dying trees) to
making "green" (live) FF (Frequent Fire) forests more resilient
to disturbances. Unfortunately, proactively treating forests to
reduce density prior to wildfires, droughts, and bark beetle
outbreaks is increasingly constrained."
--Stephens et al 2018
Option #3: No Helicopter, Least Desireable
Spending Plan for Wildfire Division Account 072900.604160
Revenue
2023-2025 Approved Budget:
LRP Grant
Total Revenue:
$ 406,374.00
$ 100,000.00
$ 506,374.00
Projected Costs
City Forestlands Climate Change Adaptation Project
Tree Marking
$
50,000.00
Layout, Marking, and Admin help
Fuels Pile and Burn
$
990,000.00
All falling, piling, burning
Post Project Monitoring
$
20,000.00
Repeat assessment of the whole project area via drone
ODF Fire Protection
$
10,000.00
Fixed cost for ODF fire protection assessed on forestlands
Fire Detection
$
15,000.00
Ongoing Cost for fire season detection via UAS
Prescribed Burning
$
100,000.00
Grayback Contract for overall maintenance outside project area
Total Expense $ 1,185,000.00
UNMET NEED $ 678,626.00
Next Steps...
1. Cutting to start March 261", helicopter projected start by
mid -April. Once cutting starts near trails, area will be
closed until helicopter is done. Work is 7 days/week from
7AM to 6PM to minimize closure duration and disruption
(follows City noise ordinance).
2. Cutting will avoid trails as long as possible to minimize
closure time.
3. Prioritize busiest trails (BTI, Jabberwocky, Bandersnatch
area) to get open as quickly as possible.
S. Clean-up starts as the helicopter wraps up.
Questions and Discussion
Option #1: Full Footprint, Best Outcome
Spending Plan for Wildfire Division Account 072900.604160
Revenue
2023-2025 Approved Budget: $ 406,374.00
Lomakatsi Grant $ 150,000.00
Potential Log Revenue $ 686,127.00 per bid
Total Revenue: $ 2,242,501.00
Projected Costs
City Forestlands Climate Change
Adaptation Project (est 400 acres)
Planning, Layout, Marking, and Cruise
$
75,000.00 Boundaries, units, prescriptions, data collection, monitoring, tree marking, tally, cruise, and sale admin
Helicopter Logging Cost
$
1,295,946.00 per bid and marked tree volume
Log Haul
$
190,080.00 4 hrs/trip @ 165/hr . 3500bf/load
Activity Fuels Pile and Burn
$
150,000.00 Rate of $1000/acre for moderate density pile and burn assuming some snag falling included
Timber Harvest Tax
$
4,802.00 Per ODF 2022 tax rate per MBF
Post Project Monitoring
$
20,000.00 Lomakatsi post -project data collection and summary
ODF Fire Protection
$
10,000.00 Fixed cost for ODF fire protection assessed on forestlands
Fire Patrol
$
15,000.00 Ongoing cost for UAS based summer fire detection
Rx Burn Maintenance
$
100,000.00 Grayback Contract --Decreased by $250,000 to put more money toward the Climate Adaptation project
Total Expense $ 1,860,829.00
UNMET $ 618,327.00
5%Contingency $ 649,243.35
for rot and defect in wood
m,
COA2
� _• i f _j �
f COA1�
/ ,st j
COA ^
�COA3 ~�
ww
SMP
COA6
N
0 0.2 04 08 12 16
-- —� Miles
Option #2: Reduced Footprint, Minimum Needed
Spending Plan for Wildfire Division Account 072900.604160
Revenue
2023-2025 Approved Budget:
$
406,374.00
Lomakatsi Grant
$
150,000.00
Potential Log Revenue
$
524,806.60 per mill pricing, no unit COA 5
Total Revenue:
$
1,081,180.60
Projected Costs
City Forestlands Climate Change
Adaptation Project (est 400 acres)
ing, Layout, Marking, and Cruise
$
75,000.00 Boundaries, units, prescriptions, data collection, monitoring, tree marking, tally, and cruise report
Helicopter Logging Cost
$
1,000,069.50 per bid
Log Haul
$
146,520.00 $150 per thousand BF
Fuels Pile and Burn
$
150,000.00 Rate of $1000/acre for moderate density pile and burn assuming some snag falling included
Timber Harvest Tax
$
4,802.00 Per ODF 2022 tax rate per MBF
Post Project Monitoring
$
20,000.00 Lomakatsi post thinning data collection and summary
ODF Fire Protection
$
10,000.00 Fixed cost for ODF fire protection assessed on Forestlands
Fire Detection
$
15,000.00 Ongoing fire season UAS detection program
Rx Burning
$
100,000.00 Decreased by $250,000 to put more money toward the Climate Adaptation project
Total Expense $ 1,521,391.50
UNMET $ 440,210.90
5% Contingency $ 462,221.45
for rot and defect in wood
"Although dealing with dead trees has become a focus of
forest management on many lands in the western US (and a
priority where human safety is compromised), for long-term
resilience and adaptation to climate change, we need to
move beyond triage (e.g., removal of dead and dying trees) to
making "green" (live) FF (Frequent Fire) forests more resilient
to disturbances. Unfortunately, proactively treating forests to
reduce density prior to wildfires, droughts, and bark beetle
outbreaks is increasingly constrained."
--Stephens et al 2018
Option #3: No Helicopter, Least Desireable
Spending Plan for Wildfire Division Account 072900.604160
Revenue
2023-2025 Approved Budget:
LRP Grant
Total Revenue:
$ 406,374.00
$ 100,000.00
$ 506,374.00
Projected Costs
City Forestlands Climate Change Adaptation Project
Tree Marking
$
50,000.00
Layout, Marking, and Admin help
Fuels Pile and Burn
$
990,000.00
All falling, piling, burning
Post Project Monitoring
$
20,000.00
Repeat assessment of the whole project area via drone
ODF Fire Protection
$
10,000.00
Fixed cost for ODF fire protection assessed on forestlands
Fire Detection
$
15,000.00
Ongoing Cost for fire season detection via UAS
Prescribed Burning
$
100,000.00
Grayback Contract for overall maintenance outside project area
Total Expense $ 1,185,000.00
UNMET NEED $ 678,626.00