Loading...
HomeMy WebLinkAboutTransportation Meeting Supplemental January 2018 160 Madison Street, Suite A Eugene, Oregon 97402 541.513.3376 SOUTH ASHLAND BUSINESS PARK January 5, 2018 TR A N S P O R T A T I O N P L A N N I N G R U L E A N A L Y S I S Transportation Planning Rule Analysis South Ashland Business Park Kelly Sandow PE Ashland, Oregon January 5, 2018 SANDOW ENGINEERING 160 Madison Street, Suite A Eugene Oregon 97402 541.513.3376 sandowengineering.com project # 5643 06 / 30 /18 1 South Ashland Business Park TPR Analysis January 5, 2018 EXECUTIVE SUMMARY This report describes the traffic analysis and findings consistent with the development proposal of Tax Lot 2800 of Assessor’s Map 391E14AB in Ashland, Oregon. The property consists of 5.38 acres and is currently zoned Rural Residential (5 acre) minimum (RR-5) by Jackson County. The property is currently located outside of the City of Ashland city limits. The applicant is requesting an annexation and a zone change to Employment (E-1) to support the proposed business park to be developed on the site. As part of the zone change request, an analysis of compliance with the Transportation Planning Rule (TPR), Statewide Planning Rule Goal 12, OAR 660-012-0060(1) is needed to demonstrate that any increase in traffic generated by the proposed zoning will not have a significant effect on the adjacent transportation system. The analysis evaluates the adjacent roadway network and intersections with added traffic from the proposed rezoning and development consistent with City of Ashland and Oregon Department of Transportation (ODOT) analysis and evaluation criteria. The following findings and recommendations are based on the information and analysis contained within this report. FINDINGS The analysis concludes the following: • All of the studied intersections meet mobility standards though the year 2023 with the proposed development of a 72,606 sf of business park. • The proposed E-1 zoning will generate more traffic than the existing Rural Residential zoning, triggering the need for TPR analysis. • The intersection of Ashland Street at I-5 Northbound Ramps, Ashland Street at I-5 Southbound Ramps, and Ashland Street at Normal Avenue do not meet the applicable mobility standards for the year 2034 background conditions. • The “worst-case” development potential under the proposed E-1 zoning will worsen the year 2034 intersection performance. In lieu of expensive mitigation, the applicant is proposing a trip cap equal to the level of traffic generated by the proposed development scenario. Under the trip cap, all intersections projected to operate within applicable mobility standards will continue to meet applicable mobility standards. Under the trip cap, all intersections projected to not meet the mobility standards will operate no worse than the 2034 background conditions, and no further mitigation is needed. 2 South Ashland Business Park TPR Analysis January 5, 2018 CONTENTS BACKGROUND ...................................................................................................................... 5 1.1 SITE INFORMATION ............................................................................................................................. 5 1.2 SCOPE OF ANALYSIS ............................................................................................................................ 5 EXISTING ROADWAY CONDITIONS ...................................................................................... 8 2.1 STREET NETWORK ............................................................................................................................... 8 2.2 CRASH ANALYSIS ............................................................................................................................... 10 BACKGROUND TRAFFIC VOLUMES .................................................................................... 11 3.1 INTERSECTION COUNTS .................................................................................................................... 11 3.2 SEASONAL ADJUSTMENT .................................................................................................................. 11 3.3 FUTURE YEAR BACKGROUND VOLUMES ........................................................................................... 12 3.4 BACKGROUND VOLUMES .................................................................................................................. 12 DEVELOPMENT ANALYSIS .................................................................................................. 17 4.1 TRIP GENERATION ............................................................................................................................. 17 4.2 TRIP DISTRIBUTION ........................................................................................................................... 17 4.3 BUILD-OUT TRAFFIC VOLUMES ......................................................................................................... 18 4.4 PERFORMANCE MEASURES .............................................................................................................. 23 4.5 INTERSECTION ANALYSIS RESULTS - 2017 ........................................................................................ 24 4.6 INTERSECTION ANALYSIS RESULTS – 2019 ........................................................................................ 24 4.7 INTERSECTION ANALYSIS RESULTS – 2023 ........................................................................................ 25 4.8 INTERSECTION QUEUING ANALYSIS RESULTS - YEAR 2017 .............................................................. 26 4.9 INTERSECTION QUEUING ANALYSIS RESULTS - YEAR 2019 .............................................................. 28 4.10 INTERSECTION QUEUING ANALYSIS RESULTS - YEAR 2023 ............................................................ 29 WASHINGTON STREET CROSS-SECTION RECOMMENDATION .......................................... 31 DEVELOPMENT SCENARIOS FINDINGS .............................................................................. 33 TRANSPORTATION PLANNING RULE ANALYSIS ................................................................. 33 7.1 YEAR 2034 BACKGROUND TRAFFIC VOLUMES ................................................................................. 33 7.2 TRIP GENERATION ............................................................................................................................. 33 7.3 TRIP DISTRIBUTION ........................................................................................................................... 35 7.4 BUILD-OUT TRAFFIC VOLUMES ......................................................................................................... 35 7.5 INTERSECTION ANALYSIS RESULTS – 2034 ........................................................................................ 35 TPR MITIGATION ................................................................................................................ 40 CONCLUSION ...................................................................................................................... 44 3 South Ashland Business Park TPR Analysis January 5, 2018 LIST OF TABLES TABLE 1: ROADWAY CHARACTERISTICS WITHIN STUDY AREA ..................................................................... 8 TABLE 2: INTERSECTION CRASH RATES ....................................................................................................... 10 TABLE 3: TRAFFIC COUNT SUMMARY ......................................................................................................... 11 TABLE 4: PM PEAK HOUR PROPOSED DEVELOPMENT TRIP GENERATION ................................................. 17 TABLE 5: HCM LEVEL OF SERVICE FOR INTERSECTIONS .............................................................................. 23 TABLE 6: STUDY AREA MOBILITY STANDARDS ............................................................................................ 24 TABLE 7: INTERSECTION PERFORMANCE: YEAR 2017 PM PEAK HOUR ...................................................... 24 TABLE 8: INTERSECTION PERFORMANCE: YEAR 2019 PM PEAK HOUR ...................................................... 25 TABLE 9: INTERSECTION PERFORMANCE: YEAR 2023 PM PEAK HOUR ...................................................... 25 TABLE 10: INTERSECTION QUEUING: YEAR 2017 PM PEAK HOUR ............................................................. 27 TABLE 11: INTERSECTION QUEUING: YEAR 2019 PM PEAK HOUR ............................................................. 28 TABLE 12: INTERSECTION QUEUING: YEAR 2023 PM PEAK HOUR ............................................................. 30 TABLE 13: PM PEAK HOUR WORST CASE-TRIP GENERATION RR-5 ZONING .............................................. 34 TABLE 14: INTERSECTION PERFORMANCE: YEAR 2034 PM PEAK HOUR .................................................... 35 TABLE 15: TRIP CAP ADT TRIP GENERATION ............................................................................................... 40 TABLE 16: INTERSECTION PERFORMANCE: YEAR 2034 PM PEAK HOUR .................................................... 41 4 South Ashland Business Park TPR Analysis January 5, 2018 LIST OF FIGURES FIGURE 1 – SITE LOCATION AND VICINITY MAP............................................................................................ 7 FIGURE 2 – INTERSECTION CONTROL AND LANE CONFIGURATION ............................................................. 9 FIGURE 3 – 2017 AM PEAK HOUR BACKGROUND TRAFFIC VOLUMES ....................................................... 13 FIGURE 4 – 2017 PM PEAK HOUR BACKGROUND TRAFFIC VOLUMES ....................................................... 14 FIGURE 5 – 2019 PM PEAK HOUR BACKGROUND TRAFFIC VOLUMES ....................................................... 15 FIGURE 6 – 2023 PM PEAK HOUR BACKGROUND TRAFFIC VOLUMES ....................................................... 16 FIGURE 7 – 2019 BUILD-OUT PM PEAK HOUR DEVELOPMENT TRIPS ........................................................ 19 FIGURE 8 – FULL BUILD-OUT PM PEAK HOUR DEVELOPMENT TRIPS ......................................................... 20 FIGURE 9 – 2019 PM PEAK HOUR BUILD TRAFFIC VOLUMES – PHASE 1 .................................................... 21 FIGURE 10 – 2023 PM PEAK HOUR BUILD TRAFFIC VOLUMES – PHASE 2 .................................................. 22 FIGURE 11 – 2034 PM PEAK HOUR BACKGROUND TRAFFIC VOLUMES ..................................................... 37 FIGURE 12 – E-1 ZONING PM PEAK HOUR DEVELOPMENT TRIPS .............................................................. 38 FIGURE 13 – 2034 PM PEAK HOUR BUILD TRAFFIC VOLUMES – E-1 ZONING ............................................ 39 FIGURE 14 – 2034 PM PEAK HOUR BUILD TRAFFIC VOLUMES – TRIP CAP ................................................. 43 LIST OF APPENDICES APPENDIX A: SITE PLAN APPENDIX B: SCOPE OF WORK APPENDIX C: CRASH DATA APPENDIX D: TRAFFIC COUNTS APPENDIX E: TRAFFIC VOLUME ADJUSTMENTS APPENDIX F: 2017 SYNCHRO OUTPUT APPENDIX G: 2019 SYNCHRO OUTPUT APPENDIX H: 2023 SYNCHRO OUTPUT APPENDIX I: 2017 QUEUING ANALYSIS APPENDIX J: 2017 QUEUING ANALYSIS APPENDIX K: 2023 QUEUING ANALYSIS APPENDIX L: 2034 SYNCHRO ANALYSIS 5 South Ashland Business Park TPR Analysis January 5, 2018 BACKGROUND 1.1 SITE INFORMATION This report describes the traffic analysis and findings for the development and zone change of Tax Lot 2800 of Assessor’s Map 391E14AB located on Washington Street in Ashland, Oregon. Figure 1 illustrates the site location. The property is currently zoned Rural Residential (5 acre) minimum (RR-5) by Jackson County. The applicant will be requesting a zone change to support the annexation, therefore the traffic study will require analysis/findings consistent with the Transportation Planning Rule (TPR), Statewide Planning Rule Goal 12, OAR 660-12-0060 requirements. The proposed development will be a business park consisting of approximately 72,606 square feet of light industrial building/office and one two-bedroom apartment1. The proposed development is anticipated to generate 112 PM peak hour trips. As such, the development triggers a Traffic Impact Analysis as per City of Ashland TIA requirements. Appendix A includes the preliminary site plan. The development is expected to be completed in multiple phases. It is anticipated that current market demand exists for approximately two-thirds of the project in the short-to-medium term. Thus, impacts are evaluated at two-thirds completion and final completion. At these two stages in the development there is the potential for cumulative impacts of the development trips on the adjacent intersections to warrant an evaluation. 1.2 SCOPE OF ANALYSIS The traffic study is performed in accordance with City of Ashland and ODOT Traffic Impact Analysis standards and criteria. The Scope of Work was coordinated by Sandow Engineering, the City of Ashland, and ODOT to establish evaluation criteria for off-site impacts at the following locations and time periods. The traffic impacts are evaluated for the weekday PM time period between 4:00 PM to 6:00 PM at locations within the City of Ashland’s jurisdiction and from 3:30 PM to 6:30 PM at locations within ODOT’s jurisdiction. The intersections included in the analysis are as follows: • Ashland Street @ Walker Avenue (City - TPR Only) • Ashland Street @ Normal Avenue (City - TPR Only) • Ashland Street @ Tolman Creek Road (ODOT) • Ashland Street @ Washington Street (ODOT) • Ashland Street @ Southbound I-5 Ramps (ODOT) • Ashland Street @ Northbound I-5 Ramps (ODOT) • Tolman Creek Road @ Independent Way (City - Future) 1 A “watchman or managers” apartment until accessory to the business park use. 6 South Ashland Business Park TPR Analysis January 5, 2018 • Washington Street @ Independent Way (City - Future) • Washington Street @ Site Driveway (City) The operational analysis is performed at the studied intersections during the weekday PM peak hour of the system for the existing year (year 2017), at two-thirds site completion (year 2019) with and without the proposed development, final completion (year 2023) with and without the proposed development, and for the 20-year planning horizon (year 2034) with and without the proposed zone change. Year 2034 is the current planning horizon for the City of Ashland Transportation System Plan (TSP) and therefore is the 20-year planning horizon to be considered for the TPR Analysis. The scope of work is included in Appendix B. South Ashland Business Park, Ashland, Oregon Figure 1: Site Location and Vicinity Map Int e r s t a t e 5 Sis k i y o u B l v d (Hw y 9 9 ) Ashland St To l m a n Cr e e k R d E Main St Wa l k e r A v e No r m a l A v e Wig h t m a n A v e S M o u n t a i n A v e Project Site Cl a y S t Cl a y S t Be s w i c k W a y Hi l l v i e w D r Mi s t l e t o e R d Iowa St 8 South Ashland Business Park TPR Analysis January 5, 2018 EXISTING ROADWAY CONDITIONS 2.1 STREET NETWORK Streets included within the study are Ashland Street, Washington Street, Tolman Creek Road, Normal Avenue, Walker Avenue, and the future Independent Way. The City of Ashland’s functional classification system uses “Boulevards” as the street classification intended to serve the highest travel demands and “Avenues” as the next highest classification. The project site abuts Washington Street. Ashland Street is a Boulevard which serves as a main east-west route between the interstate and downtown Ashland. Washington Street is an Avenue that serves as access to surrounding industrial businesses. Tolman Creek Road is a Boulevard south of Ashland Street and Avenue to the north. Tolman Creek Road is a main north-south route that serves residential and commercial properties in the surrounding area. Normal Avenue is an Avenue that serves surrounding residences and connects Ashland Street to Siskiyou Boulevard (Hwy 99) to the south. Walker Avenue is an Avenue that serves surrounding residences, commercial, and a portion of Southern Oregon University and connects Ashland Street to Siskiyou Boulevard (Hwy 99) to the south. Table 1 illustrates the roadway characteristics within the study area. TABLE 1: ROADWAY CHARACTERISTICS WITHIN STUDY AREA Characteris�c Ashland Street Washington Street Tolman Creek Road Normal Avenue Walker Avenue Func�onal Classifica�on District Highway/ Boulevard Avenue Boulevard/ Avenue Avenue Avenue Posted Speed 30/35 mph 25 mph (unposted) 25 mph 25 mph (unposted) 25 mph Lanes per Direc�on 2 1 1 1 1 Center Le� Turn Lane Yes None None None None Restric�ons in the Median Intermitent None None None None Bikes Lanes Present Yes None Yes None Yes Sidewalks Present Yes East/North-Yes South- Intermitent Yes East Side – Yes West Side - None Yes Transit Route Yes None Yes None None On-Street Parking None Yes Yes Yes North of Ashland Street Figure 2 illustrates the study area intersection locations, intersection geometry, and access control. South Ashland Business Park, Ashland, Oregon Figure 2: Intersection Controland Lane Configuration I n t e r s t a t e 5 Sisk i y o u B l v d (H w y 9 9 ) Ashland St To l m a n Cr e e k R d E Main S t Wa l k e r A v e No r m a l A v e Wa s h i n g t o n S t Project Site Cl a y S t Cl a y S t Mi s t l e t o e R d Indepen- dent Way 1: Ashland St @ Walker Ave 2: Ashland St @ Normal Ave 3: Ashland St @ Tolman Creek Rd 4: Ashland St @ Washington St 5: Ashland St @ I-5 SB Ramp 6: Ashland St @ I-5 NB Ramp 7: Tolman Creek Rd @ IndependentWay 8: Washington St @ Independent Way 9: Washington St @ Site Driveway STOP STOP STOP ST O P ST O P STOP 1 2 3 4 5 6 7 8 9 10 South Ashland Business Park TPR Analysis January 5, 2018 2.2 CRASH ANALYSIS A crash investigation was performed for the study area intersections. The analysis investigates crashes that have been reported to the state for the most recent 5 years of data available, 1/1/2011- 12/31/2015, to determine a crash rate in crashes per million vehicles on the roadway and the types of crashes that occurred. Year 2016 data is preliminary and does not include property damage, only crashes, therefore was not included in the analysis. The crash rate is compared to the statewide 90th percentile intersection crash rate as there are not enough intersections to create a reference population for the HSM Critical Crash rate methodology. If the calculated crash rate exceeds the statewide 90th percentile intersection crash rate or there is a high percentage of a certain crash type, the location is investigated for further mitigation measures. The 90th % crash rate for 4-way signalized intersections is 0.860, and 0.293 for stop controlled “T” intersections. Crash data was provided by ODOT for the study area and is included in Appendix C. The results of the crash analysis are provided in Table 2. TABLE 2: INTERSECTION CRASH RATES Loca�on Number of Crashes Types of Crashes ADT Crash Rate* 90th % crash rate Head Rear Side Turn Other Pedestrian/ Bike Ashland St @ SB I-5 Ramp 0** 0 0 0 0 0 0 19,640 0.00** 0.860 Ashland St @ NB I-5 Ramp 0** 0 0 0 0 0 0 16,940 0.00** 0.860 Ashland St @ Washington St 1 0 1 0 0 0 0 17,650 0.00 0.293 Ashland St @ Tolman Creek Rd 8 0 3 0 3 2 0 22,140 0.20 0.860 *(crashes/million entering vehicles) ** Intersections were recently updated and signalized in 2012. No crashes reported from 2012 to 2015. It should be noted that the intersections of Ashland Street with the I-5 ramps were recently updated in 2012 with traffic signals. This substantial change to intersection operations mean that historic crash data will not reflect existing conditions. As such, crash data from the Ashland Street and I-5 ramp intersections was limited to the time frame after the signal update was completed. The ODOT Crash reports show no crashes at these intersections for the time period evaluated. As illustrated in Table 2, all of the studied intersections have a crash rate lower than the statewide 90th percentile crash rate. The intersections do not meet the threshold for requiring mitigation. Additionally, the types and frequency of crashes are typical of those found at intersections with similar configurations and control. 11 South Ashland Business Park TPR Analysis January 5, 2018 BACKGROUND TRAFFIC VOLUMES 3.1 INTERSECTION COUNTS As part of the analysis, weekday PM peak hour turning movement counts were collected at the study intersections. The traffic counts were performed for the 3:30 PM to 6:30 PM peak period at ODOT intersections and the 4:00PM to 6:00PM peak period at Ashland Intersections. AM traffic counts were taken at ODOT intersections for the purpose of verifying the peak hour of the system. Figure 3 includes the AM traffic volumes. Figure 4 includes the PM peak hour traffic volumes. The PM peak hour traffic volumes on the system total 10,549 (combined total of all ODOT intersections). The AM peak hour traffic volumes on the system total 5,978 (combine total of all ODOT intersections). The PM peak hour traffic volumes are nearly twice as high as the AM peak hour. As per coordination with ODOT, an AM analysis is not necessary since the PM is clearly the peak hour of the day. Table 3 provides the count date for each intersection and the traffic volumes are included in Appendix D. TABLE 3: TRAFFIC COUNT SUMMARY Intersec�on Count Date Count Type Jurisdic�on Ashland Street @ I-5 Northbound Ramps 6/7/2017 3 hr ODOT Ashland Street @ I-5 Southbound Ramps 6/7/2017 3 hr ODOT Ashland Street @ Washington Street 6/7/2017 3 hr ODOT Ashland Street @ Tolman Creek Road 6/7/2017 3 hr ODOT Ashland Street @ Normal Avenue 9/20/2016 2 hr City Ashland Street @ Walker Avenue 9/22/2016 2 hr City Washington Street @ Independence Way (Future) 6/7/2017 2 hr City 3.2 SEASONAL ADJUSTMENT Application of seasonal adjustment factors account for the fact that through volumes along State Highways and recreational routes tend to fluctuate from month to month due to changes in recreational behavior, etc. Monthly volume variations for routes with recreational traffic show much higher seasonal peaking than for routes with predominantly intercity traffic. All traffic counts were taken on a typical Southern Oregon University day to account for university traffic. The traffic volumes were seasonally adjusted using rates included in the ODOT Seasonal Trend Table. The nearest Automatic Traffic Recorders are along Interstate-5 and Highway 99 outside of the city. Therefore, they are not representative of the study area. The seasonal factor for the commuter trend was determined to be the appropriate factor for this section of Ashland St. The seasonal adjustment calculation is included in Appendix E. 12 South Ashland Business Park TPR Analysis January 5, 2018 3.3 FUTURE YEAR BACKGROUND VOLUMES The analysis evaluates the traffic conditions for the years 2019, 2023 and 2034. Therefore, existing traffic volumes are “grown” to represent the future conditions. The growth rates for intersections in the area were determined from the City of Ashland Transportation System Plan (TSP). Base level and future traffic volumes were used to determine a linear growth rate for the study area intersection turning movements. 3.4 BACKGROUND VOLUMES Independent way is anticipated to be completed prior to completion of Phase 1 (year 2019). The Independent Way connection will provide alternate routing for vehicles in the area. The years 2019, 2023, and 2034 traffic volumes were adjusted to account for this connection. The adjustment followed the same travel patterns within the Southern Oregon Transportation Engineering IPCO Site Expansion and Independent Way Street Connection TIA dated November 11th, 2013. Additionally, the approved but not completed IPCO development was included as pipeline trips in the background and no build conditions. Resulting background traffic volumes are included in Appendix E. The background traffic volumes are illustrated in Figure 5 for year 2019, Figure 6 for year 2023, and Figure 7 for year 2024. South Ashland Business Park, Ashland, Oregon Figure 3: 2017 AM Peak HourBackground Traffic Volumes I n t e r s t a t e 5 Sisk i y o u B l v d (H w y 9 9 ) Ashland St To l m a n Cr e e k R d E Main S t Wa l k e r A v e No r m a l A v e Wa s h i n g t o n S t Project Site Cl a y S t Cl a y S t Mi s t l e t o e R d 3: Ashland St @ Tolman Creek Rd 4: Ashland St @ Washington St 9: Washington St @ Site Driveway 7 5 81844 2011 56358 62588155 6969 14 7 2537440 348384 5: Ashland St @ I-5 SB Ramp 6: Ashland St @ I-5 NB Ramp 243207 37018 411329 22816 57425 68 1 116 6 3 4 5 6 9 South Ashland Business Park, Ashland, Oregon Figure 4: 2017 PM Peak HourBackground Traffic Volumes I n t e r s t a t e 5 Sisk i y o u B l v d (H w y 9 9 ) Ashland St To l m a n Cr e e k R d E Main S t Wa l k e r A v e No r m a l A v e Wa s h i n g t o n S t Project Site Cl a y S t Cl a y S t Mi s t l e t o e R d 1: Ashland St @ Walker Ave 2: Ashland St @ Normal Ave 3: Ashland St @ Tolman Creek Rd 4: Ashland St @ Washington St 9: Washington St @ Site Driveway 13 5 75573 444 87012 11445260 83693 9651918 736316 2 1656347 9416 1968014 4217 63517203 8793 18 3 8669761 5910 5 60 5: Ashland St @ I-5 SB Ramp 6: Ashland St @ I-5 NB Ramp 270283 41051 571478 29925 87063 51 1 117 9 1 2 3 4 5 6 9 South Ashland Business Park, Ashland, Oregon Figure 5: 2019 PM Peak HourBackground Traffic Volumes I n t e r s t a t e 5 Sisk i y o u B l v d (H w y 9 9 ) Ashland St To l m a n Cr e e k R d E Main S t Wa l k e r A v e No r m a l A v e Wa s h i n g t o n S t Project Site Cl a y S t Cl a y S t Mi s t l e t o e R d 1: Ashland St @ Walker Ave 2: Ashland St @ Normal Ave 3: Ashland St @ Tolman Creek Rd 4: Ashland St @ Washington St 5: Ashland St @ I-5 SB Ramp 6: Ashland St @ I-5 NB Ramp 7: Tolman Creek Rd @ Independent Way 8: Washington St @ Independent Way 9: Washington St @ Site Driveway 4519 35 010 37 4 11 2719 228 2320 14 5 281295 42051 609500 76777 560 91613 31126 92669 52 5 118 3 11746263 83693 10155019 736316 2 1859251 9417 2070815 4218 65529207 9997 19 1 9173566 6010 7 61 1 2 3 4 5 6 7 8 9 South Ashland Business Park, Ashland, Oregon Figure 6: 2023 PM Peak HourBackground Traffic Volumes I n t e r s t a t e 5 Sisk i y o u B l v d (H w y 9 9 ) Ashland St To l m a n Cr e e k R d E Main S t Wa l k e r A v e No r m a l A v e Wa s h i n g t o n S t Project Site Cl a y S t Cl a y S t Mi s t l e t o e R d 1: Ashland St @ Walker Ave 2: Ashland St @ Normal Ave 3: Ashland St @ Tolman Creek Rd 4: Ashland St @ Washington St 5: Ashland St @ I-5 SB Ramp 6: Ashland St @ I-5 NB Ramp 7: Tolman Creek Rd @ Independent Way 8: Washington St @ Independent Way 9: Washington St @ Site Driveway 4720 37 711 40 3 12 2921 239 2421 14 6 304318 43051 655544 79077 669 99914 33427 100974 54 6 119 0 12047966 83694 11261221 736316 2 1963755 10418 2176316 4219 68552216 10 2 10 1 19 8 10081072 6311 0 64 1 2 3 4 5 6 7 8 9 17 South Ashland Business Park TPR Analysis January 5, 2018 DEVELOPMENT ANALYSIS 4.1 TRIP GENERATION The proposed development is 72,606 square feet of light industrial building/office flex space and one two-bedroom apartment. The development will be completed in multiple phases. However, potential cumulative impacts are not anticipated to be significant enough to warrant an evaluation until two- thirds completion (48,404 sf). Impacts are evaluated at two-thirds completion and full-build out of the development. The ITE Trip Generation Manual 9th Edition was used to estimate development trips. The ITE land use 770-Business Park was determined to most closely match the proposed use of the site. The associated traffic generation for the proposed development is illustrated in Table 4. TABLE 4: PM PEAK HOUR PROPOSED DEVELOPMENT TRIP GENERATION ITE Land Use Size Units PM Peak Hour Trip Genera�on In Out Rate Trips 770 – Business Park 72.61 KSF GFA Ln(T) = 0.90 * Ln(X) + 0.85 111 29 (26%) 82 (74%) 220 – Apartment 1 Dwelling Units 0.62 1 1 (65%) 0 (35%) Total 112 30 82 Frist Two-Thirds of Development (48,404 sf) 74 20 54 Final Third of Development (24,202 sf) 38 10 28 As demonstrated in the table above, full-build out of the proposed development is expected to generate approximately 112 trips during the PM peak hour. 4.2 TRIP DISTRIBUTION The development trips were distributed though the study area network using the existing observed travel patterns as a base with modifications as per reasonable origins and destinations. Trip distribution patterns: • 30% to/from the west via Ashland Street (OR 66) • 40% to/from the north via I-5 • 9% to/from the south via I-5 • 18% to/from the south via Tolman Creek Road • 3% to/from nearby streets The trip distribution is illustrated in Figure 7 for the year 2019 and Figure 8 for the year 2023. 18 South Ashland Business Park TPR Analysis January 5, 2018 4.3 BUILD-OUT TRAFFIC VOLUMES The development trips for Phase 1 and Phase 2 are added to background traffic volumes to determine the traffic volumes after completion. Figure 9 illustrates the year 2019 build-out traffic volumes, and Figure 10 illustrates the year 2023 built-out traffic volumes. South Ashland Business Park, Ashland, Oregon Figure 7: 2019 Build-Out PM Peak HourDevelopment Trips I n t e r s t a t e 5 Sisk i y o u B l v d (H w y 9 9 ) Ashland St To l m a n Cr e e k R d E Main S t Wa l k e r A v e No r m a l A v e Wa s h i n g t o n S t Project Site Cl a y S t Cl a y S t Mi s t l e t o e R d 3: Ashland St @ Tolman Creek Rd 4: Ashland St @ Washington St 5: Ashland St @ I-5 SB Ramp 6: Ashland St @ I-5 NB Ramp 7: Tolman Creek Rd @ Independent Way 8: Washington St @ Independent Way 9: Washington St @ Site Driveway 1611 03 03 2727 06 014 01 100 211 010 027 04 20 225 800 000 1420 042 010 00 540 020 1 2 3 4 5 6 7 8 9 South Ashland Business Park, Ashland, Oregon Figure 8: Full Build-Out PM Peak HourDevelopment Trips I n t e r s t a t e 5 Sisk i y o u B l v d (H w y 9 9 ) Ashland St To l m a n Cr e e k R d E Main S t Wa l k e r A v e No r m a l A v e Wa s h i n g t o n S t Project Site Cl a y S t Cl a y S t Mi s t l e t o e R d 3: Ashland St @ Tolman Creek Rd 4: Ashland St @ Washington St 5: Ashland St @ I-5 SB Ramp 6: Ashland St @ I-5 NB Ramp 7: Tolman Creek Rd @ Independent Way 8: Washington St @ Independent Way 9: Washington St @ Site Driveway 2417 04 05 4141 09 021 01 200 321 015 041 06 30 338 1200 000 2130 064 010 00 820 030 1 2 3 4 5 6 7 8 9 South Ashland Business Park, Ashland, Oregon Figure 9: 2019 PM Peak HourBuild Traffic Volumes - Phase 1 I n t e r s t a t e 5 Sisk i y o u B l v d (H w y 9 9 ) Ashland St To l m a n Cr e e k R d E Main S t Wa l k e r A v e No r m a l A v e Wa s h i n g t o n S t Project Site Cl a y S t Cl a y S t Mi s t l e t o e R d 3: Ashland St @ Tolman Creek Rd 4: Ashland St @ Washington St 5: Ashland St @ I-5 SB Ramp 6: Ashland St @ I-5 NB Ramp 7: Tolman Creek Rd @ Independent Way 8: Washington St @ Independent Way 9: Washington St @ Site Driveway 6130 35 013 37 4 14 5446 2214 2334 281296 43051 630501 76787 587 91617 31326 94874 53 3 118 3 65529207 11 399 19 1 9173968 6010 8 61 140 540 520 1 2 3 4 5 6 7 8 9 South Ashland Business Park, Ashland, Oregon Figure 10: 2023 PM Peak HourBuild Traffic Volumes - Phase 2 I n t e r s t a t e 5 Sisk i y o u B l v d (H w y 9 9 ) Ashland St To l m a n Cr e e k R d E Main S t Wa l k e r A v e No r m a l A v e Wa s h i n g t o n S t Project Site Cl a y S t Cl a y S t Mi s t l e t o e R d 3: Ashland St @ Tolman Creek Rd 4: Ashland St @ Washington St 5: Ashland St @ I-5 SB Ramp 6: Ashland St @ I-5 NB Ramp 7: Tolman Creek Rd @ Independent Way 8: Washington St @ Independent Way 9: Washington St @ Site Driveway 7137 37 715 40 3 17 7062 2318 2442 304319 45051 687545 79092 6 11 0 99920 33727 104282 55 8 119 0 68552216 12 3 10 4 19 8 10081676 6311 1 64 140 820 630 1 2 3 4 5 6 7 8 9 23 South Ashland Business Park TPR Analysis January 5, 2018 4.4 PERFORMANCE MEASURES The studied intersections were evaluated for Level of Service (LOS) and volume to capacity (V/C). LOS is defined by the Highway Capacity Manual (HCM). LOS is a concept developed to quantify the degree of comfort (including such elements as travel time, number of stops, total amount of stopped delay, and impediments caused by other vehicles) afforded to drivers as they travel though an intersection or along a roadway segment. It was developed to quantify the quality of service of transportation facilities. LOS is based on average delay, defined as the average total elapsed time from when a vehicle stops at the end of a queue until the vehicle departs from the stop line. Average delay is measured in seconds per vehicle per hour and then translated into a grade or “level of service” for each intersection. LOS ranges from A to F, with A indicating the most desirable condition and F indicating the most unsatisfactory condition. For Ashland, a LOS D or better, is considered to be acceptable operations. The LOS criteria, as defined by the Highway Capacity Manual, for intersections is provided in Table 5. TABLE 5: HCM LEVEL OF SERVICE FOR INTERSECTIONS Level of Service Stopped Delay Per Vehicle (Seconds per Vehicle) Unsignalized Intersec�ons Signalized Intersec�ons A ≤ 10.0 ≤ 10 B > 10.0 and ≤ 15.0 > 10 and ≤ 20 C > 15.0 and ≤ 25.0 > 20 and ≤ 35 D > 25.0 and ≤ 35.0 > 35 and ≤ 55 E > 35.0 and ≤ 50.0 > 55 and ≤ 80 F > 50.0 > 80 The volume-to-capacity ratio describes the capability of an intersection to meet volume demand based upon the maximum number of vehicles that could be served in an hour. V/C is the threshold for which ODOT evaluates the operation of intersections, as defined by the 1999 Oregon Highway Plan. V/C thresholds are defined based on roadway classification and speed. Ashland Street is a District Level Highway and is within a Metropolitan Planning Organization (MPO). The maximum v/c threshold for Ashland Street is 0.95. Policy 1F of the Oregon Highway plan defines a v/c for a ramp terminal as 0.85, therefore this standard applies to the signalized intersections of Ashland Street at the I-5 Northbound and Southbound ramps. Table 6 illustrates the mobility standards for the studied intersections. 24 South Ashland Business Park TPR Analysis January 5, 2018 TABLE 6: STUDY AREA MOBILITY STANDARDS Intersec�on Jurisdic�on Mobility Standard V/C, LOS Ashland Street @ I-5 Northbound Ramps ODOT 0.85 Ashland Street @ I-5 Southbound Ramps ODOT 0.85 Ashland Street @ Washington Street ODOT 0.95 Ashland Street @ Tolman Creek Road ODOT 0.95 Washington Street @ Site Driveway (Future) City D Washington Street @ Independent Way (Future) City D Tolman Creek Road @ Independent Way (Future) City D 4.5 INTERSECTION ANALYSIS RESULTS - 2017 A performance analysis was conducted for the studied intersections for the year 2017 existing condition during the PM peak hour. The results of the analysis are illustrated in Table 7. The SYNCHRO outputs are provided in Appendix F. TABLE 7: INTERSECTION PERFORMANCE: YEAR 2017 PM PEAK HOUR Intersec�on Jurisdic�on Mobility Standard V/C, LOS 2017 Background Ashland Street @ I-5 Northbound Ramps ODOT 0.85 0.73 Ashland Street @ I-5 Southbound Ramps ODOT 0.85 0.85 Ashland Street @ Washington Street ODOT 0.95 0.19* Ashland Street @ Tolman Creek Road ODOT 0.95 0.79 *results for stop controlled intersections are reported for the critical approach only. As illustrated in Table 7, all of the studied intersections operate at or better than the mobility standard in existing conditions. The intersection of Ashland Street at I-5 Southbound Ramps is operating right at the acceptable v/c ratio. 4.6 INTERSECTION ANALYSIS RESULTS – 2019 A performance analysis was conducted for the studied intersections for the year 2019 background condition and development scenario during the PM peak hour. The results of the analysis are illustrated in Table 8. The SYNCHRO outputs are provided in Appendix G. 25 South Ashland Business Park TPR Analysis January 5, 2018 TABLE 8: INTERSECTION PERFORMANCE: YEAR 2019 PM PEAK HOUR Intersec�on Jurisdic�on Mobility Standard V/C, LOS 2019 Background* 2019 With Phase 1 Ashland Street @ I-5 Northbound Ramps ODOT 0.85 0.79 0.81 Ashland Street @ I-5 Southbound Ramps ODOT 0.85 0.85 0.85 Ashland Street @ Washington Street ODOT 0.95 0.12* 0.18* Ashland Street @ Tolman Creek Road ODOT 0.95 0.82 0.83 Tolman Creek @ Independent Way City D B* B* Washington Street @ Independent Way City D A* A* Washington Street @ Site Driveway City D A* A* *results for stop controlled intersections are reported for the critical approach only. As illustrated in Table 8, all of the studied intersections operate at or better than the mobility standard in the year 2019 PM peak hour background and build conditions. The intersection of Ashland Street at I- 5 Southbound Ramps is operating right at the acceptable v/c ratio. The addition of development trips to this intersection does no worsen the v/c ratio to below the mobility standard. 4.7 INTERSECTION ANALYSIS RESULTS – 2023 A performance analysis was conducted for the studied intersections for the year 2023 background condition and development scenario during the PM peak hour. The results of the analysis are illustrated in Table 9. The SYNCHRO outputs are provided in Appendix H. TABLE 9: INTERSECTION PERFORMANCE: YEAR 2023 PM PEAK HOUR Intersec�on Jurisdic�on Mobility Standard V/C, LOS 2023 Background 2023 With Phase 1 and Phase 2 Ashland Street @ I-5 Northbound Ramps ODOT 0.85 0.71 0.74 Ashland Street @ I-5 Southbound Ramps ODOT 0.85 0.88 0.88 Ashland Street @ Washington Street ODOT 0.95 0.15* 0.24* Ashland Street @ Tolman Creek Road ODOT 0.95 0.77 0.77 Tolman Creek @ Independent Way City D B* B* Washington Street @ Independent Way City D A* A* 26 South Ashland Business Park TPR Analysis January 5, 2018 Intersec�on Jurisdic�on Mobility Standard V/C, LOS 2023 Background 2023 With Phase 1 and Phase 2 Washington Street @ Site Driveway City D A* A* *results for stop controlled intersections are reported for the critical approach only. As illustrated in Table 9, all of the studied intersections operate at or better than the mobility standard in the year 2023 PM peak hour background and build conditions with the exception of Ashland Street at the I-5 Southbound ramps. The intersection is projected to not meet mobility standards in the background conditions. The development traffic is not projected to worsen the operation beyond the background conditions. ODOT standard procedures for analysis is to apply default parameters for items as peak hour factors for analysis that is performed for 5 years or more into the future. This will sometimes result in the intersection v/c shown to be improved between just prior to and after the 5-year period. This is the case for the signalized intersections of Ashland @ I-5 northbound ramps and Ashland @ Tolman Creek. The peak hour factors were increased to 0.95 as per the ODOT Analysis Procedures Manual, resulting in an improved v/c result. Additionally, it is not uncommon for intersections to have improved v/c ratios as conditions become more congested. Typically signal timing an driver behavior changes making the intersection operate more efficiently and allow more vehicles through per cycle. 4.8 INTERSECTION QUEUING ANALYSIS RESULTS - YEAR 2017 A queuing analysis was performed following procedures within the Highway Capacity Manual and implemented within SimTraffic 8. SimTraffic, a micro simulation software, evaluates traffic operations as a network and provides queuing estimates. The Average and 95th Percentile queues for the year 2017 PM peak hour existing conditions are included in Table 10. The outputs are included in Appendix I. 27 South Ashland Business Park TPR Analysis January 5, 2018 TABLE 10: INTERSECTION QUEUING: YEAR 2017 PM PEAK HOUR Intersection Approach Storage (Feet) 2017 Average Queue Length (feet) 2017 95th Queue Length (feet) Tolman Creek Rd & Ashland St EB L TWLTL 100 200 EB T 500+ 250 400 EB TR 500+ 200 350 WB L TWLTL 150 200 WB T 500+ 150 300 WB TR 500+ 150 250 NB L 100 75 150 NB TR 500+ 175 300 SB L 100 75 125 SB TR 500+ 100 175 Washington St & Ashland St EB T 650 50 225 EB TR 650 25 125 WB L 1075 50 75 WB T 650 0 25 WB T 335 0 0 NB L 250+ 50 100 NB R 75 50 75 I-5 SB Ramp & Ashland St EB T 400 225 400 EB R 400 25 100 WB L 150 25 50 WB T 425 50 125 SB LT 1000 125 250 SB R 100 150 250 I-5 NB Ramp & Ashland St EB L 150 200 325 EB T 425 125 400 WB T 385 100 175 WB R 385 75 125 NB LT 775 25 75 NB R 185 25 50 EB = Eastbound, WB = Westbound, NB = Northbound, SB = Southbound, U=U-Turn,L = Left, T = Thru, R = Right Table 10 illustrateds that the existing storage lengths are not exceed with the exception of the Eastbound Left Turn at the I-5 Northbound Ramp. The queuing can be improved with extended green time for this approach. 28 South Ashland Business Park TPR Analysis January 5, 2018 4.9 INTERSECTION QUEUING ANALYSIS RESULTS - YEAR 2019 A queuing analysis was performed following procedures within the Highway Capacity Manual and implemented within SimTraffic 8. SimTraffic, a micro simulation software, evaluates traffic operations as a network and provides queuing estimates. The Average and 95th Percentile queues for the year 2019 PM peak hour with and without the proposed development scenario are included in Table 11. The outputs are included in Appendix J. TABLE 11: INTERSECTION QUEUING: YEAR 2019 PM PEAK HOUR Intersection Approach Storage (Feet) 2019 Background Queue Length (feet) 2019 Build Queue Length (feet) Average 95th Average 95th Tolman Creek Rd & Ashland St EB L TWLTL 125 225 125 225 EB T 500+ 350 625 300 450 EB TR 500+ 275 550 225 375 WB L TWLTL 150 200 150 200 WB T 500+ 175 325 175 325 WB TR 500+ 150 250 175 275 NB L 100 100 200 125 225 NB TR 500+ 250 500 250 475 SB L 100 75 150 75 150 SB TR 500+ 125 225 125 225 Washington St & Ashland St EB T 650 275 675 250 600 EB TR 650 150 550 75 375 WB L 1075 50 100 50 100 WB T 650 0 0 0 50 NB L 250+ 125 350 175 500 NB R 75 75 125 75 125 I-5 SB Ramp & Ashland St EB T 400 300 425 300 425 EB R 400 25 75 25 100 WB L 150 25 75 25 75 WB T 425 75 175 75 175 SB LT 1000 150 300 150 350 SB R 100 150 275 175 275 29 South Ashland Business Park TPR Analysis January 5, 2018 Intersection Approach Storage (Feet) 2019 Background Queue Length (feet) 2019 Build Queue Length (feet) Average 95th Average 95th I-5 NB Ramp & Ashland St EB L 150 225 350 225 325 EB T 425 200 500 175 475 WB T 385 100 175 100 175 WB R 385 75 125 75 125 NB LT 775 25 75 25 75 NB R 185 25 75 25 75 Tolman Creek Rd & Independent Way WB LR 125 50 75 50 75 NB TR 500 0 0 0 25 SB LT 500 25 50 25 50 Washington St & Independent Way EB LR 150 25 50 25 50 WB LT 125 0 25 0 25 Site Driveway & Washington St WB LT 250+ 0 0 0 25 NB LR 75 N/A N/A 25 50 EB = Eastbound, WB = Westbound, NB = Northbound, SB = Southbound, U=U-Turn, L = Left, T = Thru, R = Right As illustrated in Table 11, the added development traffic is not anticipated to significantly increase queuing conditions in the future year. 4.10 INTERSECTION QUEUING ANALYSIS RESULTS - YEAR 2023 A queuing analysis was performed following procedures within the Highway Capacity Manual and implemented within SimTraffic 8. SimTraffic, a micro simulation software, evaluates traffic operations as a network and provides queuing estimates. The Average and 95th Percentile queues for the year 2023 PM peak hour with and without the proposed development scenario are included in Table 12. The outputs are included in Appendix K. 30 South Ashland Business Park TPR Analysis January 5, 2018 TABLE 12: INTERSECTION QUEUING: YEAR 2023 PM PEAK HOUR Intersection Approach Storage (Feet) 2023 Background Queue Length (feet) 2023 Build Queue Length (feet) Average 95th Average 95th Tolman Creek Rd & Ashland St EB L TWLTL 125 225 125 250 EB T 500+ 250 400 375 650 EB TR 500+ 200 350 300 575 WB L TWLTL 125 200 150 200 WB T 500+ 150 250 150 275 WB TR 500+ 125 225 150 225 NB L 100 100 175 125 200 NB TR 500+ 150 275 200 350 SB L 100 50 100 75 125 SB TR 500+ 100 175 125 200 Washington St & Ashland St EB T 650 300 625 475 825 EB TR 650 100 425 325 800 WB L 1075 50 100 50 100 WB T 650 0 25 0 25 NB L 250+ 150 425 550 800 NB R 75 75 125 100 100 I-5 SB Ramp & Ashland St EB T 400 325 400 350 350 EB R 400 25 100 25 125 WB L 150 25 75 25 50 WB T 425 75 200 75 200 SB LT 1000 100 225 100 200 SB R 100 125 250 150 225 I-5 NB Ramp & Ashland St EB L 150 175 300 175 300 EB T 425 100 300 75 200 WB T 385 125 225 125 250 WB R 385 100 175 100 175 NB LT 775 25 75 25 75 NB R 185 25 75 25 75 Tolman Creek Rd & Independent Way WB LR 125 50 75 50 100 NB TR 500 0 0 0 0 SB LT 500 25 50 25 200 31 South Ashland Business Park TPR Analysis January 5, 2018 Intersection Approach Storage (Feet) 2023 Background Queue Length (feet) 2023 Build Queue Length (feet) Average 95th Average 95th Washington St & Independent Way EB LR 150 25 50 200 500 WB LT 125 0 25 125 275 Site Driveway & Washington Street WB LT 250+ 0 0 25 50 NB LR 75 N/A N/A 75 175 EB = Eastbound, WB = Westbound, NB = Northbound, SB = Southbound, U=U-Turn, L = Left, T = Thru, R = Right As illustrated in Table 12, the added development traffic is not anticipated to significantly increase queuing conditions in the future year. WASHINGTON STREET CROSS-SECTION RECOMMENDATION In addition to completing a traffic analysis, the development is responsible for improving the Washington Street frontage along the site. The following discussed the operation of Washington Street and the proposed cross section. ROADWAY CHARACTERISTICS: Washington Street is designated as an Avenue within the City of Ashland roadway functional classification. The TSP has identified Washington Avenue as a street with a modified cross section as there are right of way restrictions. As such, the appropriate cross section is determined based on the right of way, goals and objectives of the city’s functional classification, existing and future land uses, street characteristics, and safety for all users. Street Classification: As per the City of Ashland Transportation System Plan (TSP) Washington Street functionally classified an Avenue. As per the City of Ashland “A Handbook for Planning and Designing Streets” an Avenue should “provide concentrated pedestrian, bicycle, and motor vehicle access” and the “Design should provide an environment where walking, bicycling, using transit, and driving are equally convenient”. Therefore, the street cross section needs to provide safe and efficient bicycling, pedestrian, and vehicle amenities. Surrounding Land Uses: Washington Street for its entirety has been developed with a mix of office, commercial, and light industrial uses. There is a significant amount vacant land in the area with the potential to develop with similar land uses. The City Ashland TSP has identified the area to develop and add an additional 324 employees by the year 2034. Additionally, there is the future potential to connect Washington Street south to Benson Way, and to provide a future connection across the railroad tracks to the Croman Mill District redevelopment area. 32 South Ashland Business Park TPR Analysis January 5, 2018 The Washington Street connection to the south will occur with future development. The timing of the connection is unknown; however, the connection has the potential to increase traffic on Washington Street and should be taken into consideration. This connection will provide a more direct route for users of businesses along the Washington Street and Benson Way, i.e. drivers from Ashland Blvd with destination on Benson Way will likely find the new connection a more direct and better route to take. However, due to the travel speed, and horizontal curvature it is not anticipated that this connection will result in a significant amount of cut through traffic. Users between Ashland St and Siskiyou Blvd. or Crowson Road will find the use of Tolman Creek Road a significantly faster and easier route to travel, therefore minimizing cut through traffic on Washington Street. The Croman Mill District plan and Ashland TSP have identified a railroad crossing from Washington Street to the redevelopment area. This at grade crossing will be development driven and has no identified timeline for completion. As with the Washington St/Benson Way connection there will likely be some increase in traffic to Washington Street for users accessing businesses between these two areas but it is anticipated that there will be minimal cut through traffic as this route has a longer travel distance and length between Siskiyou Boulevard and Ashland St. Street Characteristics: Traffic Volumes: • The existing average daily traffic is estimated from recent PM peak hour traffic volumes. Washington Street east of Jefferson Avenue has an ADT of 325 vehicles. Washington Street west of Jefferson Avenue has an ADT of 1,205 vehicles • The TSP estimates the area between Ashland St, Tolman Creek Rd, I-5 and the north edge of Benson Way will expand to include additional 325 employees. The TSP estimates the area along Benson Way to Crowson Road will increase by 29 employees. This area is anticipated to increase traffic volumes between 1,500 and 2,000 ADT. • Sandow Engineering estimates Washington Street east of Jefferson Avenue will have an increase in ADT of 750-1000 vehicles by the year 2034. Roadway Speed: • Roadway Speed is not posed however, a comfortable driving speed given the horizontal curvature is 25 mph. Street Usage: • The area surrounding Washington Street will be developed with a mix of office and light industrial uses. The uses are anticipated to frequently have a mix of larger vehicles such as signal unit trucks and larger. • Tolman Creek will connect Washington Street to Central Bike Path and other neighborhood center through the Independence Way connection. Additionally, Tolman Creek Road will be 33 South Ashland Business Park TPR Analysis January 5, 2018 improved to include more pedestrian friendly amenities, providing employees and visitors to Washington Street businesses with a future safer bicycle and pedestrian network. CROSS-SECTION RECOMMENDATION: CSA Planning provided cross section alternatives in a memo dated January 15, 2018. The alternatives are Option A with two 10’ travel lanes and a 10’ multi use path; Option B which is a half-street improvement with two 10’ travel lanes, a bike lane, a curb and gutter and sidewalk; and Option C which is the City standard cross-section for Avenue. Each cross-section scenario was evaluated, and it was determined that the proposed cross-sections will provide safe and adequate transportation facilities for all roadway users for the current and future traffic scenarios. DEVELOPMENT SCENARIOS FINDINGS As demonstrated in the above sections, the proposed development of approximately two-thirds of the South Ashland Business Park will not reduce the performance of any intersection to below the mobility standard. Further the development traffic does not significantly increase queuing conditions over the no-build conditions. Therefore, intersection improvements are not required for the proposed development. Additionally, a cross-section recommendation has been made for Washington Street as the City of Ashland TSP identified the need for a modified cross section as there are right-of-way restrictions. The recommended cross-section provides safe and efficient bicycling, pedestrian, and vehicle amenities as required by the City of Ashland’s “A Handbook for Planning and Designing Streets”. TRANSPORTATION PLANNING RULE ANALYSIS To be consistent with the Oregon Administrative Rule OAR 660-012-0060, Transportation Planning Rule (TPR), it must be found that the reasonable worst-case development potential of the E-1 zoning will not have a significant effect on the adjacent transportation system. This is achieved by evaluating the impacts from a reasonable “worst-case” development scenario for the allowed uses under the local code. 7.1 YEAR 2034 BACKGROUND TRAFFIC VOLUMES The TPR analysis needs to evaluate conditions at the end of the City of Ashland’s Planning Horizon. As defined in the City of Ashland’s TSP the planning horizon is the year 2034, therefore the conditions need to be evaluated though the year 2034. The growth rate described in Section 3.3 was used to project the year 2034 traffic volumes. Figure 11 illustrates the year 2034 background traffic volumes. 7.2 TRIP GENERATION The reasonable worst-case development potential was determined for both the existing and proposed zoning. The development Potential trip generation is estimated using the ITE Trip Generation Manual (9th edition). 34 South Ashland Business Park TPR Analysis January 5, 2018 EXISTING RR-5 DEVELOPMENT POTENTIAL The reasonable “worst-case” development potential and associated traffic generation for the existing RR-5 zoning is illustrated in Table 13. These numbers were determined using the following assumptions and allowed uses under the Jackson County LDO 8.2. RR-5 Zoning • Maximum Gross Density 1 unit / 5 acres TABLE 13: PM PEAK HOUR WORST CASE-TRIP GENERATION RR-5 ZONING ITE Land Use Size (DU) PM Peak Hour Trip Genera�on Rate Trips 210 – Single-Family Detached Housing 1 1.0 1 PROPOSED E-1 DEVELOPMENT POTENTIAL The reasonable “worst-case” development potential and associated traffic generation for the proposed E-1 zoning is illustrated in Table 14. These numbers were determined using the following assumptions and allowed uses under Ashland Code. E-1 Zoning • Building is 2 stories • Building area is 32% of site • 48% of area is drive isles, loading, and parking • 20% is landscaping, setbacks, pedestrian facilities and storm water Several land use scenarios were evaluated to determine the highest trip generator allowed by the code. The following is the calculated building type and square footage that generates the highest traffic. TABLE 14: PM PEAK HOUR WORST CASE-TRIP GENERATION E-1 ZONING ITE Land Use Size (ksf) PM Peak Hour Trip Genera�on Rate Trips 710 – General Office Building 149.99 1.49 223 The above analysis illustrates the following trip generation: PM Potential E-1 Zoning 223 Existing RR-5 Zoning 1 Additional Trips 222 35 South Ashland Business Park TPR Analysis January 5, 2018 As illustrated, the proposed zoning has the potential to generate 222 additional PM peak hour trips. As the proposed zoning generates more traffic than the existing zoning, an intersection analysis needs to be performed to determine if there are any significant impacts. 7.3 TRIP DISTRIBUTION The development trips were distributed though the study area network using the existing observed travel patterns as a base with modifications as per reasonable origins and destinations. Trip distribution patterns: • 30% to/from the west via Ashland Street (OR 66) • 40% to/from the north via I-5 • 9% to/from the south via I-5 • 18% to/from the south via Tolman Creek Road • 3% to/from nearby streets The trip distribution is illustrated in Figure 12 for the 223 worst-case E-1 zoning trips. The level of E-1 development trips trigger the need for an intersection analysis at Ashland Street at Walker Avenue and Ashland Street at Normal Avenue. 7.4 BUILD-OUT TRAFFIC VOLUMES The development trips for the E-1 worst case zoning were added to the background traffic volumes to determine future traffic volumes under a worst-case development scenario with the E-2 zoning. Figure 13 illustrates the year 2034 total traffic volumes. 7.5 INTERSECTION ANALYSIS RESULTS – 2034 A performance analysis was conducted for the studied intersections for the year 2034 background conditions and with proposed zoning during the PM peak hour. The results of the analysis are illustrated in Table 14. The SYNCHRO outputs are provided in Appendix L. The intersection mobility standards for year 2034 are the same as used for the development level analysis (Section 4.1). TABLE 14: INTERSECTION PERFORMANCE: YEAR 2034 PM PEAK HOUR Intersec�on Jurisdic�on Mobility Standard V/C, LOS 2034 Background 2034 with E-1 Zoning Ashland Street @ I-5 Northbound Ramps ODOT 0.85 0.90 0.98 Ashland Street @ I-5 Southbound Ramps ODOT 0.85 1.09 1.10 Ashland Street @ Washington Street ODOT 0.95 0.32* 0.57* Ashland Street @ Tolman Creek Road ODOT 0.95 0.90 0.91 36 South Ashland Business Park TPR Analysis January 5, 2018 Intersec�on Jurisdic�on Mobility Standard V/C, LOS 2034 Background 2034 with E-1 Zoning Ashland Street @ Normal Avenue City D F* F* Ashland Street @ Walker Avenue City D C C Tolman Creek @ Independent Way City D C* C* Washington Street @ Independent Way City D A* B* Washington Street @ Site Driveway City D A* A* *results for stop controlled intersections are reported for the critical approach only. As illustrated in Table 14 the intersections of Ashland Street at I-5 Northbound Ramps, Ashland Street at I-5 Southbound Ramps, and Ashland at Normal Avenue are projected to not meet mobility standards at the end of the planning horizon. With the “worst case” E-1 zoning, the intersections of Ashland Street at I-5 Northbound Ramps, Ashland Street at I-5 Ramps, and Ashland Street at Normal Avenue continue to not meet the mobility standard with the I-5 ramps operating worse than the background condition. South Ashland Business Park, Ashland, Oregon Figure 11: 2034 PM Peak HourBackground Traffic Volumes I n t e r s t a t e 5 Sisk i y o u B l v d (H w y 9 9 ) Ashland St To l m a n Cr e e k R d E Main S t Wa l k e r A v e No r m a l A v e Wa s h i n g t o n S t Project Site Cl a y S t Cl a y S t Mi s t l e t o e R d 1: Ashland St @ Walker Ave 2: Ashland St @ Normal Ave 3: Ashland St @ Tolman Creek Rd 4: Ashland St @ Washington St 5: Ashland St @ I-5 SB Ramp 6: Ashland St @ I-5 NB Ramp 7: Tolman Creek Rd @ Independent Way 8: Washington St @ Independent Way 9: Washington St @ Site Driveway 9742 45 217 48 2 21 3525 5811 3725 17 7 367380 47051 829653 85586 12 12 3 123917 39829 127396 61 3 120 9 13353077 83698 14278326 736316 2 2477668 12522 2591519 5324 77617240 13 7 11 6 23 0 125101695 6912 1 70 1 2 3 4 5 6 7 8 9 South Ashland Business Park, Ashland, Oregon Figure 12: E-1 Zoning PM Peak HourDevelopment Trips I n t e r s t a t e 5 Sisk i y o u B l v d (H w y 9 9 ) Ashland St To l m a n Cr e e k R d E Main S t Wa l k e r A v e No r m a l A v e Wa s h i n g t o n S t Project Site Cl a y S t Cl a y S t Mi s t l e t o e R d 1: Ashland St @ Walker Ave 2: Ashland St @ Normal Ave 3: Ashland St @ Tolman Creek Rd 4: Ashland St @ Washington St 5: Ashland St @ I-5 SB Ramp 6: Ashland St @ I-5 NB Ramp 7: Tolman Creek Rd @ Independent Way 8: Washington St @ Independent Way 9: Washington St @ Site Driveway 6033 07 05 9293 012 026 01 300 722 019 092 07 40 7418 1500 3118 002 020 001 3308 001 060 001 000 5640 074 010 00 18 5 0 038 1 2 3 4 5 6 7 8 9 South Ashland Business Park, Ashland, Oregon Figure 13: 2034 PM Peak HourBuild Traffic Volumes - E-1 Zoning I n t e r s t a t e 5 Sisk i y o u B l v d (H w y 9 9 ) Ashland St To l m a n Cr e e k R d E Main S t Wa l k e r A v e No r m a l A v e Wa s h i n g t o n S t Project Site Cl a y S t Cl a y S t Mi s t l e t o e R d 1: Ashland St @ Walker Ave 2: Ashland St @ Normal Ave 3: Ashland St @ Tolman Creek Rd 4: Ashland St @ Washington St 5: Ashland St @ I-5 SB Ramp 6: Ashland St @ I-5 NB Ramp 7: Tolman Creek Rd @ Independent Way 8: Washington St @ Independent Way 9: Washington St @ Site Driveway 15775 45 224 48 2 26 127118 5823 3751 367381 50051 901655 855105 12 21 5 123924 40229 1347114 62 8 120 9 13654185 836 10 0 14278526 736316 3 2780676 12523 2592119 5325 77617240 19 3 12 0 23 0 125102399 6912 2 70 170 18 5 0 738 1 2 3 4 5 6 7 8 9 40 South Ashland Business Park TPR Analysis January 5, 2018 TPR MITIGATION To make findings of “no significant effect”, the worst-case development scenario from the proposed zone change needs to not reduce the intersection performance to below mobility standards. In circumstances where an intersection does not meet the mobility standard prior to the zone change (2034 background conditions) the zone change needs to show “no further degradation” meaning that conditions with the zone change are to make the intersections no worse. The following intersections do not meet the mobility standard for the year 2034 conditions with the proposed zone change: • Ashland Street at I-5 Northbound Ramps • Ashland Street at I-5 Southbound Ramps • Ashland at Normal Avenue Ashland Street at I-5 Northbound Ramps and I-5 Southbound Ramps: Ashland Street at the I-5 Northbound and Southbound ramp terminals are project to exceed the mobility standard with the worst-case development scenario. Both intersections are projected to not meet mobility standards in 2034 under the existing zoning. The interchange was recently updated to include signalized intersection improvements. The City of Ashland TSP identified that the interchange would need two eastbound through lanes at the southbound ramp signal to have enough capacity to meet mobility standards. However, the interchange was completed with one through lane. As demonstrated in Section 5, the southbound ramp terminal is projected to not meet mobility standards under 2034 background conditions. Improvements to the interchange would be costly and disproportional to the amount of impact the proposed zone change would have. Action 1F.5 of the Oregon Highway Plan allows for the placement of a trip cap on a property in lieu of mitigation to meet the “avoid further degradation” requirement. The applicant is proposing a trip cap equivalent to the proposed development trip generation. The proposal is a trip cap of 72,606 square feet of uses allowed within a business park and one apartment dwelling. Table 15 shows the trip generation for the proposed trip cap. TABLE 15: TRIP CAP ADT TRIP GENERATION ITE Land Use Size Units ADT Trip Genera�on Rate Trips 770 – Business Park 72.61 KSF GFA 12.44 903 220 – Apartment 1 Dwelling Units 6.65 7 Total 910 The PM peak hour trip generation for the trip cap would be equivalent to that calculated in Table 4 and illustrated in Figure 8. Figure 14 illustrates 2034 PM peak hour traffic volumes with the proposed trip cap. 41 South Ashland Business Park TPR Analysis January 5, 2018 The intersections were evaluated with the proposed trip cap. Table 16 illustrates the synchro analysis for the 2034 PM peak hour traffic volumes with the proposed trip cap. The SYNCHRO outputs are provided in Appendix L. TABLE 16: INTERSECTION PERFORMANCE: YEAR 2034 PM PEAK HOUR Intersec�on Jurisdic�on Mobility Standard V/C, LOS 2034 Background 2034 with E-1 Zoning 2034 with Trip Cap Ashland Street @ I-5 Northbound Ramps ODOT 0.85 0.90 0.98 0.90 Ashland Street @ I-5 Southbound Ramps ODOT 0.85 1.09 1.10 1.09 Ashland Street @ Washington Street ODOT 0.95 0.32* 0.57* 0.43* Ashland Street @ Tolman Creek Road ODOT 0.95 0.90 0.92 0.91 Ashland Street @ Normal Avenue City D F* F* N/A Ashland Street @ Walker Avenue City D C C N/A Tolman Creek @ Independent Way City D C* C* C* Washington Street @ Independent Way City D A* B* B* Washington Street @ Site Driveway City D A* A* A* *results for stop controlled intersections are reported for the critical approach only. N/A= The intersections of Ashland Street at Normal Avenue and Ashland Street at Walker Avenue have less than 25 trips added under the proposed trip cap. Therefore, the impacts from the zone change are considered insignificant and the intersection evaluation is not required or performed. With the proposed trip cap, all intersections operate better than the mobility standard, or no worse than the 2034 background conditions. Therefore, a trip cap of one apartment dwelling and 72,606 square feet of development consisting of uses allowed within a business park is shown to meet TPR compliance of no further degradation to the operation of an already failing intersection. Additionally, Action 1F.5 of the Oregon Highway Plan (OHP) has made a determination that any development that creates a “small” increase in traffic is considered to not cause further degradation of an already failing facility. The OHP defines a small increase as less than 1,001 trips between existing and proposed zoning on a 5-lane Highway that has less than 25,000 AADT. The ODOT Trans GIS and Traffic Volume Tables indicate that Ashland Street has about 10,200 AADT. Therefore, if the development is to trigger no more than 1,001 ADT, TPR findings can be met to show nor further degradation to the ODOT intersections. The proposed trip cap would generate 910 ADT (as shown in Table 15). The proposed trip 42 South Ashland Business Park TPR Analysis January 5, 2018 cap meets OHP policy of “no further degradation” to intersections which do not meet the mobility standard in background conditions. South Ashland Business Park, Ashland, Oregon Figure 14: 2034 PM Peak HourBuild Traffic Volumes - Trip Cap I n t e r s t a t e 5 Sisk i y o u B l v d (H w y 9 9 ) Ashland St To l m a n Cr e e k R d E Main S t Wa l k e r A v e No r m a l A v e Wa s h i n g t o n S t Project Site Cl a y S t Cl a y S t Mi s t l e t o e R d 3: Ashland St @ Tolman Creek Rd 4: Ashland St @ Washington St 5: Ashland St @ I-5 SB Ramp 6: Ashland St @ I-5 NB Ramp 7: Tolman Creek Rd @ Independent Way 8: Washington St @ Independent Way 9: Washington St @ Site Driveway 12158 45 221 48 2 26 7666 5820 3746 367381 49051 861654 855101 12 16 4 123923 40129 1306104 62 5 120 9 77617240 15 8 11 9 23 0 125102299 6912 2 70 170 820 730 1 2 3 4 5 6 7 8 9 44 South Ashland Business Park TPR Analysis January 5, 2018 CONCLUSION This report describes the traffic analysis and findings for the proposed of a zone change from Rural Residential to E-1 and the development of 72,606 square feet of business park. The analysis shows consistency with the City of Ashland and ODOT development criteria and the consistency with the Transportation Planning Rule (TPR); the Statewide Planning Rule Goal 12, OAR 660-12-0060. The analysis evaluates the adjacent roadway network and intersections with the added traffic from the proposed rezoning. The following findings are based on the information and analysis contained within this report. FINDINGS The analysis concludes the following findings: • All of the studied intersections will meet the mobility standards though the year 2023 with the proposed development of 72,606 sf of business park. • The proposed E-1 zoning will generate more traffic than the existing Rural Residential zoning, triggering the need for a TPR analysis. • The intersection of Ashland Street at I-5 Northbound Ramps, Ashland Street at the I-5 Southbound Ramps, and Ashland Street at Normal Avenue do not meet the applicable mobility standards for the year 2034 background conditions. • The “worst-case” development potential under the proposed E-1 zoning will worsen the year 2034 intersection performance to not meet standards in lieu of expensive mitigation, the applicant is proposing a trip cap equal to the level of traffic generated by the proposed development scenario. Under the trip cap all intersections operate better than the mobility standards, or no worse than the 2034 background conditions, and no further mitigation is needed.  SANDOW ENGINEERING                            AP P E N D I X A : S I T E P L A N South Ashland Business Park  SI T E P L A N TE L : ( 5 4 1 ) 4 8 8 - 0 7 1 9 As h l a n d , O r e g o n 9 7 5 2 0 P. O . B o x 1 3 4 8 51 8 W a s h i n g t o n S t r e e t , S u i t e 4 EM A I L : i n f o @ A D W a r c h i t e c t . c o m  SANDOW ENGINEERING                            AP P E N D I X B : S C O P E O F W O R K South Ashland Business Park  160 Madison Street Suite A Eugene, Oregon 97402 541.513.3376 SANDOWENGINEERING April 24, 2017 Karl Johnson City of Ashland Public Works / Engineering 20 East Main Street Ashland, OR 97520 RE: Scope of Work Request for Transportation Planning Rule Analysis – South Ashland Business Park Dear Mr. Johnson, Sandow Engineering would like to request a Scope of Work for a Transportation Planning Rule Analysis and Traffic Impact Analysis for the annexation, zone change, and development of tax lot 2800 of Assessor’s Map 391E14AB, adjacent to I-5 and located south of the extension of Washington Street in Ashland, Oregon. The property is currently zoned Rural Residential (5 acre) minimum (RR-5) by Jackson County. The applicant is requesting annexation of the property and is proposing a business park be developed on the site. The applicant is requesting that the property be annexed as Employment (E-1) as designated in the Ashland Comprehensive Plan. The applicant will be requesting a zone change to support the annexation, therefore the traffic study will require analysis/findings consistent with the Transportation Planning Rule (TPR), Statewide Planning Rule Goal 12, OAR 660-12-0060 (1) requirements The proposed development will be a business park consisting 72,606 square feet of light industrial building/office and one two-bedroom apartment. The proposed development is anticipated to generate 112 PM peak hour trips. As such, the development triggers a Traffic Impact Analysis as per City of Ashland TIA requirements. The development will be completed in 2 phases. The first phase will be completed in 2019 and the second phase will be completed in 2023. SITE ZONING Size: 5.38 acres Current zoning: RR-5 Proposed Zoning: E-1 From: Kelly Sandow PE Sandow Engineering RE: Scope of Work Request for TPR and TIA Analysis Date: 4/24/17 Page 2 SANDO SANDOW ENGINEERING TRIP GENERATION The trip generation estimates use information contained within the ITE Trip Generation Manuals 9th edition EXISTING RR-5 DEVELOPMENT POTENTIAL The reasonable “worst-case” development potential and associated traffic generation for the existing RR-5 zoning is illustrated in Table 1. These numbers were determined using the following assumptions and the allowed uses under the Jackson County LDO 8.2. RR-5 Zoning • Maximum Gross Density 1 unit / 5 acres TABLE 1: PM PEAK HOUR WORST CASE-TRIP GENERATION RR-5 ZONING ITE Land Use Size (DU) PM Peak Hour Trip Generation Rate Trips 210 – Single-Family Detached Housing 1 1.0 1 PROPOSED E-1 DEVELOPMENT POTENTIAL The reasonable “worst-case” development potential and associated traffic generation for the proposed E-1 zoning is illustrated in Table 2. These numbers were determined using the following assumptions and allowed uses under Ashland Code. E-1 Zoning • Building is 2 stories • Building area is 32% of site • 48% of area is drive isles, loading, and parking • 20% is landscaping, setbacks, pedestrian facilities and storm water Several land use scenarios were evaluated to determine the highest trip generator allowed by the code. The following is the calculated building type and square footage that generates the highest traffic. From: Kelly Sandow PE Sandow Engineering RE: Scope of Work Request for TPR and TIA Analysis Date: 4/24/17 Page 3 SANDO SANDOW ENGINEERING TABLE 2: PM PEAK HOUR WORST CASE-TRIP GENERATION E-1 ZONING ITE Land Use Size (ksf) PM Peak Hour Trip Generation Rate Trips 710 – General Office Building 149.99 1.49 223 The above analysis illustrates the following trip generation: PM Potential E-1 Zoning 223 Existing RR-5 Zoning 1 Additional Trips 222 As illustrated, the proposed zoning has the potential to generate 222 additional PM peak hour trips. PROPOSED BUILDING DEVELOPMENT POTENTIAL The application is proposing the development of a business park consisting 72,606 square feet of light industrial building/office and one two-bedroom apartment. The associated traffic generation for the proposed development is illustrated in Table 3. TABLE 3: PM PEAK HOUR PROPOSED DEVELOPMENT TRIP GENERATION ITE Land Use Size Units PM Peak Hour Trip Generation Rate Trips 770 – Business Park 72.61 KSF GFA Ln(T) = 0.90 Ln(X) + 0.85 111 220 – Apartment 1 Dwelling Units 0.62 1 Total 112 As determined in the table above the proposed development is expected to generate approximately 112 trips during the PM peak hour. TRIP DISTRIBUTION Preliminary trip distribution patterns: • 50% to/from the west via Ashland Street (OR 66) • 40% to/from the north via I-5 • 10% to/from the south via I-5 The preliminary trip distribution was determined based on engineering judgement and local knowledge and will be further refined once traffic volumes have been evaluated. Figure 1 below illustrates the distribution of trips during the PM peak hour for the proposed zoning. From: Kelly Sandow PE Sandow Engineering RE: Scope of Work Request for TPR and TIA Analysis Date: 4/24/17 Page 4 SANDO SANDOW ENGINEERING Figure 2 below illustrates the distribution of primary trips during the PM peak hour for the proposed development. As shown in the illustrations there is a proposed street connection between Washington Street and Tolman Creek Road. This street connection project, which will be known as Independent Way, is currently in the design process and the city is planning to begin construction at the end of 2017/beginning of 2018. The completion of this road connection will have a significant impact on the trip distribution. The Figures 3 and 4 below illustrate the trip generation for the proposed E-1 zoning and proposed development with the Independent Way street connection in place. Figure 1: Preliminary PM Peak Hour Primary Trip Distribution for Proposed E-1 Zoning Figure 2: Preliminary PM Peak Hour Primary Trip Distribution for Proposed Development From: Kelly Sandow PE Sandow Engineering RE: Scope of Work Request for TPR and TIA Analysis Date: 4/24/17 Page 5 SANDO SANDOW ENGINEERING Based upon the estimated trip distribution it is anticipated that the proposed “worst case” E-1 zoning potential could add 25 or more trips added to the following intersections: • Ashland Street @ Northbound I-5 Ramps (ODOT Jurisdiction) • Ashland Street @ Southbound I-5 Ramps (ODOT Jurisdiction) • Ashland Street @ Washington Street • Ashland Street @ Tolman Creek Road • Ashland Street @ Normal Ave • Ashland Street @ Walker Ave • Washington Street @ Independent Way • Tolman Creek Road @ Independent Way Figure 3: Preliminary PM Peak Hour Primary Trip Distribution for Proposed E-1 Zoning with Independent Way Figure 4: Preliminary PM Peak Hour Primary Trip Distribution for Proposed Development with Independent Way From: Kelly Sandow PE Sandow Engineering RE: Scope of Work Request for TPR and TIA Analysis Date: 4/24/17 Page 6 SANDO SANDOW ENGINEERING Based on the above information Sandow Engineering recommends the following as the Scope of Work for this project: Time periods: • Weekday PM Peak Hour occurring between 4:00 – 6:00 PM (3:30 – 6:30 PM at ODOT Intersections) Intersections to be studied: • Ashland Street @ Northbound I-5 Ramps (ODOT Jurisdiction) • Ashland Street @ Southbound I-5 Ramps (ODOT Jurisdiction) • Ashland Street @ Washington Street • Ashland Street @ Tolman Creek Road • Ashland Street @ Normal Ave • Ashland Street @ Walker Ave • Washington Street @ Independent Way • Tolman Creek Road @ Independent Way Years studied: • Existing Year - 2017 • Build Year (Phase 1) – 2019 • Build Year (Completion) – 2023 • 20 Year Horizon – 2034 (TPR analysis only) Street Configuration: Independent Way connection to be considered in place for the years 2019, 2023, and 2034 analysis. Please feel free to contact me if you would like to discuss this scoping letter further or if you need any additional information. Sincerely, Kelly Sandow 160 Madison Street Suite A Eugene, Oregon 97402 541.513.3376 SANDOWENGINEERING April 24, 2017 Michael Wang PE Development Review Traffic Engineer ODOT Region 3 100 Antelope Rd. White City, OR 97503 RE: Scope of Work Request for Transportation Planning Rule Analysis – South Ashland Business Park Dear Mr. Johnson, Sandow Engineering would like to request a Scope of Work for a Transportation Planning Rule Analysis and Traffic Impact Analysis for the annexation, zone change, and development of tax lot 2800 of Assessor’s Map 391E14AB, adjacent to I-5 and located south of the extension of Washington Street in Ashland, Oregon. The property is currently zoned Rural Residential (5 acre) minimum (RR-5) by Jackson County. The applicant is requesting annexation of the property and is proposing a business park be developed on the site. The applicant is requesting that the property be annexed as Employment (E-1) as designated in the Ashland Comprehensive Plan. The applicant will be requesting a zone change to support the annexation, therefore the traffic study will require analysis/findings consistent with the Transportation Planning Rule (TPR), Statewide Planning Rule Goal 12, OAR 660-12-0060 (1) requirements The proposed development will be a business park consisting 72,606 square feet of light industrial building/office and one two-bedroom apartment. The proposed development is anticipated to generate 112 PM peak hour trips. As such, the development triggers a Traffic Impact Analysis as per City of Ashland TIA requirements. The development will be completed in 2 phases. The first phase will be completed in 2019 and the second phase will be completed in 2023. SITE ZONING Size: 5.38 acres Current zoning: RR-5 Proposed Zoning: E-1 From: Kelly Sandow PE Sandow Engineering RE: Scope of Work Request for TPR and TIA Analysis Date: 4/24/17 Page 2 SANDO SANDOW ENGINEERING TRIP GENERATION The trip generation estimates use information contained within the ITE Trip Generation Manuals 9th edition EXISTING RR-5 DEVELOPMENT POTENTIAL The reasonable “worst-case” development potential and associated traffic generation for the existing RR-5 zoning is illustrated in Table 1. These numbers were determined using the following assumptions and the allowed uses under the Jackson County LDO 8.2. RR-5 Zoning • Maximum Gross Density 1 unit / 5 acres TABLE 1: PM PEAK HOUR WORST CASE-TRIP GENERATION RR-5 ZONING ITE Land Use Size (DU) PM Peak Hour Trip Generation Rate Trips 210 – Single-Family Detached Housing 1 1.0 1 PROPOSED E-1 DEVELOPMENT POTENTIAL The reasonable “worst-case” development potential and associated traffic generation for the proposed E-1 zoning is illustrated in Table 2. These numbers were determined using the following assumptions and allowed uses under Ashland Code. E-1 Zoning • Building is 2 stories • Building area is 32% of site • 48% of area is drive isles, loading, and parking • 20% is landscaping, setbacks, pedestrian facilities and storm water Several land use scenarios were evaluated to determine the highest trip generator allowed by the code. The following is the calculated building type and square footage that generates the highest traffic. From: Kelly Sandow PE Sandow Engineering RE: Scope of Work Request for TPR and TIA Analysis Date: 4/24/17 Page 3 SANDO SANDOW ENGINEERING TABLE 2: PM PEAK HOUR WORST CASE-TRIP GENERATION E-1 ZONING ITE Land Use Size (ksf) PM Peak Hour Trip Generation Rate Trips 710 – General Office Building 149.99 1.49 223 The above analysis illustrates the following trip generation: PM Potential E-1 Zoning 223 Existing RR-5 Zoning 1 Additional Trips 222 As illustrated, the proposed zoning has the potential to generate 222 additional PM peak hour trips. PROPOSED BUILDING DEVELOPMENT POTENTIAL The application is proposing the development of a business park consisting 72,606 square feet of light industrial building/office and one two-bedroom apartment. The associated traffic generation for the proposed development is illustrated in Table 3. TABLE 3: PM PEAK HOUR PROPOSED DEVELOPMENT TRIP GENERATION ITE Land Use Size Units PM Peak Hour Trip Generation Rate Trips 770 – Business Park 72.61 KSF GFA Ln(T) = 0.90 Ln(X) + 0.85 111 220 – Apartment 1 Dwelling Units 0.62 1 Total 112 As determined in the table above the proposed development is expected to generate approximately 112 trips during the PM peak hour. TRIP DISTRIBUTION Preliminary trip distribution patterns: • 50% to/from the west via Ashland Street (OR 66) • 40% to/from the north via I-5 • 10% to/from the south via I-5 The preliminary trip distribution was determined based on engineering judgement and local knowledge and will be further refined once traffic volumes have been evaluated. Figure 1 below illustrates the distribution of trips during the PM peak hour for the proposed zoning. From: Kelly Sandow PE Sandow Engineering RE: Scope of Work Request for TPR and TIA Analysis Date: 4/24/17 Page 4 SANDO SANDOW ENGINEERING Figure 2 below illustrates the distribution of primary trips during the PM peak hour for the proposed development. As shown in the illustrations there is a proposed street connection between Washington Street and Tolman Creek Road. This street connection project, which will be known as Independent Way, is currently in the design process and the city is planning to begin construction at the end of 2017/beginning of 2018. The completion of this road connection will have a significant impact on the trip distribution. The Figures 3 and 4 below illustrate the trip generation for the proposed E-1 zoning and proposed development with the Independent Way street connection in place. Figure 1: Preliminary PM Peak Hour Primary Trip Distribution for Proposed E-1 Zoning Figure 2: Preliminary PM Peak Hour Primary Trip Distribution for Proposed Development From: Kelly Sandow PE Sandow Engineering RE: Scope of Work Request for TPR and TIA Analysis Date: 4/24/17 Page 5 SANDO SANDOW ENGINEERING Based upon the estimated trip distribution it is anticipated that the proposed “worst case” E-1 zoning potential could add 25 or more trips added to the following intersections: • Ashland Street @ Northbound I-5 Ramps (ODOT Jurisdiction) • Ashland Street @ Southbound I-5 Ramps (ODOT Jurisdiction) • Ashland Street @ Washington Street • Ashland Street @ Tolman Creek Road • Ashland Street @ Normal Ave • Ashland Street @ Walker Ave • Washington Street @ Independent Way • Tolman Creek Road @ Independent Way Figure 3: Preliminary PM Peak Hour Primary Trip Distribution for Proposed E-1 Zoning with Independent Way Figure 4: Preliminary PM Peak Hour Primary Trip Distribution for Proposed Development with Independent Way From: Kelly Sandow PE Sandow Engineering RE: Scope of Work Request for TPR and TIA Analysis Date: 4/24/17 Page 6 SANDO SANDOW ENGINEERING Based on the above information Sandow Engineering recommends the following as the Scope of Work for this project: Time periods: • Weekday PM Peak Hour occurring between 4:00 – 6:00 PM (3:30 – 6:30 PM at ODOT Intersections) Intersections to be studied: • Ashland Street @ Northbound I-5 Ramps (ODOT Jurisdiction) • Ashland Street @ Southbound I-5 Ramps (ODOT Jurisdiction) • Ashland Street @ Washington Street • Ashland Street @ Tolman Creek Road • Ashland Street @ Normal Ave • Ashland Street @ Walker Ave • Washington Street @ Independent Way • Tolman Creek Road @ Independent Way Years studied: • Existing Year - 2017 • Build Year (Phase 1) – 2019 • Build Year (Completion) – 2023 • 20 Year Horizon – 2034 (TPR analysis only) Street Configuration: Independent Way connection to be considered in place for the years 2019, 2023, and 2034 analysis. Please feel free to contact me if you would like to discuss this scoping letter further or if you need any additional information. Sincerely, Kelly Sandow  SANDOW ENGINEERING                            AP P E N D I X C : C R A S H D A T A South Ashland Business Park  CR A S H D A T A S U M M A R Y 19 6 4 5 19 6 4 0 71 6 8 6 0 0 . 0 0 0 0. 0 0.0 0 CH E C K 20 1 1 0O K 20 1 2 0O K 20 1 3 0O K 20 1 4 0O K 20 1 5 0O K TO T A L S : 00 0 0 0 0 0 0 0 0 0 16 9 4 5 16 9 4 0 61 8 3 1 0 0 . 0 0 0 0. 0 0.0 0 CH E C K 20 1 1 0O K 20 1 2 0O K 20 1 3 0O K 20 1 4 0O K 20 1 5 0O K TO T A L S : 00 0 0 0 0 0 0 0 0 0 17 6 5 5 17 6 5 0 64 4 2 2 5 0 . 0 0 0 0. 0 0.0 0 CH E C K 20 1 1 0O K 20 1 2 0O K 20 1 3 0O K 20 1 4 0O K 20 1 5 11 1O K TO T A L S : 01 0 0 1 0 0 0 0 0 1 22 1 4 5 22 1 4 0 80 8 1 1 0 0 . 0 0 0 16 0 0 0 0 0 . 0 0.2 0 CH E C K 20 1 1 1 1 1 1 2 OK 20 1 2 1 11 OK 20 1 3 22 2O K 20 1 4 21 1 2OK 20 1 5 11 1OK TO T A L S : 35 0 0 3 0 3 2 0 0 8 13 9 1 5 13 9 1 0 50 7 7 1 5 0 . 0 0 0 40 0 0 0 0 . 0 0.0 8 CH E C K 20 1 1 0O K 20 1 2 1 1 1 OK 20 1 3 0O K 20 1 4 0O K 20 1 5 1 11 OK TO T A L S : 11 0 0 0 0 1 1 0 0 2 16 9 4 5 16 9 4 0 61 8 3 1 0 0 . 0 0 0 16 0 0 0 0 0 . 0 0.2 6 CH E C K 20 1 1 1 11 O K 20 1 2 1 2 1 1 1 3 OK 20 1 3 21 12 OK 20 1 4 11 1O K 20 1 5 1 11 OK TO T A L S : 35 0 0 2 0 2 2 2 0 8 AV G . Y E A R L Y CR A S H E S CR A S H R A T E / MIL L I O N M I L E S YE A R P D O I N J U R Y F A T A L H E A D R E A R S I D E T U R N O T H E R P E D B I K E T O T A L As h l a n d S t @ W a l k e r A v e P. M . P E A K HO U R Nu m b e r o f Ye a r s , n AD T AV G . A N N U A L M I L E S (M I L L I O N S ) AV G . Y E A R L Y CR A S H E S CR A S H R A T E / MIL L I O N M I L E S YE A R P D O I N J U R Y F A T A L H E A D R E A R S I D E T U R N O T H E R P E D B I K E T O T A L As h l a n d S t @ N o r m a l A v e P. M . P E A K HO U R Nu m b e r o f Ye a r s , n AD T AV G . A N N U A L M I L E S (M I L L I O N S ) AV G . Y E A R L Y CR A S H E S CR A S H R A T E / MIL L I O N M I L E S YE A R P D O I N J U R Y F A T A L H E A D R E A R S I D E T U R N O T H E R P E D B I K E T O T A L As h l a n d S t @ T o l m a n C r e e k R d P. M . P E A K HO U R Nu m b e r o f Ye a r s , n AD T AV G . A N N U A L M I L E S (M I L L I O N S ) YE A R P D O I N J U R Y F A T A L H E A D CR A S H R A T E / MIL L I O N M I L E S P. M . P E A K HO U R Nu m b e r o f Ye a r s , n AD T AV G . A N N U A L M I L E S (M I L L I O N S ) AV G . Y E A R L Y CR A S H E S As h l a n d S t @ N B I - 5 R a m p RE A R S I D E T U R N O T H E R P E D TO T A L BIK E Nu m b e r o f Ye a r s , n AD T AV G . A N N U A L M I L E S (M I L L I O N S ) AV G . Y E A R L Y CR A S H E S BIK E T O T A L As h l a n d S t @ S B I - 5 R a m p P. M . P E A K HO U R Nu m b e r o f Ye a r s , n RE A R S I D E T U R N O T H E R P E D CR A S H R A T E / MIL L I O N M I L E S AD T AV G . A N N U A L M I L E S (M I L L I O N S ) AV G . Y E A R L Y CR A S H E S CR A S H R A T E / MIL L I O N M I L E S YE A R P D O I N J U R Y F A T A L H E A D BIK E T O T A L As h l a n d S t @ W a s h i n g t o n S t P. M . P E A K HO U R RE A R S I D E T U R N O T H E R P E D YE A R P D O I N J U R Y F A T A L H E A D South Ashland Business Park TPRA C - 1 OR E G O N . . D E P A R T M E N T O F T R A N S P O R T A T I O N - T R A N S P O R T A T I O N D E V E L O P M E N T D I V I S I O N TR A N S P O R T A T I O N D A T A S E C T I O N - C R A S H A N A Y L Y S I S A N D R E P O R T I N G U N I T UR B A N N O N - S Y S T E M C R A S H L I S T I N G AS H L A N D S T a n d N B E N F R A S H L A N D S T , C i t y o f A s h l a n d , J a c k s o n C o u n t y , 0 1 / 0 1 / 2 0 1 1 t o 1 2 / 3 1 / 2 0 1 5 06 / 0 2 / 2 0 1 7 CD S 3 8 0 Pa g e : 1 CI T Y O F A S H L A N D , J A C K S O N C O U N T Y To t a l c r a s h r e c o r d s : 7 Di s c l a i m e r : T h e i n f o r m a t i o n c o n t a i n e d i n t h i s r e p o r t i s c o m p i l e d f r o m i n d i v i d u a l d r i v e r a n d p o l i c e c r a s h r e p o r t s s u b m i t t e d t o t h e O r e g o n D e p a r t m e n t o f T r a n s p o r t a t i o n a s r e q u i r e d i n O R S 8 1 1 . 7 2 0 . T h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t i s c o m m i t t e d t o p r o v i d i n g t h e h i g h e s t q u a l i t y c r a s h d a t a t o c u s t o m e r s . H o w e v e r , b e c a u s e s u b m i t t a l o f c r a s h r e p o r t f o r m s i s th e r e s p o n s i b i l i t y o f t h e i n d i v i d u a l d r i v e r , t h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t c a n n o t g u a r a n t e e t h a t a l l q u a l i f y i n g c r a s h e s a r e r e p r e s e n t e d n o r c a n a s s u r a n c e s b e m a d e t h a t a l l d e t a i l s p e r t a i n i n g t o a s i n g l e c r a s h a r e a c c u r a t e . N o t e : L e g i s l a t i v e c h a n g e s t o D M V ' s v e h i c l e c r a s h r e p o r t i n g r e q u i r e m e n t , e f f e c t i v e 0 1 / 0 1 / 2 0 0 4 , m a y r e s u l t i n f e w e r p r o p e r t y da m a g e o n l y c r a s h e s b e i n g e l i g i b l e f o r i n c l u s i o n i n t h e S t a t e w i d e C r a s h D a t a F i l e . 5P 03 N D A Y P D O PS N G R C A R 01 D R V R N O N E 2 2 F O R - Y 01 6 , 0 2 6 0 3 8 27 01 3 5 5 N N N N N 0 7 / 2 7 / 2 0 1 2 1 4 A S H L A N D S T ST R G H T N N C L R S - 1 S T O P 0 1 N O N E ST R G H T 00 4 27 CI T Y FR NB E N F R A S H L A N D S T W (N O N E ) N O N E N D R Y R E A R PR V T E W - E 00 0 0 0 4 00 OR < 2 5 02 N O N E ST R G H T PR V T E E - W 00 0 00 00 7 3 8 N N N N Y 0 4 / 2 2 / 2 0 1 1 1 4 A S H L A N D S T IN T E R C R O S S N N C L R O - 1 L - T U R N 0 1 N O N E TU R N - L 02 CI T Y FR NB E N F R A S H L A N D S T C N UN K N O W N N D R Y T U R N PR V T E W - N 00 0 00 4P 02 0 N D A Y I N J PS N G R C A R 01 D R V R N O N E 8 1 M O R - Y 00 4 , 0 2 8 0 0 0 02 PR V T E E - W 00 0 00 PS N G R C A R 02 P S N G I N J C 2 7 M 00 0 00 0 00 PS N G R C A R 01 D R V R I N J C 2 0 M O R - Y 00 0 00 0 00 OR < 2 5 02 N O N E ST R G H T 02 N O N E ST O P N- R E S 9A 06 0 N D A Y P D O PS N G R C A R 01 D R V R N O N E 2 5 F O T H - Y 01 6 , 0 1 4 , 0 2 6 0 3 8 0 0 3 07 , 2 7 OR < 2 5 PS N G R C A R 01 D R V R N O N E 3 9 M O R - Y 00 0 00 0 00 PR V T E W - E 01 2 00 NO R P T SU NB E N F R A S H L A N D S T W UN K N O W N N D R Y R E A R PR V T E W - E 00 0 00 01 6 1 9 N N N 0 8 / 2 8 / 2 0 1 1 1 4 A S H L A N D S T IN T E R C R O S S N N C L R S - 1 S T O P 0 1 N O N E ST R G H T 00 3 07 , 2 7 02 N O N E ST O P OR < 2 5 PS N G R C A R 01 D R V R I N J C 4 2 F O R - Y 00 0 00 0 00 PS N G R C A R 02 P S N G I N J C 1 2 M 00 0 00 0 00 PR V T E W - E 01 1 0 1 3 00 4P 06 0 N D A Y I N J PS N G R C A R 01 D R V R N O N E 4 2 F O R - Y 05 2 , 0 2 6 0 0 0 32 CI T Y SU NB E N F R A S H L A N D S T W NO N E N D R Y R E A R PR V T E W - E 00 0 00 01 0 7 9 N N N N Y 0 6 / 1 2 / 2 0 1 1 1 4 A S H L A N D S T IN T E R C R O S S N N C L R S - 1 S T O P 0 1 N O N E ST R G H T 01 3 32 PR V T E W - E 01 1 0 1 3 00 02 N O N E ST O P OR < 2 5 03 N O N E ST O P OR < 2 5 PS N G R C A R 01 D R V R I N J C 6 4 F O R - Y 00 0 00 0 00 PS N G R C A R 02 P S N G I N J C 3 9 F 00 0 00 0 00 PR V T E W - E 01 2 00 PS N G R C A R 03 P S N G I N J C 1 3 M 00 0 00 0 00 PR V T E W - E 01 1 0 1 3 00 02 N O N E ST O P PR V T E W - E 01 2 00 03 N O N E ST O P NO N E SU NB E N F R A S H L A N D S T N ST O P S I G N N W E T F I X PR V T E W - N 00 0 0 4 3 00 02 4 9 3 Y N N 1 2 / 2 1 / 2 0 1 4 1 1 A S H L A N D S T IN T E R C R O S S N Y R A I N F I X O B J 0 1 N O N E 0 T U R N - L 04 3 01 , 0 8 OR < 2 5 3P 05 0 N D A Y P D O PS N G R C A R 01 D R V R N O N E 2 0 F O R - Y 04 7 , 0 0 1 , 0 8 1 0 0 0 01 , 0 8 P R S W IN T - T Y P E SP C L U S E S D E A U C O D A T E C L A S S C I T Y S T R E E T RD C H A R ( M E D I A N ) I N T - R E L O F F R D W T H R C R A S H TR L R Q T Y M O V E A S IN V E S T D C S L K TI M E FR O M SE C O N D S T R E E T LO C T N (# L A N E S ) CO N T L DR V W Y LI G H T SV R T Y V# TY P E TO P# TY P E SV R T Y E X RE S LO C ER R O R AC T EV E N T CA U S E SE R # E L G H R D A Y DI S T F I R S T S T R E E T DI R E C T LE G S T R A F - RN D B T S U R F C O L L OW N E R FR O M PR T C I N J G E L I C N S P E D South Ashland Business Park TPRA C - 2 OR E G O N . . D E P A R T M E N T O F T R A N S P O R T A T I O N - T R A N S P O R T A T I O N D E V E L O P M E N T D I V I S I O N TR A N S P O R T A T I O N D A T A S E C T I O N - C R A S H A N A Y L Y S I S A N D R E P O R T I N G U N I T UR B A N N O N - S Y S T E M C R A S H L I S T I N G AS H L A N D S T a n d N B E N F R A S H L A N D S T , C i t y o f A s h l a n d , J a c k s o n C o u n t y , 0 1 / 0 1 / 2 0 1 1 t o 1 2 / 3 1 / 2 0 1 5 06 / 0 2 / 2 0 1 7 CD S 3 8 0 Pa g e : 2 CI T Y O F A S H L A N D , J A C K S O N C O U N T Y To t a l c r a s h r e c o r d s : 7 Di s c l a i m e r : T h e i n f o r m a t i o n c o n t a i n e d i n t h i s r e p o r t i s c o m p i l e d f r o m i n d i v i d u a l d r i v e r a n d p o l i c e c r a s h r e p o r t s s u b m i t t e d t o t h e O r e g o n D e p a r t m e n t o f T r a n s p o r t a t i o n a s r e q u i r e d i n O R S 8 1 1 . 7 2 0 . T h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t i s c o m m i t t e d t o p r o v i d i n g t h e h i g h e s t q u a l i t y c r a s h d a t a t o c u s t o m e r s . H o w e v e r , b e c a u s e s u b m i t t a l o f c r a s h r e p o r t f o r m s i s th e r e s p o n s i b i l i t y o f t h e i n d i v i d u a l d r i v e r , t h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t c a n n o t g u a r a n t e e t h a t a l l q u a l i f y i n g c r a s h e s a r e r e p r e s e n t e d n o r c a n a s s u r a n c e s b e m a d e t h a t a l l d e t a i l s p e r t a i n i n g t o a s i n g l e c r a s h a r e a c c u r a t e . N o t e : L e g i s l a t i v e c h a n g e s t o D M V ' s v e h i c l e c r a s h r e p o r t i n g r e q u i r e m e n t , e f f e c t i v e 0 1 / 0 1 / 2 0 0 4 , m a y r e s u l t i n f e w e r p r o p e r t y da m a g e o n l y c r a s h e s b e i n g e l i g i b l e f o r i n c l u s i o n i n t h e S t a t e w i d e C r a s h D a t a F i l e . 11 A 04 N D A Y I N J PS N G R C A R 01 D R V R N O N E 3 0 F O R - Y 04 3 00 0 07 (0 3 ) OR < 2 5 00 0 2 4 N N N N N 0 1 / 0 3 / 2 0 1 3 1 4 A S H L A N D S T ST R G H T N N C L R S - 1 S T O P 0 1 N O N E ST R G H T 07 CI T Y TH NB E N F R A S H L A N D S T W (N O N E ) U N K N O W N N D R Y R E A R PR V T E W - E 00 0 00 PS N G R C A R 01 D R V R I N J C 2 7 M O R - Y 00 0 00 0 00 OR > 2 5 02 N O N E ST O P PR V T E W - E 01 1 00 OR < 2 5 PS N G R C A R 01 D R V R I N J C 3 5 M O R - Y 00 0 00 0 00 PR V T E E - W 01 1 0 1 3 00 03 N O N E 0 S T O P N- R E S PS N G R C A R 01 D R V R I N J C 4 7 F O T H - Y 00 0 00 0 00 PR V T E E - W 02 2 00 CI T Y TU NB E N F R A S H L A N D S T W (N O N E ) U N K N O W N N D R Y R E A R PR V T E E - W 00 0 00 01 7 2 1 Y N N Y 0 9 / 1 8 / 2 0 1 2 1 4 A S H L A N D S T ST R G H T N N C L R S - 1 S T O P 0 1 N O N E 0 S T R G H T 01 3 01 8A 04 N D A Y I N J PS N G R C A R 01 D R V R N O N E 2 0 F O R - Y 04 7 , 0 2 6 0 2 6 01 02 N O N E 0 S T O P (0 2 ) OR < 2 5 02 N O N E ST O P (0 2 ) OR < 2 5 PR V T E W - E 01 1 00 OR < 2 5 PS N G R C A R 01 D R V R N O N E 2 7 M O R - Y 00 0 00 0 00 P R S W IN T - T Y P E SP C L U S E S D E A U C O D A T E C L A S S C I T Y S T R E E T RD C H A R ( M E D I A N ) I N T - R E L O F F R D W T H R C R A S H TR L R Q T Y M O V E A S IN V E S T D C S L K TI M E FR O M SE C O N D S T R E E T LO C T N (# L A N E S ) CO N T L DR V W Y LI G H T SV R T Y V# TY P E TO P# TY P E SV R T Y E X RE S LO C ER R O R AC T EV E N T CA U S E SE R # E L G H R D A Y DI S T F I R S T S T R E E T DI R E C T LE G S T R A F - RN D B T S U R F C O L L OW N E R FR O M PR T C I N J G E L I C N S P E D South Ashland Business Park TPRA C - 3 OR E G O N . . D E P A R T M E N T O F T R A N S P O R T A T I O N - T R A N S P O R T A T I O N D E V E L O P M E N T D I V I S I O N TR A N S P O R T A T I O N D A T A S E C T I O N - C R A S H A N A Y L Y S I S A N D R E P O R T I N G U N I T UR B A N N O N - S Y S T E M C R A S H L I S T I N G AS H L A N D S T a n d N B E X T O A S H L A N D S T , C i t y o f A s h l a n d , J a c k s o n C o u n t y , 0 1 / 0 1 / 2 0 1 1 t o 1 2 / 3 1 / 2 0 1 5 06 / 0 2 / 2 0 1 7 CD S 3 8 0 Pa g e : 1 CI T Y O F A S H L A N D , J A C K S O N C O U N T Y No R o w s t o D i s p l a y Di s c l a i m e r : T h e i n f o r m a t i o n c o n t a i n e d i n t h i s r e p o r t i s c o m p i l e d f r o m i n d i v i d u a l d r i v e r a n d p o l i c e c r a s h r e p o r t s s u b m i t t e d t o t h e O r e g o n D e p a r t m e n t o f T r a n s p o r t a t i o n a s r e q u i r e d i n O R S 8 1 1 . 7 2 0 . T h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t i s c o m m i t t e d t o p r o v i d i n g t h e h i g h e s t q u a l i t y c r a s h d a t a t o c u s t o m e r s . H o w e v e r , b e c a u s e s u b m i t t a l o f c r a s h r e p o r t f o r m s i s th e r e s p o n s i b i l i t y o f t h e i n d i v i d u a l d r i v e r , t h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t c a n n o t g u a r a n t e e t h a t a l l q u a l i f y i n g c r a s h e s a r e r e p r e s e n t e d n o r c a n a s s u r a n c e s b e m a d e t h a t a l l d e t a i l s p e r t a i n i n g t o a s i n g l e c r a s h a r e a c c u r a t e . N o t e : L e g i s l a t i v e c h a n g e s t o D M V ' s v e h i c l e c r a s h r e p o r t i n g r e q u i r e m e n t , e f f e c t i v e 0 1 / 0 1 / 2 0 0 4 , m a y r e s u l t i n f e w e r p r o p e r t y da m a g e o n l y c r a s h e s b e i n g e l i g i b l e f o r i n c l u s i o n i n t h e S t a t e w i d e C r a s h D a t a F i l e . SE R # E L G H R D A Y DI S T F I R S T S T R E E T DI R E C T LE G S T R A F - RN D B T S U R F C O L L OW N E R FR O M PR T C I N J G E L I C N S P E D IN V E S T D C S L K TI M E FR O M SE C O N D S T R E E T LO C T N (# L A N E S ) CO N T L DR V W Y LI G H T SV R T Y V# TY P E TO P# TY P E SV R T Y E X RE S LO C ER R O R AC T EV E N T CA U S E E A U C O D A T E C L A S S C I T Y S T R E E T RD C H A R ( M E D I A N ) I N T - R E L O F F R D W T H R C R A S H TR L R Q T Y M O V E A S S D P R S W IN T - T Y P E SP C L U S E South Ashland Business Park TPRA C - 4 OR E G O N . . D E P A R T M E N T O F T R A N S P O R T A T I O N - T R A N S P O R T A T I O N D E V E L O P M E N T D I V I S I O N TR A N S P O R T A T I O N D A T A S E C T I O N - C R A S H A N A Y L Y S I S A N D R E P O R T I N G U N I T UR B A N N O N - S Y S T E M C R A S H L I S T I N G AS H L A N D S T a n d S B E N F R A S H L A N D S T , C i t y o f A s h l a n d , J a c k s o n C o u n t y , 0 1 / 0 1 / 2 0 1 1 t o 1 2 / 3 1 / 2 0 1 5 06 / 0 2 / 2 0 1 7 CD S 3 8 0 Pa g e : 1 CI T Y O F A S H L A N D , J A C K S O N C O U N T Y To t a l c r a s h r e c o r d s : 3 Di s c l a i m e r : T h e i n f o r m a t i o n c o n t a i n e d i n t h i s r e p o r t i s c o m p i l e d f r o m i n d i v i d u a l d r i v e r a n d p o l i c e c r a s h r e p o r t s s u b m i t t e d t o t h e O r e g o n D e p a r t m e n t o f T r a n s p o r t a t i o n a s r e q u i r e d i n O R S 8 1 1 . 7 2 0 . T h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t i s c o m m i t t e d t o p r o v i d i n g t h e h i g h e s t q u a l i t y c r a s h d a t a t o c u s t o m e r s . H o w e v e r , b e c a u s e s u b m i t t a l o f c r a s h r e p o r t f o r m s i s th e r e s p o n s i b i l i t y o f t h e i n d i v i d u a l d r i v e r , t h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t c a n n o t g u a r a n t e e t h a t a l l q u a l i f y i n g c r a s h e s a r e r e p r e s e n t e d n o r c a n a s s u r a n c e s b e m a d e t h a t a l l d e t a i l s p e r t a i n i n g t o a s i n g l e c r a s h a r e a c c u r a t e . N o t e : L e g i s l a t i v e c h a n g e s t o D M V ' s v e h i c l e c r a s h r e p o r t i n g r e q u i r e m e n t , e f f e c t i v e 0 1 / 0 1 / 2 0 0 4 , m a y r e s u l t i n f e w e r p r o p e r t y da m a g e o n l y c r a s h e s b e i n g e l i g i b l e f o r i n c l u s i o n i n t h e S t a t e w i d e C r a s h D a t a F i l e . CI T Y SU SB E N F R A S H L A N D S T W (R S D M D ) N O N E N W E T F I X PR V T E E - S 01 9 0 4 4 00 02 3 8 1 N Y N N N 1 2 / 1 6 / 2 0 1 2 1 4 A S H L A N D S T ST R G H T N Y R A I N F I X O B J 0 1 N O N E 0 T U R N - L 04 4 08 (0 4 ) N- R E S 11 P 05 N D A R K P D O PS N G R C A R 01 D R V R N O N E 5 6 F O T H - Y 00 5 08 8 08 6P 03 N D A Y I N J PS N G R C A R 01 D R V R I N J C 3 8 F O R - Y 02 6 00 0 29 (0 4 ) OR < 2 5 01 3 9 5 N N N 0 7 / 0 7 / 2 0 1 5 1 4 A S H L A N D S T ST R G H T N N C L R S - 1 S T O P 0 1 N O N E 0 S T R G H T 29 NO N E TU SB E N F R A S H L A N D S T U N (N O N E ) U N K N O W N N D R Y R E A R PR V T E W - E 00 0 00 UN K N O W N 01 D R V R N O N E 0 0 U n k U N K 00 0 00 0 00 UN K 02 N O N E 0 S T O P UN K N W - E 01 1 00 3P 03 N D A Y P D O PS N G R C A R 01 D R V R N O N E 4 3 M O R - Y 00 0 00 0 00 (0 4 ) OR < 2 5 01 6 8 4 N N N N N 0 9 / 1 6 / 2 0 1 1 1 4 A S H L A N D S T AL L E Y N N C L R O - 1 L - T U R N 0 1 N O N E ST R G H T 08 2 08 CI T Y FR SB E N F R A S H L A N D S T W (N O N E ) U N K N O W N N D R Y T U R N PR V T E W - E 00 0 00 PS N G R C A R 01 D R V R N O N E 6 0 M O R - Y 00 4 00 0 0 8 2 08 OR < 2 5 02 N O N E TU R N - L PR V T E E - S 01 9 00 P R S W IN T - T Y P E SP C L U S E S D E A U C O D A T E C L A S S C I T Y S T R E E T RD C H A R ( M E D I A N ) I N T - R E L O F F R D W T H R C R A S H TR L R Q T Y M O V E A S IN V E S T D C S L K TI M E FR O M SE C O N D S T R E E T LO C T N (# L A N E S ) CO N T L DR V W Y LI G H T SV R T Y V# TY P E TO P# TY P E SV R T Y E X RE S LO C ER R O R AC T EV E N T CA U S E SE R # E L G H R D A Y DI S T F I R S T S T R E E T DI R E C T LE G S T R A F - RN D B T S U R F C O L L OW N E R FR O M PR T C I N J G E L I C N S P E D South Ashland Business Park TPRA C - 5 OR E G O N . . D E P A R T M E N T O F T R A N S P O R T A T I O N - T R A N S P O R T A T I O N D E V E L O P M E N T D I V I S I O N TR A N S P O R T A T I O N D A T A S E C T I O N - C R A S H A N A Y L Y S I S A N D R E P O R T I N G U N I T UR B A N N O N - S Y S T E M C R A S H L I S T I N G AS H L A N D S T a n d S B E X T O A S H L A N D S T , C i t y o f A s h l a n d , J a c k s o n C o u n t y , 0 1 / 0 1 / 2 0 1 1 t o 1 2 / 3 1 / 2 0 1 5 06 / 0 2 / 2 0 1 7 CD S 3 8 0 Pa g e : 1 CI T Y O F A S H L A N D , J A C K S O N C O U N T Y To t a l c r a s h r e c o r d s : 4 Di s c l a i m e r : T h e i n f o r m a t i o n c o n t a i n e d i n t h i s r e p o r t i s c o m p i l e d f r o m i n d i v i d u a l d r i v e r a n d p o l i c e c r a s h r e p o r t s s u b m i t t e d t o t h e O r e g o n D e p a r t m e n t o f T r a n s p o r t a t i o n a s r e q u i r e d i n O R S 8 1 1 . 7 2 0 . T h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t i s c o m m i t t e d t o p r o v i d i n g t h e h i g h e s t q u a l i t y c r a s h d a t a t o c u s t o m e r s . H o w e v e r , b e c a u s e s u b m i t t a l o f c r a s h r e p o r t f o r m s i s th e r e s p o n s i b i l i t y o f t h e i n d i v i d u a l d r i v e r , t h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t c a n n o t g u a r a n t e e t h a t a l l q u a l i f y i n g c r a s h e s a r e r e p r e s e n t e d n o r c a n a s s u r a n c e s b e m a d e t h a t a l l d e t a i l s p e r t a i n i n g t o a s i n g l e c r a s h a r e a c c u r a t e . N o t e : L e g i s l a t i v e c h a n g e s t o D M V ' s v e h i c l e c r a s h r e p o r t i n g r e q u i r e m e n t , e f f e c t i v e 0 1 / 0 1 / 2 0 0 4 , m a y r e s u l t i n f e w e r p r o p e r t y da m a g e o n l y c r a s h e s b e i n g e l i g i b l e f o r i n c l u s i o n i n t h e S t a t e w i d e C r a s h D a t a F i l e . 5P 05 N D U S K P D O PS N G R C A R 01 D R V R N O N E 4 4 M O R - Y 02 6 00 0 07 (0 4 ) OR < 2 5 00 1 4 5 N N N 0 1 / 0 5 / 2 0 1 1 1 4 A S H L A N D S T BR I D G E N N U N K S - 1 S T O P 0 1 N O N E ST R G H T 07 NO R P T WE SB E X T O A S H L A N D S T E (N O N E ) U N K N O W N N U N K R E A R PR V T E E - W 00 0 00 PS N G R C A R 01 D R V R N O N E 1 7 F O R - Y 00 0 00 0 00 OR < 2 5 02 N O N E ST O P PR V T E E - W 01 1 00 6P 03 N D A Y I N J PS N G R C A R 01 D R V R N O N E 5 3 M O R - Y 02 6 00 0 07 , 2 9 (0 1 ) OR < 2 5 00 9 3 5 N N N N N 0 5 / 2 8 / 2 0 1 4 1 1 S B E X T O A S H L A N D S T S T R G H T Y N C L R S - 1 S T O P 0 1 N O N E ST R G H T 07 , 2 9 ST A T E WE AS H L A N D S T N (N O N E ) U N K N O W N N D R Y R E A R PR V T E N - S 00 0 00 PS N G R C A R 01 D R V R I N J C 4 6 F O T H - Y 00 0 00 0 00 N- R E S 02 N O N E ST O P PR V T E N - S 01 1 00 PS N G R C A R 01 D R V R N O N E 6 7 M O T H - Y 00 0 00 0 00 N- R E S PR V T E E - N 01 9 00 CI T Y SU SB E X T O A S H L A N D S T W (N O N E ) N O N E N D R Y R E A R PR V T E E - W 00 0 00 02 5 8 9 N N N N N 1 2 / 2 9 / 2 0 1 3 1 4 A S H L A N D S T AL L E Y N N C L R S - 1 T U R N 0 1 N O N E ST R G H T 07 12 P 06 N D A Y I N J PS N G R C A R 01 D R V R I N J C 8 5 F O R - Y 02 6 00 0 07 02 N O N E 1 T U R N - R (0 4 ) OR < 2 5 4P 01 0 N D U S K I N J PS N G R C A R 01 D R V R N O N E 2 6 M O R - Y 02 6 03 8 07 OR < 2 5 00 1 0 8 N N N 0 1 / 1 7 / 2 0 1 1 1 4 A S H L A N D S T IN T E R 4 - L E G N N C L R S - 1 T U R N 0 1 N O N E ST R G H T 07 NO N E MO SB E X T O A S H L A N D S T C N ST O P S I G N N D R Y R E A R PR V T E N - S 00 0 00 PS N G R C A R 01 D R V R I N J C 6 0 F O R - Y 00 0 00 0 00 OR < 2 5 02 N O N E ST O P PR V T E N - W 01 3 00 P R S W IN T - T Y P E SP C L U S E S D E A U C O D A T E C L A S S C I T Y S T R E E T RD C H A R ( M E D I A N ) I N T - R E L O F F R D W T H R C R A S H TR L R Q T Y M O V E A S IN V E S T D C S L K TI M E FR O M SE C O N D S T R E E T LO C T N (# L A N E S ) CO N T L DR V W Y LI G H T SV R T Y V# TY P E TO P# TY P E SV R T Y E X RE S LO C ER R O R AC T EV E N T CA U S E SE R # E L G H R D A Y DI S T F I R S T S T R E E T DI R E C T LE G S T R A F - RN D B T S U R F C O L L OW N E R FR O M PR T C I N J G E L I C N S P E D South Ashland Business Park TPRA C - 6 OR E G O N . . D E P A R T M E N T O F T R A N S P O R T A T I O N - T R A N S P O R T A T I O N D E V E L O P M E N T D I V I S I O N TR A N S P O R T A T I O N D A T A S E C T I O N - C R A S H A N A Y L Y S I S A N D R E P O R T I N G U N I T UR B A N N O N - S Y S T E M C R A S H L I S T I N G AS H L A N D S T a n d W A S H I N G T O N S T , C i t y o f A s h l a n d , J a c k s o n C o u n t y , 0 1 / 0 1 / 2 0 1 1 t o 1 2 / 3 1 / 2 0 1 5 06 / 0 2 / 2 0 1 7 CD S 3 8 0 Pa g e : 1 CI T Y O F A S H L A N D , J A C K S O N C O U N T Y To t a l c r a s h r e c o r d s : 8 Di s c l a i m e r : T h e i n f o r m a t i o n c o n t a i n e d i n t h i s r e p o r t i s c o m p i l e d f r o m i n d i v i d u a l d r i v e r a n d p o l i c e c r a s h r e p o r t s s u b m i t t e d t o t h e O r e g o n D e p a r t m e n t o f T r a n s p o r t a t i o n a s r e q u i r e d i n O R S 8 1 1 . 7 2 0 . T h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t i s c o m m i t t e d t o p r o v i d i n g t h e h i g h e s t q u a l i t y c r a s h d a t a t o c u s t o m e r s . H o w e v e r , b e c a u s e s u b m i t t a l o f c r a s h r e p o r t f o r m s i s th e r e s p o n s i b i l i t y o f t h e i n d i v i d u a l d r i v e r , t h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t c a n n o t g u a r a n t e e t h a t a l l q u a l i f y i n g c r a s h e s a r e r e p r e s e n t e d n o r c a n a s s u r a n c e s b e m a d e t h a t a l l d e t a i l s p e r t a i n i n g t o a s i n g l e c r a s h a r e a c c u r a t e . N o t e : L e g i s l a t i v e c h a n g e s t o D M V ' s v e h i c l e c r a s h r e p o r t i n g r e q u i r e m e n t , e f f e c t i v e 0 1 / 0 1 / 2 0 0 4 , m a y r e s u l t i n f e w e r p r o p e r t y da m a g e o n l y c r a s h e s b e i n g e l i g i b l e f o r i n c l u s i o n i n t h e S t a t e w i d e C r a s h D a t a F i l e . (0 4 ) OR < 2 5 02 N O N E ST O P PR V T E W - E 01 1 0 1 3 00 00 9 3 0 N N N 0 5 / 2 7 / 2 0 1 4 1 4 A S H L A N D S T ST R G H T N N C L R S - 1 S T O P 0 1 N O N E ST R G H T 01 3 29 NO R P T TU WA S H I N G T O N S T E (N O N E ) U N K N O W N N D R Y R E A R PR V T E W - E 00 0 00 2P 04 N D A Y P D O PS N G R C A R 01 D R V R N O N E 3 4 F O R - Y 02 6 00 0 29 PS N G R C A R 01 D R V R N O N E 2 3 F O R - Y 00 0 00 0 00 1P 04 N D A Y P D O PS N G R C A R 01 D R V R N O N E 2 5 M O R - Y 00 0 00 0 00 (0 4 ) OR < 2 5 00 3 7 0 N N N N N 0 2 / 2 1 / 2 0 1 4 1 4 A S H L A N D S T ST R G H T N N R A I N O - O T H E R 0 1 N O N E ST R G H T 08 CI T Y FR WA S H I N G T O N S T E (N O N E ) N O N E N W E T T U R N PR V T E W - E 00 0 00 PS N G R C A R 01 D R V R N O N E 4 5 M O T H - Y 00 8 00 0 08 N- R E S 02 N O N E U- T U R N PR V T E E - E 00 0 00 02 N O N E ST R G H T PS N G R C A R 02 P S N G I N J C 7 4 F 00 0 00 0 00 OR < 2 5 PS N G R C A R 01 D R V R I N J C 5 1 F O R - Y 00 0 00 0 00 PR V T E E - W 00 0 00 PR V T E N - E 01 8 00 CI T Y TH WA S H I N G T O N S T W (N O N E ) U N K N O W N N D R Y T U R N PR V T E N - E 01 8 00 01 4 8 4 N N N 0 8 / 1 4 / 2 0 1 4 1 4 A S H L A N D S T AL L E Y N N C L R A N G L - O T H 0 1 N O N E TU R N - L 02 4P 05 N D A Y I N J PS N G R C A R 01 D R V R N O N E 5 6 F O R - Y 02 8 00 0 02 01 N O N E TU R N - L (0 4 ) OR < 2 5 (0 4 ) OR < 2 5 02 N O N E ST R G H T PR V T E W - E 00 0 0 1 3 , 0 8 8 0 0 02 5 1 7 N N N N N 1 2 / 2 0 / 2 0 1 3 1 4 A S H L A N D S T AL L E Y N N C L D A N G L - O T H 0 1 N O N E TU R N - L 01 3 , 0 8 8 0 2 CI T Y FR WA S H I N G T O N S T W (N O N E ) N O N E N D R Y T U R N PR V T E N - E 01 8 00 9A 04 N D A Y I N J PS N G R C A R 01 D R V R N O N E 6 1 F O R - Y 02 8 00 0 02 PR V T E W - E 00 0 0 1 3 , 0 8 8 0 0 PS N G R C A R 02 P S N G N O < 5 0 2 M 00 0 00 0 00 PS N G R C A R 01 D R V R I N J C 2 5 F O R - Y 00 0 00 0 00 OR < 2 5 02 N O N E ST R G H T OR < 2 5 02 N O N E 0 S T O P PR V T E W - E 01 1 0 1 3 00 02 0 3 1 N Y N N N 0 9 / 3 0 / 2 0 1 5 1 4 A S H L A N D S T IN T E R 3 - L E G N N C L R S - 1 S T O P 0 1 N O N E 0 S T R G H T 01 3 32 CI T Y WE WA S H I N G T O N S T W UN K N O W N N D R Y R E A R PR V T E W - E 00 0 00 3P 06 0 N D A Y I N J PS N G R C A R 01 D R V R N O N E 3 7 M N O N E 05 2 , 0 2 6 0 0 0 32 PR V T E W - E 02 2 00 PS N G R C A R 01 D R V R N O N E 3 6 F O R - Y 00 0 00 0 00 OR < 2 5 PS N G R C A R 01 D R V R I N J C 2 4 F O R - Y 00 0 00 0 00 OR < 2 5 03 N O N E 0 S T O P P R S W IN T - T Y P E SP C L U S E S D E A U C O D A T E C L A S S C I T Y S T R E E T RD C H A R ( M E D I A N ) I N T - R E L O F F R D W T H R C R A S H TR L R Q T Y M O V E A S IN V E S T D C S L K TI M E FR O M SE C O N D S T R E E T LO C T N (# L A N E S ) CO N T L DR V W Y LI G H T SV R T Y V# TY P E TO P# TY P E SV R T Y E X RE S LO C ER R O R AC T EV E N T CA U S E SE R # E L G H R D A Y DI S T F I R S T S T R E E T DI R E C T LE G S T R A F - RN D B T S U R F C O L L OW N E R FR O M PR T C I N J G E L I C N S P E D South Ashland Business Park TPRA C - 7 OR E G O N . . D E P A R T M E N T O F T R A N S P O R T A T I O N - T R A N S P O R T A T I O N D E V E L O P M E N T D I V I S I O N TR A N S P O R T A T I O N D A T A S E C T I O N - C R A S H A N A Y L Y S I S A N D R E P O R T I N G U N I T UR B A N N O N - S Y S T E M C R A S H L I S T I N G AS H L A N D S T a n d W A S H I N G T O N S T , C i t y o f A s h l a n d , J a c k s o n C o u n t y , 0 1 / 0 1 / 2 0 1 1 t o 1 2 / 3 1 / 2 0 1 5 06 / 0 2 / 2 0 1 7 CD S 3 8 0 Pa g e : 2 CI T Y O F A S H L A N D , J A C K S O N C O U N T Y To t a l c r a s h r e c o r d s : 8 Di s c l a i m e r : T h e i n f o r m a t i o n c o n t a i n e d i n t h i s r e p o r t i s c o m p i l e d f r o m i n d i v i d u a l d r i v e r a n d p o l i c e c r a s h r e p o r t s s u b m i t t e d t o t h e O r e g o n D e p a r t m e n t o f T r a n s p o r t a t i o n a s r e q u i r e d i n O R S 8 1 1 . 7 2 0 . T h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t i s c o m m i t t e d t o p r o v i d i n g t h e h i g h e s t q u a l i t y c r a s h d a t a t o c u s t o m e r s . H o w e v e r , b e c a u s e s u b m i t t a l o f c r a s h r e p o r t f o r m s i s th e r e s p o n s i b i l i t y o f t h e i n d i v i d u a l d r i v e r , t h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t c a n n o t g u a r a n t e e t h a t a l l q u a l i f y i n g c r a s h e s a r e r e p r e s e n t e d n o r c a n a s s u r a n c e s b e m a d e t h a t a l l d e t a i l s p e r t a i n i n g t o a s i n g l e c r a s h a r e a c c u r a t e . N o t e : L e g i s l a t i v e c h a n g e s t o D M V ' s v e h i c l e c r a s h r e p o r t i n g r e q u i r e m e n t , e f f e c t i v e 0 1 / 0 1 / 2 0 0 4 , m a y r e s u l t i n f e w e r p r o p e r t y da m a g e o n l y c r a s h e s b e i n g e l i g i b l e f o r i n c l u s i o n i n t h e S t a t e w i d e C r a s h D a t a F i l e . (0 4 ) N- R E S 02 N O N E 0 S T O P PR V T E W - E 01 1 0 1 3 00 02 2 0 6 N N N 1 0 / 1 9 / 2 0 1 5 1 4 A S H L A N D S T ST R G H T Y N C L R S - 1 S T O P 0 1 N O N E 0 S T R G H T 01 3 29 NO N E MO WA S H I N G T O N S T W (N O N E ) U N K N O W N N D R Y R E A R PR V T E W - E 00 0 00 5P 04 N D U S K P D O PS N G R C A R 01 D R V R N O N E 2 0 F O T H - Y 02 6 00 0 29 PR V T E W - E 02 2 00 PS N G R C A R 01 D R V R N O N E 5 7 M O R - Y 00 0 00 0 00 OR < 2 5 PS N G R C A R 01 D R V R N O N E 0 0 F O R - Y 00 0 00 0 00 OR < 2 5 03 N O N E 0 S T O P (0 2 ) N- R E S 3P 03 N D A Y P D O PS N G R C A R 01 D R V R N O N E 6 4 M O T H - Y 00 8 , 0 2 8 0 0 0 08 , 0 2 NO R P T TH WA S H I N G T O N S T E (D I V M D ) U N K N O W N N W E T T U R N PR V T E E - E 00 0 00 02 N O N E 0 S T R G H T N- R E S PS N G R C A R 01 D R V R N O N E 3 5 M O T H - Y 00 0 00 0 00 PR V T E W - E 00 0 00 00 9 9 3 N N N 0 5 / 2 1 / 2 0 1 5 1 4 A S H L A N D S T ST R G H T N N R A I N O - O T H E R 0 1 N O N E 0 U - T U R N 08 , 0 2 9A 05 N D A Y P D O PS N G R C A R 01 D R V R N O N E 2 3 F O R - Y 00 0 00 0 00 (0 4 ) OR < 2 5 00 8 4 9 N N N 0 5 / 0 2 / 2 0 1 5 1 4 A S H L A N D S T ST R G H T N N C L R S - O T H E R 0 1 N O N E 0 S T R G H T 08 , 0 2 CI T Y SA WA S H I N G T O N S T E (N O N E ) N O N E N D R Y T U R N PR V T E E - W 00 0 00 PS N G R C A R 01 D R V R N O N E 5 9 M O R - Y 00 6 , 0 0 8 , 0 2 8 0 0 0 08 , 0 2 OR < 2 5 02 N O N E 0 U - T U R N PR V T E E - E 00 0 00 03 N O N E ST O P OR > 2 5 PR V T E W - E 01 1 00 OR < 2 5 PS N G R C A R 01 D R V R N O N E 6 1 F O R - Y 00 0 00 0 00 P R S W IN T - T Y P E SP C L U S E S D E A U C O D A T E C L A S S C I T Y S T R E E T RD C H A R ( M E D I A N ) I N T - R E L O F F R D W T H R C R A S H TR L R Q T Y M O V E A S IN V E S T D C S L K TI M E FR O M SE C O N D S T R E E T LO C T N (# L A N E S ) CO N T L DR V W Y LI G H T SV R T Y V# TY P E TO P# TY P E SV R T Y E X RE S LO C ER R O R AC T EV E N T CA U S E SE R # E L G H R D A Y DI S T F I R S T S T R E E T DI R E C T LE G S T R A F - RN D B T S U R F C O L L OW N E R FR O M PR T C I N J G E L I C N S P E D South Ashland Business Park TPRA C - 8 OR E G O N . . D E P A R T M E N T O F T R A N S P O R T A T I O N - T R A N S P O R T A T I O N D E V E L O P M E N T D I V I S I O N TR A N S P O R T A T I O N D A T A S E C T I O N - C R A S H A N A Y L Y S I S A N D R E P O R T I N G U N I T UR B A N N O N - S Y S T E M C R A S H L I S T I N G AS H L A N D S T a n d T O L M A N C R E E K R D , C i t y o f A s h l a n d , J a c k s o n C o u n t y , 0 1 / 0 1 / 2 0 1 1 t o 1 2 / 3 1 / 2 0 1 5 06 / 0 2 / 2 0 1 7 CD S 3 8 0 Pa g e : 1 CI T Y O F A S H L A N D , J A C K S O N C O U N T Y To t a l c r a s h r e c o r d s : 3 3 Di s c l a i m e r : T h e i n f o r m a t i o n c o n t a i n e d i n t h i s r e p o r t i s c o m p i l e d f r o m i n d i v i d u a l d r i v e r a n d p o l i c e c r a s h r e p o r t s s u b m i t t e d t o t h e O r e g o n D e p a r t m e n t o f T r a n s p o r t a t i o n a s r e q u i r e d i n O R S 8 1 1 . 7 2 0 . T h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t i s c o m m i t t e d t o p r o v i d i n g t h e h i g h e s t q u a l i t y c r a s h d a t a t o c u s t o m e r s . H o w e v e r , b e c a u s e s u b m i t t a l o f c r a s h r e p o r t f o r m s i s th e r e s p o n s i b i l i t y o f t h e i n d i v i d u a l d r i v e r , t h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t c a n n o t g u a r a n t e e t h a t a l l q u a l i f y i n g c r a s h e s a r e r e p r e s e n t e d n o r c a n a s s u r a n c e s b e m a d e t h a t a l l d e t a i l s p e r t a i n i n g t o a s i n g l e c r a s h a r e a c c u r a t e . N o t e : L e g i s l a t i v e c h a n g e s t o D M V ' s v e h i c l e c r a s h r e p o r t i n g r e q u i r e m e n t , e f f e c t i v e 0 1 / 0 1 / 2 0 0 4 , m a y r e s u l t i n f e w e r p r o p e r t y da m a g e o n l y c r a s h e s b e i n g e l i g i b l e f o r i n c l u s i o n i n t h e S t a t e w i d e C r a s h D a t a F i l e . 01 7 7 4 N N N N N 0 8 / 2 8 / 2 0 1 5 1 4 A S H L A N D S T IN T E R C R O S S N N C L R S - O T H E R 0 1 N O N E 1 T U R N - R 08 , 1 0 CI T Y FR TO L M A N C R E E K R D C N TR F S I G N A L N D R Y T U R N PR V T E S - E 00 0 00 7A 04 0 N D A W N I N J SE M I T O W 01 D R V R N O N E 6 8 M O R - Y 00 6 00 0 08 OR < 2 5 02 3 7 0 N N N N N 1 2 / 0 9 / 2 0 1 4 1 4 A S H L A N D S T IN T E R C R O S S N N C L D S - O T H E R 0 1 N O N E 1 T U R N - R 08 CI T Y TU TO L M A N C R E E K R D C N TR F S I G N A L N D R Y T U R N PR V T E S - E 00 0 00 PS N G R C A R 01 D R V R I N J C 5 9 F O R - Y 00 0 00 0 00 OR < 2 5 02 N O N E 0 T U R N - R PR V T E S - E 00 0 00 12 P 03 0 N D A Y I N J PS N G R C A R 01 D R V R I N J C 5 2 F O R - Y 00 0 00 0 00 OR < 2 5 00 3 3 1 N N N N N 0 2 / 2 4 / 2 0 1 2 1 4 A S H L A N D S T IN T E R C R O S S N N C L R A N G L - O T H 0 1 N O N E ST R G H T 04 CI T Y FR TO L M A N C R E E K R D C N TR F S I G N A L N D R Y A N G L PR V T E N - S 00 0 00 PS N G R C A R 01 D R V R I N J C 5 7 M O T H - Y 02 0 03 8 04 N- R E S 02 N O N E ST R G H T PR V T E W - E 00 0 00 PS N G R C A R 01 D R V R N O N E 0 0 U n k U N K 00 0 00 0 00 UN K PR V T E W - E 01 1 00 NO N E WE TO L M A N C R E E K R D W TR F S I G N A L N D R Y R E A R PR V T E W - E 00 0 00 01 9 3 1 N N N 1 0 / 1 6 / 2 0 1 3 1 4 A S H L A N D S T IN T E R C R O S S N N C L R S - 1 S T O P 0 1 N O N E ST R G H T 07 3P 06 0 N D A Y P D O PS N G R C A R 01 D R V R N O N E 3 3 F O R - Y 02 6 , 0 1 4 0 0 0 07 02 N O N E ST O P OR < 2 5 9P 06 0 N D L I T I N J PS N G R C A R 01 D R V R N O N E 8 3 F O R - Y 05 2 , 0 0 2 0 0 0 32 OR < 2 5 01 5 0 5 N N N N N 0 8 / 1 1 / 2 0 1 1 1 4 A S H L A N D S T IN T E R C R O S S N N C L R A N G L - S T P 0 1 N O N E TU R N - L 32 CI T Y TH TO L M A N C R E E K R D W TR F S I G N A L N D R Y T U R N PR V T E S - W 00 0 00 PS N G R C A R 01 D R V R I N J C 5 3 F O R - Y 00 0 00 0 00 OR < 2 5 02 N O N E ST O P PR V T E W - E 01 2 00 3P 06 0 N D A Y P D O PS N G R C A R 01 D R V R N O N E 9 1 M O R - Y 01 1 00 0 10 OR < 2 5 01 4 4 6 N N N N N 0 8 / 0 4 / 2 0 1 1 1 7 A S H L A N D S T IN T E R C R O S S N N C L R O - O T H E R 0 1 N O N E 0 B A C K 10 CI T Y TH 0 TO L M A N C R E E K R D S TR F S I G N A L N D R Y B A C K UN K N N - S 00 0 00 PS N G R C A R 01 D R V R N O N E 6 2 F O R - Y 00 0 00 0 00 OR < 2 5 02 N O N E 0 S T O P PR V T E S - N 01 1 00 12 P 06 0 N D A Y P D O PS N G R C A R 01 D R V R N O N E 3 3 M O R - Y 02 6 00 0 07 OR < 2 5 00 6 1 5 N N N 0 3 / 0 4 / 2 0 1 3 1 7 A S H L A N D S T IN T E R C R O S S N N C L R S - 1 S T O P 0 1 N O N E ST R G H T 07 NO R P T MO 0 TO L M A N C R E E K R D N TR F S I G N A L N D R Y R E A R PR V T E N - S 00 0 00 PS N G R C A R 01 D R V R N O N E 4 5 F O R - Y 00 0 00 0 00 OR < 2 5 02 N O N E ST O P PR V T E N - S 01 1 00 P R S W IN T - T Y P E SP C L U S E S D E A U C O D A T E C L A S S C I T Y S T R E E T RD C H A R ( M E D I A N ) I N T - R E L O F F R D W T H R C R A S H TR L R Q T Y M O V E A S IN V E S T D C S L K TI M E FR O M SE C O N D S T R E E T LO C T N (# L A N E S ) CO N T L DR V W Y LI G H T SV R T Y V# TY P E TO P# TY P E SV R T Y E X RE S LO C ER R O R AC T EV E N T CA U S E SE R # E L G H R D A Y DI S T F I R S T S T R E E T DI R E C T LE G S T R A F - RN D B T S U R F C O L L OW N E R FR O M PR T C I N J G E L I C N S P E D South Ashland Business Park TPRA C - 9 OR E G O N . . D E P A R T M E N T O F T R A N S P O R T A T I O N - T R A N S P O R T A T I O N D E V E L O P M E N T D I V I S I O N TR A N S P O R T A T I O N D A T A S E C T I O N - C R A S H A N A Y L Y S I S A N D R E P O R T I N G U N I T UR B A N N O N - S Y S T E M C R A S H L I S T I N G AS H L A N D S T a n d T O L M A N C R E E K R D , C i t y o f A s h l a n d , J a c k s o n C o u n t y , 0 1 / 0 1 / 2 0 1 1 t o 1 2 / 3 1 / 2 0 1 5 06 / 0 2 / 2 0 1 7 CD S 3 8 0 Pa g e : 2 CI T Y O F A S H L A N D , J A C K S O N C O U N T Y To t a l c r a s h r e c o r d s : 3 3 Di s c l a i m e r : T h e i n f o r m a t i o n c o n t a i n e d i n t h i s r e p o r t i s c o m p i l e d f r o m i n d i v i d u a l d r i v e r a n d p o l i c e c r a s h r e p o r t s s u b m i t t e d t o t h e O r e g o n D e p a r t m e n t o f T r a n s p o r t a t i o n a s r e q u i r e d i n O R S 8 1 1 . 7 2 0 . T h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t i s c o m m i t t e d t o p r o v i d i n g t h e h i g h e s t q u a l i t y c r a s h d a t a t o c u s t o m e r s . H o w e v e r , b e c a u s e s u b m i t t a l o f c r a s h r e p o r t f o r m s i s th e r e s p o n s i b i l i t y o f t h e i n d i v i d u a l d r i v e r , t h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t c a n n o t g u a r a n t e e t h a t a l l q u a l i f y i n g c r a s h e s a r e r e p r e s e n t e d n o r c a n a s s u r a n c e s b e m a d e t h a t a l l d e t a i l s p e r t a i n i n g t o a s i n g l e c r a s h a r e a c c u r a t e . N o t e : L e g i s l a t i v e c h a n g e s t o D M V ' s v e h i c l e c r a s h r e p o r t i n g r e q u i r e m e n t , e f f e c t i v e 0 1 / 0 1 / 2 0 0 4 , m a y r e s u l t i n f e w e r p r o p e r t y da m a g e o n l y c r a s h e s b e i n g e l i g i b l e f o r i n c l u s i o n i n t h e S t a t e w i d e C r a s h D a t a F i l e . 12 P 08 N D A Y I N J PS N G R C A R 01 D R V R N O N E 5 4 F O R - Y 05 2 , 0 4 3 0 3 8 32 , 0 7 (0 2 ) OR < 2 5 01 1 5 7 N N N N N 0 6 / 3 0 / 2 0 1 3 1 7 T O L M A N C R E E K R D A L L E Y N N C L R S - 1 S T O P 0 1 N O N E ST R G H T 32 , 0 7 CI T Y SU 53 0 A S H L A N D S T S (N O N E ) U N K N O W N N D R Y R E A R PR V T E S - N 00 0 00 02 N O N E ST O P 12 P 07 0 N D A Y I N J PS N G R C A R 01 D R V R N O N E 2 9 M O R - Y 04 3 , 0 2 6 0 0 0 07 (0 2 ) OR < 2 5 02 0 5 0 N N N N N 1 0 / 2 7 / 2 0 1 1 1 7 T O L M A N C R E E K R D A L L E Y N N C L R S - 1 S T O P 0 1 N O N E 0 S T R G H T 00 4 07 CI T Y TH 20 0 A S H L A N D S T S (N O N E ) N O N E N D R Y R E A R PR V T E N - S 00 0 00 PS N G R C A R 01 D R V R I N J C 6 3 F O R - Y 00 0 00 0 00 OR < 2 5 02 N O N E 0 S T O P PR V T E N - S 01 1 0 0 4 00 4P 08 N D A Y P D O PS N G R C A R 01 D R V R N O N E 5 7 M O R - Y 02 8 00 0 02 (0 2 ) OR < 2 5 00 8 6 8 N N N N N 0 5 / 0 5 / 2 0 1 5 1 7 T O L M A N C R E E K R D A L L E Y N N C L R O - 1 L - T U R N 0 1 N O N E 0 T U R N - L 02 CI T Y TU 16 5 A S H L A N D S T S (N O N E ) N O N E N D R Y T U R N PR V T E W - N 01 8 00 PS N G R C A R 01 D R V R N O N E 4 0 M O R - Y 00 0 00 0 00 OR < 2 5 02 N O N E 0 S T R G H T PR V T E E - W 01 9 00 PR V T E N - W 01 8 00 PS N G R C A R 01 D R V R N O N E 0 0 M U N K 00 6 , 0 0 3 0 0 0 08 UN K NO R P T FR TO L M A N C R E E K R D E (N O N E ) U N K N O W N N D R Y T U R N PR V T E N - W 01 8 00 00 1 5 3 N N N 0 1 / 2 7 / 2 0 1 2 1 4 A S H L A N D S T AL L E Y N N C L R S - O T H E R 0 1 N O N E TU R N - R 08 12 P 06 N D A Y P D O PS N G R C A R 01 D R V R N O N E 2 4 F O R - Y 00 0 00 0 00 02 N O N E TU R N - R (0 4 ) OR < 2 5 11 A 08 N D A Y I N J PS N G R C A R 01 D R V R N O N E 2 1 F O R - Y 02 7 00 0 02 (0 2 ) OR < 2 5 01 4 2 2 N N N N N 0 7 / 1 1 / 2 0 1 5 1 7 T O L M A N C R E E K R D A L L E Y N N C L R B I K E 0 1 N O N E 0 T U R N - R 02 CI T Y SA 10 6 0 A S H L A N D S T N (N O N E ) U N K N O W N N D R Y T U R N PR V T E W - S 01 8 00 ST R G H T 0 1 B I K E I N J B 1 2 M SI D E W K 0 0 0 04 7 00 S N - 4P 08 N D A Y I N J ST R G H T 0 1 B I K E I N J C 1 3 M BK P A T H 0 4 4 04 7 1 1 0 12 (0 2 ) S N 00 5 4 4 N N N N N 0 3 / 2 7 / 2 0 1 4 1 7 T O L M A N C R E E K R D A L L E Y N N C L R B I K E 11 0 12 CI T Y TH 10 4 5 A S H L A N D S T N (N O N E ) N O N E N D R Y T U R N - PS N G R C A R 01 D R V R N O N E 5 3 M O R - Y 00 0 00 0 00 OR < 2 5 01 N O N E TU R N - R PR V T E W - S 01 8 00 02 N O N E 0 P R K D - I OR < 2 5 12 P 04 0 N D A Y I N J TR U C K 01 D R V R N O N E 5 4 M O R - Y 00 2 00 0 08 OR < 2 5 MT R C Y C L E 01 D R V R I N J B 4 6 M O R - Y 01 2 00 0 10 PR V T E S - N 03 2 00 P R S W IN T - T Y P E SP C L U S E S D E A U C O D A T E C L A S S C I T Y S T R E E T RD C H A R ( M E D I A N ) I N T - R E L O F F R D W T H R C R A S H TR L R Q T Y M O V E A S IN V E S T D C S L K TI M E FR O M SE C O N D S T R E E T LO C T N (# L A N E S ) CO N T L DR V W Y LI G H T SV R T Y V# TY P E TO P# TY P E SV R T Y E X RE S LO C ER R O R AC T EV E N T CA U S E SE R # E L G H R D A Y DI S T F I R S T S T R E E T DI R E C T LE G S T R A F - RN D B T S U R F C O L L OW N E R FR O M PR T C I N J G E L I C N S P E D South Ashland Business Park TPRA C - 10 OR E G O N . . D E P A R T M E N T O F T R A N S P O R T A T I O N - T R A N S P O R T A T I O N D E V E L O P M E N T D I V I S I O N TR A N S P O R T A T I O N D A T A S E C T I O N - C R A S H A N A Y L Y S I S A N D R E P O R T I N G U N I T UR B A N N O N - S Y S T E M C R A S H L I S T I N G AS H L A N D S T a n d T O L M A N C R E E K R D , C i t y o f A s h l a n d , J a c k s o n C o u n t y , 0 1 / 0 1 / 2 0 1 1 t o 1 2 / 3 1 / 2 0 1 5 06 / 0 2 / 2 0 1 7 CD S 3 8 0 Pa g e : 3 CI T Y O F A S H L A N D , J A C K S O N C O U N T Y To t a l c r a s h r e c o r d s : 3 3 Di s c l a i m e r : T h e i n f o r m a t i o n c o n t a i n e d i n t h i s r e p o r t i s c o m p i l e d f r o m i n d i v i d u a l d r i v e r a n d p o l i c e c r a s h r e p o r t s s u b m i t t e d t o t h e O r e g o n D e p a r t m e n t o f T r a n s p o r t a t i o n a s r e q u i r e d i n O R S 8 1 1 . 7 2 0 . T h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t i s c o m m i t t e d t o p r o v i d i n g t h e h i g h e s t q u a l i t y c r a s h d a t a t o c u s t o m e r s . H o w e v e r , b e c a u s e s u b m i t t a l o f c r a s h r e p o r t f o r m s i s th e r e s p o n s i b i l i t y o f t h e i n d i v i d u a l d r i v e r , t h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t c a n n o t g u a r a n t e e t h a t a l l q u a l i f y i n g c r a s h e s a r e r e p r e s e n t e d n o r c a n a s s u r a n c e s b e m a d e t h a t a l l d e t a i l s p e r t a i n i n g t o a s i n g l e c r a s h a r e a c c u r a t e . N o t e : L e g i s l a t i v e c h a n g e s t o D M V ' s v e h i c l e c r a s h r e p o r t i n g r e q u i r e m e n t , e f f e c t i v e 0 1 / 0 1 / 2 0 0 4 , m a y r e s u l t i n f e w e r p r o p e r t y da m a g e o n l y c r a s h e s b e i n g e l i g i b l e f o r i n c l u s i o n i n t h e S t a t e w i d e C r a s h D a t a F i l e . PS N G R C A R 02 P S N G I N J C 1 0 F 00 0 00 0 00 PR V T E W - E 00 0 00 PR V T E W - E 00 0 00 01 N O N E ST R G H T CI T Y TU TO L M A N C R E E K R D W (N O N E ) U N K N O W N N D R Y T U R N PR V T E W - E 00 0 00 02 2 5 2 N N N N N 1 1 / 2 6 / 2 0 1 3 1 4 A S H L A N D S T AL L E Y N N C L R A N G L - O T H 0 1 N O N E ST R G H T 02 3P 03 N D A Y I N J PS N G R C A R 01 D R V R I N J C 3 4 F O R - Y 00 0 00 0 00 01 N O N E ST R G H T (0 4 ) OR < 2 5 OR < 2 5 PS N G R C A R 03 P S N G I N J C 0 6 F 00 0 00 0 00 02 N O N E TU R N - L PS N G R C A R 01 D R V R N O N E 5 2 M O R - Y 02 8 00 0 02 PR V T E S - W 01 8 00 PS N G R C A R 01 D R V R N O N E 3 1 M O R - Y 00 0 00 0 00 OR > 2 5 02 N O N E ST R G H T PR V T E W - E 00 0 00 PS N G R C A R 02 P S N G N O N E 0 0 U n k 00 0 00 0 00 02 N O N E ST R G H T PR V T E W - E 00 0 00 (0 4 ) OR < 2 5 00 6 0 6 N N N N N 0 4 / 0 5 / 2 0 1 3 1 4 A S H L A N D S T AL L E Y N N C L R A N G L - O T H 0 1 N O N E TU R N - L 08 2 02 CI T Y FR TO L M A N C R E E K R D W (N O N E ) N O N E N D R Y T U R N PR V T E S - W 01 8 00 2P 04 N D A Y P D O PS N G R C A R 01 D R V R N O N E 4 6 F O R - Y 02 8 00 0 0 8 2 02 (0 4 ) UN K 02 N O N E TU R N - R PR V T E W - S 01 9 00 00 5 3 1 N N N 0 3 / 2 3 / 2 0 1 3 1 4 A S H L A N D S T AL L E Y N N U N K S - 1 T U R N 0 1 N O N E ST R G H T 07 NO N E SA TO L M A N C R E E K R D W (N O N E ) U N K N O W N N U N K R E A R PR V T E W - E 00 0 00 3P 03 N D A Y I N J PS N G R C A R 01 D R V R N O N E 0 0 M U N K 02 6 00 0 07 PR V T E W - S 01 9 00 PS N G R C A R 02 P S N G I N J C 0 7 M 00 0 00 0 00 PS N G R C A R 01 D R V R N O N E 3 9 M O R - Y 00 0 00 0 00 OR < 2 5 02 N O N E TU R N - R 1P 03 N D A Y P D O PS N G R C A R 01 D R V R N O N E 6 1 F O R - Y 02 8 00 0 02 (0 4 ) OR < 2 5 02 2 1 8 N N N N N 1 1 / 2 2 / 2 0 1 1 1 4 A S H L A N D S T AL L E Y N N R A I N A N G L - O T H 0 1 N O N E TU R N - L 02 CI T Y TU TO L M A N C R E E K R D W (N O N E ) U N K N O W N N W E T T U R N PR V T E S - W 01 8 00 PS N G R C A R 01 D R V R N O N E 2 5 M O R - Y 00 0 00 0 00 OR < 2 5 02 N O N E ST R G H T PR V T E W - E 00 0 00 PR V T E S - N 01 2 00 PS N G R C A R 01 D R V R I N J C 5 2 M O R - Y 00 0 00 0 00 OR < 2 5 P R S W IN T - T Y P E SP C L U S E S D E A U C O D A T E C L A S S C I T Y S T R E E T RD C H A R ( M E D I A N ) I N T - R E L O F F R D W T H R C R A S H TR L R Q T Y M O V E A S IN V E S T D C S L K TI M E FR O M SE C O N D S T R E E T LO C T N (# L A N E S ) CO N T L DR V W Y LI G H T SV R T Y V# TY P E TO P# TY P E SV R T Y E X RE S LO C ER R O R AC T EV E N T CA U S E SE R # E L G H R D A Y DI S T F I R S T S T R E E T DI R E C T LE G S T R A F - RN D B T S U R F C O L L OW N E R FR O M PR T C I N J G E L I C N S P E D South Ashland Business Park TPRA C - 11 OR E G O N . . D E P A R T M E N T O F T R A N S P O R T A T I O N - T R A N S P O R T A T I O N D E V E L O P M E N T D I V I S I O N TR A N S P O R T A T I O N D A T A S E C T I O N - C R A S H A N A Y L Y S I S A N D R E P O R T I N G U N I T UR B A N N O N - S Y S T E M C R A S H L I S T I N G AS H L A N D S T a n d T O L M A N C R E E K R D , C i t y o f A s h l a n d , J a c k s o n C o u n t y , 0 1 / 0 1 / 2 0 1 1 t o 1 2 / 3 1 / 2 0 1 5 06 / 0 2 / 2 0 1 7 CD S 3 8 0 Pa g e : 4 CI T Y O F A S H L A N D , J A C K S O N C O U N T Y To t a l c r a s h r e c o r d s : 3 3 Di s c l a i m e r : T h e i n f o r m a t i o n c o n t a i n e d i n t h i s r e p o r t i s c o m p i l e d f r o m i n d i v i d u a l d r i v e r a n d p o l i c e c r a s h r e p o r t s s u b m i t t e d t o t h e O r e g o n D e p a r t m e n t o f T r a n s p o r t a t i o n a s r e q u i r e d i n O R S 8 1 1 . 7 2 0 . T h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t i s c o m m i t t e d t o p r o v i d i n g t h e h i g h e s t q u a l i t y c r a s h d a t a t o c u s t o m e r s . H o w e v e r , b e c a u s e s u b m i t t a l o f c r a s h r e p o r t f o r m s i s th e r e s p o n s i b i l i t y o f t h e i n d i v i d u a l d r i v e r , t h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t c a n n o t g u a r a n t e e t h a t a l l q u a l i f y i n g c r a s h e s a r e r e p r e s e n t e d n o r c a n a s s u r a n c e s b e m a d e t h a t a l l d e t a i l s p e r t a i n i n g t o a s i n g l e c r a s h a r e a c c u r a t e . N o t e : L e g i s l a t i v e c h a n g e s t o D M V ' s v e h i c l e c r a s h r e p o r t i n g r e q u i r e m e n t , e f f e c t i v e 0 1 / 0 1 / 2 0 0 4 , m a y r e s u l t i n f e w e r p r o p e r t y da m a g e o n l y c r a s h e s b e i n g e l i g i b l e f o r i n c l u s i o n i n t h e S t a t e w i d e C r a s h D a t a F i l e . 02 5 8 5 N N N 1 2 / 2 3 / 2 0 1 4 1 7 T O L M A N C R E E K R D S T R G H T N Y U N K P R K D M V 0 1 N O N E 0 P A R K N G 10 NO R P T TU 28 3 A S H L A N D S T N (N O N E ) U N K N O W N N U N K P A R K PR V T E UN - U N 00 8 00 3P 03 N D A Y P D O PS N G R C A R 01 D R V R N O N E 3 2 M O R - Y 00 0 00 0 00 (0 5 ) OR < 2 5 02 4 3 5 N N N N N 1 1 / 1 3 / 2 0 1 5 1 4 A S H L A N D S T AL L E Y N N C L R O - 1 L - T U R N 0 1 N O N E 0 S T R G H T 02 NO N E FR TO L M A N C R E E K R D W (N O N E ) L - T U R N R E F N D R Y T U R N PR V T E W - E 00 0 00 PS N G R C A R 01 D R V R N O N E 6 3 M O R - Y 00 4 , 0 2 8 0 0 0 02 OR < 2 5 02 N O N E 0 T U R N - L PR V T E E - S 01 9 00 9A 03 N D A Y P D O PS N G R C A R 01 D R V R N O N E 4 4 M O R - Y 00 0 00 0 00 (0 4 ) OR < 2 5 00 1 0 1 N N N N N 0 1 / 1 6 / 2 0 1 5 1 4 A S H L A N D S T AL L E Y N N C L R A N G L - O T H 0 1 N O N E ST R G H T 08 2 02 , 4 0 CI T Y FR TO L M A N C R E E K R D W (N O N E ) N O N E N D R Y T U R N PR V T E W - E 00 0 00 PS N G R C A R 01 D R V R N O N E 2 2 F O T H - Y 02 8 00 0 0 8 2 02 , 4 0 N- R E S 02 N O N E TU R N - L PR V T E S - W 01 8 00 PR V T E E - S 01 9 00 02 N O N E 0 T U R N - L OR < 2 5 PS N G R C A R 01 D R V R N O N E 2 8 M O R - Y 00 4 , 0 2 8 0 0 0 02 11 A 03 N D A Y I N J PS N G R C A R 01 D R V R I N J C 1 9 M O R - Y 00 0 00 0 00 (0 4 ) OR < 2 5 02 6 8 7 N N N 1 2 / 0 9 / 2 0 1 5 1 4 A S H L A N D S T AL L E Y N N C L R O - 1 L - T U R N 0 1 N O N E 0 S T R G H T 02 CI T Y WE TO L M A N C R E E K R D W (N O N E ) U N K N O W N N D R Y T U R N PR V T E W - E 00 0 00 PS N G R C A R 02 P S N G I N J C 1 8 M 00 0 00 0 00 01 N O N E 0 S T R G H T PR V T E W - E 00 0 00 10 A 03 N D A Y I N J ST R G H T 0 1 B I K E I N J C 2 0 F BI K E LN 06 2 04 7 1 1 0 12 (0 4 ) E W 00 2 5 7 N N N N N 0 2 / 1 0 / 2 0 1 5 1 4 A S H L A N D S T AL L E Y N N C L R B I K E 11 0 02 , 1 2 CI T Y TU TO L M A N C R E E K R D W (N O N E ) U N K N O W N N D R Y T U R N - PS N G R C A R 01 D R V R N O N E 5 2 F O R - Y 02 7 00 0 02 OR < 2 5 01 N O N E TU R N - R PR V T E S - E 01 8 00 4P 03 N D A Y I N J ST R G H T 0 1 B I K E I N J C 4 6 M BK P A T H 0 7 1 04 7 1 1 0 12 , 1 8 (0 4 ) E W 02 0 3 8 N Y N N N 1 0 / 2 3 / 2 0 1 4 1 4 A S H L A N D S T AL L E Y N N R A I N B I K E 11 0 , 0 9 4 1 2 , 1 8 CI T Y TH TO L M A N C R E E K R D W (N O N E ) N O N E N W E T T U R N - PS N G R C A R 01 D R V R N O N E 1 7 F O R - Y 00 0 00 0 0 9 4 00 OR < 2 5 01 N O N E TU R N - L PR V T E S - W 01 8 00 PR V T E S - W 01 8 00 02 N O N E TU R N - L PS N G R C A R 02 P S N G I N J C 1 6 F 00 0 00 0 00 P R S W IN T - T Y P E SP C L U S E S D E A U C O D A T E C L A S S C I T Y S T R E E T RD C H A R ( M E D I A N ) I N T - R E L O F F R D W T H R C R A S H TR L R Q T Y M O V E A S IN V E S T D C S L K TI M E FR O M SE C O N D S T R E E T LO C T N (# L A N E S ) CO N T L DR V W Y LI G H T SV R T Y V# TY P E TO P# TY P E SV R T Y E X RE S LO C ER R O R AC T EV E N T CA U S E SE R # E L G H R D A Y DI S T F I R S T S T R E E T DI R E C T LE G S T R A F - RN D B T S U R F C O L L OW N E R FR O M PR T C I N J G E L I C N S P E D South Ashland Business Park TPRA C - 12 OR E G O N . . D E P A R T M E N T O F T R A N S P O R T A T I O N - T R A N S P O R T A T I O N D E V E L O P M E N T D I V I S I O N TR A N S P O R T A T I O N D A T A S E C T I O N - C R A S H A N A Y L Y S I S A N D R E P O R T I N G U N I T UR B A N N O N - S Y S T E M C R A S H L I S T I N G AS H L A N D S T a n d T O L M A N C R E E K R D , C i t y o f A s h l a n d , J a c k s o n C o u n t y , 0 1 / 0 1 / 2 0 1 1 t o 1 2 / 3 1 / 2 0 1 5 06 / 0 2 / 2 0 1 7 CD S 3 8 0 Pa g e : 5 CI T Y O F A S H L A N D , J A C K S O N C O U N T Y To t a l c r a s h r e c o r d s : 3 3 Di s c l a i m e r : T h e i n f o r m a t i o n c o n t a i n e d i n t h i s r e p o r t i s c o m p i l e d f r o m i n d i v i d u a l d r i v e r a n d p o l i c e c r a s h r e p o r t s s u b m i t t e d t o t h e O r e g o n D e p a r t m e n t o f T r a n s p o r t a t i o n a s r e q u i r e d i n O R S 8 1 1 . 7 2 0 . T h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t i s c o m m i t t e d t o p r o v i d i n g t h e h i g h e s t q u a l i t y c r a s h d a t a t o c u s t o m e r s . H o w e v e r , b e c a u s e s u b m i t t a l o f c r a s h r e p o r t f o r m s i s th e r e s p o n s i b i l i t y o f t h e i n d i v i d u a l d r i v e r , t h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t c a n n o t g u a r a n t e e t h a t a l l q u a l i f y i n g c r a s h e s a r e r e p r e s e n t e d n o r c a n a s s u r a n c e s b e m a d e t h a t a l l d e t a i l s p e r t a i n i n g t o a s i n g l e c r a s h a r e a c c u r a t e . N o t e : L e g i s l a t i v e c h a n g e s t o D M V ' s v e h i c l e c r a s h r e p o r t i n g r e q u i r e m e n t , e f f e c t i v e 0 1 / 0 1 / 2 0 0 4 , m a y r e s u l t i n f e w e r p r o p e r t y da m a g e o n l y c r a s h e s b e i n g e l i g i b l e f o r i n c l u s i o n i n t h e S t a t e w i d e C r a s h D a t a F i l e . (0 4 ) OR < 2 5 02 N O N E ST O P 00 7 2 0 N N N 0 4 / 2 0 / 2 0 1 1 1 4 A S H L A N D S T ST R G H T N N R A I N S - 1 S T O P 0 1 N O N E ST R G H T 01 3 07 NO N E WE TO L M A N C R E E K R D W (N O N E ) U N K N O W N N W E T R E A R PR V T E W - E 00 0 00 5P 03 N D A Y P D O PS N G R C A R 01 D R V R N O N E 0 0 M O R - Y 02 6 00 0 07 1P 08 N D A Y P D O PS N G R C A R 01 D R V R N O N E 2 1 M O R - Y 02 6 00 0 07 (0 2 ) OR < 2 5 00 5 9 4 N N N 0 4 / 0 1 / 2 0 1 1 1 7 T O L M A N C R E E K R D S T R G H T N N U N K S - 1 S T O P 0 1 N O N E ST R G H T 07 NO R P T FR 10 0 A S H L A N D S T S (N O N E ) U N K N O W N N U N K R E A R PR V T E S - N 00 0 00 PS N G R C A R 01 D R V R N O N E 3 8 F O T H - Y 00 0 00 0 00 N- R E S 02 N O N E ST O P PR V T E S - N 01 1 00 3P 05 N D A Y P D O PS N G R C A R 01 D R V R N O N E 0 0 U n k U N K 04 5 00 0 13 (0 4 ) UN K 01 9 6 0 N N N N N 1 0 / 2 0 / 2 0 1 3 1 4 A S H L A N D S T ST R G H T N N C L R S - S T R G H T 0 1 N O N E ST R G H T 13 CI T Y SU TO L M A N C R E E K R D E (N O N E ) N O N E N D R Y S S - O PR V T E E - W 00 0 00 PS N G R C A R 01 D R V R N O N E 3 5 F O R - Y 00 0 00 0 00 OR < 2 5 02 N O N E ST R G H T PR V T E E - W 00 0 00 OR < 2 5 6A 04 Y D A Y P D O PS N G R C A R 01 D R V R N O N E 7 8 F O R - Y 04 5 02 6 13 CI T Y FR TO L M A N C R E E K R D E (N O N E ) U N K N O W N N D R Y S S - O PR V T E W - E 00 0 00 01 2 0 4 N N N N N 0 7 / 0 5 / 2 0 1 3 1 4 A S H L A N D S T ST R G H T N N C L R S - S T R G H T 0 1 N O N E ST R G H T 13 (0 4 ) OR < 2 5 PS N G R C A R 01 D R V R N O N E 2 8 M O R - Y 00 0 00 0 00 PR V T E W - E 00 0 00 02 N O N E ST R G H T 1P 05 N D A Y P D O PS N G R C A R 01 D R V R N O N E 2 5 F S U S P 04 3 03 8 07 (0 4 ) OR > 2 5 02 2 1 0 N N N N N 1 1 / 2 2 / 2 0 1 1 1 4 A S H L A N D S T ST R G H T N N C L D S - 1 S T O P 0 1 N O N E ST R G H T 07 CI T Y TU TO L M A N C R E E K R D E (N O N E ) U N K N O W N N D R Y R E A R PR V T E E - W 00 0 00 PS N G R C A R 01 D R V R N O N E 2 0 M O T H - Y 00 0 00 0 00 N- R E S 02 N O N E ST O P PR V T E E - W 01 1 00 1P 04 N D A Y P D O PS N G R C A R 01 D R V R N O N E 6 5 M O R - Y 02 6 00 0 07 (0 4 ) OR < 2 5 01 9 8 9 N N N 1 0 / 1 7 / 2 0 1 1 1 4 A S H L A N D S T ST R G H T N N C L R S - 1 S T O P 0 1 N O N E ST R G H T 07 NO N E MO TO L M A N C R E E K R D E (N O N E ) U N K N O W N N D R Y R E A R PR V T E W - E 00 0 00 PS N G R C A R 01 D R V R N O N E 6 7 F O R - Y 00 0 00 0 00 OR < 2 5 02 N O N E ST O P PR V T E W - E 01 1 00 02 N O N E 0 P R K D - P (0 2 ) OR < 2 5 9A 07 N D A Y P D O PS N G R C A R 01 D R V R N O N E 5 3 F O R - Y 01 8 00 0 10 PS N G R C A R PR V T E UN - U N 00 8 00 P R S W IN T - T Y P E SP C L U S E S D E A U C O D A T E C L A S S C I T Y S T R E E T RD C H A R ( M E D I A N ) I N T - R E L O F F R D W T H R C R A S H TR L R Q T Y M O V E A S IN V E S T D C S L K TI M E FR O M SE C O N D S T R E E T LO C T N (# L A N E S ) CO N T L DR V W Y LI G H T SV R T Y V# TY P E TO P# TY P E SV R T Y E X RE S LO C ER R O R AC T EV E N T CA U S E SE R # E L G H R D A Y DI S T F I R S T S T R E E T DI R E C T LE G S T R A F - RN D B T S U R F C O L L OW N E R FR O M PR T C I N J G E L I C N S P E D South Ashland Business Park TPRA C - 13 OR E G O N . . D E P A R T M E N T O F T R A N S P O R T A T I O N - T R A N S P O R T A T I O N D E V E L O P M E N T D I V I S I O N TR A N S P O R T A T I O N D A T A S E C T I O N - C R A S H A N A Y L Y S I S A N D R E P O R T I N G U N I T UR B A N N O N - S Y S T E M C R A S H L I S T I N G AS H L A N D S T a n d T O L M A N C R E E K R D , C i t y o f A s h l a n d , J a c k s o n C o u n t y , 0 1 / 0 1 / 2 0 1 1 t o 1 2 / 3 1 / 2 0 1 5 06 / 0 2 / 2 0 1 7 CD S 3 8 0 Pa g e : 6 CI T Y O F A S H L A N D , J A C K S O N C O U N T Y To t a l c r a s h r e c o r d s : 3 3 Di s c l a i m e r : T h e i n f o r m a t i o n c o n t a i n e d i n t h i s r e p o r t i s c o m p i l e d f r o m i n d i v i d u a l d r i v e r a n d p o l i c e c r a s h r e p o r t s s u b m i t t e d t o t h e O r e g o n D e p a r t m e n t o f T r a n s p o r t a t i o n a s r e q u i r e d i n O R S 8 1 1 . 7 2 0 . T h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t i s c o m m i t t e d t o p r o v i d i n g t h e h i g h e s t q u a l i t y c r a s h d a t a t o c u s t o m e r s . H o w e v e r , b e c a u s e s u b m i t t a l o f c r a s h r e p o r t f o r m s i s th e r e s p o n s i b i l i t y o f t h e i n d i v i d u a l d r i v e r , t h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t c a n n o t g u a r a n t e e t h a t a l l q u a l i f y i n g c r a s h e s a r e r e p r e s e n t e d n o r c a n a s s u r a n c e s b e m a d e t h a t a l l d e t a i l s p e r t a i n i n g t o a s i n g l e c r a s h a r e a c c u r a t e . N o t e : L e g i s l a t i v e c h a n g e s t o D M V ' s v e h i c l e c r a s h r e p o r t i n g r e q u i r e m e n t , e f f e c t i v e 0 1 / 0 1 / 2 0 0 4 , m a y r e s u l t i n f e w e r p r o p e r t y da m a g e o n l y c r a s h e s b e i n g e l i g i b l e f o r i n c l u s i o n i n t h e S t a t e w i d e C r a s h D a t a F i l e . (0 4 ) OR < 2 5 02 N O N E ST O P PR V T E W - E 01 1 0 1 3 00 02 0 8 2 N N N 1 1 / 0 1 / 2 0 1 1 1 4 A S H L A N D S T BR I D G E N N C L R S - 1 S T O P 0 1 N O N E ST R G H T 01 3 07 NO R P T TU TO L M A N C R E E K R D W (N O N E ) U N K N O W N N D R Y R E A R PR V T E W - E 00 0 00 4P 04 N D A Y P D O PS N G R C A R 01 D R V R N O N E 0 0 F O R - Y 02 6 03 8 07 PR V T E W - E 01 1 00 PS N G R C A R 01 D R V R N O N E 0 0 M O R - Y 00 0 00 0 00 OR < 2 5 PS N G R C A R 01 D R V R N O N E 6 8 F O R - Y 00 0 00 0 00 OR < 2 5 03 N O N E ST O P (0 4 ) OR < 2 5 02 N O N E 0 S T O P PR V T E W - E 01 1 0 1 3 00 02 6 3 1 N N N 1 2 / 0 3 / 2 0 1 5 1 4 A S H L A N D S T ST R G H T N N C L R S - 1 S T O P 0 1 N O N E 0 S T R G H T 01 3 29 NO N E TH TO L M A N C R E E K R D W (N O N E ) U N K N O W N N D R Y R E A R PR V T E W - E 00 0 00 3P 03 N D A Y I N J PS N G R C A R 01 D R V R N O N E 1 7 F O R - Y 02 6 03 8 29 PR V T E W - E 02 2 00 PS N G R C A R 01 D R V R N O N E 0 0 F U N K 00 0 00 0 00 UN K PS N G R C A R 01 D R V R I N J C 4 6 M O R - Y 00 0 00 0 00 OR < 2 5 03 N O N E 0 S T O P PR V T E W - E 01 1 00 02 N O N E ST O P OR < 2 5 PS N G R C A R 01 D R V R I N J C 2 9 M O R - Y 00 0 00 0 00 CI T Y TH TO L M A N C R E E K R D W (N O N E ) U N K N O W N N W E T R E A R PR V T E W - E 00 0 00 00 5 8 0 N N N N N 0 4 / 0 3 / 2 0 1 4 1 4 A S H L A N D S T ST R G H T Y N C L D S - 1 S T O P 0 1 N O N E ST R G H T 07 , 2 9 (0 4 ) OR < 2 5 3P 03 N D A Y I N J PS N G R C A R 01 D R V R N O N E 1 9 F O R - Y 04 3 00 0 07 , 2 9 (0 4 ) N- R E S 01 N O N E ST R G H T PR V T E W - E 00 0 00 00 4 3 6 N N N N N 0 3 / 0 6 / 2 0 1 3 1 4 A S H L A N D S T ST R G H T N N C L R P E D 0 1 N O N E ST R G H T 02 , 1 8 , 1 9 CI T Y WE TO L M A N C R E E K R D W (N O N E ) N O N E N D R Y P E D PR V T E W - E 00 0 00 9P 03 N D L I T I N J PS N G R C A R 01 D R V R N O N E 4 2 M O T H - Y 00 0 00 0 00 -ST R G H T 0 1 P E D I N J A 7 4 M RO A D 0 2 8 03 7 02 , 1 8 , 1 9 N S PS N G R C A R 02 P S N G N O < 5 0 2 F 00 0 00 0 00 OR < 2 5 PS N G R C A R 01 D R V R N O N E 7 0 F O R - Y 00 0 00 0 00 PR V T E W - E 01 1 0 1 3 00 03 N O N E ST O P UN K PS N G R C A R 01 D R V R N O N E 0 0 M U N K 00 0 00 0 00 PR V T E W - E 01 1 00 P R S W IN T - T Y P E SP C L U S E S D E A U C O D A T E C L A S S C I T Y S T R E E T RD C H A R ( M E D I A N ) I N T - R E L O F F R D W T H R C R A S H TR L R Q T Y M O V E A S IN V E S T D C S L K TI M E FR O M SE C O N D S T R E E T LO C T N (# L A N E S ) CO N T L DR V W Y LI G H T SV R T Y V# TY P E TO P# TY P E SV R T Y E X RE S LO C ER R O R AC T EV E N T CA U S E SE R # E L G H R D A Y DI S T F I R S T S T R E E T DI R E C T LE G S T R A F - RN D B T S U R F C O L L OW N E R FR O M PR T C I N J G E L I C N S P E D South Ashland Business Park TPRA C - 14 OR E G O N . . D E P A R T M E N T O F T R A N S P O R T A T I O N - T R A N S P O R T A T I O N D E V E L O P M E N T D I V I S I O N TR A N S P O R T A T I O N D A T A S E C T I O N - C R A S H A N A Y L Y S I S A N D R E P O R T I N G U N I T UR B A N N O N - S Y S T E M C R A S H L I S T I N G AS H L A N D S T a n d N O R M A L A V E , C i t y o f A s h l a n d , J a c k s o n C o u n t y , 0 1 / 0 1 / 2 0 1 1 t o 1 2 / 3 1 / 2 0 1 5 06 / 0 2 / 2 0 1 7 CD S 3 8 0 Pa g e : 1 CI T Y O F A S H L A N D , J A C K S O N C O U N T Y To t a l c r a s h r e c o r d s : 2 Di s c l a i m e r : T h e i n f o r m a t i o n c o n t a i n e d i n t h i s r e p o r t i s c o m p i l e d f r o m i n d i v i d u a l d r i v e r a n d p o l i c e c r a s h r e p o r t s s u b m i t t e d t o t h e O r e g o n D e p a r t m e n t o f T r a n s p o r t a t i o n a s r e q u i r e d i n O R S 8 1 1 . 7 2 0 . T h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t i s c o m m i t t e d t o p r o v i d i n g t h e h i g h e s t q u a l i t y c r a s h d a t a t o c u s t o m e r s . H o w e v e r , b e c a u s e s u b m i t t a l o f c r a s h r e p o r t f o r m s i s th e r e s p o n s i b i l i t y o f t h e i n d i v i d u a l d r i v e r , t h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t c a n n o t g u a r a n t e e t h a t a l l q u a l i f y i n g c r a s h e s a r e r e p r e s e n t e d n o r c a n a s s u r a n c e s b e m a d e t h a t a l l d e t a i l s p e r t a i n i n g t o a s i n g l e c r a s h a r e a c c u r a t e . N o t e : L e g i s l a t i v e c h a n g e s t o D M V ' s v e h i c l e c r a s h r e p o r t i n g r e q u i r e m e n t , e f f e c t i v e 0 1 / 0 1 / 2 0 0 4 , m a y r e s u l t i n f e w e r p r o p e r t y da m a g e o n l y c r a s h e s b e i n g e l i g i b l e f o r i n c l u s i o n i n t h e S t a t e w i d e C r a s h D a t a F i l e . 2P 03 0 N D A Y P D O PS N G R C A R 01 D R V R N O N E 3 9 F N O N E 02 1 08 8 03 OR < 2 5 00 5 3 7 N Y N N N 0 3 / 2 2 / 2 0 1 5 1 4 A S H L A N D S T IN T E R C R O S S N N R A I N A N G L - O T H 0 1 N O N E 0 S T R G H T 03 CI T Y SU 0 NO R M A L A V E CN ST O P S I G N N W E T A N G L PR V T E N - S 00 0 00 PS N G R C A R 01 D R V R N O N E 4 5 M O R - Y 00 0 00 0 00 OR < 2 5 02 N O N E 0 S T R G H T PR V T E W - E 00 0 00 PS N G R C A R 01 D R V R I N J C 6 0 F O R - Y 00 0 00 0 00 OR < 2 5 PR V T E W - E 00 0 00 CI T Y WE 0 NO R M A L A V E CN ST O P S I G N N D R Y T U R N PR V T E E - S 00 0 00 01 9 3 7 N N N N N 1 0 / 1 7 / 2 0 1 2 1 4 A S H L A N D S T IN T E R C R O S S N N C L R O - 1 L - T U R N 0 1 N O N E 0 T U R N - L 02 10 A 03 0 N D A Y I N J PS N G R C A R 01 D R V R N O N E 2 2 M O R - Y 02 8 , 0 0 4 0 0 0 02 02 N O N E 0 S T R G H T OR < 2 5 P R S W IN T - T Y P E SP C L U S E S D E A U C O D A T E C L A S S C I T Y S T R E E T RD C H A R ( M E D I A N ) I N T - R E L O F F R D W T H R C R A S H TR L R Q T Y M O V E A S IN V E S T D C S L K TI M E FR O M SE C O N D S T R E E T LO C T N (# L A N E S ) CO N T L DR V W Y LI G H T SV R T Y V# TY P E TO P# TY P E SV R T Y E X RE S LO C ER R O R AC T EV E N T CA U S E SE R # E L G H R D A Y DI S T F I R S T S T R E E T DI R E C T LE G S T R A F - RN D B T S U R F C O L L OW N E R FR O M PR T C I N J G E L I C N S P E D South Ashland Business Park TPRA C - 15 OR E G O N . . D E P A R T M E N T O F T R A N S P O R T A T I O N - T R A N S P O R T A T I O N D E V E L O P M E N T D I V I S I O N TR A N S P O R T A T I O N D A T A S E C T I O N - C R A S H A N A Y L Y S I S A N D R E P O R T I N G U N I T UR B A N N O N - S Y S T E M C R A S H L I S T I N G AS H L A N D S T a n d W A L K E R A V E , C i t y o f A s h l a n d , J a c k s o n C o u n t y , 0 1 / 0 1 / 2 0 1 1 t o 1 2 / 3 1 / 2 0 1 5 06 / 0 2 / 2 0 1 7 CD S 3 8 0 Pa g e : 1 CI T Y O F A S H L A N D , J A C K S O N C O U N T Y To t a l c r a s h r e c o r d s : 1 6 Di s c l a i m e r : T h e i n f o r m a t i o n c o n t a i n e d i n t h i s r e p o r t i s c o m p i l e d f r o m i n d i v i d u a l d r i v e r a n d p o l i c e c r a s h r e p o r t s s u b m i t t e d t o t h e O r e g o n D e p a r t m e n t o f T r a n s p o r t a t i o n a s r e q u i r e d i n O R S 8 1 1 . 7 2 0 . T h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t i s c o m m i t t e d t o p r o v i d i n g t h e h i g h e s t q u a l i t y c r a s h d a t a t o c u s t o m e r s . H o w e v e r , b e c a u s e s u b m i t t a l o f c r a s h r e p o r t f o r m s i s th e r e s p o n s i b i l i t y o f t h e i n d i v i d u a l d r i v e r , t h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t c a n n o t g u a r a n t e e t h a t a l l q u a l i f y i n g c r a s h e s a r e r e p r e s e n t e d n o r c a n a s s u r a n c e s b e m a d e t h a t a l l d e t a i l s p e r t a i n i n g t o a s i n g l e c r a s h a r e a c c u r a t e . N o t e : L e g i s l a t i v e c h a n g e s t o D M V ' s v e h i c l e c r a s h r e p o r t i n g r e q u i r e m e n t , e f f e c t i v e 0 1 / 0 1 / 2 0 0 4 , m a y r e s u l t i n f e w e r p r o p e r t y da m a g e o n l y c r a s h e s b e i n g e l i g i b l e f o r i n c l u s i o n i n t h e S t a t e w i d e C r a s h D a t a F i l e . OR < 2 5 02 N O N E 0 S T R G H T PR V T E N - S 00 0 00 02 1 4 6 N N N N N 1 1 / 1 7 / 2 0 1 2 1 4 A S H L A N D S T IN T E R C R O S S N N C L D A N G L - O T H 0 1 N O N E 0 S T R G H T 04 CI T Y SA 0 WA L K E R A V E CN TR F S I G N A L N W E T A N G L PR V T E W - E 00 0 00 10 A 03 0 N D A Y I N J PS N G R C A R 01 D R V R N O N E 6 7 M O R - Y 02 0 00 0 04 PS N G R C A R 01 D R V R I N J C 6 1 M O R - Y 00 0 00 0 00 9A 06 0 N D A Y P D O TR U C K 01 D R V R N O N E 4 5 M O R - Y 00 0 00 0 00 OR < 2 5 01 6 8 4 N N N N N 0 9 / 1 3 / 2 0 1 2 1 4 A S H L A N D S T IN T E R C R O S S N N C L R S - O T H E R 0 1 N O N E 0 T U R N - R 08 CI T Y TH 0 WA L K E R A V E W TR F S I G N A L N D R Y T U R N PR V T E W - S 00 0 00 PS N G R C A R 01 D R V R N O N E 7 4 M O R - Y 00 6 00 0 08 OR < 2 5 02 N O N E 0 T U R N - R PR V T E W - S 00 0 00 E W ST R G H T 0 1 P E D I N J C 2 1 F I X W L K 0 6 2 03 5 12 -E W ST R G H T 0 2 P E D I N J C 0 0 U n k I X W L K 0 6 2 03 5 12 - NO N E FR 0 WA L K E R A V E S TR F S I G N A L N D R Y P E D PR V T E S - E 00 0 00 00 8 6 4 N N N 0 5 / 0 6 / 2 0 1 1 1 7 A S H L A N D S T IN T E R C R O S S N N C L R P E D 0 1 N O N E TU R N - R 02 2P 06 0 N D A Y I N J PS N G R C A R 01 D R V R N O N E 8 4 F O R - Y 02 9 00 0 02 OR < 2 5 6P 05 0 N D L I T I N J PS N G R C A R 01 D R V R N O N E 7 4 F O R - Y 00 0 00 0 00 OR < 2 5 02 1 1 8 N N N N N 1 1 / 1 0 / 2 0 1 2 1 4 A S H L A N D S T IN T E R C R O S S N N C L D P E D 0 1 N O N E 0 S T R G H T 14 CI T Y SA 0 WA L K E R A V E E TR F S I G N A L N W E T P E D PR V T E E - W 00 0 00 ST R G H T 0 1 P E D I N J C 1 2 M I X W L K 0 5 5 03 5 14 S N - 11 A 06 0 N D A Y I N J PS N G R C A R 01 D R V R N O N E 3 2 M O R - Y 01 1 00 0 10 OR < 2 5 00 0 7 6 N N N N N 0 1 / 1 2 / 2 0 1 5 1 7 A S H L A N D S T IN T E R C R O S S N N R A I N O - 1 S T O P 0 1 N O N E BA C K 10 CI T Y MO 0 WA L K E R A V E N TR F S I G N A L N W E T B A C K PR V T E S - N 00 0 00 PS N G R C A R 01 D R V R I N J C 4 4 F O R - Y 00 0 00 0 00 OR < 2 5 02 N O N E ST O P PR V T E N - S 01 1 00 11 A 06 0 N D A Y P D O PS N G R C A R 01 D R V R N O N E 2 0 F O R - Y 02 6 00 0 07 OR < 2 5 01 9 2 6 N N N 1 0 / 1 5 / 2 0 1 3 1 7 A S H L A N D S T IN T E R C R O S S N N C L R S - 1 S T O P 0 1 N O N E ST R G H T 07 , 1 1 NO N E TU 0 WA L K E R A V E N TR F S I G N A L N D R Y R E A R PR V T E N - S 00 0 21 PS N G R C A R 01 D R V R N O N E 0 0 F U N K 00 0 00 0 00 UN K 02 N O N E ST O P PR V T E N - S 01 1 00 P R S W IN T - T Y P E SP C L U S E S D E A U C O D A T E C L A S S C I T Y S T R E E T RD C H A R ( M E D I A N ) I N T - R E L O F F R D W T H R C R A S H TR L R Q T Y M O V E A S IN V E S T D C S L K TI M E FR O M SE C O N D S T R E E T LO C T N (# L A N E S ) CO N T L DR V W Y LI G H T SV R T Y V# TY P E TO P# TY P E SV R T Y E X RE S LO C ER R O R AC T EV E N T CA U S E SE R # E L G H R D A Y DI S T F I R S T S T R E E T DI R E C T LE G S T R A F - RN D B T S U R F C O L L OW N E R FR O M PR T C I N J G E L I C N S P E D South Ashland Business Park TPRA C - 16 OR E G O N . . D E P A R T M E N T O F T R A N S P O R T A T I O N - T R A N S P O R T A T I O N D E V E L O P M E N T D I V I S I O N TR A N S P O R T A T I O N D A T A S E C T I O N - C R A S H A N A Y L Y S I S A N D R E P O R T I N G U N I T UR B A N N O N - S Y S T E M C R A S H L I S T I N G AS H L A N D S T a n d W A L K E R A V E , C i t y o f A s h l a n d , J a c k s o n C o u n t y , 0 1 / 0 1 / 2 0 1 1 t o 1 2 / 3 1 / 2 0 1 5 06 / 0 2 / 2 0 1 7 CD S 3 8 0 Pa g e : 2 CI T Y O F A S H L A N D , J A C K S O N C O U N T Y To t a l c r a s h r e c o r d s : 1 6 Di s c l a i m e r : T h e i n f o r m a t i o n c o n t a i n e d i n t h i s r e p o r t i s c o m p i l e d f r o m i n d i v i d u a l d r i v e r a n d p o l i c e c r a s h r e p o r t s s u b m i t t e d t o t h e O r e g o n D e p a r t m e n t o f T r a n s p o r t a t i o n a s r e q u i r e d i n O R S 8 1 1 . 7 2 0 . T h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t i s c o m m i t t e d t o p r o v i d i n g t h e h i g h e s t q u a l i t y c r a s h d a t a t o c u s t o m e r s . H o w e v e r , b e c a u s e s u b m i t t a l o f c r a s h r e p o r t f o r m s i s th e r e s p o n s i b i l i t y o f t h e i n d i v i d u a l d r i v e r , t h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t c a n n o t g u a r a n t e e t h a t a l l q u a l i f y i n g c r a s h e s a r e r e p r e s e n t e d n o r c a n a s s u r a n c e s b e m a d e t h a t a l l d e t a i l s p e r t a i n i n g t o a s i n g l e c r a s h a r e a c c u r a t e . N o t e : L e g i s l a t i v e c h a n g e s t o D M V ' s v e h i c l e c r a s h r e p o r t i n g r e q u i r e m e n t , e f f e c t i v e 0 1 / 0 1 / 2 0 0 4 , m a y r e s u l t i n f e w e r p r o p e r t y da m a g e o n l y c r a s h e s b e i n g e l i g i b l e f o r i n c l u s i o n i n t h e S t a t e w i d e C r a s h D a t a F i l e . 9A 08 N D A Y P D O PS N G R C A R 01 D R V R N O N E 3 4 M O R - Y 04 3 00 0 07 , 2 9 (0 2 ) OR < 2 5 00 4 4 7 N N N N N 0 3 / 1 3 / 2 0 1 4 1 7 W A L K E R A V E AL L E Y N N C L R S - 1 T U R N 0 1 N O N E ST R G H T 07 , 2 9 CI T Y TH 75 AS H L A N D S T S (N O N E ) N O N E N D R Y R E A R PR V T E S - N 00 0 00 02 N O N E TU R N - R PR V T E S - E 01 9 00 2P 05 N D A Y I N J PS N G R C A R 01 D R V R N O N E 5 5 M O R - Y 02 6 00 0 07 (0 2 ) OR < 2 5 00 2 0 4 N N N 0 2 / 0 2 / 2 0 1 1 1 7 W A L K E R A V E AL L E Y N N C L R S - 1 S T O P 0 1 N O N E ST R G H T 07 NO R P T WE 50 AS H L A N D S T S (N O N E ) U N K N O W N N D R Y R E A R PR V T E N - S 00 0 00 PS N G R C A R 01 D R V R I N J C 3 1 M O R - Y 00 0 00 0 00 OR < 2 5 02 N O N E ST O P PR V T E N - S 01 2 00 1P 07 N D A Y I N J ST R G H T 0 1 B I K E I N J C 1 9 M BK P A T H 0 0 0 04 1 1 1 0 00 (0 4 ) W E 00 6 1 7 N N N N N 0 4 / 0 5 / 2 0 1 1 1 4 A S H L A N D S T AL L E Y N N C L R B I K E 11 0 02 CI T Y TU 20 0 W A L K E R A V E E (N O N E ) N O N E N D R Y T U R N - PS N G R C A R 01 D R V R N O N E 6 1 F O R - Y 02 7 00 0 02 OR < 2 5 01 N O N E TU R N - R PR V T E W - S 01 9 00 OR < 2 5 12 P 07 N D A Y P D O PS N G R C A R 01 D R V R N O N E 1 9 M O R - Y 02 8 00 0 02 CI T Y FR 19 3 W A L K E R A V E E (N O N E ) L - T U R N R E F N D R Y T U R N PR V T E S - W 01 8 00 00 5 0 3 N N N N N 0 3 / 2 3 / 2 0 1 2 1 4 A S H L A N D S T AL L E Y N N C L R O - O T H E R 0 1 N O N E TU R N - L 02 (0 5 ) OR < 2 5 PS N G R C A R 01 D R V R N O N E 7 0 M O R - Y 02 8 00 0 02 PR V T E N - E 01 8 00 02 N O N E TU R N - L 11 A 07 N D A Y I N J ST R G H T 0 1 B I K E I N J B 5 7 M BK P A T H 0 3 1 , 0 4 7 0 3 9 1 1 0 , 0 0 1 0 6 , 0 1 (0 2 ) S N 01 9 0 6 N N N N N 1 0 / 1 0 / 2 0 1 2 1 7 W A L K E R A V E AL L E Y N Y C L R B I K E 11 0 , 0 0 1 0 6 , 0 1 CI T Y WE 84 AS H L A N D S T N (N O N E ) U N K N O W N N D R Y T U R N - PS N G R C A R 01 D R V R N O N E 7 8 F O R - Y 00 0 00 0 00 OR < 2 5 01 N O N E 0 T U R N - R PR V T E S - E 01 9 1 1 0 00 11 P 04 0 N D L I T P D O PS N G R C A R 01 D R V R N O N E 1 8 F O T H - Y 00 0 00 0 00 N- R E S 01 9 5 5 N N N N N 1 0 / 1 9 / 2 0 1 3 1 4 A S H L A N D S T IN T E R C R O S S N N C L R O - 1 L - T U R N 0 1 N O N E ST R G H T 08 , 0 2 CI T Y SA 0 WA L K E R A V E CN TR F S I G N A L N D R Y T U R N PR V T E S - N 00 0 00 PS N G R C A R 01 D R V R N O N E 1 9 F O R - Y 00 4 , 0 2 8 0 0 0 08 , 0 2 OR < 2 5 02 N O N E TU R N - L PR V T E N - E 00 0 00 02 N O N E 0 S T R G H T OR < 2 5 PR V T E N - S 00 0 00 PS N G R C A R 02 P S N G I N J C 7 1 F 00 0 00 0 00 P R S W IN T - T Y P E SP C L U S E S D E A U C O D A T E C L A S S C I T Y S T R E E T RD C H A R ( M E D I A N ) I N T - R E L O F F R D W T H R C R A S H TR L R Q T Y M O V E A S IN V E S T D C S L K TI M E FR O M SE C O N D S T R E E T LO C T N (# L A N E S ) CO N T L DR V W Y LI G H T SV R T Y V# TY P E TO P# TY P E SV R T Y E X RE S LO C ER R O R AC T EV E N T CA U S E SE R # E L G H R D A Y DI S T F I R S T S T R E E T DI R E C T LE G S T R A F - RN D B T S U R F C O L L OW N E R FR O M PR T C I N J G E L I C N S P E D South Ashland Business Park TPRA C - 17 OR E G O N . . D E P A R T M E N T O F T R A N S P O R T A T I O N - T R A N S P O R T A T I O N D E V E L O P M E N T D I V I S I O N TR A N S P O R T A T I O N D A T A S E C T I O N - C R A S H A N A Y L Y S I S A N D R E P O R T I N G U N I T UR B A N N O N - S Y S T E M C R A S H L I S T I N G AS H L A N D S T a n d W A L K E R A V E , C i t y o f A s h l a n d , J a c k s o n C o u n t y , 0 1 / 0 1 / 2 0 1 1 t o 1 2 / 3 1 / 2 0 1 5 06 / 0 2 / 2 0 1 7 CD S 3 8 0 Pa g e : 3 CI T Y O F A S H L A N D , J A C K S O N C O U N T Y To t a l c r a s h r e c o r d s : 1 6 Di s c l a i m e r : T h e i n f o r m a t i o n c o n t a i n e d i n t h i s r e p o r t i s c o m p i l e d f r o m i n d i v i d u a l d r i v e r a n d p o l i c e c r a s h r e p o r t s s u b m i t t e d t o t h e O r e g o n D e p a r t m e n t o f T r a n s p o r t a t i o n a s r e q u i r e d i n O R S 8 1 1 . 7 2 0 . T h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t i s c o m m i t t e d t o p r o v i d i n g t h e h i g h e s t q u a l i t y c r a s h d a t a t o c u s t o m e r s . H o w e v e r , b e c a u s e s u b m i t t a l o f c r a s h r e p o r t f o r m s i s th e r e s p o n s i b i l i t y o f t h e i n d i v i d u a l d r i v e r , t h e C r a s h A n a l y s i s a n d R e p o r t i n g U n i t c a n n o t g u a r a n t e e t h a t a l l q u a l i f y i n g c r a s h e s a r e r e p r e s e n t e d n o r c a n a s s u r a n c e s b e m a d e t h a t a l l d e t a i l s p e r t a i n i n g t o a s i n g l e c r a s h a r e a c c u r a t e . N o t e : L e g i s l a t i v e c h a n g e s t o D M V ' s v e h i c l e c r a s h r e p o r t i n g r e q u i r e m e n t , e f f e c t i v e 0 1 / 0 1 / 2 0 0 4 , m a y r e s u l t i n f e w e r p r o p e r t y da m a g e o n l y c r a s h e s b e i n g e l i g i b l e f o r i n c l u s i o n i n t h e S t a t e w i d e C r a s h D a t a F i l e . 7P 07 N D L I T I N J PS N G R C A R 01 D R V R N O N E 4 3 M O R - Y 04 3 03 8 07 , 2 9 (0 4 ) OR < 2 5 00 3 5 7 N N N 0 2 / 2 4 / 2 0 1 5 1 4 A S H L A N D S T ST R G H T N N C L R S - 1 S T O P 0 1 N O N E ST R G H T 00 4 07 , 2 9 CI T Y TU 31 5 W A L K E R A V E W (N O N E ) U N K N O W N N D R Y R E A R PR V T E E - W 00 0 00 PS N G R C A R 01 D R V R I N J B 7 3 M O R - Y 00 0 00 0 00 OR < 2 5 02 N O N E ST O P PR V T E E - W 01 1 0 0 4 00 1P 08 N D A Y P D O PS N G R C A R 01 D R V R N O N E 2 0 F O R - Y 02 6 00 0 07 (0 4 ) OR < 2 5 01 8 0 3 N N N 0 9 / 2 9 / 2 0 1 2 1 4 A S H L A N D S T ST R G H T N N C L R S - 1 S T O P 0 1 N O N E 0 S T R G H T 13 , 0 7 CI T Y SA 20 0 W A L K E R A V E E (N O N E ) N O N E N D R Y R E A R PR V T E E - W 00 0 00 PS N G R C A R 01 D R V R N O N E 4 4 M O R - Y 04 5 , 0 0 9 0 0 0 13 OR < 2 5 02 N O N E 0 S T O P PR V T E E - W 01 1 00 02 N O N E 0 S T R G H T PR V T E W - E 00 6 00 OR < 2 5 PS N G R C A R 01 D R V R I N J C 2 9 F O R - Y 00 0 00 0 00 PS N G R C A R 02 P S N G N O < 5 0 2 M 00 0 00 0 00 4P 05 Y D A Y I N J PS N G R C A R 01 D R V R N O N E 2 4 F O R - Y 01 6 , 0 4 3 , 0 4 2 0 0 0 27 , 0 7 CI T Y TU 68 WA L K E R A V E E (R S D M D ) U N K N O W N N D R Y R E A R PR V T E W - E 00 6 00 02 2 9 8 N N N N N 1 1 / 2 7 / 2 0 1 2 1 4 A S H L A N D S T ST R G H T N N C L R S - S T R G H T 0 1 N O N E 0 S T R G H T 27 , 0 7 PR V T E W - E 00 6 00 01 N O N E 0 S T R G H T (0 2 ) OR < 2 5 12 P 08 N D A Y I N J PS N G R C A R 01 D R V R N O N E 5 7 M O R - Y 04 3 , 0 2 6 0 0 0 07 (0 2 ) OR < 2 5 02 1 3 2 N N N N N 1 1 / 0 6 / 2 0 1 4 1 7 W A L K E R A V E ST R G H T Y N C L D S - 1 S T O P 0 1 N O N E 0 S T R G H T 07 CI T Y TH 10 8 A S H L A N D S T N (N O N E ) U N K N O W N N D R Y R E A R PR V T E N - S 00 0 00 PS N G R C A R 01 D R V R I N J C 5 7 M O R - Y 00 0 00 0 00 OR < 2 5 02 N O N E 0 S T O P PR V T E N - S 01 1 00 PS N G R C A R 01 D R V R N O N E 3 2 F O R - Y 00 0 00 0 00 OR < 2 5 P R S W IN T - T Y P E SP C L U S E S D E A U C O D A T E C L A S S C I T Y S T R E E T RD C H A R ( M E D I A N ) I N T - R E L O F F R D W T H R C R A S H TR L R Q T Y M O V E A S IN V E S T D C S L K TI M E FR O M SE C O N D S T R E E T LO C T N (# L A N E S ) CO N T L DR V W Y LI G H T SV R T Y V# TY P E TO P# TY P E SV R T Y E X RE S LO C ER R O R AC T EV E N T CA U S E SE R # E L G H R D A Y DI S T F I R S T S T R E E T DI R E C T LE G S T R A F - RN D B T S U R F C O L L OW N E R FR O M PR T C I N J G E L I C N S P E D South Ashland Business Park TPRA C - 18 SANDOW ENGINEERING AP P E N D I X D : TR A F F I C C O U N T S South Ashland Business Park  File Name : Walker_AshlandSt Site Code : 00000002 Start Date : 9/22/2016 Page No : 1 North-South: Walker Avenue East-West: Ashland Street Weather: Warm, Sunny Veh Type: All Vehicles Groups Printed- Unshifted Walker Ave From North Ashland St From East Walker Ave From South Ashland St From West Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total 03:00 PM 49 22 34 0 105 16 103 42 16 177 7 38 43 1 89 22 96 2 2 122 493 03:15 PM 40 23 26 4 93 22 125 32 19 198 0 14 24 9 47 18 107 8 4 137 475 03:30 PM 50 19 10 5 84 17 117 29 4 167 3 12 18 5 38 11 123 2 5 141 430 03:45 PM 42 8 26 0 76 10 101 21 2 134 1 8 14 6 29 14 109 11 2 136 375 Total 181 72 96 9 358 65 446 124 41 676 11 72 99 21 203 65 435 23 13 536 1773 04:00 PM 37 10 19 5 71 12 143 29 2 186 2 14 22 4 42 13 110 3 4 130 429 04:15 PM 38 15 9 3 65 15 114 30 4 163 0 11 17 5 33 19 125 4 4 152 413 04:30 PM 29 18 16 1 64 9 98 35 3 145 3 12 13 5 33 29 134 7 4 174 416 04:45 PM 43 18 18 4 83 22 112 27 0 161 4 6 27 2 39 27 128 4 4 163 446 Total 147 61 62 13 283 58 467 121 9 655 9 43 79 16 147 88 497 18 16 619 1704 05:00 PM 51 21 20 4 96 17 133 33 3 186 1 9 22 9 41 23 136 2 5 166 489 05:15 PM 39 6 19 2 66 12 96 19 3 130 0 9 30 3 42 17 107 5 1 130 368 05:30 PM 30 13 14 4 61 15 101 20 3 139 4 6 16 8 34 17 105 7 5 134 368 05:45 PM 14 9 10 1 34 8 123 30 0 161 1 7 21 1 30 21 93 5 4 123 348 Total 134 49 63 11 257 52 453 102 9 616 6 31 89 21 147 78 441 19 15 553 1573 Grand Total 462 182 221 33 898 175 1366 347 59 1947 26 146 267 58 497 231 1373 60 44 1708 5050 Apprch %51.4 20.3 24.6 3.7 9 70.2 17.8 3 5.2 29.4 53.7 11.7 13.5 80.4 3.5 2.6 Total %9.1 3.6 4.4 0.7 17.8 3.5 27 6.9 1.2 38.6 0.5 2.9 5.3 1.1 9.8 4.6 27.2 1.2 0.9 33.8 Southern Oregon Transportation Engineering, LLC 112 Monterey Drive Medford, Oregon 97504 Kwkp1@q.com South Ashland Business Park TPRA D - 1 File Name : Walker_AshlandSt Site Code : 00000002 Start Date : 9/22/2016 Page No : 2 North-South: Walker Avenue East-West: Ashland Street Weather: Warm, Sunny Veh Type: All Vehicles Walker Ave From North Ashland St From East Walker Ave From South Ashland St From West Start Time Left Thru Right Peds App. Total Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s App. Total Int. Total Peak Hour Analysis From 03:00 PM to 03:45 PM - Peak 1 of 1 Peak Hour for Each Approach Begins at: 03:00 PM 03:00 PM 03:00 PM 03:00 PM +0 mins.49 22 34 0 105 16 103 42 16 177 7 38 43 1 89 22 96 2 2 122 +15 mins.40 23 26 4 93 22 125 32 19 198 0 14 24 9 47 18 107 8 4 137 +30 mins.50 19 10 5 84 17 117 29 4 167 3 12 18 5 38 11 123 2 5 141 +45 mins.42 8 26 0 76 10 101 21 2 134 1 8 14 6 29 14 109 11 2 136 Total Volume 181 72 96 9 358 65 446 124 41 676 11 72 99 21 203 65 435 23 13 536 % App. Total 50.6 20.1 26.8 2.5 9.6 66 18.3 6.1 5.4 35.5 48.8 10.3 12.1 81.2 4.3 2.4 PHF .905 .783 .706 .450 .852 .739 .892 .738 .539 .854 .393 .474 .576 .583 .570 .739 .884 .523 .650 .950 Walker Ave A s h l a n d S t A s h l a n d S t Walker Ave Right 96 Thru 72 Left 181 Peds 9 In - Peak Hour: 03:00 PM 358 Ri g h t 12 4 Th r u 44 6 Le f t 65 Pe d s 41 In - P e a k H o u r : 0 3 : 0 0 P M 67 6 Left 11 Thru 72 Right 99 Peds 21 In - Peak Hour: 03:00 PM 203 Le f t 65 Th r u43 5 Rig h t 23 Pe d s 13 In - P e a k H o u r : 0 3 : 0 0 P M 53 6 Unshifted Peak Hour Data North Southern Oregon Transportation Engineering, LLC 112 Monterey Drive Medford, Oregon 97504 Kwkp1@q.com South Ashland Business Park TPRA D - 2 File Name : Walker_AshlandSt Site Code : 00000002 Start Date : 9/22/2016 Page No : 1 North-South: Walker Avenue East-West: Ashland Street Weather: Warm, Sunny Veh Type: Trucks & Cyclists Groups Printed- Bank 1 Walker Ave From North Ashland St From East Walker Ave From South Ashland St From West Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total 03:00 PM 0 1 0 0 1 1 1 0 0 2 0 1 0 0 1 0 0 0 1 1 5 03:15 PM 0 0 0 0 0 1 0 0 1 2 0 0 0 2 2 0 0 0 1 1 5 03:30 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 2 2 3 03:45 PM 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 1 1 2 Total 0 1 0 0 1 2 2 0 2 6 0 1 0 2 3 0 0 0 5 5 15 04:00 PM 0 0 0 0 0 1 0 0 2 3 0 0 0 1 1 0 0 0 1 1 5 04:15 PM 0 0 0 1 1 1 3 1 1 6 0 0 0 0 0 0 0 0 1 1 8 04:30 PM 0 0 0 1 1 0 2 0 1 3 0 0 2 2 4 0 2 0 0 2 10 04:45 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 Total 0 0 0 2 2 2 6 1 4 13 0 0 2 3 5 0 2 0 2 4 24 05:00 PM 0 0 0 2 2 1 1 0 0 2 0 0 0 0 0 0 2 0 1 3 7 05:15 PM 0 0 0 0 0 0 0 0 1 1 0 0 1 0 1 0 1 0 0 1 3 05:30 PM 1 0 0 1 2 0 0 0 0 0 0 0 0 1 1 0 0 0 2 2 5 05:45 PM 0 0 0 1 1 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 2 Total 1 0 0 4 5 1 2 0 1 4 0 0 1 1 2 0 3 0 3 6 17 Grand Total 1 1 0 6 8 5 10 1 7 23 0 1 3 6 10 0 5 0 10 15 56 Apprch %12.5 12.5 0 75 21.7 43.5 4.3 30.4 0 10 30 60 0 33.3 0 66.7 Total %1.8 1.8 0 10.7 14.3 8.9 17.9 1.8 12.5 41.1 0 1.8 5.4 10.7 17.9 0 8.9 0 17.9 26.8 Southern Oregon Transportation Engineering, LLC 112 Monterey Drive Medford, Oregon 97504 Kwkp1@q.com South Ashland Business Park TPRA D - 3 File Name : Walker_AshlandSt Site Code : 00000002 Start Date : 9/22/2016 Page No : 2 North-South: Walker Avenue East-West: Ashland Street Weather: Warm, Sunny Veh Type: Trucks & Cyclists Walker Ave From North Ashland St From East Walker Ave From South Ashland St From West Start Time Left Thru Right Peds App. Total Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s App. Total Int. Total Peak Hour Analysis From 03:00 PM to 03:45 PM - Peak 1 of 1 Peak Hour for Each Approach Begins at: 03:00 PM 03:00 PM 03:00 PM 03:00 PM +0 mins.0 1 0 0 1 1 1 0 0 2 0 1 0 0 1 0 0 0 1 1 +15 mins.0 0 0 0 0 1 0 0 1 2 0 0 0 2 2 0 0 0 1 1 +30 mins.0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 2 2 +45 mins.0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 1 1 Total Volume 0 1 0 0 1 2 2 0 2 6 0 1 0 2 3 0 0 0 5 5 % App. Total 0 100 0 0 33.3 33.3 0 33.3 0 33.3 0 66.7 0 0 0 100 PHF .000 .250 .000 .000 .250 .500 .500 .000 .500 .750 .000 .250 .000 .250 .375 .000 .000 .000 .625 .625 Walker Ave A s h l a n d S t A s h l a n d S t Walker Ave Right 0 Thru 1 Left 0 Peds 0 In - Peak Hour: 03:00 PM 1 Ri g h t 0 Th r u 2 Le f t 2 Pe d s 2 In - P e a k H o u r : 0 3 : 0 0 P M 6 Left 0 Thru 1 Right 0 Peds 2 In - Peak Hour: 03:00 PM 3 Le f t 0 Th r u 0 Rig h t 0 Pe d s 5 In - P e a k H o u r : 0 3 : 0 0 P M 5 Bank 1 Peak Hour Data North Southern Oregon Transportation Engineering, LLC 112 Monterey Drive Medford, Oregon 97504 Kwkp1@q.com South Ashland Business Park TPRA D - 4 File Name : Walker_AshlandSt Site Code : 00000002 Start Date : 9/22/2016 Page No : 1 North-South: Walker Avenue East-West: Ashland Street Weather: Warm, Sunny Veh Type: School Buses Groups Printed- Bank 2 Walker Ave From North Ashland St From East Walker Ave From South Ashland St From West Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total 03:00 PM 0 0 0 0 0 0 0 0 0 0 0 2 1 0 3 0 0 0 0 0 3 03:15 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:30 PM 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 1 03:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 Total 0 1 0 0 1 0 0 0 0 0 0 3 1 0 4 0 1 0 0 1 6 04:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 04:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 1 Total 0 0 0 0 0 0 1 0 0 1 0 0 1 0 1 0 0 0 0 0 2 05:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Grand Total 0 1 0 0 1 0 1 0 0 1 0 3 2 0 5 0 1 0 0 1 8 Apprch %0 100 0 0 0 100 0 0 0 60 40 0 0 100 0 0 Total %0 12.5 0 0 12.5 0 12.5 0 0 12.5 0 37.5 25 0 62.5 0 12.5 0 0 12.5 Southern Oregon Transportation Engineering, LLC 112 Monterey Drive Medford, Oregon 97504 Kwkp1@q.com South Ashland Business Park TPRA D - 5 File Name : Walker_AshlandSt Site Code : 00000002 Start Date : 9/22/2016 Page No : 2 North-South: Walker Avenue East-West: Ashland Street Weather: Warm, Sunny Veh Type: School Buses Walker Ave From North Ashland St From East Walker Ave From South Ashland St From West Start Time Left Thru Right Peds App. Total Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s App. Total Int. Total Peak Hour Analysis From 03:00 PM to 03:45 PM - Peak 1 of 1 Peak Hour for Each Approach Begins at: 03:00 PM 03:00 PM 03:00 PM 03:00 PM +0 mins.0 0 0 0 0 0 0 0 0 0 0 2 1 0 3 0 0 0 0 0 +15 mins.0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 +30 mins.0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 +45 mins.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 Total Volume 0 1 0 0 1 0 0 0 0 0 0 3 1 0 4 0 1 0 0 1 % App. Total 0 100 0 0 0 0 0 0 0 75 25 0 0 100 0 0 PHF .000 .250 .000 .000 .250 .000 .000 .000 .000 .000 .000 .375 .250 .000 .333 .000 .250 .000 .000 .250 Walker Ave A s h l a n d S t A s h l a n d S t Walker Ave Right 0 Thru 1 Left 0 Peds 0 In - Peak Hour: 03:00 PM 1 Rig h t 0 Th r u 0 Le f t 0 Pe d s 0 In - P e a k H o u r : 0 3 : 0 0 P M 0 Left 0 Thru 3 Right 1 Peds 0 In - Peak Hour: 03:00 PM 4 Le f t 0 Th r u 1 Ri g h t 0 Pe d s 0 In - P e a k H o u r : 0 3 : 0 0 P M 1 Bank 2 Peak Hour Data North Southern Oregon Transportation Engineering, LLC 112 Monterey Drive Medford, Oregon 97504 Kwkp1@q.com South Ashland Business Park TPRA D - 6 File Name : Normal_AshalndSt Site Code : 00000001 Start Date : 9/20/2016 Page No : 1 North-South: Normal Avenue East-West: Ashland Street Weather: Warm, Sunny Veh Type: All Vehicles Groups Printed- Unshifted Normal Ave From North Ashland Street From East Normal Ave From South Ashland Street From West Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total 03:00 PM 10 0 1 1 12 11 161 7 7 186 2 3 7 2 14 2 182 5 8 197 409 03:15 PM 8 0 0 2 10 8 158 2 3 171 1 2 8 2 13 3 181 5 3 192 386 03:30 PM 6 0 3 1 10 9 136 3 3 151 1 0 6 0 7 13 162 3 4 182 350 03:45 PM 3 0 1 4 8 3 145 3 3 154 3 0 11 1 15 3 171 4 2 180 357 Total 27 0 5 8 40 31 600 15 16 662 7 5 32 5 49 21 696 17 17 751 1502 04:00 PM 6 0 1 0 7 8 145 3 7 163 0 1 5 1 7 2 130 4 4 140 317 04:15 PM 7 0 4 2 13 12 160 6 6 184 6 0 10 1 17 3 153 6 1 163 377 04:30 PM 4 0 0 0 4 14 135 2 1 152 3 0 3 1 7 5 171 4 2 182 345 04:45 PM 2 1 0 2 5 11 134 4 1 150 2 1 4 3 10 3 144 3 4 154 319 Total 19 1 5 4 29 45 574 15 15 649 11 2 22 6 41 13 598 17 11 639 1358 05:00 PM 4 0 3 0 7 9 136 3 4 152 1 1 6 2 10 1 188 2 5 196 365 05:15 PM 7 1 1 0 9 13 142 6 3 164 3 2 3 2 10 10 158 4 1 173 356 05:30 PM 1 2 0 2 5 15 149 4 2 170 0 1 7 0 8 2 157 2 3 164 347 05:45 PM 3 1 3 3 10 3 128 2 4 137 0 0 6 4 10 8 118 4 7 137 294 Total 15 4 7 5 31 40 555 15 13 623 4 4 22 8 38 21 621 12 16 670 1362 Grand Total 61 5 17 17 100 116 1729 45 44 1934 22 11 76 19 128 55 1915 46 44 2060 4222 Apprch %61 5 17 17 6 89.4 2.3 2.3 17.2 8.6 59.4 14.8 2.7 93 2.2 2.1 Total %1.4 0.1 0.4 0.4 2.4 2.7 41 1.1 1 45.8 0.5 0.3 1.8 0.5 3 1.3 45.4 1.1 1 48.8 Southern Oregon Transportation Engineering, LLC 112 Monterey Drive Medford, Oregon 97504 Kwkp1@q.com South Ashland Business Park TPRA D - 7 File Name : Normal_AshalndSt Site Code : 00000001 Start Date : 9/20/2016 Page No : 2 North-South: Normal Avenue East-West: Ashland Street Weather: Warm, Sunny Veh Type: All Vehicles Normal Ave From North Ashland Street From East Normal Ave From South Ashland Street From West Start Time Left Thru Right Peds App. Total Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s App. Total Int. Total Peak Hour Analysis From 03:00 PM to 03:45 PM - Peak 1 of 1 Peak Hour for Each Approach Begins at: 03:00 PM 03:00 PM 03:00 PM 03:00 PM +0 mins.10 0 1 1 12 11 161 7 7 186 2 3 7 2 14 2 182 5 8 197 +15 mins.8 0 0 2 10 8 158 2 3 171 1 2 8 2 13 3 181 5 3 192 +30 mins.6 0 3 1 10 9 136 3 3 151 1 0 6 0 7 13 162 3 4 182 +45 mins.3 0 1 4 8 3 145 3 3 154 3 0 11 1 15 3 171 4 2 180 Total Volume 27 0 5 8 40 31 600 15 16 662 7 5 32 5 49 21 696 17 17 751 % App. Total 67.5 0 12.5 20 4.7 90.6 2.3 2.4 14.3 10.2 65.3 10.2 2.8 92.7 2.3 2.3 PHF .675 .000 .417 .500 .833 .705 .932 .536 .571 .890 .583 .417 .727 .625 .817 .404 .956 .850 .531 .953 Normal Ave A s h l a n d S t r e e t A s h l a n d S t r e e t Normal Ave Right 5 Thru 0 Left 27 Peds 8 In - Peak Hour: 03:00 PM 40 Ri g h t 15 Th r u 60 0 Le f t 31 Pe d s 16 In - P e a k H o u r : 0 3 : 0 0 P M 66 2 Left 7 Thru 5 Right 32 Peds 5 In - Peak Hour: 03:00 PM 49 Le f t 21 Th r u69 6 Rig h t 17 Pe d s 17 In - P e a k H o u r : 0 3 : 0 0 P M 75 1 Unshifted Peak Hour Data North Southern Oregon Transportation Engineering, LLC 112 Monterey Drive Medford, Oregon 97504 Kwkp1@q.com South Ashland Business Park TPRA D - 8 File Name : Normal_AshalndSt Site Code : 00000001 Start Date : 9/20/2016 Page No : 1 North-South: Normal Avenue East-West: Ashland Street Weather: Warm, Sunny Veh Type: Trucks & Cyclists Groups Printed- Bank 1 Normal Ave From North Ashland Street From East Normal Ave From South Ashland Street From West Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total 03:00 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 2 0 0 2 3 03:15 PM 1 0 0 0 1 0 0 1 0 1 0 0 0 0 0 0 1 0 0 1 3 03:30 PM 1 0 1 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 03:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 2 0 1 0 3 0 1 1 0 2 0 0 0 0 0 0 3 0 0 3 8 04:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 04:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 04:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 3 3 05:00 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 05:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 05:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 2 0 0 2 3 Grand Total 2 0 1 0 3 0 2 1 0 3 0 0 0 0 0 0 8 0 0 8 14 Apprch %66.7 0 33.3 0 0 66.7 33.3 0 0 0 0 0 0 100 0 0 Total %14.3 0 7.1 0 21.4 0 14.3 7.1 0 21.4 0 0 0 0 0 0 57.1 0 0 57.1 Southern Oregon Transportation Engineering, LLC 112 Monterey Drive Medford, Oregon 97504 Kwkp1@q.com South Ashland Business Park TPRA D - 9 File Name : Normal_AshalndSt Site Code : 00000001 Start Date : 9/20/2016 Page No : 2 North-South: Normal Avenue East-West: Ashland Street Weather: Warm, Sunny Veh Type: Trucks & Cyclists Normal Ave From North Ashland Street From East Normal Ave From South Ashland Street From West Start Time Left Thru Right Peds App. Total Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s App. Total Int. Total Peak Hour Analysis From 03:00 PM to 03:45 PM - Peak 1 of 1 Peak Hour for Each Approach Begins at: 03:00 PM 03:00 PM 03:00 PM 03:00 PM +0 mins.0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 2 0 0 2 +15 mins.1 0 0 0 1 0 0 1 0 1 0 0 0 0 0 0 1 0 0 1 +30 mins.1 0 1 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 +45 mins.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Volume 2 0 1 0 3 0 1 1 0 2 0 0 0 0 0 0 3 0 0 3 % App. Total 66.7 0 33.3 0 0 50 50 0 0 0 0 0 0 100 0 0 PHF .500 .000 .250 .000 .375 .000 .250 .250 .000 .500 .000 .000 .000 .000 .000 .000 .375 .000 .000 .375 Normal Ave A s h l a n d S t r e e t A s h l a n d S t r e e t Normal Ave Right 1 Thru 0 Left 2 Peds 0 In - Peak Hour: 03:00 PM 3 Ri g h t 1 Th r u 1 Le f t 0 Pe d s 0 In - P e a k H o u r : 0 3 : 0 0 P M 2 Left 0 Thru 0 Right 0 Peds 0 In - Peak Hour: 03:00 PM 0 Le f t 0 Th r u 3 Rig h t 0 Pe d s 0 In - P e a k H o u r : 0 3 : 0 0 P M 3 Bank 1 Peak Hour Data North Southern Oregon Transportation Engineering, LLC 112 Monterey Drive Medford, Oregon 97504 Kwkp1@q.com South Ashland Business Park TPRA D - 10 File Name : Normal_AshalndSt Site Code : 00000001 Start Date : 9/20/2016 Page No : 1 North-South: Normal Avenue East-West: Ashland Street Weather: Warm, Sunny Veh Type: School Buses Groups Printed- Bank 2 Normal Ave From North Ashland Street From East Normal Ave From South Ashland Street From West Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total 03:00 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 2 03:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 03:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 2 Total 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 3 0 0 3 5 04:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 04:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 Total 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 05:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Grand Total 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 4 0 0 4 7 Apprch %0 0 0 0 0 100 0 0 0 0 0 0 0 100 0 0 Total %0 0 0 0 0 0 42.9 0 0 42.9 0 0 0 0 0 0 57.1 0 0 57.1 Southern Oregon Transportation Engineering, LLC 112 Monterey Drive Medford, Oregon 97504 Kwkp1@q.com South Ashland Business Park TPRA D - 11 File Name : Normal_AshalndSt Site Code : 00000001 Start Date : 9/20/2016 Page No : 2 North-South: Normal Avenue East-West: Ashland Street Weather: Warm, Sunny Veh Type: School Buses Normal Ave From North Ashland Street From East Normal Ave From South Ashland Street From West Start Time Left Thru Right Peds App. Total Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s App. Total Int. Total Peak Hour Analysis From 03:00 PM to 03:45 PM - Peak 1 of 1 Peak Hour for Each Approach Begins at: 03:00 PM 03:00 PM 03:00 PM 03:00 PM +0 mins.0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 +15 mins.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 +30 mins.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 +45 mins.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 Total Volume 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 3 0 0 3 % App. Total 0 0 0 0 0 100 0 0 0 0 0 0 0 100 0 0 PHF .000 .000 .000 .000 .000 .000 .250 .000 .000 .250 .000 .000 .000 .000 .000 .000 .375 .000 .000 .375 Normal Ave A s h l a n d S t r e e t A s h l a n d S t r e e t Normal Ave Right 0 Thru 0 Left 0 Peds 0 In - Peak Hour: 03:00 PM 0 Rig h t 0 Th r u 2 Le f t 0 Pe d s 0 In - P e a k H o u r : 0 3 : 0 0 P M 2 Left 0 Thru 0 Right 0 Peds 0 In - Peak Hour: 03:00 PM 0 Le f t 0 Th r u 3 Ri g h t 0 Pe d s 0 In - P e a k H o u r : 0 3 : 0 0 P M 3 Bank 2 Peak Hour Data North Southern Oregon Transportation Engineering, LLC 112 Monterey Drive Medford, Oregon 97504 Kwkp1@q.com South Ashland Business Park TPRA D - 12 AM TC Rd @ Ashland St : 6/8/2017 : 1 Start Time Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Int. Total 6:30 AM 6162155381315713000131312034119 6:45 AM 3745196671719115203203361141171 Total 9 8 10 7 34 11 105 30 2 148 28 2 0 3 33 4 67 3 1 75 290 7:00 AM 0780153381816013410182355042135 7:15 AM 7 5 11 0 23 6 52 12 0 70 21 5 1 2 29 5 43 0 0 48 170 7:30 AM 4 11 13 0 28 7 69 29 0 105 29 7 0 0 36 4 87 0 0 91 260 7:45 AM 3 10 18 4 35 12 118 37 1 168 29 14 8 1 52 6 61 6 2 75 330 Total 14 33 50 4 101 28 277 96 2 403 92 30 10 3 135 17 226 11 2 256 895 8:00 AM 7 24 27 2 60 13 155 41 1 210 38 14 22 0 74 13 74 5 0 92 436 8:15 AM 11 25 15 0 51 15 180 36 0 231 53 28 25 1 107 8 79 6 0 93 482 8:30 AM 4 18 25 2 49 19 120 37 2 178 29 14 11 4 58 5 112 6 1 124 409 8:45 AM 11 14 16 2 43 13 100 34 0 147 22 13 11 0 46 13 83 8 0 104 340 Total 33 81 83 6 203 60 555 148 3 766 142 69 69 5 285 39 348 25 1 413 1667 9:00 AM 8 16 14 0 38 16 108 31 2 157 31 10 4 2 47 7 75 3 1 86 328 9:15 AM 8 18 18 0 44 17 73 31 1 122 30 10 6 2 48 8 81 6 0 95 309 Total 16 34 32 0 82 33 181 62 3 279 61 20 10 4 95 15 156 9 1 181 637 Grand Total 72 156 175 17 420 132 1118 336 10 1596 323 121 89 15 548 75 797 48 5 925 3489 Apprch %17% 37% 42% 4% 8% 70% 21% 1% 59% 22% 16% 3% 8% 86% 5% 1% Total % 2% 4% 5% 0% 12% 4% 32% 10% 0% 46% 9% 3% 3% 0% 16% 2% 23% 1% 0% 27% SANDOWENGINEERING llc. 160 Madison Street Suite A Eugene, Oregon 97402 Tolman Creek Rd Southbound Westbound Northbound Eastbound Ashland St Tolman Creek Rd Ashland St Page No Groups Printed ‐ Vehicles File Name Start Date South Ashland Business Park TPRA D - 13 AM TC Rd @ Ashland St : 6/8/2017 : 2 Start Time Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Int. Total 6:30 AM 000000210300000011025 6:45 AM 010010310400000011027 Total 0100105207000000220412 7:00 AM 000000230510001110028 7:15 AM 0000015006120030100110 7:30 AM 1010200404300030100110 7:45 AM 000000200230003120038 Total 101021970178200102500736 8:00 AM 000000200210001010014 8:15 AM 1000102204200021400512 8:30 AM 010010210310001010016 8:45 AM 01102244010100010500518 Total 12104210701950005111001240 9:00 AM 1010202204200021100210 9:15 AM 000000110220002140059 Total 1010203306400042500719 Grand Total 333093271904917200195232030107 Apprch %33% 33% 33% 0% 6% 55% 39% 0% 89% 11% 0% 0% 17% 77% 7% 0% Total % 3% 3% 3% 0% 8% 3% 25% 18% 0% 46% 16% 2% 0% 0% 18% 5% 21% 2% 0% 28% SANDOWENGINEERING llc. 160 Madison Street Suite A Eugene, Oregon 97402 Groups Printed ‐ Trucks Tolman Creek Rd Ashland St Tolman Creek Rd Ashland St Southbound Westbound Northbound Eastbound Page No File Name Start Date South Ashland Business Park TPRA D - 14 AM TC Rd @ Ashland St : 6/8/2017 : 3 Start Time Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Int. Total 6:30 AM 000000000000000000000 6:45 AM 000000000011002000002 Total 000000000011002000002 7:00 AM 000000000000000000000 7:15 AM 000000000000000000000 7:30 AM 000000000000000000000 7:45 AM 000000000000000010011 Total 000000000000000010011 8:00 AM 000000000000000000000 8:15 AM 000000000010001000001 8:30 AM 000000000001001000001 8:45 AM 000000000000000000000 Total 000000000011002000002 9:00 AM 000000000000000000000 9:15 AM 000000000000000000000 Total 000000000000000000000 Grand Total 000000000022004010015 Apprch %0% 0% 0% 0% 0% 0% 0% 0% 50% 50% 0% 0% 0%100%0% 0% Total % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 40% 40% 0% 0% 80% 0% 20% 0% 0% 20% SANDOWENGINEERING llc. 160 Madison Street Suite A Eugene, Oregon 97402 File Name Start Date Page No Groups Printed ‐ Bicycles Tolman Creek Rd Ashland St Tolman Creek Rd Ashland St Southbound Westbound Northbound Eastbound South Ashland Business Park TPRA D - 15 AM TC Rd @ Ashland St : 6/8/2017 : 4 Start Time Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Int. Total 6:30 AM 6162155401416013000131323036124 6:45 AM 3845206701819516303223372143180 Total 9 9 10 7 35 11 110 32 2 155 29 3 0 3 35 4 69 5 1 79 304 7:00 AM 0780153402116514410193365044143 7:15 AM 7 5 11 0 23 7 57 12 0 76 22 7 1 2 32 5 44 0 0 49 180 7:30 AM 5 11 14 0 30 7 69 33 0 109 32 7 0 0 39 4 88 0 0 92 270 7:45 AM 3 10 18 4 35 12 120 37 1 170 32 14 8 1 55 7 64 6 2 79 339 Total 15 33 51 4 103 29 286 103 2 420 100 32 10 3 145 19 232 11 2 264 932 8:00 AM 7 24 27 2 60 13 157 41 1 212 39 14 22 0 75 13 75 5 0 93 440 8:15 AM 12 25 15 0 52 15 182 38 0 235 56 28 25 1 110 9 83 6 0 98 495 8:30 AM 4 19 25 2 50 19 122 38 2 181 30 15 11 4 60 5 113 6 1 125 416 8:45 AM 11 15 17 2 45 15 104 38 0 157 23 13 11 0 47 13 88 8 0 109 358 Total 34 83 84 6 207 62 565 155 3 785 148 70 69 5 292 40 359 25 1 425 1709 9:00 AM 9 16 15 0 40 16 110 33 2 161 33 10 4 2 49 8 76 3 1 88 338 9:15 AM 8 18 18 0 44 17 74 32 1 124 32 10 6 2 50 9 85 6 0 100 318 Total 17 34 33 0 84 33 184 65 3 285 65 20 10 4 99 17 161 9 1 188 656 Grand Total 75 159 178 17 429 135 1145 355 10 1645 342 125 89 15 571 80 821 50 5 956 3601 Apprch %17% 37% 41% 4% 8% 70% 22% 1% 60% 22% 16% 3% 8% 86% 5% 1% Total % 2% 4% 5% 0% 12% 4% 32% 10% 0% 46% 9% 3% 2% 0% 16% 2% 23% 1% 0% 27% Page No SANDOWENGINEERING llc. 160 Madison Street Suite A Eugene, Oregon 97402 File Name Start Date Ashland St Southbound Westbound Northbound Eastbound Groups Printed ‐ Total Tolman Creek Rd Ashland St Tolman Creek Rd South Ashland Business Park TPRA D - 16 PM TC Rd @ Ashland St : 6/7/2017 : 1 Start Time Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Int. Total 6:30 AM 15 30 25 9 79 19 105 52 4 180 43 31 20 6 100 10 142 23 2 177 536 6:45 AM 11 30 28 8 77 19 110 47 2 178 47 27 17 5 96 17 138 21 3 179 530 Total 26 60 53 17 156 38 215 99 6 358 90 58 37 11 196 27 280 44 5 356 1066 7:00 AM 9 31 22 6 68 18 89 49 3 159 51 16 16 1 84 8 155 16 0 179 490 7:15 AM 13 26 20 2 61 15 120 47 1 183 45 19 13 4 81 14 99 24 0 137 462 7:30 AM 11 23 10 6 50 16 107 48 0 171 54 25 19 3 101 15 127 19 3 164 486 7:45 AM 16 22 18 3 59 15 123 58 5 201 50 16 14 6 86 10 121 18 1 150 496 Total 49 102 70 17 238 64 439 202 9 714 200 76 62 14 352 47 502 77 4 630 1934 8:00 AM 17 24 24 8 73 19 137 46 4 206 39 20 15 2 76 18 270 28 3 319 674 8:15 AM 15 33 10 3 61 12 149 57 2 220 43 29 15 2 89 11 155 20 1 187 557 8:30 AM 11 40 28 5 84 12 106 49 4 171 39 31 16 2 88 13 117 24 1 155 498 8:45 AM 19 33 16 4 72 12 126 53 2 193 34 20 13 2 69 12 97 24 3 136 470 Total 62 130 78 20 290 55 518 205 12 790 155 100 59 8 322 54 639 96 8 797 2199 9:00 AM 15 22 12 0 49 16 94 49 1 160 40 24 8 1 73 10 95 14 0 119 401 9:15 AM 17 19 11 5 52 12 125 33 1 171 27 13 8 3 51 8 72 13 0 93 367 Total 32 41 23 5 101 28 219 82 2 331 67 37 16 4 124 18 167 27 0 212 768 Grand Total 169 333 224 59 785 185 1391 588 29 2193 512 271 174 37 994 146 1588 244 17 1995 5967 Apprch %22% 42% 29% 8% 8% 63% 27% 1% 52% 27% 18% 4% 7% 80% 12% 1% Total % 3% 6% 4% 1% 13% 3% 23% 10% 0% 37% 9% 5% 3% 1% 17% 2% 27% 4% 0% 33% SANDOWENGINEERING llc. 160 Madison Street Suite A Eugene, Oregon 97402 Tolman Creek Rd Southbound Westbound Northbound Eastbound Ashland St Tolman Creek Rd Ashland St Page No Groups Printed ‐ Vehicles File Name Start Date South Ashland Business Park TPRA D - 17 PM TC Rd @ Ashland St : 6/7/2017 : 2 Start Time Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Int. Total 6:30 AM 010010010130104120039 6:45 AM 000000110210102020026 Total 0100101203402061400515 7:00 AM 000000010110001030035 7:15 AM 000000000000202020024 7:30 AM 000001310510001010017 7:45 AM 000000010110001020024 Total 0000013307302050800820 8:00 AM 010010110221003000006 8:15 AM 000001120410001011027 8:30 AM 000000200210001000003 8:45 AM 000000100100000000001 Total 0100115309410050110217 9:00 AM 000000000000000010011 9:15 AM 000000000000000000000 Total 000000000000000010011 Grand Total 020022980191114016114101653 Apprch %0%100%0% 0% 11% 47% 42% 0% 69% 6% 25% 0% 6% 88% 6% 0% Total % 0% 4% 0% 0% 4% 4% 17% 15% 0% 36% 21% 2% 8% 0% 30% 2% 26% 2% 0% 30% SANDOWENGINEERING llc. 160 Madison Street Suite A Eugene, Oregon 97402 Groups Printed ‐ Trucks Tolman Creek Rd Ashland St Tolman Creek Rd Ashland St Southbound Westbound Northbound Eastbound Page No File Name Start Date South Ashland Business Park TPRA D - 18 PM TC Rd @ Ashland St : 6/7/2017 : 3 Start Time Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Int. Total 6:30 AM 000000300300000010014 6:45 AM 000000000000000000000 Total 000000300300000010014 7:00 AM 000000010101001000002 7:15 AM 000000100111002000003 7:30 AM 010010000011002000003 7:45 AM 000000200202002000004 Total 0100103104250070000012 8:00 AM 000000000000000021033 8:15 AM 000000010101001001013 8:30 AM 010010100100000000002 8:45 AM 110020110200000020026 Total 1200302204010010420614 9:00 AM 000000000000000000000 9:15 AM 100010000000000000001 Total 100010000000000000001 Grand Total 23005083011260080520731 Apprch %40% 60% 0% 0% 0% 73% 27% 0% 25% 75% 0% 0% 0%71%29% 0% Total % 6% 10% 0% 0% 16% 0% 26% 10% 0% 35% 6% 19% 0% 0% 26% 0% 16% 6% 0% 23% SANDOWENGINEERING llc. 160 Madison Street Suite A Eugene, Oregon 97402 File Name Start Date Page No Groups Printed ‐ Bicycles Tolman Creek Rd Ashland St Tolman Creek Rd Ashland St Southbound Westbound Northbound Eastbound South Ashland Business Park TPRA D - 19 PM TC Rd @ Ashland St : 6/7/2017 : 4 Start Time Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Int. Total 6:30 AM 15 31 25 9 80 19 108 53 4 184 46 31 21 6 104 11 145 23 2 181 549 6:45 AM 11 30 28 8 77 19 111 48 2 180 48 27 18 5 98 17 140 21 3 181 536 Total 26 61 53 17 157 38 219 101 6 364 94 58 39 11 202 28 285 44 5 362 1085 7:00 AM 9 31 22 6 68 18 89 51 3 161 52 17 16 1 86 8 158 16 0 182 497 7:15 AM 13 26 20 2 61 15 121 47 1 184 46 20 15 4 85 14 101 24 0 139 469 7:30 AM 11 24 10 6 51 17 110 49 0 176 56 26 19 3 104 15 128 19 3 165 496 7:45 AM 16 22 18 3 59 15 125 59 5 204 51 18 14 6 89 10 123 18 1 152 504 Total 49 103 70 17 239 65 445 206 9 725 205 81 64 14 364 47 510 77 4 638 1966 8:00 AM 17 25 24 8 74 19 138 47 4 208 41 21 15 2 79 18 272 29 3 322 683 8:15 AM 15 33 10 3 61 13 150 60 2 225 44 30 15 2 91 11 156 22 1 190 567 8:30 AM 11 41 28 5 85 12 109 49 4 174 40 31 16 2 89 13 117 24 1 155 503 8:45 AM 20 34 16 4 74 12 128 54 2 196 34 20 13 2 69 12 99 24 3 138 477 Total 63 133 78 20 294 56 525 210 12 803 159 102 59 8 328 54 644 99 8 805 2230 9:00 AM 15 22 12 0 49 16 94 49 1 160 40 24 8 1 73 10 96 14 0 120 402 9:15 AM 18 19 11 5 53 12 125 33 1 171 27 13 8 3 51 8 72 13 0 93 368 Total 33 41 23 5 102 28 219 82 2 331 67 37 16 4 124 18 168 27 0 213 770 Grand Total 171 338 224 59 792 187 1408 599 29 2223 525 278 178 37 1018 147 1607 247 17 2018 6051 Apprch %22% 43% 28% 7% 8% 63% 27% 1% 52% 27% 17% 4% 7% 80% 12% 1% Total % 3% 6% 4% 1% 13% 3% 23% 10% 0% 37% 9% 5% 3% 1% 17% 2% 27% 4% 0% 33% Page No SANDOWENGINEERING llc. 160 Madison Street Suite A Eugene, Oregon 97402 File Name Start Date Ashland St Southbound Westbound Northbound Eastbound Groups Printed ‐ Total Tolman Creek Rd Ashland St Tolman Creek Rd South Ashland Business Park TPRA D - 20 Turn Count Summary Sandow Engineering 160 Madison Street Suite A Eugene, Oregon, 97402 Location: Washington at Ashland , Ashland OR GPS Coordinates: Date: 2017-06-08 Day of week: Thursday Weather: Analyst: Total vehicle traffic Interval starts SouthBound Westbound Northbound Eastbound TotalLeftThruRightLeftThruRightLeftThruRightLeftThruRight 06:26 0 0 0 2 7 0 1 0 0 0 10 0 20 06:30 0 0 0 17 61 0 0 0 5 0 49 1 133 06:45 0 0 0 12 97 1 3 0 1 0 52 7 173 07:00 0 0 0 8 55 0 5 0 2 0 62 2 134 07:15 0 0 0 11 85 0 0 0 3 0 79 4 182 07:30 0 0 0 13 126 0 3 0 4 0 126 6 278 07:45 0 0 0 15 172 0 6 0 6 0 100 15 314 08:00 0 0 0 12 220 0 3 0 3 0 130 11 379 08:15 0 0 0 13 234 0 9 0 4 0 150 10 420 08:30 0 0 0 7 165 0 5 0 1 0 150 16 344 08:45 0 0 0 12 167 0 3 0 3 0 112 21 318 09:00 0 0 0 6 151 0 5 0 6 0 120 8 296 09:15 0 0 0 25 114 0 5 0 3 1 124 11 283 09:30 0 0 0 0 1 0 0 0 0 0 0 0 1 Car traffic Interval starts SouthBound Westbound Northbound Eastbound TotalLeftThruRightLeftThruRightLeftThruRightLeftThruRight 06:26 0 0 0 2 7 0 1 0 0 0 10 0 20 06:30 0 0 0 17 59 0 0 0 5 0 48 1 130 06:45 0 0 0 12 93 1 3 0 1 0 50 7 167 07:00 0 0 0 8 50 0 5 0 2 0 60 2 127 07:15 0 0 0 11 78 0 0 0 3 0 76 4 172 07:30 0 0 0 12 122 0 3 0 4 0 121 6 268 07:45 0 0 0 15 169 0 6 0 5 0 94 15 304 08:00 0 0 0 11 217 0 3 0 3 0 128 11 373 08:15 0 0 0 13 233 0 6 0 4 0 142 10 408 08:30 0 0 0 7 162 0 4 0 1 0 146 16 336 08:45 0 0 0 11 158 0 3 0 3 0 107 21 303 09:00 0 0 0 6 146 0 5 0 5 0 116 8 286 09:15 0 0 0 25 111 0 5 0 3 1 117 10 272 09:30 0 0 0 0 1 0 0 0 0 0 0 0 1 Truck traffic Interval starts SouthBound Westbound Northbound Eastbound TotalLeftThruRightLeftThruRightLeftThruRightLeftThruRight 06:26 0 0 0 0 0 0 0 0 0 0 0 0 0 06:30 0 0 0 0 2 0 0 0 0 0 1 0 3 06:45 0 0 0 0 4 0 0 0 0 0 1 0 5 07:00 0 0 0 0 5 0 0 0 0 0 2 0 7 07:15 0 0 0 0 7 0 0 0 0 0 3 0 10 07:30 0 0 0 1 4 0 0 0 0 0 5 0 10 07:45 0 0 0 0 3 0 0 0 1 0 5 0 9 08:00 0 0 0 1 3 0 0 0 0 0 2 0 6 08:15 0 0 0 0 1 0 3 0 0 0 7 0 11 08:30 0 0 0 0 3 0 1 0 0 0 4 0 8 08:45 0 0 0 1 9 0 0 0 0 0 5 0 15 09:00 0 0 0 0 5 0 0 0 1 0 4 0 10 09:15 0 0 0 0 3 0 0 0 0 0 7 1 11 09:30 0 0 0 0 0 0 0 0 0 0 0 0 0 Bicycle traffic Interval starts SouthBound Westbound Northbound Eastbound TotalLeftThruRightLeftThruRightLeftThruRightLeftThruRight 06:26 0 0 0 0 0 0 0 0 0 0 0 0 0 06:30 0 0 0 0 0 0 0 0 0 0 0 0 0 06:45 0 0 0 0 0 0 0 0 0 0 1 0 1 07:00 0 0 0 0 0 0 0 0 0 0 0 0 0 07:15 0 0 0 0 0 0 0 0 0 0 0 0 0 07:30 0 0 0 0 0 0 0 0 0 0 0 0 0 07:45 0 0 0 0 0 0 0 0 0 0 1 0 1 08:00 0 0 0 0 0 0 0 0 0 0 0 0 0 08:15 0 0 0 0 0 0 0 0 0 0 1 0 1 08:30 0 0 0 0 0 0 0 0 0 0 0 0 0 08:45 0 0 0 0 0 0 0 0 0 0 0 0 0 09:00 0 0 0 0 0 0 0 0 0 0 0 0 0 09:15 0 0 0 0 0 0 0 0 0 0 0 0 0 09:30 0 0 0 0 0 0 0 0 0 0 0 0 0 Pedestrian volumes Interval starts NE NW SW SE TotalLeftRightTotalLeftRightTotalLeftRightTotalLeftRightTotal 06:26 0 0 0 0 0 0 0 0 0 0 0 0 0 06:30 0 0 0 0 0 0 0 0 0 1 0 1 1 06:45 0 0 0 0 0 0 0 0 0 0 0 0 0 07:00 0 0 0 0 0 0 0 0 0 2 0 2 2 07:15 0 0 0 0 0 0 0 0 0 1 0 1 1 07:30 0 0 0 0 0 0 0 0 0 0 0 0 0 07:45 0 0 0 0 0 0 0 2 2 0 0 0 2 08:00 0 0 0 0 0 0 0 5 5 0 0 0 5 08:15 0 0 0 0 0 0 0 0 0 1 0 1 1 08:30 0 0 0 0 0 0 0 1 1 0 0 0 1 08:45 0 0 0 0 0 0 0 0 0 1 0 1 1 09:00 0 0 0 0 0 0 0 0 0 2 0 2 2 09:15 0 0 0 0 0 0 0 1 1 1 0 1 2 09:30 0 0 0 0 0 0 0 0 0 0 0 0 0 South Ashland Business Park TPRA D - 21 Intersection Peak Hour 08:00 - 09:00 SouthBound Westbound Northbound Eastbound TotalLeftThruRightLeftThruRightLeftThruRightLeftThruRight Vehicle Total 0 0 0 44 786 0 20 0 11 0 542 58 1461 Factor 0.00 0.00 0.00 0.85 0.84 0.00 0.56 0.00 0.69 0.00 0.90 0.69 0.87 Approach Factor 0.00 0.84 0.60 0.90 Peak Hour Vehicle Summary Vehicle SouthBound Westbound Northbound Eastbound TotalLeftThruRightLeftThruRightLeftThruRightLeftThruRight Car 0 0 0 42 770 0 16 0 11 0 523 58 1420 Truck 0 0 0 2 16 0 4 0 0 0 18 0 40 Bicycle 0 0 0 0 0 0 0 0 0 0 1 0 1 Peak Hour Pedestrians NE NW SW SE TotalLeftRightTotalLeftRightTotalLeftRightTotalLeftRightTotal Pedestrians 0 0 0 0 0 0 0 6 6 2 0 2 8 South Ashland Business Park TPRA D - 22 Intersection Peak Hour Location: Washington at Ashland , Ashland OR GPS Coordinates: Date: 2017-06-08 Day of week: Thursday Weather: Analyst: SB: Washington EB : A s h l a n d WB : A s h l a n d NB: Washington 0 542 58 0 786 44 0 0 0 20 0 11 Intersection Peak Hour 08:00 - 09:00 SouthBound Westbound Northbound Eastbound TotalLeftThruRightLeftThruRightLeftThruRightLeftThruRight Vehicle Total 0 0 0 44 786 0 20 0 11 0 542 58 1461 Factor 0.00 0.00 0.00 0.85 0.84 0.00 0.56 0.00 0.69 0.00 0.90 0.69 0.87 Approach Factor 0.00 0.84 0.60 0.90 South Ashland Business Park TPRA D - 23 Turn Count Summary Sandow Engineering 160 Madison Street Suite A Eugene, Oregon, 97402 Location: Washington at Ashland , Ashland OR GPS Coordinates: Date: 2017-06-07 Day of week: Wednesday Weather: Analyst: Total vehicle traffic Interval starts SouthBound Westbound Northbound Eastbound TotalLeftThruRightLeftThruRightLeftThruRightLeftThruRight 15:29 0 0 0 0 2 0 0 0 2 0 5 0 9 15:30 0 0 0 4 160 0 13 0 21 3 224 8 433 15:45 0 0 0 8 174 0 5 0 11 3 202 16 419 16:00 0 0 0 9 133 0 17 0 20 0 232 6 417 16:15 0 0 0 8 163 0 9 0 10 2 160 12 364 16:30 0 0 0 5 188 0 9 0 11 2 195 3 413 16:45 0 0 0 34 167 1 11 0 11 2 183 9 418 17:00 0 0 0 27 161 0 15 0 15 1 243 12 474 17:15 0 0 0 7 213 0 7 0 8 1 221 5 462 17:30 0 0 0 8 174 0 5 0 9 0 189 3 388 17:45 0 0 0 8 181 0 4 0 8 0 150 10 361 18:00 0 0 0 5 150 0 7 0 5 1 149 5 322 18:15 0 0 0 1 153 0 3 0 5 0 114 6 282 18:30 0 0 0 0 1 0 0 0 0 0 3 0 4 Car traffic Interval starts SouthBound Westbound Northbound Eastbound TotalLeftThruRightLeftThruRightLeftThruRightLeftThruRight 15:29 0 0 0 0 2 0 0 0 1 0 4 0 7 15:30 0 0 0 4 156 0 13 0 21 3 218 8 423 15:45 0 0 0 8 171 0 5 0 11 3 199 16 413 16:00 0 0 0 9 133 0 17 0 20 0 228 6 413 16:15 0 0 0 8 161 0 9 0 10 2 160 12 362 16:30 0 0 0 5 183 0 9 0 11 2 192 3 405 16:45 0 0 0 34 164 1 11 0 11 2 178 9 410 17:00 0 0 0 27 158 0 14 0 14 1 237 12 463 17:15 0 0 0 7 208 0 7 0 8 1 218 5 454 17:30 0 0 0 8 172 0 5 0 9 0 188 3 385 17:45 0 0 0 8 178 0 4 0 8 0 147 10 355 18:00 0 0 0 5 150 0 7 0 5 1 148 5 321 18:15 0 0 0 1 152 0 3 0 5 0 114 6 281 18:30 0 0 0 0 1 0 0 0 0 0 3 0 4 Truck traffic Interval starts SouthBound Westbound Northbound Eastbound TotalLeftThruRightLeftThruRightLeftThruRightLeftThruRight 15:29 0 0 0 0 0 0 0 0 1 0 0 0 1 15:30 0 0 0 0 1 0 0 0 0 0 5 0 6 15:45 0 0 0 0 2 0 0 0 0 0 3 0 5 16:00 0 0 0 0 0 0 0 0 0 0 4 0 4 16:15 0 0 0 0 1 0 0 0 0 0 0 0 1 16:30 0 0 0 0 5 0 0 0 0 0 2 0 7 16:45 0 0 0 0 1 0 0 0 0 0 4 0 5 17:00 0 0 0 0 3 0 0 0 0 0 2 0 5 17:15 0 0 0 0 4 0 0 0 0 0 3 0 7 17:30 0 0 0 0 2 0 0 0 0 0 1 0 3 17:45 0 0 0 0 1 0 0 0 0 0 1 0 2 18:00 0 0 0 0 0 0 0 0 0 0 1 0 1 18:15 0 0 0 0 0 0 0 0 0 0 0 0 0 18:30 0 0 0 0 0 0 0 0 0 0 0 0 0 Bicycle traffic Interval starts SouthBound Westbound Northbound Eastbound TotalLeftThruRightLeftThruRightLeftThruRightLeftThruRight 15:29 0 0 0 0 0 0 0 0 0 0 1 0 1 15:30 0 0 0 0 3 0 0 0 0 0 1 0 4 15:45 0 0 0 0 1 0 0 0 0 0 0 0 1 16:00 0 0 0 0 0 0 0 0 0 0 0 0 0 16:15 0 0 0 0 1 0 0 0 0 0 0 0 1 16:30 0 0 0 0 0 0 0 0 0 0 1 0 1 16:45 0 0 0 0 2 0 0 0 0 0 1 0 3 17:00 0 0 0 0 0 0 1 0 1 0 4 0 6 17:15 0 0 0 0 1 0 0 0 0 0 0 0 1 17:30 0 0 0 0 0 0 0 0 0 0 0 0 0 17:45 0 0 0 0 2 0 0 0 0 0 2 0 4 18:00 0 0 0 0 0 0 0 0 0 0 0 0 0 18:15 0 0 0 0 1 0 0 0 0 0 0 0 1 18:30 0 0 0 0 0 0 0 0 0 0 0 0 0 Pedestrian volumes Interval starts NE NW SW SE TotalLeftRightTotalLeftRightTotalLeftRightTotalLeftRightTotal 15:29 0 0 0 0 0 0 0 0 0 0 0 0 0 15:30 0 0 0 0 0 0 0 1 1 0 0 0 1 15:45 0 0 0 0 0 0 0 2 2 1 0 1 3 16:00 0 0 0 0 0 0 0 1 1 2 0 2 3 16:15 0 0 0 0 0 0 0 3 3 1 0 1 4 16:30 2 0 2 0 1 1 0 0 0 1 0 1 4 16:45 0 0 0 0 0 0 0 2 2 0 0 0 2 17:00 0 0 0 0 0 0 0 2 2 0 0 0 2 17:15 0 0 0 0 0 0 0 1 1 0 0 0 1 17:30 0 0 0 0 0 0 0 1 1 0 0 0 1 17:45 0 0 0 0 0 0 1 0 1 0 0 0 1 18:00 0 0 0 0 0 0 0 0 0 0 0 0 0 18:15 0 0 0 0 0 0 0 2 2 1 0 1 3 18:30 0 0 0 0 0 0 0 0 0 0 0 0 0 South Ashland Business Park TPRA D - 24 Intersection Peak Hour 16:30 - 17:30 SouthBound Westbound Northbound Eastbound TotalLeftThruRightLeftThruRightLeftThruRightLeftThruRight Vehicle Total 0 0 0 73 729 1 42 0 45 6 842 29 1767 Factor 0.00 0.00 0.00 0.54 0.86 0.25 0.70 0.00 0.75 0.75 0.87 0.60 0.93 Approach Factor 0.00 0.91 0.73 0.86 Peak Hour Vehicle Summary Vehicle SouthBound Westbound Northbound Eastbound TotalLeftThruRightLeftThruRightLeftThruRightLeftThruRight Car 0 0 0 73 713 1 41 0 44 6 825 29 1732 Truck 0 0 0 0 13 0 0 0 0 0 11 0 24 Bicycle 0 0 0 0 3 0 1 0 1 0 6 0 11 Peak Hour Pedestrians NE NW SW SE TotalLeftRightTotalLeftRightTotalLeftRightTotalLeftRightTotal Pedestrians 2 0 2 0 1 1 0 5 5 1 0 1 9 South Ashland Business Park TPRA D - 25 Intersection Peak Hour Location: Washington at Ashland , Ashland OR GPS Coordinates: Date: 2017-06-07 Day of week: Wednesday Weather: Analyst: SB: Washington EB : A s h l a n d WB : A s h l a n d NB: Washington 6 842 29 1 729 73 0 0 0 42 0 45 Intersection Peak Hour 16:30 - 17:30 SouthBound Westbound Northbound Eastbound TotalLeftThruRightLeftThruRightLeftThruRightLeftThruRight Vehicle Total 0 0 0 73 729 1 42 0 45 6 842 29 1767 Factor 0.00 0.00 0.00 0.54 0.86 0.25 0.70 0.00 0.75 0.75 0.87 0.60 0.93 Approach Factor 0.00 0.91 0.73 0.86 South Ashland Business Park TPRA D - 26 File Name : I-5SB_AshlandSt Site Code : 00000007 Start Date : 6/8/2017 Page No : 1 North-South: I-5 SB Ramps East-West: Ashland Street Weather: Overcast, warm Veh Type: All Vehicles Groups Printed- Unshifted I-5 SB Off From North Ashland St From East I-5 SB On From South Ashland St From West Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Uturn Thru Right Peds App. Total Int. Total 06:30 AM 24 0 65 0 89 1 15 0 1 17 0 0 0 0 0 0 56 2 0 58 164 06:45 AM 31 0 87 0 118 3 27 0 0 30 0 0 0 0 0 0 51 4 0 55 203 Total 55 0 152 0 207 4 42 0 1 47 0 0 0 0 0 0 107 6 0 113 367 07:00 AM 19 1 55 0 75 3 17 0 2 22 0 0 0 0 0 0 56 9 0 65 162 07:15 AM 28 0 70 1 99 5 27 0 0 32 0 0 0 0 0 0 74 5 0 79 210 07:30 AM 31 0 116 0 147 3 31 0 0 34 0 0 0 0 0 0 117 7 0 124 305 07:45 AM 58 0 158 0 216 6 31 0 0 37 0 0 0 0 0 0 105 6 0 111 364 Total 136 1 399 1 537 17 106 0 2 125 0 0 0 0 0 0 352 27 0 379 1041 08:00 AM 35 0 203 0 238 3 52 0 0 55 0 0 0 0 0 0 120 5 3 128 421 08:15 AM 38 0 205 0 243 6 48 0 1 55 0 0 0 0 0 1 156 11 0 168 466 08:30 AM 40 1 126 0 167 2 55 0 1 58 0 0 0 0 0 2 154 3 0 159 384 08:45 AM 47 0 120 0 167 4 64 0 0 68 0 0 0 0 0 2 122 5 1 130 365 Total 160 1 654 0 815 15 219 0 2 236 0 0 0 0 0 5 552 24 4 585 1636 09:00 AM 33 0 109 0 142 3 53 0 1 57 0 0 0 0 0 0 124 12 0 136 335 09:15 AM 38 1 98 0 137 8 50 0 0 58 0 0 0 0 0 1 126 10 0 137 332 *** BREAK *** Total 71 1 207 0 279 11 103 0 1 115 0 0 0 0 0 1 250 22 0 273 667 *** BREAK *** 03:30 PM 37 0 136 0 173 5 62 0 0 67 0 0 0 0 0 0 235 16 1 252 492 03:45 PM 50 0 129 0 179 6 70 0 0 76 0 0 0 0 0 0 199 17 2 218 473 Total 87 0 265 0 352 11 132 0 0 143 0 0 0 0 0 0 434 33 3 470 965 04:00 PM 35 0 127 1 163 4 61 0 0 65 0 0 0 0 0 0 210 14 2 226 454 04:15 PM 49 0 117 0 166 4 62 0 1 67 0 0 0 0 0 2 202 13 0 217 450 04:30 PM 35 1 112 0 148 9 73 0 0 82 0 0 1 0 1 4 189 18 4 215 446 04:45 PM 43 0 101 1 145 9 86 0 5 100 0 0 0 0 0 3 170 13 0 186 431 Total 162 1 457 2 622 26 282 0 6 314 0 0 1 0 1 9 771 58 6 844 1781 05:00 PM 56 0 125 0 181 4 61 0 1 66 0 0 0 0 0 3 231 17 0 251 498 05:15 PM 38 0 153 0 191 2 67 0 1 70 0 0 0 0 0 5 246 13 0 264 525 05:30 PM 40 1 130 0 171 8 70 0 2 80 0 0 0 0 0 3 190 14 3 210 461 05:45 PM 48 0 120 0 168 9 60 0 0 69 0 0 0 0 0 1 178 8 0 187 424 Total 182 1 528 0 711 23 258 0 4 285 0 0 0 0 0 12 845 52 3 912 1908 06:00 PM 45 0 120 0 165 3 62 0 3 68 0 0 0 0 0 2 180 16 1 199 432 06:15 PM 35 1 92 0 128 5 58 0 3 66 0 0 0 0 0 2 154 20 0 176 370 Grand Total 933 6 2874 3 3816 115 1262 0 22 1399 0 0 1 0 1 31 3645 258 17 3951 9167 Apprch %24.4 0.2 75.3 0.1 8.2 90.2 0 1.6 0 0 100 0 0.8 92.3 6.5 0.4 Total %10.2 0.1 31.4 0 41.6 1.3 13.8 0 0.2 15.3 0 0 0 0 0 0.3 39.8 2.8 0.2 43.1 Southern Oregon Transportation Engineering, LLC Medford, Or. 97504 South Ashland Business Park TPRA D - 27 File Name : I-5SB_AshlandSt Site Code : 00000007 Start Date : 6/8/2017 Page No : 2 North-South: I-5 SB Ramps East-West: Ashland Street Weather: Overcast, warm Veh Type: All Vehicles I-5 SB Off From North Ashland St From East I-5 SB On From South Ashland St From West Start Time Left Thru Right Peds App. Total Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s App. Total Utu rn Thr u Rig ht Ped s App. Total Int. Total Peak Hour Analysis From 08:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Each Approach Begins at: 08:00 AM 08:00 AM 08:00 AM 08:00 AM +0 mins.35 0 203 0 238 3 52 0 0 55 0 0 0 0 0 0 120 5 3 128 +15 mins.38 0 205 0 243 6 48 0 1 55 0 0 0 0 0 1 156 11 0 168 +30 mins.40 1 126 0 167 2 55 0 1 58 0 0 0 0 0 2 154 3 0 159 +45 mins.47 0 120 0 167 4 64 0 0 68 0 0 0 0 0 2 122 5 1 130 Total Volume 160 1 654 0 815 15 219 0 2 236 0 0 0 0 0 5 552 24 4 585 % App. Total 19.6 0.1 80.2 0 6.4 92.8 0 0.8 0 0 0 0 0.9 94.4 4.1 0.7 PHF .851 .250 .798 .000 .838 .625 .855 .000 .500 .868 .000 .000 .000 .000 .000 .625 .885 .545 .333 .871 I-5 SB Off A s h l a n d S t A s h l a n d S t I-5 SB On Right 654 Thru 1 Left 160 Peds 0 In - Peak Hour: 08:00 AM 815 Rig h t 0 Th r u 21 9 Le f t 15 Pe d s 2 In - P e a k H o u r : 0 8 : 0 0 A M 23 6 Left 0 Thru 0 Right 0 Peds 0 In - Peak Hour: 08:00 AM 0 Utu r n 5 Th r u 55 2 Ri g h t 24 Pe d s 4 In - P e a k H o u r : 0 8 : 0 0 A M 58 5 Unshifted Peak Hour Data North Southern Oregon Transportation Engineering, LLC Medford, Or. 97504 South Ashland Business Park TPRA D - 28 File Name : I-5SB_AshlandSt Site Code : 00000007 Start Date : 6/8/2017 Page No : 3 North-South: I-5 SB Ramps East-West: Ashland Street Weather: Overcast, warm Veh Type: All Vehicles I-5 SB Off From North Ashland St From East I-5 SB On From South Ashland St From West Start Time Left Thru Right Peds App. Total Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s App. Total Utu rn Thr u Rig ht Ped s App. Total Int. Total Peak Hour Analysis From 03:30 PM to 04:15 PM - Peak 1 of 1 Peak Hour for Each Approach Begins at: 03:30 PM 03:30 PM 03:30 PM 03:30 PM +0 mins.37 0 136 0 173 5 62 0 0 67 0 0 0 0 0 0 235 16 1 252 +15 mins.50 0 129 0 179 6 70 0 0 76 0 0 0 0 0 0 199 17 2 218 +30 mins.35 0 127 1 163 4 61 0 0 65 0 0 0 0 0 0 210 14 2 226 +45 mins.49 0 117 0 166 4 62 0 1 67 0 0 0 0 0 2 202 13 0 217 Total Volume 171 0 509 1 681 19 255 0 1 275 0 0 0 0 0 2 846 60 5 913 % App. Total 25.1 0 74.7 0.1 6.9 92.7 0 0.4 0 0 0 0 0.2 92.7 6.6 0.5 PHF .855 .000 .936 .250 .951 .792 .911 .000 .250 .905 .000 .000 .000 .000 .000 .250 .900 .882 .625 .906 I-5 SB Off A s h l a n d S t A s h l a n d S t I-5 SB On Right 509 Thru 0 Left 171 Peds 1 In - Peak Hour: 03:30 PM 681 Ri g h t 0 Th r u 25 5 Le f t 19 Pe d s 1 In - P e a k H o u r : 0 3 : 3 0 P M 27 5 Left 0 Thru 0 Right 0 Peds 0 In - Peak Hour: 03:30 PM 0 Ut u r n 2 Th r u 84 6 Ri g h t 60 Pe d s 5 In - P e a k H o u r : 0 3 : 3 0 P M 91 3 Unshifted Peak Hour Data North Southern Oregon Transportation Engineering, LLC Medford, Or. 97504 South Ashland Business Park TPRA D - 29 File Name : I-5SB_AshlandSt Site Code : 00000007 Start Date : 6/8/2017 Page No : 1 North-South: I-5 SB Ramps East-West: Ashland Street Weather: Overcast, warm Veh Type: Heavy Vehicles & Cyclists Groups Printed- Bank 1 I-5 SB Off From North Ashland St From East I-5 SB On From South Ashland St From West Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total 06:30 AM 2 0 5 0 7 0 1 0 0 1 0 0 0 0 0 0 2 0 0 2 10 06:45 AM 7 0 8 0 15 1 2 0 0 3 0 0 0 0 0 0 1 0 1 2 20 Total 9 0 13 0 22 1 3 0 0 4 0 0 0 0 0 0 3 0 1 4 30 07:00 AM 2 0 8 0 10 1 2 0 0 3 0 0 0 0 0 0 3 1 0 4 17 07:15 AM 1 0 4 0 5 0 5 0 1 6 0 0 0 0 0 0 5 0 0 5 16 07:30 AM 1 0 7 0 8 1 1 0 0 2 0 0 0 0 0 0 7 1 0 8 18 07:45 AM 7 0 5 0 12 0 1 0 0 1 0 0 0 0 0 0 6 0 1 7 20 Total 11 0 24 0 35 2 9 0 1 12 0 0 0 0 0 0 21 2 1 24 71 08:00 AM 4 0 4 0 8 0 3 0 0 3 0 0 0 0 0 0 4 0 0 4 15 08:15 AM 1 0 4 0 5 1 3 0 0 4 0 0 0 0 0 0 10 0 1 11 20 08:30 AM 5 0 5 0 10 0 3 0 0 3 0 0 0 0 0 0 10 0 0 10 23 08:45 AM 3 0 8 0 11 0 3 0 0 3 0 0 0 0 0 0 7 0 0 7 21 Total 13 0 21 0 34 1 12 0 0 13 0 0 0 0 0 0 31 0 1 32 79 09:00 AM 5 0 2 0 7 1 4 0 0 5 0 0 0 0 0 0 17 1 0 18 30 09:15 AM 8 0 6 0 14 2 2 0 1 5 0 0 0 0 0 0 13 1 0 14 33 *** BREAK *** Total 13 0 8 0 21 3 6 0 1 10 0 0 0 0 0 0 30 2 0 32 63 *** BREAK *** 03:30 PM 7 0 7 0 14 0 3 0 0 3 0 0 0 0 0 0 11 1 0 12 29 03:45 PM 3 0 6 0 9 0 2 0 0 2 0 0 0 0 0 0 11 0 0 11 22 Total 10 0 13 0 23 0 5 0 0 5 0 0 0 0 0 0 22 1 0 23 51 04:00 PM 2 0 4 0 6 2 1 0 0 3 0 0 0 0 0 0 12 1 0 13 22 04:15 PM 2 0 2 0 4 0 1 0 0 1 0 0 0 0 0 0 6 0 1 7 12 04:30 PM 3 0 6 0 9 0 2 0 0 2 0 0 0 0 0 0 5 1 0 6 17 04:45 PM 1 0 2 0 3 0 1 0 0 1 0 0 0 0 0 0 8 0 0 8 12 Total 8 0 14 0 22 2 5 0 0 7 0 0 0 0 0 0 31 2 1 34 63 05:00 PM 2 0 1 0 3 0 2 0 1 3 0 0 0 0 0 0 4 0 0 4 10 05:15 PM 2 0 3 0 5 0 3 0 0 3 0 0 0 0 0 0 5 0 0 5 13 05:30 PM 1 0 4 0 5 0 1 0 0 1 0 0 0 0 0 0 4 0 0 4 10 05:45 PM 4 0 2 0 6 0 3 0 0 3 0 0 0 0 0 0 4 1 0 5 14 Total 9 0 10 0 19 0 9 0 1 10 0 0 0 0 0 0 17 1 0 18 47 06:00 PM 1 0 1 0 2 0 3 0 2 5 0 0 0 0 0 0 2 1 0 3 10 06:15 PM 1 0 3 0 4 1 1 0 1 3 0 0 0 0 0 0 3 1 0 4 11 Grand Total 75 0 107 0 182 10 53 0 6 69 0 0 0 0 0 0 160 10 4 174 425 Apprch %41.2 0 58.8 0 14.5 76.8 0 8.7 0 0 0 0 0 92 5.7 2.3 Total %17.6 0 25.2 0 42.8 2.4 12.5 0 1.4 16.2 0 0 0 0 0 0 37.6 2.4 0.9 40.9 Southern Oregon Transportation Engineering, LLC Medford, Or. 97504 South Ashland Business Park TPRA D - 30 File Name : I-5SB_AshlandSt Site Code : 00000007 Start Date : 6/8/2017 Page No : 2 North-South: I-5 SB Ramps East-West: Ashland Street Weather: Overcast, warm Veh Type: Heavy Vehicles & Cyclists I-5 SB Off From North Ashland St From East I-5 SB On From South Ashland St From West Start Time Left Thru Right Peds App. Total Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s App. Total Int. Total Peak Hour Analysis From 08:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Each Approach Begins at: 08:00 AM 08:00 AM 08:00 AM 08:00 AM +0 mins.4 0 4 0 8 0 3 0 0 3 0 0 0 0 0 0 4 0 0 4 +15 mins.1 0 4 0 5 1 3 0 0 4 0 0 0 0 0 0 10 0 1 11 +30 mins.5 0 5 0 10 0 3 0 0 3 0 0 0 0 0 0 10 0 0 10 +45 mins.3 0 8 0 11 0 3 0 0 3 0 0 0 0 0 0 7 0 0 7 Total Volume 13 0 21 0 34 1 12 0 0 13 0 0 0 0 0 0 31 0 1 32 % App. Total 38.2 0 61.8 0 7.7 92.3 0 0 0 0 0 0 0 96.9 0 3.1 PHF .650 .000 .656 .000 .773 .250 1.000 .000 .000 .813 .000 .000 .000 .000 .000 .000 .775 .000 .250 .727 I-5 SB Off A s h l a n d S t A s h l a n d S t I-5 SB On Right 21 Thru 0 Left 13 Peds 0 In - Peak Hour: 08:00 AM 34 Rig h t 0 Th r u 12 Le f t 1 Pe d s 0 In - P e a k H o u r : 0 8 : 0 0 A M 13 Left 0 Thru 0 Right 0 Peds 0 In - Peak Hour: 08:00 AM 0 Utu r n 0 Th r u 31 Ri g h t 0 Pe d s 1 In - P e a k H o u r : 0 8 : 0 0 A M 32 Bank 1 Peak Hour Data North Southern Oregon Transportation Engineering, LLC Medford, Or. 97504 South Ashland Business Park TPRA D - 31 File Name : I-5SB_AshlandSt Site Code : 00000007 Start Date : 6/8/2017 Page No : 3 North-South: I-5 SB Ramps East-West: Ashland Street Weather: Overcast, warm Veh Type: Heavy Vehicles & Cyclists I-5 SB Off From North Ashland St From East I-5 SB On From South Ashland St From West Start Time Left Thru Right Peds App. Total Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s App. Total Int. Total Peak Hour Analysis From 03:30 PM to 04:15 PM - Peak 1 of 1 Peak Hour for Each Approach Begins at: 03:30 PM 03:30 PM 03:30 PM 03:30 PM +0 mins.7 0 7 0 14 0 3 0 0 3 0 0 0 0 0 0 11 1 0 12 +15 mins.3 0 6 0 9 0 2 0 0 2 0 0 0 0 0 0 11 0 0 11 +30 mins.2 0 4 0 6 2 1 0 0 3 0 0 0 0 0 0 12 1 0 13 +45 mins.2 0 2 0 4 0 1 0 0 1 0 0 0 0 0 0 6 0 1 7 Total Volume 14 0 19 0 33 2 7 0 0 9 0 0 0 0 0 0 40 2 1 43 % App. Total 42.4 0 57.6 0 22.2 77.8 0 0 0 0 0 0 0 93 4.7 2.3 PHF .500 .000 .679 .000 .589 .250 .583 .000 .000 .750 .000 .000 .000 .000 .000 .000 .833 .500 .250 .827 I-5 SB Off A s h l a n d S t A s h l a n d S t I-5 SB On Right 19 Thru 0 Left 14 Peds 0 In - Peak Hour: 03:30 PM 33 Ri g h t 0 Th r u 7 Le f t 2 Pe d s 0 In - P e a k H o u r : 0 3 : 3 0 P M 9 Left 0 Thru 0 Right 0 Peds 0 In - Peak Hour: 03:30 PM 0 Ut u r n 0 Th r u 40 Ri g h t 2 Pe d s 1 In - P e a k H o u r : 0 3 : 3 0 P M 43 Bank 1 Peak Hour Data North Southern Oregon Transportation Engineering, LLC Medford, Or. 97504 South Ashland Business Park TPRA D - 32 File Name : I-5NB_AshlandSt Site Code : 00000008 Start Date : 6/8/2017 Page No : 1 North-South: I-5 NB Ramps East-West: Ashland Street Weather: Overcast, warm Veh Type: All Vehicles Groups Printed- Unshifted I-5 NB On From North Ashland St From East I-5 NB Off From South Ashland St From West Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total 06:30 AM 0 0 0 0 0 0 12 24 0 36 4 0 4 1 9 43 35 0 0 78 123 06:45 AM 0 0 0 0 0 0 26 27 0 53 4 0 2 2 8 42 40 0 1 83 144 Total 0 0 0 0 0 0 38 51 0 89 8 0 6 3 17 85 75 0 1 161 267 07:00 AM 0 0 0 0 0 0 15 25 0 40 5 0 2 0 7 48 30 0 0 78 125 07:15 AM 0 0 0 0 0 0 29 41 0 70 3 0 1 1 5 62 40 0 0 102 177 07:30 AM 0 0 0 0 0 0 29 61 0 90 5 0 1 0 6 94 52 0 0 146 242 07:45 AM 0 0 0 0 0 0 33 54 0 87 3 0 3 0 6 85 78 0 0 163 256 Total 0 0 0 0 0 0 106 181 0 287 16 0 7 1 24 289 200 0 0 489 800 08:00 AM 0 0 0 1 1 0 46 58 0 104 9 0 0 0 9 84 71 0 2 157 271 08:15 AM 0 0 0 0 0 0 47 56 0 103 6 0 7 1 14 110 84 0 1 195 312 08:30 AM 0 0 0 0 0 0 47 85 0 132 10 0 2 0 12 118 76 0 0 194 338 08:45 AM 0 0 0 1 1 0 57 35 0 92 11 0 8 0 19 84 85 0 1 170 282 Total 0 0 0 2 2 0 197 234 0 431 36 0 17 1 54 396 316 0 4 716 1203 09:00 AM 0 0 0 0 0 0 45 50 0 95 10 0 6 0 16 85 70 0 0 155 266 09:15 AM 0 0 0 0 0 0 50 44 0 94 6 0 5 1 12 80 85 0 0 165 271 *** BREAK *** Total 0 0 0 0 0 0 95 94 0 189 16 0 11 1 28 165 155 0 0 320 537 *** BREAK *** 03:30 PM 0 0 0 2 2 3 57 79 0 139 11 0 16 1 28 156 116 0 1 273 442 03:45 PM 0 0 0 2 2 0 59 71 0 130 16 0 17 0 33 138 111 0 0 249 414 Total 0 0 0 4 4 3 116 150 0 269 27 0 33 1 61 294 227 0 1 522 856 04:00 PM 0 0 0 1 1 0 50 83 0 133 13 0 15 0 28 138 108 0 1 247 409 04:15 PM 0 0 0 0 0 0 57 63 1 121 10 0 11 0 21 126 125 0 1 252 394 04:30 PM 0 0 0 1 1 0 71 67 0 138 9 0 10 2 21 122 100 0 0 222 382 04:45 PM 0 0 0 0 0 0 84 60 0 144 10 0 8 1 19 111 102 0 2 215 378 Total 0 0 0 2 2 0 262 273 1 536 42 0 44 3 89 497 435 0 4 936 1563 05:00 PM 0 0 0 0 0 0 58 60 1 119 7 0 13 1 21 153 134 0 1 288 428 05:15 PM 0 0 0 0 0 0 56 72 0 128 13 0 18 0 31 162 121 1 0 284 443 05:30 PM 0 0 0 0 0 0 62 55 0 117 15 1 13 0 29 126 104 0 0 230 376 05:45 PM 0 0 0 0 0 0 53 43 0 96 16 0 12 0 28 112 114 0 2 228 352 Total 0 0 0 0 0 0 229 230 1 460 51 1 56 1 109 553 473 1 3 1030 1599 06:00 PM 0 0 0 0 0 0 52 44 4 100 12 0 16 2 30 115 106 3 2 226 356 06:15 PM 0 0 0 0 0 0 52 44 1 97 10 0 10 1 21 92 99 0 0 191 309 Grand Total 0 0 0 8 8 3 1147 1301 7 2458 218 1 200 14 433 2486 2086 4 15 4591 7490 Apprch %0 0 0 100 0.1 46.7 52.9 0.3 50.3 0.2 46.2 3.2 54.1 45.4 0.1 0.3 Total %0 0 0 0.1 0.1 0 15.3 17.4 0.1 32.8 2.9 0 2.7 0.2 5.8 33.2 27.9 0.1 0.2 61.3 Southern Oregon Transportation Engineering, LLC Medford, Or. 97504 South Ashland Business Park TPRA D - 33 File Name : I-5NB_AshlandSt Site Code : 00000008 Start Date : 6/8/2017 Page No : 2 North-South: I-5 NB Ramps East-West: Ashland Street Weather: Overcast, warm Veh Type: All Vehicles I-5 NB On From North Ashland St From East I-5 NB Off From South Ashland St From West Start Time Left Thru Right Peds App. Total Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s App. Total Int. Total Peak Hour Analysis From 08:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Each Approach Begins at: 08:00 AM 08:00 AM 08:00 AM 08:00 AM +0 mins.0 0 0 1 1 0 46 58 0 104 9 0 0 0 9 84 71 0 2 157 +15 mins.0 0 0 0 0 0 47 56 0 103 6 0 7 1 14 110 84 0 1 195 +30 mins.0 0 0 0 0 0 47 85 0 132 10 0 2 0 12 118 76 0 0 194 +45 mins.0 0 0 1 1 0 57 35 0 92 11 0 8 0 19 84 85 0 1 170 Total Volume 0 0 0 2 2 0 197 234 0 431 36 0 17 1 54 396 316 0 4 716 % App. Total 0 0 0 100 0 45.7 54.3 0 66.7 0 31.5 1.9 55.3 44.1 0 0.6 PHF .000 .000 .000 .500 .500 .000 .864 .688 .000 .816 .818 .000 .531 .250 .711 .839 .929 .000 .500 .918 I-5 NB On A s h l a n d S t A s h l a n d S t I-5 NB Off Right 0 Thru 0 Left 0 Peds 2 In - Peak Hour: 08:00 AM 2 Rig h t 23 4 Th r u 19 7 Le f t 0 Pe d s 0 In - P e a k H o u r : 0 8 : 0 0 A M 43 1 Left 36 Thru 0 Right 17 Peds 1 In - Peak Hour: 08:00 AM 54 Le f t 39 6 Th r u 31 6 Ri g h t 0 Pe d s 4 In - P e a k H o u r : 0 8 : 0 0 A M 71 6 Unshifted Peak Hour Data North Southern Oregon Transportation Engineering, LLC Medford, Or. 97504 South Ashland Business Park TPRA D - 34 File Name : I-5NB_AshlandSt Site Code : 00000008 Start Date : 6/8/2017 Page No : 3 North-South: I-5 NB Ramps East-West: Ashland Street Weather: Overcast, warm Veh Type: All Vehicles I-5 NB On From North Ashland St From East I-5 NB Off From South Ashland St From West Start Time Left Thru Right Peds App. Total Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s App. Total Int. Total Peak Hour Analysis From 03:30 PM to 04:15 PM - Peak 1 of 1 Peak Hour for Each Approach Begins at: 03:30 PM 03:30 PM 03:30 PM 03:30 PM +0 mins.0 0 0 2 2 3 57 79 0 139 11 0 16 1 28 156 116 0 1 273 +15 mins.0 0 0 2 2 0 59 71 0 130 16 0 17 0 33 138 111 0 0 249 +30 mins.0 0 0 1 1 0 50 83 0 133 13 0 15 0 28 138 108 0 1 247 +45 mins.0 0 0 0 0 0 57 63 1 121 10 0 11 0 21 126 125 0 1 252 Total Volume 0 0 0 5 5 3 223 296 1 523 50 0 59 1 110 558 460 0 3 1021 % App. Total 0 0 0 100 0.6 42.6 56.6 0.2 45.5 0 53.6 0.9 54.7 45.1 0 0.3 PHF .000 .000 .000 .625 .625 .250 .945 .892 .250 .941 .781 .000 .868 .250 .833 .894 .920 .000 .750 .935 I-5 NB On A s h l a n d S t A s h l a n d S t I-5 NB Off Right 0 Thru 0 Left 0 Peds 5 In - Peak Hour: 03:30 PM 5 Ri g h t 29 6 Th r u 22 3 Le f t 3 Pe d s 1 In - P e a k H o u r : 0 3 : 3 0 P M 52 3 Left 50 Thru 0 Right 59 Peds 1 In - Peak Hour: 03:30 PM 110 Le f t 55 8 Th r u 46 0 Ri g h t 0 Pe d s 3 In - P e a k H o u r : 0 3 : 3 0 P M 10 2 1 Unshifted Peak Hour Data North Southern Oregon Transportation Engineering, LLC Medford, Or. 97504 South Ashland Business Park TPRA D - 35 File Name : I-5NB_AshlandSt Site Code : 00000008 Start Date : 6/8/2017 Page No : 1 North-South: I-5 NB Ramps East-West: Ashland Street Weather: Overcast, warm Veh Type: Heavy Vehicles & Cyclists Groups Printed- Bank 1 I-5 NB On From North Ashland St From East I-5 NB Off From South Ashland St From West Start Time Left Thru Right Cyclists App. Total Left Thru Right Cyclists App. Total Left Thru Right Cyclists App. Total Left Thru Right Cyclists App. Total Int. Total 06:30 AM 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 1 0 0 0 1 2 06:45 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 3 5 0 1 9 10 Total 0 0 0 0 0 0 1 1 0 2 0 0 0 0 0 4 5 0 1 10 12 07:00 AM 0 0 0 0 0 0 1 1 0 2 1 0 0 0 1 4 0 0 0 4 7 07:15 AM 0 0 0 0 0 0 3 1 0 4 0 0 0 1 1 1 3 0 0 4 9 07:30 AM 0 0 0 0 0 0 1 1 0 2 0 0 0 0 0 5 2 0 0 7 9 07:45 AM 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 3 7 0 0 10 11 Total 0 0 0 0 0 0 5 4 0 9 1 0 0 1 2 13 12 0 0 25 36 08:00 AM 0 0 0 0 0 0 2 2 0 4 0 0 0 0 0 0 5 0 0 5 9 08:15 AM 0 0 0 0 0 0 3 3 0 6 0 0 0 0 0 3 3 0 1 7 13 08:30 AM 0 0 0 0 0 0 2 1 0 3 0 0 0 0 0 2 6 0 0 8 11 08:45 AM 0 0 0 0 0 0 1 4 0 5 1 0 0 0 1 2 2 0 0 4 10 Total 0 0 0 0 0 0 8 10 0 18 1 0 0 0 1 7 16 0 1 24 43 09:00 AM 0 0 0 0 0 0 1 2 0 3 0 0 0 0 0 11 6 0 0 17 20 09:15 AM 0 0 0 0 0 0 1 2 0 3 0 0 1 1 2 3 6 0 0 9 14 *** BREAK *** Total 0 0 0 0 0 0 2 4 0 6 0 0 1 1 2 14 12 0 0 26 34 *** BREAK *** 03:30 PM 0 0 0 0 0 0 1 2 0 3 0 0 2 0 2 5 6 0 0 11 16 03:45 PM 0 0 0 0 0 0 0 5 0 5 1 0 0 0 1 4 2 0 0 6 12 Total 0 0 0 0 0 0 1 7 0 8 1 0 2 0 3 9 8 0 0 17 28 04:00 PM 0 0 0 0 0 0 1 2 0 3 0 0 1 0 1 4 4 0 0 8 12 04:15 PM 0 0 0 0 0 0 0 2 0 2 0 0 0 0 0 1 1 0 1 3 5 04:30 PM 0 0 0 0 0 0 1 0 0 1 1 0 0 0 1 1 2 0 0 3 5 04:45 PM 0 0 0 0 0 0 0 3 0 3 1 0 2 0 3 2 0 0 0 2 8 Total 0 0 0 0 0 0 2 7 0 9 2 0 3 0 5 8 7 0 1 16 30 05:00 PM 0 0 0 0 0 0 0 1 0 1 1 0 1 1 3 0 0 0 0 0 4 05:15 PM 0 0 0 0 0 0 3 1 0 4 0 0 3 0 3 0 0 0 0 0 7 05:30 PM 0 0 0 0 0 0 0 2 0 2 1 0 0 0 1 1 0 0 0 1 4 05:45 PM 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 2 0 0 2 3 Total 0 0 0 0 0 0 3 4 0 7 3 0 4 1 8 1 2 0 0 3 18 06:00 PM 0 0 0 0 0 0 1 0 2 3 1 0 0 0 1 1 0 0 0 1 5 06:15 PM 0 0 0 0 0 0 0 0 1 1 0 0 1 0 1 0 1 0 0 1 3 Grand Total 0 0 0 0 0 0 23 37 3 63 9 0 11 3 23 57 63 0 3 123 209 Apprch %0 0 0 0 0 36.5 58.7 4.8 39.1 0 47.8 13 46.3 51.2 0 2.4 Total %0 0 0 0 0 0 11 17.7 1.4 30.1 4.3 0 5.3 1.4 11 27.3 30.1 0 1.4 58.9 Southern Oregon Transportation Engineering, LLC Medford, Or. 97504 South Ashland Business Park TPRA D - 36 File Name : I-5NB_AshlandSt Site Code : 00000008 Start Date : 6/8/2017 Page No : 2 North-South: I-5 NB Ramps East-West: Ashland Street Weather: Overcast, warm Veh Type: Heavy Vehicles & Cyclists I-5 NB On From North Ashland St From East I-5 NB Off From South Ashland St From West Start Time Left Thru Right Cyclists App. Total Left Thr u Rig ht Cyc lists App. Total Left Thr u Rig ht Cyc lists App. Total Left Thr u Rig ht Cyc lists App. Total Int. Total Peak Hour Analysis From 08:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Each Approach Begins at: 08:00 AM 08:00 AM 08:00 AM 08:00 AM +0 mins.0 0 0 0 0 0 2 2 0 4 0 0 0 0 0 0 5 0 0 5 +15 mins.0 0 0 0 0 0 3 3 0 6 0 0 0 0 0 3 3 0 1 7 +30 mins.0 0 0 0 0 0 2 1 0 3 0 0 0 0 0 2 6 0 0 8 +45 mins.0 0 0 0 0 0 1 4 0 5 1 0 0 0 1 2 2 0 0 4 Total Volume 0 0 0 0 0 0 8 10 0 18 1 0 0 0 1 7 16 0 1 24 % App. Total 0 0 0 0 0 44.4 55.6 0 100 0 0 0 29.2 66.7 0 4.2 PHF .000 .000 .000 .000 .000 .000 .667 .625 .000 .750 .250 .000 .000 .000 .250 .583 .667 .000 .250 .750 I-5 NB On A s h l a n d S t A s h l a n d S t I-5 NB Off Right 0 Thru 0 Left 0 Peds 0 In - Peak Hour: 08:00 AM 0 Rig h t 10 Th r u 8 Le f t 0 Pe d s 0 In - P e a k H o u r : 0 8 : 0 0 A M 18 Left 1 Thru 0 Right 0 Peds 0 In - Peak Hour: 08:00 AM 1 Le f t 7 Th r u 16 Ri g h t 0 Pe d s 1 In - P e a k H o u r : 0 8 : 0 0 A M 24 Bank 1 Peak Hour Data North Southern Oregon Transportation Engineering, LLC Medford, Or. 97504 South Ashland Business Park TPRA D - 37 File Name : I-5NB_AshlandSt Site Code : 00000008 Start Date : 6/8/2017 Page No : 3 North-South: I-5 NB Ramps East-West: Ashland Street Weather: Overcast, warm Veh Type: Heavy Vehicles & Cyclists I-5 NB On From North Ashland St From East I-5 NB Off From South Ashland St From West Start Time Left Thru Right Cyclists App. Total Left Thr u Rig ht Cyc lists App. Total Left Thr u Rig ht Cyc lists App. Total Left Thr u Rig ht Cyc lists App. Total Int. Total Peak Hour Analysis From 03:30 PM to 04:15 PM - Peak 1 of 1 Peak Hour for Each Approach Begins at: 03:30 PM 03:30 PM 03:30 PM 03:30 PM +0 mins.0 0 0 0 0 0 1 2 0 3 0 0 2 0 2 5 6 0 0 11 +15 mins.0 0 0 0 0 0 0 5 0 5 1 0 0 0 1 4 2 0 0 6 +30 mins.0 0 0 0 0 0 1 2 0 3 0 0 1 0 1 4 4 0 0 8 +45 mins.0 0 0 0 0 0 0 2 0 2 0 0 0 0 0 1 1 0 1 3 Total Volume 0 0 0 0 0 0 2 11 0 13 1 0 3 0 4 14 13 0 1 28 % App. Total 0 0 0 0 0 15.4 84.6 0 25 0 75 0 50 46.4 0 3.6 PHF .000 .000 .000 .000 .000 .000 .500 .550 .000 .650 .250 .000 .375 .000 .500 .700 .542 .000 .250 .636 I-5 NB On A s h l a n d S t A s h l a n d S t I-5 NB Off Right 0 Thru 0 Left 0 Peds 0 In - Peak Hour: 03:30 PM 0 Ri g h t 11 Th r u 2 Le f t 0 Pe d s 0 In - P e a k H o u r : 0 3 : 3 0 P M 13 Left 1 Thru 0 Right 3 Peds 0 In - Peak Hour: 03:30 PM 4 Le f t 14 Th r u 13 Ri g h t 0 Pe d s 1 In - P e a k H o u r : 0 3 : 3 0 P M 28 Bank 1 Peak Hour Data North Southern Oregon Transportation Engineering, LLC Medford, Or. 97504 South Ashland Business Park TPRA D - 38 : 6/8/2017 : 1 Start Time Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Int. Total 6:30 AM 00000010010030382001014 6:45 AM 000000000000101111001213 Total 000000100100404193002227 7:00 AM 000000000000505200027 7:15 AM 0000000000001015220910 7:30 AM 0100102002004047110916 7:45 AM 00000010010050593001218 Total 01001030030015015236303251 8:00 AM 00000021030030393001218 8:15 AM 0000000000006068100915 8:30 AM 000000100100404123101621 8:45 AM 000000000000303113101518 Total 000000310400160164010205272 9:00 AM 0000000000005054300712 9:15 AM 101020010100606140001423 Total 10102001010011011183002135 Grand Total 111030720900460461002250127185 Apprch %33% 33% 33% 0% 0% 78% 22% 0% 0% 0%100%0% 79% 17% 4% 0% Total % 1% 1% 1% 0% 2% 0% 4% 1% 0% 5% 0% 0% 25% 0% 25% 54% 12% 3% 0% 69% SANDOWENGINEERING llc. 160 Madison Street Suite A Eugene, Oregon 97402 Driveway Southbound Westbound Northbound Eastbound Washington St Jefferson Ave Washington St Page No File Name Start Date Groups Printed ‐ Vehicles AM Jefferson Ave @  Washington St South Ashland Business Park TPRA D - 39 : 6/8/2017 : 2 Start Time Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Int. Total 6:30 AM 000000000000000000000 6:45 AM 000000000000000000000 Total 000000000000000000000 7:00 AM 000000000000000000000 7:15 AM 000000000000000000000 7:30 AM 000000000000000000000 7:45 AM 000000000000000000000 Total 000000000000000000000 8:00 AM 000000000000000100011 8:15 AM 000000000000000000000 8:30 AM 000000100100000000001 8:45 AM 000000000000000010011 Total 000000100100000110023 9:00 AM 000000000000101000001 9:15 AM 000000000000000000000 Total 000000000000101000001 Grand Total 000000100100101110024 Apprch %0% 0% 0% 0% 0%100%0% 0% 0% 0%100%0% 50% 50% 0% 0% Total % 0% 0% 0% 0% 0% 0% 25% 0% 0% 25% 0% 0% 25% 0% 25% 25% 25% 0% 0% 50% SANDOWENGINEERING llc. 160 Madison Street Suite A Eugene, Oregon 97402 Groups Printed ‐ Trucks Driveway Washington St Page No AM Jefferson Ave @  Washington St Jefferson Ave Washington St Southbound Westbound Northbound Eastbound File Name Start Date South Ashland Business Park TPRA D - 40 : 6/8/2017 : 3 Start Time Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Int. Total 6:30 AM 000000000000000000000 6:45 AM 000000000000000000000 Total 000000000000000000000 7:00 AM 000000000000000000000 7:15 AM 000000000000000000000 7:30 AM 000000000000000000000 7:45 AM 000000000000000000000 Total 000000000000000000000 8:00 AM 000000000000000000000 8:15 AM 000000000000000000000 8:30 AM 000000000000000000000 8:45 AM 000000000000000000000 Total 000000000000000000000 9:00 AM 000000000000000000000 9:15 AM 000000000000000010011 Total 000000000000000010011 Grand Total 000000000000000010011 Apprch %0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%100%0% 0% Total % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%100%0% 0%100% AM Jefferson Ave @  Washington St SANDOWENGINEERING llc. 160 Madison Street Suite A Eugene, Oregon 97402 File Name Start Date Page No Groups Printed ‐ Bicycles Driveway Washington St Jefferson Ave Washington St Southbound Westbound Northbound Eastbound South Ashland Business Park TPRA D - 41 : 6/8/2017 : 4 Start Time Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Int. Total 6:30 AM 00000010010030382001014 6:45 AM 000000000000101111001213 Total 000000100100404193002227 7:00 AM 000000000000505200027 7:15 AM 0000000000001015220910 7:30 AM 0100102002004047110916 7:45 AM 00000010010050593001218 Total 01001030030015015236303251 8:00 AM 000000210300303103001319 8:15 AM 0000000000006068100915 8:30 AM 000000200200404123101622 8:45 AM 000000000000303114101619 Total 000000410500160164111205475 9:00 AM 0000000000006064300713 9:15 AM 101020010100606141001524 Total 10102001010012012184002237 Grand Total 1110308201000470471012450130190 Apprch %33% 33% 33% 0% 0% 80% 20% 0% 0% 0%100%0% 78% 18% 4% 0% Total % 1% 1% 1% 0% 2% 0% 4% 1% 0% 5% 0% 0% 25% 0% 25% 53% 13% 3% 0% 68% AM Jefferson Ave @  Washington St 160 Madison Street Suite A Eugene, Oregon 97402 File Name Start Date Page No Washington St Southbound Westbound Northbound Eastbound Groups Printed ‐ Total Driveway Washington St Jefferson Ave SANDOWENGINEERING llc. South Ashland Business Park TPRA D - 42 : 6/7/2017 : 1 Start Time Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Int. Total 6:30 AM 000000700700190194000430 6:45 AM 11002050050040445201122 Total 110020120012002302385201552 7:00 AM 00000011001100190194100535 7:15 AM 0000004004005057200918 7:30 AM 0000007007008085000520 7:45 AM 20002030030090983101226 Total 2000202500250041041246103199 8:00 AM 1000101001009096200819 8:15 AM 000000110200404200028 8:30 AM 0000001001104055000511 8:45 AM 100010300300404102001220 Total 20002061071021022234002758 9:00 AM 0000003003006064000413 9:15 AM 000000400400303110029 Total 0000007007009095100622 Grand Total 510060501051109409560163079231 Apprch %83% 17% 0% 0% 0% 98% 2% 0% 1% 0%99%0% 76% 20% 4% 0% Total % 2% 0% 0% 0% 3% 0% 22% 0% 0% 22% 0% 0% 41% 0% 41% 26% 7% 1% 0% 34% File Name Start Date Groups Printed ‐ Vehicles PM Jefferson Ave @  Washington St SANDOWENGINEERING llc. 160 Madison Street Suite A Eugene, Oregon 97402 Driveway Southbound Westbound Northbound Eastbound Washington St Jefferson Ave Washington St Page No South Ashland Business Park TPRA D - 43 : 6/7/2017 : 2 Start Time Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Int. Total 6:30 AM 000000000000000000000 6:45 AM 000000000000000000000 Total 000000000000000000000 7:00 AM 000000000000000000000 7:15 AM 000000000000000000000 7:30 AM 000000000000000000000 7:45 AM 000000000000000000000 Total 000000000000000000000 8:00 AM 000000000000000000000 8:15 AM 000000000000000000000 8:30 AM 000000000000000000000 8:45 AM 000000000000000000000 Total 000000000000000000000 9:00 AM 000000000000000000000 9:15 AM 000000000000000000000 Total 000000000000000000000 Grand Total 000000000000000000000 Apprch %0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Total % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Southbound Westbound Northbound Eastbound File Name Start Date SANDOWENGINEERING llc. 160 Madison Street Suite A Eugene, Oregon 97402 Groups Printed ‐ Trucks Driveway Washington St Page No PM Jefferson Ave @  Washington St Jefferson Ave Washington St South Ashland Business Park TPRA D - 44 : 6/7/2017 : 3 Start Time Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Int. Total 6:30 AM 000000000000000000000 6:45 AM 000000000000000000000 Total 000000000000000000000 7:00 AM 000000000000000000000 7:15 AM 000000000000000000000 7:30 AM 000000000000000000000 7:45 AM 000000000000000000000 Total 000000000000000000000 8:00 AM 000000000000000000000 8:15 AM 000000000000000000000 8:30 AM 000000000000000000000 8:45 AM 000000000000000000000 Total 000000000000000000000 9:00 AM 000000000000000000000 9:15 AM 000000000000000000000 Total 000000000000000000000 Grand Total 000000000000000000000 Apprch %0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Total % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Washington St Southbound Westbound Northbound Eastbound Page No Groups Printed ‐ Bicycles Driveway Washington St Jefferson Ave SANDOWENGINEERING llc. 160 Madison Street Suite A Eugene, Oregon 97402 File Name Start Date PM Jefferson Ave @  Washington St South Ashland Business Park TPRA D - 45 : 6/7/2017 : 4 Start Time Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Right Thru Left Peds App.  Total Int. Total 6:30 AM 000000700700190194000430 6:45 AM 11002050050040445201122 Total 110020120012002302385201552 7:00 AM 00000011001100190194100535 7:15 AM 0000004004005057200918 7:30 AM 0000007007008085000520 7:45 AM 20002030030090983101226 Total 2000202500250041041246103199 8:00 AM 1000101001009096200819 8:15 AM 000000110200404200028 8:30 AM 0000001001104055000511 8:45 AM 100010300300404102001220 Total 20002061071021022234002758 9:00 AM 0000003003006064000413 9:15 AM 000000400400303110029 Total 0000007007009095100622 Grand Total 510060501051109409560163079231 Apprch %83% 17% 0% 0% 0% 98% 2% 0% 1% 0%99%0% 76% 20% 4% 0% Total % 2% 0% 0% 0% 3% 0% 22% 0% 0% 22% 0% 0% 41% 0% 41% 26% 7% 1% 0% 34% SANDOWENGINEERING llc. Start Date Page No Washington St Southbound Westbound Northbound Eastbound Groups Printed ‐ Total Driveway Washington St Jefferson Ave PM Jefferson Ave @  Washington St 160 Madison Street Suite A Eugene, Oregon 97402 File Name South Ashland Business Park TPRA D - 46 SANDOW ENGINEERING AP P E N D I X E : TR A F F I C V O L U M E A D J U S T M E N T S South Ashland Business Park  Ci t y : Da t e : To t a l o f A ll  V e hic les Rig h t T h r u L e f t Ap p r o a c h   To t a l Ri g h t T h r u L e f t Ap p r o a c h   To t a l Rig h t T h r u L e f t Ap p r o a c h   To t a l Rig h t T h r u L e f t Ap p r o a c h   To t a l SB W B N B E B 15 : 3 0 1 5 : 4 5 1 0 1 9 5 0 7 9 2 9 1 1 7 1 7 1 6 3 1 8 1 3 3 3 4 2 1 2 3 1 1 1 3 6 4 1 2 5 4 5 7 15 : 4 5 1 6 : 0 0 2 6 8 4 2 7 6 2 1 1 0 1 1 0 1 3 2 1 4 8 1 2 3 1 1 1 1 0 1 4 1 3 5 3 6 6 0 3 6 3 16 : 0 0 1 6 : 1 5 1 9 1 0 3 7 6 6 2 9 1 4 3 1 2 1 8 4 2 2 1 4 2 3 8 3 1 1 0 1 3 1 2 6 4 1 4 5 4 5 5 16 : 1 5 1 6 : 3 0 9 1 5 3 8 6 2 3 0 1 1 4 1 5 1 5 9 1 7 1 1 0 2 8 4 1 2 5 1 9 1 4 8 3 9 7 1 5 8 9 4 5 5 5 16 : 3 0 1 6 : 4 5 1 6 1 8 2 9 6 3 3 5 9 9 9 1 4 3 1 3 1 2 3 2 8 7 1 3 4 2 9 1 7 0 4 0 4 1 5 8 1 2 4 7 4 16 : 4 5 1 7 : 0 0 1 8 1 8 4 3 7 9 2 7 1 1 2 2 2 1 6 1 2 8 6 4 3 8 4 1 2 8 2 7 1 5 9 4 3 7 1 6 5 2 4 0 2 4 17 : 0 0 1 7 : 1 5 2 0 2 1 5 1 9 2 3 3 1 3 3 1 7 1 8 3 2 2 9 1 3 2 2 1 3 6 2 3 1 6 1 4 6 8 1 7 0 6 6 3 9 6 17 : 1 5 1 7 : 3 0 1 9 6 3 9 6 4 1 9 9 6 1 2 1 2 7 3 0 9 0 3 9 5 1 0 7 1 7 1 2 9 3 5 9 1 6 6 8 2 4 3 1 17 : 3 0 1 7 : 4 5 1 4 1 3 3 0 5 7 2 0 1 0 1 1 5 1 3 6 1 6 6 4 2 6 7 1 0 5 1 7 1 2 9 3 4 8 1 6 1 2 5 3 9 7 17 : 4 5 1 8 : 0 0 1 0 9 1 4 3 3 3 0 1 2 3 8 1 6 1 2 1 7 1 2 9 5 9 3 2 1 1 1 9 3 4 2 1 5 1 7 2 0 1 4 18 : 0 0 1 8 : 1 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 4 9 0 0 0 0 18 : 1 5 1 8 : 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 9 0 0 0 0 0 16 1 1 3 7 3 7 3 27 3 1 1 3 9 1 3 7 20 1 9 5 1 9 50 1 1 7 1 1 9 1 39 4 7 35 30 52 4 6 Rig h t T h r u L e f t Ap p r o a c h   To t a l Ri g h t T h r u L e f t Ap p r o a c h   To t a l Rig h t T h r u L e f t Ap p r o a c h   To t a l Rig h t T h r u L e f t Ap p r o a c h   To t a l SB W B N B E B 73 6 3 1 6 2 2 9 8 1 1 4 4 4 0 6 0 6 1 4 9 3 3 6 8 1 3 7 1 8 5 0 5 9 6 6 1 9 1 6 6 8 14 11 2 1 1 5 0.9 1 0 . 7 5 0 . 7 9 0 . 8 1 0 . 8 1 0 . 8 3 0 . 6 8 0 . 8 4 0 . 7 8 0 . 7 5 0 . 5 0 0 . 8 8 0 . 6 4 0 . 9 3 0 . 8 3 0 . 9 1 0.8 9 00 0 0 4 1 3 0 0 0 5 0 0% 0 % 0 % 0% 1 % 2 % 3% 0 % 0 % 0% 1 % 0 % 15   Min u t e   Vo l u m e In t e r s e c t i o n :   1:   W a l k e r   A v e   @   A s h l a n d   S t As h l a n d ,   O R Co u n t e r :   SO T E T h u r s d a y ,   S e p t e m b e r   2 2 ,   2 0 1 6 Tim e   P e r i o d So u t h b o u n d   W e s t b o u n d   N o r t h b o u n d   E a s t b o u n d   Ho u r l y   Vo l u m e Pe d e s t r i a n s PH F Co u n t   P e r i o d   T o t a l PM   P e a k   H o u r   C o u n t   S u m m a r y So u t h b o u n d   We s t b o u n d   No r t h b o u n d   Ea s t b o u n d   Pe d e s t r i a n s Pe a k   V o l u m e s Tr u c k s % T r u c k s South Ashland Business Park TPRA E - 1 1:  W a l k e r   A v e   @   A s h l a n d   S t Pe d e s t r i a n s   a n d   C a r s Pe d s R i g h t T h r u L e f t Pe d s R i g h t T h r u L e f t Pe d s R i g h t T h r u L e f t Pe d s R i g h t T h r u L e f t 3:3 0   P M 5 1 0 1 9 5 0 4 2 9 1 1 6 1 7 5 1 8 1 3 3 5 2 1 2 3 1 1 41 1 3:4 5   P M 0 2 6 8 4 2 2 2 1 1 0 1 1 0 6 1 4 8 1 2 1 1 1 1 0 1 4 36 6 4:0 0   P M 5 1 9 1 0 3 7 2 2 9 1 4 3 1 1 4 2 2 1 4 2 4 3 1 1 0 1 3 41 3 4:1 5   P M 3 9 1 5 3 8 4 2 9 1 1 1 1 4 5 1 7 1 1 0 4 4 1 2 5 1 9 39 2 1 5 8 2 4:3 0   P M 1 1 6 1 8 2 9 3 3 5 9 7 9 5 1 1 1 2 3 4 7 1 3 2 2 9 39 8 1 5 6 9 4:4 5   P M 4 1 8 1 8 4 3 0 2 7 1 1 1 2 2 2 2 8 6 4 4 4 1 2 8 2 7 43 6 1 6 3 9 5:0 0   P M 4 2 0 2 1 5 1 3 3 3 1 3 2 1 6 9 2 2 9 1 5 2 1 3 4 2 3 46 4 1 6 9 0 5:1 5   P M 2 1 9 6 3 9 3 1 9 9 6 1 2 3 2 9 9 0 1 5 1 0 6 1 7 35 7 1 6 5 5 5:3 0   P M 4 1 4 1 3 2 9 3 2 0 1 0 1 1 5 8 1 6 6 4 5 7 1 0 5 1 7 34 7 1 6 0 4 5:4 5   P M 1 1 0 9 1 4 0 3 0 1 2 2 8 1 2 1 7 1 4 5 9 3 2 1 34 1 1 5 0 9 6:0 0   P M 0 1 0 4 5 6:1 5   P M 0 68 8 To t a l 29 1 6 1 1 3 7 3 7 2 24 2 7 2 1 1 3 0 1 3 4 48 1 9 8 9 5 1 9 38 5 0 1 1 6 6 1 9 1 Pe a k   H o u r 1 1 7 3 6 3 1 6 2 9 1 1 4 4 3 6 5 9 19 9 0 3 6 8 14 1 8 5 0 0 9 6 16 5 5 Tr u c k s Rig h t T h r u L e f t Ri g h t T h r u L e f t Ri g h t T h r u L e f t Ri g h t T h r u L e f t 3:3 0   P M 00 0 01 0 00 0 0 0 0 1 3:4 5   P M 00 0 00 0 00 0 0 0 0 0 4:0 0   P M 00 0 00 1 00 0 0 0 0 1 4:1 5   P M 00 0 13 1 00 0 0 0 0 57 4:3 0   P M 00 0 02 0 20 0 0 2 0 61 2 4:4 5   P M 00 0 01 0 00 0 0 0 0 11 3 5:0 0   P M 00 0 01 1 00 0 0 2 0 41 6 5:1 5   P M 00 0 00 0 10 0 0 1 0 21 3 5:3 0   P M 00 1 00 0 00 0 0 0 0 18 5:4 5   P M 00 0 01 0 00 0 0 0 0 18 6:0 0   P M 04 6:1 5   P M 02 To t a l 001 1 9 3 3 0 0 0 5 0 Pe a k   H o u r 0 0 0 0 4 1 3 0 0 0 5 0 13 Bik e s Rig h t T h r u L e f t Ri g h t T h r u L e f t Ri g h t T h r u L e f t Ri g h t T h r u L e f t 3:3 0   P M 0 0 0 2 0 0 0 2 3:4 5   P M 0 1 0 1 0 1 0 1 4:0 0   P M 0 2 1 1 0 2 1 1 4:1 5   P M 1 1 0 1 1 1 0 1 4:3 0   P M 1 1 2 0 1 1 2 0 4:4 5   P M 0 0 0 0 0 0 0 0 5:0 0   P M 2 0 0 1 2 0 0 1 5:1 5   P M 0 1 0 0 0 1 0 0 5:3 0   P M 1 0 1 2 1 0 1 2 5:4 5   P M 1 0 0 0 1 0 0 0 6:0 0   P M 00 0 0 6:1 5   P M 00 0 0 To t a l 0600 6 0 0 4 0 0 8 0 Pe a k   H o u r 0 3 0 0 2 0 0 2 0 0 1 0 Tim e   P e r i o d So u t h b o u n d   We s t b o u n d   Ea s t b o u n d   15   M i n u t e   Vo l u m e Ho u r l y   Vo l u m e Tim e   P e r i o d So u t h b o u n d We s t b o u n d No r t h b o u n d Ea s t b o u n d 15   M i n u t e   Vo l u m e Ho u r l y   Vo l u m e No r t h b o u n d   WB N B E B Tim e   P e r i o d So u t h b o u n d We s t b o u n d No r t h b o u n d Ea s t b o u n d SB South Ashland Business Park TPRA E - 2 54 . 3 6 % 2 1 . 1 4 % 2 4 . 5 0 % % R T L P E D 1 73 6 3 1 6 2 1 4 % Pe d 15 1 1 4 R 9.5 8 % 2. 8 4 % L 96 4 5 2 T 72 . 2 0 % 81 . 9 9 % T 51 9 6 0 L 18 . 2 1 % 15 . 1 7 % R 18 1 1 Pe d % 21 8 3 6 9 3 Pe d L T R Se a s o n a l   A d j u s t m e n t   F a c t o r % 67 . 9 % 2 6 . 3 % 5 . 8 % 1.0 2 8 54 4 29 8 63 3 77 4 24 6 Se a s o n a l l y   A d j u s t e d   P e a k   H o u r So u t h b o u n d 53 3 Eastbound 1:   W a l k e r   A v e   @   A s h l a n d   S t Westbound 62 6 11 6 6 14 0 0 27 8 No r t h b o u n d 14 1 1 3 7 South Ashland Business Park TPRA E - 3 Ci t y : Da t e : To t a l o f A ll  V e hic les Rig h t T h r u L e f t Ap p r o a c h   To t a l Ri g h t T h r u L e f t Ap p r o a c h   To t a l Rig h t T h r u L e f t Ap p r o a c h   To t a l Rig h t T h r u L e f t Ap p r o a c h   To t a l SB W B N B E B 15 : 3 0 1 5 : 4 5 3 0 6 9 3 1 3 6 9 1 4 8 6 0 1 7 3 1 6 2 1 3 1 7 8 3 4 2 1 3 0 4 15 : 4 5 1 6 : 0 0 1 0 3 4 3 1 4 5 3 1 5 1 1 1 0 3 1 4 6 1 7 3 3 1 8 2 3 5 1 4 3 1 2 16 : 0 0 1 6 : 1 5 1 0 6 7 3 1 4 5 8 1 5 6 5 1 0 6 4 1 3 0 2 1 3 6 3 0 5 0 7 1 4 16 : 1 5 1 6 : 3 0 4 0 7 1 1 6 1 6 0 1 2 1 7 8 1 0 0 6 1 6 6 1 5 3 3 1 6 2 3 6 7 1 3 6 5 2 6 1 1 16 : 3 0 1 6 : 4 5 0 0 4 4 3 1 3 6 1 4 1 5 3 3 0 3 6 4 1 7 1 5 1 8 0 3 4 3 1 3 6 6 0 1 1 2 16 : 4 5 1 7 : 0 0 0 1 2 3 4 1 3 4 1 1 1 4 9 4 1 2 7 4 1 4 5 3 1 5 2 3 1 1 1 3 2 6 2 1 3 4 17 : 0 0 1 7 : 1 5 3 0 4 7 3 1 3 6 9 1 4 8 6 1 1 8 2 1 8 8 1 1 9 1 3 5 4 1 3 7 5 0 4 2 5 17 : 1 5 1 7 : 3 0 1 1 7 9 6 1 4 2 1 3 1 6 1 3 2 3 8 4 1 5 8 1 0 1 7 2 3 5 0 1 3 5 8 0 3 2 1 17 : 3 0 1 7 : 4 5 0 2 1 3 4 1 4 9 1 5 1 6 8 7 1 0 8 2 1 5 7 2 1 6 1 3 4 0 1 3 5 5 2 2 0 3 17 : 4 5 1 8 : 0 0 3 1 3 7 2 1 2 8 3 1 3 3 6 0 0 6 4 1 1 8 8 1 3 0 2 7 6 1 3 2 0 1 0 4 4 7 18 : 0 0 1 8 : 1 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 6 6 0 0 0 0 18 : 1 5 1 8 : 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1 6 0 0 0 0 16 5 4 3 37 1 4 1 1 9 7 61 6 1 9 39 1 5 5 5 5 0 33 3 9 21 34 15 3 3 Rig h t T h r u L e f t Ap p r o a c h   To t a l Ri g h t T h r u L e f t Ap p r o a c h   To t a l Rig h t T h r u L e f t Ap p r o a c h   To t a l Rig h t T h r u L e f t Ap p r o a c h   To t a l SB W B N B E B 4 2 1 7 2 3 1 6 5 4 8 4 7 6 1 1 1 6 4 9 2 9 1 4 6 6 2 1 9 6 9 5 1 3 5 8 2 98 1 2 0.3 3 0 . 5 0 0 . 6 1 0 . 6 4 0 . 6 7 0 . 9 6 0 . 8 4 0 . 9 5 0 . 6 7 0 . 5 0 0 . 7 5 0 . 9 1 0 . 8 8 0 . 8 8 0 . 4 8 0 . 9 1 0.9 6 00 0 0 1 0 0 0 0 0 4 0 0% 0 % 0 % 0% 0 % 0 % 0% 0 % 0 % 0% 1 % 0 % 15   Min u t e   Vo l u m e In t e r s e c t i o n :   2:   N o r m a l   A v e   @   A s h l a n d   S t A s h l a n d ,   O R Co u n t e r :   SO T E T u e s d a y ,   S e p t e m b e r   2 0 ,   2 0 1 6 Tim e   P e r i o d So u t h b o u n d   W e s t b o u n d   N o r t h b o u n d   E a s t b o u n d   Ho u r l y   Vo l u m e Pe d e s t r i a n s PH F Co u n t   P e r i o d   T o t a l PM   P e a k   H o u r   C o u n t   S u m m a r y So u t h b o u n d   We s t b o u n d   No r t h b o u n d   Ea s t b o u n d   Pe d e s t r i a n s Pe a k   V o l u m e s Tr u c k s % T r u c k s South Ashland Business Park TPRA E - 4 2:  N o r m a l   A v e   @   A s h l a n d   S t Pe d e s t r i a n s   a n d   C a r s Pe d s R i g h t T h r u L e f t Pe d s R i g h t T h r u L e f t Pe d s R i g h t T h r u L e f t Pe d s R i g h t T h r u L e f t 3:3 0   P M 1 2 0 5 3 3 1 3 6 9 0 6 0 1 4 3 1 6 2 1 3 34 0 3:4 5   P M 4 1 0 3 3 3 1 4 5 3 1 1 1 0 3 2 6 1 7 3 3 35 1 4:0 0   P M 0 1 0 6 7 3 1 4 5 8 1 5 1 0 4 4 1 3 0 2 30 5 4:1 5   P M 2 4 0 7 6 6 1 6 0 1 2 1 1 0 0 6 1 6 1 5 2 3 36 6 1 3 6 2 4:3 0   P M 0 0 0 4 1 3 1 3 6 1 4 1 3 0 3 2 4 1 7 0 5 34 2 1 3 6 4 4:4 5   P M 2 0 1 2 1 4 1 3 4 1 1 3 4 1 2 4 4 1 4 4 3 31 0 1 3 2 3 5:0 0   P M 0 3 0 4 4 3 1 3 5 9 2 6 1 1 5 2 1 8 7 1 35 2 1 3 7 0 5:1 5   P M 0 1 1 7 3 6 1 4 2 1 3 2 3 2 3 1 4 1 5 7 1 0 34 9 1 3 5 3 5:3 0   P M 2 0 2 1 2 4 1 4 9 1 5 0 7 1 0 3 2 1 5 7 2 34 0 1 3 5 1 5:4 5   P M 1 0 3 1 3 4 2 1 2 8 3 4 6 0 0 7 4 1 1 8 8 27 6 1 3 1 7 6:0 0   P M 0 96 5 6:1 5   P M 0 61 6 To t a l 21 1 5 5 4 2 34 3 7 1 4 1 0 9 7 15 6 1 6 1 9 33 3 9 1 5 5 0 5 0 Pe a k   H o u r 2 4 2 1 7 9 1 6 5 4 7 4 7 8 1 6 4 9 12 1 4 6 5 8 1 9 13 5 3 Tr u c k s Rig h t T h r u L e f t Ri g h t T h r u L e f t Ri g h t T h r u L e f t Ri g h t T h r u L e f t 3:3 0   P M 10 1 00 0 00 0 0 0 0 2 3:4 5   P M 00 0 00 0 00 0 0 0 0 0 4:0 0   P M 00 0 00 0 00 0 0 0 0 0 4:1 5   P M 00 0 00 0 00 0 0 1 0 13 4:3 0   P M 00 0 00 0 00 0 0 1 0 12 4:4 5   P M 00 0 00 0 00 0 0 1 0 13 5:0 0   P M 00 0 01 0 00 0 0 1 0 25 5:1 5   P M 00 0 00 0 00 0 0 1 0 15 5:3 0   P M 00 0 00 0 00 0 0 0 0 04 5:4 5   P M 00 0 00 0 00 0 0 0 0 03 6:0 0   P M 01 6:1 5   P M 00 To t a l 101 0 1 0 0 0 0 0 5 0 Pe a k   H o u r 0 0 0 0 1 0 0 0 0 0 4 0 5 Tim e   P e r i o d So u t h b o u n d   We s t b o u n d   Ho u r l y   Vo l u m e Tim e   P e r i o d So u t h b o u n d We s t b o u n d No r t h b o u n d Ea s t b o u n d 15   M i n u t e   Vo l u m e Ho u r l y   Vo l u m e No r t h b o u n d   Ea s t b o u n d   15   M i n u t e   Vo l u m e South Ashland Business Park TPRA E - 5 73 . 9 1 % 8 . 7 0 % 1 7 . 3 9 % % R T L P E D 2 4 2 1 7 2 % Pe d 12 1 6 R 7.5 1 % 1. 9 6 % L 19 5 6 3 T 89 . 9 4 % 95 . 3 7 % T 68 0 4 7 L 2. 5 6 % 2.6 6 % R 14 9 Pe d % 89 4 1 6 Pe d L T R Se a s o n a l   A d j u s t m e n t   F a c t o r % 55 . 2 % 1 3 . 8 % 3 1 . 0 % 1.0 2 8 62 23 71 3 71 3 39 Se a s o n a l l y   A d j u s t e d   P e a k   H o u r So u t h b o u n d 57 6 Eastbound 2:  N o r m a l   A v e   @   A s h l a n d   S t Westbound 62 6 12 8 9 13 3 9 92 No r t h b o u n d 63 2 9 South Ashland Business Park TPRA E - 6 Ci t y : Da t e : To t a l o f A ll  V e hic les Rig h t T h r u L e f t Ap p r o a c h   To t a l Ri g h t T h r u L e f t Ap p r o a c h   To t a l Rig h t T h r u L e f t Ap p r o a c h   To t a l Rig h t T h r u L e f t Ap p r o a c h   To t a l SB W B N B E B 15 : 3 0 1 5 : 4 5 1 5 3 1 2 5 7 1 1 9 1 0 5 5 3 1 7 7 4 6 3 1 2 1 9 8 1 1 1 4 4 2 3 1 7 8 5 2 4 9 4 6 2 15 : 4 5 1 6 : 0 0 1 1 3 0 2 8 6 9 1 9 1 1 1 4 8 1 7 8 4 8 2 7 1 8 9 3 1 7 1 4 0 2 1 1 7 8 5 1 8 8 2 5 3 16 : 0 0 1 6 : 1 5 9 3 1 2 2 6 2 1 8 8 9 5 0 1 5 7 5 2 1 6 1 6 8 4 8 1 5 8 1 6 1 8 2 4 8 5 6 3 1 0 16 : 1 5 1 6 : 3 0 1 3 2 6 2 0 5 9 1 5 1 2 0 4 7 1 8 2 4 5 1 9 1 5 7 9 1 4 1 0 1 2 4 1 3 9 4 5 9 1 9 8 6 2 1 4 0 16 : 3 0 1 6 : 4 5 1 1 2 3 1 0 4 4 1 7 1 1 0 4 9 1 7 6 5 5 2 5 1 9 9 9 1 5 1 2 8 1 9 1 6 2 4 8 1 1 9 4 3 6 0 3 3 16 : 4 5 1 7 : 0 0 1 6 2 2 1 8 5 6 1 5 1 2 3 5 9 1 9 7 5 1 1 6 1 4 8 1 1 0 1 2 3 1 8 1 5 1 4 8 5 1 9 1 0 3 5 6 1 17 : 0 0 1 7 : 1 5 1 7 2 5 2 4 6 6 1 9 1 3 8 4 7 2 0 4 4 1 2 1 1 5 7 7 1 8 2 7 0 2 8 3 1 6 6 6 3 2 0 8 8 8 4 2 3 17 : 1 5 1 7 : 3 0 1 5 3 3 1 0 5 8 1 3 1 5 0 5 9 2 2 2 4 4 2 9 1 5 8 8 1 1 1 5 6 2 1 1 8 8 5 5 6 2 1 8 5 3 2 2 1 17 : 3 0 1 7 : 4 5 1 1 4 0 2 8 7 9 1 2 1 0 8 4 9 1 6 9 4 0 3 1 1 6 8 7 1 3 1 1 7 2 4 1 5 4 4 8 9 2 1 9 3 5 4 2 1 17 : 4 5 1 8 : 0 0 1 9 3 3 1 6 6 8 1 2 1 2 7 5 3 1 9 2 3 4 2 0 1 3 6 7 1 2 9 7 2 4 1 3 3 4 6 0 2 1 6 8 4 2 2 3 18 : 0 0 1 8 : 1 5 1 5 2 2 1 2 4 9 1 6 9 4 4 9 1 5 9 4 0 2 4 8 7 2 1 0 9 6 1 4 1 2 0 4 0 0 1 9 0 5 0 1 1 0 18 : 1 5 1 8 : 3 0 1 7 1 9 1 1 4 7 1 2 1 2 5 3 3 1 7 0 2 7 1 3 8 4 8 8 7 2 1 3 9 3 3 5 8 1 7 0 7 5 1 3 0 16 9 3 3 5 2 2 4 18 7 1 4 0 0 5 9 6 52 3 2 7 2 1 7 8 14 7 1 6 0 2 2 4 5 58 7 8 59 29 37 1 7 Rig h t T h r u L e f t Ap p r o a c h   To t a l Ri g h t T h r u L e f t Ap p r o a c h   To t a l Rig h t T h r u L e f t Ap p r o a c h   To t a l Rig h t T h r u L e f t Ap p r o a c h   To t a l SB W B N B E B 59 1 0 3 6 2 2 2 4 6 4 5 2 1 2 1 4 7 9 9 1 9 1 9 1 6 3 3 4 5 5 4 6 7 7 8 6 8 1 7 2 1 8 5 20 11 1 3 8 0.8 7 0 . 7 8 0 . 6 5 0 . 8 5 0 . 8 4 0 . 8 7 0 . 9 1 0 . 9 0 0 . 8 7 0 . 7 8 0 . 8 3 0 . 8 7 0 . 7 5 0 . 6 3 0 . 7 7 0 . 6 5 0.8 2 01 0 2 5 5 5 1 0 0 4 1 0% 1 % 0 % 3% 1 % 2 % 3% 1 % 0 % 0% 1 % 1 % 15   Min u t e   Vo l u m e In t e r s e c t i o n :   3:   T o l m a n   C r e e k   R d   @   A s h l a n d   S t As h l a n d ,   O R Co u n t e r :   Sa n d o w   E n g i n e e r i n g W e d n e s d a y ,   J u n e   7 ,   2 0 1 7 Tim e   P e r i o d So u t h b o u n d   W e s t b o u n d   N o r t h b o u n d   E a s t b o u n d   Ho u r l y   Vo l u m e Pe d e s t r i a n s PH F Co u n t   P e r i o d   T o t a l PM   P e a k   H o u r   C o u n t   S u m m a r y So u t h b o u n d   We s t b o u n d   No r t h b o u n d   Ea s t b o u n d   Pe d e s t r i a n s Pe a k   V o l u m e s Tr u c k s % T r u c k s South Ashland Business Park TPRA E - 7 3:  T o l m a n   C r e e k   R d   @   A s h l a n d   S t Pe d e s t r i a n s   a n d   C a r s Pe d s R i g h t T h r u L e f t Pe d s R i g h t T h r u L e f t Pe d s R i g h t T h r u L e f t Pe d s R i g h t T h r u L e f t 3:3 0   P M 9 1 5 3 0 2 5 1 1 9 1 0 5 5 2 6 4 3 3 1 2 0 1 1 0 1 4 2 2 3 51 5 3:4 5   P M 8 1 1 3 0 2 8 2 1 9 1 1 0 4 7 5 4 7 2 7 1 7 3 1 7 1 3 8 2 1 51 2 4:0 0   P M 6 9 3 1 2 2 2 1 8 8 9 4 9 0 5 1 1 6 1 6 0 8 1 5 5 1 6 48 0 4:1 5   P M 2 1 3 2 6 2 0 0 1 5 1 2 0 4 7 2 4 5 1 9 1 3 0 1 4 9 9 2 4 45 5 1 9 6 2 4:3 0   P M 5 1 1 2 3 1 0 0 1 6 1 0 7 4 8 1 5 4 2 5 1 9 3 1 5 1 2 7 1 9 47 4 1 9 2 1 4:4 5   P M 3 1 6 2 2 1 8 3 1 5 1 2 3 5 8 4 5 0 1 6 1 4 1 1 0 1 2 1 1 8 48 1 1 8 9 0 5:0 0   P M 8 1 7 2 4 2 4 4 1 9 1 3 7 4 6 2 3 9 2 0 1 5 0 1 8 2 7 0 2 8 65 7 2 0 6 7 5:1 5   P M 3 1 5 3 3 1 0 1 1 2 1 4 9 5 7 1 4 3 2 9 1 5 0 1 1 1 5 5 2 0 54 9 2 1 6 1 5:3 0   P M 4 1 1 4 0 2 8 3 1 2 1 0 6 4 9 2 3 9 3 1 1 6 1 1 3 1 1 7 2 4 48 6 2 1 7 3 5:4 5   P M 2 1 9 3 3 1 6 0 1 2 1 2 6 5 3 2 3 4 2 0 1 3 1 1 2 9 7 2 4 45 9 2 1 5 1 6:0 0   P M 0 1 5 2 2 1 2 1 1 6 9 4 4 9 1 4 0 2 4 8 0 1 0 9 5 1 4 39 9 1 8 9 3 6:1 5   P M 4 1 7 1 9 1 1 1 1 2 1 2 5 3 3 3 2 7 1 3 8 0 8 7 2 1 3 35 8 1 7 0 2 To t a l 54 1 6 9 3 3 3 2 2 4 18 1 8 5 1 3 9 1 5 8 8 29 5 1 2 2 7 1 1 7 4 10 1 4 6 1 5 8 8 2 4 4 Pe a k   H o u r 1 9 5 9 1 0 2 6 2 8 6 2 5 1 6 2 0 9 8 1 8 6 9 0 6 3 4 5 4 6 7 3 8 5 21 6 1 Tr u c k s Rig h t T h r u L e f t Ri g h t T h r u L e f t Ri g h t T h r u L e f t Ri g h t T h r u L e f t 3:3 0   P M 01 0 00 1 30 1 1 2 0 9 3:4 5   P M 00 0 01 1 10 1 0 2 0 6 4:0 0   P M 00 0 00 1 10 0 0 3 0 5 4:1 5   P M 00 0 00 0 00 2 0 2 0 42 4 4:3 0   P M 00 0 13 1 10 0 0 1 0 72 2 4:4 5   P M 00 0 00 1 10 0 0 2 0 42 0 5:0 0   P M 01 0 01 1 21 0 0 0 0 62 1 5:1 5   P M 00 0 11 2 10 0 0 1 1 72 4 5:3 0   P M 00 0 02 0 10 0 0 0 0 32 0 5:4 5   P M 00 0 01 0 00 0 0 0 0 11 7 6:0 0   P M 00 0 00 0 00 0 0 1 0 11 2 6:1 5   P M 00 0 00 0 00 0 0 0 0 05 To t a l 02 0 2 9 8 1 1 1 4 1 1 4 1 Pe a k   H o u r 0 1 0 2 5 5 5 1 0 0 4 1 24 Bik e s Rig h t T h r u L e f t Ri g h t T h r u L e f t Ri g h t T h r u L e f t Ri g h t T h r u L e f t 3:3 0   P M 0 0 0 0 3 0 0 0 0 0 1 0 0 3 0 1 3:4 5   P M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:0 0   P M 0 0 0 0 0 1 0 1 0 0 0 0 0 1 1 0 4:1 5   P M 0 0 0 0 1 0 1 1 0 0 0 0 0 1 2 0 4:3 0   P M 0 1 0 0 0 0 1 1 0 0 0 0 1 0 2 0 4:4 5   P M 0 0 0 0 2 0 0 2 0 0 0 0 0 2 2 0 5:0 0   P M 0 0 0 0 0 0 0 0 0 0 2 1 0 0 0 3 5:1 5   P M 0 0 0 0 0 1 0 1 0 0 0 1 0 1 1 1 5:3 0   P M 0 1 0 0 1 0 0 0 0 0 0 0 1 1 0 0 5:4 5   P M 1 1 0 0 1 1 0 0 0 0 2 0 2 2 0 2 6:0 0   P M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:1 5   P M 1 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 To t a l 2300 8 3 2 6 0 0 5 2 Pe a k   H o u r 0 1 0 0 2 1 1 4 0 0 2 2 Tim e   P e r i o d So u t h b o u n d   We s t b o u n d   Ea s t b o u n d   15   M i n u t e   Vo l u m e Ho u r l y   Vo l u m e Tim e   P e r i o d So u t h b o u n d We s t b o u n d No r t h b o u n d Ea s t b o u n d 15   M i n u t e   Vo l u m e Ho u r l y   Vo l u m e No r t h b o u n d   WB N B E B Tim e   P e r i o d So u t h b o u n d We s t b o u n d No r t h b o u n d Ea s t b o u n d SB South Ashland Business Park TPRA E - 8 27 . 6 8 % 4 5 . 9 8 % 2 6 . 3 4 % % R T L P E D 3 59 1 0 3 6 2 2 0 % Pe d 86 4 R 26 . 1 0 % 6. 4 0 % L 86 5 4 2 T 66 . 1 0 % 83 . 4 1 % T 70 4 2 1 4 L 7. 8 0 % 10 . 1 9 % R 54 1 1 Pe d % 13 6 3 9 1 1 9 1 Pe d L T R Se a s o n a l   A d j u s t m e n t   F a c t o r % 55 . 4 % 2 6 . 4 % 1 8 . 3 % 1.0 4 1 46 5 22 4 84 4 95 7 24 1 Se a s o n a l l y   A d j u s t e d   P e a k   H o u r So u t h b o u n d 66 4 Eastbound 3:  T o l m a n   C r e e k   R d   @   A s h l a n d   S t Westbound 82 0 15 0 8 17 7 7 71 6 No r t h b o u n d 37 1 3 4 5 South Ashland Business Park TPRA E - 9 Ci t y : Da t e : To t a l   o f   A l l   V e h i c l e s Rig h t T h r u L e f t Ap p r o a c h   To t a l Rig h t T h r u L e f t Ap p r o a c h   To t a l Rig h t T h r u L e f t Ap p r o a c h   To t a l Ri g h t T h r u L e f t Ap p r o a c h   To t a l SB W B N B E B 15 : 3 0 1 5 : 4 5 0 0 0 0 0 1 5 7 4 1 6 1 2 1 0 1 3 3 4 8 2 2 3 3 2 3 4 4 2 9 0 3 0 2 15 : 4 5 1 6 : 0 0 0 0 0 0 0 1 7 3 8 1 8 1 1 1 0 5 1 6 1 6 2 0 2 3 2 2 1 4 1 8 0 1 0 3 16 : 0 0 1 6 : 1 5 0 0 0 0 0 1 3 3 9 1 4 2 2 0 0 1 7 3 7 6 2 3 2 0 2 3 8 4 1 7 0 0 0 3 16 : 1 5 1 6 : 3 0 0 0 0 0 0 1 6 2 8 1 7 0 1 0 0 9 1 9 1 2 1 6 0 2 1 7 4 3 6 3 1 6 2 7 0 1 0 4 16 : 3 0 1 6 : 4 5 0 0 0 0 0 1 8 8 5 1 9 3 1 1 0 9 2 0 3 1 9 4 2 1 9 9 4 1 2 1 6 1 0 1 0 2 2 16 : 4 5 1 7 : 0 0 0 0 0 0 1 1 6 5 3 4 2 0 0 1 1 0 1 1 2 2 9 1 8 2 2 1 9 3 4 1 5 1 6 0 7 0 2 0 3 17 : 0 0 1 7 : 1 5 0 0 0 0 0 1 6 1 2 7 1 8 8 1 4 0 1 4 2 8 1 2 2 3 9 1 2 5 2 4 6 8 1 6 5 8 0 0 2 6 17 : 1 5 1 7 : 3 0 0 0 0 0 0 2 1 2 7 2 1 9 8 0 7 1 5 5 2 2 1 1 2 2 7 4 6 1 1 7 5 6 0 1 0 1 17 : 3 0 1 7 : 4 5 0 0 0 0 0 1 7 4 8 1 8 2 9 0 5 1 4 3 1 8 9 0 1 9 2 3 8 8 1 7 3 2 0 0 0 1 17 : 4 5 1 8 : 0 0 0 0 0 0 0 1 7 9 8 1 8 7 8 0 4 1 2 1 0 1 4 8 0 1 5 8 3 5 7 1 6 7 4 1 2 0 2 18 : 0 0 1 8 : 1 5 0 0 0 0 0 1 5 0 5 1 5 5 5 0 7 1 2 5 1 4 9 1 1 5 5 3 2 2 1 5 2 8 0 0 0 0 18 : 1 5 1 8 : 3 0 0 0 0 0 0 1 5 2 1 1 5 3 5 0 3 8 6 1 1 4 0 1 2 0 2 8 1 1 3 4 8 0 1 0 3 0 0 0 1 2 0 0 6 1 2 4 13 3 0 1 0 4 95 2 2 5 3 1 5 47 3 1 2 11 4 3 0 Rig h t T h r u L e f t Ap p r o a c h   To t a l Rig h t T h r u L e f t Ap p r o a c h   To t a l Rig h t T h r u L e f t Ap p r o a c h   To t a l Ri g h t T h r u L e f t Ap p r o a c h   To t a l SB W B N B E B 0 0 0 0 1 7 2 6 7 3 8 0 0 4 4 0 4 1 8 5 2 9 8 3 6 6 8 7 1 1 7 5 6 1 34 1 2 0.0 0 0 . 0 0 0 . 0 0 0 . 0 0 0 . 2 5 0 . 8 6 0 . 5 4 0 . 9 1 0 . 7 9 0 . 0 0 0 . 7 3 0 . 7 6 0 . 6 0 0 . 8 7 0 . 7 5 0 . 8 6 0.9 4 00 0 01 3 0 0 0 0 0 1 1 0 0% 0 % 0 % 0% 2 % 0 % 0% 0 % 0 % 0% 1 % 0 % 15   Min u t e   Vo l u m e In t e r s e c t i o n :   4:   W a s h i n g t o n   S t   @   A s h l a n d   S t A s h l a n d ,   O R Co u n t e r :   Sa n d o w   E n g i n e e r i n g W e d n e s d a y ,   J u n e   7 ,   2 0 1 7 Tim e   P e r i o d So u t h b o u n d   W e s t b o u n d   N o r t h b o u n d   E a s t b o u n d   Ho u r l y   Vo l u m e Pe d e s t r i a n s PH F Co u n t   P e r i o d   T o t a l PM   P e a k   H o u r   C o u n t   S u m m a r y So u t h b o u n d   We s t b o u n d   No r t h b o u n d   Ea s t b o u n d   Pe d e s t r i a n s Pe a k   V o l u m e s Tr u c k s % T r u c k s South Ashland Business Park TPRA E - 10 4:   W a s h i n g t o n   S t   @   A s h l a n d   S t Pe d e s t r i a n s   a n d   C a r s Pe d s R i g h t T h r u L e f t P e d s R i g h t T h r u L e f t P e d s R i g h t T h r u L e f t P e d s R i g h t T h r u L e f t 3:3 0   P M 0 0 0 0 0 0 1 5 6 4 0 2 1 0 1 3 1 8 2 1 8 3 42 3 3:4 5   P M 0 0 0 0 0 0 1 7 1 8 0 1 1 0 5 3 1 6 1 9 9 3 41 3 4:0 0   P M 0 0 0 0 0 0 1 3 3 9 0 2 0 0 1 7 3 6 2 2 8 0 41 3 4:1 5   P M 0 0 0 0 0 0 1 6 1 8 0 1 0 0 9 4 1 2 1 6 0 2 36 2 1 6 1 1 4:3 0   P M 1 0 0 0 0 0 1 8 3 5 2 1 1 0 9 1 3 1 9 2 2 40 5 1 5 9 3 4:4 5   P M 0 0 0 0 0 1 1 6 4 3 4 0 1 1 0 1 1 2 9 1 7 8 2 41 0 1 5 9 0 5:0 0   P M 0 0 0 0 0 0 1 5 8 2 7 0 1 4 0 1 4 2 1 2 2 3 7 1 46 3 1 6 4 0 5:1 5   P M 0 0 0 0 0 0 2 0 8 7 0 8 0 7 1 5 2 1 8 1 45 4 1 7 3 2 5:3 0   P M 0 0 0 0 0 0 1 7 2 8 0 9 0 5 1 3 1 8 8 0 38 5 1 7 1 2 5:4 5   P M 1 0 0 0 0 0 1 7 8 8 0 8 0 4 0 1 0 1 4 7 0 35 5 1 6 5 7 6:0 0   P M 0 0 0 0 0 0 1 5 0 5 0 5 0 7 0 5 1 4 8 1 32 1 1 5 1 5 6:1 5   P M 0 0 0 0 0 0 1 5 2 1 0 5 0 3 3 6 1 1 4 0 28 1 1 3 4 2 To t a l 2 0 0 0 0 1 1 9 8 6 1 2 4 2 1 3 3 0 1 0 4 21 9 5 2 2 2 7 1 5 Pe a k   H o u r 1 0 0 0 0 1 7 1 3 7 3 2 4 4 0 4 1 6 2 9 8 2 5 6 17 3 2 Tr u c k s Rig h t T h r u L e f t Rig h t T h r u L e f t Rig h t T h r u L e f t Rig h t T h r u L e f t 3:3 0   P M 0 0 0 0 1 0 0 0 0 0 5 06 3:4 5   P M 0 0 0 0 2 0 0 0 0 0 3 05 4:0 0   P M 0 0 0 0 0 0 0 0 0 0 4 04 4:1 5   P M 0 0 0 0 1 0 0 0 0 0 0 01 16 4:3 0   P M 0 0 0 0 5 0 0 0 0 0 2 07 17 4:4 5   P M 0 0 0 0 1 0 0 0 0 0 4 05 17 5:0 0   P M 0 0 0 0 3 0 0 0 0 0 2 05 18 5:1 5   P M 0 0 0 0 4 0 0 0 0 0 3 07 24 5:3 0   P M 0 0 0 0 2 0 0 0 0 0 1 03 20 5:4 5   P M 0 0 0 0 1 0 0 0 0 0 1 02 17 6:0 0   P M 0 0 0 0 0 0 0 0 0 0 1 01 13 6:1 5   P M 0 0 0 0 0 0 0 0 0 0 0 00 6 To t a l 00 0 0 2 0 0 0 0 0 0 2 6 0 Pe a k   H o u r 0 0 0 0 1 3 0 0 0 0 0 1 1 0 2 4 Bik e s Rig h t T h r u L e f t R i g h t T h r u L e f t R i g h t T h r u L e f t R i g h t T h r u L e f t 3:3 0   P M 0 0 0 0 3 0 0 0 0 0 1 0 0 3 0 1 3:4 5   P M 0 0 0 0 1 0 0 0 0 0 0 0 0 1 0 0 4:0 0   P M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:1 5   P M 0 0 0 0 1 0 0 0 0 0 0 0 0 1 0 0 4:3 0   P M 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 1 4:4 5   P M 0 0 0 0 2 0 0 0 0 0 1 0 0 2 0 1 5:0 0   P M 0 0 0 0 0 0 1 0 1 0 4 0 0 0 2 4 5:1 5   P M 0 0 0 0 1 0 0 0 0 0 0 0 0 1 0 0 5:3 0   P M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:4 5   P M 0 0 0 0 2 0 0 0 0 0 2 0 0 2 0 2 6:0 0   P M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:1 5   P M 0 0 0 0 1 0 0 0 0 0 0 0 0 1 0 0 To t a l 0 0 0 0 1 1 0 1 0 1 0 9 0 Pe a k   H o u r 0 0 0 0 3 0 1 0 1 0 6 0 Le f t R i g h t T o t a l Le f t R i g h t T o t a l Le f t R i g h t T o t a l Le f t R i g h t T o t a l 3:3 0   P M 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 1 3:4 5   P M 0 0 0 0 0 0 0 2 2 1 0 1 0 0 0 3 4:0 0   P M 0 0 0 0 0 0 0 1 1 2 0 2 0 0 0 3 4:1 5   P M 0 0 0 0 0 0 0 3 3 1 0 1 0 0 0 4 4:3 0   P M 2 0 2 0 1 1 0 0 0 1 0 1 1 0 2 1 4:4 5   P M 0 0 0 0 0 0 0 2 2 0 0 0 0 0 0 2 5:0 0   P M 0 0 0 0 0 0 0 2 2 0 0 0 0 0 0 2 5:1 5   P M 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 1 5:3 0   P M 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 1 5:4 5   P M 0 0 0 0 0 0 1 0 1 0 0 0 1 0 0 0 6:0 0   P M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:1 5   P M 0 0 0 0 0 0 0 2 2 1 0 1 0 0 0 3 To t a l 20 2 0 1 1 1 1 5 1 6 6 0 6 2 0 2 2 1 Pe a k   H o u r 2 0 2 0 1 1 0 5 5 1 0 1 Ti m e   P e r i o d So u t h b o u n d   We s t b o u n d   Ho u r l y   Vo l u m e Ti m e   P e r i o d So u t h b o u n d We s t b o u n d No r t h b o u n d Ea s t b o u n d 15   M i n u t e   Vo l u m e Ho u r l y   Vo l u m e No r t h b o u n d   No r t h b o u n d Ea s t b o u n d SB Ea s t b o u n d   15   M i n u t e   Vo l u m e WB N B E B WB N B E B Pe d e s t r i a n s Ti m e   P e r i o d NE N W S W S E SB Ti m e   P e r i o d So u t h b o u n d W e s t b o u n d South Ashland Business Park TPRA E - 11 #D I V / 0 ! # D I V / 0 ! # D I V / 0 ! % R T L PE D 4 00 0 1 % Pe d 12 1 R 8.8 1 % 3.2 0 % L 6 75 5 T 91 . 0 7 % 96 . 1 3 % T 87 0 73 L 0.1 2 % 0. 6 6 % R 29 3 Pe d % 44 1 0 4 4 Pe d L T R Se a s o n a l   A d j u s t m e n t   F a c t o r % 51 . 8 % 0 . 0 % 4 8 . 2 % 1.0 4 1 7 0 90 5 91 4 7 Se a s o n a l l y   A d j u s t e d   P e a k   H o u r So u t h b o u n d 79 6 Eastbound 4:  W a s h i n g t o n   S t   @   A s h l a n d   S t Westbound 82 9 17 0 1 17 4 3 18 7 No r t h b o u n d 10 2 8 5 South Ashland Business Park TPRA E - 12 Ci t y : Da t e : To t a l o f A ll  V e hic les Rig h t T h r u L e f t Ap p r o a c h   To t a l Ri g h t T h r u L e f t Ap p r o a c h   To t a l Rig h t T h r u L e f t Ap p r o a c h   To t a l Rig h t T h r u L e f t Ap p r o a c h   To t a l SB W B N B E B 15 : 3 0 1 5 : 4 5 1 3 6 0 3 7 1 7 3 0 6 2 5 6 7 0 0 0 0 1 6 2 3 5 0 2 5 1 4 9 1 0 0 0 1 15 : 4 5 1 6 : 0 0 1 2 9 0 5 0 1 7 9 0 7 0 6 7 6 0 0 0 0 1 7 1 9 9 0 2 1 6 4 7 1 0 0 0 2 16 : 0 0 1 6 : 1 5 1 2 7 0 3 5 1 6 2 0 6 1 4 6 5 0 0 0 0 1 4 2 1 0 0 2 2 4 4 5 1 1 0 0 2 16 : 1 5 1 6 : 3 0 1 1 7 0 4 9 1 6 6 0 6 2 4 6 6 0 0 0 0 1 3 2 0 2 2 2 1 7 4 4 9 1 8 6 2 0 1 0 1 16 : 3 0 1 6 : 4 5 1 1 2 1 3 5 1 4 8 0 7 3 9 8 2 0 0 0 0 1 8 1 8 9 4 2 1 1 4 4 1 1 8 1 2 0 0 1 4 16 : 4 5 1 7 : 0 0 1 0 1 0 4 3 1 4 4 0 8 6 9 9 5 0 0 0 0 1 3 1 7 0 3 1 8 6 4 2 5 1 7 6 6 1 5 0 0 17 : 0 0 1 7 : 1 5 1 2 5 0 5 6 1 8 1 0 6 1 4 6 5 0 0 0 0 1 7 2 3 1 3 2 5 1 4 9 7 1 8 1 2 0 2 0 0 17 : 1 5 1 7 : 3 0 1 5 3 0 3 8 1 9 1 0 6 7 2 6 9 0 0 0 0 1 3 2 4 6 5 2 6 4 5 2 4 1 8 8 7 0 1 0 0 17 : 3 0 1 7 : 4 5 1 3 0 1 4 0 1 7 1 0 7 0 8 7 8 0 0 0 0 1 4 1 9 0 3 2 0 7 4 5 6 1 9 0 2 0 2 0 3 17 : 4 5 1 8 : 0 0 1 2 0 0 4 8 1 6 8 0 6 0 9 6 9 0 0 0 0 8 1 7 8 1 1 8 7 4 2 4 1 9 0 1 0 0 0 0 18 : 0 0 1 8 : 1 5 1 2 0 0 4 5 1 6 5 0 6 2 3 6 5 0 0 0 0 1 6 1 8 0 2 1 9 8 4 2 8 1 8 3 2 0 5 0 1 18 : 1 5 1 8 : 3 0 9 2 1 3 5 1 2 8 0 5 8 5 6 3 0 0 0 0 2 0 1 5 4 2 1 7 6 3 6 7 1 6 7 5 0 4 0 0 14 6 2 3 5 1 1 0 7 9 2 6 8 0 0 0 17 9 2 3 8 4 2 5 54 2 4 2 20 1 1 4 Rig h t T h r u L e f t Ap p r o a c h   To t a l Ri g h t T h r u L e f t Ap p r o a c h   To t a l Rig h t T h r u L e f t Ap p r o a c h   To t a l Rig h t T h r u L e f t Ap p r o a c h   To t a l SB W B N B E B 49 1 1 1 7 2 6 6 4 0 2 8 7 2 4 3 1 1 0 0 0 0 6 1 8 3 6 1 5 9 1 2 1 8 8 7 1 81 4 0.8 0 0 . 2 5 0 . 7 7 0 . 8 7 0 . 0 0 0 . 8 3 0 . 6 7 0 . 8 2 0 . 0 0 0 . 0 0 0 . 0 0 0 . 0 0 0 . 8 5 0 . 8 5 0 . 7 5 0 . 8 6 0.9 0 12 0 8 0 8 0 0 0 0 1 2 2 0 2% 0 % 5 % 0% 3 % 0 % 0% 0 % 0 % 2% 3 % 0 % 15   Min u t e   Vo l u m e In t e r s e c t i o n :   5:   S B   I ‐ 5   O n / O f f   R a m p   @   A s h l a n d   S t A s h l a n d ,   O R Co u n t e r :   SO T E W e d n e s d a y ,   J u n e   7 ,   2 0 1 7 Tim e   P e r i o d So u t h b o u n d   W e s t b o u n d   N o r t h b o u n d   E a s t b o u n d   Ho u r l y   Vo l u m e Pe d e s t r i a n s PH F Co u n t   P e r i o d   T o t a l PM   P e a k   H o u r   C o u n t   S u m m a r y So u t h b o u n d   We s t b o u n d   No r t h b o u n d   Ea s t b o u n d   Pe d e s t r i a n s Pe a k   V o l u m e s Tr u c k s % T r u c k s South Ashland Business Park TPRA E - 13 5:  S B   I ‐ 5   O n / O f f   R a m p   @   A s h l a n d   S t Pe d e s t r i a n s   a n d   C a r s Pe d s R i g h t T h r u L e f t Pe d s R i g h t T h r u L e f t Pe d s R i g h t T h r u L e f t Pe d s R i g h t T h r u L e f t 3:3 0   P M 0 1 2 9 0 3 0 0 0 5 9 5 0 0 0 0 1 1 5 2 2 4 0 46 2 3:4 5   P M 0 1 2 3 0 4 7 0 0 6 8 6 0 0 0 0 2 1 7 1 8 8 0 44 9 4:0 0   P M 1 1 2 3 0 3 3 0 0 6 0 2 0 0 0 0 2 1 3 1 9 8 0 42 9 4:1 5   P M 0 1 1 5 0 4 7 1 0 6 1 4 0 0 0 0 0 1 3 1 9 6 2 43 8 1 7 7 8 4:3 0   P M 0 1 0 6 1 3 2 0 0 7 1 9 1 0 0 0 4 1 7 1 8 4 4 42 4 1 7 4 0 4:4 5   P M 1 9 9 0 4 2 5 0 8 5 9 0 0 0 0 0 1 3 1 6 2 3 41 3 1 7 0 4 5:0 0   P M 0 1 2 4 0 5 4 1 0 5 9 4 0 0 0 0 0 1 7 2 2 7 3 48 8 1 7 6 3 5:1 5   P M 0 1 5 0 0 3 6 1 0 6 4 2 0 0 0 0 0 1 3 2 4 1 5 51 1 1 8 3 6 5:3 0   P M 0 1 2 6 1 3 9 2 0 6 9 8 0 0 0 0 3 1 4 1 8 6 3 44 6 1 8 5 8 5:4 5   P M 0 1 1 8 0 4 4 0 0 5 7 9 0 0 0 0 0 7 1 7 4 1 41 0 1 8 5 5 6:0 0   P M 0 1 1 9 0 4 4 3 0 5 9 3 0 0 0 0 1 1 5 1 7 8 2 42 0 1 7 8 7 6: 1 5   P M 0 8 9 1 3 4 3 0 5 7 4 0 0 0 0 0 1 9 1 5 1 2 35 7 1 6 3 3 To t a l 2 1 4 2 1 3 4 8 2 16 0 7 6 9 6 5 1 0 0 0 13 1 7 3 2 3 0 9 2 5 Pe a k   H o u r 1 4 7 9 1 1 6 4 7 0 2 7 9 2 4 1 0 0 0 4 6 0 8 1 4 1 5 18 3 6 Tr u c k s Rig h t T h r u L e f t Ri g h t T h r u L e f t Ri g h t T h r u L e f t Ri g h t T h r u L e f t 3:3 0   P M 70 7 03 0 00 0 11 1 02 929 18 3 3:4 5   P M 60 3 02 0 00 0 01 1 02 222 14 2 4:0 0   P M 40 2 01 2 00 0 11 2 02 222 14 3 4:1 5   P M 20 2 01 0 00 0 06 01 18412 81 4:3 0   P M 60 3 02 0 00 0 15 01 77217 82 4:4 5   P M 20 1 01 0 00 0 08 01 26212 91 5:0 0   P M 10 2 02 0 00 0 04 09 4910 62 5:1 5   P M 30 2 03 0 00 0 05 01 35113 73 5:3 0   P M 40 1 01 0 00 0 04 01 04410 51 5:4 5   P M 20 4 03 0 00 0 14 01 44614 83 6:0 0   P M 10 1 03 0 00 0 12 08 4510 33 6:1 5   P M 30 1 01 1 00 0 13 01 04211 42 To t a l 41 0 2 9 0 2 3 3 0 0 0 6 7 5 0 Pe a k   H o u r 1 2 0 8 0 8 0 0 0 0 1 2 2 0 51 Bik e s Rig h t T h r u L e f t Ri g h t T h r u L e f t Ri g h t T h r u L e f t Ri g h t T h r u L e f t 3:3 0   P M 00 0 00 00 0 00 0 0 00 0 0 3:4 5   P M 00 0 00 00 0 00 0 0 00 0 0 4:0 0   P M 00 0 00 00 0 00 0 0 00 0 0 4:1 5   P M 00 0 00 00 0 00 1 0 00 0 1 4:3 0   P M 00 0 00 00 0 00 0 0 00 0 0 4:4 5   P M 00 0 00 00 0 00 0 0 00 0 0 5:0 0   P M 00 0 01 00 0 00 0 0 01 0 0 5:1 5   P M 00 0 00 00 0 00 0 0 00 0 0 5:3 0   P M 00 0 00 00 0 00 0 0 00 0 0 5:4 5   P M 00 0 00 00 0 00 0 0 00 0 0 6:0 0   P M 00 0 02 00 0 00 0 0 02 0 0 6:1 5   P M 00 0 01 00 0 00 0 0 01 0 0 To t a l 000 0 4 0 0 0 0 0 1 0 Pe a k   H o u r 0 0 0 0 1 0 0 0 0 0 0 0 Tim e   P e r i o d So u t h b o u n d   We s t b o u n d   Ea s t b o u n d   15   M i n u t e   Vo l u m e Ho u r l y   Vo l u m e Tim e   P e r i o d So u t h b o u n d We s t b o u n d No r t h b o u n d Ea s t b o u n d 15   M i n u t e   Vo l u m e Ho u r l y   Vo l u m e No r t h b o u n d   WB N B E B Tim e   P e r i o d So u t h b o u n d We s t b o u n d No r t h b o u n d Ea s t b o u n d SB South Ashland Business Park TPRA E - 14 25 . 9 0 % 0 . 1 4 % 7 3 . 9 5 % % R T L P E D 5 51 1 1 1 7 9 1 % Pe d 40 R 7.7 2 % 6. 6 4 % L 16 2 9 9 T 92 . 2 8 % 91 . 6 8 % T 87 0 2 5 L 0. 0 0 % 1.6 9 % R 63 8 Pe d % 10 0 0 Pe d L T R Se a s o n a l   A d j u s t m e n t   F a c t o r % #D I V / 0 ! # D I V / 0 ! # D I V / 0 ! 1.0 4 1 70 7 69 1 94 9 10 4 9 16 Se a s o n a l l y   A d j u s t e d   P e a k   H o u r So u t h b o u n d 81 0 Eastbound 5:  S B   I ‐ 5   O n / O f f   R a m p   @   A s h l a n d   S t Westbound 32 4 17 5 9 13 7 3 89 No r t h b o u n d 89 0 South Ashland Business Park TPRA E - 15 Ci t y : Da t e : To t a l o f A ll  V e hic les Rig h t T h r u L e f t Ap p r o a c h   To t a l Ri g h t T h r u L e f t Ap p r o a c h   To t a l Rig h t T h r u L e f t Ap p r o a c h   To t a l Rig h t T h r u L e f t Ap p r o a c h   To t a l SB W B N B E B 15 : 3 0 1 5 : 4 5 0 0 0 0 7 9 5 7 3 1 3 9 1 6 0 1 1 2 7 0 1 1 6 1 5 6 2 7 2 4 3 8 2 0 1 1 15 : 4 5 1 6 : 0 0 0 0 0 0 7 1 5 9 0 1 3 0 1 7 0 1 6 3 3 0 1 1 1 1 3 8 2 4 9 4 1 2 2 0 0 0 16 : 0 0 1 6 : 1 5 0 0 0 0 8 3 5 0 0 1 3 3 1 5 0 1 3 2 8 0 1 0 8 1 3 8 2 4 6 4 0 7 1 0 0 1 16 : 1 5 1 6 : 3 0 0 0 0 0 6 3 5 7 0 1 2 0 1 1 0 1 0 2 1 0 1 2 5 1 2 6 2 5 1 3 9 2 1 6 4 9 0 1 0 2 16 : 3 0 1 6 : 4 5 0 0 0 0 6 7 7 1 0 1 3 8 1 0 0 9 1 9 0 1 0 0 1 2 2 2 2 2 3 7 9 1 5 9 0 1 0 2 0 16 : 4 5 1 7 : 0 0 0 0 0 0 6 0 8 4 0 1 4 4 8 0 1 0 1 8 0 1 0 2 1 1 1 2 1 3 3 7 5 1 5 5 3 0 0 1 2 17 : 0 0 1 7 : 1 5 0 0 0 0 6 0 5 8 0 1 1 8 1 3 0 7 2 0 0 1 3 4 1 5 3 2 8 7 4 2 5 1 5 7 1 0 1 2 1 17 : 1 5 1 7 : 3 0 0 0 0 0 7 2 5 6 0 1 2 8 1 8 0 1 3 3 1 0 1 2 2 1 6 2 2 8 4 4 4 3 1 6 2 2 0 0 0 0 17 : 3 0 1 7 : 4 5 0 0 0 0 5 5 6 2 0 1 1 7 1 3 1 1 5 2 9 0 1 0 4 1 2 6 2 3 0 3 7 6 1 6 1 9 0 0 0 0 17 : 4 5 1 8 : 0 0 0 0 0 0 4 3 5 3 0 9 6 12 0 1 6 2 8 0 1 1 4 1 1 2 2 2 6 3 5 0 1 5 9 4 0 0 0 2 18 : 0 0 1 8 : 1 5 0 0 0 0 4 4 5 2 0 9 6 16 0 1 2 2 8 0 1 0 9 1 1 5 2 2 4 3 4 8 1 5 1 7 0 6 2 2 18 : 1 5 1 8 : 3 0 0 0 0 0 4 4 5 2 0 9 6 10 0 1 0 2 0 0 9 9 9 2 1 9 1 3 0 7 1 3 8 1 0 2 1 0 0 0 0 74 1 7 1 1 3 15 9 1 1 4 2 0 1 3 4 4 1 5 5 1 46 5 2 6 10 9 1 1 Rig h t T h r u L e f t Ap p r o a c h   To t a l Ri g h t T h r u L e f t Ap p r o a c h   To t a l Rig h t T h r u L e f t Ap p r o a c h   To t a l Rig h t T h r u L e f t Ap p r o a c h   To t a l SB W B N B E B 0 0 0 0 2 5 9 2 6 9 0 5 2 8 4 9 0 3 9 8 8 0 4 5 8 5 4 8 1 0 0 6 1 6 2 2 1 15 3 0.0 0 0 . 0 0 0 . 0 0 0 . 0 0 0 . 9 0 0 . 8 0 0 . 0 0 0 . 9 2 0 . 6 8 0 . 0 0 0 . 7 5 0 . 7 1 0 . 0 0 0 . 8 5 0 . 8 5 0 . 8 8 0.9 2 00 0 5 4 0 6 0 3 0 2 3 0% 0 % 0 % 2% 1 % 0 % 12 % 0 % 8 % 0% 0 % 1 % 15   Min u t e   Vo l u m e In t e r s e c t i o n :   6:   N B   I ‐ 5   O n / O f f   R a m p   @   A s h l a n d   S t A s h l a n d ,   O R Co u n t e r :   SO T E W e d n e s d a y ,   J u n e   7 ,   2 0 1 7 Tim e   P e r i o d So u t h b o u n d   W e s t b o u n d   N o r t h b o u n d   E a s t b o u n d   Ho u r l y   Vo l u m e Pe d e s t r i a n s PH F Co u n t   P e r i o d   T o t a l PM   P e a k   H o u r   C o u n t   S u m m a r y So u t h b o u n d   We s t b o u n d   No r t h b o u n d   Ea s t b o u n d   Pe d e s t r i a n s Pe a k   V o l u m e s Tr u c k s % T r u c k s South Ashland Business Park TPRA E - 16 6:  N B   I ‐ 5   O n / O f f   R a m p   @   A s h l a n d   S t Pe d e s t r i a n s   a n d   C a r s Pe d s R i g h t T h r u L e f t Pe d s R i g h t T h r u L e f t Pe d s R i g h t T h r u L e f t Pe d s R i g h t T h r u L e f t 3:3 0   P M 2 0 0 0 0 7 7 5 6 3 1 1 4 0 1 1 1 0 1 1 0 1 5 1 42 2 3:4 5   P M 2 0 0 0 0 6 6 5 9 0 0 1 7 0 1 5 0 0 1 0 9 1 3 4 40 0 4:0 0   P M 1 0 0 0 0 8 1 4 9 0 0 1 4 0 1 3 1 0 1 0 4 1 3 4 39 5 4:1 5   P M 0 0 0 0 1 6 1 5 7 0 0 1 1 0 1 0 1 0 1 2 4 1 2 5 38 8 1 6 0 5 4:3 0   P M 1 0 0 0 0 6 7 7 0 0 2 1 0 0 8 0 0 9 8 1 2 1 37 4 1 5 5 7 4:4 5   P M 0 0 0 0 0 5 7 8 4 0 1 6 0 9 2 0 1 0 2 1 0 9 36 7 1 5 2 4 5:0 0   P M 0 0 0 0 1 5 9 5 8 0 1 1 2 0 6 1 0 1 3 4 1 5 3 42 2 1 5 5 1 5:1 5   P M 0 0 0 0 0 7 1 5 3 0 0 1 5 0 1 3 0 0 1 2 2 1 6 2 43 6 1 5 9 9 5:3 0   P M 0 0 0 0 0 5 3 6 2 0 0 1 3 1 1 4 0 0 1 0 4 1 2 5 37 2 1 5 9 7 5:4 5   P M 0 0 0 0 0 4 3 5 3 0 0 1 2 0 1 5 2 0 1 1 2 1 1 2 34 7 1 5 7 7 6:0 0   P M 0 0 0 0 4 4 4 5 1 0 2 1 6 0 1 1 2 0 1 0 9 1 1 4 34 5 1 5 0 0 6:1 5   P M 0 0 0 0 1 4 4 5 2 0 1 9 0 1 0 0 0 9 8 9 2 30 5 1 3 6 9 To t a l 6 0 0 0 7 7 2 3 7 0 4 3 8 1 4 9 1 1 3 5 10 0 1 3 2 6 1 5 3 2 Pe a k   H o u r 1 0 0 0 1 2 5 4 2 6 5 0 4 4 3 0 3 6 3 0 4 5 6 5 4 5 15 9 9 Tr u c k s Rig h t T h r u L e f t Ri g h t T h r u L e f t Ri g h t T h r u L e f t Ri g h t T h r u L e f t 3:3 0   P M 0 0 0 21 0 2 0 0 0 6 51 616 11 1 18 3:4 5   P M 0 0 0 50 0 0 0 1 0 2 41 212 6 1 14 4:0 0   P M 0 0 0 21 0 1 0 0 0 4 41 212 8 1 14 4:1 5   P M 0 0 0 20 0 0 0 0 0 1 14 4452 0 8 4:3 0   P M 0 0 0 01 0 0 0 1 0 2 15 3353 2 8 4:4 5   P M 0 0 0 30 0 2 0 1 0 0 28 2982 1 9 5:0 0   P M 0 0 0 10 0 1 0 1 0 0 03 2040 1 6 5:1 5   P M 0 0 0 13 0 3 0 0 0 0 07 2370 3 7 5:3 0   P M 0 0 0 20 0 0 0 1 0 0 14 2241 1 5 5:4 5   P M 0 0 0 00 0 0 0 1 0 2 03 1732 1 8 6:0 0   P M 0 0 0 01 0 0 0 1 0 0 13 1751 2 3 6:1 5   P M 0 0 0 00 0 1 0 0 0 1 02 1231 0 4 To t a l 0 0 0 1 8 7 0 1 0 0 7 0 1 8 1 9 Pe a k   H o u r 0 0 0 5 4 0 6 0 3 0 2 3 23 Bik e s Rig h t T h r u L e f t Ri g h t T h r u L e f t Ri g h t T h r u L e f t Ri g h t T h r u L e f t 3:3 0   P M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3:4 5   P M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:0 0   P M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:1 5   P M 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 1 4:3 0   P M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:4 5   P M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:0 0   P M 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 5:1 5   P M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:3 0   P M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:4 5   P M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:0 0   P M 0 0 0 0 2 0 0 0 0 0 0 0 0 2 0 0 6:1 5   P M 0 0 0 0 1 0 0 0 0 0 0 0 0 1 0 0 To t a l 0000 3 0 0 1 0 0 1 0 Pe a k   H o u r 0 0 0 0 0 0 0 1 0 0 0 0 Tim e   P e r i o d So u t h b o u n d   We s t b o u n d   Ea s t b o u n d   15   M i n u t e   Vo l u m e Ho u r l y   Vo l u m e Tim e   P e r i o d So u t h b o u n d We s t b o u n d No r t h b o u n d Ea s t b o u n d 15   M i n u t e   Vo l u m e Ho u r l y   Vo l u m e No r t h b o u n d   WB N B E B Tim e   P e r i o d So u t h b o u n d We s t b o u n d No r t h b o u n d Ea s t b o u n d SB South Ashland Business Park TPRA E - 17 #D I V / 0 ! # D I V / 0 ! # D I V / 0 ! % R T L P E D 6 00 0 1 % Pe d 3 2 7 0 R 0.0 0 % 0.0 0 % L 57 0 2 8 0 T 50 . 9 1 % 45 . 5 6 % T 47 7 0 L 49 . 0 9 % 54 . 4 4 % R 01 Pe d % 54 1 0 5 1 Pe d L T R Se a s o n a l   A d j u s t m e n t   F a c t o r % 55 . 4 % 0 . 0 % 4 4 . 6 % 1.0 4 1 84 0 0 10 4 7 52 8 84 0 Se a s o n a l l y   A d j u s t e d   P e a k   H o u r So u t h b o u n d 32 1 Eastbound 6:   N B   I ‐ 5   O n / O f f   R a m p   @   A s h l a n d   S t Westbound 55 0 13 6 8 10 7 8 92 No r t h b o u n d 09 2 South Ashland Business Park TPRA E - 18 Ci t y : Da t e : To t a l o f A ll  V e hic les Rig h t T h r u L e f t Ap p r o a c h   To t a l Ri g h t T h r u L e f t Ap p r o a c h   To t a l Rig h t T h r u L e f t Ap p r o a c h   To t a l Rig h t T h r u L e f t Ap p r o a c h   To t a l SB W B N B E B 15 : 3 0 1 5 : 4 5 0 0 0 0 0 7 0 7 0 0 1 9 1 9 4 0 0 4 3 0 0 0 0 0 15 : 4 5 1 6 : 0 0 1 1 0 2 0 5 0 5 0 0 4 4 4 5 2 1 1 2 2 0 0 0 0 16 : 0 0 1 6 : 1 5 0 0 0 0 0 1 1 0 1 1 0 0 1 9 1 9 4 1 0 5 3 5 0 0 0 0 16 : 1 5 1 6 : 3 0 0 0 0 0 0 4 0 4 0 0 5 5 7 2 0 9 1 8 1 0 5 0 0 0 0 16 : 3 0 1 6 : 4 5 0 0 0 0 0 7 0 7 0 0 8 8 5 0 0 5 2 0 9 5 0 0 0 0 16 : 4 5 1 7 : 0 0 2 0 0 2 0 3 0 3 0 0 9 9 8 3 1 1 2 2 6 9 9 0 0 0 0 17 : 0 0 1 7 : 1 5 1 0 0 1 0 1 0 1 0 0 9 9 6 2 0 8 1 9 8 3 0 0 0 0 17 : 1 5 1 7 : 3 0 0 0 0 0 0 1 1 2 0 0 4 4 2 0 0 2 8 7 3 0 0 0 0 17 : 3 0 1 7 : 4 5 0 0 0 0 0 1 0 1 1 0 4 5 5 0 0 5 1 1 6 4 0 0 0 0 17 : 4 5 1 8 : 0 0 1 0 0 1 0 3 0 3 0 0 4 4 1 0 2 0 1 2 2 0 5 8 0 0 0 0 18 : 0 0 1 8 : 1 5 0 0 0 0 0 3 0 3 0 0 6 6 4 0 0 4 1 3 5 2 0 0 0 0 18 : 1 5 1 8 : 3 0 0 0 0 0 0 4 0 4 0 0 3 3 1 1 0 2 9 5 3 0 0 0 0 5 1 0 0 5 0 1 1 0 9 4 60 1 6 3 23 1 0 0 0 0 Rig h t T h r u L e f t Ap p r o a c h   To t a l Ri g h t T h r u L e f t Ap p r o a c h   To t a l Rig h t T h r u L e f t Ap p r o a c h   To t a l Rig h t T h r u L e f t Ap p r o a c h   To t a l SB W B N B E B 30 0 3 0 1 2 1 1 3 0 0 3 0 3 0 2 1 5 1 2 7 7 3 0 00 0 0.3 8 0 . 0 0 0 . 0 0 0 . 3 8 0 . 0 0 0 . 4 3 0 . 2 5 0 . 4 6 0 . 0 0 0 . 0 0 0 . 8 3 0 . 8 3 0 . 6 6 0 . 4 2 0 . 2 5 0 . 5 6 0.7 0 00 0 0 0 0 0 0 0 0 0 0 0% 0 % 0 % 0% 0 % 0 % 0% 0 % 0 % 0% 0 % 0 % 15   Min u t e   Vo l u m e In t e r s e c t i o n :   9:   J e f f e r s o n   A v e   @   W a s h i n g t o n   S t A s h l a n d ,   O R Co u n t e r :   Sa n d o w   E n g i n e e r i n g W e d n e s d a y ,   J u n e   7 ,   2 0 1 7 Tim e   P e r i o d So u t h b o u n d   W e s t b o u n d   N o r t h b o u n d   E a s t b o u n d   Ho u r l y   Vo l u m e Pe d e s t r i a n s PH F Co u n t   P e r i o d   T o t a l PM   P e a k   H o u r   C o u n t   S u m m a r y So u t h b o u n d   We s t b o u n d   No r t h b o u n d   Ea s t b o u n d   Pe d e s t r i a n s Pe a k   V o l u m e s Tr u c k s % T r u c k s South Ashland Business Park TPRA E - 19 9:  J e f f e r s o n   A v e   @   W a s h i n g t o n   S t Pe d e s t r i a n s   a n d   C a r s Pe d s R i g h t T h r u L e f t Pe d s R i g h t T h r u L e f t Pe d s R i g h t T h r u L e f t Pe d s R i g h t T h r u L e f t 3:3 0   P M 0 0 0 0 0 0 7 0 0 0 0 1 9 0 4 0 0 30 3:4 5   P M 0 1 1 0 0 0 5 0 0 0 0 4 0 4 5 2 22 4:0 0   P M 0 0 0 0 0 0 1 1 0 0 0 0 1 9 0 4 1 0 35 4:1 5   P M 0 0 0 0 0 0 4 0 0 0 0 5 0 7 2 0 18 1 0 5 4:3 0   P M 0 0 0 0 0 0 7 0 0 0 0 8 0 5 0 0 20 95 4:4 5   P M 0 2 0 0 0 0 3 0 0 0 0 9 0 8 3 1 26 99 5:0 0   P M 0 1 0 0 0 0 1 0 0 0 0 9 0 6 2 0 19 83 5:1 5   P M 0 0 0 0 0 0 1 1 0 0 0 4 0 2 0 0 8 73 5:3 0   P M 0 0 0 0 0 0 1 0 0 1 0 4 0 5 0 0 11 64 5:4 5   P M 0 1 0 0 0 0 3 0 0 0 0 4 0 1 0 2 0 20 58 6:0 0   P M 0 0 0 0 0 0 3 0 0 0 0 6 0 4 0 0 13 52 6:1 5   P M 0 0 0 0 0 0 4 0 0 0 0 3 0 1 1 0 9 53 To t a l 0 5 1 0 0 0 5 0 1 0 1 0 9 4 0 6 0 1 6 3 Pe a k   H o u r 0 3 0 0 0 0 1 2 1 0 0 0 3 0 0 2 1 5 1 73 Tr u c k s Rig h t T h r u L e f t Ri g h t T h r u L e f t Ri g h t T h r u L e f t Ri g h t T h r u L e f t 3:3 0   P M 0000 0 0 0 0 0 0 00 0 3:4 5   P M 0000 0 0 0 0 0 0 00 0 4:0 0   P M 0000 0 0 0 0 0 0 00 0 4:1 5   P M 0000 0 0 0 0 0 0 00 00 4:3 0   P M 0000 0 0 0 0 0 0 00 00 4:4 5   P M 0000 0 0 0 0 0 0 00 00 5:0 0   P M 0000 0 0 0 0 0 0 00 00 5:1 5   P M 0000 0 0 0 0 0 0 00 00 5:3 0   P M 0000 0 0 0 0 0 0 00 00 5:4 5   P M 0000 0 0 0 0 0 0 00 00 6:0 0   P M 0000 0 0 0 0 0 0 00 00 6:1 5   P M 0000 0 0 0 0 0 0 00 00 To t a l 000 0 0 0 0 0 0 0 0 0 Pe a k   H o u r 0 0 0 0 0 0 0 0 0 0 0 0 0 Bik e s Rig h t T h r u L e f t Ri g h t T h r u L e f t Ri g h t T h r u L e f t Ri g h t T h r u L e f t 3:3 0   P M 0000 0 0 0 0 0 0 00 00 0 0 3:4 5   P M 0000 0 0 0 0 0 0 00 00 0 0 4:0 0   P M 0000 0 0 0 0 0 0 00 00 0 0 4:1 5   P M 0000 0 0 0 0 0 0 00 00 0 0 4:3 0   P M 0000 0 0 0 0 0 0 00 00 0 0 4:4 5   P M 0000 0 0 0 0 0 0 00 00 0 0 5:0 0   P M 0000 0 0 0 0 0 0 00 00 0 0 5:1 5   P M 0000 0 0 0 0 0 0 00 00 0 0 5:3 0   P M 0000 0 0 0 0 0 0 00 00 0 0 5:4 5   P M 0000 0 0 0 0 0 0 00 00 0 0 6:0 0   P M 0000 0 0 0 0 0 0 00 00 0 0 6:1 5   P M 0000 0 0 0 0 0 0 00 00 0 0 To t a l 000 0 0 0 0 0 0 0 0 0 Pe a k   H o u r 0 0 0 0 0 0 0 0 0 0 0 0 Tim e   P e r i o d So u t h b o u n d   We s t b o u n d   Ea s t b o u n d   15   M i n u t e   Vo l u m e Ho u r l y   Vo l u m e Tim e   P e r i o d So u t h b o u n d We s t b o u n d No r t h b o u n d Ea s t b o u n d 15   M i n u t e   Vo l u m e Ho u r l y   Vo l u m e No r t h b o u n d   WB N B E B Tim e   P e r i o d So u t h b o u n d We s t b o u n d No r t h b o u n d Ea s t b o u n d SB South Ashland Business Park TPRA E - 20 0.0 0 % 0 . 0 0 % 1 0 0 . 0 0 % % R T L P E D 9 30 0 0 % Pe d 00 R 7.6 9 % 77 . 7 8 % L 11 2 T 92 . 3 1 % 18 . 5 2 % T 51 L 0. 0 0 % 3.7 0 % R 21 0 Pe d % 03 0 0 0 Pe d L T R Se a s o n a l   A d j u s t m e n t   F a c t o r % 0. 0 % 0 . 0 % 1 0 0 . 0 % 0.0 0 0 4 3 27 5 1 Se a s o n a l l y   A d j u s t e d   P e a k   H o u r So u t h b o u n d 45 Eastbound 9:   J e f f e r s o n   A v e   @   W a s h i n g t o n   S t Westbound 13 72 18 52 No r t h b o u n d 22 3 0 South Ashland Business Park TPRA E - 21 Gl o b a l P e a k H o u r 1: W a l k e r A v e @ As h l a n d S t 2: N o r m a l A v e @ As h l a n d S t 3: T o l m a n C r e e k R d @ As h l a n d S t 4: W a s h i n g t o n S t @ As h l a n d S t 5: S B I - 5 O n / O f f R a m p @ A s h l a n d S t 6: N B I - 5 O n / O f f R a m p @ A s h l a n d S t 7: T o l m a n C r e e k R d @ In d e p e n d e n t W a y 8: W a s h i n g t o n S t @ In d e p e n d e n t Wa y/W a s h i n gto n S t 9: J e f f e r s o n A v e @ Wa s h i n g t o n S t 10 : S i t e D r i v e w a y @ Wa s h i n g t o n S t 3:3 0 P M 4 : 3 0 P M 1 5 8 9 13 6 5 19 8 6 16 2 7 18 6 2 16 4 9 0 0 10 5 0 10 1 8 3 3:4 5 P M 4 : 4 5 P M 1 5 8 1 13 6 6 19 4 3 16 1 0 18 1 2 15 9 0 0 0 95 0 99 9 7 4:0 0 P M 5 : 0 0 P M 1 6 5 2 13 2 6 19 1 0 16 0 7 17 6 6 15 5 3 0 0 99 0 99 1 3 4:1 5 P M 5 : 1 5 P M 1 7 0 6 13 7 5 20 8 8 16 5 8 18 1 2 15 7 1 0 0 83 0 10 2 9 3 4:3 0 P M 5 : 3 0 P M 1 6 6 8 13 5 8 21 8 5 17 5 6 18 8 7 16 2 2 0 0 73 0 10 5 4 9 4:4 5 P M 5 : 4 5 P M 1 6 1 2 13 5 5 21 9 3 17 3 2 19 0 2 16 1 9 0 0 64 0 10 4 7 7 5:0 0 P M 6 : 0 0 P M 1 5 1 7 13 2 0 21 6 8 16 7 4 19 0 1 15 9 4 0 0 58 0 10 2 3 2 5:1 5 P M 6 : 1 5 P M 1 0 4 9 96 6 19 0 5 15 2 8 18 3 2 15 1 7 0 0 52 0 88 4 9 5:3 0 P M 6 : 3 0 P M 6 9 0 61 6 17 0 7 13 4 8 16 7 5 13 8 1 0 0 53 0 74 7 0 17 0 6 13 7 5 21 9 3 17 5 6 19 0 2 16 2 2 0 0 99 0 10 5 4 9 In t e r s e c t i o n s To t a l Tim e P e r i o d Vo l u m e V o l u m e V o l u m e V o l u m e V o l u m e V o l u m e V o l u m e V o l u m e V o l u m e V o l u m e South Ashland Business Park TPRA E - 22 Ex i s t i n g 2 0 1 7 P M V o l u m e s 298 2 4 6 2 3 3 9 2 2 4 2 4 1 0 7 6 9 1 0 0 8 4 0 R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D 1 7 3 6 3 1 6 2 1 4 0 . 8 9 2 4 2 1 7 2 0 . 9 6 3 5 9 1 0 3 6 2 2 0 0 . 8 2 4 00 0 1 0.9 4 5 5 1 1 1 1 7 9 1 0 . 9 0 6 00 0 1 0.9 2 Ped 1 5 1 1 4 R 6 2 6 P e d 1 2 1 6 R 6 2 6 P e d 8 6 4 R 8 2 0 P e d 1 2 1 R 8 2 9 P e d 4 0 R 3 2 4 P e d 3 2 7 0 R 5 5 0 533 L 9 6 4 5 2 T 5 7 6 L 1 9 5 6 3 T 6 6 4 L 8 6 5 4 2 T 7 9 6 L 6 7 5 5 T 8 2 6 U T u r n 16 29 9 T 321 L 5 7 0 28 0 T T 5 1 9 60 L 7 7 4 T 6 8 0 47 L 7 1 3 T 7 0 4 21 4 L 9 5 7 T 8 7 0 73 L 9 1 4 T 8 7 0 25 L 1 0 4 9 T 4 7 7 0 L 5 2 8 633 R 1 8 11 P e d 71 3 R 1 4 9 P e d 84 4 R 5 4 11 P e d 90 5 R 2 9 3 P e d 94 9 R 6 3 8 P e d 10 4 7 R 0 1 P e d 21 8 3 6 9 3 89 4 1 6 136 3 9 1 1 9 1 441 0 4 4 10 0 0 541 0 5 1 Pe d L T R Pe d L T R Ped L T R Pe d L T R Pe d L T R Pe d L T R 14 1 1 3 7 63 29 37 1 3 4 5 102 85 89 0 0 92 00 2745 31 00 R T L P E D R T L P E D R T L P E D R T L P E D 7 0 0 0 0 0.9 4 8 0 0 2 7 0 0 . 7 0 9 30 0 0 0.7 0 10 00 0 0 0.0 0 Pe d 0 0 R 0 P e d 0 45 R 4 5 P e d 0 0 R 1 3 P e d 0 0 R 0 0L 0 0T 0 L 0 0T 4 5 L 1 12T 0 L 0 0T T00 L0T00 L27T51 L5T00 L0 0 R 0 0 P e d 0 R 0 0 P e d 27 R 2 1 0 P e d 0 R 0 0 P e d 00 0 0 00 0 0 030 0 0 00 0 0 Ped L T R Pe d L T R Pe d L T R Pe d L T R 00 00 2230 00 Ba l a n c e d 2 0 1 7 P M V o l u m e s 298 2 4 6 23 39 22 4 2 4 1 0 7 69 1 16 0 8 4 1 R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D 1 7 3 6 3 1 6 2 1 4 2 4 2 1 7 2 3 5 9 1 0 3 6 2 2 0 4 0 0 0 1 5 5 1 1 1 1 7 9 1 6 0 0 0 1 Ped 1 5 11 4 R 6 2 6 P e d 1 2 16 R 6 2 6 P e d 8 64 R 8 2 0 P e d 1 2 1 R 8 2 9 P e d 4 0 R 3 2 4 P e d 3 27 0 R 5 5 3 533 L 9 6 45 2 T 57 6 L 1 9 56 3 T 66 4 L 8 6 54 2 T 79 6 L 6 75 5 T 82 6 U T u r n 16 29 9 T 324 L 5 7 1 28 3 T T 5 1 9 60 L 7 7 4 T 6 8 0 47 L 7 1 3 T 7 0 4 21 4 L 9 5 7 T 8 7 0 73 L 9 1 4 T 8 7 0 25 L 1 0 4 9 T 4 7 8 0 L 5 2 9 633 R 1 8 11 P e d 71 3 R 1 4 9 P e d 84 4 R 5 4 11 P e d 90 5 R 2 9 3 P e d 94 9 R 6 3 8 P e d 10 4 9 R 0 1 P e d 21 8 3 6 9 3 89 4 1 6 136 3 9 1 1 9 1 441 0 4 4 10 0 0 541 0 5 1 Pe d L T R Pe d L T R Ped L T R Pe d L T R Pe d L T R Pe d L T R 14 1 1 3 7 63 29 37 1 3 4 5 102 85 89 0 0 92 37 1 3 4 5 27 45 3 1 0 0 R T L P E D R T L P E D R T L P E D R T L P E D 7 0 3 7 1 0 0 8 0 0 2 7 0 9 3 0 0 0 10 0 0 0 0 Pe d 0 0 R 0 P e d 0 45 R 4 5 P e d 0 0 R 1 3 P e d 0 0 R 1 3 0L 0 0T 0L 0 0T 45 L 1 12T 13L 0 13 T T00 L0T00 L27T51 L5T50 L5 0 R 0 0 P e d 0 R 0 0 P e d 27 R 2 1 0 P e d 5 R 0 0 P e d 00 3 4 5 0 00 0 0 030 0 0 00 0 0 Ped L T R Pe d L T R Pe d L T R Pe d L T R 37 1 3 4 5 0 0 22 30 0 0 2: N o r m a l A v e @ A s h l a n d St 3: T o l m a n C r e e k R d @ Ash l a n d S t 4: W a s h i n g t o n S t @ As h l a n d S t 5: S B I - 5 O n / O f f R a m p @ As h l a n d S t 5: S B I - 5 O n / O f f R a m p @ As h l a n d S t 9: J e f f e r s o n A v e @ Wa s h i n g t o n S t 10 : S i t e D r i v e w a y @ Wa s h i n g t o n S t 9: J e f f e r s o n A v e @ Wa s h i n g t o n S t 1: W a l k e r A v e @ A s h l a n d St 1: W a l k e r A v e @ A s h l a n d St 2: N o r m a l A v e @ A s h l a n d St 6: N B I - 5 O n / O f f R a m p @ As h l a n d S t 7: T o l m a n C r e e k R d @ In d e p e n d e n t W a y 8: W a s h i n g t o n S t @ Ind e p e n d e n t Wa y / W a s h i n g t o n S t 10 : S i t e D r i v e w a y @ Wa s h i n g t o n S t 6: N B I - 5 O n / O f f R a m p @ As h l a n d S t 7: T o l m a n C r e e k R d @ In d e p e n d e n t W a y 3: T o l m a n C r e e k R d @ Ash l a n d S t 8: W a s h i n g t o n S t @ Ind e p e n d e n t Wa y / W a s h i n g t o n S t 4: W a s h i n g t o n S t @ As h l a n d S t South Ashland Business Park TPRA E - 23 "E x i s t i n g " ( 2 0 0 9 ) T S P V o l u m e s 22 0 1 6 5 0 0 2 6 5 2 7 0 0 0 4 8 5 0 0 6 5 0 R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D 1 6 0 3 5 1 2 5 0 2 0 0 0 0 3 6 0 1 4 5 6 0 0 4 0 0 0 0 5 3 4 0 5 1 4 0 0 6 0 0 0 0 Pe d 0 7 5 R 6 1 0 P e d 0 0 R 0 P e d 0 6 0 R 7 2 0 P e d 0 0 R 6 6 0 P e d 0 0 R 2 7 5 P e d 0 1 9 0 R 4 3 0 55 0 L 5 0 4 8 0 T 0 L 0 0 T 6 0 5 L 9 0 4 7 5 T 6 8 5 L 0 6 4 0 T 5 9 5 U T u r n 0 255 T 27 5 L 4 5 5 240 T T 5 2 5 55 L 7 3 5 T 0 0 L 0 T 5 0 5 18 5 L 7 5 5 T 7 2 5 20 L 7 6 5 T 7 5 0 20 L 8 9 0 T 4 3 0 0 L 4 6 5 59 0 R 1 5 0 P e d 0 R 0 0 P e d 65 0 R 5 5 0 P e d 77 0 R 4 5 0 P e d 80 0 R 5 0 0 P e d 88 5 R 0 0 P e d 010 4 0 8 5 00 0 0 070 1 2 0 1 9 0 045 0 4 0 00 0 0 0 035 5 3 5 Pe d L T R Pe d L T R Pe d L T R Ped L T R Pe d L T R Pe d L T R 10 5 1 3 5 0 0 38 5 3 8 0 65 85 75 0 0 75 00 00 00 00 R T L P E D R T L P E D R T L P E D R T L P E D 7 0 0 0 0 8 0 0 0 0 9 0 0 0 0 10 0 0 0 0 Pe d 0 0 R 0 P e d 0 0 R 0 P e d 0 0 R 0 P e d 0 0 R 0 0L 0 0T 0L 0 0T 0L 0 0T 0L 0 0T T0 0L 0 T 0 0L 0 T 0 0L 0 T 0 0L 0 0 R 0 0 P e d 0 R 0 0 P e d 0 R 0 0 P e d 0 R 0 0 P e d 00 0 0 00 0 0 00 0 0 00 0 0 Pe d L T R Ped L T R Pe d L T R Pe d L T R 00 00 00 00 20 3 4 F u t u r e T S P N o - B u i l d V o l u m e s 22 0 2 1 5 0 0 32 5 3 8 0 0 0 61 0 0 0 1 0 0 5 R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D 1 6 0 3 5 1 2 5 0 2 0 0 0 0 3 7 5 1 7 5 7 5 0 4 0 0 0 0 5 4 3 0 5 1 7 5 0 6 0 0 0 0 Pe d 0 90 R 7 5 0 P e d 0 0 R 0 P e d 0 80 R 9 2 0 P e d 0 0 R 7 8 5 P e d 0 0 R 4 0 0 P e d 0 290 R 6 5 0 66 0 L 8 5 590 T 0 L 0 0 T 76 5 L 1 5 0 60 5 T 87 0 L 0 76 5 T 80 5 U T u r n 0 375 T 40 0 L 7 1 0 360 T T 9 1 5 70 L 1 1 3 0 T 0 0 L 0 T 8 4 5 23 5 L 1 1 5 5 T 1 1 5 5 20 L 1 2 4 5 T 1 2 0 0 25 L 1 3 7 5 T 6 6 5 0 L 7 0 0 102 5 R 2 5 0 P e d 0 R 0 0 P e d 10 8 5 R 9 0 0 P e d 12 2 5 R 7 0 0 P e d 12 7 5 R 7 5 0 P e d 137 5 R 0 0 P e d 010 4 0 9 0 00 0 0 085 1 5 0 2 3 5 0105 0 9 0 00 0 0 040 5 3 5 Pe d L T R Pe d L T R Pe d L T R Ped L T R Pe d L T R Pe d L T R 13 0 1 4 0 0 0 50 0 4 7 0 90 1 9 5 105 0 0 80 00 00 00 00 R T L P E D R T L P E D R T L P E D R T L P E D 7 0 0 0 0 8 0 0 0 0 9 0 0 0 0 10 0 0 0 0 Pe d 0 0 R 0 P e d 0 0 R 0 P e d 0 0 R 0 P e d 0 0 R 0 0L 0 0T 0L 0 0T 0L 0 0T 0L 0 0T T0 0L 0 T 0 0L 0 T 0 0L 0 T 0 0L 0 0 R 0 0 P e d 0 R 0 0 P e d 0 R 0 0 P e d 0 R 0 0 P e d 00 0 0 00 0 0 00 0 0 00 0 0 Pe d L T R Ped L T R Pe d L T R Pe d L T R 00 00 00 00 Ca l c u l a t e d A n n u a l G r o w t h R a t e f r o m T S P 00 00 00 00 00 00 R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D 1 0 . 0 0 0 0 . 0 0 0 0 . 0 0 0 2 0 . 0 2 0 0 . 0 2 0 0 . 0 2 0 3 0 . 0 1 0 0 . 0 0 8 0 . 0 1 0 4 0 . 0 0 0 0 . 0 0 0 0 . 0 0 0 5 0 . 0 1 1 0 . 0 0 0 0 . 0 1 0 6 0 . 0 0 0 0 . 0 0 0 0 . 0 0 0 Pe d 0.0 0 8 R 0 . 0 2 8 P e d 0.0 2 0 R 0 . 0 6 P e d 0.0 1 3 R 0 . 0 3 5 P e d 0.0 0 0 R 0 . 0 0 8 P e d 0.0 0 0 R 0 . 0 2 9 P e d 0.0 2 1 R 0 . 0 4 1 0.0 0 9 L 0 . 0 2 8 0.0 0 9 T 0.0 6 L 0 . 0 2 0 0.0 2 0 T 0.0 3 L 0 . 0 2 7 0.0 1 1 T 0.0 6 1 L 0 . 0 0 0 0.0 0 8 T 0 U T u r n0.0 0 0 0.0 1 9 T 0.0 2 6 L 0 . 0 2 2 0.0 2 0 T T 0 . 0 3 0 0.0 1 1 L 0 . 0 3 2 T 0 . 0 2 0 0.0 2 0 L 0 . 0 6 T 0 . 0 2 7 0.0 1 1 L 0 . 0 4 6 T 0 . 0 2 4 0.0 0 0 L 0 . 0 7 4 T 0 . 0 2 4 0.0 1 0 L 0 . 0 3 4 T 0 . 0 2 2 0.0 0 0 L 0 . 0 2 2 0.0 8 4 R 0 . 0 2 7 Ped 0.0 6 R 0 . 0 2 0 Pe d 0 . 0 7 9 R 0 . 0 2 5 Pe d 0 . 0 4 6 R 0 . 0 2 2 Pe d 0 . 0 4 4 R 0 . 0 2 0 Pe d 0 . 0 4 4 R 0 . 0 0 0 Ped 0.0 0 0 0 . 0 0 0 0 . 0 0 2 0.0 2 0 0 . 0 2 0 0 . 0 2 0 0.0 0 9 0 . 0 1 0 0 . 0 0 9 0.0 5 3 0 . 0 0 0 0 . 0 5 0 0.0 0 0 0 . 0 0 0 0 . 0 0 0 0.0 0 6 0 . 0 0 0 0 . 0 0 0 Pe d L T R Pe d L T R Pe d L T R Ped L T R Pe d L T R Pe d L T R 00 00 00 00 00 00 00 00 00 00 R T L P E D R T L P E D R T L P E D R T L P E D 7 0 . 0 0 0 0 . 0 2 0 0 . 0 2 0 8 0 . 0 2 0 0 . 0 0 0 0 . 0 2 0 9 0 . 0 2 0 0 . 0 2 0 0 . 0 2 0 10 0 . 0 0 0 0 . 0 0 0 0 . 0 0 0 Pe d 0.0 2 0 R 0 . 0 4 P e d 0.0 2 0 R 0 . 0 4 P e d 0.0 2 0 R 0 . 0 6 P e d R 0 . 0 2 0 L 0 . 0 0 0 0.0 0 0 T 0.0 4 L 0 . 0 2 0 0.0 2 0 T 0.0 6 L 0 . 0 2 0 0.0 2 0 T 0.0 2 L 0.0 2 0 T T 0 . 0 0 0 0.0 2 0 L 0 . 0 4 T 0 . 0 2 0 0.0 0 0 L 0 . 0 4 T 0 . 0 2 0 0.0 2 0 L 0 . 0 6 T 0 . 0 2 0 0.0 0 0 L 0 . 0 2 0 R 0 . 0 0 0 Pe d 0.0 4 R 0 . 0 0 0 Pe d 0.0 6 R 0 . 0 2 0 Pe d 0.0 2 R 0 . 0 0 0 Ped 0.0 0 0 0 . 0 2 0 0 . 0 2 0 0.0 0 0 0 . 0 0 0 0 . 0 0 0 0.0 2 0 0 . 0 2 0 0 . 0 2 0 0.0 0 0 0 . 0 0 0 0 . 0 0 0 Pe d L T R Ped L T R Pe d L T R Pe d L T R 00 00 00 00 9: J e f f e r s o n A v e @ Wa s h i n g t o n S t 10 : S i t e D r i v e w a y @ Wa s h i n g t o n S t 9: J e f f e r s o n A v e @ Wa s h i n g t o n S t 10 : S i t e D r i v e w a y @ Wa s h i n g t o n S t 7: T o l m a n C r e e k R d @ In d e p e n d e n t W a y 8: W a s h i n g t o n S t @ In d e p e n d e n t Wa y / W a s h i n g t o n S t 1: W a l k e r A v e @ A s h l a n d St 2: N o r m a l A v e @ A s h l a n d St 3: T o l m a n C r e e k R d @ Ash l a n d S t 4: W a s h i n g t o n S t @ Ash l a n d S t 7: T o l m a n C r e e k R d @ In d e p e n d e n t W a y 8: W a s h i n g t o n S t @ In d e p e n d e n t Wa y / W a s h i n g t o n S t 5: S B I - 5 O n / O f f R a m p @ As h l a n d S t 6: N B I - 5 O n / O f f R a m p @ As h l a n d S t 1: W a l k e r A v e @ A s h l a n d St 2: N o r m a l A v e @ A s h l a n d St 3: T o l m a n C r e e k R d @ Ash l a n d S t 4: W a s h i n g t o n S t @ Ash l a n d S t 7: T o l m a n C r e e k R d @ In d e p e n d e n t W a y 8: W a s h i n g t o n S t @ In d e p e n d e n t Wa y / W a s h i n g t o n S t 1: W a l k e r A v e @ A s h l a n d St 2: N o r m a l A v e @ A s h l a n d St 9: J e f f e r s o n A v e @ Wa s h i n g t o n S t 10 : S i t e D r i v e w a y @ Wa s h i n g t o n S t 5: S B I - 5 O n / O f f R a m p @ As h l a n d S t 6: N B I - 5 O n / O f f R a m p @ As h l a n d S t 3: T o l m a n C r e e k R d @ Ash l a n d S t 4: W a s h i n g t o n S t @ Ash l a n d S t 5: S B I - 5 O n / O f f R a m p @ As h l a n d S t 6: N B I - 5 O n / O f f R a m p @ As h l a n d S t South Ashland Business Park TPRA E - 24 201 9 P M V o l u m e s B a c k g r o u n d 29 8 2 5 3 2 4 4 1 2 2 8 2 5 1 0 7 7 0 6 1 6 0 8 7 8 R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D 1 7 3 6 3 1 6 2 1 4 2 4 2 1 8 2 3 6 0 1 0 7 6 1 2 0 4 0 0 0 1 5 5 2 2 1 1 8 3 1 6 0 0 0 1 Pe d 1 5 1 1 6 R 6 3 7 P e d 1 2 1 7 R 6 5 2 P e d 8 6 5 R 8 0 0 P e d 1 2 1 R 8 4 1 P e d 4 0 R 3 3 6 P e d 3 2 8 1 R 5 7 5 54 1 L 1 0 1 4 6 0 T 5 9 9 L 2 0 5 8 6 T 6 7 6 L 9 1 5 2 8 T 7 7 1 L 6 7 6 7 T 8 4 8 U T u r n 16 310 T 335 L 5 9 7 29 4 T T 5 5 0 61 L 8 0 5 T 7 0 7 49 L 7 4 2 T 7 3 5 20 7 L 9 8 2 T 9 1 1 73 L 9 5 9 T 9 1 2 26 L 1 0 9 5 T 4 9 9 0 L 5 5 0 67 0 R 1 9 11 P e d 74 2 R 1 5 9 P e d 89 0 R 6 4 11 P e d 93 0 R 1 3 4 P e d 99 4 R 6 6 8 P e d 10 9 6 R 0 1 P e d 218 3 6 9 3 89 4 1 7 138 8 9 5 1 8 6 44 0 4 8 10 0 0 541 0 5 1 Pe d L T R Pe d L T R Ped L T R Pe d L T R Pe d L T R Pe d L T R 143 137 66 30 37 8 3 6 9 86 52 93 0 0 92 38 3 3 7 7 39 36 3 1 0 0 R T L P E D R T L P E D R T L P E D R T L P E D 7 0 3 7 4 9 0 8 1 9 0 2 0 0 9 3 0 0 0 10 0 0 0 0 Pe d 0 27 R 3 8 P e d 0 27 R 4 7 P e d 0 0 R 1 3 P e d 0 0 R 1 4 0L 0 0T 39 L 9 20 T 46 L 1 12T 14L 0 14 T T 0 11L 1 7 T 8 0L 2 8 T 5 1L 5 T 5 0L 5 0 R 0 0 P e d 17 R 0 0 P e d 28 R 2 2 0 P e d 5 R 0 0 P e d 00 3 5 0 8 00 0 0 031 0 0 00 0 0 Ped L T R Pe d L T R Pe d L T R Pe d L T R 38 5 3 5 8 0 0 23 31 0 0 201 9 P M V o l u m e s B a c k g r o u n d 29 8 2 5 3 24 41 22 8 2 5 1 0 7 70 6 16 0 8 7 7 R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D 1 7 3 6 3 1 6 2 1 4 2 4 2 1 8 2 3 6 0 1 0 7 6 1 2 0 4 0 0 0 1 5 5 2 2 1 1 8 3 1 6 0 0 0 1 Pe d 1 5 11 6 R 6 3 7 P e d 1 2 17 R 6 5 2 P e d 8 65 R 8 0 0 P e d 1 2 1 R 8 4 1 P e d 4 0 R 3 3 6 P e d 3 28 1 R 5 7 6 54 1 L 1 0 1 46 0 T 59 9 L 2 0 58 6 T 67 6 L 9 1 52 8 T 77 1 L 6 76 7 T 84 8 U T u r n 16 310 T 336 L 5 9 6 29 5 T T 5 5 0 61 L 8 0 5 T 7 0 7 49 L 7 4 2 T 7 3 5 20 7 L 9 8 2 T 9 1 1 73 L 9 5 9 T 9 1 2 26 L 1 0 9 5 T 4 9 9 0 L 5 5 0 67 0 R 1 9 11 P e d 74 2 R 1 5 9 P e d 89 0 R 6 4 11 P e d 93 0 R 1 3 4 P e d 99 4 R 6 6 8 P e d 10 9 5 R 0 1 P e d 218 3 6 9 3 89 4 1 7 138 8 9 5 1 8 6 44 0 4 8 10 0 0 541 0 5 1 Pe d L T R Pe d L T R Ped L T R Pe d L T R Pe d L T R Pe d L T R 143 137 66 30 37 8 3 6 9 86 52 93 0 0 92 38 3 3 7 7 39 36 3 1 0 0 R T L P E D R T L P E D R T L P E D R T L P E D 7 0 3 7 4 9 0 8 1 9 0 2 0 0 9 3 0 0 0 10 0 0 0 0 Pe d 0 27 R 3 8 P e d 0 27 R 4 6 P e d 0 0 R 1 4 P e d 0 0 R 1 4 0L 0 0T 38 L 9 19 T 47 L 1 13T 14L 0 14 T T 0 11L 1 7 T 8 0L 2 8 T 5 1L 5 T 5 0L 5 0 R 0 0 P e d 17 R 0 0 P e d 28 R 2 2 0 P e d 5 R 0 0 P e d 00 3 5 0 8 00 0 0 031 0 0 00 0 0 Ped L T R Pe d L T R Pe d L T R Pe d L T R 38 5 3 5 8 0 0 23 31 0 0 201 9 P M B a c k g r o u n d V o l u m e s w / P i p e l i n e t r i p s ( I P C O P h a s e 1 ) 29 8 2 5 4 24 42 22 8 2 5 3 0 7 70 9 16 0 8 9 0 R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D 1 7 3 6 3 1 6 2 1 4 2 4 2 1 8 2 3 6 0 1 0 7 6 1 2 0 4 0 0 0 1 5 5 2 5 1 1 8 3 1 6 0 0 0 1 Pe d 1 5 11 7 R 6 4 2 P e d 1 2 18 R 6 6 1 P e d 8 65 R 8 0 1 P e d 1 2 1 R 8 4 5 P e d 4 0 R 3 3 7 P e d 3 28 1 R 5 7 6 54 3 L 1 0 1 46 2 T 60 5 L 2 0 59 2 T 68 8 L 9 1 52 9 T 77 2 L 6 76 7 T 85 2 U T u r n 16 311 T 337 L 6 0 9 29 5 T T 5 5 0 63 L 8 0 5 T 7 0 8 51 L 7 4 3 T 7 3 5 20 7 L 9 8 7 T 9 1 6 77 L 9 7 6 T 9 2 6 26 L 1 1 0 9 T 5 0 0 0 L 5 5 1 67 0 R 1 9 11 P e d 74 3 R 1 5 9 P e d 89 2 R 6 6 11 P e d 93 5 R 1 3 4 P e d 101 1 R 6 9 8 P e d 11 0 9 R 0 1 P e d 218 3 6 9 3 89 4 1 7 139 9 9 7 1 9 1 45 0 6 0 10 0 0 542 0 5 1 Pe d L T R Pe d L T R Ped L T R Pe d L T R Pe d L T R Pe d L T R 145 137 68 30 38 0 3 8 7 90 65 96 0 0 93 38 5 3 9 5 43 49 3 1 0 0 R T L P E D R T L P E D R T L P E D R T L P E D 7 0 3 7 4 1 1 0 8 2 3 0 2 0 0 9 3 0 0 0 10 0 0 0 0 Pe d 0 45 R 6 4 P e d 0 27 R 4 6 P e d 0 0 R 1 4 P e d 0 0 R 1 4 0 L 0 0 T 42 L 2 2 19 T 47 L 1 13 T 14 L 0 14 T T 0 19L 2 1 T 8 0L 2 8 T 5 1L 5 T 5 0L 5 0 R 0 0 P e d 30 R 0 0 P e d 28 R 2 2 0 P e d 5 R 0 0 P e d 00 3 5 0 1 0 00 0 0 031 0 0 00 0 0 Ped L T R Pe d L T R Pe d L T R Pe d L T R 39 3 3 6 0 0 0 23 31 0 0 9: J e f f e r s o n A v e @ Wa s h i n g t o n S t 6: N B I - 5 O n / O f f R a m p @ As h l a n d S t 2: N o r m a l A v e @ A s h l a n d St 6: N B I - 5 O n / O f f R a m p @ As h l a n d S t 2: N o r m a l A v e @ A s h l a n d St 3: T o l m a n C r e e k R d @ Ash l a n d S t 1: W a l k e r A v e @ A s h l a n d S t 1: W a l k e r A v e @ A s h l a n d S t 1: W a l k e r A v e @ A s h l a n d S t 3: T o l m a n C r e e k R d @ Ash l a n d S t 3: T o l m a n C r e e k R d @ Ash l a n d S t 4: W a s h i n g t o n S t @ As h l a n d S t 5: S B I - 5 O n / O f f R a m p @ As h l a n d S t 7: T o l m a n C r e e k R d @ In d e p e n d e n t W a y 8: W a s h i n g t o n S t @ Ind e p e n d e n t Wa y / W a s h i n g t o n S t 2: N o r m a l A v e @ A s h l a n d St 4: W a s h i n g t o n S t @ As h l a n d S t 5: S B I - 5 O n / O f f R a m p @ As h l a n d S t 7: T o l m a n C r e e k R d @ In d e p e n d e n t W a y 9: J e f f e r s o n A v e @ Wa s h i n g t o n S t 9: J e f f e r s o n A v e @ Wa s h i n g t o n S t 10 : S i t e D r i v e w a y @ Wa s h i n g t o n S t 6: N B I - 5 O n / O f f R a m p @ As h l a n d S t 7: T o l m a n C r e e k R d @ In d e p e n d e n t W a y 8: W a s h i n g t o n S t @ Ind e p e n d e n t Wa y / W a s h i n g t o n S t 10 : S i t e D r i v e w a y @ Wa s h i n g t o n S t 4: W a s h i n g t o n S t @ As h l a n d S t 5: S B I - 5 O n / O f f R a m p @ As h l a n d S t 8: W a s h i n g t o n S t @ Ind e p e n d e n t Wa y / W a s h i n g t o n S t 10 : S i t e D r i v e w a y @ Wa s h i n g t o n S t South Ashland Business Park TPRA E - 25 20 2 3 P M V o l u m e s B a c k g r o u n d 29 8 2 6 7 2 5 4 3 2 3 7 2 6 7 0 7 7 3 4 1 6 0 9 5 2 R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D 1 7 3 6 3 1 6 2 1 4 2 4 2 1 9 2 3 6 3 1 1 0 6 4 2 0 4 0 0 0 1 5 5 4 3 1 1 9 0 1 6 0 0 0 1 Pe d 1 5 1 1 9 R 6 6 0 P e d 1 2 1 8 R 7 0 2 P e d 8 6 8 R 8 3 5 P e d 1 2 1 R 8 6 4 P e d 4 0 R 3 6 0 P e d 3 3 0 4 R 6 2 1 55 8 L 1 1 2 4 7 7 T 6 4 5 L 2 1 6 3 1 T 7 0 5 L 1 0 0 5 5 1 T 7 9 5 L 6 7 9 0 T 8 9 2 U T u r n 16 33 3 T 35 9 L 6 4 8 317 T T 6 1 2 64 L 8 6 8 T 7 6 2 53 L 7 9 9 T 8 1 0 21 6 L 1 0 6 7 T 9 9 4 73 L 1 0 5 1 T 9 9 5 27 L 1 1 8 5 T 5 4 1 0 L 5 9 2 74 5 R 2 1 11 P e d 799 R 1 6 9 P e d 98 0 R 7 0 11 P e d 10 1 4 R 1 4 4 P e d 10 8 2 R 7 1 8 P e d 118 9 R 0 1 P e d 21 8 3 6 9 4 810 4 1 8 139 1 9 9 1 9 3 45 0 5 7 10 0 0 542 0 5 1 Pe d L T R Pe d L T R Pe d L T R Ped L T R Pe d L T R Pe d L T R 14 8 13 8 71 32 39 6 3 8 3 87 62 99 0 0 93 41 3 4 0 6 41 39 3 1 0 0 R T L P E D R T L P E D R T L P E D R T L P E D 7 0 4 0 3 1 0 0 8 2 0 0 2 1 0 9 3 0 0 0 10 0 0 0 0 Ped 0 29 R 4 1 P e d 0 29 R 5 0 P e d 0 0 R 1 4 P e d 0 0 R 1 5 0 L 0 0 T 41 L 1 0 21 T 50 L 1 13 T 15 L 0 15 T T 0 12L 1 9 T 9 0L 3 0 T 6 1L 6 T 6 0L 6 0 R 0 0 P e d 19 R 0 0 P e d 31 R 2 4 0 P e d 6 R 0 0 P e d 00 3 7 7 9 00 0 0 034 0 0 00 0 0 Pe d L T R Ped L T R Pe d L T R Pe d L T R 41 5 3 8 6 0 0 25 34 0 0 20 2 3 P M V o l u m e s B a c k g r o u n d 29 8 2 6 7 25 43 237 2 6 7 0 7 73 4 16 0 9 4 6 R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D 1 7 3 6 3 1 6 2 1 4 2 4 2 1 9 2 3 6 3 1 1 0 6 4 2 0 4 0 0 0 1 5 5 4 3 1 1 9 0 1 6 0 0 0 1 Pe d 1 5 119 R 6 6 0 P e d 1 2 18 R 7 0 2 P e d 8 68 R 8 3 5 P e d 1 2 1 R 8 6 4 P e d 4 0 R 3 6 0 P e d 3 304 R 6 2 2 55 8 L 1 1 2 477 T 645 L 2 1 63 1 T 70 5 L 1 0 0 55 1 T 79 5 L 6 79 0 T 89 2 U T u r n 16 33 3 T 36 0 L 6 4 2 318 T T 6 1 2 64 L 8 6 8 T 7 6 2 53 L 7 9 9 T 8 1 0 21 6 L 1 0 6 7 T 9 9 4 73 L 1 0 5 1 T 9 9 5 27 L 1 1 8 5 T 5 4 3 0 L 5 9 4 74 5 R 2 1 11 P e d 799 R 1 6 9 P e d 98 0 R 7 0 11 P e d 10 1 4 R 1 4 4 P e d 10 8 2 R 7 1 8 P e d 118 5 R 0 1 P e d 21 8 3 6 9 4 810 4 1 8 139 1 9 9 1 9 3 45 0 5 7 10 0 0 542 0 5 1 Pe d L T R Pe d L T R Pe d L T R Ped L T R Pe d L T R Pe d L T R 14 8 13 8 71 32 39 6 3 8 3 87 62 99 0 0 93 41 3 4 0 6 41 39 3 1 0 0 R T L P E D R T L P E D R T L P E D R T L P E D 7 0 4 0 3 1 0 0 8 2 0 0 2 1 0 9 3 0 0 0 10 0 0 0 0 Ped 0 29 R 4 1 P e d 0 29 R 5 0 P e d 0 0 R 1 4 P e d 0 0 R 1 4 0 L 0 0 T 41 L 1 0 21 T 50 L 1 13 T 14 L 0 14 T T 0 12L 1 9 T 9 0L 3 0 T 6 1L 6 T 6 0L 6 0 R 0 0 P e d 19 R 0 0 P e d 30 R 2 3 0 P e d 6 R 0 0 P e d 00 3 7 7 9 00 0 0 034 0 0 00 0 0 Pe d L T R Ped L T R Pe d L T R Pe d L T R 41 5 3 8 6 0 0 24 34 0 0 20 2 3 P M V o l u m e s B a c k g r o u n d w / P i p e l i n e t r i p s ( I P C O P h a s e 1 ) 29 8 2 6 8 25 44 237 2 6 9 0 7 73 7 16 0 9 5 9 R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D 1 7 3 6 3 1 6 2 1 4 2 4 2 1 9 2 3 6 3 1 1 0 6 4 2 0 4 0 0 0 1 5 5 4 6 1 1 9 0 1 6 0 0 0 1 Pe d 1 5 120 R 6 6 5 P e d 1 2 19 R 7 1 1 P e d 8 68 R 8 3 6 P e d 1 2 1 R 8 6 8 P e d 4 0 R 3 6 1 P e d 3 304 R 6 2 2 56 0 L 1 1 2 479 T 651 L 2 1 63 7 T 71 7 L 1 0 0 55 2 T 79 6 L 6 79 0 T 89 6 U T u r n 16 33 4 T 36 1 L 6 5 5 318 T T 6 1 2 66 L 8 6 8 T 7 6 3 55 L 8 0 0 T 8 1 0 21 6 L 1 0 7 2 T 9 9 9 77 L 1 0 6 8 T 1 0 0 9 27 L 1 1 9 9 T 5 4 4 0 L 5 9 5 74 5 R 2 1 11 P e d 800 R 1 6 9 P e d 98 2 R 7 2 11 P e d 10 1 9 R 1 4 4 P e d 10 9 9 R 7 4 8 P e d 119 9 R 0 1 P e d 21 8 3 6 9 4 810 4 1 8 1310 2 1 0 1 1 9 8 46 0 6 9 10 0 0 543 0 5 1 Pe d L T R Pe d L T R Pe d L T R Ped L T R Pe d L T R Pe d L T R 15 0 13 8 73 32 39 8 4 0 1 91 75 10 2 0 0 94 41 5 4 2 4 45 52 3 1 0 0 R T L P E D R T L P E D R T L P E D R T L P E D 7 0 4 0 3 1 2 0 8 2 4 0 2 1 0 9 3 0 0 0 10 0 0 0 0 Ped 0 47 R 6 7 P e d 0 29 R 5 0 P e d 0 0 R 1 4 P e d 0 0 R 1 4 0 L 0 0 T 45 L 2 3 21 T 50 L 1 13 T 14 L 0 14 T T 0 20L 2 3 T 9 0L 3 0 T 6 1L 6 T 6 0L 6 0 R 0 0 P e d 32 R 0 0 P e d 30 R 2 3 0 P e d 6 R 0 0 P e d 00 3 7 7 1 1 00 0 0 034 0 0 00 0 0 Pe d L T R Ped L T R Pe d L T R Pe d L T R 42 3 3 8 8 0 0 24 34 0 0 7: T o l m a n C r e e k R d @ In d e p e n d e n t W a y 8: W a s h i n g t o n S t @ In d e p e n d e n t Wa y / W a s h i n g t o n S t 10 : S i t e D r i v e w a y @ Wa s h i n g t o n S t 2: N o r m a l A v e @ A s h l a n d St 3: T o l m a n C r e e k R d @ As h l a n d S t 4: W a s h i n g t o n S t @ Ash l a n d S t 1: W a l k e r A v e @ A s h l a n d St 1: W a l k e r A v e @ A s h l a n d St 1: W a l k e r A v e @ A s h l a n d St 2: N o r m a l A v e @ A s h l a n d St 3: T o l m a n C r e e k R d @ As h l a n d S t 4: W a s h i n g t o n S t @ Ash l a n d S t 2: N o r m a l A v e @ A s h l a n d St 3: T o l m a n C r e e k R d @ As h l a n d S t 4: W a s h i n g t o n S t @ Ash l a n d S t 7: T o l m a n C r e e k R d @ In d e p e n d e n t W a y 8: W a s h i n g t o n S t @ In d e p e n d e n t Wa y / W a s h i n g t o n S t 7: T o l m a n C r e e k R d @ In d e p e n d e n t W a y 8: W a s h i n g t o n S t @ In d e p e n d e n t Wa y / W a s h i n g t o n S t 10 : S i t e D r i v e w a y @ Wa s h i n g t o n S t 9: J e f f e r s o n A v e @ Wa s h i n g t o n S t 9: J e f f e r s o n A v e @ Wa s h i n g t o n S t 9: J e f f e r s o n A v e @ Wa s h i n g t o n S t 5: S B I - 5 O n / O f f R a m p @ Ash l a n d S t 6: N B I - 5 O n / O f f R a m p @ As h l a n d S t 10 : S i t e D r i v e w a y @ Wa s h i n g t o n S t 5: S B I - 5 O n / O f f R a m p @ Ash l a n d S t 5: S B I - 5 O n / O f f R a m p @ Ash l a n d S t 6: N B I - 5 O n / O f f R a m p @ As h l a n d S t 6: N B I - 5 O n / O f f R a m p @ As h l a n d S t South Ashland Business Park TPRA E - 26 20 3 4 P M V o l u m e s B a c k g r o u n d 29 8 3 0 8 3 1 5 1 2 5 9 3 1 1 0 7 8 1 3 1 6 0 1 1 5 6 R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D 1 7 3 6 3 1 6 2 1 4 2 5 3 2 3 2 3 6 9 1 2 0 7 0 2 0 4 0 0 0 1 5 6 0 3 1 2 0 9 1 6 0 0 0 1 Pe d 1 5 1 3 0 R 7 2 3 P e d 1 2 2 1 R 8 3 8 P e d 8 7 7 R 9 3 0 P e d 1 2 1 R 9 2 9 P e d 4 0 R 4 2 4 P e d 3 3 6 7 R 7 4 6 60 3 L 1 4 2 5 2 2 T 7 7 1 L 2 5 7 5 4 T 7 8 2 L 1 2 5 6 1 3 T 8 6 3 L 6 8 5 5 T 1 0 1 4 U T u r n 16 395 T 42 4 L 7 8 9 379 T T 7 8 1 71 L 1 0 4 0 T 9 1 1 63 L 9 5 5 T 1 0 1 6 24 0 L 1 2 9 8 T 1 2 2 1 73 L 1 3 0 2 T 1 2 2 5 29 L 1 4 3 4 T 6 5 6 0 L 7 0 7 94 9 R 2 6 11 P e d 955 R 1 9 9 P e d 12 2 8 R 8 7 11 P e d 12 4 4 R 1 7 4 P e d 13 2 5 R 8 4 8 P e d 144 5 R 0 1 P e d 218 3 6 9 7 812 5 2 1 1310 0 1 0 9 2 1 2 48 0 8 1 10 0 0 545 0 5 1 Pe d L T R Pe d L T R Pe d L T R Ped L T R Pe d L T R Pe d L T R 160 14 1 85 38 44 7 4 2 1 90 89 114 0 0 96 49 4 4 8 7 49 47 4 1 0 0 R T L P E D R T L P E D R T L P E D R T L P E D 7 0 4 8 2 1 2 0 8 2 4 0 2 5 0 9 4 0 0 0 10 0 0 0 0 Pe d 0 35 R 5 0 P e d 0 35 R 6 0 P e d 0 0 R 1 7 P e d 0 0 R 1 7 0 L 0 0 T 49 L 1 2 25 T 60 L 1 16 T 17 L 0 17 T T 0 15 L 2 3 T 1 1 0 L 3 6 T 7 1 L 7 T 7 0 L 7 0 R 0 0 P e d 23 R 0 0 P e d 36 R 2 8 0 P e d 7 R 0 0 P e d 00 4 5 2 1 1 00 0 0 040 0 0 00 0 0 Pe d L T R Ped L T R Pe d L T R Pe d L T R 49 7 4 6 3 0 0 29 40 0 0 20 3 4 P M V o l u m e s B a c k g r o u n d 29 8 3 0 8 31 51 25 9 3 1 1 0 7 81 3 16 0 1 1 5 0 R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D 1 7 3 6 3 1 6 2 1 4 2 5 3 2 3 2 3 6 9 1 2 0 7 0 2 0 4 0 0 0 1 5 6 0 3 1 2 0 9 1 6 0 0 0 1 Pe d 1 5 130 R 7 2 3 P e d 1 2 21 R 8 3 8 P e d 8 77 R 9 3 0 P e d 1 2 1 R 9 2 9 P e d 4 0 R 4 2 4 P e d 3 367 R 7 4 6 60 3 L 1 4 2 522 T 771 L 2 5 75 4 T 78 2 L 1 2 5 61 3 T 86 3 L 6 85 5 T 10 1 4 U T u r n 16 395 T 42 4 L 7 8 3 379 T T 7 8 1 71 L 1 0 4 0 T 9 1 1 63 L 9 5 5 T 1 0 1 6 24 0 L 1 2 9 8 T 1 2 2 1 73 L 1 3 0 2 T 1 2 2 5 29 L 1 4 3 4 T 6 5 1 0 L 7 0 2 94 9 R 2 6 11 P e d 955 R 1 9 9 P e d 12 2 8 R 8 7 11 P e d 12 4 4 R 1 7 4 P e d 13 2 5 R 8 4 8 P e d 143 4 R 0 1 P e d 218 3 6 9 7 812 5 2 1 1310 0 1 0 9 2 1 2 48 0 8 1 10 0 0 545 0 5 1 Pe d L T R Pe d L T R Pe d L T R Ped L T R Pe d L T R Pe d L T R 160 14 1 85 38 44 7 4 2 1 90 89 114 0 0 96 49 4 4 8 7 49 47 4 1 0 0 R T L P E D R T L P E D R T L P E D R T L P E D 7 0 4 8 2 1 2 0 8 2 4 0 2 5 0 9 4 0 0 0 10 0 0 0 0 Pe d 0 35 R 5 0 P e d 0 35 R 6 0 P e d 0 0 R 1 7 P e d 0 0 R 1 7 0 L 0 0 T 49 L 1 2 25 T 60 L 1 16 T 17 L 0 17 T T 0 15 L 2 3 T 1 1 0 L 3 6 T 7 1 L 7 T 7 0 L 7 0 R 0 0 P e d 23 R 0 0 P e d 36 R 2 8 0 P e d 7 R 0 0 P e d 00 4 5 2 1 1 00 0 0 040 0 0 00 0 0 Pe d L T R Ped L T R Pe d L T R Pe d L T R 49 7 4 6 3 0 0 29 40 0 0 20 3 4 P M V o l u m e s B a c k g r o u n d w / P i p e l i n e T r i p s ( I P C O P h a s e 2 ) 29 8 3 1 1 32 54 26 0 3 1 8 0 7 82 3 16 0 1 1 9 6 R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D 1 7 3 6 3 1 6 2 1 4 2 5 3 2 4 2 3 6 9 1 2 1 7 0 2 0 4 0 0 0 1 5 6 1 3 1 2 0 9 1 6 0 0 0 1 Pe d 1 5 133 R 7 4 0 P e d 1 2 24 R 8 6 8 P e d 8 77 R 9 3 4 P e d 1 2 1 R 9 4 2 P e d 4 0 R 4 2 7 P e d 3 367 R 7 4 7 61 1 L 1 4 2 530 T 793 L 2 5 77 6 T 82 3 L 1 2 5 61 7 T 86 7 L 6 85 5 T 10 2 7 U T u r n 16 398 T 42 7 L 8 2 9 380 T T 7 8 3 77 L 1 0 4 3 T 9 1 5 68 L 9 6 1 T 1 0 1 6 24 0 L 1 3 1 6 T 1 2 3 9 86 L 1 3 6 2 T 1 2 7 3 29 L 1 4 8 2 T 6 5 3 0 L 7 0 4 95 1 R 2 6 11 P e d 959 R 1 9 9 P e d 12 3 6 R 9 5 11 P e d 12 6 2 R 1 7 4 P e d 13 8 5 R 9 6 8 P e d 148 2 R 0 1 P e d 218 3 6 9 8 812 5 2 2 1313 7 1 1 6 2 3 0 412 0 1 2 3 10 0 0 547 0 5 1 Pe d L T R Pe d L T R Pe d L T R Ped L T R Pe d L T R Pe d L T R 166 14 2 90 39 45 6 4 8 3 10 3 1 3 5 126 0 0 98 50 3 5 4 9 62 93 4 1 0 0 R T L P E D R T L P E D R T L P E D R T L P E D 7 0 4 8 2 2 1 0 8 3 7 0 2 5 0 9 4 0 0 0 10 0 0 0 0 Pe d 0 97 R 1 3 9 P e d 0 35 R 6 0 P e d 0 0 R 1 7 P e d 0 0 R 1 7 0 L 0 0 T 62 L 5 8 25 T 60 L 1 16 T 17 L 0 17 T T 0 42 L 3 8 T 1 1 0 L 3 6 T 7 1 L 7 T 7 0 L 7 0 R 0 0 P e d 69 R 0 0 P e d 36 R 2 8 0 P e d 7 R 0 0 P e d 00 4 5 2 1 7 00 0 0 040 0 0 00 0 0 Pe d L T R Ped L T R Pe d L T R Pe d L T R 52 4 4 6 9 0 0 29 40 0 0 7: T o l m a n C r e e k R d @ In d e p e n d e n t W a y 8: W a s h i n g t o n S t @ In d e p e n d e n t Wa y / W a s h i n g t o n S t 9: J e f f e r s o n A v e @ Wa s h i n g t o n S t 10 : S i t e D r i v e w a y @ Wa s h i n g t o n S t 1: W a l k e r A v e @ A s h l a n d St 2: N o r m a l A v e @ A s h l a n d St 3: T o l m a n C r e e k R d @ Ash l a n d S t 4: W a s h i n g t o n S t @ Ash l a n d S t 5: S B I - 5 O n / O f f R a m p @ As h l a n d S t 6: N B I - 5 O n / O f f R a m p @ As h l a n d S t 7: T o l m a n C r e e k R d @ In d e p e n d e n t W a y 8: W a s h i n g t o n S t @ In d e p e n d e n t Wa y / W a s h i n g t o n S t 9: J e f f e r s o n A v e @ Wa s h i n g t o n S t 10 : S i t e D r i v e w a y @ Wa s h i n g t o n S t 1: W a l k e r A v e @ A s h l a n d St 2: N o r m a l A v e @ A s h l a n d St 3: T o l m a n C r e e k R d @ Ash l a n d S t 4: W a s h i n g t o n S t @ Ash l a n d S t 5: S B I - 5 O n / O f f R a m p @ As h l a n d S t 6: N B I - 5 O n / O f f R a m p @ As h l a n d S t 1: W a l k e r A v e @ A s h l a n d St 2: N o r m a l A v e @ A s h l a n d St 3: T o l m a n C r e e k R d @ Ash l a n d S t 4: W a s h i n g t o n S t @ Ash l a n d S t 5: S B I - 5 O n / O f f R a m p @ As h l a n d S t 6: N B I - 5 O n / O f f R a m p @ As h l a n d S t 7: T o l m a n C r e e k R d @ In d e p e n d e n t W a y 8: W a s h i n g t o n S t @ In d e p e n d e n t Wa y / W a s h i n g t o n S t 9: J e f f e r s o n A v e @ Wa s h i n g t o n S t 10 : S i t e D r i v e w a y @ Wa s h i n g t o n S t South Ashland Business Park TPRA E - 27 IP C O P h a s e 1 P M P i p e l i n e T r i p s 01 0 1 0 2 0 0 3 0 0 1 3 R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D 1 0 0 0 0 2 0 0 0 0 3 0 0 0 0 4 0 0 0 0 5 3 0 0 0 6 0 0 0 0 Pe d 0 1 R 5 P e d 0 1 R 9 P e d 0 0 R 1 P e d 0 0 R 4 P e d 0 0 R 1 P e d 0 0 R 0 2L 0 2 T 6 L 0 6 T 1 2 L 0 1 T 1 L 0 0 T 4 L 0 1 T 1 L 1 3 0 T T 0 2 L 0 T 1 2 L 1 T 0 0 L 5 T 5 4 L 1 7 T 1 4 0 L 1 4 T 1 0 L 1 0 R 0 0 P e d 1 R 0 0 P e d 2 R 2 0 P e d 5 R 0 0 P e d 1 7 R 3 0 P e d 1 4 R 0 0 P e d 00 0 0 0 0 0 0 0 1 1 2 5 0 1 0 1 2 0 0 0 0 0 1 0 0 Pe d L T R P e d L T R P e d L T R P e d L T R P e d L T R P e d L T R 20 2 0 2 1 8 4 1 3 3 0 0 1 21 8 4 1 3 0 0 R T L P E D R T L P E D R T L P E D 7 0 0 2 0 8 4 0 0 0 1 0 0 0 0 0 Pe d 0 1 8 R 2 6 P e d 0 0 R 0 P e d 0 0 R 0 0L0 0 T 4 L 1 3 0 T 0 L 0 0 T T0 8 L 4 T 0 0 L 0 T 0 0 L 0 0 R 0 0 P e d 1 3 R 0 0 P e d 0 R 0 0 P e d 00 0 2 0 0 0 0 0 0 0 0 Pe d L T R P e d L T R P e d L T R 82 0 0 0 0 IP C O P h a s e 2 P M P i p e l i n e T r i p s 03 1 3 1 7 0 0 1 0 0 0 4 6 R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D R T L P E D 1 0 0 0 0 2 0 0 1 0 3 0 1 0 0 4 0 0 0 0 5 1 0 0 0 0 6 0 0 0 0 Pe d 0 3 R 1 7 P e d 0 3 R 3 0 P e d 0 0 R 4 P e d 0 0 R 1 3 P e d 0 0 R 3 P e d 0 0 R 1 8L 0 8 T 2 2 L 0 2 2 T 4 1 L 0 4 T 4 L 0 0 T 1 3 L 0 3 T 3 L 4 6 1 T T2 6 L 3 T 4 5 L 6 T 0 0 L 1 8 T 1 8 1 3 L 6 0 T 4 8 0 L 4 8 T 2 0 L 2 2 R 0 0 P e d 4 R 0 0 P e d 8 R 8 0 P e d 1 8 R 0 0 P e d 6 0 R 1 2 0 P e d 4 8 R 0 0 P e d 00 0 1 0 0 0 1 0 3 7 7 1 8 0 4 0 4 2 0 0 0 0 0 2 0 0 Pe d L T R P e d L T R P e d L T R P e d L T R P e d L T R P e d L T R 61 5 1 9 6 2 1 3 4 6 1 2 0 0 2 96 2 1 3 4 6 0 0 R T L P E D R T L P E D R T L P E D 7 0 0 9 0 8 1 3 0 0 0 1 0 0 0 0 0 Pe d 0 6 2 R 8 9 P e d 0 0 R 0 P e d 0 0 R 0 0L 0 0 T 1 3 L 4 6 0 T 0 L 0 0 T T0 2 7 L 1 5 T 0 0 L 0 T 0 0 L 0 0 R 0 0 P e d 4 6 R 0 0 P e d 0 R 0 0 P e d 00 0 6 0 0 0 0 0 0 0 0 Pe d L T R P e d L T R P e d L T R 276 0 0 0 0 4: W a s h i n g t o n S t @ As h l a n d S t 5: S B I - 5 O n / O f f R a m p @ As h l a n d S t 6: N B I - 5 O n / O f f R a m p @ As h l a n d S t 7: T o l m a n C r e e k R d @ In d e p e n d e n t W a y 8: W a s h i n g t o n S t @ In d e p e n d e n t Wa y / W a s h i n g t o n S t 10 : S i t e D r i v e w a y @ Wa s h i n g t o n S t 4: W a s h i n g t o n S t @ As h l a n d S t 5: S B I - 5 O n / O f f R a m p @ As h l a n d S t 6: N B I - 5 O n / O f f R a m p @ As h l a n d S t 7: T o l m a n C r e e k R d @ In d e p e n d e n t W a y 8: W a s h i n g t o n S t @ In d e p e n d e n t Wa y / W a s h i n g t o n S t 10 : S i t e D r i v e w a y @ Wa s h i n g t o n S t 2: N o r m a l A v e @ A s h l a n d St 3: T o l m a n C r e e k R d @ As h l a n d S t 2: N o r m a l A v e @ A s h l a n d St 3: T o l m a n C r e e k R d @ As h l a n d S t 1: W a l k e r A v e @ A s h l a n d St 1: W a l k e r A v e @ A s h l a n d St South Ashland Business Park TPRA E - 28 TR E N D 1-J a n 1 5 - J a n 1 - F e b 1 5 - F e b 1-M a r 15- M a r 1-A p r 1 5 - A p r 1 - M a y 1 5 - M a y 1-J u n 15 - J u n 1 - J u l 15 - J u l 1-A u g 1 5 - A u g 1 - S e p 1 5 - S e p 1-O c t 15 - O c t 1 - N o v 15 - N o v 1-D e c 1 5 - D e c IN T E R S T A T E U R B A N I Z E D 1.0 3 2 8 1 . 0 4 2 3 1 . 0 1 5 7 0 . 9 8 9 1 0.9 7 8 0 0.9 6 7 0 0.9 5 8 2 0 . 9 4 9 3 0 . 9 5 3 0 0 . 9 5 6 7 0.9 3 8 5 0.9 2 0 2 0 . 9 2 2 8 0.9 2 7 5 0.9 2 2 9 0 . 9 1 8 2 0 . 9 3 6 3 0 . 9 5 4 4 0.9 5 6 8 0.9 5 9 2 0 . 9 7 7 6 0.9 9 5 9 1.0 1 3 1 1 . 0 3 0 3 0 . 9 1 8 2 IN T E R S T A T E N O N U R B A N I Z E D 1.2 4 3 7 1 . 3 0 8 9 1 . 2 5 4 3 1 . 1 9 9 7 1.1 3 4 1 1.0 6 8 5 1.0 5 9 4 1 . 0 5 0 3 1 . 0 2 4 3 0 . 9 9 8 4 0.9 4 9 4 0.9 0 0 5 0 . 8 7 4 8 0.8 4 4 9 0.8 4 5 0 0 . 8 4 5 2 0 . 8 9 2 8 0 . 9 4 0 5 0.9 8 1 5 1.0 2 2 4 1 . 0 4 4 5 1.0 6 6 6 1.1 1 9 3 1 . 1 7 2 1 0 . 8 4 4 9 CO M M U T E R 1.0 4 7 5 1 . 0 5 5 3 1 . 0 2 7 2 0 . 9 9 9 1 0.9 9 1 3 0.9 8 3 6 0.9 6 5 5 0 . 9 4 7 4 0 . 9 4 4 2 0 . 9 4 1 1 0.9 4 9 7 0.9 5 8 3 0 . 9 4 1 0 0.9 2 4 3 0.9 2 0 6 0 . 9 1 6 8 0 . 9 2 8 9 0 . 9 4 0 9 0.9 4 3 1 0.9 4 5 2 0 . 9 7 3 4 1.0 0 1 7 1.0 2 4 9 1 . 0 4 8 1 0 . 9 1 6 8 CO A S T A L D E S T I N A T I O N 1.2 0 1 1 1 . 2 1 0 5 1 . 1 6 6 9 1 . 1 2 3 4 1.0 9 5 9 1.0 6 8 4 1.0 6 7 9 1 . 0 6 7 3 1 . 0 4 5 0 1 . 0 2 2 7 0.9 8 3 2 0.9 4 3 8 0 . 8 9 2 3 0.8 2 9 3 0.8 2 8 9 0 . 8 2 8 4 0 . 8 7 9 2 0 . 9 3 0 0 0.9 8 6 6 1.0 4 3 2 1 . 1 0 0 0 1.1 5 6 7 1.1 7 9 5 1 . 2 0 2 3 0 . 8 2 8 4 CO A S T A L D E S T I N A T I O N R O U T E 1.4 5 8 1 1 . 4 9 4 5 1 . 4 1 3 2 1 . 3 3 1 9 1.2 6 8 9 1.2 0 6 0 1.1 9 8 9 1 . 1 9 1 8 1 . 1 3 1 8 1 . 0 7 1 8 1.0 0 9 0 0.9 4 6 2 0 . 8 6 2 7 0.7 5 7 0 0.7 5 8 0 0 . 7 5 8 9 0 . 8 3 5 7 0 . 9 1 2 5 1.0 2 2 3 1.1 3 2 1 1 . 2 1 2 2 1.2 9 2 2 1.3 5 5 6 1 . 4 1 8 9 0 . 7 5 7 0 AG R I C U L T U R E 1.2 5 0 1 1 . 2 6 7 1 1 . 2 1 2 6 1 . 1 5 8 1 1.1 2 3 9 1.0 8 9 6 1.0 5 1 5 1 . 0 1 3 4 0 . 9 7 5 0 0 . 9 3 6 7 0.9 0 8 1 0.8 7 9 4 0 . 8 6 3 3 0.8 4 3 9 0.8 4 4 0 0 . 8 4 4 1 0 . 8 4 5 7 0 . 8 4 7 3 0.8 7 9 9 0.9 1 2 5 0 . 9 8 2 0 1.0 5 1 5 1.1 4 9 1 1 . 2 4 6 7 0 . 8 4 3 9 RE C R E A T I O N A L S U M M E R 1.7 1 7 5 1 . 7 8 5 3 1 . 7 1 4 4 1 . 6 4 3 4 1.5 4 1 6 1.4 3 9 8 1.3 8 4 7 1 . 3 2 9 7 1 . 1 7 3 0 1 . 0 1 6 3 0.9 3 5 5 0.8 5 4 6 0 . 7 9 6 0 0.7 2 4 8 0.7 3 6 3 0 . 7 4 7 8 0 . 8 0 5 0 0 . 8 6 2 3 0.9 6 6 1 1.0 6 9 9 1 . 2 2 9 9 1.3 8 9 8 1.5 1 2 2 1 . 6 3 4 6 0 . 7 2 4 8 RE C R E A T I O N A L S U M M E R W I N T E R 1.1 8 7 6 1 . 2 5 1 0 1 . 2 6 7 1 1 . 2 8 3 1 1.3 0 9 2 1.3 3 5 3 1.4 5 2 3 1 . 5 6 9 2 1 . 5 2 8 0 1 . 4 8 6 8 1.2 8 0 9 1.0 7 5 0 0 . 9 6 5 1 0.8 1 8 3 0.8 5 5 6 0 . 8 9 3 0 1 . 0 3 7 2 1 . 1 8 1 4 1.4 1 4 6 1.6 2 6 2 1 . 6 9 2 2 1.7 3 6 5 1.4 0 6 9 1 . 0 7 7 3 0 . 8 1 8 3 RE C R E A T I O N A L W I N T E R 0.9 8 2 9 0 . 9 4 0 5 0 . 9 6 1 0 0 . 9 8 1 4 1.0 0 8 8 1.0 3 6 3 1.2 7 1 7 1 . 5 0 7 0 1 . 8 8 9 9 2 . 2 7 2 9 1.9 5 9 8 1.6 4 6 8 1 . 4 4 7 8 1.1 3 7 8 1.1 6 8 0 1 . 1 9 8 1 1 . 3 3 4 1 1 . 4 7 0 2 1.7 7 7 2 2.0 8 4 3 2 . 4 1 6 9 2.7 4 9 5 1.8 7 7 8 1 . 0 0 6 0 0 . 9 4 0 5 SU M M E R 1.2 0 6 4 1 . 2 3 6 1 1 . 1 9 3 3 1 . 1 5 0 5 1.1 1 6 3 1.0 8 2 1 1.0 5 5 1 1 . 0 2 8 0 0 . 9 9 4 6 0 . 9 6 1 1 0.9 2 5 2 0.8 8 9 3 0 . 8 6 5 4 0.8 3 5 6 0.8 3 9 4 0 . 8 4 3 1 0 . 8 7 8 7 0 . 9 1 4 2 0.9 4 8 9 0.9 8 3 6 1 . 0 3 8 6 1.0 9 3 6 1.1 3 8 1 1 . 1 8 2 6 0 . 8 3 5 6 SU M M E R < 2 5 0 0 1.2 9 5 6 1 . 3 2 9 5 1 . 2 8 2 3 1 . 2 3 5 2 1.1 7 7 5 1.1 1 9 8 1.0 7 1 1 1 . 0 2 2 3 0 . 9 7 2 8 0 . 9 2 3 2 0.8 9 0 9 0.8 5 8 6 0 . 8 3 9 4 0.8 1 6 1 0.8 2 5 1 0 . 8 3 4 1 0 . 8 4 7 8 0 . 8 6 1 6 0.9 0 0 4 0.9 3 9 2 1 . 0 1 4 5 1.0 8 9 8 1.1 7 8 7 1 . 2 6 7 5 0 . 8 1 6 1 *S e a s o n a l T r e n d T a b l e f a c t o r s a r e b a s e d o n p r e v i o u s y e a r A T R d a ta . T h e t a b l e i s u p d a t e d y e a r l y . *G r e y s h a d i n g i n d i c a t e s m o n t h s w e r e s e a s o n a l f a c t o r i s g r e a t e r th a n 3 0 % 1-J u n 1 5 - J u n A v g Co m m u t e r 0.9 4 9 7 0 . 9 5 8 3 0 . 9 5 4 0 Pea k 0.9 1 6 8 1.0 4 0 5 9 6 15 - S e p 1 - O c t A v g Co m m u t e r 0.9 4 0 9 0 . 9 4 3 1 0 . 9 4 2 0 Pea k 0.9 1 6 8 1.0 2 7 5 1 4 SE A S O N A L T R E N D T A B L E ( U p d a t e d : 9 / 3 0 / 1 6 ) Seas o n a l Tr e n d Pe a k Period South Ashland Business Park TPRA E - 29 SANDOW ENGINEERING AP P E N D I X F : 20 1 7 SY N C H R O O U T P U T South Ashland Business Park  Lanes, Volumes, Timings 3: Tolman Creek Rd & Ashland Street 8/3/2017 South Ashland Business Park 12/1/2016 2017 PM - Existing Conditions Synchro 8 Report Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)86 704 54 214 542 64 63 91 191 62 103 59 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)115 0 115 0 87 0 83 0 Storage Lanes 1 0 1 0 1 0 1 0 Taper Length (ft)77 66 87 84 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.989 0.984 0.898 0.945 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot)1646 3258 0 1630 3233 0 1662 1535 0 1662 1643 0 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm)1646 3258 0 1630 3233 0 1662 1535 0 1662 1643 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)7 13 83 22 Link Speed (mph)35 35 25 25 Link Distance (ft)1678 663 2398 1812 Travel Time (s)32.7 12.9 65.4 49.4 Peak Hour Factor 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 Heavy Vehicles (%)1% 1% 0% 2% 1% 3% 0% 1% 3% 0% 1% 0% Adj. Flow (vph)105 859 66 261 661 78 77 111 233 76 126 72 Shared Lane Traffic (%) Lane Group Flow (vph) 105 925 0 261 739 0 77 344 0 76 198 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)12 12 12 12 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Yes Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2 2 2 2 2 2 2 2 Detector Template ODOT Left/SideODOT 35 Thru ODOT Left/SideODOT 35 Thru ODOT Left/SideODOT Left/Side ODOT Left/SideODOT Left/Side Leading Detector (ft)78 223 78 223 78 78 78 78 Trailing Detector (ft)2 107 2 107 2 2 2 2 Detector 1 Position(ft)2 107 2 107 2 2 2 2 Detector 1 Size(ft)16 6 16 6 16 16 16 16 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 72 217 72 217 72 72 72 72 Detector 2 Size(ft)6 6 6 6 6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Prot NA Prot NA Prot NA Prot NA Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases South Ashland Business Park TPRA F - 1 Lanes, Volumes, Timings 3: Tolman Creek Rd & Ashland Street 8/3/2017 South Ashland Business Park 12/1/2016 2017 PM - Existing Conditions Synchro 8 Report Page 8 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 5 2 1 6 3 8 7 4 Switch Phase Minimum Initial (s)4.0 9.5 4.0 9.5 4.0 6.0 4.0 6.0 Minimum Split (s)13.0 14.0 13.0 14.0 13.0 13.0 13.0 13.0 Total Split (s)19.0 45.0 29.0 55.0 16.0 33.0 13.0 30.0 Total Split (%)15.8% 37.5% 24.2% 45.8% 13.3% 27.5% 10.8% 25.0% Maximum Green (s) 14.5 40.5 24.5 50.5 12.0 29.0 9.0 26.0 Yellow Time (s)4.0 4.0 4.0 4.0 3.5 3.5 3.5 3.5 All-Red Time (s)0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 Lost Time Adjust (s) -0.5 -0.5 -0.5 -0.5 0.0 0.0 0.0 0.0 Total Lost Time (s)4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.5 4.0 2.5 4.0 2.5 2.5 2.5 2.5 Minimum Gap (s)2.0 2.7 2.0 2.7 2.0 2.0 2.0 2.0 Time Before Reduce (s) 8.0 10.0 8.0 10.0 8.0 8.0 8.0 8.0 Time To Reduce (s)4.0 13.0 4.0 13.0 4.0 4.0 4.0 4.0 Recall Mode None Min None Min None None None None Walk Time (s)7.0 7.0 7.0 7.0 Flash Dont Walk (s)16.7 16.0 22.9 23.0 Pedestrian Calls (#/hr)0000 Act Effct Green (s) 11.9 34.9 21.2 48.1 9.6 23.0 8.5 21.8 Actuated g/C Ratio 0.12 0.34 0.21 0.47 0.09 0.23 0.08 0.21 v/c Ratio 0.54 0.82 0.77 0.48 0.49 0.83 0.55 0.54 Control Delay 59.4 39.2 57.4 22.6 61.0 49.0 67.4 40.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 59.4 39.2 57.4 22.6 61.0 49.0 67.4 40.7 LOS ED EC ED ED Approach Delay 41.3 31.7 51.2 48.1 Approach LOS DCDD Intersection Summary Area Type:Other Cycle Length: 120 Actuated Cycle Length: 101.4 Natural Cycle: 75 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.83 Intersection Signal Delay: 40.0 Intersection LOS: D Intersection Capacity Utilization 70.9%ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 3: Tolman Creek Rd & Ashland Street South Ashland Business Park TPRA F - 2 HCM Signalized Intersection Capacity Analysis 3: Tolman Creek Rd & Ashland Street 8/3/2017 South Ashland Business Park 12/1/2016 2017 PM - Existing Conditions Synchro 8 Report Page 9 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)86 704 54 214 542 64 63 91 191 62 103 59 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Total Lost time (s)4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00 Frt 1.00 0.99 1.00 0.98 1.00 0.90 1.00 0.95 Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot)1646 3259 1630 3233 1662 1536 1662 1644 Flt Permitted 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (perm)1646 3259 1630 3233 1662 1536 1662 1644 Peak-hour factor, PHF 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 Adj. Flow (vph)105 859 66 261 661 78 77 111 233 76 126 72 RTOR Reduction (vph)05007006400170 Lane Group Flow (vph) 105 920 0 261 732 0 77 280 0 76 181 0 Heavy Vehicles (%) 1% 1% 0% 2% 1% 3% 0% 1% 3% 0% 1% 0% Turn Type Prot NA Prot NA Prot NA Prot NA Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases Actuated Green, G (s) 9.1 36.0 20.7 47.6 7.6 23.0 6.4 21.8 Effective Green, g (s) 9.6 36.5 21.2 48.1 7.6 23.0 6.4 21.8 Actuated g/C Ratio 0.09 0.35 0.21 0.47 0.07 0.22 0.06 0.21 Clearance Time (s)4.5 4.5 4.5 4.5 4.0 4.0 4.0 4.0 Vehicle Extension (s) 2.5 4.0 2.5 4.0 2.5 2.5 2.5 2.5 Lane Grp Cap (vph) 153 1153 335 1508 122 342 103 347 v/s Ratio Prot 0.06 c0.28 c0.16 0.23 c0.05 c0.18 0.05 0.11 v/s Ratio Perm v/c Ratio 0.69 0.80 0.78 0.49 0.63 0.82 0.74 0.52 Uniform Delay, d1 45.3 30.0 38.7 19.0 46.4 38.1 47.5 36.0 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 11.1 4.2 10.5 0.3 9.0 13.7 22.6 1.1 Delay (s)56.4 34.2 49.2 19.3 55.3 51.7 70.1 37.1 Level of Service E C D B E D E D Approach Delay (s)36.4 27.1 52.4 46.3 Approach LOS DCDD Intersection Summary HCM 2000 Control Delay 36.5 HCM 2000 Level of Service D HCM 2000 Volume to Capacity ratio 0.79 Actuated Cycle Length (s) 103.1 Sum of lost time (s)16.0 Intersection Capacity Utilization 70.9% ICU Level of Service C Analysis Period (min)15 c Critical Lane Group South Ashland Business Park TPRA F - 3 Lanes, Volumes, Timings 4: Washington St & Ashland Street 8/3/2017 South Ashland Business Park 12/1/2016 2017 PM - Existing Conditions Synchro 8 Report Page 11 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Volume (vph)870 29 73 755 41 44 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Storage Length (ft)0 100 0 73 Storage Lanes 0 1 1 1 Taper Length (ft)75 25 Lane Util. Factor 0.95 0.95 1.00 0.95 1.00 1.00 Frt 0.995 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot)3277 0 1662 3260 1662 1488 Flt Permitted 0.950 0.950 Satd. Flow (perm)3277 0 1662 3260 1662 1488 Link Speed (mph)35 35 25 Link Distance (ft)663 474 899 Travel Time (s)12.9 9.2 24.5 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%)1% 0% 0% 2% 0% 0% Adj. Flow (vph)926 31 78 803 44 47 Shared Lane Traffic (%) Lane Group Flow (vph) 957 0 78 803 44 47 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft)12 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Yes Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph)9 15 15 9 Sign Control Free Free Stop Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 44.8% ICU Level of Service A Analysis Period (min) 15 South Ashland Business Park TPRA F - 4 HCM 2010 TWSC 4: Washington St & Ashland Street 8/3/2017 South Ashland Business Park 12/1/2016 2017 PM - Existing Conditions Synchro 8 Report Page 12 Intersection Int Delay, s/veh 1.3 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h 870 29 73 755 41 44 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - 100 -0 73 Veh in Median Storage, #0 -- 0 0 - Grade, %0 -- 0 0 - Peak Hour Factor 94 94 94 94 94 94 Heavy Vehicles, %1 0 0 2 0 0 Mvmt Flow 926 31 78 803 44 47 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 956 0 1498 478 Stage 1 - -- -941 - Stage 2 - -- -557 - Critical Hdwy - - 4.1 -6.8 6.9 Critical Hdwy Stg 1 - -- -5.8 - Critical Hdwy Stg 2 - -- -5.8 - Follow-up Hdwy - - 2.2 -3.5 3.3 Pot Cap-1 Maneuver - - 727 -115 539 Stage 1 - -- -345 - Stage 2 - -- -543 - Platoon blocked, %- -- Mov Cap-1 Maneuver - - 727 -103 539 Mov Cap-2 Maneuver - -- -229 - Stage 1 - -- -345 - Stage 2 - -- -485 - Approach EB WB NB HCM Control Delay, s 0 0.9 18.1 HCM LOS C Minor Lane/Major Mvmt NBLn1NBLn2 EBT EBR WBL WBT Capacity (veh/h)229 539 - - 727 - HCM Lane V/C Ratio 0.19 0.087 - - 0.107 - HCM Control Delay (s) 24.4 12.3 - - 10.5 - HCM Lane LOS C B - - B - HCM 95th %tile Q(veh) 0.7 0.3 - - 0.4 - South Ashland Business Park TPRA F - 5 Lanes, Volumes, Timings 5: I-5 SB Ramp & Ashland Street 8/3/2017 South Ashland Business Park 12/1/2016 2017 PM - Existing Conditions Synchro 8 Report Page 13 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)0 870 63 25 299 00001791511 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)0 0 111 0 0 0 0 200 Storage Lanes 0 1 1 0 0 0 0 1 Taper Length (ft)25 70 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.953 Satd. Flow (prot)0 1699 1458 1662 1699 000001589 1458 Flt Permitted 0.109 0.953 Satd. Flow (perm)0 1699 1458 191 1699 000001589 1458 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)84 568 Link Speed (mph)35 35 45 45 Link Distance (ft)474 560 744 614 Travel Time (s)9.2 10.9 11.3 9.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Heavy Vehicles (%)0% 3% 2% 0% 3% 0% 0% 0% 0% 5% 0% 2% Adj. Flow (vph)0 967 70 28 332 00001991568 Shared Lane Traffic (%) Lane Group Flow (vph) 0 967 70 28 332 00000200568 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)12 12 0 0 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2122 133 Detector Template ODOT 35 ThruODOT RightODOT Left/SideODOT 35 Thru LeftODOT Ramp HSODOT Ramp HS Leading Detector (ft)223 143 78 223 20 213 213 Trailing Detector (ft)107 137 2 107 0 2 2 Detector 1 Position(ft)107 137 2 107 0 2 2 Detector 1 Size(ft)6 6 16 6 20 16 16 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft)217 72 217 107 107 Detector 2 Size(ft)6 6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 0.0 0.0 0.0 0.0 Detector 3 Position(ft)207 207 Detector 3 Size(ft)66 Detector 3 Type Cl+Ex Cl+Ex South Ashland Business Park TPRA F - 6 Lanes, Volumes, Timings 5: I-5 SB Ramp & Ashland Street 8/3/2017 South Ashland Business Park 12/1/2016 2017 PM - Existing Conditions Synchro 8 Report Page 14 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 3 Channel Detector 3 Extend (s)0.0 0.0 Turn Type NA Perm pm+pt NA Perm NA Perm Protected Phases 2 1 6 4 Permitted Phases 2 6 4 4 Detector Phase 2216 444 Switch Phase Minimum Initial (s) 10.0 10.0 4.0 4.0 6.0 6.0 6.0 Minimum Split (s)14.5 14.5 13.0 14.0 13.0 13.0 13.0 Total Split (s)60.0 60.0 13.0 73.0 17.0 17.0 17.0 Total Split (%)66.7% 66.7% 14.4% 81.1%18.9% 18.9% 18.9% Maximum Green (s)55.5 55.5 8.5 68.5 11.6 11.6 11.6 Yellow Time (s)4.0 4.0 4.0 4.0 4.7 4.7 4.7 All-Red Time (s)0.5 0.5 0.5 0.5 0.7 0.7 0.7 Lost Time Adjust (s)-0.5 -0.5 -0.5 -0.5 -1.4 -1.4 Total Lost Time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lag Lag Lead Lead-Lag Optimize?Yes Yes Yes Vehicle Extension (s)4.0 4.0 2.5 4.0 2.5 2.5 2.5 Minimum Gap (s)2.7 2.7 2.0 2.7 2.0 2.0 2.0 Time Before Reduce (s)10.0 10.0 8.0 10.0 8.0 8.0 8.0 Time To Reduce (s)13.0 13.0 4.0 13.0 4.0 4.0 4.0 Recall Mode Min Min None Min None None None Walk Time (s)7.0 7.0 7.0 7.0 7.0 7.0 Flash Dont Walk (s)19.1 19.1 21.7 19.0 19.0 19.0 Pedestrian Calls (#/hr)0 0 0 0 0 0 Act Effct Green (s)45.6 45.6 48.9 48.9 13.5 13.5 Actuated g/C Ratio 0.64 0.64 0.69 0.69 0.19 0.19 v/c Ratio 0.88 0.07 0.11 0.28 0.66 0.77 Control Delay 22.8 1.3 3.6 4.4 44.2 11.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 22.8 1.3 3.6 4.4 44.2 11.8 LOS C A A A D B Approach Delay 21.4 4.3 20.2 Approach LOS C A C Intersection Summary Area Type:Other Cycle Length: 90 Actuated Cycle Length: 70.7 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.88 Intersection Signal Delay: 18.1 Intersection LOS: B Intersection Capacity Utilization 73.9% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 5: I-5 SB Ramp & Ashland Street South Ashland Business Park TPRA F - 7 HCM Signalized Intersection Capacity Analysis 5: I-5 SB Ramp & Ashland Street 8/3/2017 South Ashland Business Park 12/1/2016 2017 PM - Existing Conditions Synchro 8 Report Page 15 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)0 870 63 25 299 00001791511 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Total Lost time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.85 1.00 1.00 1.00 0.85 Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot)1699 1458 1662 1699 1588 1458 Flt Permitted 1.00 1.00 0.11 1.00 0.95 1.00 Satd. Flow (perm)1699 1458 191 1699 1588 1458 Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)0 967 70 28 332 00001991568 RTOR Reduction (vph) 0 0 26 00000000464 Lane Group Flow (vph) 0 967 44 28 332 00000200104 Heavy Vehicles (%) 0% 3% 2% 0% 3% 0% 0% 0% 0% 5% 0% 2% Turn Type NA Perm pm+pt NA Perm NA Perm Protected Phases 2 1 6 4 Permitted Phases 2 6 4 4 Actuated Green, G (s)45.0 45.0 51.3 51.3 12.0 12.0 Effective Green, g (s)45.5 45.5 51.8 51.8 13.4 13.4 Actuated g/C Ratio 0.62 0.62 0.71 0.71 0.18 0.18 Clearance Time (s)4.5 4.5 4.5 4.5 5.4 5.4 Vehicle Extension (s)4.0 4.0 2.5 4.0 2.5 2.5 Lane Grp Cap (vph)1056 906 181 1202 290 266 v/s Ratio Prot c0.57 0.00 c0.20 v/s Ratio Perm 0.03 0.10 0.13 0.07 v/c Ratio 0.92 0.05 0.15 0.28 0.69 0.39 Uniform Delay, d1 12.2 5.4 10.6 3.9 28.0 26.3 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 12.2 0.0 0.3 0.2 6.1 0.7 Delay (s)24.4 5.4 10.9 4.1 34.1 27.0 Level of Service C A B A C C Approach Delay (s)23.1 4.6 0.0 28.8 Approach LOS C A A C Intersection Summary HCM 2000 Control Delay 22.1 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.85 Actuated Cycle Length (s) 73.2 Sum of lost time (s)12.0 Intersection Capacity Utilization 73.9% ICU Level of Service D Analysis Period (min)15 c Critical Lane Group South Ashland Business Park TPRA F - 8 Lanes, Volumes, Timings 6: I-5 NB Ramp & Ashland Street 8/3/2017 South Ashland Business Park 12/1/2016 2017 PM - Existing Conditions Synchro 8 Report Page 17 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)571 478 0 0 283 270 41 0 51 0 0 0 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)212 0 0 160 0 95 0 0 Storage Lanes 1 0 0 1 0 1 0 0 Taper Length (ft)72 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot)1646 1750 0 0 1733 1458 0 1539 1328 0 0 0 Flt Permitted 0.343 0.950 Satd. Flow (perm)594 1750 0 0 1733 1458 0 1539 1328 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)293 73 Link Speed (mph)35 35 45 45 Link Distance (ft)560 889 615 566 Travel Time (s)10.9 17.3 9.3 8.6 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles (%)1% 0% 0% 0% 1% 2% 8% 0% 12% 0% 0% 0% Adj. Flow (vph)621 520 0 0 308 293 45 0 55 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 621 520 0 0 308 293 0 45 55 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)12 12 0 0 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2 2 21133 Detector Template ODOT Left/SideODOT 35 Thru ODOT 35 ThruODOT Right LeftODOT Ramp HSODOT Ramp HS Leading Detector (ft) 78 223 223 143 20 213 213 Trailing Detector (ft)2 107 107 137 0 2 2 Detector 1 Position(ft)2 107 107 137 0 2 2 Detector 1 Size(ft)16 6 6 6 20 16 16 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 72 217 217 107 107 Detector 2 Size(ft)6 6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 0.0 Detector 3 Position(ft)207 207 Detector 3 Size(ft)6 6 Detector 3 Type Cl+Ex Cl+Ex South Ashland Business Park TPRA F - 9 Lanes, Volumes, Timings 6: I-5 NB Ramp & Ashland Street 8/3/2017 South Ashland Business Park 12/1/2016 2017 PM - Existing Conditions Synchro 8 Report Page 18 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 3 Channel Detector 3 Extend (s) 0.0 0.0 Turn Type pm+pt NA NA Perm Perm NA Perm Protected Phases 5 2 6 8 Permitted Phases 2 6 8 8 Detector Phase 5 2 66888 Switch Phase Minimum Initial (s) 4.0 9.5 9.5 9.5 6.0 6.0 6.0 Minimum Split (s)13.0 14.0 34.9 34.9 31.8 31.8 31.8 Total Split (s)23.0 58.2 35.2 35.2 31.8 31.8 31.8 Total Split (%)25.6% 64.7%39.1% 39.1% 35.3% 35.3% 35.3% Maximum Green (s) 18.5 53.7 30.7 30.7 26.4 26.4 26.4 Yellow Time (s)4.0 4.0 4.0 4.0 4.7 4.7 4.7 All-Red Time (s)0.5 0.5 0.5 0.5 0.7 0.7 0.7 Lost Time Adjust (s) -0.5 -0.5 -0.5 -0.5 -1.4 -1.4 Total Lost Time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 2.5 4.0 4.0 4.0 2.5 2.5 2.5 Minimum Gap (s)2.0 2.7 2.7 2.7 2.0 2.0 2.0 Time Before Reduce (s) 8.0 10.0 10.0 10.0 8.0 8.0 8.0 Time To Reduce (s)4.0 13.0 13.0 13.0 4.0 4.0 4.0 Recall Mode None Min Min Min None None None Walk Time (s)7.0 5.0 5.0 7.0 7.0 7.0 Flash Dont Walk (s)19.5 25.4 25.4 19.4 19.4 19.4 Pedestrian Calls (#/hr)0 00000 Act Effct Green (s)39.6 40.8 15.8 15.8 8.6 8.6 Actuated g/C Ratio 0.74 0.77 0.30 0.30 0.16 0.16 v/c Ratio 0.75 0.39 0.60 0.46 0.18 0.20 Control Delay 14.0 4.3 22.2 4.9 24.2 6.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 14.0 4.3 22.2 4.9 24.2 6.9 LOS BA CA CA Approach Delay 9.6 13.8 14.7 Approach LOS A B B Intersection Summary Area Type:Other Cycle Length: 90 Actuated Cycle Length: 53.3 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.75 Intersection Signal Delay: 11.2 Intersection LOS: B Intersection Capacity Utilization 73.9% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 6: I-5 NB Ramp & Ashland Street South Ashland Business Park TPRA F - 10 HCM Signalized Intersection Capacity Analysis 6: I-5 NB Ramp & Ashland Street 8/3/2017 South Ashland Business Park 12/1/2016 2017 PM - Existing Conditions Synchro 8 Report Page 19 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)571 478 0 0 283 270 41 0 51 0 0 0 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Total Lost time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.85 1.00 0.85 Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00 Satd. Flow (prot)1646 1750 1733 1458 1539 1328 Flt Permitted 0.34 1.00 1.00 1.00 0.95 1.00 Satd. Flow (perm)595 1750 1733 1458 1539 1328 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph)621 520 0 0 308 293 45 0 55 0 0 0 RTOR Reduction (vph)000002080048000 Lane Group Flow (vph) 621 520 0 0 308 85 0 45 7000 Heavy Vehicles (%) 1% 0% 0% 0% 1% 2% 8% 0% 12% 0% 0% 0% Turn Type pm+pt NA NA Perm Perm NA Perm Protected Phases 5 2 6 8 Permitted Phases 2 6 8 8 Actuated Green, G (s) 39.1 39.1 15.4 15.4 5.5 5.5 Effective Green, g (s) 39.6 39.6 15.9 15.9 6.9 6.9 Actuated g/C Ratio 0.73 0.73 0.29 0.29 0.13 0.13 Clearance Time (s)4.5 4.5 4.5 4.5 5.4 5.4 Vehicle Extension (s) 2.5 4.0 4.0 4.0 2.5 2.5 Lane Grp Cap (vph) 812 1271 505 425 194 168 v/s Ratio Prot c0.28 0.30 0.18 v/s Ratio Perm c0.28 0.06 0.03 0.01 v/c Ratio 0.76 0.41 0.61 0.20 0.23 0.04 Uniform Delay, d1 5.2 2.9 16.6 14.5 21.4 20.9 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 4.1 0.3 2.4 0.3 0.4 0.1 Delay (s)9.3 3.2 19.0 14.8 21.9 21.0 Level of Service A A B B C C Approach Delay (s)6.5 17.0 21.4 0.0 Approach LOS A B C A Intersection Summary HCM 2000 Control Delay 10.7 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.73 Actuated Cycle Length (s) 54.5 Sum of lost time (s)12.0 Intersection Capacity Utilization 73.9% ICU Level of Service D Analysis Period (min)15 c Critical Lane Group South Ashland Business Park TPRA F - 11 Lanes, Volumes, Timings 10: Site Driveway & Washington St 8/3/2017 South Ashland Business Park 12/1/2016 2017 PM - Existing Conditions Synchro 8 Report Page 23 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Volume (vph)5 0 0 13 0 0 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt Flt Protected Satd. Flow (prot) 1750 0 0 1750 1750 0 Flt Permitted Satd. Flow (perm) 1750 0 0 1750 1750 0 Link Speed (mph)25 25 25 Link Distance (ft)405 170 345 Travel Time (s)11.0 4.6 9.4 Peak Hour Factor 0.70 0.70 0.70 0.70 0.70 0.70 Heavy Vehicles (%)0% 0% 0% 0% 0% 0% Adj. Flow (vph)7 0 0 19 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 7 0 0 19 0 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft)0 0 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph)9 15 15 9 Sign Control Free Free Stop Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 6.7%ICU Level of Service A Analysis Period (min) 15 South Ashland Business Park TPRA F - 12 HCM 2010 TWSC 10: Site Driveway & Washington St 8/3/2017 South Ashland Business Park 12/1/2016 2017 PM - Existing Conditions Synchro 8 Report Page 24 Intersection Int Delay, s/veh 0 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h 5 0 0 13 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - -- -0 - Veh in Median Storage, #0 -- 0 0 - Grade, %0 -- 0 0 - Peak Hour Factor 70 70 70 70 70 70 Heavy Vehicles, %0 0 0 0 0 0 Mvmt Flow 7 0 0 19 0 0 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 7 0 26 7 Stage 1 - -- -7 - Stage 2 - -- -19 - Critical Hdwy - - 4.1 -6.4 6.2 Critical Hdwy Stg 1 - -- -5.4 - Critical Hdwy Stg 2 - -- -5.4 - Follow-up Hdwy - - 2.2 -3.5 3.3 Pot Cap-1 Maneuver - - 1627 -995 1081 Stage 1 - -- -1021 - Stage 2 - -- -1009 - Platoon blocked, %- -- Mov Cap-1 Maneuver - - 1627 -995 1081 Mov Cap-2 Maneuver - -- -995 - Stage 1 - -- -1021 - Stage 2 - -- -1009 - Approach EB WB NB HCM Control Delay, s 0 0 0 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h)- - - 1627 - HCM Lane V/C Ratio ----- HCM Control Delay (s) 0 - - 0 - HCM Lane LOS A - - A - HCM 95th %tile Q(veh) - - - 0 - South Ashland Business Park TPRA F - 13 SANDOW ENGINEERING AP P E N D I X G : 20 1 9 SY N C H R O O U T P U T South Ashland Business Park  Lanes, Volumes, Timings 3: Tolman Creek Rd & Ashland Street 8/24/2017 South Ashland Business Park 12/1/2016 2019 PM - Background Conditions Synchro 8 Report Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)91 735 66 207 529 65 99 97 191 61 107 60 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)115 0 115 0 87 0 83 0 Storage Lanes 1 0 1 0 1 0 1 0 Taper Length (ft)77 66 87 84 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.988 0.984 0.900 0.946 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot)1646 3255 0 1630 3232 0 1662 1539 0 1662 1645 0 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm)1646 3255 0 1630 3232 0 1662 1539 0 1662 1645 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)9 13 78 21 Link Speed (mph)35 35 25 25 Link Distance (ft)1678 724 696 1812 Travel Time (s)32.7 14.1 19.0 49.4 Peak Hour Factor 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 Heavy Vehicles (%)1% 1% 0% 2% 1% 3% 0% 1% 3% 0% 1% 0% Adj. Flow (vph)111 896 80 252 645 79 121 118 233 74 130 73 Shared Lane Traffic (%) Lane Group Flow (vph) 111 976 0 252 724 0 121 351 0 74 203 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)12 12 12 12 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Yes Yes Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2 2 2 2 2 2 2 2 Detector Template ODOT Left/SideODOT 35 Thru ODOT Left/SideODOT 35 Thru ODOT Left/SideODOT Left/Side ODOT Left/SideODOT Left/Side Leading Detector (ft)78 223 78 223 78 78 78 78 Trailing Detector (ft)2 107 2 107 2 2 2 2 Detector 1 Position(ft)2 107 2 107 2 2 2 2 Detector 1 Size(ft)16 6 16 6 16 16 16 16 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 72 217 72 217 72 72 72 72 Detector 2 Size(ft)6 6 6 6 6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Prot NA Prot NA Prot NA Prot NA Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases South Ashland Business Park TPRA G - 1 Lanes, Volumes, Timings 3: Tolman Creek Rd & Ashland Street 8/24/2017 South Ashland Business Park 12/1/2016 2019 PM - Background Conditions Synchro 8 Report Page 8 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 5 2 1 6 3 8 7 4 Switch Phase Minimum Initial (s)4.0 9.5 4.0 9.5 4.0 6.0 4.0 6.0 Minimum Split (s)13.0 14.0 13.0 14.0 13.0 13.0 13.0 13.0 Total Split (s)20.0 47.0 27.0 54.0 19.0 33.0 13.0 27.0 Total Split (%)16.7% 39.2% 22.5% 45.0% 15.8% 27.5% 10.8% 22.5% Maximum Green (s) 15.5 42.5 22.5 49.5 15.0 29.0 9.0 23.0 Yellow Time (s)4.0 4.0 4.0 4.0 3.5 3.5 3.5 3.5 All-Red Time (s)0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 Lost Time Adjust (s) -0.5 -0.5 -0.5 -0.5 0.0 0.0 0.0 0.0 Total Lost Time (s)4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.5 4.0 2.5 4.0 2.5 2.5 2.5 2.5 Minimum Gap (s)2.0 2.7 2.0 2.7 2.0 2.0 2.0 2.0 Time Before Reduce (s) 8.0 10.0 8.0 10.0 8.0 8.0 8.0 8.0 Time To Reduce (s)4.0 13.0 4.0 13.0 4.0 4.0 4.0 4.0 Recall Mode None Min None Min None None None None Walk Time (s)7.0 7.0 7.0 7.0 Flash Dont Walk (s)16.7 16.0 22.9 23.0 Pedestrian Calls (#/hr)0000 Act Effct Green (s) 12.3 37.1 20.2 45.0 12.0 25.8 8.3 19.0 Actuated g/C Ratio 0.12 0.35 0.19 0.43 0.11 0.25 0.08 0.18 v/c Ratio 0.58 0.85 0.81 0.52 0.64 0.81 0.57 0.65 Control Delay 60.4 40.2 63.6 24.4 64.3 46.7 69.9 48.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 60.4 40.2 63.6 24.4 64.3 46.7 69.9 48.2 LOS ED EC ED ED Approach Delay 42.2 34.5 51.2 54.0 Approach LOS DCDD Intersection Summary Area Type:Other Cycle Length: 120 Actuated Cycle Length: 105.1 Natural Cycle: 75 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.85 Intersection Signal Delay: 42.2 Intersection LOS: D Intersection Capacity Utilization 72.1%ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 3: Tolman Creek Rd & Ashland Street South Ashland Business Park TPRA G - 2 HCM Signalized Intersection Capacity Analysis 3: Tolman Creek Rd & Ashland Street 8/24/2017 South Ashland Business Park 12/1/2016 2019 PM - Background Conditions Synchro 8 Report Page 9 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)91 735 66 207 529 65 99 97 191 61 107 60 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Total Lost time (s)4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00 Frt 1.00 0.99 1.00 0.98 1.00 0.90 1.00 0.95 Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot)1646 3254 1630 3231 1662 1540 1662 1645 Flt Permitted 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (perm)1646 3254 1630 3231 1662 1540 1662 1645 Peak-hour factor, PHF 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 Adj. Flow (vph)111 896 80 252 645 79 121 118 233 74 130 73 RTOR Reduction (vph)06007005900170 Lane Group Flow (vph) 111 970 0 252 717 0 121 292 0 74 186 0 Heavy Vehicles (%) 1% 1% 0% 2% 1% 3% 0% 1% 3% 0% 1% 0% Turn Type Prot NA Prot NA Prot NA Prot NA Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases Actuated Green, G (s) 11.8 36.6 19.7 44.5 12.0 25.8 6.5 20.3 Effective Green, g (s) 12.3 37.1 20.2 45.0 12.0 25.8 6.5 20.3 Actuated g/C Ratio 0.12 0.35 0.19 0.43 0.11 0.24 0.06 0.19 Clearance Time (s)4.5 4.5 4.5 4.5 4.0 4.0 4.0 4.0 Vehicle Extension (s) 2.5 4.0 2.5 4.0 2.5 2.5 2.5 2.5 Lane Grp Cap (vph) 191 1143 311 1376 188 376 102 316 v/s Ratio Prot 0.07 c0.30 c0.15 0.22 c0.07 c0.19 0.04 0.11 v/s Ratio Perm v/c Ratio 0.58 0.85 0.81 0.52 0.64 0.78 0.73 0.59 Uniform Delay, d1 44.2 31.7 40.9 22.3 44.8 37.2 48.7 38.8 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 3.7 6.3 14.3 0.5 6.5 9.3 21.2 2.3 Delay (s)47.9 37.9 55.2 22.8 51.3 46.5 69.9 41.2 Level of Service D D E C D D E D Approach Delay (s) 39.0 31.2 47.8 48.8 Approach LOS DCDD Intersection Summary HCM 2000 Control Delay 38.7 HCM 2000 Level of Service D HCM 2000 Volume to Capacity ratio 0.82 Actuated Cycle Length (s) 105.6 Sum of lost time (s)16.0 Intersection Capacity Utilization 72.1% ICU Level of Service C Analysis Period (min)15 c Critical Lane Group South Ashland Business Park TPRA G - 3 Lanes, Volumes, Timings 4: Washington St & Ashland Street 8/24/2017 South Ashland Business Park 12/1/2016 2019 PM - Background Conditions Synchro 8 Report Page 11 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Volume (vph)916 13 77 767 5 60 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Storage Length (ft)0 100 0 73 Storage Lanes 0 1 1 1 Taper Length (ft)75 25 Lane Util. Factor 0.95 0.95 1.00 0.95 1.00 1.00 Frt 0.998 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot)3286 0 1662 3260 1662 1488 Flt Permitted 0.950 0.950 Satd. Flow (perm)3286 0 1662 3260 1662 1488 Link Speed (mph)35 35 25 Link Distance (ft)724 413 696 Travel Time (s)14.1 8.0 19.0 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%)1% 0% 0% 2% 0% 0% Adj. Flow (vph)974 14 82 816 5 64 Shared Lane Traffic (%) Lane Group Flow (vph) 988 0 82 816 5 64 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft)12 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Yes Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph)9 15 15 9 Sign Control Free Free Stop Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 45.9% ICU Level of Service A Analysis Period (min) 15 South Ashland Business Park TPRA G - 4 HCM 2010 TWSC 4: Washington St & Ashland Street 8/24/2017 South Ashland Business Park 12/1/2016 2019 PM - Background Conditions Synchro 8 Report Page 12 Intersection Int Delay, s/veh 0.9 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h 916 13 77 767 5 60 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - 100 -0 73 Veh in Median Storage, #0 -- 0 0 - Grade, %0 -- 0 0 - Peak Hour Factor 94 94 94 94 94 94 Heavy Vehicles, %1 0 0 2 0 0 Mvmt Flow 974 14 82 816 5 64 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 988 0 1553 494 Stage 1 - -- -981 - Stage 2 - -- -572 - Critical Hdwy - - 4.1 -6.8 6.9 Critical Hdwy Stg 1 - -- -5.8 - Critical Hdwy Stg 2 - -- -5.8 - Follow-up Hdwy - - 2.2 -3.5 3.3 Pot Cap-1 Maneuver - - 708 -106 526 Stage 1 - -- -329 - Stage 2 - -- -534 - Platoon blocked, %- -- Mov Cap-1 Maneuver - - 708 -94 526 Mov Cap-2 Maneuver - -- -218 - Stage 1 - -- -329 - Stage 2 - -- -472 - Approach EB WB NB HCM Control Delay, s 0 1 13.5 HCM LOS B Minor Lane/Major Mvmt NBLn1NBLn2 EBT EBR WBL WBT Capacity (veh/h)218 526 - - 708 - HCM Lane V/C Ratio 0.024 0.121 - - 0.116 - HCM Control Delay (s) 21.9 12.8 - - 10.7 - HCM Lane LOS C B - - B - HCM 95th %tile Q(veh) 0.1 0.4 - - 0.4 - South Ashland Business Park TPRA G - 5 Lanes, Volumes, Timings 5: I-5 SB Ramp & Ashland Street 8/24/2017 South Ashland Business Park 12/1/2016 2019 PM - Background Conditions Synchro 8 Report Page 13 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)0 926 69 26 311 00001831525 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)0 0 111 0 0 0 0 200 Storage Lanes 0 1 1 0 0 0 0 1 Taper Length (ft)25 70 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.953 Satd. Flow (prot)0 1699 1458 1662 1699 000001589 1458 Flt Permitted 0.102 0.953 Satd. Flow (perm)0 1699 1458 178 1699 000001589 1458 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)63 582 Link Speed (mph)35 35 45 45 Link Distance (ft)413 560 744 614 Travel Time (s)8.0 10.9 11.3 9.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Heavy Vehicles (%)0% 3% 2% 0% 3% 0% 0% 0% 0% 5% 0% 2% Adj. Flow (vph)0 1029 77 29 346 00002031583 Shared Lane Traffic (%) Lane Group Flow (vph) 0 1029 77 29 346 00000204583 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)12 12 0 0 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2122 133 Detector Template ODOT 35 ThruODOT RightODOT Left/SideODOT 35 Thru LeftODOT Ramp HSODOT Ramp HS Leading Detector (ft)223 143 78 223 20 213 213 Trailing Detector (ft)107 137 2 107 0 2 2 Detector 1 Position(ft)107 137 2 107 0 2 2 Detector 1 Size(ft)6 6 16 6 20 16 16 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft)217 72 217 107 107 Detector 2 Size(ft)6 6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 0.0 0.0 0.0 0.0 Detector 3 Position(ft)207 207 Detector 3 Size(ft)66 Detector 3 Type Cl+Ex Cl+Ex South Ashland Business Park TPRA G - 6 Lanes, Volumes, Timings 5: I-5 SB Ramp & Ashland Street 8/24/2017 South Ashland Business Park 12/1/2016 2019 PM - Background Conditions Synchro 8 Report Page 14 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 3 Channel Detector 3 Extend (s)0.0 0.0 Turn Type NA Perm pm+pt NA Perm NA Perm Protected Phases 2 1 6 4 Permitted Phases 2 6 4 4 Detector Phase 2216 444 Switch Phase Minimum Initial (s) 10.0 10.0 4.0 4.0 6.0 6.0 6.0 Minimum Split (s)30.6 30.6 13.0 33.2 31.4 31.4 31.4 Total Split (s)75.6 75.6 13.0 88.6 31.4 31.4 31.4 Total Split (%)63.0% 63.0% 10.8% 73.8%26.2% 26.2% 26.2% Maximum Green (s)71.1 71.1 8.5 84.1 26.0 26.0 26.0 Yellow Time (s)4.0 4.0 4.0 4.0 4.7 4.7 4.7 All-Red Time (s)0.5 0.5 0.5 0.5 0.7 0.7 0.7 Lost Time Adjust (s)-0.5 -0.5 -0.5 -0.5 -1.4 -1.4 Total Lost Time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lag Lag Lead Lead-Lag Optimize?Yes Yes Yes Vehicle Extension (s)4.0 4.0 2.5 4.0 2.5 2.5 2.5 Minimum Gap (s)2.7 2.7 2.0 2.7 2.0 2.0 2.0 Time Before Reduce (s)10.0 10.0 8.0 10.0 8.0 8.0 8.0 Time To Reduce (s)13.0 13.0 4.0 13.0 4.0 4.0 4.0 Recall Mode Min Min None Min None None None Walk Time (s)7.0 7.0 7.0 7.0 7.0 7.0 Flash Dont Walk (s)19.1 19.1 21.7 19.0 19.0 19.0 Pedestrian Calls (#/hr)0 0 0 0 0 0 Act Effct Green (s)71.6 71.6 77.4 77.4 21.1 21.1 Actuated g/C Ratio 0.67 0.67 0.73 0.73 0.20 0.20 v/c Ratio 0.90 0.08 0.14 0.28 0.65 0.77 Control Delay 30.0 3.3 6.3 6.3 50.3 11.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 30.0 3.3 6.3 6.3 50.3 11.1 LOS C A A A D B Approach Delay 28.2 6.3 21.2 Approach LOS C A C Intersection Summary Area Type:Other Cycle Length: 120 Actuated Cycle Length: 106.6 Natural Cycle: 120 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.90 Intersection Signal Delay: 22.1 Intersection LOS: C Intersection Capacity Utilization 77.3% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 5: I-5 SB Ramp & Ashland Street South Ashland Business Park TPRA G - 7 HCM Signalized Intersection Capacity Analysis 5: I-5 SB Ramp & Ashland Street 8/24/2017 South Ashland Business Park 12/1/2016 2019 PM - Background Conditions Synchro 8 Report Page 15 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)0 926 69 26 311 00001831525 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Total Lost time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.85 1.00 1.00 1.00 0.85 Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot)1699 1458 1662 1699 1588 1458 Flt Permitted 1.00 1.00 0.10 1.00 0.95 1.00 Satd. Flow (perm)1699 1458 179 1699 1588 1458 Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)0 1029 77 29 346 00002031583 RTOR Reduction (vph) 0 0 21 00000000469 Lane Group Flow (vph) 0 1029 56 29 346 00000204114 Heavy Vehicles (%) 0% 3% 2% 0% 3% 0% 0% 0% 0% 5% 0% 2% Turn Type NA Perm pm+pt NA Perm NA Perm Protected Phases 2 1 6 4 Permitted Phases 2 6 4 4 Actuated Green, G (s)71.1 71.1 78.9 78.9 19.7 19.7 Effective Green, g (s)71.6 71.6 79.4 79.4 21.1 21.1 Actuated g/C Ratio 0.66 0.66 0.73 0.73 0.19 0.19 Clearance Time (s)4.5 4.5 4.5 4.5 5.4 5.4 Vehicle Extension (s)4.0 4.0 2.5 4.0 2.5 2.5 Lane Grp Cap (vph)1121 962 182 1243 308 283 v/s Ratio Prot c0.61 0.01 c0.20 v/s Ratio Perm 0.04 0.11 0.13 0.08 v/c Ratio 0.92 0.06 0.16 0.28 0.66 0.40 Uniform Delay, d1 15.9 6.5 15.8 4.9 40.4 38.2 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 11.9 0.0 0.3 0.2 4.8 0.7 Delay (s)27.8 6.6 16.1 5.1 45.2 38.9 Level of Service C A B A D D Approach Delay (s)26.3 5.9 0.0 40.5 Approach LOS C A A D Intersection Summary HCM 2000 Control Delay 27.9 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.84 Actuated Cycle Length (s) 108.5 Sum of lost time (s)12.0 Intersection Capacity Utilization 77.3% ICU Level of Service D Analysis Period (min)15 c Critical Lane Group South Ashland Business Park TPRA G - 8 Lanes, Volumes, Timings 6: I-5 NB Ramp & Ashland Street 8/24/2017 South Ashland Business Park 12/1/2016 2019 PM - Background Conditions Synchro 8 Report Page 17 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)609 500 0 0 295 281 42 0 51 0 0 0 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)212 0 0 160 0 95 0 0 Storage Lanes 1 0 0 1 0 1 0 0 Taper Length (ft)72 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot)1646 1750 0 0 1733 1458 0 1539 1328 0 0 0 Flt Permitted 0.334 0.950 Satd. Flow (perm)579 1750 0 0 1733 1458 0 1539 1328 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)305 73 Link Speed (mph)35 35 45 45 Link Distance (ft)560 889 615 566 Travel Time (s)10.9 17.3 9.3 8.6 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles (%)1% 0% 0% 0% 1% 2% 8% 0% 12% 0% 0% 0% Adj. Flow (vph)662 543 0 0 321 305 46 0 55 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 662 543 0 0 321 305 0 46 55 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)12 12 0 0 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2 2 21133 Detector Template ODOT Left/SideODOT 35 Thru ODOT 35 ThruODOT Right LeftODOT Ramp HSODOT Ramp HS Leading Detector (ft) 78 223 223 143 20 213 213 Trailing Detector (ft)2 107 107 137 0 2 2 Detector 1 Position(ft)2 107 107 137 0 2 2 Detector 1 Size(ft)16 6 6 6 20 16 16 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 72 217 217 107 107 Detector 2 Size(ft)6 6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 0.0 Detector 3 Position(ft)207 207 Detector 3 Size(ft)6 6 Detector 3 Type Cl+Ex Cl+Ex South Ashland Business Park TPRA G - 9 Lanes, Volumes, Timings 6: I-5 NB Ramp & Ashland Street 8/24/2017 South Ashland Business Park 12/1/2016 2019 PM - Background Conditions Synchro 8 Report Page 18 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 3 Channel Detector 3 Extend (s) 0.0 0.0 Turn Type pm+pt NA NA Perm Perm NA Perm Protected Phases 5 2 6 8 Permitted Phases 2 6 8 8 Detector Phase 5 2 66888 Switch Phase Minimum Initial (s) 4.0 9.5 9.5 9.5 6.0 6.0 6.0 Minimum Split (s)13.0 14.0 34.9 34.9 31.8 31.8 31.8 Total Split (s)23.0 58.2 35.2 35.2 31.8 31.8 31.8 Total Split (%)25.6% 64.7%39.1% 39.1% 35.3% 35.3% 35.3% Maximum Green (s) 18.5 53.7 30.7 30.7 26.4 26.4 26.4 Yellow Time (s)4.0 4.0 4.0 4.0 4.7 4.7 4.7 All-Red Time (s)0.5 0.5 0.5 0.5 0.7 0.7 0.7 Lost Time Adjust (s) -0.5 -0.5 -0.5 -0.5 -1.4 -1.4 Total Lost Time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 2.5 4.0 4.0 4.0 2.5 2.5 2.5 Minimum Gap (s)2.0 2.7 2.7 2.7 2.0 2.0 2.0 Time Before Reduce (s) 8.0 10.0 10.0 10.0 8.0 8.0 8.0 Time To Reduce (s)4.0 13.0 13.0 13.0 4.0 4.0 4.0 Recall Mode None Min Min Min None None None Walk Time (s)7.0 5.0 5.0 7.0 7.0 7.0 Flash Dont Walk (s)19.5 25.4 25.4 19.4 19.4 19.4 Pedestrian Calls (#/hr)0 00000 Act Effct Green (s)40.1 41.3 16.2 16.2 8.7 8.7 Actuated g/C Ratio 0.75 0.77 0.30 0.30 0.16 0.16 v/c Ratio 0.80 0.40 0.62 0.47 0.19 0.20 Control Delay 17.7 4.4 22.5 4.8 24.6 6.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 17.7 4.4 22.5 4.8 24.6 6.9 LOS BA CA CA Approach Delay 11.7 13.9 14.9 Approach LOS B B B Intersection Summary Area Type:Other Cycle Length: 90 Actuated Cycle Length: 53.8 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.80 Intersection Signal Delay: 12.6 Intersection LOS: B Intersection Capacity Utilization 77.3% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 6: I-5 NB Ramp & Ashland Street South Ashland Business Park TPRA G - 10 HCM Signalized Intersection Capacity Analysis 6: I-5 NB Ramp & Ashland Street 8/24/2017 South Ashland Business Park 12/1/2016 2019 PM - Background Conditions Synchro 8 Report Page 19 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)609 500 0 0 295 281 42 0 51 0 0 0 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Total Lost time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.85 1.00 0.85 Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00 Satd. Flow (prot)1646 1750 1733 1458 1539 1328 Flt Permitted 0.33 1.00 1.00 1.00 0.95 1.00 Satd. Flow (perm)578 1750 1733 1458 1539 1328 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph)662 543 0 0 321 305 46 0 55 0 0 0 RTOR Reduction (vph)000002140048000 Lane Group Flow (vph) 662 543 0 0 321 91 0 46 7000 Heavy Vehicles (%) 1% 0% 0% 0% 1% 2% 8% 0% 12% 0% 0% 0% Turn Type pm+pt NA NA Perm Perm NA Perm Protected Phases 5 2 6 8 Permitted Phases 2 6 8 8 Actuated Green, G (s) 39.6 39.6 15.9 15.9 5.5 5.5 Effective Green, g (s) 40.1 40.1 16.4 16.4 6.9 6.9 Actuated g/C Ratio 0.73 0.73 0.30 0.30 0.13 0.13 Clearance Time (s)4.5 4.5 4.5 4.5 5.4 5.4 Vehicle Extension (s) 2.5 4.0 4.0 4.0 2.5 2.5 Lane Grp Cap (vph) 803 1275 516 434 193 166 v/s Ratio Prot c0.29 0.31 0.19 v/s Ratio Perm c0.31 0.06 0.03 0.01 v/c Ratio 0.82 0.43 0.62 0.21 0.24 0.04 Uniform Delay, d1 6.4 2.9 16.6 14.4 21.7 21.1 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 6.7 0.3 2.6 0.3 0.5 0.1 Delay (s)13.2 3.2 19.3 14.8 22.1 21.2 Level of Service B A B B C C Approach Delay (s)8.7 17.1 21.6 0.0 Approach LOS A B C A Intersection Summary HCM 2000 Control Delay 12.1 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.79 Actuated Cycle Length (s) 55.0 Sum of lost time (s)12.0 Intersection Capacity Utilization 77.3% ICU Level of Service D Analysis Period (min)15 c Critical Lane Group South Ashland Business Park TPRA G - 11 Lanes, Volumes, Timings 7: Tolman Creek Rd & Independent Way 8/24/2017 South Ashland Business Park 12/1/2016 2019 PM - Background Conditions Synchro 8 Report Page 21 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Volume (vph)19 45 350 10 11 374 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.905 0.996 Flt Protected 0.986 0.999 Satd. Flow (prot)1531 0 1709 0 0 1714 Flt Permitted 0.986 0.999 Satd. Flow (perm)1531 0 1709 0 0 1714 Link Speed (mph)30 25 25 Link Distance (ft)708 1733 696 Travel Time (s)16.1 47.3 19.0 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 Adj. Flow (vph)20 48 372 11 12 398 Shared Lane Traffic (%) Lane Group Flow (vph) 68 0 383 0 0 410 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(ft)12 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Yes Yes Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 9 15 Sign Control Stop Free Free Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 41.8% ICU Level of Service A Analysis Period (min) 15 South Ashland Business Park TPRA G - 12 HCM 2010 TWSC 7: Tolman Creek Rd & Independent Way 8/24/2017 South Ashland Business Park 12/1/2016 2019 PM - Background Conditions Synchro 8 Report Page 22 Intersection Int Delay, s/veh 1 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h 19 45 350 10 11 374 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 -- -- - Veh in Median Storage, # 0 -0 -- 0 Grade, %0 -0 -- 0 Peak Hour Factor 94 94 94 94 94 94 Heavy Vehicles, %2 2 2 2 2 2 Mvmt Flow 20 48 372 11 12 398 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 799 378 0 0 383 0 Stage 1 378 -- -- - Stage 2 421 -- -- - Critical Hdwy 6.42 6.22 - - 4.12 - Critical Hdwy Stg 1 5.42 -- -- - Critical Hdwy Stg 2 5.42 -- -- - Follow-up Hdwy 3.518 3.318 - - 2.218 - Pot Cap-1 Maneuver 355 669 - - 1175 - Stage 1 693 -- -- - Stage 2 662 -- -- - Platoon blocked, %- -- Mov Cap-1 Maneuver 350 669 - - 1175 - Mov Cap-2 Maneuver 466 -- -- - Stage 1 693 -- -- - Stage 2 653 -- -- - Approach WB NB SB HCM Control Delay, s 11.9 0 0.2 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h)- - 592 1175 - HCM Lane V/C Ratio - - 0.115 0.01 - HCM Control Delay (s) - - 11.9 8.1 0 HCM Lane LOS - - B A A HCM 95th %tile Q(veh) - - 0.4 0 - South Ashland Business Park TPRA G - 13 Lanes, Volumes, Timings 8: Washington St & Independent Way 8/24/2017 South Ashland Business Park 12/1/2016 2019 PM - Background Conditions Synchro 8 Report Page 23 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Volume (vph)22 8 19 27 20 23 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.965 0.928 Flt Protected 0.964 0.980 Satd. Flow (prot)1628 0 0 1715 1624 0 Flt Permitted 0.964 0.980 Satd. Flow (perm)1628 0 0 1715 1624 0 Link Speed (mph)25 25 25 Link Distance (ft)708 248 696 Travel Time (s)19.3 6.8 19.0 Peak Hour Factor 0.70 0.70 0.70 0.70 0.70 0.70 Heavy Vehicles (%)0% 0% 0% 0% 0% 0% Adj. Flow (vph)31 11 27 39 29 33 Shared Lane Traffic (%) Lane Group Flow (vph) 42 0 0 66 62 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft)12 0 0 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 Sign Control Stop Free Free Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 19.4%ICU Level of Service A Analysis Period (min) 15 South Ashland Business Park TPRA G - 14 HCM 2010 TWSC 8: Washington St & Independent Way 8/24/2017 South Ashland Business Park 12/1/2016 2019 PM - Background Conditions Synchro 8 Report Page 24 Intersection Int Delay, s/veh 3.5 Movement EBL EBR NBL NBT SBT SBR Vol, veh/h 22 8 19 27 20 23 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 -- -- - Veh in Median Storage, # 0 -- 0 0 - Grade, %0 -- 0 0 - Peak Hour Factor 70 70 70 70 70 70 Heavy Vehicles, %0 0 0 0 0 0 Mvmt Flow 31 11 27 39 29 33 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 138 45 61 0 - 0 Stage 1 45 -- -- - Stage 2 93 -- -- - Critical Hdwy 6.4 6.2 4.1 -- - Critical Hdwy Stg 1 5.4 -- -- - Critical Hdwy Stg 2 5.4 -- -- - Follow-up Hdwy 3.5 3.3 2.2 -- - Pot Cap-1 Maneuver 860 1031 1555 -- - Stage 1 983 -- -- - Stage 2 936 -- -- - Platoon blocked, %-- - Mov Cap-1 Maneuver 845 1031 1555 -- - Mov Cap-2 Maneuver 845 -- -- - Stage 1 983 -- -- - Stage 2 919 -- -- - Approach EB NB SB HCM Control Delay, s 9.3 3 0 HCM LOS A Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h)1555 - 888 - - HCM Lane V/C Ratio 0.017 - 0.048 - - HCM Control Delay (s) 7.4 0 9.3 - - HCM Lane LOS A A A - - HCM 95th %tile Q(veh) 0.1 - 0.2 - - South Ashland Business Park TPRA G - 15 Lanes, Volumes, Timings 10: Site Driveway & Washington St 8/24/2017 South Ashland Business Park 12/1/2016 2019 PM - Background Conditions Synchro 8 Report Page 27 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Volume (vph)5 0 0 14 0 0 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt Flt Protected Satd. Flow (prot) 1750 0 0 1750 1750 0 Flt Permitted Satd. Flow (perm) 1750 0 0 1750 1750 0 Link Speed (mph)25 25 25 Link Distance (ft)405 170 345 Travel Time (s)11.0 4.6 9.4 Peak Hour Factor 0.70 0.70 0.70 0.70 0.70 0.70 Heavy Vehicles (%)0% 0% 0% 0% 0% 0% Adj. Flow (vph)7 0 0 20 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 7 0 0 20 0 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft)0 0 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph)9 15 15 9 Sign Control Free Free Stop Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 6.7%ICU Level of Service A Analysis Period (min) 15 South Ashland Business Park TPRA G - 16 HCM 2010 TWSC 10: Site Driveway & Washington St 8/24/2017 South Ashland Business Park 12/1/2016 2019 PM - Background Conditions Synchro 8 Report Page 28 Intersection Int Delay, s/veh 0 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h 5 0 0 14 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - -- -0 - Veh in Median Storage, #0 -- 0 0 - Grade, %0 -- 0 0 - Peak Hour Factor 70 70 70 70 70 70 Heavy Vehicles, %0 0 0 0 0 0 Mvmt Flow 7 0 0 20 0 0 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 7 0 27 7 Stage 1 - -- -7 - Stage 2 - -- -20 - Critical Hdwy - - 4.1 -6.4 6.2 Critical Hdwy Stg 1 - -- -5.4 - Critical Hdwy Stg 2 - -- -5.4 - Follow-up Hdwy - - 2.2 -3.5 3.3 Pot Cap-1 Maneuver - - 1627 -993 1081 Stage 1 - -- -1021 - Stage 2 - -- -1008 - Platoon blocked, %- -- Mov Cap-1 Maneuver - - 1627 -993 1081 Mov Cap-2 Maneuver - -- -993 - Stage 1 - -- -1021 - Stage 2 - -- -1008 - Approach EB WB NB HCM Control Delay, s 0 0 0 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h)- - - 1627 - HCM Lane V/C Ratio ----- HCM Control Delay (s) 0 - - 0 - HCM Lane LOS A - - A - HCM 95th %tile Q(veh) - - - 0 - South Ashland Business Park TPRA G - 17 Lanes, Volumes, Timings 3: Tolman Creek Rd & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2019 PM - Build Conditions Synchro 8 Report Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)91 739 68 207 529 65 113 99 191 61 108 60 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)115 0 115 0 87 0 83 0 Storage Lanes 1 0 1 0 1 0 1 0 Taper Length (ft)77 66 87 84 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.987 0.984 0.901 0.947 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot)1646 3252 0 1630 3232 0 1662 1541 0 1662 1647 0 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm)1646 3252 0 1630 3232 0 1662 1541 0 1662 1647 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)9 14 75 21 Link Speed (mph)35 35 25 25 Link Distance (ft)1678 724 696 1812 Travel Time (s)32.7 14.1 19.0 49.4 Peak Hour Factor 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 Heavy Vehicles (%)1% 1% 0% 2% 1% 3% 0% 1% 3% 0% 1% 0% Adj. Flow (vph)111 901 83 252 645 79 138 121 233 74 132 73 Shared Lane Traffic (%) Lane Group Flow (vph) 111 984 0 252 724 0 138 354 0 74 205 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)12 12 12 12 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Yes Yes Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2 2 2 2 2 2 2 2 Detector Template ODOT Left/SideODOT 35 Thru ODOT Left/SideODOT 35 Thru ODOT Left/SideODOT Left/Side ODOT Left/SideODOT Left/Side Leading Detector (ft)78 223 78 223 78 78 78 78 Trailing Detector (ft)2 107 2 107 2 2 2 2 Detector 1 Position(ft)2 107 2 107 2 2 2 2 Detector 1 Size(ft)16 6 16 6 16 16 16 16 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 72 217 72 217 72 72 72 72 Detector 2 Size(ft)6 6 6 6 6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Prot NA Prot NA Prot NA Prot NA Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases South Ashland Business Park TPRA G - 18 Lanes, Volumes, Timings 3: Tolman Creek Rd & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2019 PM - Build Conditions Synchro 8 Report Page 8 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 5 2 1 6 3 8 7 4 Switch Phase Minimum Initial (s)4.0 9.5 4.0 9.5 4.0 6.0 4.0 6.0 Minimum Split (s)13.0 14.0 13.0 14.0 13.0 13.0 13.0 13.0 Total Split (s)20.0 48.0 27.0 55.0 18.0 32.0 13.0 27.0 Total Split (%)16.7% 40.0% 22.5% 45.8% 15.0% 26.7% 10.8% 22.5% Maximum Green (s) 15.5 43.5 22.5 50.5 14.0 28.0 9.0 23.0 Yellow Time (s)4.0 4.0 4.0 4.0 3.5 3.5 3.5 3.5 All-Red Time (s)0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 Lost Time Adjust (s) -0.5 -0.5 -0.5 -0.5 0.0 0.0 0.0 0.0 Total Lost Time (s)4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.5 4.0 2.5 4.0 2.5 2.5 2.5 2.5 Minimum Gap (s)2.0 2.7 2.0 2.7 2.0 2.0 2.0 2.0 Time Before Reduce (s) 8.0 10.0 8.0 10.0 8.0 8.0 8.0 8.0 Time To Reduce (s)4.0 13.0 4.0 13.0 4.0 4.0 4.0 4.0 Recall Mode None Min None Min None None None None Walk Time (s)7.0 7.0 7.0 7.0 Flash Dont Walk (s)16.7 16.0 22.9 23.0 Pedestrian Calls (#/hr)0000 Act Effct Green (s) 12.3 37.7 20.3 45.7 12.4 26.0 8.3 18.9 Actuated g/C Ratio 0.12 0.36 0.19 0.43 0.12 0.25 0.08 0.18 v/c Ratio 0.58 0.85 0.81 0.52 0.71 0.82 0.57 0.66 Control Delay 60.8 40.0 64.3 24.1 69.5 48.5 70.6 49.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 60.8 40.0 64.3 24.1 69.5 48.5 70.6 49.4 LOS ED EC ED ED Approach Delay 42.1 34.5 54.4 55.0 Approach LOS D C D E Intersection Summary Area Type:Other Cycle Length: 120 Actuated Cycle Length: 106 Natural Cycle: 80 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.85 Intersection Signal Delay: 42.9 Intersection LOS: D Intersection Capacity Utilization 72.4%ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 3: Tolman Creek Rd & Ashland Street South Ashland Business Park TPRA G - 19 HCM Signalized Intersection Capacity Analysis 3: Tolman Creek Rd & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2019 PM - Build Conditions Synchro 8 Report Page 9 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)91 739 68 207 529 65 113 99 191 61 108 60 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Total Lost time (s)4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00 Frt 1.00 0.99 1.00 0.98 1.00 0.90 1.00 0.95 Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot)1646 3253 1630 3231 1662 1542 1662 1646 Flt Permitted 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (perm)1646 3253 1630 3231 1662 1542 1662 1646 Peak-hour factor, PHF 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 Adj. Flow (vph)111 901 83 252 645 79 138 121 233 74 132 73 RTOR Reduction (vph)06008005700170 Lane Group Flow (vph) 111 978 0 252 716 0 138 297 0 74 188 0 Heavy Vehicles (%) 1% 1% 0% 2% 1% 3% 0% 1% 3% 0% 1% 0% Turn Type Prot NA Prot NA Prot NA Prot NA Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases Actuated Green, G (s) 11.8 37.2 19.7 45.1 12.4 26.0 6.5 20.1 Effective Green, g (s) 12.3 37.7 20.2 45.6 12.4 26.0 6.5 20.1 Actuated g/C Ratio 0.12 0.35 0.19 0.43 0.12 0.24 0.06 0.19 Clearance Time (s)4.5 4.5 4.5 4.5 4.0 4.0 4.0 4.0 Vehicle Extension (s) 2.5 4.0 2.5 4.0 2.5 2.5 2.5 2.5 Lane Grp Cap (vph) 190 1152 309 1384 193 376 101 310 v/s Ratio Prot 0.07 c0.30 c0.15 0.22 c0.08 c0.19 0.04 0.11 v/s Ratio Perm v/c Ratio 0.58 0.85 0.82 0.52 0.72 0.79 0.73 0.61 Uniform Delay, d1 44.6 31.7 41.3 22.3 45.3 37.7 49.1 39.5 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 3.8 6.2 14.8 0.4 11.1 10.5 22.5 2.8 Delay (s)48.4 38.0 56.1 22.8 56.4 48.1 71.6 42.3 Level of Service D D E C E D E D Approach Delay (s)39.0 31.4 50.5 50.1 Approach LOS DCDD Intersection Summary HCM 2000 Control Delay 39.5 HCM 2000 Level of Service D HCM 2000 Volume to Capacity ratio 0.83 Actuated Cycle Length (s) 106.4 Sum of lost time (s)16.0 Intersection Capacity Utilization 72.4% ICU Level of Service C Analysis Period (min)15 c Critical Lane Group South Ashland Business Park TPRA G - 20 Lanes, Volumes, Timings 4: Washington St & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2019 PM - Build Conditions Synchro 8 Report Page 11 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Volume (vph)916 17 87 767 5 87 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Storage Length (ft)0 100 0 73 Storage Lanes 0 1 1 1 Taper Length (ft)75 25 Lane Util. Factor 0.95 0.95 1.00 0.95 1.00 1.00 Frt 0.997 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot)3283 0 1662 3260 1662 1488 Flt Permitted 0.950 0.950 Satd. Flow (perm)3283 0 1662 3260 1662 1488 Link Speed (mph)35 35 25 Link Distance (ft)724 413 696 Travel Time (s)14.1 8.0 19.0 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%)1% 0% 0% 2% 0% 0% Adj. Flow (vph)974 18 93 816 5 93 Shared Lane Traffic (%) Lane Group Flow (vph) 992 0 93 816 5 93 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft)12 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Yes Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph)9 15 15 9 Sign Control Free Free Stop Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 46.6% ICU Level of Service A Analysis Period (min) 15 South Ashland Business Park TPRA G - 21 HCM 2010 TWSC 4: Washington St & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2019 PM - Build Conditions Synchro 8 Report Page 12 Intersection Int Delay, s/veh 1.2 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h 916 17 87 767 5 87 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - 100 -0 73 Veh in Median Storage, #0 -- 0 0 - Grade, %0 -- 0 0 - Peak Hour Factor 94 94 94 94 94 94 Heavy Vehicles, %1 0 0 2 0 0 Mvmt Flow 974 18 93 816 5 93 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 993 0 1577 496 Stage 1 - -- -984 - Stage 2 - -- -593 - Critical Hdwy - - 4.1 -6.8 6.9 Critical Hdwy Stg 1 - -- -5.8 - Critical Hdwy Stg 2 - -- -5.8 - Follow-up Hdwy - - 2.2 -3.5 3.3 Pot Cap-1 Maneuver - - 704 -102 525 Stage 1 - -- -327 - Stage 2 - -- -521 - Platoon blocked, %- -- Mov Cap-1 Maneuver - - 704 -89 525 Mov Cap-2 Maneuver - -- -212 - Stage 1 - -- -327 - Stage 2 - -- -452 - Approach EB WB NB HCM Control Delay, s 0 1.1 13.8 HCM LOS B Minor Lane/Major Mvmt NBLn1NBLn2 EBT EBR WBL WBT Capacity (veh/h)212 525 - - 704 - HCM Lane V/C Ratio 0.025 0.176 - - 0.131 - HCM Control Delay (s) 22.4 13.3 - - 10.9 - HCM Lane LOS C B - - B - HCM 95th %tile Q(veh) 0.1 0.6 - - 0.5 - South Ashland Business Park TPRA G - 22 Lanes, Volumes, Timings 5: I-5 SB Ramp & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2019 PM - Build Conditions Synchro 8 Report Page 13 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)0 948 74 26 313 00001831533 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)0 0 111 0 0 0 0 200 Storage Lanes 0 1 1 0 0 0 0 1 Taper Length (ft)25 70 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.953 Satd. Flow (prot)0 1699 1458 1662 1699 000001589 1458 Flt Permitted 0.090 0.953 Satd. Flow (perm)0 1699 1458 158 1699 000001589 1458 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)64 579 Link Speed (mph)35 35 45 45 Link Distance (ft)413 560 744 614 Travel Time (s)8.0 10.9 11.3 9.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Heavy Vehicles (%)0% 3% 2% 0% 3% 0% 0% 0% 0% 5% 0% 2% Adj. Flow (vph)0 1053 82 29 348 00002031592 Shared Lane Traffic (%) Lane Group Flow (vph) 0 1053 82 29 348 00000204592 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)12 12 0 0 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2122 133 Detector Template ODOT 35 ThruODOT RightODOT Left/SideODOT 35 Thru LeftODOT Ramp HSODOT Ramp HS Leading Detector (ft)223 143 78 223 20 213 213 Trailing Detector (ft)107 137 2 107 0 2 2 Detector 1 Position(ft)107 137 2 107 0 2 2 Detector 1 Size(ft)6 6 16 6 20 16 16 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft)217 72 217 107 107 Detector 2 Size(ft)6 6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 0.0 0.0 0.0 0.0 Detector 3 Position(ft)207 207 Detector 3 Size(ft)66 Detector 3 Type Cl+Ex Cl+Ex South Ashland Business Park TPRA G - 23 Lanes, Volumes, Timings 5: I-5 SB Ramp & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2019 PM - Build Conditions Synchro 8 Report Page 14 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 3 Channel Detector 3 Extend (s)0.0 0.0 Turn Type NA Perm pm+pt NA Perm NA Perm Protected Phases 2 1 6 4 Permitted Phases 2 6 4 4 Detector Phase 2216 444 Switch Phase Minimum Initial (s) 10.0 10.0 4.0 4.0 6.0 6.0 6.0 Minimum Split (s)30.6 30.6 13.0 33.2 31.4 31.4 31.4 Total Split (s)75.6 75.6 13.0 88.6 31.4 31.4 31.4 Total Split (%)63.0% 63.0% 10.8% 73.8%26.2% 26.2% 26.2% Maximum Green (s)71.1 71.1 8.5 84.1 26.0 26.0 26.0 Yellow Time (s)4.0 4.0 4.0 4.0 4.7 4.7 4.7 All-Red Time (s)0.5 0.5 0.5 0.5 0.7 0.7 0.7 Lost Time Adjust (s)-0.5 -0.5 -0.5 -0.5 -1.4 -1.4 Total Lost Time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lag Lag Lead Lead-Lag Optimize?Yes Yes Yes Vehicle Extension (s)4.0 4.0 2.5 4.0 2.5 2.5 2.5 Minimum Gap (s)2.7 2.7 2.0 2.7 2.0 2.0 2.0 Time Before Reduce (s)10.0 10.0 8.0 10.0 8.0 8.0 8.0 Time To Reduce (s)13.0 13.0 4.0 13.0 4.0 4.0 4.0 Recall Mode Min Min None Min None None None Walk Time (s)7.0 7.0 7.0 7.0 7.0 7.0 Flash Dont Walk (s)19.1 19.1 21.7 19.0 19.0 19.0 Pedestrian Calls (#/hr)0 0 0 0 0 0 Act Effct Green (s)72.3 72.3 78.1 78.1 21.3 21.3 Actuated g/C Ratio 0.67 0.67 0.73 0.73 0.20 0.20 v/c Ratio 0.92 0.08 0.14 0.28 0.65 0.79 Control Delay 32.6 3.5 6.6 6.3 50.3 12.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 32.6 3.5 6.6 6.3 50.3 12.2 LOS C A A A D B Approach Delay 30.5 6.3 21.9 Approach LOS C A C Intersection Summary Area Type:Other Cycle Length: 120 Actuated Cycle Length: 107.5 Natural Cycle: 120 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.92 Intersection Signal Delay: 23.6 Intersection LOS: C Intersection Capacity Utilization 78.6% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 5: I-5 SB Ramp & Ashland Street South Ashland Business Park TPRA G - 24 HCM Signalized Intersection Capacity Analysis 5: I-5 SB Ramp & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2019 PM - Build Conditions Synchro 8 Report Page 15 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)0 948 74 26 313 00001831533 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Total Lost time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.85 1.00 1.00 1.00 0.85 Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot)1699 1458 1662 1699 1588 1458 Flt Permitted 1.00 1.00 0.09 1.00 0.95 1.00 Satd. Flow (perm)1699 1458 158 1699 1588 1458 Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)0 1053 82 29 348 00002031592 RTOR Reduction (vph) 0 0 22 00000000466 Lane Group Flow (vph) 0 1053 60 29 348 00000204126 Heavy Vehicles (%) 0% 3% 2% 0% 3% 0% 0% 0% 0% 5% 0% 2% Turn Type NA Perm pm+pt NA Perm NA Perm Protected Phases 2 1 6 4 Permitted Phases 2 6 4 4 Actuated Green, G (s)71.8 71.8 79.6 79.6 19.9 19.9 Effective Green, g (s)72.3 72.3 80.1 80.1 21.3 21.3 Actuated g/C Ratio 0.66 0.66 0.73 0.73 0.19 0.19 Clearance Time (s)4.5 4.5 4.5 4.5 5.4 5.4 Vehicle Extension (s)4.0 4.0 2.5 4.0 2.5 2.5 Lane Grp Cap (vph)1122 963 167 1243 309 283 v/s Ratio Prot c0.62 0.01 c0.20 v/s Ratio Perm 0.04 0.12 0.13 0.09 v/c Ratio 0.94 0.06 0.17 0.28 0.66 0.44 Uniform Delay, d1 16.6 6.6 17.3 4.9 40.7 38.8 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 14.5 0.0 0.4 0.2 4.7 0.8 Delay (s)31.1 6.6 17.6 5.1 45.4 39.6 Level of Service C A B A D D Approach Delay (s)29.3 6.1 0.0 41.1 Approach LOS C A A D Intersection Summary HCM 2000 Control Delay 29.6 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.86 Actuated Cycle Length (s) 109.4 Sum of lost time (s)12.0 Intersection Capacity Utilization 78.6% ICU Level of Service D Analysis Period (min)15 c Critical Lane Group South Ashland Business Park TPRA G - 25 Lanes, Volumes, Timings 6: I-5 NB Ramp & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2019 PM - Build Conditions Synchro 8 Report Page 17 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)630 501 0 0 296 281 43 0 51 0 0 0 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)212 0 0 160 0 95 0 0 Storage Lanes 1 0 0 1 0 1 0 0 Taper Length (ft)72 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot)1646 1750 0 0 1733 1458 0 1539 1328 0 0 0 Flt Permitted 0.332 0.950 Satd. Flow (perm)575 1750 0 0 1733 1458 0 1539 1328 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)305 73 Link Speed (mph)35 35 45 45 Link Distance (ft)560 889 615 566 Travel Time (s)10.9 17.3 9.3 8.6 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles (%)1% 0% 0% 0% 1% 2% 8% 0% 12% 0% 0% 0% Adj. Flow (vph)685 545 0 0 322 305 47 0 55 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 685 545 0 0 322 305 0 47 55 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)12 12 0 0 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2 2 21133 Detector Template ODOT Left/SideODOT 35 Thru ODOT 35 ThruODOT Right LeftODOT Ramp HSODOT Ramp HS Leading Detector (ft) 78 223 223 143 20 213 213 Trailing Detector (ft)2 107 107 137 0 2 2 Detector 1 Position(ft)2 107 107 137 0 2 2 Detector 1 Size(ft)16 6 6 6 20 16 16 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 72 217 217 107 107 Detector 2 Size(ft)6 6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 0.0 Detector 3 Position(ft)207 207 Detector 3 Size(ft)6 6 Detector 3 Type Cl+Ex Cl+Ex South Ashland Business Park TPRA G - 26 Lanes, Volumes, Timings 6: I-5 NB Ramp & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2019 PM - Build Conditions Synchro 8 Report Page 18 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 3 Channel Detector 3 Extend (s) 0.0 0.0 Turn Type pm+pt NA NA Perm Perm NA Perm Protected Phases 5 2 6 8 Permitted Phases 2 6 8 8 Detector Phase 5 2 66888 Switch Phase Minimum Initial (s) 4.0 9.5 9.5 9.5 6.0 6.0 6.0 Minimum Split (s)13.0 14.0 34.9 34.9 31.8 31.8 31.8 Total Split (s)23.0 58.2 35.2 35.2 31.8 31.8 31.8 Total Split (%)25.6% 64.7%39.1% 39.1% 35.3% 35.3% 35.3% Maximum Green (s) 18.5 53.7 30.7 30.7 26.4 26.4 26.4 Yellow Time (s)4.0 4.0 4.0 4.0 4.7 4.7 4.7 All-Red Time (s)0.5 0.5 0.5 0.5 0.7 0.7 0.7 Lost Time Adjust (s) -0.5 -0.5 -0.5 -0.5 -1.4 -1.4 Total Lost Time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 2.5 4.0 4.0 4.0 2.5 2.5 2.5 Minimum Gap (s)2.0 2.7 2.7 2.7 2.0 2.0 2.0 Time Before Reduce (s) 8.0 10.0 10.0 10.0 8.0 8.0 8.0 Time To Reduce (s)4.0 13.0 13.0 13.0 4.0 4.0 4.0 Recall Mode None Min Min Min None None None Walk Time (s)7.0 5.0 5.0 7.0 7.0 7.0 Flash Dont Walk (s)19.5 25.4 25.4 19.4 19.4 19.4 Pedestrian Calls (#/hr)0 00000 Act Effct Green (s)40.1 41.3 16.2 16.2 8.8 8.8 Actuated g/C Ratio 0.74 0.77 0.30 0.30 0.16 0.16 v/c Ratio 0.84 0.41 0.62 0.47 0.19 0.20 Control Delay 20.2 4.5 22.6 4.8 24.6 6.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 20.2 4.5 22.6 4.8 24.6 6.9 LOS CA CA CA Approach Delay 13.3 13.9 15.0 Approach LOS B B B Intersection Summary Area Type:Other Cycle Length: 90 Actuated Cycle Length: 53.9 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.84 Intersection Signal Delay: 13.6 Intersection LOS: B Intersection Capacity Utilization 78.6% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 6: I-5 NB Ramp & Ashland Street South Ashland Business Park TPRA G - 27 HCM Signalized Intersection Capacity Analysis 6: I-5 NB Ramp & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2019 PM - Build Conditions Synchro 8 Report Page 19 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)630 501 0 0 296 281 43 0 51 0 0 0 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Total Lost time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.85 1.00 0.85 Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00 Satd. Flow (prot)1646 1750 1733 1458 1539 1328 Flt Permitted 0.33 1.00 1.00 1.00 0.95 1.00 Satd. Flow (perm)575 1750 1733 1458 1539 1328 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph)685 545 0 0 322 305 47 0 55 0 0 0 RTOR Reduction (vph)000002140048000 Lane Group Flow (vph) 685 545 0 0 322 91 0 47 7000 Heavy Vehicles (%) 1% 0% 0% 0% 1% 2% 8% 0% 12% 0% 0% 0% Turn Type pm+pt NA NA Perm Perm NA Perm Protected Phases 5 2 6 8 Permitted Phases 2 6 8 8 Actuated Green, G (s) 39.6 39.6 15.9 15.9 5.6 5.6 Effective Green, g (s) 40.1 40.1 16.4 16.4 7.0 7.0 Actuated g/C Ratio 0.73 0.73 0.30 0.30 0.13 0.13 Clearance Time (s)4.5 4.5 4.5 4.5 5.4 5.4 Vehicle Extension (s) 2.5 4.0 4.0 4.0 2.5 2.5 Lane Grp Cap (vph) 801 1273 515 433 195 168 v/s Ratio Prot c0.31 0.31 0.19 v/s Ratio Perm c0.32 0.06 0.03 0.01 v/c Ratio 0.86 0.43 0.63 0.21 0.24 0.04 Uniform Delay, d1 7.0 3.0 16.7 14.5 21.7 21.1 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 8.8 0.3 2.7 0.3 0.5 0.1 Delay (s)15.8 3.3 19.4 14.8 22.1 21.2 Level of Service B A B B C C Approach Delay (s)10.2 17.2 21.6 0.0 Approach LOS B B C A Intersection Summary HCM 2000 Control Delay 13.1 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.81 Actuated Cycle Length (s) 55.1 Sum of lost time (s)12.0 Intersection Capacity Utilization 78.6% ICU Level of Service D Analysis Period (min)15 c Critical Lane Group South Ashland Business Park TPRA G - 28 Lanes, Volumes, Timings 7: Tolman Creek Rd & Independent Way 9/7/2017 South Ashland Business Park 12/1/2016 2019 PM - Build Conditions Synchro 8 Report Page 21 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Volume (vph)30 61 350 13 14 374 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.910 0.995 Flt Protected 0.984 0.998 Satd. Flow (prot)1536 0 1707 0 0 1712 Flt Permitted 0.984 0.998 Satd. Flow (perm)1536 0 1707 0 0 1712 Link Speed (mph)30 25 25 Link Distance (ft)708 1733 696 Travel Time (s)16.1 47.3 19.0 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 Adj. Flow (vph)32 65 372 14 15 398 Shared Lane Traffic (%) Lane Group Flow (vph) 97 0 386 0 0 413 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(ft)12 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Yes Yes Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 9 15 Sign Control Stop Free Free Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 46.2% ICU Level of Service A Analysis Period (min) 15 South Ashland Business Park TPRA G - 29 HCM 2010 TWSC 7: Tolman Creek Rd & Independent Way 9/7/2017 South Ashland Business Park 12/1/2016 2019 PM - Build Conditions Synchro 8 Report Page 22 Intersection Int Delay, s/veh 1.5 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h 30 61 350 13 14 374 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 -- -- - Veh in Median Storage, # 0 -0 -- 0 Grade, %0 -0 -- 0 Peak Hour Factor 94 94 94 94 94 94 Heavy Vehicles, %2 2 2 2 2 2 Mvmt Flow 32 65 372 14 15 398 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 807 379 0 0 386 0 Stage 1 379 -- -- - Stage 2 428 -- -- - Critical Hdwy 6.42 6.22 - - 4.12 - Critical Hdwy Stg 1 5.42 -- -- - Critical Hdwy Stg 2 5.42 -- -- - Follow-up Hdwy 3.518 3.318 - - 2.218 - Pot Cap-1 Maneuver 351 668 - - 1172 - Stage 1 692 -- -- - Stage 2 657 -- -- - Platoon blocked, %- -- Mov Cap-1 Maneuver 345 668 - - 1172 - Mov Cap-2 Maneuver 462 -- -- - Stage 1 692 -- -- - Stage 2 646 -- -- - Approach WB NB SB HCM Control Delay, s 12.4 0 0.3 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h)- - 582 1172 - HCM Lane V/C Ratio - - 0.166 0.013 - HCM Control Delay (s) - - 12.4 8.1 0 HCM Lane LOS - - B A A HCM 95th %tile Q(veh) - - 0.6 0 - South Ashland Business Park TPRA G - 30 Lanes, Volumes, Timings 8: Washington St & Independent Way 9/7/2017 South Ashland Business Park 12/1/2016 2019 PM - Build Conditions Synchro 8 Report Page 23 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Volume (vph)22 14 46 54 34 23 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.947 0.946 Flt Protected 0.971 0.977 Satd. Flow (prot)1609 0 0 1710 1656 0 Flt Permitted 0.971 0.977 Satd. Flow (perm)1609 0 0 1710 1656 0 Link Speed (mph)25 25 25 Link Distance (ft)708 248 696 Travel Time (s)19.3 6.8 19.0 Peak Hour Factor 0.70 0.70 0.70 0.70 0.70 0.70 Heavy Vehicles (%)0% 0% 0% 0% 0% 0% Adj. Flow (vph)31 20 66 77 49 33 Shared Lane Traffic (%) Lane Group Flow (vph) 51 0 0 143 82 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft)12 0 0 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 Sign Control Stop Free Free Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 22.5%ICU Level of Service A Analysis Period (min) 15 South Ashland Business Park TPRA G - 31 HCM 2010 TWSC 8: Washington St & Independent Way 9/7/2017 South Ashland Business Park 12/1/2016 2019 PM - Build Conditions Synchro 8 Report Page 24 Intersection Int Delay, s/veh 3.6 Movement EBL EBR NBL NBT SBT SBR Vol, veh/h 22 14 46 54 34 23 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 -- -- - Veh in Median Storage, # 0 -- 0 0 - Grade, %0 -- 0 0 - Peak Hour Factor 70 70 70 70 70 70 Heavy Vehicles, %0 0 0 0 0 0 Mvmt Flow 31 20 66 77 49 33 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 274 65 81 0 - 0 Stage 1 65 -- -- - Stage 2 209 -- -- - Critical Hdwy 6.4 6.2 4.1 -- - Critical Hdwy Stg 1 5.4 -- -- - Critical Hdwy Stg 2 5.4 -- -- - Follow-up Hdwy 3.5 3.3 2.2 -- - Pot Cap-1 Maneuver 720 1005 1529 -- - Stage 1 963 -- -- - Stage 2 831 -- -- - Platoon blocked, %-- - Mov Cap-1 Maneuver 688 1005 1529 -- - Mov Cap-2 Maneuver 688 -- -- - Stage 1 963 -- -- - Stage 2 794 -- -- - Approach EB NB SB HCM Control Delay, s 9.9 3.4 0 HCM LOS A Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h)1529 - 784 - - HCM Lane V/C Ratio 0.043 - 0.066 - - HCM Control Delay (s) 7.5 0 9.9 - - HCM Lane LOS A A A - - HCM 95th %tile Q(veh) 0.1 - 0.2 - - South Ashland Business Park TPRA G - 32 Lanes, Volumes, Timings 10: Site Driveway & Washington St 9/7/2017 South Ashland Business Park 12/1/2016 2019 PM - Build Conditions Synchro 8 Report Page 27 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Volume (vph)5 20 0 14 54 0 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.891 Flt Protected 0.950 Satd. Flow (prot)1559 0 0 1750 1662 0 Flt Permitted 0.950 Satd. Flow (perm) 1559 0 0 1750 1662 0 Link Speed (mph)25 25 25 Link Distance (ft)405 170 345 Travel Time (s)11.0 4.6 9.4 Peak Hour Factor 0.70 0.70 0.70 0.70 0.70 0.70 Heavy Vehicles (%)0% 0% 0% 0% 0% 0% Adj. Flow (vph)7 29 0 20 77 0 Shared Lane Traffic (%) Lane Group Flow (vph) 36 0 0 20 77 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft)0 0 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph)9 15 15 9 Sign Control Free Free Stop Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 13.3%ICU Level of Service A Analysis Period (min) 15 South Ashland Business Park TPRA G - 33 HCM 2010 TWSC 10: Site Driveway & Washington St 9/7/2017 South Ashland Business Park 12/1/2016 2019 PM - Build Conditions Synchro 8 Report Page 28 Intersection Int Delay, s/veh 5.2 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h 5 20 0 14 54 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - -- -0 - Veh in Median Storage, #0 -- 0 0 - Grade, %0 -- 0 0 - Peak Hour Factor 70 70 70 70 70 70 Heavy Vehicles, %0 0 0 0 0 0 Mvmt Flow 7 29 0 20 77 0 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 36 0 41 21 Stage 1 - -- -21 - Stage 2 - -- -20 - Critical Hdwy - - 4.1 -6.4 6.2 Critical Hdwy Stg 1 - -- -5.4 - Critical Hdwy Stg 2 - -- -5.4 - Follow-up Hdwy - - 2.2 -3.5 3.3 Pot Cap-1 Maneuver - - 1588 -975 1062 Stage 1 - -- -1007 - Stage 2 - -- -1008 - Platoon blocked, %- -- Mov Cap-1 Maneuver - - 1588 -975 1062 Mov Cap-2 Maneuver - -- -975 - Stage 1 - -- -1007 - Stage 2 - -- -1008 - Approach EB WB NB HCM Control Delay, s 0 0 9 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h)975 - - 1588 - HCM Lane V/C Ratio 0.079 ---- HCM Control Delay (s) 9 - - 0 - HCM Lane LOS A - - A - HCM 95th %tile Q(veh) 0.3 - - 0 - South Ashland Business Park TPRA G - 34 SANDOW ENGINEERING AP P E N D I X H : 20 2 3 SY N C H R O O U T P U T South Ashland Business Park  Lanes, Volumes, Timings 3: Tolman Creek Rd & Ashland Street 8/23/2017 South Ashland Business Park 12/1/2016 2023 PM - Background Conditions Synchro 8 Report Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)100 810 72 216 552 68 102 101 198 64 110 63 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)115 0 115 0 87 0 83 0 Storage Lanes 1 0 1 0 1 0 1 0 Taper Length (ft)77 66 87 84 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.988 0.983 0.901 0.946 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot)1646 3255 0 1630 3229 0 1662 1541 0 1662 1645 0 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm)1646 3255 0 1630 3229 0 1662 1541 0 1662 1645 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)9 14 77 21 Link Speed (mph)35 35 25 25 Link Distance (ft)1678 724 696 1812 Travel Time (s)32.7 14.1 19.0 49.4 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%)1% 1% 0% 2% 1% 3% 0% 1% 3% 0% 1% 0% Adj. Flow (vph)105 853 76 227 581 72 107 106 208 67 116 66 Shared Lane Traffic (%) Lane Group Flow (vph) 105 929 0 227 653 0 107 314 0 67 182 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)12 12 12 12 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Yes Yes Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2 2 2 2 2 2 2 2 Detector Template ODOT Left/SideODOT 35 Thru ODOT Left/SideODOT 35 Thru ODOT Left/SideODOT Left/Side ODOT Left/SideODOT Left/Side Leading Detector (ft)78 223 78 223 78 78 78 78 Trailing Detector (ft)2 107 2 107 2 2 2 2 Detector 1 Position(ft)2 107 2 107 2 2 2 2 Detector 1 Size(ft)16 6 16 6 16 16 16 16 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 72 217 72 217 72 72 72 72 Detector 2 Size(ft)6 6 6 6 6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Prot NA Prot NA Prot NA Prot NA Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases South Ashland Business Park TPRA H - 1 Lanes, Volumes, Timings 3: Tolman Creek Rd & Ashland Street 8/23/2017 South Ashland Business Park 12/1/2016 2023 PM - Background Conditions Synchro 8 Report Page 8 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 5 2 1 6 3 8 7 4 Switch Phase Minimum Initial (s)4.0 9.5 4.0 9.5 4.0 6.0 4.0 6.0 Minimum Split (s)13.0 14.0 13.0 14.0 13.0 13.0 13.0 13.0 Total Split (s)19.0 48.0 27.0 56.0 19.0 32.0 13.0 26.0 Total Split (%)15.8% 40.0% 22.5% 46.7% 15.8% 26.7% 10.8% 21.7% Maximum Green (s) 14.5 43.5 22.5 51.5 15.0 28.0 9.0 22.0 Yellow Time (s)4.0 4.0 4.0 4.0 3.5 3.5 3.5 3.5 All-Red Time (s)0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 Lost Time Adjust (s) -0.5 -0.5 -0.5 -0.5 0.0 0.0 0.0 0.0 Total Lost Time (s)4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.5 4.0 2.5 4.0 2.5 2.5 2.5 2.5 Minimum Gap (s)2.0 2.7 2.0 2.7 2.0 2.0 2.0 2.0 Time Before Reduce (s) 8.0 10.0 8.0 10.0 8.0 8.0 8.0 8.0 Time To Reduce (s)4.0 13.0 4.0 13.0 4.0 4.0 4.0 4.0 Recall Mode None Min None Min None None None None Walk Time (s)7.0 7.0 7.0 7.0 Flash Dont Walk (s)16.7 16.0 22.9 23.0 Pedestrian Calls (#/hr)0000 Act Effct Green (s) 11.8 35.3 18.8 46.3 11.4 20.7 8.2 17.9 Actuated g/C Ratio 0.12 0.36 0.19 0.48 0.12 0.21 0.08 0.18 v/c Ratio 0.53 0.78 0.72 0.42 0.55 0.81 0.48 0.57 Control Delay 56.8 34.6 55.1 20.9 58.3 46.5 62.3 43.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 56.8 34.6 55.1 20.9 58.3 46.5 62.3 43.8 LOS EC EC ED ED Approach Delay 36.8 29.7 49.5 48.8 Approach LOS DCDD Intersection Summary Area Type:Other Cycle Length: 120 Actuated Cycle Length: 97.2 Natural Cycle: 75 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.81 Intersection Signal Delay: 37.6 Intersection LOS: D Intersection Capacity Utilization 75.9%ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 3: Tolman Creek Rd & Ashland Street South Ashland Business Park TPRA H - 2 HCM Signalized Intersection Capacity Analysis 3: Tolman Creek Rd & Ashland Street 8/23/2017 South Ashland Business Park 12/1/2016 2023 PM - Background Conditions Synchro 8 Report Page 9 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)100 810 72 216 552 68 102 101 198 64 110 63 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Total Lost time (s)4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00 Frt 1.00 0.99 1.00 0.98 1.00 0.90 1.00 0.95 Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot)1646 3254 1630 3231 1662 1540 1662 1644 Flt Permitted 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (perm)1646 3254 1630 3231 1662 1540 1662 1644 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Adj. Flow (vph)105 853 76 227 581 72 107 106 208 67 116 66 RTOR Reduction (vph)06007006100170 Lane Group Flow (vph) 105 923 0 227 646 0 107 253 0 67 165 0 Heavy Vehicles (%) 1% 1% 0% 2% 1% 3% 0% 1% 3% 0% 1% 0% Turn Type Prot NA Prot NA Prot NA Prot NA Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases Actuated Green, G (s) 9.0 36.5 18.3 45.8 9.1 20.8 6.2 17.9 Effective Green, g (s) 9.5 37.0 18.8 46.3 9.1 20.8 6.2 17.9 Actuated g/C Ratio 0.10 0.37 0.19 0.47 0.09 0.21 0.06 0.18 Clearance Time (s)4.5 4.5 4.5 4.5 4.0 4.0 4.0 4.0 Vehicle Extension (s) 2.5 4.0 2.5 4.0 2.5 2.5 2.5 2.5 Lane Grp Cap (vph) 158 1218 310 1514 153 324 104 297 v/s Ratio Prot 0.06 c0.28 c0.14 0.20 c0.06 c0.16 0.04 0.10 v/s Ratio Perm v/c Ratio 0.66 0.76 0.73 0.43 0.70 0.78 0.64 0.55 Uniform Delay, d1 43.1 27.0 37.6 17.4 43.5 36.9 45.2 36.8 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 9.1 2.9 8.2 0.3 12.1 11.2 11.5 1.8 Delay (s)52.2 29.9 45.8 17.7 55.6 48.1 56.7 38.6 Level of Service D C D B E D E D Approach Delay (s)32.2 24.9 50.0 43.5 Approach LOS CCDD Intersection Summary HCM 2000 Control Delay 33.7 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.77 Actuated Cycle Length (s) 98.8 Sum of lost time (s)16.0 Intersection Capacity Utilization 75.9% ICU Level of Service D Analysis Period (min)15 c Critical Lane Group South Ashland Business Park TPRA H - 3 Lanes, Volumes, Timings 4: Washington St & Ashland Street 8/23/2017 South Ashland Business Park 12/1/2016 2023 PM - Background Conditions Synchro 8 Report Page 11 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Volume (vph)999 14 77 790 6 69 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Storage Length (ft)0 100 0 73 Storage Lanes 0 1 1 1 Taper Length (ft)75 25 Lane Util. Factor 0.95 0.95 1.00 0.95 1.00 1.00 Frt 0.998 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot)3286 0 1662 3260 1662 1488 Flt Permitted 0.950 0.950 Satd. Flow (perm)3286 0 1662 3260 1662 1488 Link Speed (mph)35 35 25 Link Distance (ft)724 413 696 Travel Time (s)14.1 8.0 19.0 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%)1% 0% 0% 2% 0% 0% Adj. Flow (vph)1063 15 82 840 6 73 Shared Lane Traffic (%) Lane Group Flow (vph) 1078 0 82 840 6 73 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft)12 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Yes Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph)9 15 15 9 Sign Control Free Free Stop Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 48.4% ICU Level of Service A Analysis Period (min) 15 South Ashland Business Park TPRA H - 4 HCM 2010 TWSC 4: Washington St & Ashland Street 8/23/2017 South Ashland Business Park 12/1/2016 2023 PM - Background Conditions Synchro 8 Report Page 12 Intersection Int Delay, s/veh 1 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h 999 14 77 790 6 69 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - 100 -0 73 Veh in Median Storage, #0 -- 0 0 - Grade, %0 -- 0 0 - Peak Hour Factor 94 94 94 94 94 94 Heavy Vehicles, %1 0 0 2 0 0 Mvmt Flow 1063 15 82 840 6 73 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 1078 0 1654 539 Stage 1 - -- -1070 - Stage 2 - -- -584 - Critical Hdwy - - 4.1 -6.8 6.9 Critical Hdwy Stg 1 - -- -5.8 - Critical Hdwy Stg 2 - -- -5.8 - Follow-up Hdwy - - 2.2 -3.5 3.3 Pot Cap-1 Maneuver - - 655 -91 492 Stage 1 - -- -295 - Stage 2 - -- -526 - Platoon blocked, %- -- Mov Cap-1 Maneuver - - 655 -80 492 Mov Cap-2 Maneuver - -- -198 - Stage 1 - -- -295 - Stage 2 - -- -460 - Approach EB WB NB HCM Control Delay, s 0 1 14.4 HCM LOS B Minor Lane/Major Mvmt NBLn1NBLn2 EBT EBR WBL WBT Capacity (veh/h)198 492 - - 655 - HCM Lane V/C Ratio 0.032 0.149 - - 0.125 - HCM Control Delay (s) 23.8 13.6 - - 11.3 - HCM Lane LOS C B - - B - HCM 95th %tile Q(veh) 0.1 0.5 - - 0.4 - South Ashland Business Park TPRA H - 5 Lanes, Volumes, Timings 5: I-5 SB Ramp & Ashland Street 8/23/2017 South Ashland Business Park 12/1/2016 2023 PM - Background Conditions Synchro 8 Report Page 13 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)0 1009 74 27 334 00001901546 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)0 0 111 0 0 0 0 200 Storage Lanes 0 1 1 0 0 0 0 1 Taper Length (ft)25 70 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.953 Satd. Flow (prot)0 1699 1458 1662 1699 000001589 1458 Flt Permitted 0.065 0.953 Satd. Flow (perm)0 1699 1458 114 1699 000001589 1458 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)63 544 Link Speed (mph)35 35 45 45 Link Distance (ft)413 560 744 614 Travel Time (s)8.0 10.9 11.3 9.3 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%)0% 3% 2% 0% 3% 0% 0% 0% 0% 5% 0% 2% Adj. Flow (vph)0 1062 78 28 352 00002001575 Shared Lane Traffic (%) Lane Group Flow (vph) 0 1062 78 28 352 00000201575 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)12 12 0 0 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2122 133 Detector Template ODOT 35 ThruODOT RightODOT Left/SideODOT 35 Thru LeftODOT Ramp HSODOT Ramp HS Leading Detector (ft)223 143 78 223 20 213 213 Trailing Detector (ft)107 137 2 107 0 2 2 Detector 1 Position(ft)107 137 2 107 0 2 2 Detector 1 Size(ft)6 6 16 6 20 16 16 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft)217 72 217 107 107 Detector 2 Size(ft)6 6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 0.0 0.0 0.0 0.0 Detector 3 Position(ft)207 207 Detector 3 Size(ft)66 Detector 3 Type Cl+Ex Cl+Ex South Ashland Business Park TPRA H - 6 Lanes, Volumes, Timings 5: I-5 SB Ramp & Ashland Street 8/23/2017 South Ashland Business Park 12/1/2016 2023 PM - Background Conditions Synchro 8 Report Page 14 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 3 Channel Detector 3 Extend (s)0.0 0.0 Turn Type NA Perm pm+pt NA Perm NA Perm Protected Phases 2 1 6 4 Permitted Phases 2 6 4 4 Detector Phase 2216 444 Switch Phase Minimum Initial (s) 10.0 10.0 4.0 4.0 6.0 6.0 6.0 Minimum Split (s)30.6 30.6 21.0 33.2 38.0 38.0 38.0 Total Split (s)61.0 61.0 21.0 82.0 38.0 38.0 38.0 Total Split (%)50.8% 50.8% 17.5% 68.3%31.7% 31.7% 31.7% Maximum Green (s)56.5 56.5 16.5 77.5 32.6 32.6 32.6 Yellow Time (s)4.0 4.0 4.0 4.0 4.7 4.7 4.7 All-Red Time (s)0.5 0.5 0.5 0.5 0.7 0.7 0.7 Lost Time Adjust (s)-0.5 -0.5 -0.5 -0.5 -1.4 -1.4 Total Lost Time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lag Lag Lead Lead-Lag Optimize?Yes Yes Yes Vehicle Extension (s)4.0 4.0 2.5 4.0 2.5 2.5 2.5 Minimum Gap (s)2.7 2.7 2.0 2.7 2.0 2.0 2.0 Time Before Reduce (s)10.0 10.0 8.0 10.0 8.0 8.0 8.0 Time To Reduce (s)13.0 13.0 4.0 13.0 4.0 4.0 4.0 Recall Mode Min Min None Min None None None Walk Time (s)7.0 7.0 7.0 7.0 7.0 7.0 Flash Dont Walk (s)19.1 19.1 21.7 19.0 19.0 19.0 Pedestrian Calls (#/hr)0 0 0 0 0 0 Act Effct Green (s)58.0 58.0 63.7 63.7 20.5 20.5 Actuated g/C Ratio 0.63 0.63 0.69 0.69 0.22 0.22 v/c Ratio 1.00 0.08 0.15 0.30 0.57 0.77 Control Delay 48.1 4.4 8.0 7.5 39.0 11.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 48.1 4.4 8.0 7.5 39.0 11.6 LOS D A A A D B Approach Delay 45.1 7.5 18.7 Approach LOS D A B Intersection Summary Area Type:Other Cycle Length: 120 Actuated Cycle Length: 92.3 Natural Cycle: 150 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.00 Intersection Signal Delay: 30.0 Intersection LOS: C Intersection Capacity Utilization 82.5% ICU Level of Service E Analysis Period (min) 15 Splits and Phases: 5: I-5 SB Ramp & Ashland Street South Ashland Business Park TPRA H - 7 HCM Signalized Intersection Capacity Analysis 5: I-5 SB Ramp & Ashland Street 8/23/2017 South Ashland Business Park 12/1/2016 2023 PM - Background Conditions Synchro 8 Report Page 15 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)0 1009 74 27 334 00001901546 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Total Lost time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.85 1.00 1.00 1.00 0.85 Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot)1699 1458 1662 1699 1588 1458 Flt Permitted 1.00 1.00 0.06 1.00 0.95 1.00 Satd. Flow (perm)1699 1458 113 1699 1588 1458 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Adj. Flow (vph)0 1062 78 28 352 00002001575 RTOR Reduction (vph) 0 0 24 00000000426 Lane Group Flow (vph) 0 1062 54 28 352 00000201149 Heavy Vehicles (%) 0% 3% 2% 0% 3% 0% 0% 0% 0% 5% 0% 2% Turn Type NA Perm pm+pt NA Perm NA Perm Protected Phases 2 1 6 4 Permitted Phases 2 6 4 4 Actuated Green, G (s)57.5 57.5 65.3 65.3 19.0 19.0 Effective Green, g (s)58.0 58.0 65.8 65.8 20.4 20.4 Actuated g/C Ratio 0.62 0.62 0.70 0.70 0.22 0.22 Clearance Time (s)4.5 4.5 4.5 4.5 5.4 5.4 Vehicle Extension (s)4.0 4.0 2.5 4.0 2.5 2.5 Lane Grp Cap (vph)1046 897 141 1186 343 315 v/s Ratio Prot c0.63 0.01 c0.21 v/s Ratio Perm 0.04 0.13 0.13 0.10 v/c Ratio 1.02 0.06 0.20 0.30 0.59 0.47 Uniform Delay, d1 18.1 7.2 19.4 5.4 33.1 32.2 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 31.7 0.0 0.5 0.2 2.1 0.8 Delay (s)49.8 7.3 19.9 5.6 35.2 33.0 Level of Service D A B A D C Approach Delay (s)46.9 6.6 0.0 33.6 Approach LOS D A A C Intersection Summary HCM 2000 Control Delay 35.7 HCM 2000 Level of Service D HCM 2000 Volume to Capacity ratio 0.88 Actuated Cycle Length (s) 94.2 Sum of lost time (s)12.0 Intersection Capacity Utilization 82.5% ICU Level of Service E Analysis Period (min)15 c Critical Lane Group South Ashland Business Park TPRA H - 8 Lanes, Volumes, Timings 6: I-5 NB Ramp & Ashland Street 8/23/2017 South Ashland Business Park 12/1/2016 2023 PM - Background Conditions Synchro 8 Report Page 17 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)655 544 0 0 318 304 43 0 51 0 0 0 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)212 0 0 160 0 95 0 0 Storage Lanes 1 0 0 1 0 1 0 0 Taper Length (ft)72 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot)1646 1750 0 0 1733 1458 0 1539 1328 0 0 0 Flt Permitted 0.276 0.950 Satd. Flow (perm)478 1750 0 0 1733 1458 0 1539 1328 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)293 55 Link Speed (mph)35 35 45 45 Link Distance (ft)560 889 615 566 Travel Time (s)10.9 17.3 9.3 8.6 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%)1% 0% 0% 0% 1% 2% 8% 0% 12% 0% 0% 0% Adj. Flow (vph)689 573 0 0 335 320 45 0 54 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 689 573 0 0 335 320 0 45 54 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)12 12 0 0 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2 2 21133 Detector Template ODOT Left/SideODOT 35 Thru ODOT 35 ThruODOT Right LeftODOT Ramp HSODOT Ramp HS Leading Detector (ft) 78 223 223 143 20 213 213 Trailing Detector (ft)2 107 107 137 0 2 2 Detector 1 Position(ft)2 107 107 137 0 2 2 Detector 1 Size(ft)16 6 6 6 20 16 16 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 72 217 217 107 107 Detector 2 Size(ft)6 6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 0.0 Detector 3 Position(ft)207 207 Detector 3 Size(ft)6 6 Detector 3 Type Cl+Ex Cl+Ex South Ashland Business Park TPRA H - 9 Lanes, Volumes, Timings 6: I-5 NB Ramp & Ashland Street 8/23/2017 South Ashland Business Park 12/1/2016 2023 PM - Background Conditions Synchro 8 Report Page 18 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 3 Channel Detector 3 Extend (s) 0.0 0.0 Turn Type pm+pt NA NA Perm Perm NA Perm Protected Phases 5 2 6 8 Permitted Phases 2 6 8 8 Detector Phase 5 2 66888 Switch Phase Minimum Initial (s) 4.0 9.5 9.5 9.5 6.0 6.0 6.0 Minimum Split (s)13.0 31.0 34.9 34.9 31.8 31.8 31.8 Total Split (s)51.0 88.2 37.2 37.2 31.8 31.8 31.8 Total Split (%)42.5% 73.5%31.0% 31.0% 26.5% 26.5% 26.5% Maximum Green (s) 46.5 83.7 32.7 32.7 26.4 26.4 26.4 Yellow Time (s)4.0 4.0 4.0 4.0 4.7 4.7 4.7 All-Red Time (s)0.5 0.5 0.5 0.5 0.7 0.7 0.7 Lost Time Adjust (s) -0.5 -0.5 -0.5 -0.5 -1.4 -1.4 Total Lost Time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 2.5 4.0 4.0 4.0 2.5 2.5 2.5 Minimum Gap (s)2.0 2.7 2.7 2.7 2.0 2.0 2.0 Time Before Reduce (s) 8.0 10.0 10.0 10.0 8.0 8.0 8.0 Time To Reduce (s)4.0 13.0 13.0 13.0 4.0 4.0 4.0 Recall Mode None Min Min Min None None None Walk Time (s)7.0 5.0 5.0 7.0 7.0 7.0 Flash Dont Walk (s)19.5 25.4 25.4 19.4 19.4 19.4 Pedestrian Calls (#/hr)0 00000 Act Effct Green (s)66.2 67.8 22.1 22.1 10.0 10.0 Actuated g/C Ratio 0.82 0.84 0.27 0.27 0.12 0.12 v/c Ratio 0.71 0.39 0.71 0.52 0.24 0.25 Control Delay 13.6 3.3 38.1 8.1 42.9 14.7 Queue Delay 0.1 0.2 0.0 0.0 0.0 0.0 Total Delay 13.7 3.6 38.1 8.1 42.9 14.7 LOS BA DA DB Approach Delay 9.1 23.5 27.5 Approach LOS A C C Intersection Summary Area Type:Other Cycle Length: 120 Actuated Cycle Length: 80.6 Natural Cycle: 100 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.71 Intersection Signal Delay: 14.7 Intersection LOS: B Intersection Capacity Utilization 82.5% ICU Level of Service E Analysis Period (min) 15 Splits and Phases: 6: I-5 NB Ramp & Ashland Street South Ashland Business Park TPRA H - 10 HCM Signalized Intersection Capacity Analysis 6: I-5 NB Ramp & Ashland Street 8/23/2017 South Ashland Business Park 12/1/2016 2023 PM - Background Conditions Synchro 8 Report Page 19 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)655 544 0 0 318 304 43 0 51 0 0 0 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Total Lost time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.85 1.00 0.85 Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00 Satd. Flow (prot)1646 1750 1733 1458 1539 1328 Flt Permitted 0.28 1.00 1.00 1.00 0.95 1.00 Satd. Flow (perm)478 1750 1733 1458 1539 1328 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Adj. Flow (vph)689 573 0 0 335 320 45 0 54 0 0 0 RTOR Reduction (vph)000002120049000 Lane Group Flow (vph) 689 573 0 0 335 108 0 45 5000 Heavy Vehicles (%) 1% 0% 0% 0% 1% 2% 8% 0% 12% 0% 0% 0% Turn Type pm+pt NA NA Perm Perm NA Perm Protected Phases 5 2 6 8 Permitted Phases 2 6 8 8 Actuated Green, G (s) 65.6 65.6 22.1 22.1 6.0 6.0 Effective Green, g (s) 66.1 66.1 22.6 22.6 7.4 7.4 Actuated g/C Ratio 0.81 0.81 0.28 0.28 0.09 0.09 Clearance Time (s)4.5 4.5 4.5 4.5 5.4 5.4 Vehicle Extension (s) 2.5 4.0 4.0 4.0 2.5 2.5 Lane Grp Cap (vph) 953 1419 480 404 139 120 v/s Ratio Prot c0.35 0.33 0.19 v/s Ratio Perm c0.24 0.07 0.03 0.00 v/c Ratio 0.72 0.40 0.70 0.27 0.32 0.04 Uniform Delay, d1 8.3 2.2 26.4 23.0 34.7 33.8 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 2.6 0.3 4.7 0.5 1.0 0.1 Delay (s)10.9 2.4 31.1 23.5 35.7 33.9 Level of Service B A C C D C Approach Delay (s)7.0 27.4 34.7 0.0 Approach LOS A C C A Intersection Summary HCM 2000 Control Delay 15.0 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.71 Actuated Cycle Length (s) 81.5 Sum of lost time (s)12.0 Intersection Capacity Utilization 82.5% ICU Level of Service E Analysis Period (min)15 c Critical Lane Group South Ashland Business Park TPRA H - 11 Lanes, Volumes, Timings 7: Tolman Creek Rd & Independent Way 8/23/2017 South Ashland Business Park 12/1/2016 2023 PM - Background Conditions Synchro 8 Report Page 21 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Volume (vph)20 47 377 11 12 403 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.906 0.996 Flt Protected 0.985 0.999 Satd. Flow (prot)1531 0 1709 0 0 1714 Flt Permitted 0.985 0.999 Satd. Flow (perm)1531 0 1709 0 0 1714 Link Speed (mph)30 25 25 Link Distance (ft)708 1733 696 Travel Time (s)16.1 47.3 19.0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph)22 51 410 12 13 438 Shared Lane Traffic (%) Lane Group Flow (vph) 73 0 422 0 0 451 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(ft)12 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Yes Yes Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 9 15 Sign Control Stop Free Free Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 44.5% ICU Level of Service A Analysis Period (min) 15 South Ashland Business Park TPRA H - 12 HCM 2010 TWSC 7: Tolman Creek Rd & Independent Way 8/23/2017 South Ashland Business Park 12/1/2016 2023 PM - Background Conditions Synchro 8 Report Page 22 Intersection Int Delay, s/veh 1.1 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h 20 47 377 11 12 403 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 -- -- - Veh in Median Storage, # 0 -0 -- 0 Grade, %0 -0 -- 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, %2 2 2 2 2 2 Mvmt Flow 22 51 410 12 13 438 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 880 416 0 0 422 0 Stage 1 416 -- -- - Stage 2 464 -- -- - Critical Hdwy 6.42 6.22 - - 4.12 - Critical Hdwy Stg 1 5.42 -- -- - Critical Hdwy Stg 2 5.42 -- -- - Follow-up Hdwy 3.518 3.318 - - 2.218 - Pot Cap-1 Maneuver 318 637 - - 1137 - Stage 1 666 -- -- - Stage 2 633 -- -- - Platoon blocked, %- -- Mov Cap-1 Maneuver 313 637 - - 1137 - Mov Cap-2 Maneuver 437 -- -- - Stage 1 666 -- -- - Stage 2 624 -- -- - Approach WB NB SB HCM Control Delay, s 12.4 0 0.2 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h)- - 560 1137 - HCM Lane V/C Ratio - - 0.13 0.011 - HCM Control Delay (s) - - 12.4 8.2 0 HCM Lane LOS - - B A A HCM 95th %tile Q(veh) - - 0.4 0 - South Ashland Business Park TPRA H - 13 Lanes, Volumes, Timings 8: Washington St & Independent Way 8/23/2017 South Ashland Business Park 12/1/2016 2023 PM - Background Conditions Synchro 8 Report Page 23 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Volume (vph)23 9 21 29 21 24 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.961 0.929 Flt Protected 0.966 0.979 Satd. Flow (prot)1593 0 0 1680 1594 0 Flt Permitted 0.966 0.979 Satd. Flow (perm)1593 0 0 1680 1594 0 Link Speed (mph)25 25 25 Link Distance (ft)708 248 696 Travel Time (s)19.3 6.8 19.0 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 Adj. Flow (vph)27 11 25 34 25 28 Shared Lane Traffic (%) Lane Group Flow (vph) 38 0 0 59 53 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft)12 0 0 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 Sign Control Stop Free Free Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 19.6% ICU Level of Service A Analysis Period (min) 15 South Ashland Business Park TPRA H - 14 HCM 2010 TWSC 8: Washington St & Independent Way 8/23/2017 South Ashland Business Park 12/1/2016 2023 PM - Background Conditions Synchro 8 Report Page 24 Intersection Int Delay, s/veh 3.5 Movement EBL EBR NBL NBT SBT SBR Vol, veh/h 23 9 21 29 21 24 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 -- -- - Veh in Median Storage, # 0 -- 0 0 - Grade, %0 -- 0 0 - Peak Hour Factor 85 85 85 85 85 85 Heavy Vehicles, %2 2 2 2 2 2 Mvmt Flow 27 11 25 34 25 28 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 123 39 53 0 - 0 Stage 1 39 -- -- - Stage 2 84 -- -- - Critical Hdwy 6.42 6.22 4.12 -- - Critical Hdwy Stg 1 5.42 -- -- - Critical Hdwy Stg 2 5.42 -- -- - Follow-up Hdwy 3.518 3.318 2.218 -- - Pot Cap-1 Maneuver 872 1033 1553 -- - Stage 1 983 -- -- - Stage 2 939 -- -- - Platoon blocked, %-- - Mov Cap-1 Maneuver 858 1033 1553 -- - Mov Cap-2 Maneuver 858 -- -- - Stage 1 983 -- -- - Stage 2 924 -- -- - Approach EB NB SB HCM Control Delay, s 9.2 3.1 0 HCM LOS A Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h)1553 - 901 - - HCM Lane V/C Ratio 0.016 - 0.042 - - HCM Control Delay (s) 7.4 0 9.2 - - HCM Lane LOS A A A - - HCM 95th %tile Q(veh) 0 - 0.1 - - South Ashland Business Park TPRA H - 15 Lanes, Volumes, Timings 10: Site Driveway & Washington St 8/23/2017 South Ashland Business Park 12/1/2016 2023 PM - Background Conditions Synchro 8 Report Page 27 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Volume (vph)6 0 0 14 0 0 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt Flt Protected Satd. Flow (prot) 1716 0 0 1716 1716 0 Flt Permitted Satd. Flow (perm) 1716 0 0 1716 1716 0 Link Speed (mph)25 25 25 Link Distance (ft)405 170 345 Travel Time (s)11.0 4.6 9.4 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 Adj. Flow (vph)7 0 0 16 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 7 0 0 16 0 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft)0 0 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph)9 15 15 9 Sign Control Free Free Stop Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 6.7% ICU Level of Service A Analysis Period (min) 15 South Ashland Business Park TPRA H - 16 HCM 2010 TWSC 10: Site Driveway & Washington St 8/23/2017 South Ashland Business Park 12/1/2016 2023 PM - Background Conditions Synchro 8 Report Page 28 Intersection Int Delay, s/veh 0 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h 6 0 0 14 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - -- -0 - Veh in Median Storage, #0 -- 0 0 - Grade, %0 -- 0 0 - Peak Hour Factor 85 85 85 85 85 85 Heavy Vehicles, %2 2 2 2 2 2 Mvmt Flow 7 0 0 16 0 0 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 7 0 23 7 Stage 1 - -- -7 - Stage 2 - -- -16 - Critical Hdwy - - 4.12 -6.42 6.22 Critical Hdwy Stg 1 - -- -5.42 - Critical Hdwy Stg 2 - -- -5.42 - Follow-up Hdwy - - 2.218 -3.518 3.318 Pot Cap-1 Maneuver - - 1614 -993 1075 Stage 1 - -- -1016 - Stage 2 - -- -1007 - Platoon blocked, %- -- Mov Cap-1 Maneuver - - 1614 -993 1075 Mov Cap-2 Maneuver - -- -993 - Stage 1 - -- -1016 - Stage 2 - -- -1007 - Approach EB WB NB HCM Control Delay, s 0 0 0 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h)- - - 1614 - HCM Lane V/C Ratio ----- HCM Control Delay (s) 0 - - 0 - HCM Lane LOS A - - A - HCM 95th %tile Q(veh) - - - 0 - South Ashland Business Park TPRA H - 17 Lanes, Volumes, Timings 3: Tolman Creek Rd & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2023 PM - Build Conditions Synchro 8 Report Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)100 816 76 216 552 68 123 104 198 64 111 63 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)115 0 115 0 87 0 83 0 Storage Lanes 1 0 1 0 1 0 1 0 Taper Length (ft)77 66 87 84 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.987 0.983 0.902 0.946 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot)1646 3252 0 1630 3229 0 1662 1543 0 1662 1645 0 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm)1646 3252 0 1630 3229 0 1662 1543 0 1662 1645 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)9 14 75 21 Link Speed (mph)35 35 25 25 Link Distance (ft)1678 724 696 1812 Travel Time (s)32.7 14.1 19.0 49.4 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%)1% 1% 0% 2% 1% 3% 0% 1% 3% 0% 1% 0% Adj. Flow (vph)105 859 80 227 581 72 129 109 208 67 117 66 Shared Lane Traffic (%) Lane Group Flow (vph) 105 939 0 227 653 0 129 317 0 67 183 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)12 12 12 12 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Yes Yes Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2 2 2 2 2 2 2 2 Detector Template ODOT Left/SideODOT 35 Thru ODOT Left/SideODOT 35 Thru ODOT Left/SideODOT Left/Side ODOT Left/SideODOT Left/Side Leading Detector (ft)78 223 78 223 78 78 78 78 Trailing Detector (ft)2 107 2 107 2 2 2 2 Detector 1 Position(ft)2 107 2 107 2 2 2 2 Detector 1 Size(ft)16 6 16 6 16 16 16 16 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 72 217 72 217 72 72 72 72 Detector 2 Size(ft)6 6 6 6 6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Prot NA Prot NA Prot NA Prot NA Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases South Ashland Business Park TPRA H - 18 Lanes, Volumes, Timings 3: Tolman Creek Rd & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2023 PM - Build Conditions Synchro 8 Report Page 8 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 5 2 1 6 3 8 7 4 Switch Phase Minimum Initial (s)4.0 9.5 4.0 9.5 4.0 6.0 4.0 6.0 Minimum Split (s)13.0 14.0 13.0 14.0 13.0 13.0 13.0 13.0 Total Split (s)19.0 48.0 27.0 56.0 20.0 32.0 13.0 25.0 Total Split (%)15.8% 40.0% 22.5% 46.7% 16.7% 26.7% 10.8% 20.8% Maximum Green (s) 14.5 43.5 22.5 51.5 16.0 28.0 9.0 21.0 Yellow Time (s)4.0 4.0 4.0 4.0 3.5 3.5 3.5 3.5 All-Red Time (s)0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 Lost Time Adjust (s) -0.5 -0.5 -0.5 -0.5 0.0 0.0 0.0 0.0 Total Lost Time (s)4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.5 4.0 2.5 4.0 2.5 2.5 2.5 2.5 Minimum Gap (s)2.0 2.7 2.0 2.7 2.0 2.0 2.0 2.0 Time Before Reduce (s) 8.0 10.0 8.0 10.0 8.0 8.0 8.0 8.0 Time To Reduce (s)4.0 13.0 4.0 13.0 4.0 4.0 4.0 4.0 Recall Mode None Min None Min None None None None Walk Time (s)7.0 7.0 7.0 7.0 Flash Dont Walk (s)16.7 16.0 22.9 23.0 Pedestrian Calls (#/hr)0000 Act Effct Green (s) 11.7 35.3 18.7 45.8 12.4 23.6 8.0 16.3 Actuated g/C Ratio 0.12 0.35 0.19 0.46 0.12 0.24 0.08 0.16 v/c Ratio 0.55 0.81 0.74 0.44 0.63 0.75 0.50 0.64 Control Delay 57.9 36.5 57.1 21.3 60.1 42.1 63.9 48.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 57.9 36.5 57.1 21.3 60.1 42.1 63.9 48.2 LOS ED EC ED ED Approach Delay 38.6 30.5 47.3 52.4 Approach LOS DCDD Intersection Summary Area Type:Other Cycle Length: 120 Actuated Cycle Length: 99.7 Natural Cycle: 75 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.81 Intersection Signal Delay: 38.7 Intersection LOS: D Intersection Capacity Utilization 76.4%ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 3: Tolman Creek Rd & Ashland Street South Ashland Business Park TPRA H - 19 HCM Signalized Intersection Capacity Analysis 3: Tolman Creek Rd & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2023 PM - Build Conditions Synchro 8 Report Page 9 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)100 816 76 216 552 68 123 104 198 64 111 63 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Total Lost time (s)4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00 Frt 1.00 0.99 1.00 0.98 1.00 0.90 1.00 0.95 Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot)1646 3253 1630 3231 1662 1542 1662 1645 Flt Permitted 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (perm)1646 3253 1630 3231 1662 1542 1662 1645 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Adj. Flow (vph)105 859 80 227 581 72 129 109 208 67 117 66 RTOR Reduction (vph)06008005800170 Lane Group Flow (vph) 105 933 0 227 645 0 129 259 0 67 166 0 Heavy Vehicles (%) 1% 1% 0% 2% 1% 3% 0% 1% 3% 0% 1% 0% Turn Type Prot NA Prot NA Prot NA Prot NA Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases Actuated Green, G (s) 9.1 36.2 18.2 45.3 12.4 23.6 6.3 17.5 Effective Green, g (s) 9.6 36.7 18.7 45.8 12.4 23.6 6.3 17.5 Actuated g/C Ratio 0.09 0.36 0.18 0.45 0.12 0.23 0.06 0.17 Clearance Time (s)4.5 4.5 4.5 4.5 4.0 4.0 4.0 4.0 Vehicle Extension (s) 2.5 4.0 2.5 4.0 2.5 2.5 2.5 2.5 Lane Grp Cap (vph) 155 1178 300 1460 203 359 103 284 v/s Ratio Prot 0.06 c0.29 c0.14 0.20 c0.08 c0.17 0.04 0.10 v/s Ratio Perm v/c Ratio 0.68 0.79 0.76 0.44 0.64 0.72 0.65 0.58 Uniform Delay, d1 44.4 28.9 39.1 19.0 42.3 35.8 46.4 38.5 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 10.2 3.9 9.9 0.3 5.6 6.6 12.4 2.5 Delay (s)54.5 32.8 49.1 19.3 47.9 42.4 58.8 41.1 Level of Service D C D B D D E D Approach Delay (s)35.0 27.0 44.0 45.8 Approach LOS DCDD Intersection Summary HCM 2000 Control Delay 34.9 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.77 Actuated Cycle Length (s) 101.3 Sum of lost time (s)16.0 Intersection Capacity Utilization 76.4% ICU Level of Service D Analysis Period (min)15 c Critical Lane Group South Ashland Business Park TPRA H - 20 Lanes, Volumes, Timings 4: Washington St & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2023 PM - Build Conditions Synchro 8 Report Page 11 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Volume (vph)999 20 92 790 6 110 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Storage Length (ft)0 100 0 73 Storage Lanes 0 1 1 1 Taper Length (ft)75 25 Lane Util. Factor 0.95 0.95 1.00 0.95 1.00 1.00 Frt 0.997 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot)3283 0 1662 3260 1662 1488 Flt Permitted 0.950 0.950 Satd. Flow (perm)3283 0 1662 3260 1662 1488 Link Speed (mph)35 35 25 Link Distance (ft)724 413 696 Travel Time (s)14.1 8.0 19.0 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%)1% 0% 0% 2% 0% 0% Adj. Flow (vph)1063 21 98 840 6 117 Shared Lane Traffic (%) Lane Group Flow (vph) 1084 0 98 840 6 117 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft)12 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Yes Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph)9 15 15 9 Sign Control Free Free Stop Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 49.5% ICU Level of Service A Analysis Period (min) 15 South Ashland Business Park TPRA H - 21 HCM 2010 TWSC 4: Washington St & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2023 PM - Build Conditions Synchro 8 Report Page 12 Intersection Int Delay, s/veh 1.4 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h 999 20 92 790 6 110 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - 100 -0 73 Veh in Median Storage, #0 -- 0 0 - Grade, %0 -- 0 0 - Peak Hour Factor 94 94 94 94 94 94 Heavy Vehicles, %1 0 0 2 0 0 Mvmt Flow 1063 21 98 840 6 117 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 1084 0 1689 542 Stage 1 - -- -1073 - Stage 2 - -- -616 - Critical Hdwy - - 4.1 -6.8 6.9 Critical Hdwy Stg 1 - -- -5.8 - Critical Hdwy Stg 2 - -- -5.8 - Follow-up Hdwy - - 2.2 -3.5 3.3 Pot Cap-1 Maneuver - - 651 -86 490 Stage 1 - -- -294 - Stage 2 - -- -507 - Platoon blocked, %- -- Mov Cap-1 Maneuver - - 651 -73 490 Mov Cap-2 Maneuver - -- -191 - Stage 1 - -- -294 - Stage 2 - -- -431 - Approach EB WB NB HCM Control Delay, s 0 1.2 15.1 HCM LOS C Minor Lane/Major Mvmt NBLn1NBLn2 EBT EBR WBL WBT Capacity (veh/h)191 490 - - 651 - HCM Lane V/C Ratio 0.033 0.239 - - 0.15 - HCM Control Delay (s) 24.5 14.6 - - 11.5 - HCM Lane LOS C B - - B - HCM 95th %tile Q(veh) 0.1 0.9 - - 0.5 - South Ashland Business Park TPRA H - 22 Lanes, Volumes, Timings 5: I-5 SB Ramp & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2023 PM - Build Conditions Synchro 8 Report Page 13 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)0 1042 82 27 337 00001901558 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)0 0 111 0 0 0 0 200 Storage Lanes 0 1 1 0 0 0 0 1 Taper Length (ft)25 70 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.953 Satd. Flow (prot)0 1699 1458 1662 1699 000001589 1458 Flt Permitted 0.065 0.953 Satd. Flow (perm)0 1699 1458 114 1699 000001589 1458 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)63 541 Link Speed (mph)35 35 45 45 Link Distance (ft)413 560 744 614 Travel Time (s)8.0 10.9 11.3 9.3 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%)0% 3% 2% 0% 3% 0% 0% 0% 0% 5% 0% 2% Adj. Flow (vph)0 1097 86 28 355 00002001587 Shared Lane Traffic (%) Lane Group Flow (vph) 0 1097 86 28 355 00000201587 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)12 12 0 0 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2122 133 Detector Template ODOT 35 ThruODOT RightODOT Left/SideODOT 35 Thru LeftODOT Ramp HSODOT Ramp HS Leading Detector (ft)223 143 78 223 20 213 213 Trailing Detector (ft)107 137 2 107 0 2 2 Detector 1 Position(ft)107 137 2 107 0 2 2 Detector 1 Size(ft)6 6 16 6 20 16 16 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft)217 72 217 107 107 Detector 2 Size(ft)6 6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 0.0 0.0 0.0 0.0 Detector 3 Position(ft)207 207 Detector 3 Size(ft)66 Detector 3 Type Cl+Ex Cl+Ex South Ashland Business Park TPRA H - 23 Lanes, Volumes, Timings 5: I-5 SB Ramp & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2023 PM - Build Conditions Synchro 8 Report Page 14 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 3 Channel Detector 3 Extend (s)0.0 0.0 Turn Type NA Perm pm+pt NA Perm NA Perm Protected Phases 2 1 6 4 Permitted Phases 2 6 4 4 Detector Phase 2216 444 Switch Phase Minimum Initial (s) 10.0 10.0 4.0 4.0 6.0 6.0 6.0 Minimum Split (s)30.6 30.6 21.0 33.2 38.0 38.0 38.0 Total Split (s)61.0 61.0 21.0 82.0 38.0 38.0 38.0 Total Split (%)50.8% 50.8% 17.5% 68.3%31.7% 31.7% 31.7% Maximum Green (s)56.5 56.5 16.5 77.5 32.6 32.6 32.6 Yellow Time (s)4.0 4.0 4.0 4.0 4.7 4.7 4.7 All-Red Time (s)0.5 0.5 0.5 0.5 0.7 0.7 0.7 Lost Time Adjust (s)-0.5 -0.5 -0.5 -0.5 -1.4 -1.4 Total Lost Time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lag Lag Lead Lead-Lag Optimize?Yes Yes Yes Vehicle Extension (s)4.0 4.0 2.5 4.0 2.5 2.5 2.5 Minimum Gap (s)2.7 2.7 2.0 2.7 2.0 2.0 2.0 Time Before Reduce (s)10.0 10.0 8.0 10.0 8.0 8.0 8.0 Time To Reduce (s)13.0 13.0 4.0 13.0 4.0 4.0 4.0 Recall Mode Min Min None Min None None None Walk Time (s)7.0 7.0 7.0 7.0 7.0 7.0 Flash Dont Walk (s)19.1 19.1 21.7 19.0 19.0 19.0 Pedestrian Calls (#/hr)0 0 0 0 0 0 Act Effct Green (s)58.0 58.0 63.7 63.7 20.5 20.5 Actuated g/C Ratio 0.63 0.63 0.69 0.69 0.22 0.22 v/c Ratio 1.03 0.09 0.15 0.30 0.57 0.79 Control Delay 57.0 4.8 8.1 7.5 38.9 12.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 57.0 4.8 8.1 7.5 38.9 12.9 LOS EAAA DB Approach Delay 53.2 7.6 19.5 Approach LOS D A B Intersection Summary Area Type:Other Cycle Length: 120 Actuated Cycle Length: 92.4 Natural Cycle: 150 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.03 Intersection Signal Delay: 34.5 Intersection LOS: C Intersection Capacity Utilization 84.4% ICU Level of Service E Analysis Period (min) 15 Splits and Phases: 5: I-5 SB Ramp & Ashland Street South Ashland Business Park TPRA H - 24 HCM Signalized Intersection Capacity Analysis 5: I-5 SB Ramp & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2023 PM - Build Conditions Synchro 8 Report Page 15 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)0 1042 82 27 337 00001901558 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Total Lost time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.85 1.00 1.00 1.00 0.85 Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot)1699 1458 1662 1699 1588 1458 Flt Permitted 1.00 1.00 0.06 1.00 0.95 1.00 Satd. Flow (perm)1699 1458 113 1699 1588 1458 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Adj. Flow (vph)0 1097 86 28 355 00002001587 RTOR Reduction (vph) 0 0 24 00000000423 Lane Group Flow (vph) 0 1097 62 28 355 00000201164 Heavy Vehicles (%) 0% 3% 2% 0% 3% 0% 0% 0% 0% 5% 0% 2% Turn Type NA Perm pm+pt NA Perm NA Perm Protected Phases 2 1 6 4 Permitted Phases 2 6 4 4 Actuated Green, G (s)57.5 57.5 65.3 65.3 19.1 19.1 Effective Green, g (s)58.0 58.0 65.8 65.8 20.5 20.5 Actuated g/C Ratio 0.62 0.62 0.70 0.70 0.22 0.22 Clearance Time (s)4.5 4.5 4.5 4.5 5.4 5.4 Vehicle Extension (s)4.0 4.0 2.5 4.0 2.5 2.5 Lane Grp Cap (vph)1044 896 141 1185 345 316 v/s Ratio Prot c0.65 0.01 c0.21 v/s Ratio Perm 0.04 0.13 0.13 0.11 v/c Ratio 1.05 0.07 0.20 0.30 0.58 0.52 Uniform Delay, d1 18.1 7.3 21.8 5.4 33.1 32.5 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 42.2 0.0 0.5 0.2 2.1 1.1 Delay (s)60.3 7.3 22.3 5.6 35.1 33.6 Level of Service E A C A D C Approach Delay (s)56.5 6.9 0.0 34.0 Approach LOS E A A C Intersection Summary HCM 2000 Control Delay 40.9 HCM 2000 Level of Service D HCM 2000 Volume to Capacity ratio 0.90 Actuated Cycle Length (s) 94.3 Sum of lost time (s)12.0 Intersection Capacity Utilization 84.4% ICU Level of Service E Analysis Period (min)15 c Critical Lane Group South Ashland Business Park TPRA H - 25 Lanes, Volumes, Timings 6: I-5 NB Ramp & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2023 PM - Build Conditions Synchro 8 Report Page 17 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)687 545 0 0 319 304 45 0 51 0 0 0 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)212 0 0 160 0 95 0 0 Storage Lanes 1 0 0 1 0 1 0 0 Taper Length (ft)72 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot)1646 1750 0 0 1733 1458 0 1539 1328 0 0 0 Flt Permitted 0.266 0.950 Satd. Flow (perm)461 1750 0 0 1733 1458 0 1539 1328 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)289 55 Link Speed (mph)35 35 45 45 Link Distance (ft)560 889 615 566 Travel Time (s)10.9 17.3 9.3 8.6 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%)1% 0% 0% 0% 1% 2% 8% 0% 12% 0% 0% 0% Adj. Flow (vph)723 574 0 0 336 320 47 0 54 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 723 574 0 0 336 320 0 47 54 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)12 12 0 0 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2 2 21133 Detector Template ODOT Left/SideODOT 35 Thru ODOT 35 ThruODOT Right LeftODOT Ramp HSODOT Ramp HS Leading Detector (ft) 78 223 223 143 20 213 213 Trailing Detector (ft)2 107 107 137 0 2 2 Detector 1 Position(ft)2 107 107 137 0 2 2 Detector 1 Size(ft)16 6 6 6 20 16 16 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 72 217 217 107 107 Detector 2 Size(ft)6 6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 0.0 Detector 3 Position(ft)207 207 Detector 3 Size(ft)6 6 Detector 3 Type Cl+Ex Cl+Ex South Ashland Business Park TPRA H - 26 Lanes, Volumes, Timings 6: I-5 NB Ramp & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2023 PM - Build Conditions Synchro 8 Report Page 18 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 3 Channel Detector 3 Extend (s) 0.0 0.0 Turn Type pm+pt NA NA Perm Perm NA Perm Protected Phases 5 2 6 8 Permitted Phases 2 6 8 8 Detector Phase 5 2 66888 Switch Phase Minimum Initial (s) 4.0 9.5 9.5 9.5 6.0 6.0 6.0 Minimum Split (s)13.0 31.0 34.9 34.9 31.8 31.8 31.8 Total Split (s)52.0 88.2 36.2 36.2 31.8 31.8 31.8 Total Split (%)43.3% 73.5%30.2% 30.2% 26.5% 26.5% 26.5% Maximum Green (s) 47.5 83.7 31.7 31.7 26.4 26.4 26.4 Yellow Time (s)4.0 4.0 4.0 4.0 4.7 4.7 4.7 All-Red Time (s)0.5 0.5 0.5 0.5 0.7 0.7 0.7 Lost Time Adjust (s) -0.5 -0.5 -0.5 -0.5 -1.4 -1.4 Total Lost Time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 2.5 4.0 4.0 4.0 2.5 2.5 2.5 Minimum Gap (s)2.0 2.7 2.7 2.7 2.0 2.0 2.0 Time Before Reduce (s) 8.0 10.0 10.0 10.0 8.0 8.0 8.0 Time To Reduce (s)4.0 13.0 13.0 13.0 4.0 4.0 4.0 Recall Mode None Min Min Min None None None Walk Time (s)7.0 5.0 5.0 7.0 7.0 7.0 Flash Dont Walk (s)19.5 25.4 25.4 19.4 19.4 19.4 Pedestrian Calls (#/hr)0 00000 Act Effct Green (s)69.5 71.1 22.7 22.7 10.0 10.0 Actuated g/C Ratio 0.83 0.85 0.27 0.27 0.12 0.12 v/c Ratio 0.74 0.39 0.72 0.53 0.26 0.26 Control Delay 15.2 3.3 39.9 8.6 44.1 14.9 Queue Delay 0.2 0.3 0.0 0.0 0.0 0.0 Total Delay 15.4 3.6 39.9 8.6 44.1 14.9 LOS BA DA DB Approach Delay 10.1 24.6 28.5 Approach LOS B C C Intersection Summary Area Type:Other Cycle Length: 120 Actuated Cycle Length: 84 Natural Cycle: 100 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.74 Intersection Signal Delay: 15.7 Intersection LOS: B Intersection Capacity Utilization 84.4% ICU Level of Service E Analysis Period (min) 15 Splits and Phases: 6: I-5 NB Ramp & Ashland Street South Ashland Business Park TPRA H - 27 HCM Signalized Intersection Capacity Analysis 6: I-5 NB Ramp & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2023 PM - Build Conditions Synchro 8 Report Page 19 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)687 545 0 0 319 304 45 0 51 0 0 0 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Total Lost time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.85 1.00 0.85 Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00 Satd. Flow (prot)1646 1750 1733 1458 1539 1328 Flt Permitted 0.27 1.00 1.00 1.00 0.95 1.00 Satd. Flow (perm)461 1750 1733 1458 1539 1328 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Adj. Flow (vph)723 574 0 0 336 320 47 0 54 0 0 0 RTOR Reduction (vph)000002100049000 Lane Group Flow (vph) 723 574 0 0 336 110 0 47 5000 Heavy Vehicles (%) 1% 0% 0% 0% 1% 2% 8% 0% 12% 0% 0% 0% Turn Type pm+pt NA NA Perm Perm NA Perm Protected Phases 5 2 6 8 Permitted Phases 2 6 8 8 Actuated Green, G (s) 68.9 68.9 22.6 22.6 6.1 6.1 Effective Green, g (s) 69.4 69.4 23.1 23.1 7.5 7.5 Actuated g/C Ratio 0.82 0.82 0.27 0.27 0.09 0.09 Clearance Time (s)4.5 4.5 4.5 4.5 5.4 5.4 Vehicle Extension (s) 2.5 4.0 4.0 4.0 2.5 2.5 Lane Grp Cap (vph) 967 1430 471 396 135 117 v/s Ratio Prot c0.37 0.33 0.19 v/s Ratio Perm c0.24 0.08 0.03 0.00 v/c Ratio 0.75 0.40 0.71 0.28 0.35 0.04 Uniform Delay, d1 9.2 2.1 27.9 24.3 36.4 35.4 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 3.0 0.3 5.4 0.5 1.1 0.1 Delay (s)12.2 2.4 33.3 24.8 37.5 35.5 Level of Service B A C C D D Approach Delay (s)7.8 29.2 36.5 0.0 Approach LOS A C D A Intersection Summary HCM 2000 Control Delay 16.1 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.74 Actuated Cycle Length (s) 84.9 Sum of lost time (s)12.0 Intersection Capacity Utilization 84.4% ICU Level of Service E Analysis Period (min)15 c Critical Lane Group South Ashland Business Park TPRA H - 28 Lanes, Volumes, Timings 7: Tolman Creek Rd & Independent Way 9/7/2017 South Ashland Business Park 12/1/2016 2023 PM - Build Conditions Synchro 8 Report Page 21 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Volume (vph)37 71 377 15 17 403 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.911 0.995 Flt Protected 0.983 0.998 Satd. Flow (prot)1536 0 1707 0 0 1712 Flt Permitted 0.983 0.998 Satd. Flow (perm)1536 0 1707 0 0 1712 Link Speed (mph)30 25 25 Link Distance (ft)708 1733 696 Travel Time (s)16.1 47.3 19.0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph)40 77 410 16 18 438 Shared Lane Traffic (%) Lane Group Flow (vph) 117 0 426 0 0 456 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(ft)12 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Yes Yes Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 9 15 Sign Control Stop Free Free Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 51.6% ICU Level of Service A Analysis Period (min) 15 South Ashland Business Park TPRA H - 29 HCM 2010 TWSC 7: Tolman Creek Rd & Independent Way 9/7/2017 South Ashland Business Park 12/1/2016 2023 PM - Build Conditions Synchro 8 Report Page 22 Intersection Int Delay, s/veh 1.7 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h 37 71 377 15 17 403 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 -- -- - Veh in Median Storage, # 0 -0 -- 0 Grade, %0 -0 -- 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, %2 2 2 2 2 2 Mvmt Flow 40 77 410 16 18 438 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 893 418 0 0 426 0 Stage 1 418 -- -- - Stage 2 475 -- -- - Critical Hdwy 6.42 6.22 - - 4.12 - Critical Hdwy Stg 1 5.42 -- -- - Critical Hdwy Stg 2 5.42 -- -- - Follow-up Hdwy 3.518 3.318 - - 2.218 - Pot Cap-1 Maneuver 312 635 - - 1133 - Stage 1 664 -- -- - Stage 2 626 -- -- - Platoon blocked, %- -- Mov Cap-1 Maneuver 305 635 - - 1133 - Mov Cap-2 Maneuver 430 -- -- - Stage 1 664 -- -- - Stage 2 613 -- -- - Approach WB NB SB HCM Control Delay, s 13.4 0 0.3 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h)- - 546 1133 - HCM Lane V/C Ratio - - 0.215 0.016 - HCM Control Delay (s) - - 13.4 8.2 0 HCM Lane LOS - - B A A HCM 95th %tile Q(veh) - - 0.8 0.1 - South Ashland Business Park TPRA H - 30 Lanes, Volumes, Timings 8: Washington St & Independent Way 9/7/2017 South Ashland Business Park 12/1/2016 2023 PM - Build Conditions Synchro 8 Report Page 23 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Volume (vph)23 18 62 70 42 24 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.941 0.951 Flt Protected 0.973 0.977 Satd. Flow (prot)1571 0 0 1676 1632 0 Flt Permitted 0.973 0.977 Satd. Flow (perm)1571 0 0 1676 1632 0 Link Speed (mph)25 25 25 Link Distance (ft)708 248 696 Travel Time (s)19.3 6.8 19.0 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 Adj. Flow (vph)27 21 73 82 49 28 Shared Lane Traffic (%) Lane Group Flow (vph) 48 0 0 155 77 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft)12 0 0 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 Sign Control Stop Free Free Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 24.4% ICU Level of Service A Analysis Period (min) 15 South Ashland Business Park TPRA H - 31 HCM 2010 TWSC 8: Washington St & Independent Way 9/7/2017 South Ashland Business Park 12/1/2016 2023 PM - Build Conditions Synchro 8 Report Page 24 Intersection Int Delay, s/veh 3.6 Movement EBL EBR NBL NBT SBT SBR Vol, veh/h 23 18 62 70 42 24 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 -- -- - Veh in Median Storage, # 0 -- 0 0 - Grade, %0 -- 0 0 - Peak Hour Factor 85 85 85 85 85 85 Heavy Vehicles, %2 2 2 2 2 2 Mvmt Flow 27 21 73 82 49 28 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 292 64 78 0 - 0 Stage 1 64 -- -- - Stage 2 228 -- -- - Critical Hdwy 6.42 6.22 4.12 -- - Critical Hdwy Stg 1 5.42 -- -- - Critical Hdwy Stg 2 5.42 -- -- - Follow-up Hdwy 3.518 3.318 2.218 -- - Pot Cap-1 Maneuver 699 1000 1520 -- - Stage 1 959 -- -- - Stage 2 810 -- -- - Platoon blocked, %-- - Mov Cap-1 Maneuver 664 1000 1520 -- - Mov Cap-2 Maneuver 664 -- -- - Stage 1 959 -- -- - Stage 2 770 -- -- - Approach EB NB SB HCM Control Delay, s 9.9 3.5 0 HCM LOS A Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h)1520 - 779 - - HCM Lane V/C Ratio 0.048 - 0.062 - - HCM Control Delay (s) 7.5 0 9.9 - - HCM Lane LOS A A A - - HCM 95th %tile Q(veh) 0.2 - 0.2 - - South Ashland Business Park TPRA H - 32 Lanes, Volumes, Timings 10: Site Driveway & Washington St 9/7/2017 South Ashland Business Park 12/1/2016 2023 PM - Build Conditions Synchro 8 Report Page 27 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Volume (vph)6 30 0 14 82 0 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.887 Flt Protected 0.950 Satd. Flow (prot)1522 0 0 1716 1630 0 Flt Permitted 0.950 Satd. Flow (perm) 1522 0 0 1716 1630 0 Link Speed (mph)25 25 25 Link Distance (ft)405 170 345 Travel Time (s)11.0 4.6 9.4 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 Adj. Flow (vph)7 35 0 16 96 0 Shared Lane Traffic (%) Lane Group Flow (vph) 42 0 0 16 96 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft)0 0 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph)9 15 15 9 Sign Control Free Free Stop Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 14.9% ICU Level of Service A Analysis Period (min) 15 South Ashland Business Park TPRA H - 33 HCM 2010 TWSC 10: Site Driveway & Washington St 9/7/2017 South Ashland Business Park 12/1/2016 2023 PM - Build Conditions Synchro 8 Report Page 28 Intersection Int Delay, s/veh 5.7 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h 6 30 0 14 82 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - -- -0 - Veh in Median Storage, #0 -- 0 0 - Grade, %0 -- 0 0 - Peak Hour Factor 85 85 85 85 85 85 Heavy Vehicles, %2 2 2 2 2 2 Mvmt Flow 7 35 0 16 96 0 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 42 0 41 25 Stage 1 - -- -25 - Stage 2 - -- -16 - Critical Hdwy - - 4.12 -6.42 6.22 Critical Hdwy Stg 1 - -- -5.42 - Critical Hdwy Stg 2 - -- -5.42 - Follow-up Hdwy - - 2.218 -3.518 3.318 Pot Cap-1 Maneuver - - 1567 -970 1051 Stage 1 - -- -998 - Stage 2 - -- -1007 - Platoon blocked, %- -- Mov Cap-1 Maneuver - - 1567 -970 1051 Mov Cap-2 Maneuver - -- -970 - Stage 1 - -- -998 - Stage 2 - -- -1007 - Approach EB WB NB HCM Control Delay, s 0 0 9.1 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h)970 - - 1567 - HCM Lane V/C Ratio 0.099 ---- HCM Control Delay (s) 9.1 - - 0 - HCM Lane LOS A - - A - HCM 95th %tile Q(veh) 0.3 - - 0 - South Ashland Business Park TPRA H - 34 SANDOW ENGINEERING AP P E N D I X I : 20 1 7 Q U E U I N G A N A L Y S I S South Ashland Business Park  Queuing and Blocking Report 2017 PM - Existing Conditions 8/7/2017 South Ashland Business Park SimTraffic Report Page 3 Intersection: 3: Tolman Creek Rd & Ashland Street, Interval #1 Movement EB EB EB WB WB WB NB NB SB SB Directions Served L T TR L T TR L TR L TR Maximum Queue (ft) 191 443 400 180 344 292 173 343 134 230 Average Queue (ft) 106 336 271 159 239 197 87 218 67 121 95th Queue (ft)206 481 423 212 382 311 180 367 131 225 Link Distance (ft)1615 1615 596 596 2352 1765 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 115 115 87 83 Storage Blk Time (%)5 47 41 8 7 42 9 24 Queuing Penalty (veh) 22 50 136 21 24 32 18 19 Intersection: 3: Tolman Creek Rd & Ashland Street, Interval #2 Movement EB EB EB WB WB WB NB NB SB SB Directions Served L T TR L T TR L TR L TR Maximum Queue (ft) 192 354 309 180 233 204 155 262 143 190 Average Queue (ft) 89 216 158 120 106 118 60 141 51 88 95th Queue (ft)187 330 275 184 197 189 127 243 107 157 Link Distance (ft)1615 1615 596 596 2352 1765 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 115 115 87 83 Storage Blk Time (%)2 29 12 3 4 22 4 13 Queuing Penalty (veh) 7 23 30 6 9 13 5 7 Intersection: 3: Tolman Creek Rd & Ashland Street, All Intervals Movement EB EB EB WB WB WB NB NB SB SB Directions Served L T TR L T TR L TR L TR Maximum Queue (ft) 192 443 400 180 344 292 173 343 156 240 Average Queue (ft) 93 245 185 130 138 137 67 159 55 96 95th Queue (ft)193 394 335 197 280 237 143 287 114 178 Link Distance (ft)1615 1615 596 596 2352 1765 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 115 115 87 83 Storage Blk Time (%)3 34 19 4 4 27 5 16 Queuing Penalty (veh) 10 30 56 10 13 18 9 10 South Ashland Business Park TPRA I - 1 Queuing and Blocking Report 2017 PM - Existing Conditions 8/7/2017 South Ashland Business Park SimTraffic Report Page 4 Intersection: 4: Washington St & Ashland Street, Interval #1 Movement EB EB WB WB NB NB Directions Served T TR L T L R Maximum Queue (ft) 206 127 95 19 101 75 Average Queue (ft) 42 10 42 3 52 38 95th Queue (ft)198 80 92 29 107 87 Link Distance (ft)596 596 385 816 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft)100 73 Storage Blk Time (%)1081 Queuing Penalty (veh)4041 Intersection: 4: Washington St & Ashland Street, Interval #2 Movement EB EB WB NB NB Directions Served T TR L L R Maximum Queue (ft) 387 170 82 90 75 Average Queue (ft) 42 12 34 31 31 95th Queue (ft)218 117 74 72 65 Link Distance (ft)596 596 816 Upstream Blk Time (%) 0 Queuing Penalty (veh) 0 Storage Bay Dist (ft)100 73 Storage Blk Time (%)0 2 1 Queuing Penalty (veh)1 1 0 Intersection: 4: Washington St & Ashland Street, All Intervals Movement EB EB WB WB NB NB Directions Served T TR L T L R Maximum Queue (ft) 387 191 96 19 110 84 Average Queue (ft) 42 11 36 1 36 33 95th Queue (ft)213 110 79 14 83 71 Link Distance (ft)596 596 385 816 Upstream Blk Time (%) 0 Queuing Penalty (veh) 0 Storage Bay Dist (ft)100 73 Storage Blk Time (%)0031 Queuing Penalty (veh)2010 South Ashland Business Park TPRA I - 2 Queuing and Blocking Report 2017 PM - Existing Conditions 8/7/2017 South Ashland Business Park SimTraffic Report Page 5 Intersection: 5: I-5 SB Ramp & Ashland Street, Interval #1 Movement EB EB WB WB SB SB Directions Served T R L T LT R Maximum Queue (ft) 394 162 37 121 307 280 Average Queue (ft) 224 29 14 63 135 193 95th Queue (ft)426 174 40 129 288 309 Link Distance (ft)385 385 500 556 Upstream Blk Time (%) 3 1 Queuing Penalty (veh) 15 3 Storage Bay Dist (ft)111 200 Storage Blk Time (%)2 4 16 Queuing Penalty (veh)1 21 32 Intersection: 5: I-5 SB Ramp & Ashland Street, Interval #2 Movement EB EB WB WB SB SB Directions Served T R L T LT R Maximum Queue (ft) 403 76 53 140 268 252 Average Queue (ft) 199 8 15 50 103 128 95th Queue (ft)396 52 42 120 218 222 Link Distance (ft)385 385 500 556 Upstream Blk Time (%) 2 Queuing Penalty (veh) 9 Storage Bay Dist (ft)111 200 Storage Blk Time (%)1 1 3 Queuing Penalty (veh)0 3 5 Intersection: 5: I-5 SB Ramp & Ashland Street, All Intervals Movement EB EB WB WB SB SB Directions Served T R L T LT R Maximum Queue (ft) 414 215 54 156 360 284 Average Queue (ft) 205 13 15 53 110 144 95th Queue (ft)404 96 42 123 238 254 Link Distance (ft)385 385 500 556 Upstream Blk Time (%) 2 0 Queuing Penalty (veh) 10 1 Storage Bay Dist (ft)111 200 Storage Blk Time (%)1 1 6 Queuing Penalty (veh)0 8 12 South Ashland Business Park TPRA I - 3 Queuing and Blocking Report 2017 PM - Existing Conditions 8/7/2017 South Ashland Business Park SimTraffic Report Page 6 Intersection: 6: I-5 NB Ramp & Ashland Street, Interval #1 Movement EB EB WB WB NB NB Directions Served L T T R LT R Maximum Queue (ft) 283 416 170 150 64 54 Average Queue (ft) 235 171 88 76 32 30 95th Queue (ft)320 454 153 129 66 55 Link Distance (ft)500 838 568 Upstream Blk Time (%)1 Queuing Penalty (veh)7 Storage Bay Dist (ft) 212 160 95 Storage Blk Time (%) 20 0100 Queuing Penalty (veh) 101 0300 Intersection: 6: I-5 NB Ramp & Ashland Street, Interval #2 Movement EB EB WB WB NB NB Directions Served L T T R LT R Maximum Queue (ft) 284 480 183 121 78 65 Average Queue (ft) 189 110 80 56 23 23 95th Queue (ft)311 374 155 106 60 53 Link Distance (ft)500 838 568 Upstream Blk Time (%)1 Queuing Penalty (veh)7 Storage Bay Dist (ft) 212 160 95 Storage Blk Time (%) 11 0 1 0 0 Queuing Penalty (veh) 52 0 2 0 0 Intersection: 6: I-5 NB Ramp & Ashland Street, All Intervals Movement EB EB WB WB NB NB Directions Served L T T R LT R Maximum Queue (ft) 284 480 192 156 85 69 Average Queue (ft) 200 125 82 61 25 25 95th Queue (ft)318 397 155 114 62 54 Link Distance (ft)500 838 568 Upstream Blk Time (%)1 Queuing Penalty (veh)7 Storage Bay Dist (ft) 212 160 95 Storage Blk Time (%) 13 01000 Queuing Penalty (veh) 65 02000 South Ashland Business Park TPRA I - 4 Queuing and Blocking Report 2017 PM - Existing Conditions 8/7/2017 South Ashland Business Park SimTraffic Report Page 8 Intersection: 10: Site Driveway & Washington St, Interval #1 Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 10: Site Driveway & Washington St, Interval #2 Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 10: Site Driveway & Washington St, All Intervals Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty, Interval #1: 528 Network wide Queuing Penalty, Interval #2: 192 Network wide Queuing Penalty, All Intervals: 276 South Ashland Business Park TPRA I - 5 SANDOW ENGINEERING AP P E N D I X J : 20 1 9 Q U E U I N G A N A L Y S I S South Ashland Business Park  Queuing and Blocking Report 2019 PM - Background Conditions 8/24/2017 South Ashland Business Park SimTraffic Report Page 3 Intersection: 3: Tolman Creek Rd & Ashland Street, Interval #1 Movement EB EB EB WB WB WB NB NB SB SB Directions Served L T TR L T TR L TR L TR Maximum Queue (ft) 191 679 602 181 362 316 174 543 158 262 Average Queue (ft) 133 538 462 171 272 207 133 367 105 149 95th Queue (ft)233 752 689 205 421 325 217 597 178 271 Link Distance (ft)1615 1615 655 655 627 1765 Upstream Blk Time (%)0 Queuing Penalty (veh)0 Storage Bay Dist (ft) 115 115 87 83 Storage Blk Time (%)7 59 48 12 27 63 37 33 Queuing Penalty (veh) 30 65 153 30 93 76 75 25 Intersection: 3: Tolman Creek Rd & Ashland Street, Interval #2 Movement EB EB EB WB WB WB NB NB SB SB Directions Served L T TR L T TR L TR L TR Maximum Queue (ft) 192 527 477 180 295 239 167 502 149 212 Average Queue (ft) 105 265 197 125 128 132 95 197 58 104 95th Queue (ft)212 459 389 189 251 210 176 410 125 189 Link Distance (ft)1615 1615 655 655 627 1765 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 115 115 87 83 Storage Blk Time (%)2 37 18 5 17 31 7 20 Queuing Penalty (veh) 7 31 44 9 44 29 11 11 Intersection: 3: Tolman Creek Rd & Ashland Street, All Intervals Movement EB EB EB WB WB WB NB NB SB SB Directions Served L T TR L T TR L TR L TR Maximum Queue (ft) 192 679 602 181 381 327 174 571 164 264 Average Queue (ft) 112 331 261 136 163 150 104 238 69 115 95th Queue (ft)219 608 536 202 327 254 190 486 146 215 Link Distance (ft)1615 1615 655 655 627 1765 Upstream Blk Time (%)0 Queuing Penalty (veh)0 Storage Bay Dist (ft) 115 115 87 83 Storage Blk Time (%)3 42 25 6 19 39 15 23 Queuing Penalty (veh) 13 39 71 14 57 41 27 15 South Ashland Business Park TPRA J - 1 Queuing and Blocking Report 2019 PM - Background Conditions 8/24/2017 South Ashland Business Park SimTraffic Report Page 4 Intersection: 4: Washington St & Ashland Street, Interval #1 Movement EB EB WB NB NB Directions Served T TR L L R Maximum Queue (ft) 641 568 78 210 92 Average Queue (ft) 391 234 46 101 67 95th Queue (ft)783 695 81 333 116 Link Distance (ft)655 655 615 Upstream Blk Time (%) 3 1 Queuing Penalty (veh) 17 3 Storage Bay Dist (ft)100 73 Storage Blk Time (%)1 43 Queuing Penalty (veh)4 2 Intersection: 4: Washington St & Ashland Street, Interval #2 Movement EB EB WB NB NB Directions Served T TR L L R Maximum Queue (ft) 657 652 104 263 96 Average Queue (ft) 241 108 48 109 62 95th Queue (ft)616 468 89 355 119 Link Distance (ft)655 655 615 Upstream Blk Time (%) 1 0 Queuing Penalty (veh) 5 2 Storage Bay Dist (ft)100 73 Storage Blk Time (%)1 0 40 Queuing Penalty (veh)2 0 2 Intersection: 4: Washington St & Ashland Street, All Intervals Movement EB EB WB NB NB Directions Served T TR L L R Maximum Queue (ft) 670 658 104 263 96 Average Queue (ft) 277 138 48 107 63 95th Queue (ft)671 535 87 350 118 Link Distance (ft)655 655 615 Upstream Blk Time (%) 2 0 Queuing Penalty (veh) 8 2 Storage Bay Dist (ft)100 73 Storage Blk Time (%)1 0 41 Queuing Penalty (veh)3 0 2 South Ashland Business Park TPRA J - 2 Queuing and Blocking Report 2019 PM - Background Conditions 8/24/2017 South Ashland Business Park SimTraffic Report Page 5 Intersection: 5: I-5 SB Ramp & Ashland Street, Interval #1 Movement EB EB WB WB SB SB Directions Served T R L T LT R Maximum Queue (ft) 347 24 53 163 297 278 Average Queue (ft) 320 9 24 76 156 191 95th Queue (ft)386 26 53 172 381 318 Link Distance (ft)327 327 500 556 Upstream Blk Time (%) 16 4 Queuing Penalty (veh) 81 0 Storage Bay Dist (ft)111 200 Storage Blk Time (%)4 1 17 Queuing Penalty (veh)1 7 35 Intersection: 5: I-5 SB Ramp & Ashland Street, Interval #2 Movement EB EB WB WB SB SB Directions Served T R L T LT R Maximum Queue (ft) 357 154 91 232 329 268 Average Queue (ft) 294 14 20 78 122 140 95th Queue (ft)426 88 61 179 241 253 Link Distance (ft)327 327 500 556 Upstream Blk Time (%) 11 0 0 Queuing Penalty (veh) 54 0 0 Storage Bay Dist (ft)111 200 Storage Blk Time (%)0414 Queuing Penalty (veh)0168 Intersection: 5: I-5 SB Ramp & Ashland Street, All Intervals Movement EB EB WB WB SB SB Directions Served T R L T LT R Maximum Queue (ft) 357 156 91 232 341 279 Average Queue (ft) 300 13 21 77 130 152 95th Queue (ft)421 78 59 177 284 274 Link Distance (ft)327 327 500 556 Upstream Blk Time (%) 12 0 1 Queuing Penalty (veh) 61 0 0 Storage Bay Dist (ft)111 200 Storage Blk Time (%)0418 Queuing Penalty (veh)0 1 6 14 South Ashland Business Park TPRA J - 3 Queuing and Blocking Report 2019 PM - Background Conditions 8/24/2017 South Ashland Business Park SimTraffic Report Page 6 Intersection: 6: I-5 NB Ramp & Ashland Street, Interval #1 Movement EB EB WB WB NB NB Directions Served L T T R LT R Maximum Queue (ft) 283 461 144 126 70 69 Average Queue (ft) 246 247 83 69 30 29 95th Queue (ft)339 546 153 131 72 71 Link Distance (ft)500 838 568 Upstream Blk Time (%)1 Queuing Penalty (veh)11 Storage Bay Dist (ft) 212 160 95 Storage Blk Time (%) 25 1000 Queuing Penalty (veh) 135 2100 Intersection: 6: I-5 NB Ramp & Ashland Street, Interval #2 Movement EB EB WB WB NB NB Directions Served L T T R LT R Maximum Queue (ft) 283 486 199 139 69 68 Average Queue (ft) 209 169 82 62 27 24 95th Queue (ft)323 458 156 122 59 54 Link Distance (ft)500 838 568 Upstream Blk Time (%)1 Queuing Penalty (veh)7 Storage Bay Dist (ft) 212 160 95 Storage Blk Time (%) 16 01000 Queuing Penalty (veh) 75 11000 Intersection: 6: I-5 NB Ramp & Ashland Street, All Intervals Movement EB EB WB WB NB NB Directions Served L T T R LT R Maximum Queue (ft) 284 507 206 145 82 78 Average Queue (ft) 218 188 82 64 28 25 95th Queue (ft)331 485 156 124 62 58 Link Distance (ft)500 838 568 Upstream Blk Time (%)1 Queuing Penalty (veh)8 Storage Bay Dist (ft) 212 160 95 Storage Blk Time (%) 18 01000 Queuing Penalty (veh) 90 12000 South Ashland Business Park TPRA J - 4 Queuing and Blocking Report 2019 PM - Background Conditions 8/24/2017 South Ashland Business Park SimTraffic Report Page 7 Intersection: 7: Tolman Creek Rd & Independent Way, Interval #1 Movement WB SB Directions Served LR LT Maximum Queue (ft)56 29 Average Queue (ft)34 5 95th Queue (ft)62 30 Link Distance (ft)646 627 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 7: Tolman Creek Rd & Independent Way, Interval #2 Movement WB SB Directions Served LR LT Maximum Queue (ft)84 96 Average Queue (ft)35 9 95th Queue (ft)69 58 Link Distance (ft)646 627 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 7: Tolman Creek Rd & Independent Way, All Intervals Movement WB SB Directions Served LR LT Maximum Queue (ft)88 96 Average Queue (ft)35 8 95th Queue (ft)67 52 Link Distance (ft)646 627 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) South Ashland Business Park TPRA J - 5 Queuing and Blocking Report 2019 PM - Background Conditions 8/24/2017 South Ashland Business Park SimTraffic Report Page 8 Intersection: 8: Washington St & Independent Way, Interval #1 Movement EB NB Directions Served LR LT Maximum Queue (ft)35 13 Average Queue (ft)24 1 95th Queue (ft)49 11 Link Distance (ft)646 191 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 8: Washington St & Independent Way, Interval #2 Movement EB NB Directions Served LR LT Maximum Queue (ft)35 13 Average Queue (ft)18 1 95th Queue (ft)46 8 Link Distance (ft)646 191 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 8: Washington St & Independent Way, All Intervals Movement EB NB Directions Served LR LT Maximum Queue (ft)35 26 Average Queue (ft)20 1 95th Queue (ft)47 9 Link Distance (ft)646 191 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) South Ashland Business Park TPRA J - 6 Queuing and Blocking Report 2019 PM - Background Conditions 8/24/2017 South Ashland Business Park SimTraffic Report Page 10 Intersection: 10: Site Driveway & Washington St, Interval #1 Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 10: Site Driveway & Washington St, Interval #2 Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 10: Site Driveway & Washington St, All Intervals Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty, Interval #1: 884 Network wide Queuing Penalty, Interval #2: 361 Network wide Queuing Penalty, All Intervals: 492 South Ashland Business Park TPRA J - 7 Queuing and Blocking Report 2019 PM - Build Conditions 9/7/2017 South Ashland Business Park SimTraffic Report Page 3 Intersection: 3: Tolman Creek Rd & Ashland Street, Interval #1 Movement EB EB EB WB WB WB NB NB SB SB Directions Served L T TR L T TR L TR L TR Maximum Queue (ft) 191 484 437 180 320 290 174 489 120 224 Average Queue (ft) 137 361 303 160 228 214 155 372 80 131 95th Queue (ft)229 529 475 210 360 299 204 632 143 228 Link Distance (ft)1615 1615 655 655 627 1765 Upstream Blk Time (%)1 Queuing Penalty (veh)4 Storage Bay Dist (ft) 115 115 87 83 Storage Blk Time (%)6 49 34 16 43 55 16 28 Queuing Penalty (veh) 26 54 111 41 154 76 33 21 Intersection: 3: Tolman Creek Rd & Ashland Street, Interval #2 Movement EB EB EB WB WB WB NB NB SB SB Directions Served L T TR L T TR L TR L TR Maximum Queue (ft) 192 422 376 180 320 246 174 415 152 234 Average Queue (ft) 99 256 181 128 144 142 103 189 61 105 95th Queue (ft)205 390 314 196 283 227 192 345 133 197 Link Distance (ft)1615 1615 655 655 627 1765 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 115 115 87 83 Storage Blk Time (%)4 35 21 5 16 34 6 21 Queuing Penalty (veh) 12 30 51 10 43 36 10 12 Intersection: 3: Tolman Creek Rd & Ashland Street, All Intervals Movement EB EB EB WB WB WB NB NB SB SB Directions Served L T TR L T TR L TR L TR Maximum Queue (ft) 192 508 474 180 357 306 174 489 152 277 Average Queue (ft) 108 281 210 135 164 159 116 233 66 111 95th Queue (ft)215 442 378 204 314 258 205 460 137 206 Link Distance (ft)1615 1615 655 655 627 1765 Upstream Blk Time (%)0 Queuing Penalty (veh)1 Storage Bay Dist (ft) 115 115 87 83 Storage Blk Time (%)4 39 24 8 23 40 9 23 Queuing Penalty (veh) 16 36 66 18 71 46 16 14 South Ashland Business Park TPRA J - 8 Queuing and Blocking Report 2019 PM - Build Conditions 9/7/2017 South Ashland Business Park SimTraffic Report Page 4 Intersection: 4: Washington St & Ashland Street, Interval #1 Movement EB EB WB WB NB NB Directions Served T TR L T L R Maximum Queue (ft) 549 427 86 48 297 98 Average Queue (ft) 280 72 53 7 184 81 95th Queue (ft)590 332 96 54 436 116 Link Distance (ft)655 655 327 615 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft)100 73 Storage Blk Time (%)1 0 0 67 Queuing Penalty (veh)3003 Intersection: 4: Washington St & Ashland Street, Interval #2 Movement EB EB WB WB NB NB Directions Served T TR L T L R Maximum Queue (ft) 601 541 104 77 324 94 Average Queue (ft) 232 81 50 3 170 72 95th Queue (ft)575 373 95 38 515 114 Link Distance (ft)655 655 327 615 Upstream Blk Time (%) 0 0 1 Queuing Penalty (veh) 2 0 1 Storage Bay Dist (ft)100 73 Storage Blk Time (%)2 0 1 46 Queuing Penalty (veh)6012 Intersection: 4: Washington St & Ashland Street, All Intervals Movement EB EB WB WB NB NB Directions Served T TR L T L R Maximum Queue (ft) 601 541 106 77 437 98 Average Queue (ft) 244 78 51 4 174 74 95th Queue (ft)581 363 95 42 498 115 Link Distance (ft)655 655 327 615 Upstream Blk Time (%) 0 0 1 Queuing Penalty (veh) 1 0 0 Storage Bay Dist (ft)100 73 Storage Blk Time (%)1 0 1 51 Queuing Penalty (veh)5013 South Ashland Business Park TPRA J - 9 Queuing and Blocking Report 2019 PM - Build Conditions 9/7/2017 South Ashland Business Park SimTraffic Report Page 5 Intersection: 5: I-5 SB Ramp & Ashland Street, Interval #1 Movement EB EB WB WB SB SB Directions Served T R L T LT R Maximum Queue (ft) 356 134 44 200 430 282 Average Queue (ft) 318 19 19 92 190 208 95th Queue (ft)427 111 47 201 444 323 Link Distance (ft)327 327 500 556 Upstream Blk Time (%) 15 1 3 Queuing Penalty (veh) 81 4 0 Storage Bay Dist (ft)111 200 Storage Blk Time (%)5 6 18 Queuing Penalty (veh)1 37 36 Intersection: 5: I-5 SB Ramp & Ashland Street, Interval #2 Movement EB EB WB WB SB SB Directions Served T R L T LT R Maximum Queue (ft) 358 144 103 175 360 268 Average Queue (ft) 299 18 23 65 131 138 95th Queue (ft)417 86 67 145 303 250 Link Distance (ft)327 327 500 556 Upstream Blk Time (%) 12 0 1 Queuing Penalty (veh) 59 0 0 Storage Bay Dist (ft)111 200 Storage Blk Time (%)0215 Queuing Penalty (veh)0179 Intersection: 5: I-5 SB Ramp & Ashland Street, All Intervals Movement EB EB WB WB SB SB Directions Served T R L T LT R Maximum Queue (ft) 366 150 103 215 430 284 Average Queue (ft) 304 18 22 72 145 155 95th Queue (ft)420 93 63 161 345 278 Link Distance (ft)327 327 500 556 Upstream Blk Time (%) 13 0 1 Queuing Penalty (veh) 65 1 0 Storage Bay Dist (ft)111 200 Storage Blk Time (%)0338 Queuing Penalty (veh)0 1 15 16 South Ashland Business Park TPRA J - 10 Queuing and Blocking Report 2019 PM - Build Conditions 9/7/2017 South Ashland Business Park SimTraffic Report Page 6 Intersection: 6: I-5 NB Ramp & Ashland Street, Interval #1 Movement EB EB WB WB NB NB Directions Served L T T R LT R Maximum Queue (ft) 283 456 175 165 65 68 Average Queue (ft) 236 208 92 78 26 32 95th Queue (ft)320 525 165 143 66 68 Link Distance (ft)500 838 568 Upstream Blk Time (%)2 Queuing Penalty (veh)19 Storage Bay Dist (ft) 212 160 95 Storage Blk Time (%) 21 01100 Queuing Penalty (veh) 117 04300 Intersection: 6: I-5 NB Ramp & Ashland Street, Interval #2 Movement EB EB WB WB NB NB Directions Served L T T R LT R Maximum Queue (ft) 284 503 179 134 69 66 Average Queue (ft) 216 147 86 61 24 24 95th Queue (ft)324 453 157 113 58 52 Link Distance (ft)500 838 568 Upstream Blk Time (%)1 Queuing Penalty (veh)7 Storage Bay Dist (ft) 212 160 95 Storage Blk Time (%) 17 1 0 0 Queuing Penalty (veh) 81 2 0 0 Intersection: 6: I-5 NB Ramp & Ashland Street, All Intervals Movement EB EB WB WB NB NB Directions Served L T T R LT R Maximum Queue (ft) 284 507 224 186 78 80 Average Queue (ft) 221 162 87 65 24 26 95th Queue (ft)325 474 159 122 60 56 Link Distance (ft)500 838 568 Upstream Blk Time (%)1 Queuing Penalty (veh)10 Storage Bay Dist (ft) 212 160 95 Storage Blk Time (%) 18 01000 Queuing Penalty (veh) 90 02100 South Ashland Business Park TPRA J - 11 Queuing and Blocking Report 2019 PM - Build Conditions 9/7/2017 South Ashland Business Park SimTraffic Report Page 7 Intersection: 7: Tolman Creek Rd & Independent Way, Interval #1 Movement WB NB SB Directions Served LR TR LT Maximum Queue (ft)76 24 52 Average Queue (ft)46 4 15 95th Queue (ft)81 37 53 Link Distance (ft)646 1699 627 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 7: Tolman Creek Rd & Independent Way, Interval #2 Movement WB SB Directions Served LR LT Maximum Queue (ft)88 85 Average Queue (ft)43 9 95th Queue (ft)71 51 Link Distance (ft)646 627 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 7: Tolman Creek Rd & Independent Way, All Intervals Movement WB NB SB Directions Served LR TR LT Maximum Queue (ft)94 24 98 Average Queue (ft)43 1 10 95th Queue (ft)74 18 52 Link Distance (ft)646 1699 627 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) South Ashland Business Park TPRA J - 12 Queuing and Blocking Report 2019 PM - Build Conditions 9/7/2017 South Ashland Business Park SimTraffic Report Page 8 Intersection: 8: Washington St & Independent Way, Interval #1 Movement EB NB Directions Served LR LT Maximum Queue (ft)45 21 Average Queue (ft)31 6 95th Queue (ft)55 27 Link Distance (ft)646 191 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 8: Washington St & Independent Way, Interval #2 Movement EB NB Directions Served LR LT Maximum Queue (ft)45 38 Average Queue (ft)22 3 95th Queue (ft)50 19 Link Distance (ft)646 191 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 8: Washington St & Independent Way, All Intervals Movement EB NB Directions Served LR LT Maximum Queue (ft)54 39 Average Queue (ft)24 3 95th Queue (ft)52 21 Link Distance (ft)646 191 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) South Ashland Business Park TPRA J - 13 Queuing and Blocking Report 2019 PM - Build Conditions 9/7/2017 South Ashland Business Park SimTraffic Report Page 10 Intersection: 10: Site Driveway & Washington St, Interval #1 Movement NB Directions Served LR Maximum Queue (ft)40 Average Queue (ft)34 95th Queue (ft)48 Link Distance (ft)316 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 10: Site Driveway & Washington St, Interval #2 Movement NB Directions Served LR Maximum Queue (ft)46 Average Queue (ft)28 95th Queue (ft)52 Link Distance (ft)316 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 10: Site Driveway & Washington St, All Intervals Movement NB Directions Served LR Maximum Queue (ft)51 Average Queue (ft)29 95th Queue (ft)52 Link Distance (ft)316 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty, Interval #1: 853 Network wide Queuing Penalty, Interval #2: 395 Network wide Queuing Penalty, All Intervals: 510 South Ashland Business Park TPRA J - 14 SANDOW ENGINEERING AP P E N D I X K : 20 2 3 Q U E U I N G A N A L Y S I S South Ashland Business Park  Queuing and Blocking Report 2023 PM - Background Conditions 8/24/2017 South Ashland Business Park SimTraffic Report Page 3 Intersection: 3: Tolman Creek Rd & Ashland Street, Interval #1 Movement EB EB EB WB WB WB NB NB SB SB Directions Served L T TR L T TR L TR L TR Maximum Queue (ft) 192 536 450 180 341 181 174 458 112 198 Average Queue (ft) 181 423 302 147 143 149 121 263 59 96 95th Queue (ft)223 577 446 191 206 194 221 442 129 171 Link Distance (ft)1615 1615 655 655 627 1765 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 115 115 87 83 Storage Blk Time (%) 11 63 42 6 3 66 26 11 Queuing Penalty (veh) 48 66 121 13 11 70 47 8 Intersection: 3: Tolman Creek Rd & Ashland Street, Interval #2 Movement EB EB EB WB WB WB NB NB SB SB Directions Served L T TR L T TR L TR L TR Maximum Queue (ft) 192 863 871 180 282 192 174 629 167 304 Average Queue (ft) 141 666 595 123 130 123 124 230 112 140 95th Queue (ft)257 942 895 184 232 196 218 413 182 261 Link Distance (ft)1615 1615 655 655 627 1765 Upstream Blk Time (%)0 Queuing Penalty (veh)2 Storage Bay Dist (ft) 115 115 87 83 Storage Blk Time (%)9 75 23 8 17 51 53 25 Queuing Penalty (veh) 37 74 63 18 51 51 90 16 Intersection: 3: Tolman Creek Rd & Ashland Street, All Intervals Movement EB EB EB WB WB WB NB NB SB SB Directions Served L T TR L T TR L TR L TR Maximum Queue (ft) 192 863 871 180 341 192 174 629 167 304 Average Queue (ft) 151 607 524 129 133 130 123 238 99 130 95th Queue (ft)258 913 865 188 228 199 219 422 179 246 Link Distance (ft)1615 1615 655 655 627 1765 Upstream Blk Time (%)0 Queuing Penalty (veh)2 Storage Bay Dist (ft) 115 115 87 83 Storage Blk Time (%) 10 72 28 8 14 55 46 22 Queuing Penalty (veh) 40 72 78 16 41 56 79 14 South Ashland Business Park TPRA K - 1 Queuing and Blocking Report 2023 PM - Background Conditions 8/24/2017 South Ashland Business Park SimTraffic Report Page 4 Intersection: 4: Washington St & Ashland Street, Interval #1 Movement EB EB WB NB NB Directions Served T TR L L R Maximum Queue (ft) 675 691 74 52 78 Average Queue (ft) 658 606 46 14 58 95th Queue (ft)691 787 85 45 85 Link Distance (ft)655 655 615 Upstream Blk Time (%) 23 18 Queuing Penalty (veh) 130 99 Storage Bay Dist (ft)100 73 Storage Blk Time (%)18 Queuing Penalty (veh)1 Intersection: 4: Washington St & Ashland Street, Interval #2 Movement EB EB WB NB NB Directions Served T TR L L R Maximum Queue (ft) 693 691 94 632 98 Average Queue (ft) 664 637 43 432 86 95th Queue (ft)695 702 83 716 101 Link Distance (ft)655 655 615 Upstream Blk Time (%) 15 6 34 Queuing Penalty (veh) 77 34 17 Storage Bay Dist (ft)100 73 Storage Blk Time (%)2 100 Queuing Penalty (veh)9 6 Intersection: 4: Washington St & Ashland Street, All Intervals Movement EB EB WB NB NB Directions Served T TR L L R Maximum Queue (ft) 693 691 94 632 98 Average Queue (ft) 663 630 44 331 80 95th Queue (ft)695 737 84 717 107 Link Distance (ft)655 655 615 Upstream Blk Time (%) 17 9 26 Queuing Penalty (veh) 90 50 13 Storage Bay Dist (ft)100 73 Storage Blk Time (%)2 79 Queuing Penalty (veh)7 5 South Ashland Business Park TPRA K - 2 Queuing and Blocking Report 2023 PM - Background Conditions 8/24/2017 South Ashland Business Park SimTraffic Report Page 5 Intersection: 5: I-5 SB Ramp & Ashland Street, Interval #1 Movement EB EB WB WB SB SB Directions Served T R L T LT R Maximum Queue (ft) 341 11 46 199 199 295 Average Queue (ft) 335 6 13 96 104 158 95th Queue (ft)345 14 41 199 209 299 Link Distance (ft)327 327 500 556 Upstream Blk Time (%) 27 Queuing Penalty (veh) 151 Storage Bay Dist (ft)111 200 Storage Blk Time (%)7 1 11 Queuing Penalty (veh)2 8 23 Intersection: 5: I-5 SB Ramp & Ashland Street, Interval #2 Movement EB EB WB WB SB SB Directions Served T R L T LT R Maximum Queue (ft) 342 56 46 188 213 219 Average Queue (ft) 332 13 22 57 114 107 95th Queue (ft)341 35 49 149 196 193 Link Distance (ft)327 327 500 556 Upstream Blk Time (%) 21 Queuing Penalty (veh) 111 Storage Bay Dist (ft)111 200 Storage Blk Time (%)2 0 1 Queuing Penalty (veh)1 2 3 Intersection: 5: I-5 SB Ramp & Ashland Street, All Intervals Movement EB EB WB WB SB SB Directions Served T R L T LT R Maximum Queue (ft) 342 56 46 199 213 295 Average Queue (ft) 333 11 20 67 111 119 95th Queue (ft)342 32 48 165 200 227 Link Distance (ft)327 327 500 556 Upstream Blk Time (%) 23 Queuing Penalty (veh) 121 Storage Bay Dist (ft)111 200 Storage Blk Time (%)4 1 4 Queuing Penalty (veh)1 3 8 South Ashland Business Park TPRA K - 3 Queuing and Blocking Report 2023 PM - Background Conditions 8/24/2017 South Ashland Business Park SimTraffic Report Page 6 Intersection: 6: I-5 NB Ramp & Ashland Street, Interval #1 Movement EB EB WB WB NB NB Directions Served L T T R LT R Maximum Queue (ft) 267 125 180 157 45 60 Average Queue (ft) 146 63 144 76 32 22 95th Queue (ft)246 116 190 144 58 58 Link Distance (ft)500 838 568 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 212 160 95 Storage Blk Time (%)2 3 0 Queuing Penalty (veh) 11 10 1 Intersection: 6: I-5 NB Ramp & Ashland Street, Interval #2 Movement EB EB WB WB NB NB Directions Served L T T R LT R Maximum Queue (ft) 283 323 191 201 79 68 Average Queue (ft) 164 55 106 90 21 26 95th Queue (ft)276 202 171 173 62 55 Link Distance (ft)500 838 568 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 212 160 95 Storage Blk Time (%)5 1 2 0 Queuing Penalty (veh) 25 3 7 0 Intersection: 6: I-5 NB Ramp & Ashland Street, All Intervals Movement EB EB WB WB NB NB Directions Served L T T R LT R Maximum Queue (ft) 283 323 191 201 79 68 Average Queue (ft) 160 57 115 86 24 25 95th Queue (ft)270 187 182 166 63 56 Link Distance (ft)500 838 568 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 212 160 95 Storage Blk Time (%)4 1 2 0 Queuing Penalty (veh) 21 4 6 0 South Ashland Business Park TPRA K - 4 Queuing and Blocking Report 2023 PM - Background Conditions 8/24/2017 South Ashland Business Park SimTraffic Report Page 7 Intersection: 7: Tolman Creek Rd & Independent Way, Interval #1 Movement WB SB Directions Served LR LT Maximum Queue (ft)48 31 Average Queue (ft)33 0 95th Queue (ft)43 0 Link Distance (ft)646 627 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 7: Tolman Creek Rd & Independent Way, Interval #2 Movement WB NB SB Directions Served LR TR LT Maximum Queue (ft)55 53 94 Average Queue (ft)21 2 6 95th Queue (ft)50 21 35 Link Distance (ft)646 1699 627 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 7: Tolman Creek Rd & Independent Way, All Intervals Movement WB NB SB Directions Served LR TR LT Maximum Queue (ft)55 53 94 Average Queue (ft)24 2 5 95th Queue (ft)51 18 30 Link Distance (ft)646 1699 627 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) South Ashland Business Park TPRA K - 5 Queuing and Blocking Report 2023 PM - Background Conditions 8/24/2017 South Ashland Business Park SimTraffic Report Page 8 Intersection: 8: Washington St & Independent Way, Interval #1 Movement EB NB Directions Served LR LT Maximum Queue (ft)56 29 Average Queue (ft)30 4 95th Queue (ft)55 21 Link Distance (ft)646 191 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 8: Washington St & Independent Way, Interval #2 Movement EB NB Directions Served LR LT Maximum Queue (ft) 112 191 Average Queue (ft) 42 58 95th Queue (ft)85 197 Link Distance (ft)646 191 Upstream Blk Time (%)24 Queuing Penalty (veh)11 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 8: Washington St & Independent Way, All Intervals Movement EB NB Directions Served LR LT Maximum Queue (ft) 112 191 Average Queue (ft) 39 45 95th Queue (ft)80 172 Link Distance (ft)646 191 Upstream Blk Time (%)18 Queuing Penalty (veh)8 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) South Ashland Business Park TPRA K - 6 Queuing and Blocking Report 2023 PM - Background Conditions 8/24/2017 South Ashland Business Park SimTraffic Report Page 10 Intersection: 10: Site Driveway & Washington St, Interval #1 Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 10: Site Driveway & Washington St, Interval #2 Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 10: Site Driveway & Washington St, All Intervals Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty, Interval #1: 840 Network wide Queuing Penalty, Interval #2: 712 Network wide Queuing Penalty, All Intervals: 741 South Ashland Business Park TPRA K - 7 Queuing and Blocking Report 2023 PM - Build Conditions 9/7/2017 South Ashland Business Park SimTraffic Report Page 3 Intersection: 3: Tolman Creek Rd & Ashland Street, Interval #1 Movement EB EB EB WB WB WB NB NB SB SB Directions Served L T TR L T TR L TR L TR Maximum Queue (ft) 192 477 410 172 191 203 173 299 103 194 Average Queue (ft) 112 360 274 126 115 128 120 192 62 121 95th Queue (ft)220 531 437 188 193 201 198 329 118 200 Link Distance (ft)1615 1615 655 655 627 1765 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 115 115 87 83 Storage Blk Time (%)4 53 24 6 19 33 11 23 Queuing Penalty (veh) 16 56 71 13 61 43 19 15 Intersection: 3: Tolman Creek Rd & Ashland Street, Interval #2 Movement EB EB EB WB WB WB NB NB SB SB Directions Served L T TR L T TR L TR L TR Maximum Queue (ft) 192 670 604 180 307 234 173 406 166 238 Average Queue (ft) 127 363 303 132 144 136 106 183 62 110 95th Queue (ft)238 669 596 196 288 225 189 351 131 200 Link Distance (ft)1615 1615 655 655 627 1765 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 115 115 87 83 Storage Blk Time (%)8 50 24 6 15 34 8 19 Queuing Penalty (veh) 31 49 64 13 45 41 14 12 Intersection: 3: Tolman Creek Rd & Ashland Street, All Intervals Movement EB EB EB WB WB WB NB NB SB SB Directions Served L T TR L T TR L TR L TR Maximum Queue (ft) 192 700 639 180 308 240 174 407 166 238 Average Queue (ft) 124 363 296 130 137 134 109 185 62 113 95th Queue (ft)234 641 564 195 270 220 191 347 128 201 Link Distance (ft)1615 1615 655 655 627 1765 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 115 115 87 83 Storage Blk Time (%)7 51 24 6 16 34 9 20 Queuing Penalty (veh) 27 51 66 13 49 42 15 13 South Ashland Business Park TPRA K - 8 Queuing and Blocking Report 2023 PM - Build Conditions 9/7/2017 South Ashland Business Park SimTraffic Report Page 4 Intersection: 4: Washington St & Ashland Street, Interval #1 Movement EB EB WB NB NB Directions Served T TR L L R Maximum Queue (ft) 686 602 94 563 98 Average Queue (ft) 470 258 56 302 86 95th Queue (ft)830 693 102 573 103 Link Distance (ft)655 655 615 Upstream Blk Time (%) 3 1 7 Queuing Penalty (veh) 15 5 8 Storage Bay Dist (ft)100 73 Storage Blk Time (%)2 93 Queuing Penalty (veh)10 6 Intersection: 4: Washington St & Ashland Street, Interval #2 Movement EB EB WB WB NB NB Directions Served T TR L T L R Maximum Queue (ft) 677 662 102 44 636 98 Average Queue (ft) 470 325 51 3 609 89 95th Queue (ft)809 820 94 32 686 103 Link Distance (ft)655 655 327 615 Upstream Blk Time (%) 5 3 82 Queuing Penalty (veh) 26 18 72 Storage Bay Dist (ft)100 73 Storage Blk Time (%)1 0 100 Queuing Penalty (veh)4 0 6 Intersection: 4: Washington St & Ashland Street, All Intervals Movement EB EB WB WB NB NB Directions Served T TR L T L R Maximum Queue (ft) 688 688 114 44 636 98 Average Queue (ft) 470 308 52 2 535 88 95th Queue (ft)814 792 96 28 798 103 Link Distance (ft)655 655 327 615 Upstream Blk Time (%) 4 3 63 Queuing Penalty (veh) 23 15 56 Storage Bay Dist (ft)100 73 Storage Blk Time (%)1 0 98 Queuing Penalty (veh)6 0 6 South Ashland Business Park TPRA K - 9 Queuing and Blocking Report 2023 PM - Build Conditions 9/7/2017 South Ashland Business Park SimTraffic Report Page 5 Intersection: 5: I-5 SB Ramp & Ashland Street, Interval #1 Movement EB EB WB WB SB SB Directions Served T R L T LT R Maximum Queue (ft) 348 98 41 176 168 227 Average Queue (ft) 334 24 21 80 96 134 95th Queue (ft)349 116 48 186 169 224 Link Distance (ft)327 327 500 556 Upstream Blk Time (%) 22 0 Queuing Penalty (veh) 132 1 Storage Bay Dist (ft)111 200 Storage Blk Time (%)4 2 Queuing Penalty (veh)1 4 Intersection: 5: I-5 SB Ramp & Ashland Street, Interval #2 Movement EB EB WB WB SB SB Directions Served T R L T LT R Maximum Queue (ft) 348 160 71 192 244 274 Average Queue (ft) 333 22 18 69 99 130 95th Queue (ft)350 111 55 177 192 227 Link Distance (ft)327 327 500 556 Upstream Blk Time (%) 22 0 Queuing Penalty (veh) 118 2 Storage Bay Dist (ft)111 200 Storage Blk Time (%)4 0 3 Queuing Penalty (veh)1 0 5 Intersection: 5: I-5 SB Ramp & Ashland Street, All Intervals Movement EB EB WB WB SB SB Directions Served T R L T LT R Maximum Queue (ft) 354 221 71 228 244 289 Average Queue (ft) 334 22 19 71 99 131 95th Queue (ft)350 112 54 180 187 226 Link Distance (ft)327 327 500 556 Upstream Blk Time (%) 22 0 Queuing Penalty (veh) 122 1 Storage Bay Dist (ft)111 200 Storage Blk Time (%)4 0 3 Queuing Penalty (veh)1 0 5 South Ashland Business Park TPRA K - 10 Queuing and Blocking Report 2023 PM - Build Conditions 9/7/2017 South Ashland Business Park SimTraffic Report Page 6 Intersection: 6: I-5 NB Ramp & Ashland Street, Interval #1 Movement EB EB WB WB NB NB Directions Served L T T R LT R Maximum Queue (ft) 241 235 219 194 68 56 Average Queue (ft) 170 82 136 99 25 28 95th Queue (ft)281 276 229 187 64 60 Link Distance (ft)500 838 568 Upstream Blk Time (%)0 Queuing Penalty (veh)1 Storage Bay Dist (ft) 212 160 95 Storage Blk Time (%)5 5 1 0 Queuing Penalty (veh) 28 16 3 0 Intersection: 6: I-5 NB Ramp & Ashland Street, Interval #2 Movement EB EB WB WB NB NB Directions Served L T T R LT R Maximum Queue (ft) 279 219 278 218 94 79 Average Queue (ft) 170 53 123 82 30 26 95th Queue (ft)280 149 230 170 70 57 Link Distance (ft)500 838 568 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 212 160 95 Storage Blk Time (%)4 3100 Queuing Penalty (veh) 24 10 3 0 0 Intersection: 6: I-5 NB Ramp & Ashland Street, All Intervals Movement EB EB WB WB NB NB Directions Served L T T R LT R Maximum Queue (ft) 280 290 295 241 98 80 Average Queue (ft) 170 60 126 86 29 27 95th Queue (ft)280 189 231 175 69 58 Link Distance (ft)500 838 568 Upstream Blk Time (%)0 Queuing Penalty (veh)0 Storage Bay Dist (ft) 212 160 95 Storage Blk Time (%)5 4100 Queuing Penalty (veh) 25 11 3 0 0 South Ashland Business Park TPRA K - 11 Queuing and Blocking Report 2023 PM - Build Conditions 9/7/2017 South Ashland Business Park SimTraffic Report Page 7 Intersection: 7: Tolman Creek Rd & Independent Way, Interval #1 Movement WB SB Directions Served LR LT Maximum Queue (ft)58 44 Average Queue (ft)41 10 95th Queue (ft)59 42 Link Distance (ft)646 627 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 7: Tolman Creek Rd & Independent Way, Interval #2 Movement WB SB Directions Served LR LT Maximum Queue (ft) 126 207 Average Queue (ft) 42 32 95th Queue (ft)89 219 Link Distance (ft)646 627 Upstream Blk Time (%)1 Queuing Penalty (veh)5 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 7: Tolman Creek Rd & Independent Way, All Intervals Movement WB SB Directions Served LR LT Maximum Queue (ft) 126 207 Average Queue (ft) 42 27 95th Queue (ft)84 191 Link Distance (ft)646 627 Upstream Blk Time (%)1 Queuing Penalty (veh)4 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) South Ashland Business Park TPRA K - 12 Queuing and Blocking Report 2023 PM - Build Conditions 9/7/2017 South Ashland Business Park SimTraffic Report Page 8 Intersection: 8: Washington St & Independent Way, Interval #1 Movement EB NB Directions Served LR LT Maximum Queue (ft)40 83 Average Queue (ft)27 15 95th Queue (ft)48 70 Link Distance (ft)646 191 Upstream Blk Time (%)1 Queuing Penalty (veh)1 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 8: Washington St & Independent Way, Interval #2 Movement EB NB Directions Served LR LT Maximum Queue (ft) 484 210 Average Queue (ft) 246 154 95th Queue (ft)544 274 Link Distance (ft)646 191 Upstream Blk Time (%) 3 61 Queuing Penalty (veh) 1 75 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 8: Washington St & Independent Way, All Intervals Movement EB NB Directions Served LR LT Maximum Queue (ft) 484 210 Average Queue (ft) 193 121 95th Queue (ft)495 266 Link Distance (ft)646 191 Upstream Blk Time (%) 2 46 Queuing Penalty (veh) 1 57 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) South Ashland Business Park TPRA K - 13 Queuing and Blocking Report 2023 PM - Build Conditions 9/7/2017 South Ashland Business Park SimTraffic Report Page 10 Intersection: 10: Site Driveway & Washington St, Interval #1 Movement NB Directions Served LR Maximum Queue (ft)61 Average Queue (ft)34 95th Queue (ft)59 Link Distance (ft)316 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 10: Site Driveway & Washington St, Interval #2 Movement WB NB Directions Served LT LR Maximum Queue (ft)36 188 Average Queue (ft)6 64 95th Queue (ft)37 182 Link Distance (ft)146 316 Upstream Blk Time (%)2 Queuing Penalty (veh)0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 10: Site Driveway & Washington St, All Intervals Movement WB NB Directions Served LT LR Maximum Queue (ft)36 193 Average Queue (ft)5 57 95th Queue (ft)32 163 Link Distance (ft)146 316 Upstream Blk Time (%)1 Queuing Penalty (veh)0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty, Interval #1: 547 Network wide Queuing Penalty, Interval #2: 674 Network wide Queuing Penalty, All Intervals: 642 South Ashland Business Park TPRA K - 14  SANDOW ENGINEERING                            AP P E N D I X L : 2 0 3 4 S Y N C H R O A N A L Y S I S South Ashland Business Park  Lanes, Volumes, Timings 1: Walker Ave & Ashland St 8/23/2017 South Ashland Business Park 12/1/2016 2034 PM - Background Conditions Synchro 8 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)142 783 26 77 530 133 8 36 98 162 63 73 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)110 0 110 0 0 0 0 0 Storage Lanes 1 0 1 0 0 0 0 0 Taper Length (ft)70 70 25 25 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.995 0.970 0.907 0.967 Flt Protected 0.950 0.950 0.997 0.973 Satd. Flow (prot)1662 3277 0 1630 3200 0 0 1550 0 0 1647 0 Flt Permitted 0.950 0.950 0.979 0.746 Satd. Flow (perm)1662 3277 0 1630 3200 0 0 1522 0 0 1262 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)3 28 107 16 Link Speed (mph)30 30 25 25 Link Distance (ft)960 649 645 680 Travel Time (s)21.8 14.8 17.6 18.5 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles (%)0% 1% 0% 2% 1% 0% 0% 0% 3% 0% 0% 0% Adj. Flow (vph)154 851 28 84 576 145 9 39 107 176 68 79 Shared Lane Traffic (%) Lane Group Flow (vph) 154 879 0 84 721 0 0 155 0 0 323 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)12 12 0 0 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2 1 2 1 1 2 1 2 Detector Template ODOT Left/SideODOT 30 Thru ODOT Left/SideODOT 30 Thru LeftODOT Left/Side LeftODOT Left/Side Leading Detector (ft)78 183 78 183 20 78 20 78 Trailing Detector (ft)2 177 2 177 0 2 0 2 Detector 1 Position(ft)2 177 2 177 0 2 0 2 Detector 1 Size(ft)16 6 16 6 20 16 20 16 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 72 72 72 72 Detector 2 Size(ft)6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 Turn Type Prot NA Prot NA Perm NA Perm NA Protected Phases 5 2 1 6 8 4 Permitted Phases 8 4 South Ashland Business Park TPRA L - 1 Lanes, Volumes, Timings 1: Walker Ave & Ashland St 8/23/2017 South Ashland Business Park 12/1/2016 2034 PM - Background Conditions Synchro 8 Report Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 5 2 1 6 8 8 4 4 Switch Phase Minimum Initial (s)4.0 10.0 4.0 10.0 4.0 4.0 4.0 4.0 Minimum Split (s)13.0 14.0 13.0 14.0 13.0 13.0 13.0 13.0 Total Split (s)23.0 50.0 17.0 44.0 53.0 53.0 53.0 53.0 Total Split (%)19.2% 41.7% 14.2% 36.7% 44.2% 44.2% 44.2% 44.2% Maximum Green (s) 19.0 46.0 13.0 40.0 49.0 49.0 49.0 49.0 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 2.5 4.0 2.5 4.0 2.5 2.5 2.5 2.5 Minimum Gap (s)2.0 2.7 2.0 2.7 2.0 2.0 2.0 2.0 Time Before Reduce (s) 8.0 10.0 8.0 10.0 8.0 8.0 8.0 8.0 Time To Reduce (s)4.0 13.0 4.0 13.0 4.0 4.0 4.0 4.0 Recall Mode None Min None Min None None None None Walk Time (s)7.0 7.0 7.0 7.0 7.0 7.0 Flash Dont Walk (s)22.2 22.2 13.0 13.0 13.0 13.0 Pedestrian Calls (#/hr)0 0 0 0 0 0 Act Effct Green (s)12.5 27.0 9.3 20.5 25.2 25.2 Actuated g/C Ratio 0.17 0.38 0.13 0.29 0.35 0.35 v/c Ratio 0.53 0.71 0.40 0.77 0.26 0.71 Control Delay 39.5 25.6 41.5 30.3 8.6 30.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 39.5 25.6 41.5 30.3 8.6 30.2 LOS DC DC A C Approach Delay 27.7 31.5 8.6 30.2 Approach LOS C C A C Intersection Summary Area Type:Other Cycle Length: 120 Actuated Cycle Length: 71.6 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.77 Intersection Signal Delay: 28.1 Intersection LOS: C Intersection Capacity Utilization 69.6%ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 1: Walker Ave & Ashland St South Ashland Business Park TPRA L - 2 HCM Signalized Intersection Capacity Analysis 1: Walker Ave & Ashland St 8/23/2017 South Ashland Business Park 12/1/2016 2034 PM - Background Conditions Synchro 8 Report Page 3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)142 783 26 77 530 133 8 36 98 162 63 73 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Total Lost time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 Frt 1.00 1.00 1.00 0.97 0.91 0.97 Flt Protected 0.95 1.00 0.95 1.00 1.00 0.97 Satd. Flow (prot)1662 3277 1630 3199 1550 1647 Flt Permitted 0.95 1.00 0.95 1.00 0.98 0.75 Satd. Flow (perm)1662 3277 1630 3199 1522 1263 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph)154 851 28 84 576 145 9 39 107 176 68 79 RTOR Reduction (vph)020019006900100 Lane Group Flow (vph) 154 877 0 84 702 0 0 86 0 0 313 0 Heavy Vehicles (%) 0% 1% 0% 2% 1% 0% 0% 0% 3% 0% 0% 0% Turn Type Prot NA Prot NA Perm NA Perm NA Protected Phases 5 2 1 6 8 4 Permitted Phases 8 4 Actuated Green, G (s) 12.5 27.0 7.4 21.9 25.2 25.2 Effective Green, g (s) 12.5 27.0 7.4 21.9 25.2 25.2 Actuated g/C Ratio 0.17 0.38 0.10 0.31 0.35 0.35 Clearance Time (s)4.0 4.0 4.0 4.0 4.0 4.0 Vehicle Extension (s) 2.5 4.0 2.5 4.0 2.5 2.5 Lane Grp Cap (vph) 290 1235 168 978 535 444 v/s Ratio Prot c0.09 c0.27 0.05 0.22 v/s Ratio Perm 0.06 c0.25 v/c Ratio 0.53 0.71 0.50 0.72 0.16 0.70 Uniform Delay, d1 26.9 19.0 30.4 22.1 15.9 20.0 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 1.5 2.1 1.7 2.7 0.1 4.7 Delay (s)28.3 21.1 32.1 24.8 16.0 24.6 Level of Service C C C C B C Approach Delay (s)22.1 25.6 16.0 24.6 Approach LOS C C B C Intersection Summary HCM 2000 Control Delay 23.3 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.70 Actuated Cycle Length (s) 71.6 Sum of lost time (s)12.0 Intersection Capacity Utilization 69.6% ICU Level of Service C Analysis Period (min)15 c Critical Lane Group South Ashland Business Park TPRA L - 3 Lanes, Volumes, Timings 2: Normal Ave & Ashland Street 8/23/2017 South Ashland Business Park 12/1/2016 2034 PM - Background Conditions Synchro 8 Report Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)25 915 19 68 776 24 12 5 22 24 3 5 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)180 0 100 0 0 0 0 0 Storage Lanes 1 0 1 0 0 0 0 0 Taper Length (ft)70 60 25 25 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.997 0.995 0.922 0.980 Flt Protected 0.950 0.950 0.985 0.964 Satd. Flow (prot)1662 3283 0 1662 3308 0 0 1589 0 0 1653 0 Flt Permitted 0.950 0.950 0.985 0.964 Satd. Flow (perm)1662 3283 0 1662 3308 0 0 1589 0 0 1653 0 Link Speed (mph)30 30 25 25 Link Distance (ft)734 1448 1568 912 Travel Time (s)16.7 32.9 42.8 24.9 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Heavy Vehicles (%)0% 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Adj. Flow (vph)26 953 20 71 808 25 13 5 23 25 3 5 Shared Lane Traffic (%) Lane Group Flow (vph) 26 973 0 71 833 0 0 40 0 0 33 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)12 12 0 0 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 15 9 15 9 Sign Control Free Free Stop Stop Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 46.4% ICU Level of Service A Analysis Period (min) 15 South Ashland Business Park TPRA L - 4 HCM 2010 TWSC 2: Normal Ave & Ashland Street 8/23/2017 South Ashland Business Park 12/1/2016 2034 PM - Background Conditions Synchro 8 Report Page 6 Intersection Int Delay, s/veh 2.9 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Vol, veh/h 25 915 19 68 776 24 12 5 22 24 3 5 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 180 - - 100 - -- - -- - - Veh in Median Storage, # - 0 -- 0 -- 0 -- 0 - Grade, %- 0 -- 0 -- 0 -- 0 - Peak Hour Factor 96 96 96 96 96 96 96 96 96 96 96 96 Heavy Vehicles, %0 1 0 0 0 0 0 0 0 0 0 0 Mvmt Flow 26 953 20 71 808 25 12 5 23 25 3 5 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 833 0 0 973 0 0 1562 1990 486 1494 1988 417 Stage 1 - - - - - - 1015 1015 - 963 963 - Stage 2 - - -- - - 547 975 - 531 1025 - Critical Hdwy 4.1 - - 4.1 - - 7.5 6.5 6.9 7.5 6.5 6.9 Critical Hdwy Stg 1 - - -- - - 6.5 5.5 - 6.5 5.5 - Critical Hdwy Stg 2 - - -- - - 6.5 5.5 - 6.5 5.5 - Follow-up Hdwy 2.2 - - 2.2 - - 3.5 4 3.3 3.5 4 3.3 Pot Cap-1 Maneuver 809 - - 717 - - 77 61 533 87 62 590 Stage 1 - - -- - - 259 318 - 278 337 - Stage 2 - - -- - - 494 332 - 505 315 - Platoon blocked, %- -- - Mov Cap-1 Maneuver 809 - - 717 - - 66 53 533 70 54 590 Mov Cap-2 Maneuver - - -- - - 66 53 - 70 54 - Stage 1 - - -- - - 251 308 - 269 304 - Stage 2 - - -- - - 437 299 - 460 305 - Approach EB WB NB SB HCM Control Delay, s 0.3 0.8 48.1 80.4 HCM LOS E F Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h)123 809 - - 717 - - 79 HCM Lane V/C Ratio 0.33 0.032 - - 0.099 - - 0.422 HCM Control Delay (s) 48.1 9.6 - - 10.6 - - 80.4 HCM Lane LOS E A - - B - - F HCM 95th %tile Q(veh) 1.3 0.1 - - 0.3 - - 1.7 South Ashland Business Park TPRA L - 5 Lanes, Volumes, Timings 3: Tolman Creek Rd & Ashland Street 8/23/2017 South Ashland Business Park 12/1/2016 2034 PM - Background Conditions Synchro 8 Report Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)125 1016 95 240 617 77 137 116 230 70 121 69 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)115 0 115 0 87 0 83 0 Storage Lanes 1 0 1 0 1 0 1 0 Taper Length (ft)77 66 87 84 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.987 0.983 0.900 0.945 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot)1646 3252 0 1630 3229 0 1662 1539 0 1662 1643 0 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm)1646 3252 0 1630 3229 0 1662 1539 0 1662 1643 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)10 14 76 21 Link Speed (mph)35 35 25 25 Link Distance (ft)1678 724 696 1812 Travel Time (s)32.7 14.1 19.0 49.4 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%)1% 1% 0% 2% 1% 3% 0% 1% 3% 0% 1% 0% Adj. Flow (vph)132 1069 100 253 649 81 144 122 242 74 127 73 Shared Lane Traffic (%) Lane Group Flow (vph) 132 1169 0 253 730 0 144 364 0 74 200 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)12 12 12 12 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Yes Yes Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2 2 2 2 2 2 2 2 Detector Template ODOT Left/SideODOT 35 Thru ODOT Left/SideODOT 35 Thru ODOT Left/SideODOT Left/Side ODOT Left/SideODOT Left/Side Leading Detector (ft)78 223 78 223 78 78 78 78 Trailing Detector (ft)2 107 2 107 2 2 2 2 Detector 1 Position(ft)2 107 2 107 2 2 2 2 Detector 1 Size(ft)16 6 16 6 16 16 16 16 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 72 217 72 217 72 72 72 72 Detector 2 Size(ft)6 6 6 6 6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Prot NA Prot NA Prot NA Prot NA Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases South Ashland Business Park TPRA L - 6 Lanes, Volumes, Timings 3: Tolman Creek Rd & Ashland Street 8/23/2017 South Ashland Business Park 12/1/2016 2034 PM - Background Conditions Synchro 8 Report Page 8 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 5 2 1 6 3 8 7 4 Switch Phase Minimum Initial (s)4.0 9.5 4.0 9.5 4.0 6.0 4.0 6.0 Minimum Split (s)13.0 14.0 13.0 14.0 13.0 13.0 13.0 13.0 Total Split (s)21.0 52.0 25.0 56.0 18.0 30.0 13.0 25.0 Total Split (%)17.5% 43.3% 20.8% 46.7% 15.0% 25.0% 10.8% 20.8% Maximum Green (s) 16.5 47.5 20.5 51.5 14.0 26.0 9.0 21.0 Yellow Time (s)4.0 4.0 4.0 4.0 3.5 3.5 3.5 3.5 All-Red Time (s)0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 Lost Time Adjust (s) -0.5 -0.5 -0.5 -0.5 0.0 0.0 0.0 0.0 Total Lost Time (s)4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.5 4.0 2.5 4.0 2.5 2.5 2.5 2.5 Minimum Gap (s)2.0 2.7 2.0 2.7 2.0 2.0 2.0 2.0 Time Before Reduce (s) 8.0 10.0 8.0 10.0 8.0 8.0 8.0 8.0 Time To Reduce (s)4.0 13.0 4.0 13.0 4.0 4.0 4.0 4.0 Recall Mode None Min None Min None None None None Walk Time (s)7.0 7.0 7.0 7.0 Flash Dont Walk (s)16.7 16.0 22.9 23.0 Pedestrian Calls (#/hr)0000 Act Effct Green (s) 13.8 44.6 20.0 50.8 12.8 25.6 8.3 18.3 Actuated g/C Ratio 0.12 0.40 0.18 0.45 0.11 0.23 0.07 0.16 v/c Ratio 0.65 0.90 0.87 0.50 0.76 0.89 0.61 0.70 Control Delay 64.7 42.6 75.9 23.6 76.1 59.7 74.9 54.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 64.7 42.6 75.9 23.6 76.1 59.7 74.9 54.5 LOS ED EC EE ED Approach Delay 44.8 37.1 64.3 60.0 Approach LOS D D E E Intersection Summary Area Type:Other Cycle Length: 120 Actuated Cycle Length: 112.1 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.90 Intersection Signal Delay: 46.9 Intersection LOS: D Intersection Capacity Utilization 87.7%ICU Level of Service E Analysis Period (min) 15 Splits and Phases: 3: Tolman Creek Rd & Ashland Street South Ashland Business Park TPRA L - 7 HCM Signalized Intersection Capacity Analysis 3: Tolman Creek Rd & Ashland Street 8/23/2017 South Ashland Business Park 12/1/2016 2034 PM - Background Conditions Synchro 8 Report Page 9 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)125 1016 95 240 617 77 137 116 230 70 121 69 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Total Lost time (s)4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00 Frt 1.00 0.99 1.00 0.98 1.00 0.90 1.00 0.95 Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot)1646 3253 1630 3230 1662 1540 1662 1644 Flt Permitted 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (perm)1646 3253 1630 3230 1662 1540 1662 1644 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Adj. Flow (vph)132 1069 100 253 649 81 144 122 242 74 127 73 RTOR Reduction (vph)06008005900170 Lane Group Flow (vph) 132 1163 0 253 722 0 144 305 0 74 183 0 Heavy Vehicles (%) 1% 1% 0% 2% 1% 3% 0% 1% 3% 0% 1% 0% Turn Type Prot NA Prot NA Prot NA Prot NA Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases Actuated Green, G (s) 13.2 44.1 19.5 50.4 12.8 25.6 6.7 19.5 Effective Green, g (s) 13.7 44.6 20.0 50.9 12.8 25.6 6.7 19.5 Actuated g/C Ratio 0.12 0.40 0.18 0.45 0.11 0.23 0.06 0.17 Clearance Time (s)4.5 4.5 4.5 4.5 4.0 4.0 4.0 4.0 Vehicle Extension (s) 2.5 4.0 2.5 4.0 2.5 2.5 2.5 2.5 Lane Grp Cap (vph) 199 1285 288 1456 188 349 98 283 v/s Ratio Prot 0.08 c0.36 c0.16 0.22 c0.09 c0.20 0.04 0.11 v/s Ratio Perm v/c Ratio 0.66 0.91 0.88 0.50 0.77 0.87 0.76 0.65 Uniform Delay, d1 47.4 32.2 45.3 21.9 48.6 42.1 52.3 43.5 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 7.3 9.4 24.5 0.4 16.2 20.7 26.5 4.4 Delay (s)54.7 41.6 69.8 22.3 64.8 62.8 78.8 47.9 Level of Service D D E C E E E D Approach Delay (s)42.9 34.5 63.4 56.2 Approach LOS D C E E Intersection Summary HCM 2000 Control Delay 44.8 HCM 2000 Level of Service D HCM 2000 Volume to Capacity ratio 0.90 Actuated Cycle Length (s) 112.9 Sum of lost time (s)16.0 Intersection Capacity Utilization 87.7% ICU Level of Service E Analysis Period (min)15 c Critical Lane Group South Ashland Business Park TPRA L - 8 Lanes, Volumes, Timings 4: Washington St & Ashland Street 8/23/2017 South Ashland Business Park 12/1/2016 2034 PM - Background Conditions Synchro 8 Report Page 11 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Volume (vph)1239 17 86 855 12 123 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Storage Length (ft)0 100 0 73 Storage Lanes 0 1 1 1 Taper Length (ft)75 25 Lane Util. Factor 0.95 0.95 1.00 0.95 1.00 1.00 Ped Bike Factor Frt 0.998 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot)3286 0 1662 3260 1662 1488 Flt Permitted 0.950 0.950 Satd. Flow (perm)3286 0 1662 3260 1662 1488 Link Speed (mph)35 35 25 Link Distance (ft)724 413 696 Travel Time (s)14.1 8.0 19.0 Confl. Peds. (#/hr)979 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%)1% 0% 0% 2% 0% 0% Adj. Flow (vph)1318 18 91 910 13 131 Shared Lane Traffic (%) Lane Group Flow (vph) 1336 0 91 910 13 131 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft)12 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Yes Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph)9 15 15 9 Sign Control Free Free Stop Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 56.4% ICU Level of Service B Analysis Period (min) 15 South Ashland Business Park TPRA L - 9 HCM 2010 TWSC 4: Washington St & Ashland Street 8/23/2017 South Ashland Business Park 12/1/2016 2034 PM - Background Conditions Synchro 8 Report Page 12 Intersection Int Delay, s/veh 1.9 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h 1239 17 86 855 12 123 Conflicting Peds, #/hr 0 979 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - 100 -0 73 Veh in Median Storage, #0 -- 0 0 - Grade, %0 -- 0 0 - Peak Hour Factor 94 94 94 94 94 94 Heavy Vehicles, %1 0 0 2 0 0 Mvmt Flow 1318 18 91 910 13 131 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 1336 0 1965 668 Stage 1 - -- -1327 - Stage 2 - -- -638 - Critical Hdwy - - 4.1 -6.8 6.9 Critical Hdwy Stg 1 - -- -5.8 - Critical Hdwy Stg 2 - -- -5.8 - Follow-up Hdwy - - 2.2 -3.5 3.3 Pot Cap-1 Maneuver - - 523 -56 405 Stage 1 - -- -216 - Stage 2 - -- -494 - Platoon blocked, %- -- Mov Cap-1 Maneuver - - 523 -~ 9 405 Mov Cap-2 Maneuver - -- -54 - Stage 1 - -- -216 - Stage 2 - -- -75 - Approach EB WB NB HCM Control Delay, s 0 1.2 24.6 HCM LOS C Minor Lane/Major Mvmt NBLn1NBLn2 EBT EBR WBL WBT Capacity (veh/h)54 405 - - 523 - HCM Lane V/C Ratio 0.236 0.323 - - 0.175 - HCM Control Delay (s) 91.2 18.1 - - 13.3 - HCM Lane LOS F C - - B - HCM 95th %tile Q(veh) 0.8 1.4 - - 0.6 - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon South Ashland Business Park TPRA L - 10 Lanes, Volumes, Timings 5: I-5 SB Ramp & Ashland Street 8/23/2017 South Ashland Business Park 12/1/2016 2034 PM - Background Conditions Synchro 8 Report Page 13 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)0 1273 96 29 398 00002091613 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)0 0 111 0 0 0 0 200 Storage Lanes 0 1 1 0 0 0 0 1 Taper Length (ft)25 70 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.953 Satd. Flow (prot)0 1699 1458 1662 1699 000001589 1458 Flt Permitted 0.045 0.953 Satd. Flow (perm)0 1699 1458 79 1699 000001589 1458 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)85 565 Link Speed (mph)35 35 45 45 Link Distance (ft)413 560 744 614 Travel Time (s)8.0 10.9 11.3 9.3 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%)0% 3% 2% 0% 3% 0% 0% 0% 0% 5% 0% 2% Adj. Flow (vph)0 1340 101 31 419 00002201645 Shared Lane Traffic (%) Lane Group Flow (vph) 0 1340 101 31 419 00000221645 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)12 12 0 0 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2122 133 Detector Template ODOT 35 ThruODOT RightODOT Left/SideODOT 35 Thru LeftODOT Ramp HSODOT Ramp HS Leading Detector (ft)223 143 78 223 20 213 213 Trailing Detector (ft)107 137 2 107 0 2 2 Detector 1 Position(ft)107 137 2 107 0 2 2 Detector 1 Size(ft)6 6 16 6 20 16 16 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft)217 72 217 107 107 Detector 2 Size(ft)6 6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 0.0 0.0 0.0 0.0 Detector 3 Position(ft)207 207 Detector 3 Size(ft)66 Detector 3 Type Cl+Ex Cl+Ex South Ashland Business Park TPRA L - 11 Lanes, Volumes, Timings 5: I-5 SB Ramp & Ashland Street 8/23/2017 South Ashland Business Park 12/1/2016 2034 PM - Background Conditions Synchro 8 Report Page 14 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 3 Channel Detector 3 Extend (s)0.0 0.0 Turn Type NA Perm pm+pt NA Perm NA Perm Protected Phases 2 1 6 4 Permitted Phases 2 6 4 4 Detector Phase 2216 444 Switch Phase Minimum Initial (s) 10.0 10.0 4.0 4.0 6.0 6.0 6.0 Minimum Split (s)14.5 14.5 13.0 14.0 13.0 13.0 13.0 Total Split (s)89.0 89.0 13.0 102.0 18.0 18.0 18.0 Total Split (%)74.2% 74.2% 10.8% 85.0%15.0% 15.0% 15.0% Maximum Green (s)84.5 84.5 8.5 97.5 12.6 12.6 12.6 Yellow Time (s)4.0 4.0 4.0 4.0 4.7 4.7 4.7 All-Red Time (s)0.5 0.5 0.5 0.5 0.7 0.7 0.7 Lost Time Adjust (s)-0.5 -0.5 -0.5 -0.5 -1.4 -1.4 Total Lost Time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lag Lag Lead Lead-Lag Optimize?Yes Yes Yes Vehicle Extension (s)4.0 4.0 2.5 4.0 2.5 2.5 2.5 Minimum Gap (s)2.7 2.7 2.0 2.7 2.0 2.0 2.0 Time Before Reduce (s)10.0 10.0 8.0 10.0 8.0 8.0 8.0 Time To Reduce (s)13.0 13.0 4.0 13.0 4.0 4.0 4.0 Recall Mode Min Min None Min None None None Walk Time (s)7.0 7.0 7.0 7.0 7.0 7.0 Flash Dont Walk (s)19.1 19.1 21.7 19.0 19.0 19.0 Pedestrian Calls (#/hr)0 0 0 0 0 0 Act Effct Green (s)85.2 85.2 91.1 91.1 14.0 14.0 Actuated g/C Ratio 0.75 0.75 0.81 0.81 0.12 0.12 v/c Ratio 1.05 0.09 0.21 0.31 1.13 0.96 Control Delay 55.3 1.5 5.4 3.5 147.8 33.8 Queue Delay 0.0 0.0 0.0 0.4 0.0 0.0 Total Delay 55.3 1.5 5.4 3.8 147.8 33.8 LOS EAAA FC Approach Delay 51.6 3.9 62.9 Approach LOS D A E Intersection Summary Area Type:Other Cycle Length: 120 Actuated Cycle Length: 113.1 Natural Cycle: 150 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.13 Intersection Signal Delay: 47.3 Intersection LOS: D Intersection Capacity Utilization 98.7% ICU Level of Service F Analysis Period (min) 15 Splits and Phases: 5: I-5 SB Ramp & Ashland Street South Ashland Business Park TPRA L - 12 HCM Signalized Intersection Capacity Analysis 5: I-5 SB Ramp & Ashland Street 8/23/2017 South Ashland Business Park 12/1/2016 2034 PM - Background Conditions Synchro 8 Report Page 15 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)0 1273 96 29 398 00002091613 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Total Lost time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.85 1.00 1.00 1.00 0.85 Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot)1699 1458 1662 1699 1588 1458 Flt Permitted 1.00 1.00 0.04 1.00 0.95 1.00 Satd. Flow (perm)1699 1458 78 1699 1588 1458 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Adj. Flow (vph)0 1340 101 31 419 00002201645 RTOR Reduction (vph) 0 0 22 00000000496 Lane Group Flow (vph) 0 1340 79 31 419 00000221149 Heavy Vehicles (%) 0% 3% 2% 0% 3% 0% 0% 0% 0% 5% 0% 2% Turn Type NA Perm pm+pt NA Perm NA Perm Protected Phases 2 1 6 4 Permitted Phases 2 6 4 4 Actuated Green, G (s)84.7 84.7 92.5 92.5 12.6 12.6 Effective Green, g (s)85.2 85.2 93.0 93.0 14.0 14.0 Actuated g/C Ratio 0.74 0.74 0.81 0.81 0.12 0.12 Clearance Time (s)4.5 4.5 4.5 4.5 5.4 5.4 Vehicle Extension (s)4.0 4.0 2.5 4.0 2.5 2.5 Lane Grp Cap (vph)1258 1080 115 1373 193 177 v/s Ratio Prot c0.79 0.01 c0.25 v/s Ratio Perm 0.05 0.21 0.14 0.10 v/c Ratio 1.07 0.07 0.27 0.31 1.15 0.84 Uniform Delay, d1 14.9 4.1 34.3 2.8 50.5 49.4 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 44.7 0.0 0.9 0.2 109.3 28.2 Delay (s)59.6 4.1 35.2 3.0 159.8 77.6 Level of Service E A D A F E Approach Delay (s)55.7 5.2 0.0 98.6 Approach LOS E A A F Intersection Summary HCM 2000 Control Delay 60.9 HCM 2000 Level of Service E HCM 2000 Volume to Capacity ratio 1.05 Actuated Cycle Length (s) 115.0 Sum of lost time (s)12.0 Intersection Capacity Utilization 98.7% ICU Level of Service F Analysis Period (min)15 c Critical Lane Group South Ashland Business Park TPRA L - 13 Lanes, Volumes, Timings 6: I-5 NB Ramp & Ashland Street 8/23/2017 South Ashland Business Park 12/1/2016 2034 PM - Background Conditions Synchro 8 Report Page 17 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)829 653 0 0 380 367 47 0 51 0 0 0 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)212 0 0 160 0 95 0 0 Storage Lanes 1 0 0 1 0 1 0 0 Taper Length (ft)72 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot)1646 1750 0 0 1733 1458 0 1539 1328 0 0 0 Flt Permitted 0.197 0.950 Satd. Flow (perm)341 1750 0 0 1733 1458 0 1539 1328 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)293 55 Link Speed (mph)35 35 45 45 Link Distance (ft)560 889 615 566 Travel Time (s)10.9 17.3 9.3 8.6 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%)1% 0% 0% 0% 1% 2% 8% 0% 12% 0% 0% 0% Adj. Flow (vph)873 687 0 0 400 386 49 0 54 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 873 687 0 0 400 386 0 49 54 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)12 12 0 0 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2 2 21133 Detector Template ODOT Left/SideODOT 35 Thru ODOT 35 ThruODOT Right LeftODOT Ramp HSODOT Ramp HS Leading Detector (ft) 78 223 223 143 20 213 213 Trailing Detector (ft)2 107 107 137 0 2 2 Detector 1 Position(ft)2 107 107 137 0 2 2 Detector 1 Size(ft)16 6 6 6 20 16 16 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 72 217 217 107 107 Detector 2 Size(ft)6 6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 0.0 Detector 3 Position(ft)207 207 Detector 3 Size(ft)6 6 Detector 3 Type Cl+Ex Cl+Ex South Ashland Business Park TPRA L - 14 Lanes, Volumes, Timings 6: I-5 NB Ramp & Ashland Street 8/23/2017 South Ashland Business Park 12/1/2016 2034 PM - Background Conditions Synchro 8 Report Page 18 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 3 Channel Detector 3 Extend (s) 0.0 0.0 Turn Type pm+pt NA NA Perm Perm NA Perm Protected Phases 5 2 6 8 Permitted Phases 2 6 8 8 Detector Phase 5 2 66888 Switch Phase Minimum Initial (s) 4.0 9.5 9.5 9.5 6.0 6.0 6.0 Minimum Split (s)13.0 14.0 34.9 34.9 31.8 31.8 31.8 Total Split (s)52.0 88.2 36.2 36.2 31.8 31.8 31.8 Total Split (%)43.3% 73.5%30.2% 30.2% 26.5% 26.5% 26.5% Maximum Green (s) 47.5 83.7 31.7 31.7 26.4 26.4 26.4 Yellow Time (s)4.0 4.0 4.0 4.0 4.7 4.7 4.7 All-Red Time (s)0.5 0.5 0.5 0.5 0.7 0.7 0.7 Lost Time Adjust (s) -0.5 -0.5 -0.5 -0.5 -1.4 -1.4 Total Lost Time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 2.5 4.0 4.0 4.0 2.5 2.5 2.5 Minimum Gap (s)2.0 2.7 2.7 2.7 2.0 2.0 2.0 Time Before Reduce (s) 8.0 10.0 10.0 10.0 8.0 8.0 8.0 Time To Reduce (s)4.0 13.0 13.0 13.0 4.0 4.0 4.0 Recall Mode None Min Min Min None None None Walk Time (s)7.0 5.0 5.0 7.0 7.0 7.0 Flash Dont Walk (s)19.5 25.4 25.4 19.4 19.4 19.4 Pedestrian Calls (#/hr)0 00000 Act Effct Green (s)80.3 81.3 27.5 27.5 9.7 9.7 Actuated g/C Ratio 0.84 0.85 0.29 0.29 0.10 0.10 v/c Ratio 0.91 0.46 0.80 0.61 0.31 0.29 Control Delay 32.8 3.7 45.3 12.4 47.9 15.8 Queue Delay 3.8 0.5 0.0 0.0 0.0 0.0 Total Delay 36.6 4.2 45.3 12.4 47.9 15.8 LOS DA DB DB Approach Delay 22.3 29.1 31.1 Approach LOS C C C Intersection Summary Area Type:Other Cycle Length: 120 Actuated Cycle Length: 95.2 Natural Cycle: 130 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.91 Intersection Signal Delay: 24.9 Intersection LOS: C Intersection Capacity Utilization 98.7% ICU Level of Service F Analysis Period (min) 15 Splits and Phases: 6: I-5 NB Ramp & Ashland Street South Ashland Business Park TPRA L - 15 HCM Signalized Intersection Capacity Analysis 6: I-5 NB Ramp & Ashland Street 8/23/2017 South Ashland Business Park 12/1/2016 2034 PM - Background Conditions Synchro 8 Report Page 19 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)829 653 0 0 380 367 47 0 51 0 0 0 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Total Lost time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.85 1.00 0.85 Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00 Satd. Flow (prot)1646 1750 1733 1458 1539 1328 Flt Permitted 0.20 1.00 1.00 1.00 0.95 1.00 Satd. Flow (perm)341 1750 1733 1458 1539 1328 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Adj. Flow (vph)873 687 0 0 400 386 49 0 54 0 0 0 RTOR Reduction (vph)000002100049000 Lane Group Flow (vph) 873 687 0 0 400 176 0 49 5000 Heavy Vehicles (%) 1% 0% 0% 0% 1% 2% 8% 0% 12% 0% 0% 0% Turn Type pm+pt NA NA Perm Perm NA Perm Protected Phases 5 2 6 8 Permitted Phases 2 6 8 8 Actuated Green, G (s) 79.8 79.8 27.0 27.0 6.8 6.8 Effective Green, g (s) 80.3 80.3 27.5 27.5 8.2 8.2 Actuated g/C Ratio 0.83 0.83 0.28 0.28 0.08 0.08 Clearance Time (s)4.5 4.5 4.5 4.5 5.4 5.4 Vehicle Extension (s) 2.5 4.0 4.0 4.0 2.5 2.5 Lane Grp Cap (vph) 943 1456 493 415 130 112 v/s Ratio Prot c0.47 0.39 0.23 v/s Ratio Perm c0.30 0.12 0.03 0.00 v/c Ratio 0.93 0.47 0.81 0.43 0.38 0.04 Uniform Delay, d1 16.3 2.2 32.1 28.1 41.7 40.5 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 14.5 0.3 10.3 1.0 1.3 0.1 Delay (s)30.8 2.6 42.4 29.0 43.1 40.6 Level of Service C A D C D D Approach Delay (s)18.4 35.8 41.8 0.0 Approach LOS B D D A Intersection Summary HCM 2000 Control Delay 24.9 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.90 Actuated Cycle Length (s) 96.5 Sum of lost time (s)12.0 Intersection Capacity Utilization 98.7% ICU Level of Service F Analysis Period (min)15 c Critical Lane Group South Ashland Business Park TPRA L - 16 Lanes, Volumes, Timings 7: Tolman Creek Rd & Independent Way 8/23/2017 South Ashland Business Park 12/1/2016 2034 PM - Background Conditions Synchro 8 Report Page 21 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Volume (vph)42 97 452 17 21 482 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.906 0.995 Flt Protected 0.985 0.998 Satd. Flow (prot)1531 0 1707 0 0 1712 Flt Permitted 0.985 0.998 Satd. Flow (perm)1531 0 1707 0 0 1712 Link Speed (mph)30 25 25 Link Distance (ft)708 1733 696 Travel Time (s)16.1 47.3 19.0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph)46 105 491 18 23 524 Shared Lane Traffic (%) Lane Group Flow (vph) 151 0 509 0 0 547 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(ft)12 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Yes Yes Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 9 15 Sign Control Stop Free Free Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 61.7% ICU Level of Service B Analysis Period (min) 15 South Ashland Business Park TPRA L - 17 HCM 2010 TWSC 7: Tolman Creek Rd & Independent Way 8/23/2017 South Ashland Business Park 12/1/2016 2034 PM - Background Conditions Synchro 8 Report Page 22 Intersection Int Delay, s/veh 2.1 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h 42 97 452 17 21 482 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 -- -- - Veh in Median Storage, # 0 -0 -- 0 Grade, %0 -0 -- 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, %2 2 2 2 2 2 Mvmt Flow 46 105 491 18 23 524 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 1071 501 0 0 510 0 Stage 1 501 -- -- - Stage 2 570 -- -- - Critical Hdwy 6.42 6.22 - - 4.12 - Critical Hdwy Stg 1 5.42 -- -- - Critical Hdwy Stg 2 5.42 -- -- - Follow-up Hdwy 3.518 3.318 - - 2.218 - Pot Cap-1 Maneuver 244 570 - - 1055 - Stage 1 609 -- -- - Stage 2 566 -- -- - Platoon blocked, %- -- Mov Cap-1 Maneuver 236 570 - - 1055 - Mov Cap-2 Maneuver 370 -- -- - Stage 1 609 -- -- - Stage 2 548 -- -- - Approach WB NB SB HCM Control Delay, s 15.6 0 0.4 HCM LOS C Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h)- - 490 1055 - HCM Lane V/C Ratio - - 0.308 0.022 - HCM Control Delay (s) - - 15.6 8.5 0 HCM Lane LOS - - C A A HCM 95th %tile Q(veh) - - 1.3 0.1 - South Ashland Business Park TPRA L - 18 Lanes, Volumes, Timings 8: Washington St & Independent Way 8/23/2017 South Ashland Business Park 12/1/2016 2034 PM - Background Conditions Synchro 8 Report Page 23 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Volume (vph)58 11 25 35 25 37 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.978 0.919 Flt Protected 0.960 0.980 Satd. Flow (prot)1611 0 0 1681 1577 0 Flt Permitted 0.960 0.980 Satd. Flow (perm)1611 0 0 1681 1577 0 Link Speed (mph)25 25 25 Link Distance (ft)708 248 696 Travel Time (s)19.3 6.8 19.0 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 Adj. Flow (vph)68 13 29 41 29 44 Shared Lane Traffic (%) Lane Group Flow (vph) 81 0 0 70 73 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft)12 0 0 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 Sign Control Stop Free Free Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 21.1% ICU Level of Service A Analysis Period (min) 15 South Ashland Business Park TPRA L - 19 HCM 2010 TWSC 8: Washington St & Independent Way 8/23/2017 South Ashland Business Park 12/1/2016 2034 PM - Background Conditions Synchro 8 Report Page 24 Intersection Int Delay, s/veh 4.5 Movement EBL EBR NBL NBT SBT SBR Vol, veh/h 58 11 25 35 25 37 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 -- -- - Veh in Median Storage, # 0 -- 0 0 - Grade, %0 -- 0 0 - Peak Hour Factor 85 85 85 85 85 85 Heavy Vehicles, %2 2 2 2 2 2 Mvmt Flow 68 13 29 41 29 44 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 151 51 73 0 - 0 Stage 1 51 -- -- - Stage 2 100 -- -- - Critical Hdwy 6.42 6.22 4.12 -- - Critical Hdwy Stg 1 5.42 -- -- - Critical Hdwy Stg 2 5.42 -- -- - Follow-up Hdwy 3.518 3.318 2.218 -- - Pot Cap-1 Maneuver 841 1017 1527 -- - Stage 1 971 -- -- - Stage 2 924 -- -- - Platoon blocked, %-- - Mov Cap-1 Maneuver 825 1017 1527 -- - Mov Cap-2 Maneuver 825 -- -- - Stage 1 971 -- -- - Stage 2 906 -- -- - Approach EB NB SB HCM Control Delay, s 9.7 3.1 0 HCM LOS A Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h)1527 - 851 - - HCM Lane V/C Ratio 0.019 - 0.095 - - HCM Control Delay (s) 7.4 0 9.7 - - HCM Lane LOS A A A - - HCM 95th %tile Q(veh) 0.1 - 0.3 - - South Ashland Business Park TPRA L - 20 Lanes, Volumes, Timings 10: Site Driveway & Washington St 8/23/2017 South Ashland Business Park 12/1/2016 2034 PM - Background Conditions Synchro 8 Report Page 27 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Volume (vph)7 0 0 17 0 0 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt Flt Protected Satd. Flow (prot) 1716 0 0 1716 1716 0 Flt Permitted Satd. Flow (perm) 1716 0 0 1716 1716 0 Link Speed (mph)25 25 25 Link Distance (ft)405 170 345 Travel Time (s)11.0 4.6 9.4 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 Adj. Flow (vph)8 0 0 20 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 8 0 0 20 0 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft)0 0 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph)9 15 15 9 Sign Control Free Free Stop Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 6.7% ICU Level of Service A Analysis Period (min) 15 South Ashland Business Park TPRA L - 21 HCM 2010 TWSC 10: Site Driveway & Washington St 8/23/2017 South Ashland Business Park 12/1/2016 2034 PM - Background Conditions Synchro 8 Report Page 28 Intersection Int Delay, s/veh 0 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h 7 0 0 17 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - -- -0 - Veh in Median Storage, #0 -- 0 0 - Grade, %0 -- 0 0 - Peak Hour Factor 85 85 85 85 85 85 Heavy Vehicles, %2 2 2 2 2 2 Mvmt Flow 8 0 0 20 0 0 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 8 0 28 8 Stage 1 - -- -8 - Stage 2 - -- -20 - Critical Hdwy - - 4.12 -6.42 6.22 Critical Hdwy Stg 1 - -- -5.42 - Critical Hdwy Stg 2 - -- -5.42 - Follow-up Hdwy - - 2.218 -3.518 3.318 Pot Cap-1 Maneuver - - 1612 -987 1074 Stage 1 - -- -1015 - Stage 2 - -- -1003 - Platoon blocked, %- -- Mov Cap-1 Maneuver - - 1612 -987 1074 Mov Cap-2 Maneuver - -- -987 - Stage 1 - -- -1015 - Stage 2 - -- -1003 - Approach EB WB NB HCM Control Delay, s 0 0 0 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h)- - - 1612 - HCM Lane V/C Ratio ----- HCM Control Delay (s) 0 - - 0 - HCM Lane LOS A - - A - HCM 95th %tile Q(veh) - - - 0 - South Ashland Business Park TPRA L - 22 Lanes, Volumes, Timings 1: Walker Ave & Ashland St 9/7/2017 South Ashland Business Park 12/1/2016 2034 PM - Build Conditions Synchro 8 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)142 785 26 85 541 136 8 36 100 163 63 73 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)110 0 110 0 0 0 0 0 Storage Lanes 1 0 1 0 0 0 0 0 Taper Length (ft)70 70 25 25 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.995 0.970 0.906 0.967 Flt Protected 0.950 0.950 0.997 0.973 Satd. Flow (prot)1662 3277 0 1630 3200 0 0 1548 0 0 1647 0 Flt Permitted 0.950 0.950 0.979 0.742 Satd. Flow (perm)1662 3277 0 1630 3200 0 0 1521 0 0 1256 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)3 28 109 16 Link Speed (mph)30 30 25 25 Link Distance (ft)960 649 645 680 Travel Time (s)21.8 14.8 17.6 18.5 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles (%)0% 1% 0% 2% 1% 0% 0% 0% 3% 0% 0% 0% Adj. Flow (vph)154 853 28 92 588 148 9 39 109 177 68 79 Shared Lane Traffic (%) Lane Group Flow (vph) 154 881 0 92 736 0 0 157 0 0 324 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)12 12 0 0 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2 1 2 1 1 2 1 2 Detector Template ODOT Left/SideODOT 30 Thru ODOT Left/SideODOT 30 Thru LeftODOT Left/Side LeftODOT Left/Side Leading Detector (ft)78 183 78 183 20 78 20 78 Trailing Detector (ft)2 177 2 177 0 2 0 2 Detector 1 Position(ft)2 177 2 177 0 2 0 2 Detector 1 Size(ft)16 6 16 6 20 16 20 16 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 72 72 72 72 Detector 2 Size(ft)6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 Turn Type Prot NA Prot NA Perm NA Perm NA Protected Phases 5 2 1 6 8 4 Permitted Phases 8 4 South Ashland Business Park TPRA L - 23 Lanes, Volumes, Timings 1: Walker Ave & Ashland St 9/7/2017 South Ashland Business Park 12/1/2016 2034 PM - Build Conditions Synchro 8 Report Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 5 2 1 6 8 8 4 4 Switch Phase Minimum Initial (s)4.0 10.0 4.0 10.0 4.0 4.0 4.0 4.0 Minimum Split (s)13.0 14.0 13.0 14.0 13.0 13.0 13.0 13.0 Total Split (s)23.0 50.0 17.0 44.0 53.0 53.0 53.0 53.0 Total Split (%)19.2% 41.7% 14.2% 36.7% 44.2% 44.2% 44.2% 44.2% Maximum Green (s) 19.0 46.0 13.0 40.0 49.0 49.0 49.0 49.0 Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s)0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 2.5 4.0 2.5 4.0 2.5 2.5 2.5 2.5 Minimum Gap (s)2.0 2.7 2.0 2.7 2.0 2.0 2.0 2.0 Time Before Reduce (s) 8.0 10.0 8.0 10.0 8.0 8.0 8.0 8.0 Time To Reduce (s)4.0 13.0 4.0 13.0 4.0 4.0 4.0 4.0 Recall Mode None Min None Min None None None None Walk Time (s)7.0 7.0 7.0 7.0 7.0 7.0 Flash Dont Walk (s)22.2 22.2 13.0 13.0 13.0 13.0 Pedestrian Calls (#/hr)0 0 0 0 0 0 Act Effct Green (s)12.5 27.4 9.6 21.1 25.7 25.7 Actuated g/C Ratio 0.17 0.38 0.13 0.29 0.35 0.35 v/c Ratio 0.54 0.71 0.43 0.78 0.26 0.72 Control Delay 40.5 26.0 42.6 30.5 8.6 30.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 40.5 26.0 42.6 30.5 8.6 30.8 LOS DC DC A C Approach Delay 28.1 31.8 8.6 30.8 Approach LOS C C A C Intersection Summary Area Type:Other Cycle Length: 120 Actuated Cycle Length: 72.7 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.78 Intersection Signal Delay: 28.5 Intersection LOS: C Intersection Capacity Utilization 70.3%ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 1: Walker Ave & Ashland St South Ashland Business Park TPRA L - 24 HCM Signalized Intersection Capacity Analysis 1: Walker Ave & Ashland St 9/7/2017 South Ashland Business Park 12/1/2016 2034 PM - Build Conditions Synchro 8 Report Page 3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)142 785 26 85 541 136 8 36 100 163 63 73 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Total Lost time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 Frt 1.00 1.00 1.00 0.97 0.91 0.97 Flt Protected 0.95 1.00 0.95 1.00 1.00 0.97 Satd. Flow (prot)1662 3277 1630 3199 1549 1647 Flt Permitted 0.95 1.00 0.95 1.00 0.98 0.74 Satd. Flow (perm)1662 3277 1630 3199 1521 1256 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph)154 853 28 92 588 148 9 39 109 177 68 79 RTOR Reduction (vph)020019007000100 Lane Group Flow (vph) 154 879 0 92 717 0 0 87 0 0 314 0 Heavy Vehicles (%) 0% 1% 0% 2% 1% 0% 0% 0% 3% 0% 0% 0% Turn Type Prot NA Prot NA Perm NA Perm NA Protected Phases 5 2 1 6 8 4 Permitted Phases 8 4 Actuated Green, G (s) 12.5 27.4 7.6 22.5 25.7 25.7 Effective Green, g (s) 12.5 27.4 7.6 22.5 25.7 25.7 Actuated g/C Ratio 0.17 0.38 0.10 0.31 0.35 0.35 Clearance Time (s)4.0 4.0 4.0 4.0 4.0 4.0 Vehicle Extension (s) 2.5 4.0 2.5 4.0 2.5 2.5 Lane Grp Cap (vph) 285 1235 170 990 537 444 v/s Ratio Prot c0.09 c0.27 0.06 0.22 v/s Ratio Perm 0.06 c0.25 v/c Ratio 0.54 0.71 0.54 0.72 0.16 0.71 Uniform Delay, d1 27.5 19.3 30.9 22.3 16.1 20.2 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 1.6 2.1 2.8 2.8 0.1 4.7 Delay (s)29.1 21.4 33.7 25.2 16.2 25.0 Level of Service C C C C B C Approach Delay (s)22.5 26.1 16.2 25.0 Approach LOS C C B C Intersection Summary HCM 2000 Control Delay 23.7 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.70 Actuated Cycle Length (s) 72.7 Sum of lost time (s)12.0 Intersection Capacity Utilization 70.3% ICU Level of Service C Analysis Period (min)15 c Critical Lane Group South Ashland Business Park TPRA L - 25 Lanes, Volumes, Timings 2: Normal Ave & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2034 PM - Build Conditions Synchro 8 Report Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)25 921 19 76 806 27 12 5 23 25 3 5 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)180 0 100 0 0 0 0 0 Storage Lanes 1 0 1 0 0 0 0 0 Taper Length (ft)70 60 25 25 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.997 0.995 0.921 0.980 Flt Protected 0.950 0.950 0.986 0.963 Satd. Flow (prot)1662 3283 0 1662 3308 0 0 1589 0 0 1652 0 Flt Permitted 0.950 0.950 0.986 0.963 Satd. Flow (perm)1662 3283 0 1662 3308 0 0 1589 0 0 1652 0 Link Speed (mph)30 30 25 25 Link Distance (ft)734 1448 1568 912 Travel Time (s)16.7 32.9 42.8 24.9 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Heavy Vehicles (%)0% 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Adj. Flow (vph)26 959 20 79 840 28 13 5 24 26 3 5 Shared Lane Traffic (%) Lane Group Flow (vph) 26 979 0 79 868 0 0 41 0 0 34 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)12 12 0 0 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 15 9 15 9 Sign Control Free Free Stop Stop Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 47.3% ICU Level of Service A Analysis Period (min) 15 South Ashland Business Park TPRA L - 26 HCM 2010 TWSC 2: Normal Ave & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2034 PM - Build Conditions Synchro 8 Report Page 6 Intersection Int Delay, s/veh 3.3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Vol, veh/h 25 921 19 76 806 27 12 5 23 25 3 5 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 180 - - 100 - -- - -- - - Veh in Median Storage, # - 0 -- 0 -- 0 -- 0 - Grade, %- 0 -- 0 -- 0 -- 0 - Peak Hour Factor 96 96 96 96 96 96 96 96 96 96 96 96 Heavy Vehicles, %0 1 0 0 0 0 0 0 0 0 0 0 Mvmt Flow 26 959 20 79 840 28 12 5 24 26 3 5 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 868 0 0 979 0 0 1601 2047 490 1546 2043 434 Stage 1 - - - - - - 1021 1021 - 1012 1012 - Stage 2 - - -- - - 580 1026 - 534 1031 - Critical Hdwy 4.1 - - 4.1 - - 7.5 6.5 6.9 7.5 6.5 6.9 Critical Hdwy Stg 1 - - -- - - 6.5 5.5 - 6.5 5.5 - Critical Hdwy Stg 2 - - -- - - 6.5 5.5 - 6.5 5.5 - Follow-up Hdwy 2.2 - - 2.2 - - 3.5 4 3.3 3.5 4 3.3 Pot Cap-1 Maneuver 785 - - 713 - - 72 57 529 79 57 576 Stage 1 - - -- - - 257 316 - 260 319 - Stage 2 - - -- - - 472 315 - 503 313 - Platoon blocked, %- -- - Mov Cap-1 Maneuver 785 - - 713 - - 61 49 529 62 49 576 Mov Cap-2 Maneuver - - -- - - 61 49 - 62 49 - Stage 1 - - -- - - 248 306 - 251 284 - Stage 2 - - -- - - 411 280 - 456 303 - Approach EB WB NB SB HCM Control Delay, s 0.3 0.9 51.9 98.4 HCM LOS F F Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h)117 785 - - 713 - - 70 HCM Lane V/C Ratio 0.356 0.033 - - 0.111 - - 0.491 HCM Control Delay (s) 51.9 9.7 - - 10.7 - - 98.4 HCM Lane LOS F A - - B - - F HCM 95th %tile Q(veh) 1.4 0.1 - - 0.4 - - 2 South Ashland Business Park TPRA L - 27 Lanes, Volumes, Timings 3: Tolman Creek Rd & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2034 PM - Build Conditions Synchro 8 Report Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)125 1023 99 240 617 77 193 120 230 70 122 69 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)115 0 115 0 87 0 83 0 Storage Lanes 1 0 1 0 1 0 1 0 Taper Length (ft)77 66 87 84 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.987 0.983 0.901 0.946 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot)1646 3252 0 1630 3229 0 1662 1541 0 1662 1645 0 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm)1646 3252 0 1630 3229 0 1662 1541 0 1662 1645 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)10 14 74 20 Link Speed (mph)35 35 25 25 Link Distance (ft)1678 724 696 1812 Travel Time (s)32.7 14.1 19.0 49.4 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%)1% 1% 0% 2% 1% 3% 0% 1% 3% 0% 1% 0% Adj. Flow (vph)132 1077 104 253 649 81 203 126 242 74 128 73 Shared Lane Traffic (%) Lane Group Flow (vph) 132 1181 0 253 730 0 203 368 0 74 201 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)12 12 12 12 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Yes Yes Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2 2 2 2 2 2 2 2 Detector Template ODOT Left/SideODOT 35 Thru ODOT Left/SideODOT 35 Thru ODOT Left/SideODOT Left/Side ODOT Left/SideODOT Left/Side Leading Detector (ft)78 223 78 223 78 78 78 78 Trailing Detector (ft)2 107 2 107 2 2 2 2 Detector 1 Position(ft)2 107 2 107 2 2 2 2 Detector 1 Size(ft)16 6 16 6 16 16 16 16 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 72 217 72 217 72 72 72 72 Detector 2 Size(ft)6 6 6 6 6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Prot NA Prot NA Prot NA Prot NA Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases South Ashland Business Park TPRA L - 28 Lanes, Volumes, Timings 3: Tolman Creek Rd & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2034 PM - Build Conditions Synchro 8 Report Page 8 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 5 2 1 6 3 8 7 4 Switch Phase Minimum Initial (s)4.0 9.5 4.0 9.5 4.0 6.0 4.0 6.0 Minimum Split (s)13.0 14.0 13.0 14.0 13.0 13.0 13.0 13.0 Total Split (s)21.0 51.0 25.0 55.0 23.0 31.0 13.0 21.0 Total Split (%)17.5% 42.5% 20.8% 45.8% 19.2% 25.8% 10.8% 17.5% Maximum Green (s) 16.5 46.5 20.5 50.5 19.0 27.0 9.0 17.0 Yellow Time (s)4.0 4.0 4.0 4.0 3.5 3.5 3.5 3.5 All-Red Time (s)0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 Lost Time Adjust (s) -0.5 -0.5 -0.5 -0.5 0.0 0.0 0.0 0.0 Total Lost Time (s)4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.5 4.0 2.5 4.0 2.5 2.5 2.5 2.5 Minimum Gap (s)2.0 2.7 2.0 2.7 2.0 2.0 2.0 2.0 Time Before Reduce (s) 8.0 10.0 8.0 10.0 8.0 8.0 8.0 8.0 Time To Reduce (s)4.0 13.0 4.0 13.0 4.0 4.0 4.0 4.0 Recall Mode None Min None Min None None None None Walk Time (s)7.0 7.0 7.0 7.0 Flash Dont Walk (s)16.7 16.0 22.9 23.0 Pedestrian Calls (#/hr)0000 Act Effct Green (s) 13.8 44.6 20.0 50.8 17.0 27.2 8.3 15.9 Actuated g/C Ratio 0.12 0.39 0.18 0.45 0.15 0.24 0.07 0.14 v/c Ratio 0.66 0.92 0.88 0.50 0.82 0.87 0.62 0.81 Control Delay 65.4 46.0 78.2 24.4 73.5 55.9 75.9 69.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 65.4 46.0 78.2 24.4 73.5 55.9 75.9 69.1 LOS ED EC EE EE Approach Delay 48.0 38.3 62.2 70.9 Approach LOS D D E E Intersection Summary Area Type:Other Cycle Length: 120 Actuated Cycle Length: 113.8 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.92 Intersection Signal Delay: 49.5 Intersection LOS: D Intersection Capacity Utilization 88.3%ICU Level of Service E Analysis Period (min) 15 Splits and Phases: 3: Tolman Creek Rd & Ashland Street South Ashland Business Park TPRA L - 29 HCM Signalized Intersection Capacity Analysis 3: Tolman Creek Rd & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2034 PM - Build Conditions Synchro 8 Report Page 9 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)125 1023 99 240 617 77 193 120 230 70 122 69 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Total Lost time (s)4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00 Frt 1.00 0.99 1.00 0.98 1.00 0.90 1.00 0.95 Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot)1646 3251 1630 3230 1662 1542 1662 1644 Flt Permitted 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (perm)1646 3251 1630 3230 1662 1542 1662 1644 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Adj. Flow (vph)132 1077 104 253 649 81 203 126 242 74 128 73 RTOR Reduction (vph)06008005600170 Lane Group Flow (vph) 132 1175 0 253 722 0 203 312 0 74 184 0 Heavy Vehicles (%) 1% 1% 0% 2% 1% 3% 0% 1% 3% 0% 1% 0% Turn Type Prot NA Prot NA Prot NA Prot NA Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases Actuated Green, G (s) 13.3 44.1 19.5 50.3 17.0 27.2 6.8 17.0 Effective Green, g (s) 13.8 44.6 20.0 50.8 17.0 27.2 6.8 17.0 Actuated g/C Ratio 0.12 0.39 0.17 0.44 0.15 0.24 0.06 0.15 Clearance Time (s)4.5 4.5 4.5 4.5 4.0 4.0 4.0 4.0 Vehicle Extension (s) 2.5 4.0 2.5 4.0 2.5 2.5 2.5 2.5 Lane Grp Cap (vph) 198 1265 284 1431 246 365 98 243 v/s Ratio Prot 0.08 c0.36 c0.16 0.22 c0.12 c0.20 0.04 0.11 v/s Ratio Perm v/c Ratio 0.67 0.93 0.89 0.50 0.83 0.85 0.76 0.76 Uniform Delay, d1 48.2 33.5 46.2 22.9 47.4 41.8 53.1 46.8 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 7.4 12.0 27.3 0.4 19.3 17.1 26.5 12.1 Delay (s)55.6 45.5 73.6 23.3 66.7 58.9 79.6 58.9 Level of Service E D E C E E E E Approach Delay (s)46.5 36.2 61.7 64.4 Approach LOS D D E E Intersection Summary HCM 2000 Control Delay 47.6 HCM 2000 Level of Service D HCM 2000 Volume to Capacity ratio 0.91 Actuated Cycle Length (s) 114.6 Sum of lost time (s)16.0 Intersection Capacity Utilization 88.3% ICU Level of Service E Analysis Period (min)15 c Critical Lane Group South Ashland Business Park TPRA L - 30 Lanes, Volumes, Timings 4: Washington St & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2034 PM - Build Conditions Synchro 8 Report Page 11 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Volume (vph)1239 24 105 855 12 215 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Storage Length (ft)0 100 0 73 Storage Lanes 0 1 1 1 Taper Length (ft)75 25 Lane Util. Factor 0.95 0.95 1.00 0.95 1.00 1.00 Ped Bike Factor Frt 0.997 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot)3283 0 1662 3260 1662 1488 Flt Permitted 0.950 0.950 Satd. Flow (perm)3283 0 1662 3260 1662 1488 Link Speed (mph)35 35 25 Link Distance (ft)724 413 696 Travel Time (s)14.1 8.0 19.0 Confl. Peds. (#/hr)979 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%)1% 0% 0% 2% 0% 0% Adj. Flow (vph)1318 26 112 910 13 229 Shared Lane Traffic (%) Lane Group Flow (vph) 1344 0 112 910 13 229 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft)12 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Yes Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph)9 15 15 9 Sign Control Free Free Stop Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 59.4% ICU Level of Service B Analysis Period (min) 15 South Ashland Business Park TPRA L - 31 HCM 2010 TWSC 4: Washington St & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2034 PM - Build Conditions Synchro 8 Report Page 12 Intersection Int Delay, s/veh 3.3 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h 1239 24 105 855 12 215 Conflicting Peds, #/hr 0 979 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - 100 -0 73 Veh in Median Storage, #0 -- 0 0 - Grade, %0 -- 0 0 - Peak Hour Factor 94 94 94 94 94 94 Heavy Vehicles, %1 0 0 2 0 0 Mvmt Flow 1318 26 112 910 13 229 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 1344 0 2009 672 Stage 1 - -- -1331 - Stage 2 - -- -678 - Critical Hdwy - - 4.1 -6.8 6.9 Critical Hdwy Stg 1 - -- -5.8 - Critical Hdwy Stg 2 - -- -5.8 - Follow-up Hdwy - - 2.2 -3.5 3.3 Pot Cap-1 Maneuver - - 519 -53 403 Stage 1 - -- -215 - Stage 2 - -- -471 - Platoon blocked, %- -- Mov Cap-1 Maneuver - - 519 -~ 8 403 Mov Cap-2 Maneuver - -- -50 - Stage 1 - -- -215 - Stage 2 - -- -68 - Approach EB WB NB HCM Control Delay, s 0 1.5 29 HCM LOS D Minor Lane/Major Mvmt NBLn1NBLn2 EBT EBR WBL WBT Capacity (veh/h)50 403 - - 519 - HCM Lane V/C Ratio 0.255 0.568 - - 0.215 - HCM Control Delay (s) 100.1 25 - - 13.8 - HCM Lane LOS F D - - B - HCM 95th %tile Q(veh) 0.9 3.4 - - 0.8 - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon South Ashland Business Park TPRA L - 32 Lanes, Volumes, Timings 5: I-5 SB Ramp & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2034 PM - Build Conditions Synchro 8 Report Page 13 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)0 1347 114 29 402 00002091628 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)0 0 111 0 0 0 0 200 Storage Lanes 0 1 1 0 0 0 0 1 Taper Length (ft)25 70 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.953 Satd. Flow (prot)0 1699 1458 1662 1699 000001589 1458 Flt Permitted 0.045 0.953 Satd. Flow (perm)0 1699 1458 79 1699 000001589 1458 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)96 562 Link Speed (mph)35 35 45 45 Link Distance (ft)413 560 744 614 Travel Time (s)8.0 10.9 11.3 9.3 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%)0% 3% 2% 0% 3% 0% 0% 0% 0% 5% 0% 2% Adj. Flow (vph)0 1418 120 31 423 00002201661 Shared Lane Traffic (%) Lane Group Flow (vph) 0 1418 120 31 423 00000221661 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)12 12 0 0 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2122 133 Detector Template ODOT 35 ThruODOT RightODOT Left/SideODOT 35 Thru LeftODOT Ramp HSODOT Ramp HS Leading Detector (ft)223 143 78 223 20 213 213 Trailing Detector (ft)107 137 2 107 0 2 2 Detector 1 Position(ft)107 137 2 107 0 2 2 Detector 1 Size(ft)6 6 16 6 20 16 16 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft)217 72 217 107 107 Detector 2 Size(ft)6 6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 0.0 0.0 0.0 0.0 Detector 3 Position(ft)207 207 Detector 3 Size(ft)66 Detector 3 Type Cl+Ex Cl+Ex South Ashland Business Park TPRA L - 33 Lanes, Volumes, Timings 5: I-5 SB Ramp & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2034 PM - Build Conditions Synchro 8 Report Page 14 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 3 Channel Detector 3 Extend (s)0.0 0.0 Turn Type NA Perm pm+pt NA Perm NA Perm Protected Phases 2 1 6 4 Permitted Phases 2 6 4 4 Detector Phase 2216 444 Switch Phase Minimum Initial (s) 10.0 10.0 4.0 4.0 6.0 6.0 6.0 Minimum Split (s)14.5 14.5 13.0 14.0 13.0 13.0 13.0 Total Split (s)89.0 89.0 13.0 102.0 18.0 18.0 18.0 Total Split (%)74.2% 74.2% 10.8% 85.0%15.0% 15.0% 15.0% Maximum Green (s)84.5 84.5 8.5 97.5 12.6 12.6 12.6 Yellow Time (s)4.0 4.0 4.0 4.0 4.7 4.7 4.7 All-Red Time (s)0.5 0.5 0.5 0.5 0.7 0.7 0.7 Lost Time Adjust (s)-0.5 -0.5 -0.5 -0.5 -1.4 -1.4 Total Lost Time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lag Lag Lead Lead-Lag Optimize?Yes Yes Yes Vehicle Extension (s)4.0 4.0 2.5 4.0 2.5 2.5 2.5 Minimum Gap (s)2.7 2.7 2.0 2.7 2.0 2.0 2.0 Time Before Reduce (s)10.0 10.0 8.0 10.0 8.0 8.0 8.0 Time To Reduce (s)13.0 13.0 4.0 13.0 4.0 4.0 4.0 Recall Mode Min Min None Min None None None Walk Time (s)7.0 7.0 7.0 7.0 7.0 7.0 Flash Dont Walk (s)19.1 19.1 21.7 19.0 19.0 19.0 Pedestrian Calls (#/hr)0 0 0 0 0 0 Act Effct Green (s)85.2 85.2 91.1 91.1 14.0 14.0 Actuated g/C Ratio 0.75 0.75 0.81 0.81 0.12 0.12 v/c Ratio 1.11 0.11 0.21 0.31 1.13 0.98 Control Delay 77.8 1.6 5.4 3.5 147.8 40.2 Queue Delay 0.0 0.0 0.0 0.4 0.0 0.0 Total Delay 77.8 1.6 5.4 3.9 147.8 40.2 LOS EAAA FD Approach Delay 71.8 4.0 67.2 Approach LOS E A E Intersection Summary Area Type:Other Cycle Length: 120 Actuated Cycle Length: 113.1 Natural Cycle: 150 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.13 Intersection Signal Delay: 59.7 Intersection LOS: E Intersection Capacity Utilization 102.9% ICU Level of Service G Analysis Period (min) 15 Splits and Phases: 5: I-5 SB Ramp & Ashland Street South Ashland Business Park TPRA L - 34 HCM Signalized Intersection Capacity Analysis 5: I-5 SB Ramp & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2034 PM - Build Conditions Synchro 8 Report Page 15 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)0 1347 114 29 402 00002091628 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Total Lost time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.85 1.00 1.00 1.00 0.85 Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot)1699 1458 1662 1699 1588 1458 Flt Permitted 1.00 1.00 0.04 1.00 0.95 1.00 Satd. Flow (perm)1699 1458 78 1699 1588 1458 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Adj. Flow (vph)0 1418 120 31 423 00002201661 RTOR Reduction (vph) 0 0 25 00000000494 Lane Group Flow (vph) 0 1418 95 31 423 00000221167 Heavy Vehicles (%) 0% 3% 2% 0% 3% 0% 0% 0% 0% 5% 0% 2% Turn Type NA Perm pm+pt NA Perm NA Perm Protected Phases 2 1 6 4 Permitted Phases 2 6 4 4 Actuated Green, G (s)84.7 84.7 92.5 92.5 12.6 12.6 Effective Green, g (s)85.2 85.2 93.0 93.0 14.0 14.0 Actuated g/C Ratio 0.74 0.74 0.81 0.81 0.12 0.12 Clearance Time (s)4.5 4.5 4.5 4.5 5.4 5.4 Vehicle Extension (s)4.0 4.0 2.5 4.0 2.5 2.5 Lane Grp Cap (vph)1258 1080 115 1373 193 177 v/s Ratio Prot c0.83 0.01 c0.25 v/s Ratio Perm 0.07 0.21 0.14 0.11 v/c Ratio 1.13 0.09 0.27 0.31 1.15 0.95 Uniform Delay, d1 14.9 4.1 34.3 2.8 50.5 50.1 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 67.9 0.0 0.9 0.2 109.3 51.5 Delay (s)82.8 4.2 35.2 3.0 159.8 101.7 Level of Service F A D A F F Approach Delay (s)76.7 5.2 0.0 116.2 Approach LOS E A A F Intersection Summary HCM 2000 Control Delay 77.5 HCM 2000 Level of Service E HCM 2000 Volume to Capacity ratio 1.10 Actuated Cycle Length (s) 115.0 Sum of lost time (s)12.0 Intersection Capacity Utilization 102.9% ICU Level of Service G Analysis Period (min)15 c Critical Lane Group South Ashland Business Park TPRA L - 35 Lanes, Volumes, Timings 6: I-5 NB Ramp & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2034 PM - Build Conditions Synchro 8 Report Page 17 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)901 655 0 0 381 367 50 0 51 0 0 0 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)212 0 0 160 0 95 0 0 Storage Lanes 1 0 0 1 0 1 0 0 Taper Length (ft)72 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot)1646 1750 0 0 1733 1458 0 1539 1328 0 0 0 Flt Permitted 0.198 0.950 Satd. Flow (perm)343 1750 0 0 1733 1458 0 1539 1328 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)292 55 Link Speed (mph)35 35 45 45 Link Distance (ft)560 889 615 566 Travel Time (s)10.9 17.3 9.3 8.6 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%)1% 0% 0% 0% 1% 2% 8% 0% 12% 0% 0% 0% Adj. Flow (vph)948 689 0 0 401 386 53 0 54 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 948 689 0 0 401 386 0 53 54 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)12 12 0 0 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2 2 21133 Detector Template ODOT Left/SideODOT 35 Thru ODOT 35 ThruODOT Right LeftODOT Ramp HSODOT Ramp HS Leading Detector (ft) 78 223 223 143 20 213 213 Trailing Detector (ft)2 107 107 137 0 2 2 Detector 1 Position(ft)2 107 107 137 0 2 2 Detector 1 Size(ft)16 6 6 6 20 16 16 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 72 217 217 107 107 Detector 2 Size(ft)6 6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 0.0 Detector 3 Position(ft)207 207 Detector 3 Size(ft)6 6 Detector 3 Type Cl+Ex Cl+Ex South Ashland Business Park TPRA L - 36 Lanes, Volumes, Timings 6: I-5 NB Ramp & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2034 PM - Build Conditions Synchro 8 Report Page 18 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 3 Channel Detector 3 Extend (s) 0.0 0.0 Turn Type pm+pt NA NA Perm Perm NA Perm Protected Phases 5 2 6 8 Permitted Phases 2 6 8 8 Detector Phase 5 2 66888 Switch Phase Minimum Initial (s) 4.0 9.5 9.5 9.5 6.0 6.0 6.0 Minimum Split (s)13.0 14.0 34.9 34.9 31.8 31.8 31.8 Total Split (s)52.0 88.2 36.2 36.2 31.8 31.8 31.8 Total Split (%)43.3% 73.5%30.2% 30.2% 26.5% 26.5% 26.5% Maximum Green (s) 47.5 83.7 31.7 31.7 26.4 26.4 26.4 Yellow Time (s)4.0 4.0 4.0 4.0 4.7 4.7 4.7 All-Red Time (s)0.5 0.5 0.5 0.5 0.7 0.7 0.7 Lost Time Adjust (s) -0.5 -0.5 -0.5 -0.5 -1.4 -1.4 Total Lost Time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 2.5 4.0 4.0 4.0 2.5 2.5 2.5 Minimum Gap (s)2.0 2.7 2.7 2.7 2.0 2.0 2.0 Time Before Reduce (s) 8.0 10.0 10.0 10.0 8.0 8.0 8.0 Time To Reduce (s)4.0 13.0 13.0 13.0 4.0 4.0 4.0 Recall Mode None Min Min Min None None None Walk Time (s)7.0 5.0 5.0 7.0 7.0 7.0 Flash Dont Walk (s)19.5 25.4 25.4 19.4 19.4 19.4 Pedestrian Calls (#/hr)0 00000 Act Effct Green (s)80.7 81.7 27.8 27.8 10.0 10.0 Actuated g/C Ratio 0.84 0.85 0.29 0.29 0.10 0.10 v/c Ratio 1.00 0.46 0.80 0.61 0.33 0.29 Control Delay 48.8 3.8 45.2 12.5 48.3 15.7 Queue Delay 11.9 0.6 0.0 0.0 0.0 0.0 Total Delay 60.7 4.4 45.2 12.5 48.3 15.7 LOS EA DB DB Approach Delay 37.0 29.1 31.8 Approach LOS D C C Intersection Summary Area Type:Other Cycle Length: 120 Actuated Cycle Length: 95.8 Natural Cycle: 150 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.00 Intersection Signal Delay: 34.3 Intersection LOS: C Intersection Capacity Utilization 102.9% ICU Level of Service G Analysis Period (min) 15 Splits and Phases: 6: I-5 NB Ramp & Ashland Street South Ashland Business Park TPRA L - 37 HCM Signalized Intersection Capacity Analysis 6: I-5 NB Ramp & Ashland Street 9/7/2017 South Ashland Business Park 12/1/2016 2034 PM - Build Conditions Synchro 8 Report Page 19 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)901 655 0 0 381 367 50 0 51 0 0 0 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Total Lost time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.85 1.00 0.85 Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00 Satd. Flow (prot)1646 1750 1733 1458 1539 1328 Flt Permitted 0.20 1.00 1.00 1.00 0.95 1.00 Satd. Flow (perm)343 1750 1733 1458 1539 1328 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Adj. Flow (vph)948 689 0 0 401 386 53 0 54 0 0 0 RTOR Reduction (vph)000002080049000 Lane Group Flow (vph) 948 689 0 0 401 178 0 53 5000 Heavy Vehicles (%) 1% 0% 0% 0% 1% 2% 8% 0% 12% 0% 0% 0% Turn Type pm+pt NA NA Perm Perm NA Perm Protected Phases 5 2 6 8 Permitted Phases 2 6 8 8 Actuated Green, G (s) 80.1 80.1 27.3 27.3 7.0 7.0 Effective Green, g (s) 80.6 80.6 27.8 27.8 8.4 8.4 Actuated g/C Ratio 0.83 0.83 0.29 0.29 0.09 0.09 Clearance Time (s)4.5 4.5 4.5 4.5 5.4 5.4 Vehicle Extension (s) 2.5 4.0 4.0 4.0 2.5 2.5 Lane Grp Cap (vph) 940 1454 496 417 133 115 v/s Ratio Prot c0.51 0.39 0.23 v/s Ratio Perm c0.33 0.12 0.03 0.00 v/c Ratio 1.01 0.47 0.81 0.43 0.40 0.04 Uniform Delay, d1 18.5 2.3 32.1 28.1 41.9 40.6 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 31.5 0.3 9.9 1.0 1.4 0.1 Delay (s)49.9 2.6 42.0 29.1 43.3 40.7 Level of Service D A D C D D Approach Delay (s)30.0 35.7 42.0 0.0 Approach LOS C D D A Intersection Summary HCM 2000 Control Delay 32.3 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.98 Actuated Cycle Length (s) 97.0 Sum of lost time (s)12.0 Intersection Capacity Utilization 102.9% ICU Level of Service G Analysis Period (min)15 c Critical Lane Group South Ashland Business Park TPRA L - 38 Lanes, Volumes, Timings 7: Tolman Creek Rd & Independent Way 9/7/2017 South Ashland Business Park 12/1/2016 2034 PM - Build Conditions Synchro 8 Report Page 21 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Volume (vph)75 157 452 24 26 482 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.909 0.993 Flt Protected 0.984 0.997 Satd. Flow (prot)1535 0 1704 0 0 1711 Flt Permitted 0.984 0.997 Satd. Flow (perm)1535 0 1704 0 0 1711 Link Speed (mph)30 25 25 Link Distance (ft)708 1733 696 Travel Time (s)16.1 47.3 19.0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph)82 171 491 26 28 524 Shared Lane Traffic (%) Lane Group Flow (vph) 253 0 517 0 0 552 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(ft)12 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Yes Yes Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 9 15 Sign Control Stop Free Free Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 72.2% ICU Level of Service C Analysis Period (min) 15 South Ashland Business Park TPRA L - 39 HCM 2010 TWSC 7: Tolman Creek Rd & Independent Way 9/7/2017 South Ashland Business Park 12/1/2016 2034 PM - Build Conditions Synchro 8 Report Page 22 Intersection Int Delay, s/veh 4.1 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h 75 157 452 24 26 482 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 -- -- - Veh in Median Storage, # 0 -0 -- 0 Grade, %0 -0 -- 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, %2 2 2 2 2 2 Mvmt Flow 82 171 491 26 28 524 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 1084 504 0 0 517 0 Stage 1 504 -- -- - Stage 2 580 -- -- - Critical Hdwy 6.42 6.22 - - 4.12 - Critical Hdwy Stg 1 5.42 -- -- - Critical Hdwy Stg 2 5.42 -- -- - Follow-up Hdwy 3.518 3.318 - - 2.218 - Pot Cap-1 Maneuver 240 568 - - 1049 - Stage 1 607 -- -- - Stage 2 560 -- -- - Platoon blocked, %- -- Mov Cap-1 Maneuver 231 568 - - 1049 - Mov Cap-2 Maneuver 365 -- -- - Stage 1 607 -- -- - Stage 2 539 -- -- - Approach WB NB SB HCM Control Delay, s 20.4 0 0.4 HCM LOS C Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h)- - 481 1049 - HCM Lane V/C Ratio - - 0.524 0.027 - HCM Control Delay (s) - - 20.4 8.5 0 HCM Lane LOS - - C A A HCM 95th %tile Q(veh) - - 3 0.1 - South Ashland Business Park TPRA L - 40 Lanes, Volumes, Timings 8: Washington St & Independent Way 9/7/2017 South Ashland Business Park 12/1/2016 2034 PM - Build Conditions Synchro 8 Report Page 23 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Volume (vph)58 23 118 127 51 37 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.962 0.943 Flt Protected 0.965 0.976 Satd. Flow (prot)1593 0 0 1675 1618 0 Flt Permitted 0.965 0.976 Satd. Flow (perm)1593 0 0 1675 1618 0 Link Speed (mph)25 25 25 Link Distance (ft)708 248 696 Travel Time (s)19.3 6.8 19.0 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 Adj. Flow (vph)68 27 139 149 60 44 Shared Lane Traffic (%) Lane Group Flow (vph) 95 0 0 288 104 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft)12 0 0 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 Sign Control Stop Free Free Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 32.7% ICU Level of Service A Analysis Period (min) 15 South Ashland Business Park TPRA L - 41 HCM 2010 TWSC 8: Washington St & Independent Way 9/7/2017 South Ashland Business Park 12/1/2016 2034 PM - Build Conditions Synchro 8 Report Page 24 Intersection Int Delay, s/veh 4.7 Movement EBL EBR NBL NBT SBT SBR Vol, veh/h 58 23 118 127 51 37 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 -- -- - Veh in Median Storage, # 0 -- 0 0 - Grade, %0 -- 0 0 - Peak Hour Factor 85 85 85 85 85 85 Heavy Vehicles, %2 2 2 2 2 2 Mvmt Flow 68 27 139 149 60 44 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 509 82 104 0 - 0 Stage 1 82 -- -- - Stage 2 427 -- -- - Critical Hdwy 6.42 6.22 4.12 -- - Critical Hdwy Stg 1 5.42 -- -- - Critical Hdwy Stg 2 5.42 -- -- - Follow-up Hdwy 3.518 3.318 2.218 -- - Pot Cap-1 Maneuver 524 978 1488 -- - Stage 1 941 -- -- - Stage 2 658 -- -- - Platoon blocked, %-- - Mov Cap-1 Maneuver 471 978 1488 -- - Mov Cap-2 Maneuver 471 -- -- - Stage 1 941 -- -- - Stage 2 591 -- -- - Approach EB NB SB HCM Control Delay, s 12.9 3.7 0 HCM LOS B Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h)1488 - 552 - - HCM Lane V/C Ratio 0.093 - 0.173 - - HCM Control Delay (s) 7.7 0 12.9 - - HCM Lane LOS A A B - - HCM 95th %tile Q(veh) 0.3 - 0.6 - - South Ashland Business Park TPRA L - 42 Lanes, Volumes, Timings 10: Site Driveway & Washington St 9/7/2017 South Ashland Business Park 12/1/2016 2034 PM - Build Conditions Synchro 8 Report Page 27 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Volume (vph)7 38 0 17 185 0 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.885 Flt Protected 0.950 Satd. Flow (prot)1518 0 0 1716 1630 0 Flt Permitted 0.950 Satd. Flow (perm) 1518 0 0 1716 1630 0 Link Speed (mph)25 25 25 Link Distance (ft)405 170 345 Travel Time (s)11.0 4.6 9.4 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 Adj. Flow (vph)8 45 0 20 218 0 Shared Lane Traffic (%) Lane Group Flow (vph) 53 0 0 20 218 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft)0 0 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph)9 15 15 9 Sign Control Free Free Stop Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 21.1% ICU Level of Service A Analysis Period (min) 15 South Ashland Business Park TPRA L - 43 HCM 2010 TWSC 10: Site Driveway & Washington St 9/7/2017 South Ashland Business Park 12/1/2016 2034 PM - Build Conditions Synchro 8 Report Page 28 Intersection Int Delay, s/veh 7.4 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h 7 38 0 17 185 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - -- -0 - Veh in Median Storage, #0 -- 0 0 - Grade, %0 -- 0 0 - Peak Hour Factor 85 85 85 85 85 85 Heavy Vehicles, %2 2 2 2 2 2 Mvmt Flow 8 45 0 20 218 0 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 53 0 51 31 Stage 1 - -- -31 - Stage 2 - -- -20 - Critical Hdwy - - 4.12 -6.42 6.22 Critical Hdwy Stg 1 - -- -5.42 - Critical Hdwy Stg 2 - -- -5.42 - Follow-up Hdwy - - 2.218 -3.518 3.318 Pot Cap-1 Maneuver - - 1553 -958 1043 Stage 1 - -- -992 - Stage 2 - -- -1003 - Platoon blocked, %- -- Mov Cap-1 Maneuver - - 1553 -958 1043 Mov Cap-2 Maneuver - -- -958 - Stage 1 - -- -992 - Stage 2 - -- -1003 - Approach EB WB NB HCM Control Delay, s 0 0 9.9 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h)958 - - 1553 - HCM Lane V/C Ratio 0.227 ---- HCM Control Delay (s) 9.9 - - 0 - HCM Lane LOS A - - A - HCM 95th %tile Q(veh) 0.9 - - 0 - South Ashland Business Park TPRA L - 44 Lanes, Volumes, Timings 3: Tolman Creek Rd & Ashland Street 9/8/2017 South Ashland Business Park 12/1/2016 2034 PM - Build TC Conditions Synchro 8 Report Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)125 1022 99 240 617 77 158 119 230 70 122 69 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)115 0 115 0 87 0 83 0 Storage Lanes 1 0 1 0 1 0 1 0 Taper Length (ft)77 66 87 84 Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.987 0.983 0.901 0.946 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot)1646 3252 0 1630 3229 0 1662 1541 0 1662 1645 0 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm)1646 3252 0 1630 3229 0 1662 1541 0 1662 1645 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)10 14 75 21 Link Speed (mph)35 35 25 25 Link Distance (ft)1678 724 696 1812 Travel Time (s)32.7 14.1 19.0 49.4 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%)1% 1% 0% 2% 1% 3% 0% 1% 3% 0% 1% 0% Adj. Flow (vph)132 1076 104 253 649 81 166 125 242 74 128 73 Shared Lane Traffic (%) Lane Group Flow (vph) 132 1180 0 253 730 0 166 367 0 74 201 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)12 12 12 12 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Yes Yes Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2 2 2 2 2 2 2 2 Detector Template ODOT Left/SideODOT 35 Thru ODOT Left/SideODOT 35 Thru ODOT Left/SideODOT Left/Side ODOT Left/SideODOT Left/Side Leading Detector (ft)78 223 78 223 78 78 78 78 Trailing Detector (ft)2 107 2 107 2 2 2 2 Detector 1 Position(ft)2 107 2 107 2 2 2 2 Detector 1 Size(ft)16 6 16 6 16 16 16 16 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 72 217 72 217 72 72 72 72 Detector 2 Size(ft)6 6 6 6 6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Prot NA Prot NA Prot NA Prot NA Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases South Ashland Business Park TPRA L - 50 Lanes, Volumes, Timings 3: Tolman Creek Rd & Ashland Street 9/8/2017 South Ashland Business Park 12/1/2016 2034 PM - Build TC Conditions Synchro 8 Report Page 8 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 5 2 1 6 3 8 7 4 Switch Phase Minimum Initial (s)4.0 9.5 4.0 9.5 4.0 6.0 4.0 6.0 Minimum Split (s)13.0 14.0 13.0 14.0 13.0 13.0 13.0 13.0 Total Split (s)21.0 51.0 25.0 55.0 20.0 31.0 13.0 24.0 Total Split (%)17.5% 42.5% 20.8% 45.8% 16.7% 25.8% 10.8% 20.0% Maximum Green (s) 16.5 46.5 20.5 50.5 16.0 27.0 9.0 20.0 Yellow Time (s)4.0 4.0 4.0 4.0 3.5 3.5 3.5 3.5 All-Red Time (s)0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 Lost Time Adjust (s) -0.5 -0.5 -0.5 -0.5 0.0 0.0 0.0 0.0 Total Lost Time (s)4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.5 4.0 2.5 4.0 2.5 2.5 2.5 2.5 Minimum Gap (s)2.0 2.7 2.0 2.7 2.0 2.0 2.0 2.0 Time Before Reduce (s) 8.0 10.0 8.0 10.0 8.0 8.0 8.0 8.0 Time To Reduce (s)4.0 13.0 4.0 13.0 4.0 4.0 4.0 4.0 Recall Mode None Min None Min None None None None Walk Time (s)7.0 7.0 7.0 7.0 Flash Dont Walk (s)16.7 16.0 22.9 23.0 Pedestrian Calls (#/hr)0000 Act Effct Green (s) 13.8 44.4 20.0 50.6 14.4 26.6 8.3 17.8 Actuated g/C Ratio 0.12 0.39 0.18 0.45 0.13 0.24 0.07 0.16 v/c Ratio 0.66 0.92 0.88 0.50 0.78 0.87 0.61 0.73 Control Delay 65.0 45.5 76.9 24.3 74.7 57.0 75.4 57.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 65.0 45.5 76.9 24.3 74.7 57.0 75.4 57.4 LOS ED EC EE EE Approach Delay 47.4 37.8 62.5 62.3 Approach LOS D D E E Intersection Summary Area Type:Other Cycle Length: 120 Actuated Cycle Length: 112.9 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.92 Intersection Signal Delay: 48.3 Intersection LOS: D Intersection Capacity Utilization 88.2%ICU Level of Service E Analysis Period (min) 15 Splits and Phases: 3: Tolman Creek Rd & Ashland Street South Ashland Business Park TPRA L - 51 HCM Signalized Intersection Capacity Analysis 3: Tolman Creek Rd & Ashland Street 9/8/2017 South Ashland Business Park 12/1/2016 2034 PM - Build TC Conditions Synchro 8 Report Page 9 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)125 1022 99 240 617 77 158 119 230 70 122 69 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Total Lost time (s)4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00 Frt 1.00 0.99 1.00 0.98 1.00 0.90 1.00 0.95 Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot)1646 3251 1630 3230 1662 1541 1662 1644 Flt Permitted 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (perm)1646 3251 1630 3230 1662 1541 1662 1644 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Adj. Flow (vph)132 1076 104 253 649 81 166 125 242 74 128 73 RTOR Reduction (vph)06008005700180 Lane Group Flow (vph) 132 1174 0 253 722 0 166 310 0 74 183 0 Heavy Vehicles (%) 1% 1% 0% 2% 1% 3% 0% 1% 3% 0% 1% 0% Turn Type Prot NA Prot NA Prot NA Prot NA Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases Actuated Green, G (s) 13.3 43.9 19.5 50.1 14.4 26.6 6.7 18.9 Effective Green, g (s) 13.8 44.4 20.0 50.6 14.4 26.6 6.7 18.9 Actuated g/C Ratio 0.12 0.39 0.18 0.45 0.13 0.23 0.06 0.17 Clearance Time (s)4.5 4.5 4.5 4.5 4.0 4.0 4.0 4.0 Vehicle Extension (s) 2.5 4.0 2.5 4.0 2.5 2.5 2.5 2.5 Lane Grp Cap (vph) 199 1269 286 1437 210 360 97 273 v/s Ratio Prot 0.08 c0.36 c0.16 0.22 c0.10 c0.20 0.04 0.11 v/s Ratio Perm v/c Ratio 0.66 0.93 0.88 0.50 0.79 0.86 0.76 0.67 Uniform Delay, d1 47.7 33.1 45.7 22.6 48.2 41.8 52.7 44.5 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 7.3 11.6 25.9 0.4 17.6 17.9 28.2 5.8 Delay (s)55.0 44.6 71.6 22.9 65.7 59.7 80.9 50.3 Level of Service E D E C E E F D Approach Delay (s)45.7 35.5 61.6 58.5 Approach LOS D D E E Intersection Summary HCM 2000 Control Delay 46.3 HCM 2000 Level of Service D HCM 2000 Volume to Capacity ratio 0.91 Actuated Cycle Length (s) 113.7 Sum of lost time (s)16.0 Intersection Capacity Utilization 88.2% ICU Level of Service E Analysis Period (min)15 c Critical Lane Group South Ashland Business Park TPRA L - 52 Lanes, Volumes, Timings 4: Washington St & Ashland Street 9/8/2017 South Ashland Business Park 12/1/2016 2034 PM - Build TC Conditions Synchro 8 Report Page 11 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Volume (vph)1239 23 101 855 12 164 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Storage Length (ft)0 100 0 73 Storage Lanes 0 1 1 1 Taper Length (ft)75 25 Lane Util. Factor 0.95 0.95 1.00 0.95 1.00 1.00 Ped Bike Factor Frt 0.997 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot)3283 0 1662 3260 1662 1488 Flt Permitted 0.950 0.950 Satd. Flow (perm)3283 0 1662 3260 1662 1488 Link Speed (mph)35 35 25 Link Distance (ft)724 413 696 Travel Time (s)14.1 8.0 19.0 Confl. Peds. (#/hr)979 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles (%)1% 0% 0% 2% 0% 0% Adj. Flow (vph)1318 24 107 910 13 174 Shared Lane Traffic (%) Lane Group Flow (vph) 1342 0 107 910 13 174 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft)12 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Yes Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph)9 15 15 9 Sign Control Free Free Stop Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 57.6% ICU Level of Service B Analysis Period (min) 15 South Ashland Business Park TPRA L - 53 HCM 2010 TWSC 4: Washington St & Ashland Street 9/8/2017 South Ashland Business Park 12/1/2016 2034 PM - Build TC Conditions Synchro 8 Report Page 12 Intersection Int Delay, s/veh 2.5 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h 1239 23 101 855 12 164 Conflicting Peds, #/hr 0 979 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - 100 -0 73 Veh in Median Storage, #0 -- 0 0 - Grade, %0 -- 0 0 - Peak Hour Factor 94 94 94 94 94 94 Heavy Vehicles, %1 0 0 2 0 0 Mvmt Flow 1318 24 107 910 13 174 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 1343 0 2000 671 Stage 1 - -- -1330 - Stage 2 - -- -670 - Critical Hdwy - - 4.1 -6.8 6.9 Critical Hdwy Stg 1 - -- -5.8 - Critical Hdwy Stg 2 - -- -5.8 - Follow-up Hdwy - - 2.2 -3.5 3.3 Pot Cap-1 Maneuver - - 520 -53 404 Stage 1 - -- -215 - Stage 2 - -- -476 - Platoon blocked, %- -- Mov Cap-1 Maneuver - - 520 -~ 8 404 Mov Cap-2 Maneuver - -- -51 - Stage 1 - -- -215 - Stage 2 - -- -70 - Approach EB WB NB HCM Control Delay, s 0 1.4 25.8 HCM LOS D Minor Lane/Major Mvmt NBLn1NBLn2 EBT EBR WBL WBT Capacity (veh/h)51 404 - - 520 - HCM Lane V/C Ratio 0.25 0.432 - - 0.207 - HCM Control Delay (s) 97.7 20.5 - - 13.7 - HCM Lane LOS F C - - B - HCM 95th %tile Q(veh) 0.8 2.1 - - 0.8 - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon South Ashland Business Park TPRA L - 54 Lanes, Volumes, Timings 5: I-5 SB Ramp & Ashland Street 9/8/2017 South Ashland Business Park 12/1/2016 2034 PM - Build TC Conditions Synchro 8 Report Page 13 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)0 1306 104 29 401 00002091625 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)0 0 111 0 0 0 0 200 Storage Lanes 0 1 1 0 0 0 0 1 Taper Length (ft)25 70 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.953 Satd. Flow (prot)0 1699 1458 1662 1699 000001589 1458 Flt Permitted 0.051 0.953 Satd. Flow (perm)0 1699 1458 89 1699 000001589 1458 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)70 538 Link Speed (mph)35 35 45 45 Link Distance (ft)413 560 744 614 Travel Time (s)8.0 10.9 11.3 9.3 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%)0% 3% 2% 0% 3% 0% 0% 0% 0% 5% 0% 2% Adj. Flow (vph)0 1375 109 31 422 00002201658 Shared Lane Traffic (%) Lane Group Flow (vph) 0 1375 109 31 422 00000221658 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)12 12 0 0 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2122 133 Detector Template ODOT 35 ThruODOT RightODOT Left/SideODOT 35 Thru LeftODOT Ramp HSODOT Ramp HS Leading Detector (ft)223 143 78 223 20 213 213 Trailing Detector (ft)107 137 2 107 0 2 2 Detector 1 Position(ft)107 137 2 107 0 2 2 Detector 1 Size(ft)6 6 16 6 20 16 16 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft)217 72 217 107 107 Detector 2 Size(ft)6 6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s)0.0 0.0 0.0 0.0 0.0 Detector 3 Position(ft)207 207 Detector 3 Size(ft)66 Detector 3 Type Cl+Ex Cl+Ex South Ashland Business Park TPRA L - 55 HCM Signalized Intersection Capacity Analysis 5: I-5 SB Ramp & Ashland Street 9/8/2017 South Ashland Business Park 12/1/2016 2034 PM - Build TC Conditions Synchro 8 Report Page 15 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)0 1306 104 29 401 00002091625 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Total Lost time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.85 1.00 1.00 1.00 0.85 Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot)1699 1458 1662 1699 1588 1458 Flt Permitted 1.00 1.00 0.05 1.00 0.95 1.00 Satd. Flow (perm)1699 1458 88 1699 1588 1458 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Adj. Flow (vph)0 1375 109 31 422 00002201658 RTOR Reduction (vph) 0 0 22 00000000444 Lane Group Flow (vph) 0 1375 87 31 422 00000221214 Heavy Vehicles (%) 0% 3% 2% 0% 3% 0% 0% 0% 0% 5% 0% 2% Turn Type NA Perm pm+pt NA Perm NA Perm Protected Phases 2 1 6 4 Permitted Phases 2 6 4 4 Actuated Green, G (s)74.7 74.7 82.6 82.6 18.0 18.0 Effective Green, g (s)75.2 75.2 83.1 83.1 19.4 19.4 Actuated g/C Ratio 0.68 0.68 0.75 0.75 0.18 0.18 Clearance Time (s)4.5 4.5 4.5 4.5 5.4 5.4 Vehicle Extension (s)4.0 4.0 2.5 4.0 2.5 2.5 Lane Grp Cap (vph)1156 992 121 1277 278 255 v/s Ratio Prot c0.81 0.01 c0.25 v/s Ratio Perm 0.06 0.18 0.14 c0.15 v/c Ratio 1.19 0.09 0.26 0.33 0.79 0.84 Uniform Delay, d1 17.6 6.0 29.5 4.5 43.6 44.1 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 94.1 0.1 0.8 0.2 14.0 21.1 Delay (s)111.8 6.0 30.3 4.7 57.7 65.2 Level of Service F A C A E E Approach Delay (s)104.0 6.5 0.0 63.3 Approach LOS F A A E Intersection Summary HCM 2000 Control Delay 75.6 HCM 2000 Level of Service E HCM 2000 Volume to Capacity ratio 1.09 Actuated Cycle Length (s) 110.5 Sum of lost time (s)12.0 Intersection Capacity Utilization 100.6% ICU Level of Service G Analysis Period (min)15 c Critical Lane Group South Ashland Business Park TPRA L - 57 Lanes, Volumes, Timings 6: I-5 NB Ramp & Ashland Street 9/8/2017 South Ashland Business Park 12/1/2016 2034 PM - Build TC Conditions Synchro 8 Report Page 17 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)861 654 0 0 381 367 49 0 51 0 0 0 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)212 0 0 160 0 95 0 0 Storage Lanes 1 0 0 1 0 1 0 0 Taper Length (ft)72 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot)1646 1750 0 0 1733 1458 0 1539 1328 0 0 0 Flt Permitted 0.154 0.950 Satd. Flow (perm)267 1750 0 0 1733 1458 0 1539 1328 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR)285 55 Link Speed (mph)35 35 45 45 Link Distance (ft)560 889 615 566 Travel Time (s)10.9 17.3 9.3 8.6 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%)1% 0% 0% 0% 1% 2% 8% 0% 12% 0% 0% 0% Adj. Flow (vph)906 688 0 0 401 386 52 0 54 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 906 688 0 0 401 386 0 52 54 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft)12 12 0 0 Link Offset(ft)0000 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2 2 21133 Detector Template ODOT Left/SideODOT 35 Thru ODOT 35 ThruODOT Right LeftODOT Ramp HSODOT Ramp HS Leading Detector (ft) 78 223 223 143 20 213 213 Trailing Detector (ft)2 107 107 137 0 2 2 Detector 1 Position(ft)2 107 107 137 0 2 2 Detector 1 Size(ft)16 6 6 6 20 16 16 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 72 217 217 107 107 Detector 2 Size(ft)6 6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 0.0 Detector 3 Position(ft)207 207 Detector 3 Size(ft)6 6 Detector 3 Type Cl+Ex Cl+Ex South Ashland Business Park TPRA L - 58 Lanes, Volumes, Timings 6: I-5 NB Ramp & Ashland Street 9/8/2017 South Ashland Business Park 12/1/2016 2034 PM - Build TC Conditions Synchro 8 Report Page 18 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector 3 Channel Detector 3 Extend (s) 0.0 0.0 Turn Type pm+pt NA NA Perm Perm NA Perm Protected Phases 5 2 6 8 Permitted Phases 2 6 8 8 Detector Phase 5 2 66888 Switch Phase Minimum Initial (s) 4.0 9.5 9.5 9.5 6.0 6.0 6.0 Minimum Split (s)13.0 14.0 34.9 34.9 31.8 31.8 31.8 Total Split (s)63.0 97.0 34.0 34.0 23.0 23.0 23.0 Total Split (%)52.5% 80.8%28.3% 28.3% 19.2% 19.2% 19.2% Maximum Green (s) 58.5 92.5 29.5 29.5 17.6 17.6 17.6 Yellow Time (s)4.0 4.0 4.0 4.0 4.7 4.7 4.7 All-Red Time (s)0.5 0.5 0.5 0.5 0.7 0.7 0.7 Lost Time Adjust (s) -0.5 -0.5 -0.5 -0.5 -1.4 -1.4 Total Lost Time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 2.5 4.0 4.0 4.0 2.5 2.5 2.5 Minimum Gap (s)2.0 2.7 2.7 2.7 2.0 2.0 2.0 Time Before Reduce (s) 8.0 10.0 10.0 10.0 8.0 8.0 8.0 Time To Reduce (s)4.0 13.0 13.0 13.0 4.0 4.0 4.0 Recall Mode None Min Min Min None None None Walk Time (s)7.0 5.0 5.0 7.0 7.0 7.0 Flash Dont Walk (s)19.5 25.4 25.4 19.4 19.4 19.4 Pedestrian Calls (#/hr)0 00000 Act Effct Green (s)92.0 92.9 28.4 28.4 10.2 10.2 Actuated g/C Ratio 0.86 0.86 0.26 0.26 0.09 0.09 v/c Ratio 0.91 0.45 0.88 0.65 0.36 0.31 Control Delay 33.6 3.6 59.7 15.7 54.3 17.0 Queue Delay 17.1 0.7 0.0 0.0 0.0 0.0 Total Delay 50.7 4.3 59.7 15.7 54.3 17.0 LOS DA EB DB Approach Delay 30.7 38.1 35.3 Approach LOS C D D Intersection Summary Area Type:Other Cycle Length: 120 Actuated Cycle Length: 107.5 Natural Cycle: 150 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.91 Intersection Signal Delay: 33.2 Intersection LOS: C Intersection Capacity Utilization 100.6% ICU Level of Service G Analysis Period (min) 15 Splits and Phases: 6: I-5 NB Ramp & Ashland Street South Ashland Business Park TPRA L - 59 HCM Signalized Intersection Capacity Analysis 6: I-5 NB Ramp & Ashland Street 9/8/2017 South Ashland Business Park 12/1/2016 2034 PM - Build TC Conditions Synchro 8 Report Page 19 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph)861 654 0 0 381 367 49 0 51 0 0 0 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Total Lost time (s)4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.85 1.00 0.85 Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00 Satd. Flow (prot)1646 1750 1733 1458 1539 1328 Flt Permitted 0.15 1.00 1.00 1.00 0.95 1.00 Satd. Flow (perm)267 1750 1733 1458 1539 1328 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Adj. Flow (vph)906 688 0 0 401 386 52 0 54 0 0 0 RTOR Reduction (vph)000002100050000 Lane Group Flow (vph) 906 688 0 0 401 176 0 52 4000 Heavy Vehicles (%) 1% 0% 0% 0% 1% 2% 8% 0% 12% 0% 0% 0% Turn Type pm+pt NA NA Perm Perm NA Perm Protected Phases 5 2 6 8 Permitted Phases 2 6 8 8 Actuated Green, G (s) 91.5 91.5 28.0 28.0 7.3 7.3 Effective Green, g (s) 92.0 92.0 28.5 28.5 8.7 8.7 Actuated g/C Ratio 0.85 0.85 0.26 0.26 0.08 0.08 Clearance Time (s)4.5 4.5 4.5 4.5 5.4 5.4 Vehicle Extension (s) 2.5 4.0 4.0 4.0 2.5 2.5 Lane Grp Cap (vph) 980 1481 454 382 123 106 v/s Ratio Prot c0.51 0.39 0.23 v/s Ratio Perm c0.28 0.12 0.03 0.00 v/c Ratio 0.92 0.46 0.88 0.46 0.42 0.04 Uniform Delay, d1 18.1 2.1 38.5 33.6 47.6 46.1 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 13.9 0.3 18.5 1.2 1.7 0.1 Delay (s)32.0 2.4 57.0 34.8 49.3 46.3 Level of Service C A E C D D Approach Delay (s)19.2 46.1 47.8 0.0 Approach LOS B D D A Intersection Summary HCM 2000 Control Delay 29.0 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.90 Actuated Cycle Length (s) 108.7 Sum of lost time (s)12.0 Intersection Capacity Utilization 100.6% ICU Level of Service G Analysis Period (min)15 c Critical Lane Group South Ashland Business Park TPRA L - 60 Lanes, Volumes, Timings 7: Tolman Creek Rd & Independent Way 9/8/2017 South Ashland Business Park 12/1/2016 2034 PM - Build TC Conditions Synchro 8 Report Page 21 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Volume (vph)59 121 452 21 26 482 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.909 0.994 Flt Protected 0.984 0.997 Satd. Flow (prot)1535 0 1705 0 0 1711 Flt Permitted 0.984 0.997 Satd. Flow (perm)1535 0 1705 0 0 1711 Link Speed (mph)30 25 25 Link Distance (ft)708 1733 696 Travel Time (s)16.1 47.3 19.0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph)64 132 491 23 28 524 Shared Lane Traffic (%) Lane Group Flow (vph) 196 0 514 0 0 552 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(ft)12 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Yes Yes Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 9 15 Sign Control Stop Free Free Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 68.9% ICU Level of Service C Analysis Period (min) 15 South Ashland Business Park TPRA L - 61 HCM 2010 TWSC 7: Tolman Creek Rd & Independent Way 9/8/2017 South Ashland Business Park 12/1/2016 2034 PM - Build TC Conditions Synchro 8 Report Page 22 Intersection Int Delay, s/veh 2.9 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h 59 121 452 21 26 482 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 -- -- - Veh in Median Storage, # 0 -0 -- 0 Grade, %0 -0 -- 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, %2 2 2 2 2 2 Mvmt Flow 64 132 491 23 28 524 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 1083 503 0 0 514 0 Stage 1 503 -- -- - Stage 2 580 -- -- - Critical Hdwy 6.42 6.22 - - 4.12 - Critical Hdwy Stg 1 5.42 -- -- - Critical Hdwy Stg 2 5.42 -- -- - Follow-up Hdwy 3.518 3.318 - - 2.218 - Pot Cap-1 Maneuver 240 569 - - 1052 - Stage 1 607 -- -- - Stage 2 560 -- -- - Platoon blocked, %- -- Mov Cap-1 Maneuver 231 569 - - 1052 - Mov Cap-2 Maneuver 365 -- -- - Stage 1 607 -- -- - Stage 2 539 -- -- - Approach WB NB SB HCM Control Delay, s 17.5 0 0.4 HCM LOS C Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h)- - 481 1052 - HCM Lane V/C Ratio - - 0.407 0.027 - HCM Control Delay (s) - - 17.5 8.5 0 HCM Lane LOS - - C A A HCM 95th %tile Q(veh) - - 1.9 0.1 - South Ashland Business Park TPRA L - 62 Lanes, Volumes, Timings 8: Washington St & Independent Way 9/8/2017 South Ashland Business Park 12/1/2016 2034 PM - Build TC Conditions Synchro 8 Report Page 23 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Volume (vph)58 20 66 76 46 37 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.965 0.939 Flt Protected 0.964 0.977 Satd. Flow (prot)1596 0 0 1676 1611 0 Flt Permitted 0.964 0.977 Satd. Flow (perm)1596 0 0 1676 1611 0 Link Speed (mph)25 25 25 Link Distance (ft)708 248 696 Travel Time (s)19.3 6.8 19.0 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 Adj. Flow (vph)68 24 78 89 54 44 Shared Lane Traffic (%) Lane Group Flow (vph) 92 0 0 167 98 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft)12 0 0 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph) 15 9 15 9 Sign Control Stop Free Free Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 26.5% ICU Level of Service A Analysis Period (min) 15 South Ashland Business Park TPRA L - 63 HCM 2010 TWSC 8: Washington St & Independent Way 9/8/2017 South Ashland Business Park 12/1/2016 2034 PM - Build TC Conditions Synchro 8 Report Page 24 Intersection Int Delay, s/veh 4.4 Movement EBL EBR NBL NBT SBT SBR Vol, veh/h 58 20 66 76 46 37 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 -- -- - Veh in Median Storage, # 0 -- 0 0 - Grade, %0 -- 0 0 - Peak Hour Factor 85 85 85 85 85 85 Heavy Vehicles, %2 2 2 2 2 2 Mvmt Flow 68 24 78 89 54 44 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 321 76 98 0 - 0 Stage 1 76 -- -- - Stage 2 245 -- -- - Critical Hdwy 6.42 6.22 4.12 -- - Critical Hdwy Stg 1 5.42 -- -- - Critical Hdwy Stg 2 5.42 -- -- - Follow-up Hdwy 3.518 3.318 2.218 -- - Pot Cap-1 Maneuver 673 985 1495 -- - Stage 1 947 -- -- - Stage 2 796 -- -- - Platoon blocked, %-- - Mov Cap-1 Maneuver 636 985 1495 -- - Mov Cap-2 Maneuver 636 -- -- - Stage 1 947 -- -- - Stage 2 752 -- -- - Approach EB NB SB HCM Control Delay, s 10.9 3.5 0 HCM LOS B Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h)1495 - 700 - - HCM Lane V/C Ratio 0.052 - 0.131 - - HCM Control Delay (s) 7.5 0 10.9 - - HCM Lane LOS A A B - - HCM 95th %tile Q(veh) 0.2 - 0.5 - - South Ashland Business Park TPRA L - 64 Lanes, Volumes, Timings 10: Site Driveway & Washington St 9/8/2017 South Ashland Business Park 12/1/2016 2034 PM - Build TC Conditions Synchro 8 Report Page 27 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Volume (vph)7 30 0 17 82 0 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.890 Flt Protected 0.950 Satd. Flow (prot)1527 0 0 1716 1630 0 Flt Permitted 0.950 Satd. Flow (perm) 1527 0 0 1716 1630 0 Link Speed (mph)25 25 25 Link Distance (ft)405 170 345 Travel Time (s)11.0 4.6 9.4 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 Adj. Flow (vph)8 35 0 20 96 0 Shared Lane Traffic (%) Lane Group Flow (vph) 43 0 0 20 96 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft)0 0 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.11 1.11 1.11 1.11 1.11 1.11 Turning Speed (mph)9 15 15 9 Sign Control Free Free Stop Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 14.9% ICU Level of Service A Analysis Period (min) 15 South Ashland Business Park TPRA L - 65 HCM 2010 TWSC 10: Site Driveway & Washington St 9/8/2017 South Ashland Business Park 12/1/2016 2034 PM - Build TC Conditions Synchro 8 Report Page 28 Intersection Int Delay, s/veh 5.5 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h 7 30 0 17 82 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - -- -0 - Veh in Median Storage, #0 -- 0 0 - Grade, %0 -- 0 0 - Peak Hour Factor 85 85 85 85 85 85 Heavy Vehicles, %2 2 2 2 2 2 Mvmt Flow 8 35 0 20 96 0 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 44 0 46 26 Stage 1 - -- -26 - Stage 2 - -- -20 - Critical Hdwy - - 4.12 -6.42 6.22 Critical Hdwy Stg 1 - -- -5.42 - Critical Hdwy Stg 2 - -- -5.42 - Follow-up Hdwy - - 2.218 -3.518 3.318 Pot Cap-1 Maneuver - - 1564 -964 1050 Stage 1 - -- -997 - Stage 2 - -- -1003 - Platoon blocked, %- -- Mov Cap-1 Maneuver - - 1564 -964 1050 Mov Cap-2 Maneuver - -- -964 - Stage 1 - -- -997 - Stage 2 - -- -1003 - Approach EB WB NB HCM Control Delay, s 0 0 9.1 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h)964 - - 1564 - HCM Lane V/C Ratio 0.1 ---- HCM Control Delay (s) 9.1 - - 0 - HCM Lane LOS A - - A - HCM 95th %tile Q(veh) 0.3 - - 0 - South Ashland Business Park TPRA L - 66 SANDOW ENGINEERING 160 Madison Street, Suite A Eugene, Oregon 97402 541.513.3376 sandowengineering.com