Loading...
HomeMy WebLinkAboutTransportation Packet October 2020 Note: Anyone wishing to speak at any Transportation Commission meeting is encouraged to do so. If you wish to speak, please rise and, after you have been recognized by the Chair, give your name and complete address for the record. You will then be allowed to speak. Please note the public testimony may be limited by the Chair. AASSHHLLAANNDD TTRRAANNSSPPOORRTTAATTIIOONN CCOOMMMMIISSSSIIOONN OOccttoobbeerr 1155,, 22002200 AGENDA I. CALL TO ORDER: 6:00 PM, Civic Center Council Chambers, 1175 E. Main Street II. ANNOUNCEMENTS III. CONSENT AGENDA A. Approval of Minutes: September 17, 2020 IV. PUBLIC FORUM (6:05-6:20) A. Public Forum-if you wish to speak during public forum please register with Shannon.burrus@ashland.or.us by 10am October 14th. B. Comments on agenda items to be submitted in writing by 10am October 14th to Shannon.burrus@ashland.or.us C. If you are interested in watching the meeting via Zoom please utilize the following link: https://zoom.us/j/92659771983 V. ACCIDENT REPORT (6:20-6:30) VI. NEW BUSINESS A. Evacuation Planning Study (6:30-7:30, action required, discuss current and previous evacuation planning studies and background information) B. Street Capital Plan and budget process Budget Process (7:30-7:55, no action required, discussion on budget process and street CIP development, Link-20 year CIP document) VII. OLD BUSINESS A. None VIII. TASK LIST (If time allows) A. Discuss current action item list IX. FOLLOW UP ITEMS A. Terrace Street Traffic Calming Program-Property Owner Letter X. INFORMATIONAL ITEMS (If time allows) A. None XI. COMMISSION OPEN DISCUSSION (If time allows) XII. FUTURE AGENDA TOPICS A. Bike Map Subcommittee B. Street Capital Improvement Plan (budget process) C. Street User Fee/Gas Tax (budget process) D. Demand Response Microtransit pilot project update E. Bus Pass Program F. Crosswalk Policy XIII. ADJOURNMENT: 8:00 PM Next Meeting Date: November 19, 2020 Meeting In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please contact the Public Works Office at 488-5587 (TTY phone number 1 800 735 2900). Notification 48 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to the meeting (28 CFR 35.102-35.104 ADA Title I). 1 Transportation Commission Contact List as of March 2020 Name Title Telephone Mailing Address Email Address Expiration of Term Mark Brouillard Commissioner 206-661-7085 159 Helman St mtbrouillard@msn.com 4/30/2023 Joe Graf Commissioner 541-488-8429 1160 Fern St. jlgtrans15@gmail.com 4/30/2021 Corinne Vièville Commissioner 541-488-9300 or 541-944-9600 805 Glendale Ave. corinne@mind.net 4/30/2022 Derrick Claypool-Barnes Commissioner 503-482-9271 1361 Quincy St #6F dorkforest@gmail.com 4/30/2021 Linda Peterson Adams Commissioner 541-554-1544 642 Oak St gardengriotashland@gmail.com 4/30/2022 Katharine Danner Commissioner 541-482-2302 PO Box 628 ksd@mtashland.net 4/30/2022 Bruce Borgerson Commissioner 541-488-5542 209 Sleepy Hollow Dr wave@mind.net 4/30/2023 Non-Voting Ex Officio Membership Scott Fleury Interim Director, Public Works 541-488-5587 20 E. Main Street scott.fleury@ashland.or.us Julie Akins Council Liaison 20 E. Main Street julie@council.ashland.or.us Brandon Goldman Planning Department 541- 488-5305 20 E. Main Street goldmanb@ashland.or.us Steve MacLennan Police Department 541- 552-2433 20 E. Main Street maclenns@ashland.or.us Vacant SOU Liaison 541-552-8328 1250 Siskiyou Blvd Dan Dorrell, PE ODOT 541- 774-6354 100 Antelope Rd WC 97503 Dan.w.dorrell@odot.state.or.us Edem Gómez RVTD 541-608-2411 3200 Crater Lake Av 97504 egomez@rvtd.org Jenna Stanke ODOT 541- 774-5925 100 Antelope Rd WC 97503 Jenna.MARMON@odot.state.or.us David Wolske Airport Commission david@davidwolske.com Vacant Ashland Parks Vacant Ashland Schools Staff Support Scott Fleury Interim Public Works Director 541-488-5347 20 E. Main Street Scott.fleury@ashland.or.us Karl Johnson Associate Engineer 541-552-2415 20 E. Main Street johnsonk@ashland.or.us Shannon Burrus Permit Technician 541-552-2428 20 E. Main Street Shannon.burrus@ashland.or.us 2 From:City of Ashland, Oregon To:Scott Fleury; Taina Glick Subject:Transportation Commission Contact Form Submitted Date:Tuesday, October 06, 2020 8:10:32 AM [EXTERNAL SENDER] *** FORM FIELD DATA*** Full Name: Leigh HoodPhone: 5412159889 Email: leighoh@me.comSubject: Terrace Street Traffic Calming Message: This email was sent to Scott Fleury and Steve MacLennan: Thank you for yourletter about the September 17th Transportation Commission meeting. We areencouraged the commission wants to do more analysis to analyze pedestrian and bicycletraffic, however, I don't see the reason you need to wait until the spring to begingathering data. The street is just as busy in October as it is in the spring. Your letterstates, your "expectation is that activity levels would begin to return to a morenormalized pattern by then." Many people are out getting exercise and taking advantageof this beautiful, clear air. Until it begins raining at least, there?s no reason to wait. Wewould like to know what gathering pedestrian and bicycle data entails from the PublicWorks Department. Does someone sit in a car and count the number of pedestrians andbicyclists over a period of time? Is that something we could be doing? People are walkingon the street from the crack of dawn to end of day or dusk. Could I organize neighborsto take an hour out of their day to count pedestrians and bicyclists? If so, can you adviseus on what we need to do to collect reliable data? What your letter does not address isthe urgency around deterring speeding cars which is why I am including SteveMacLennan in this letter. Can we get a police officer on a motorcycle up here when itwould make the best use of his or her time? Those times are (though not exclusively):Monday-Friday* 7:00-10:00 a.m. Monday-Friday* 3:00-6:00 p.m. Saturdays 7:00-10:30a.m. Sundays 7:00-10:30 a.m. *Fridays tend to be the worst. Please advise.Attachment 1 file: Attachment 2 file: Attachment 3 file: *** USER INFORMATION *** SubscriberID: -1SubscriberUserName: SubscriberEmail: SessionID: 592627334 RemoteAddress: 66.241.70.76RemoteHost: 66.241.70.76 RemoteUser: 3 ASHLAND TRANSPORTATION COMMISSION MINUTES September 17th,2020 Transportation Commission September 17th,2020 Page 1 of 3 These minutes are pending approval by this Commission CALL TO ORDER: Peterson Adams called the Virtual meeting to order at 6:05 p.m. Commissioners Present: Mark Brouillard, Joe Graf, Corinne Vièville, Derrick Claypool-Barnes, Linda Peterson Adams, Katharine Danner, Bruce Borgerson. Council Liaison Not Present: Julie Akins Staff Present: Scott Fleury, Shannon Burruss Guests Present: Lorrie Kaplan ANNOUNCEMENTS Linda Peterson Adams informs of RVTD.or/alerts- where information on the changing bus routes can be located. CONSENT AGENDA Approval of Minutes August 20, 2020: Brouillard motions to approve, Vièville seconds. Commissioners approve minutes as amended. All ayes. Minutes approved. PUBLIC FORUM Resident Paul Bingham email (in meeting packet) regarding his desire to have a crosswalk put up near Garfield Park. Commission discusses specifics of the area and what has and has not currently been done in that area. Fleury states that staff went out to meet with Bingham to discuss the area specifically. There will be more discussion and investigation into the matter to make sure the area in which the crosswalk is located is safe for pedestrians. Commission discusses possible alternate locations. Commission reviews letter from the Climate Policy Committee addressed to the Downtown Revitalization Committee (in meeting packet). Climate Policy Committee requested a copy be included to Transportation Commission. ACCIDENT REPORT: None NEW BUSINESS A. SOCAN- (Moved up agenda by Commission in order to facilitate speaker’s time) Lorrie Kaplan presents Ashland Summer 2020 Survey results, findings and presentation available in Commission Meeting Packet. Kaplan facilitates questions from Commission. A City repair programs was mentioned, Claypool-Barnes requests more information about the grants mentioned in the Q&A. Peterson speaks to education and outreach in relation to SOCAN and the residents of Ashland. Fleury informs Commission of his knowledge of one of the afore mentioned grants, a DEQ Waste and Materials Management Grant, which was just applied for by Stu Green, focused on reducing landfill waste. Commission discusses recycling. B. Terrace Street Traffic Calming Program Request- Fleury discusses staff memo provided in meeting packet regarding this topic. A letter from Leigh Hood highlighting her opinion on the traffic study information and her response to the police opinion on the matter, letter is included in the meeting packet regarding this issue. Fleury opens the floor to discussion by Commission asking if there is anything further they would like to have done regarding this topic. Commission discusses what has been done in the past in Ashland in other areas of town, as well as other cities related to this topic and if it would be applicable to this particular request. Commission states Terrace street did not meet the criteria for phase 2 of the Traffic Calming program, Commission discusses potential options, and agrees to do a study on bicyclist and pedestrian 4 ASHLAND TRANSPORTATION COMMISSION MINUTES September 17th,2020 Transportation Commission September 17th,2020 Page 2 of 3 These minutes are pending approval by this Commission traffic on Terrace street. They also suggest to have a public meeting, as well as collect additional traffic data at a later date when traffic patterns return to normal. Fleury will pull GIS map layers together to bring to Commission in order to begin a more comprehensive look at street and traffic patterns in Ashland neighborhoods related to Traffic Calming and also to aid in the bicycle mapping in the future. OLD BUSINESS A. Tolman Creek Intersection Redesign- Fleury gives background on this project. He discusses the issues that occurred over the years since the redesign and what has been done to remedy the issues. He explains that what is being brought to the Commission now, is related to the stop sign at the current intersection, which has reportedly been hit over 11 times in the last month. ODOT is now asking City of Ashland to eliminate the right-hand turn lane leaving only one single lane, and construct a curb bump out where right hand turn lane previously was and turn it to curbside parking. The stop sign would then be relocated to the center island hopefully preventing further incidence. Commission discusses the proposal. Staff will present updated information as it progresses. TASK LIST A. Discuss current action item list- No Changes FOLLOW UP ITEMS A. None INFORMATIONAL ITEMS A. Adopted 20-year Capital Improvement Program- Informational memo Included in meeting packet. B. North Main Road Diet Merge Concept- Informational memo Included in meeting packet. Commission discusses. Commission brings attention to the need to keep pedestrian and bicycle paths safe. C. Lithia and 3rd Pedestrian Improvements- Informational memo Included in meeting packet. Commission discusses. COMMISSION OPEN DISCUSSION Commission discusses an email from Council Member Julie Akins which invites the Transportation Commission to join in with herself and APD regarding evacuation plans and routes for the City of Ashland revolving around various emergency scenarios. Commission Discusses the existing emergency management plans. Fleury discusses the grant awarded to the Fire Department to hire a consulting firm who will develop an evacuation plan for the City. Currently the data collection process has begun. Commission discusses in what way they could participate in this process; an advisory role was discussed. More discussion to occur at a later time, Fleury will bring report to Commission. FUTURE AGENDA TOPICS A. Bike Map Subcommittee B. Street Capital Improvement Plan (Budget Process) C. Street User Fee/Gas Tax (Budget Process) D. Demand Response Microtransit pilot project update E. Buss Pass Program F. Crosswalk Policy 5 ASHLAND TRANSPORTATION COMMISSION MINUTES September 17th,2020 Transportation Commission September 17th,2020 Page 3 of 3 These minutes are pending approval by this Commission ADJOURNMENT: 6:07 pm Respectfully submitted, Shannon Burruss Permit Technician-Engineering and Public Works **Full Video Available by Request** 6 7 8 Aug 2020 Accidents Motor Vehicle (13) Bike/Ped Involved (4) Previous 2020 Accidents Motor Vehicle (77) Bike/Ped Involved (8) Traffic AccidentsAug 2020 (2) 9 NO. OF ACCIDENTS: 17 Rep DATE TIME DAY LOCATION NO. VEH PED INV. BIKE INV.INJ. DUII Cited Police On Site PROP DAM. HIT/ RUN CITY VEH.CAUSE - DRIVER ERROR NR 1 12:34 Sat E Main St near Oak St 2 Y N N N N Y N N N Dv1 was stopped waiting for pedestrians crossing in the crosswalk when dv2 rearended v1. Dv2 warned for following too closely. R 1 16:18 Sat A St near N First St 2 NNNNY Y N Y N Dv2 hit parked v1, a motorcycle, knocked the vehicle over and then left the area. Dv2 cited for hit and run R 3 17:15 Mon Lithia Way near N First St 2 N Y Y N Y Y N N N Dv2 made a right turn across bike lane, and B1 (cyclist) crashed into the right rear quarter panel of v2. Cyclist was cited for unsafe passing on the right. R 9 14:30 Sun Oak St near B St 2 NNNNN Y Y NN Dv1 scraped along the sides of parked v2 and parked v3 due to inexperience. Information exchanged. R 10 8:44 Mon Ashland St near Washington St 2 NNNNN N Y NN V2 was in the left lane and v1 was in the right lane. Dv1 began to make a uturn to go east on Ashland St and pulled across the left lane directly in front of v1 causing crash. Contact was not made with Dv2. No further info. R 10 12:54 Mon Tolman Creek Rd near Siskiyou Blvd 2NNNNY Y Y NN Dv1 stopped at intersection and then continued through NB with right of way. Dv2 entered the intersection without yielding and caused accident. Dv2 cited for failure to yield. MONTH: AUGUST, 2020 MOTOR VEHICLE CRASH SUMMARY 10 Rep DATE TIME DAY LOCATION NO. VEH PED INV. BIKE INV.INJ. DUII Cited Police On Site PROP DAM. HIT/ RUN CITY VEH.CAUSE - DRIVER ERROR NR 10 16:00 Mon Sixth St near B St 2 NNNNN Y N NN Dv1 had pulled into an alley and began reversing in order to turn around. V2 was southbound on street and did not see v1. Dv1 reversed into v2. Information exchanged, no citation. NR 11 UNK Tue Tolman Creek Rd near Siskiyou Blvd 1NNNUN N N Y N Stop sign at intersection was found knocked over. No leads. R 13 7:38 Thur Water St near N Main St 2 NNNNN Y Y N Y Dv1 in a city vehicle had just descended the beaverslide onto SB Water St when dv2 pulled out into traffic from a parking spot, impacting the side of v1. Information exchanged. R 16 15:40 Sun Lithia Way near N First St 2 Y N N N N Y Y N N Dv1 stopped for a ped that entered the crosswalk suddenly. Dv2 could not stop in time and crashed into the back of v1. No citation. R 20 9:35 Thur Siskiyou Blvd near Gresham St 2 N N P N N Y Y N N Dv1 stopped for a pedestrian that was approaching the crosswalk when v2 crashed into the back of v1. Information exchanged. R 24 19:00 Mon Ashland St near Washington St 2 NNNNN N Y NN Dv1 and dv2 pulled out from a controlled intersection. V2 merged in front of v1, and then suddenly and for no apparent reason, stopped suddenly causing v1 to crash into the rear of v2. Drivers did not stop to exchange info, reported the next day. NR 25 8:54 Tue N Main St near Lithia Way 1 N Y Y N N Y N N N Bicylist was sideswiped and knocked to the ground by the trailer pulled by v1 near the merge point on N Main St near Helman St, causing suspected minor injuries to cyclist. 11 Rep DATE TIME DAY LOCATION NO. VEH PED INV. BIKE INV.INJ. DUII Cited Police On Site PROP DAM. HIT/ RUN CITY VEH.CAUSE - DRIVER ERROR R 25 16:00 Tue Siskiyou Blvd near Sherman St 2 NNNNY Y U Y N Dv1 was traveling though intersection on a green light when struck by v2 who made a left turn. Dv2 fled, was later found and cited for hit and run, and for driving uninsured. R 27 UNK Thur E Main St near Third St 2 NNNUN N N Y Y V1, a City of Ashland vehicle, was struck and damaged by an unknown vehicle. No suspects. NR 28 23:00 Fri Takelma Way near Clay Creek Way 2NNNNN Y N NN Dv2 backed out of driveway and struck parked v1 which was parked on the street on a corner. Dv2 attempted to contact owner of v1 but was unable to. R 31 17:45 Mon Central Av near N Laurel St 2 NNNNY Y Y NN Dv1 veered out of traffic lane and sideswiped parked v2 causing damage. Dv1 cited for careless driving. 12 Sept 2020 Accidents Motor Vehicle (10) Bike/Ped Involved (3) Previous 2020 Accidents Motor Vehicle (90) Bike/Ped Involved (12) Traffic AccidentsSept 2020 13 NO. OF ACCIDENTS: 13 Rep DATE TIME DAY LOCATION NO. VEH PED INV. BIKE INV.INJ. DUII Cited Police On Site PROP DAM. HIT/ RUN CITY VEH.CAUSE - DRIVER ERROR Rep 1 15:14 Tue N Main St near Bush St 1 N Y Y N N Y N N N Dv1 was stopped in traffic behind other vehicles. Bicyclist did not see that traffic was stopped and rearended V1. Cyclist was injured and taken to hospital. Minor damage. Rep 3 11:10 Thur Lithia Way at N First St 2 N N N N N Y Y N N Dv1 was NB on N First St waiting to cross Lithia Wy. Dv2 made a left turn onto N First St but cut the corner too tight and scraped the front corner of v1. Information exchanged Rep 4 16:57 Fri Ashland St near Tolman Creek Rd 2NNNN N Y NNN Dv1 and following V2 both were moving into the left turn lane, but v2 overtook v1 and crashed into the driver rear side, causing damage. Information was exchanged. Rep 8 14:15 Tue B St near Third St 2 N N N N N Y Y N N Dv2 had stopped and then pulled out into intersection to make a left turn onto B St. Dv1 was wb on B St. Dv1 collided with v2 in the intersection. Information exchanged. Rep 8 14:15 Tue California St near E Main St 2 N N N N Y Y N N N Dv2 was making a right turn onto California St from E Main St when v1 backed out from a parking spot into the traffic lane and impacted v2. Information exchanged. Rep 9 9:05 Wed Ashland St near I5 NB Onramp 4 N N N N Y Y U N N V2, 3, 4 were waiting in the left turn for the traffic light to change. Dv1 rearended v2, pushing it into v3 which then crashed into v4. Dv1 cited for following too closely. MONTH: SEPTEMBER 2020 MOTOR VEHICLE CRASH SUMMARY 14 Rep DATE TIME DAY LOCATION NO. VEH PED INV. BIKE INV.INJ. DUII Cited Police On Site PROP DAM. HIT/ RUN CITY VEH.CAUSE - DRIVER ERROR Rep 10 15:00 Thur Fifth St at C St 2 N N P N N Y Y N N Dv2 had pulled to the side of the travel lane to allow a passenger to disembark. Dv1 backed out of driveway and impacted v2. Information exchanged. Rep 10 19:50 Thur N Main St between Bush and Laurel 1NNYN N Y NNN Dv1 was distracted from watching the traffic merge at the merge point and drifted to the right, striking a light pole. Rep 11 20:45 Fri Park St at Siskiyou Blvd 1 N Y Y N N N N N N Dv was crossing Siskiyou Blvd from the north end of Park St to the south side of Park St (street segments are offset from each other) and impacted Bicyclist traveling the wrong direction in the crosswalk. Cyclist declined help, went to ACH 20 min later. Rep 15 17:05 Tue Sixth near A St 2 N N N N N Y Y N N Dv1 turned south onto Sixth St and due to being distracted, crashed into the rear of parked V2. Information exchanged. Rep 16 13:30 Wed Clay St near E Main St 2 N N N N Y Y N N N Dv1, backing onto street from a driveway, backed into v2 which was in the travel lane. Dv1 cited for failure to yield right of way. Rep 20 10:54 Sun Hillview Dr at Siskiyou Blvd 1 N Y Y N N Y N N N Dv1 turned right onto Hillview Drive and struck cyclist that was crossing in the wrong direction at a high rate of speed in the crosswalk. Cyclist was taken to RRMC with serious injuries. Rep 21 9:35 Mon S Laurel St near Almond St 1 N N N N N Y Y N N Dv1 stepped on the gas pedal instead of the brakes, and accelerated through the bushes and into a home. Information exchanged. 15 G:\pub-wrks\eng\dept-admin\TRANSPORTATION COMMISSION\2020 Staff Memos\October 15, 2020\Packet Materials\7. City of Ashland Evacuation Planning.doc Memo Date: October 8, 2020 From: Scott A. Fleury To: Transportation Commission RE: City of Ashland Evacuation Planning BACKGROUND: At the September 17, 2020 Commission meeting, the group discussed the current evacuation planning project being led by Ashland Fire and Rescue (AFR) and was interested in finding a valuable was to participate in the process. Public Works staff informed the Commission they were working with emergency services and had discussed potential interactions with the Transportation Commission. After the informal discussion Staff informed the Commission they would develop and capture previous background information regarding evacuation planning and routing for the Commission. In addition, staff would update the Commission on the status of the current planning study and determine the mechanism for participation by either the entire group or individual representatives of the body. Current Status: The current evacuation planning effort was developed by AFR as they received a State Homeland Security Grant for an evacuation planning study. Through a formal solicitation process KLD was selected to perform the study and develop an Evacuation Time Estimate (ETE) using substantial local information provided by staff. After the kickoff meeting that was held on July 20, 2020 KLD submitted a formal request for information to the City in order to obtain data necessary to develop the ETE. The kickoff presentation is also included as attachment A. KLD Project Approach: 1. Kickoff Meeting (Compete) a. Discuss assumptions, needs, study area etc. 2. Review existing data and plans a. Emergency Management Plan b. Adjacent Communities Plans c. Natural Hazard Mitigation Plan d. Others 3. Demographic survey (Complete) a. Online survey b. Advertisement-CERT/Nixle/Other 4. Road Survey and link-node analysis network a. Field survey of road network by Traffic Engineers b. GPS Data c. Speeds/topography/signal locations/general characteristics d. Develop detailed computer representation for detailed modeling of ETE 5. Access impaired neighborhoods 16 G:\pub-wrks\eng\dept-admin\TRANSPORTATION COMMISSION\2020 Staff Memos\October 15, 2020\Packet Materials\7. City of Ashland Evacuation Planning.doc a. Single ingress/egress routes b. Bottlenecks c. Recommendations-safe refuge, access and signage 6. Identify regions and scenarios a. Existing area command zones (APD) for evacuation management zones (EMZ) b. Evacuation of single EMZs and entire EMZ area to be considered c. Six scenarios for planning purposes 7. Data gathering, analysis and processing a. Facility data (schools, medical, day care, tourist attraction) b. Transportation resources (buses, ambulances, wheelchair transport, mutual aid, mobilization time) c. Plans, studies, etc. d. GIS information 8. Fuel and weather modeling a. Scenario based fire spread modeling 9. Progress meetings a. Project status check ins 10. Compute evacuation time estimates (ETE) a. Specific modeling of scenarios and EMZs to compute ETE b. Identify congestion patterns and locate bottlenecks c. Visual representations 11. Estimate impacts on ETE a. ETC from step 10 and “what if” scenario planning 12. Technical report a. Develop final comprehensive draft technical report b. Address comments c. Final report 13. Final meeting a. Final summary presentation of findings The current data collection process has been slowed down to due to the Almeda Fire response. In addition, Chief Sheppard has been the lead employee with respect to the evacuation planning and will be retiring November 1, 2020 and Chief O’Meara will take over responsibilities moving forward. Previous planning and associated documentation: City of Ashland Emergency Management Plan: The plan provides a framework for coordinated response and recovery activities during a large- scale emergency. The plan describes how various agencies and organizations in the City of Ashland will coordinate resources and activities with other Federal, State, local, community- and faith-based organizations, tribal, and private-sector partners. https://www.ashland.or.us/Files/AshlandEMP_FullPlan_Final_07312018.pdf November 18, 2018 Study Session: Evacuation and Process Planning- Emergencies or disasters, such as earthquakes, floods, wildfires, or hazardous materials spills, may require the need to evacuate people from hazardous areas to lower risk zones. In such an event, emergency responders or Emergency Operations 17 G:\pub-wrks\eng\dept-admin\TRANSPORTATION COMMISSION\2020 Staff Memos\October 15, 2020\Packet Materials\7. City of Ashland Evacuation Planning.doc Center personnel may determine that the evacuation of a part or all the city is necessary to minimize the risk of injury or death. This report is intended to identify the local resources and capacity to effectively carry out an evacuation process. Minutes Staff Report August 14, 2017 Study Session: Essential Route and Structure discussion with the City Council. Minutes Staff Report Wildfire Evacuation Route: Current wildfire evacuation rout map posted on the City’s website Wildfire Evacuation Route Map Wildland Fire Action Guide: Part of the ready set go program and details (planning document). http://www.ashland.or.us/SIB/files/RSG%20National%20Action%20Guide%2C%20Print%20Re ady%20w%20crop%20marks.pdf Ashland Fire and Rescue provides information on developing your own personal evacuation action plan including template forms that can be downloaded from the City’s website. Read! Set! Go! Personal Evacuation Action Plan Level 1 Ready – Be Ready, Be Firewise. Be ready for the potential to evacuate. Be aware of the dangers in your area by monitoring emergency service websites and local media outlets for information. Take personal responsibility, prepare your family and belongings so your home is ready to leave. For wildfire, be Firewise by reducing your home's ignition potential. Assemble emergency supplies and belongings in a safe place. Create an Evacuation Plan with escape routes and make sure all those residing within the home know the plan of action. Taking the correct route during an evacuation is critical for your safety. Tune into information about where to go during an evacuation, see sources below. Make sure you're registered in Nixle if you want contact in any way other than a landline telephone. Register for Nixle by clicking here Level 2 Set – Situational Awareness. Be set to evacuate at a moment’s notice. This level indicates significant danger in your area and voluntarily relocating to a shelter or family is advisable. This may be the only notice that you receive; emergency services cannot guarantee that they will be able to reach you again if the condition worsen. If you do decide to stay, pack your emergency items and be ready to leave at a moment’s notice. Level 3 Go! – Act Early! Leave immediately and follow your personal evacuation plan. Do not delay leaving by gathering your belongings or make efforts to save your home. Danger in your areas is imminent and you should evacuate immediately. If you chose not to evacuate, emergency 18 G:\pub-wrks\eng\dept-admin\TRANSPORTATION COMMISSION\2020 Staff Memos\October 15, 2020\Packet Materials\7. City of Ashland Evacuation Planning.doc services many not be able to assist you. DO NOT plan to return to check on your house or animals until it's declared safe to do so. Staying informed during an emergency is critical. These are some of the ways we will relay information: Nixle Citizen Alert System: ashland.or.us/nixle Ashland Emergency Broadcast Station: 1700 AM Wildfire Information Hotline: 541-552-2490 City of Ashland Website: www.ashland.or.us Jackson County Emergency Management: www.rvem.orghe City of Ashland Emergency Management Plan (Link) CONCLUSION: No formal action required at this time. It is the expectation of staff to bring back a draft version of the Technical Report to the Commission for a formal discussion and recommendations on the report moving forward. Staff also expects to provide regular updates to the Commission on the status of the evacuation planning study and provide time for formal input. City Administrator report (8/18/2020): Stakeholders met with KLD Engineering on July 20. KLD completed an on-site road survey of Ashland and the surrounding area. This included looking at access impaired neighborhoods and development of evacuation zones. At this time the City is divided into 10 evacuations zones. The demographic survey (those things not contained in U.S. Census Bureau data) has been finalized and will be going out to the community this week. Staff continues to provide KLD with other data as needed. The study will allow us to calculate evacuation times for either the entire city or evacuation zones within the city, given such variables as time of day, day of week, which season we are in, current weather conditions, etc. Fire Review News Link: https://www.ashland.or.us/news.asp?newsID=4815 We Want Your Input: Almeda Fire Review The Almeda Fire response and recovery represents a new chapter for the City of Ashland to advance our prevention, preparedness, and response to future emergency events. With extreme weather events and natural disasters on the rise, Ashland must anticipate and plan to respond to different emergencies. Lessons learned from the Almeda Fire event will help shape the response to emergencies in the future and better define areas of vulnerability. While many things went right during this emergency, we can always improve and create a more resilient community that can withstand and recover more quickly from a disaster. To that end, the City of Ashland is conducting an internal and external review of our response to the Almeda Fire. We’re gathering input from our employees who had fire response roles, and we want to know your suggestions on how we can improve public communications and/or 19 G:\pub-wrks\eng\dept-admin\TRANSPORTATION COMMISSION\2020 Staff Memos\October 15, 2020\Packet Materials\7. City of Ashland Evacuation Planning.doc evacuations for the next fire. Please take the survey here to give your feedback. The survey will end on Tuesday, October 20, 2020. Attachment A 20 21 2 22 23 4 24 25 6 26 27 8 28 29 If you live here, and… You travel here to evacuate the area, then… You are at risk until you leave the area being evacuated 10 30 An ETE is an estimate of the total time required to evacuate an area at risk. An ETE is the elapsed time after the advisory to evacuate when the last vehicle leaves the area at risk. An ETE is an aggregate measure and does not reflect the experience of an individual evacuee. 11 31 An Evacuation Time Estimate (ETE) of seven hours does not mean that individual evacuation trips will take seven hours. It means that the last vehicle to leave the area will cross the boundary of the area being evacuated seven hours after the advisory to evacuate. An ETE should be as accurate as possible. An overly conservative ETE may result in making the wrong protective action decision. Similarly, an underestimated ETE could also result in making the wrong protective action decision. 12 32 33 Evacuation travel time depends on the relationship between Traffic Demand and Highway Capacity (Supply). When Demand exceeds Capacity over some time period, travel speeds decline and congestion, exhibiting by queuing and stop-and-go conditions, is present. Traffic does move, but slowly. 14 34 ETE for Special Facilities DYNEV-II DYNAMIC TRAFFIC SIMULATION MODEL ETE for General Population (Residents, Tourists, Employees) Evacuation Speeds DEMAND •Permanent Residents •Tourists •Employees •Special Events •External Traffic •Special Facilities SUPPLY •Evacuation Routes •Number of Lanes •Roadway Capacity •Traffic Control Devices •Traffic Control Tactics 15 35 16 36 17 37 Permanent Residents - year-round population within the study area. Tourists -those people visiting the study area at parks, sporting events, beaches, and other recreational areas. Employees -those people who work within the study area, but who live outside the study area. Those with Disabilities and Access and/or Functional Needs Special Facilities -people present at special facilities (e.g., schools, correctional facilities, medical facilities). Shadow Population -those people who live outside the study area but who may elect to voluntarily evacuate. External Traffic –vehicles whose origin and destination are outside the study area but pass through the study area as part of their trip. Data for the following population groups will be obtained from the Census, local emergency management plans and direct communication with facilities: 18 38 19 39 20 40 21 41 22 Tourists 42 All major roads within the study area will be surveyed. Posted speed, free speed, number of lanes, shoulder characteristics and traffic control devices are noted during the road survey. Observations made during the road survey are used to create a link-node analysis network which replicates the actual roadway network. 23 43 2444 •Fall means that school is in session (also applies to spring and winter). Summer means that school is not in session. 25 Scenario Season Day of Week Time of Day Weather 1 Summer Midweek Midday Good 2 Summer Weekend Midday Good 3 Summer Midweek, Weekend Evening Good 4 Fall Midweek Midday Good 5 Fall Weekend Midday Good 6 Fall Midweek, Weekend Evening Good 45 Scenario Households With Returning Commuters Households Without Returning Commuters Employees Tourists Shadow School Buses Transit Buses External Through Traffic Total Scenario Vehicles 1 30,118 71,359 36,380 4,299 41,597 174 267 31,736 215,930 2 30,118 71,359 36,380 4,299 41,597 174 267 31,736 215,930 3 3,012 98,465 3,790 5,374 31,763 -267 31,736 174,407 4 3,012 98,465 3,790 5,374 31,763 -267 31,736 174,407 5 3,012 98,465 3,790 2,687 31,763 -267 12,694 152,678 Total Evacuating Vehicles varies by Scenario 26 46 Shadow Evacuation: People outside the evacuation region who choose to leave the area and might impede evacuees from within the evacuation region. The evacuation response to Hurricane Rita in Houston brought the concept of Shadow Evacuation to the forefront in the United States. External Traffic Vehicles traveling through the study area at the time of an emergency are also considered along major routes. 27 47 48 29 Summer Summer Fall Fall Midweek Weekend Midweek Weekend Midweek Weekend Midweek Weekend Scenario:(1)(2)(3)(4)(5)(6)(7) Region Midday Evening Midday Midday Evening Good Weather Good Weather Good Weather Good Weather Rain Good Weather Good Weather R01 3:00 2:50 2:50 3:00 3:00 2:50 2:50 R02 3:00 2:55 2:55 3:05 3:05 2:55 2:55 R03 3:05 2:55 2:50 3:05 3:00 2:55 2:50 R04 3:00 2:50 2:50 3:00 3:00 2:50 2:50 R05 2:55 2:50 2:50 2:55 2:55 2:50 2:50 R06 3:05 2:55 2:55 3:05 3:05 2:55 2:55 R07 2:55 2:50 2:50 3:00 3:00 2:50 2:50 R08 3:00 2:55 2:55 3:00 3:05 2:55 2:55 R09 3:00 2:50 2:50 3:00 3:00 2:50 2:50 R10 3:00 2:50 2:50 3:00 3:00 2:50 2:50 R11 3:00 2:55 2:55 3:05 3:05 2:55 2:55 R12 3:20 3:15 3:10 3:10 3:10 3:05 3:05 49 0 20 40 60 80 100 120 140 160 180 200 0 30 60 90 120 150 180 210 240 270 300 330 360 390 Ve h i c l e s E v a c u a t i n g (T h o u s a n d s ) Elapsed Time After Evacuation Recommendation (min) Evacuation Time Estimates Summer, Midweek, Midday, Good (Scenario 1) 2-Mile Region 5-Mile Region Entire EPZ 90%100% Maximum travel time is about 2 hour 30 minutes. Travel Time 30 50 School Driver Mobilization Time (min) Loading Time (min) Dist. To Bdry (mi) Average Speed (mph) Travel Time to Bdry (min) ETE (hr:min) Dist. Bdry to R.C. (mi.) Travel Time from Bdry to R.C. (min) ETE to R.C. (hr:min) Gateway Academy Child Development Centers 90 15 7.0 7.2 59 2:45 6.6 10 2:55 Primrose School of Cornelius 90 15 7.0 5.3 79 3:05 12.1 19 3:25 Southlake Christian Academy 90 15 10.8 5.3 122 3:50 6.6 10 4:00 Sunshine House 90 15 6.5 11.2 35 2:20 7.0 11 2:35 31 51 Legend ^_Hazard Study Area 2, 5, & 10 Mile Ring 32 52 53 Need to identify the region number Need to identify the scenario number What is the ETE for the following set of circumstances? It is Monday, July 20th at 9:00 AM (Summer –school not in session, Midweek, Midday)Weather is good All zones should be evacuated The 90th percentile ETE is needed 34 54 Scenario Season Day of Week Time of Day Weather 1 Summer Midweek Midday Good 2 Summer Weekend Midday Good 3 Summer Midweek, Weekend Evening Good 4 Fall Midweek Midday Good 5 Fall Weekend Midday Good 6 Fall Midweek, Weekend Evening Good 35 55 Region Description Zone A B C D E F G H I J K L M N O P Q R S R01 2-Mile Ring X X X X R02 5-Mile Ring X X X X X X X X X R03 Full EPZ X X X X X X X X X X X X X X X X X X X R04 Catawba County X R05 Gaston County X X R06 Iredell County X X X R07 Lincoln County X X X X X X R08 Mecklenburg County X X X X X X X X 36 56 Summer Summer Summer Fall Fall Fall Midweek Weekend Midweek Weekend Midweek Weekend Midweek Weekend Scenario:(1)(2)(3)(4)(5)(6)(7) Region Midday Midday Evening Midday Midday Evening Good Weather Good Weather Good Weather Good Weather Rain Good Weather Good Weather Entire 2-Mile Region, 5-Mile Region, EPZ and each County R01 (B, C, L, M)2:00 1:55 1:55 2:00 2:00 1:55 1:55 R02 (A, B, C, D, L, M, N, O, R)3:25 2:45 2:35 3:30 3:50 2:45 2:35 R03 (All -Zones)4:55 3:55 3:35 5:10 5:50 3:50 3:25 R04 (K)2:15 1:55 1:55 2:15 2:15 1:55 1:55 R05 (R, S)2:25 2:05 2:10 2:30 2:40 2:10 2:10 R06 (A, I, J)3:50 3:05 2:25 3:50 4:15 3:00 2:25 R07 (L, M, N, O, P, Q)3:00 2:40 2:40 3:00 3:25 2:40 2:40 R08 (A, B, C, D, E, F, G, H)4:40 3:45 3:25 5:00 5:35 3:45 3:15 Table 7-1. Time to Clear the Indicated Area of 90 Percent of the Affected Population ETE = 4:55 37 57 58 Mobilization time –What if people take less time or more time to prepare to evacuate, what is the impact on ETE? What is the impact on ETE of varying numbers of vehicles per household? What if more people carpooled or buses were used? What if inbound lanes are used as additional outbound evacuation lanes (contraflow), what is the impact on ETE? What if a shoulder or specialty lane was used as an additional evacuation lane? What impact does the Traffic Management Plan (TMP) have on ETE? Shadow Evacuation –What is the impact on ETE if there is no (0%) shadow evacuation, or full (100%) shadow evacuation? Other opportunities for improvement will be considered and evaluated. What if roadways are closed due to fire spread? 39 59 60 The KLD team will identify and map access impaired neighborhoods throughout the city. We will consider the following: •Neighborhoods with single ingress/egress routes •Traffic bottlenecks •Neighborhoods with extremely low traffic flow We will also provide recommendations for safe refuge area options in access impaired neighborhoods. Recommendations on evacuation signage (locations, content, size, and frequency) will be made city-wide and for access impaired neighborhoods. 41 61 62 43 63 64 Data needed for all special facilities (schools, daycares, medical facilities, correctional facilities, etc.) Data needed for all major employers Data needed for all tourist attractions (campgrounds, parks, etc.) Most recent copy of hazard mitigation plan and other emergency plans Transportation resources available Most up-to-date traffic management plans Refer to Data Needs Matrix handout for a complete list of the data needed 45 65 One hundred percent (100%) of the people within the impacted ACZs will evacuate. A percentage of people within the study area, not within the evacuated area, will voluntarily evacuate (dependent on demographic survey). Transit vehicles will be used to transport those who do not have access to a private vehicle. Schoolchildren, if school is in session, are given priority in assigning transit vehicles. No schoolchildren (excluding small day care centers) will be picked up by their parents prior to the arrival of the buses. Evacuees will drive safely, travel in directions identified, and obey all control devices and traffic guides. All project assumptions will be documented in an assumptions memo. A draft of the memo will be sent to all stakeholders for review and comment. KLD requests verbal or written confirmation of the assumptions from all stakeholders prior to starting the ETE simulations. Redoing simulations is time consuming and costly. 46 66 67 Description Completion Date Road Survey 7/19/2020 Kick-off Meeting 7/20/2020 Review Existing Plans 7/20/2020 Finalize Study Area 7/30/2020 Create Link-Node Analysis Network 8/8/2020 Identify Regions and Scenarios 8/15/2020 Demographic Survey 8/20/2020 Data Gathering 9/10/2020 Access Impaired Neighborhoods 10/3/2020 Deliver Project Assumptions Memo 10/3/2020 Progress Meeting 10/14/2020 Compute ETE 10/21/2020 Impacts on ETE 11/6/2020 Technical Report –Draft 11/27/2020 Final Meeting 12/16/2020 Final Technical Report and Project Completion 12/30/2020 4868 Kevin Weinisch, P.E (631) 524-5923 kweinisch@kldcompanies.com Brian Halpin 49 69 70 G:\pub-wrks\eng\dept-admin\TRANSPORTATION COMMISSION\2020 Staff Memos\October 15, 2020\Packet Materials\9. Capital Improvement Program.doc Memo Date: October 8, 2020 From: Scott A. Fleury To: Transportation Commission RE: Capital Improvement Program-Roadway, Bicycle and Pedestrian Networks BACKGROUND: On April 2, 2019 the City Council adopted the comprehensive 20-year Capital Improvement Program (CIP) document. This CIP document details all capital projects within the 20-year planning window for public works, parks, electric, facilities, and emergency services. Projects within the 2-year window were included in the 2019-2021 Biennium Budget and appropriations were approved through that process. As we enter fall of 2020 and into early 2021 the new biennial budget process will begin for 2021-2023. Street Division: The Street Fund has two components; operations and systems development charges (SDC) fund accountability. Division personnel are shared with the storm drain division; with the street division having a dedicated 6.85 FTE plus up to 8 temporary summer crew members (4 FTE). Division members maintain street and bike lane surfaces (sweeping, pothole corrections, crack seal, paving, ditch cleaning, signage and pavement markings), city sidewalks, railroad crossings and conduct debris and snow removal as required. Further, street division staff perform locates for both wastewater and storm drain infrastructure as well as ensure compliance with vegetation code. The division also funds and completes capital improvements (through the PW Support Division), funds the bus fare program, and signal maintenance (contracted to ODOT). Boulevard maintenance and downtown park row maintenance are coordinated with the Parks Department out of the ground’s maintenance division. Street Fund: The Street Fund within the complete Public Works budget supports personnel, maintenance, internal charges, debt service and capital improvement costs. The Street Fund receives revenues through multiple sources that assist in its mission. Revenue streams include, local street user fee, cable tv franchise fee, Food & Beverage tax, State gas tax, Systems Development Charges (SDC) and any grant funding expected/obtained. Current Budget Issues: With the economic downturn associated with COVID19 the street fund has seen a decline in projected gas tax and F&B tax revenues for the first year of the budget biennium and this decline is expected in the second year. This has caused public works to reduce planned activities, not hire seasonal temporary employees and postpone the rehabilitation of Ashland Street and other capital projects until the next biennium. 71 G:\pub-wrks\eng\dept-admin\TRANSPORTATION COMMISSION\2020 Staff Memos\October 15, 2020\Packet Materials\9. Capital Improvement Program.doc Current Biennium Budget Project Status: Within the current budget the Street Fund has supported the rehabilitation of Hersey Street along with the Laurel and Hersey Street Railroad crossing improvements. This project is complete and the closeout report for City Council can be found here: Closeout Report-Hersey Street Rehabilitation The Independent Way roadway connection project: between Tolman Creek and Washington Street is currently under construction and anticipated to be substantially complete by the end of October 2020. This project is primarily grant funded with the remaining amount being covered by SDCs and fees/rates. The grant funding was originally dedicated to the Nevada Street bridge project but was re-allocated to the Independent Way project via a formal process through the Metropolitan Planning Organization after recommendations by the Commission and Council. The 2020 Slurry Seal maintenance project: was also bid in the spring of 2020 and work was expected to occur in September, but due to the fire activity and associated recovery phases work has been postponed until spring of 2021. Council Report: Staff Report-Slurry Seal TGM Grant-Revitalize Downtown Ashland: This project has been stopped due to COVID19 pandemic related issues and will be restarted in 1-2 years. Transportation System Plan Update: This project has been placed on hold due to COVID19 pandemic related issues and is expected to restart in the 2021-2023 biennium. Chip Seal Project: This CMAQ grant funded project managed by ODOT is expected to begin in spring/summer of 2021. This includes placing a chip seal surface on numerous dirt roads within the City limits in order to dramatically reduce dust pollution. North Main Street crosswalk installation: This project is on hold due to budget limitations. Expectation is to re-budget in the 2021-2023 budget. Grandview Drive Phase II Improvements: This project has been postponed due to budget limitations. In addition, there is a waterline replacement that should occur prior to the rest of the roadway work. Lithia Way/E. Main Street Intersection Improvements: This project has been postponed due to budget limitations. 2021-2023 Budget Biennium Preparation: Specific to the transportation system CIP are roadway, bicycle and pedestrian network projects developed within the Transportation System Plan (TSP) document and other as needed or prioritized by public Works. A specific charge of the Commission per the Ashland Municipal Code (AMC) is to make recommendations on transportation funding for the CIP. AMC 2.13.030 (C) Funding: will make recommendations to the Public Works Director on the transportation section of the City’s Capital Improvements Program; 72 G:\pub-wrks\eng\dept-admin\TRANSPORTATION COMMISSION\2020 Staff Memos\October 15, 2020\Packet Materials\9. Capital Improvement Program.doc SDC Methodology Update: A change to the SDC methodology approved by the City Council in 2018 now allows SDC funding to be utilized more directly on bicycle projects and sidewalk infill projects (Staff Report). The SDC share is expected to be jointed with grant funding through competitive programs like the safe routes to school program or Statewide Transportation Improvements Program grant program. Previous Commission Priorities: Previously the Commission has supported sidewalk infill projects that create continuous sections of sidewalk on at least one side of a residential roadway block segment. Since development of the Traffic Calming Program during the budget biennium the Commission has been interested in developing a budget level authorization for the Traffic Calming Program. To date we have not entered into the phase 2 of the process and do not have a feel for associated costs, but a certain amount should be requested during the budget process to help facilitate the program. With the TSP being postponed until the 2021-2023 biennium, staff recommends a budget request to develop the update. Budget Process: Generally Public Works begins budget development in the fall prior to the budget process. Budget development includes refreshing the 20-year CIP document, estimating revenue streams for the coming biennium, and establishing each funds comprehensive budget. Each fund is comprised of personnel costs, materials & services, internal charges, training and capital projects. CONCLUSION: No formal action is required of Commission at this time, this is general background on the CIP and budget process for discussion. Once a draft CIP document is developed then staff will bring forward document with recommendations for CIP adoption. If the Commission would like additional information and assist in providing input at this stage on the process to staff that would be welcomed. 73 G:\pub-wrks\eng\dept-admin\TRANSPORTATION COMMISSION\2020 Staff Memos\October 15, 2020\Packet Materials\9. October 15, 2020 Action Item List.doc Transportation Commission Action Item List O c t o b e r 1 5 , 2 0 2 0 Action Items: 1. TSP Update (2020-21) • Solicitation documents have been submitted and scored by project team • Scope, schedule and fee documents under review (TC December 2019/January 2020/February 2020) • Professional services contract requires Council approval • Schedule Council approval (April 7, 2020) • TSP Postponed until timing to start project is more appropriate 2. Main St. Crosswalk truck parking (no change) • Analysis is included in the revitalize downtown Ashland plan and was recently discussed during the kickoff meeting. • The Revitalize Downtown Ashland Transportation Growth and Management grant project has begun that will assess safety and parking in the downtown core. (February 2020) No change- March 2020 • The Revitalize Downtown Ashland Project has been cancelled with the expectation to re-start the project at a more appropriate time in the future (1-2 years). 3. Siskiyou Blvd. and Tolman Creek Intersection Improvements • The Oregon Department of Transportation removed median island and restriped Tolman Creek portion of intersection to allow for better right hand turning truck movements. • The Oregon Department of Transportation is also looking at curb ramp design changes to the intersection. (February 2020) No change-March 2020 • Reference ODOT Intersection Change Schematic Drawing (September 2020) • Forwarded TC comments to ODOT regarding review of 60% Design (September 2020) 74 G:\pub-wrks\eng\dept-admin\TRANSPORTATION COMMISSION\2020 Staff Memos\October 15, 2020\Packet Materials\9. October 15, 2020 Action Item List.doc 4. Crosswalk Policy Development (no change-agenda item for future meeting-2020/21) 75 Page 1 of 4 Council Business Meeting November 6, 2018 Agenda Item Public Hearing and a Resolution Adopting Transportation Systems Development Charge Methodology (2018), Pursuant to Ashland Municipal Code Sections 4.20.040 and 4.20.050. From Paula C. Brown, PE Public Works Director Contact paula.brown@ashland.or.us 541-552-2411 SUMMARY With Council’s approval at the November 7, 2017, business meeting, Resolution 2016-35 was repealed and replaced with Resolution 2017-26, establishing temporary Transportation Systems Development Charges (SDC). This reversion to the 1999 adopted methodology provided time for staff to complete a focused effort for a more equitable distribution of transportation impacts. Staff hired Galardi Consulting, LLC, and has completed a comprehensive review of the Transportation SDCs (TSDC), methodology, and project list. The existing SDC Committee was utilized for input and feedback. After three consultant facilitated meetings, the SDC Committee unanimously recommended the changes to the TSDC as shown on the attached Draft Methodology Report Transportation Systems Development Charges dated August 27, 2018. Council is asked to hold a public hearing for any further comments on the proposed methodology. If there are no changes to the proposed methodology, Council is further asked to read, by title only, the Resolution Adopting Transportation Systems Development Charge Methodology (2018), Pursuant to Ashland Municipal Code Sections 4.20.040 and 4.20.050. Council will be asked to approve the methodology and to determine whether or not to phase the increases to the transportation SDC charges. POLICIES, PLANS & GOALS SUPPORTED Council Goals: 2.2 Engage boards and commissions in supporting the strategic plan 4 Evaluate real property and facility assets to strategically support city mission and goals 5.2 Support and promote, through policy, programs that make the City affordable to live in 7.2 Support land-use plans and policies that encourage family-friendly neighborhoods Department Goals:  Maintain existing infrastructure to meet regulatory requirements and minimize life-cycle costs  Deliver timely life cycle capital improvement projects  Maintain and improve infrastructure that enhances the economic vitality of the community  Evaluate all city infrastructure regarding planning management and financial resources PREVIOUS COUNCIL ACTION 76 Page 2 of 4 Council’s initial action on this specific SDC methodology was at the November 7, 2017, Council business meeting. Council approved staff’s recommendation to repeal Resolution 2016-35(a Resolution Adopting New Transportation Systems Development Charges Pursuant to Section 4.20 of the Ashland Municipal Code) and adopted Resolution 2017-26, the System Development Charges set forth in Resolution 1999-42, New Transportation Systems Development Charge Methodology and Charges, pursuant to Ashland Municipal Code Section 4.20.040 and 4.20.050. The reversion to the 1999 adopted methodology provided time for staff to complete a focused effort on a more equitable distribution of transportation impacts. At the August 7, 2018 study session, Council was presented with the proposed new 2018 Transportation Systems Development Charge methodology and the rationale and justification of the proposed changes. At the September 4, 2018 business meeting, staff informed Council that the draft methodology had been published for public review in preparation of tonight’s public hearing. BACKGROUND AND ADDITIONAL INFORMATION Oregon Revised Statutes (ORS) 223.297 through 223.314 authorize cities, to establish Transportation SDCs as a one-time fee on new development to recover a fair share of costs of existing and planned facilities that provide capacity to serve future growth. ORS 223.299 defines two types of SDCs; a reimbursement fee and an improvement fee. In preparation for the new methodology and updated TSDCs, staff reviewed the financially constrained transportation project list developed as a result of the adopted 2013 Transportation System Plan (TSP). All projects were updated to 2018 costs based upon the Oregon Department of Transportation’s (ODOT) unit costs. Future improvement costs were also adjusted for expected external funding (for example, grants and contributions). Costs were updated to include the new American’s with Disabilities Act (ADA) standards for crossings. The TSP placed a priority on sidewalks, especially school routes. As a result, the project list has over $16M in sidewalk projects that will most likely be completed through Safe Routes to School or other grant programs. Based on Council’s prior direction, the Nevada Street Bridge extension (Council action June 20, 2017) was removed from the eligible projects for funding and will be reviewed again during the next TSP update which is anticipated to be included in the next biennium budget cycle. Staff added the Ashland Street, Oak Knoll, and E. Main/Hwy 66 intersection potential roundabout project (R9) to the list in its place. In addition, staff also added five developer-driven projects expected to be constructed within the next 5-7 years. In most cases these new projects will provide benefits not only to the new development area, but also to the community at- large. The majority of the costs of the developer driven projects are borne by the developer. The updated Transportation SDC Project List is shown in the draft methodology report as Table A-1. As discussed during the August 7, 2018, study session, the changes in Transportation SDC methodology incorporate the following:  basing the rates on average daily trips  adding an adjustment for pass-by and diverted linked trips (and removing trip length) to better reflect industry standards  using rates from the newest Institute of Transportation Engineers (ITE) Trip Generation Manual, 10th Edition (2017) and thereby adopting the newest trip generation data  using updated land use categories and trip generation rates (per ITE 10th Edition)  using information from a travel demand forecasting model that recognizes the relationship between land use and transportation; this model relies upon updated population and employment growth forecasts to more accurately reflect travel patterns and volumes on specific streets and corridors 77 Page 3 of 4  using both a reimbursement fee and an improvement fee  addition of an administrative compliance component to recover program administration and a portion of future transportation studies/evaluations  policy incentives and discounts (credits) are also included in the draft methodology (page 4-3): o 50% credit for new homes (including ADU) that are 500 square feet or smaller o 25% credit for homes (including cottage housing) that are 501-800 square feet o Maintain the existing affordable housing 100% credit; qualified as affordable housing by the City of Ashland Housing Program and deed restricted to remain affordable for a minimum of 30 years o Provide a 20% credit for developers planning to employ Transportation Demand Management (measures aimed at reducing single occupancy vehicle use); as an example this credit recognizes developing near transit (e.g., Transit Triangle); eligible projects must demonstrate achievable transportation impact reductions and parking reductions FISCAL IMPACTS TSDCs were last adopted in 1999 and as such, are nearly 20 years behind in cost adjustments. According to the adopted Transportation System Plan (TSP – March 2013, Kittelson & Associates, Inc.), the City began falling behind in collecting adequate TSDCs in 2007. As noted in the August 7, 2018 study session, uncollected revenues for just single family dwelling and multi- family dwelling units (they are the easiest to determine the construction numbers) reveals $857,600 in unrecovered TSDCs due to inflation alone. Adding the commercial component only compounds the uncollected transportation revenues due to growth that was not collected these past 20 years. The SDC Committee is sensitive to the significant increases in TSDC costs per trip and has recommended a three-year phase in process. This phase-in is shown in the proposed methodology, but could be adjusted by the Council. The proposed 2018 TSDC rates reflect an increase for almost every land use category. The reason for the increases are two-fold: 1) an increase in the overall cost per trip due to the updated Project List, and 2) increases in trip rates based on more current ITE data that reflects travel behaviors more typical of today’s conditions versus relying upon outdated data collected in the 1960s, 1970s and 1980s. The increases in some cases are dramatic. Although some land uses like banks have significantly different travel characteristics than 20 years ago, the single family trip generation rate is nearly the same. It is important to note that when comparing the rejected 2016 TSDC rates (updated to reflect current project costs) to the now proposed 2018 rates, some land uses go up slightly (residential, hotel/motel, community college, library, hospital, automobile sales), while the majority of the commercial rates are significantly less that the 2016 proposed rates. Reverting back to a daily average trip rate verses a PM peak, and adding back some trip rate adjustments that had been eliminated in the 2016 methodology balances the fair share costs of 78 Page 4 of 4 future growth across all community users. A significant change comes from the increase to the overall cost per trip, reflecting 20- year inflationary cost increase. When both the updated methodology and project list costs are considered, 7 land uses are over a 500% increase with the top increase at 1139% (convenience market). Those uses that increase over 500% were provided a significant trip length adjustment in the 1999 methodology, which resulted in discounting the rates by over 95%. As noted previously, the SDC Committee recommendations include eliminating the trip length adjustment, as it is outdated, and not support by current industry data. Proposed TSDC rates by land uses are shown on Table A-2 in the draft report. The SDC Committee recommends a three-year phase in process with 50% of the increase beginning on January 1, 2019, and the remaining 50% realized in two roughly uniform increments on January 1, 2020, and January 1, 2021. In addition, the Committee recommends that the City’s fees increase with the ENR construction cost index for inflationary rates effective July 1st each year. The March ENR construction cost index is used by the City for all other fee increases and it is proposed for the TSDCs. STAFF RECOMMENDATION Staff supports the SDC Committee recommendations and fully understands the desire for a three-year phase in to lessen the burden to the community. As discussed by at least one council member at the August 7th meeting, Council does have the option to request a full rate increase on January 1, 2019, which would increase the revenue stream for transportation projects. Regardless of the phasing, the methodology itself stays the same. ACTIONS, OPTIONS & POTENTIAL MOTIONS 1) I move to approve the Resolution Adopting Transportation Systems Development Charge Methodology (2018), Pursuant to Ashland Municipal Code Sections 4.20.040 and 4.20.050, with the three-year phase in process; or, 2) I move to approve the Resolution Adopting Transportation Systems Development Charge Methodology (2018), Pursuant to Ashland Municipal Code Sections 4.20.040 and 4.20.050, without a phase in process. 3) I recommend staff make the following changes (list) and bring this back for future Council action. ATTACHMENTS Attachment 1: Draft Methodology Report Transportation Systems Development Charges dated August 27, 2018 Attachment 2: Resolution Adopting Transportation Systems Development Charge Methodology REFERENCES Council Meeting September 4, 2018, agenda item (link) Council Study Session August 7, 2018, agenda item (link) Council Meeting November 7, 2017, agenda item (link) Council Meeting December 20, 2016, agenda item (link) and minutes (link) Council Study Session November 14, 2016, agenda item (link) and minutes (link) 79 Draft Methodology Report Transportation System Development Charges August 27, 2018 In association with 80 CITY OF ASHLAND TRANSPORTATION SYSTEMS DEVELOPMENT CHARGES DRAFT METHODOLOGY AUGUST 2018 I Executive Summary Background The City of Ashland (the City) last updated its transportation system development charges (TSDCs) in 2016 (effective July 1, 2017). However, concerns over the impact of the new TSDCs on certain development types led to the fees being repealed in November 2017. Since that time, the City has been charging TSDCs based on its prior methodology and fee schedule adopted in 1999. In January 2018, the City embarked on an effort to update its TSDC methodology and project list. The objectives of the study were to: • Develop a new project list based on the 2013 Transportation System Plan and more current (2018) project costs. • Work with a SDC Advisory Committee (SAC) to develop a methodology that was consistent with industry standards and Oregon Revised Statutes (ORS) 223.297 through 223.314 guidelines. • Consider potential TSDC discounts and incentives related to broader City policy objectives. The SAC met three times over the course of the project and reached consensus on methodological and policy recommendations. The Ashland City Council intends on holding a public hearing to hear comments on the proposed Transportation SDC methodology on November 6, 2018, at its regularly scheduled business meeting. Subject to comments, first reading of the ordinance to impose these fees will be the same night, with second reading on November 20, 2018. The fees are intended to be enacted on January 1, 2019. Overview of Proposed Methodology Table ES-1 presents the key components of the recommended methodology, and provides comparison to the current (1999) and prior (2016) methodologies. Table ES-1 TSDC Methodology Comparison Methodology Element Current (1999) Methodology Prior (2016) Methodology Recommended (2018) Methodology Project List Improvement only Improvement only Improvement & Reimbursement Growth share Population-based Population based Mode-specific planning criteria Growth in trips Estimated from population and employment data system-wide Estimated from population and employment data system-wide Based on travel demand model forecast that recognizes growth in land use by area (e.g., by TAZ) Trip Rate Type Average Daily Trips PM Peak Trips Average Daily Trips 81 CITY OF ASHLAND TRANSPORTATION SYSTEMS DEVELOPMENT CHARGES DRAFT METHODOLOGY AUGUST 2018 II Trip Rate Adjustments Pass-by and trip length None Pass-by and diverted trips Trip Rate Data by Land Use ITE 5th edition ITE 9th Edition ITE current edition (10th edition most recent; 2017) TAZ = Transportation Analysis Zone As shown in Table ES-1, the recommended methodology differs from the current methodology in that it includes both an improvement and reimbursement element. The addition of a reimbursement element provides a more flexible capital funding source, and ensures that new development contributes an equitable share to existing roadway capacity. The new methodology also includes a more rigorous approach to both the determination of the growth share of project costs, and the projected growth in trips system-wide. The new methodology is based on data from the regional travel demand model. Like the existing methodology, the recommended methodology is assessed based on average daily trips, and it maintains trip rate adjustments (a key difference from the 2016 methodology). However, the type of adjustments have changed somewhat from the current methodology and the adjustment factors along with the trip rates have been updated to reflect current data from the Institute of Transportation Engineers (ITE) Trip Generation Manual. Major Findings TSDC Costs A summary of the SDC improvement project costs by project type is provided in Table ES-2, and the detailed project list is provided in Appendix A-1. As shown in Table ES-2, the TSDC improvement project list includes about $56.3 million in planned improvements and related studies. The improvements include new facilities and upgrades to existing facilities in order to increase capacity and improve the level of performance of the transportation system. Approximately $23.9 million of project costs are assumed to be funded by other (external) funds, including grants, developer contributions, and state funding. When the project costs are reduced by projected external funding sources, the net project costs allocated to growth are about $16.8 million (about 52 percent of total project costs.) Table ES-2 City of Ashland Summary of Improvement Project List Project Type Total Cost Other Funding % Growth1 TSDC Cost2 Studies $153,400 $0 11% $16,430 Transit $4,425,000 $0 11% $473,937 Pedestrian $16,359,225 $10,763,813 97% $5,486,026 Bike $5,943,660 $594,366 34% $1,969,374 Intersection Studies $330,400 $0 24% $80,406 Intersection & Roadway Improvements $27,884,972 $11,728,161 52% $8,323,813 Crossing $1,180,000 $767,000 100% $413,000 Total $56,276,657 $23,853,340 52% $16,762,985 1 Growth portion before other funds applied 82 CITY OF ASHLAND TRANSPORTATION SYSTEMS DEVELOPMENT CHARGES DRAFT METHODOLOGY AUGUST 2018 III 2 Other funding applied first to non-growth share of cost; any remaining funds reduce TSDC cost The reimbursement fee is calculated based on the actual cost of reserve capacity from roadway improvements constructed over the past 20 years, exclusive of grants and contributions. A total value of $7.5 million was identified for reimbursement projects, of which about $3.4 million represents the estimated City-funded cost. Growth is allocated approximately $1.2 million (35 percent) of the net existing system value, based on individual project cost allocations. TSDC Schedule The growth-related improvement and reimbursement costs are divided by the projected future growth in trips (as measured by average daily trip ends) to determine the system- wide cost per trip. The regional travel demand model projects a growth in daily trips of 38,066, which results in a total cost per trip of about $472: $440.36 (improvement fee) + $31.19 (reimbursement fee) = $471.55 combined fee In addition, local governments are entitled to include in the SDCs, a charge to recover costs associated with complying with the SDC law. Compliance costs include costs related to developing and administering the TSDC methodology, project list, as well as annual accounting costs. The compliance charge is estimated to be about $16 per trip, or about three percent of the combined TSDC per trip ($488). The TSDC for an individual development is based on the cost per trip, and the number of trips attributable to a particular development, where the number of development trips is computed as follows: Number of Development Trips = Trip Generation Rate X Adjustment Factors X Development Units The standard practice in the transportation industry is to use ITE trip generation rates to determine the TSDCs for individual developments. Adjustment factors applied to base trip rates reflect pass-by and diverted linked trip factors for some land uses. Pass-by trips refer to trips that occur when a motorist is already on the roadway, as in the case of a traveler stopping by a fast-food restaurant on the way home from work. In this case, the motorist making a stop while “passing by” is counted as a trip generated by the restaurant, but it does not represent a new (or primary) trip on the roadway. A diverted linked trip is a similar type of non-primary trip but in this case the motorist will divert from a primary route to access a nearby use (e.g., a vehicle may turn off a major roadway onto an intersecting street to access a land use), and then return to the original route to complete the trip. Based on the TSDCs presented in this report, and the most current version of the ITE Trip Generation Manual (10th edition), the TSDC for a single family dwelling unit (with an average trip rate of 9.44) is $4,603. The full TSDC schedule is shown in Appendix Table A-2. 83 CITY OF ASHLAND TRANSPORTATION SYSTEMS DEVELOPMENT CHARGES DRAFT METHODOLOGY AUGUST 2018 IV TSDC Implementation In addition to the updated methodology and project list, the SAC made a number of recommendations related to the implementation of the TSDCs, aimed primarily at addressing revenue adequacy and affordability objectives. Inflationary Adjustments In order to keep pace with inflation, and avoid significant future TSDC adjustments, the SAC recommends that the City’s fees increase with the Engineering News Record (ENR) construction cost index July 1st each year. Phase-In As a result of the updated cost per trip, as well as changes to ITE trip rates since the 1999 methodology, the TSDCs for many land use categories increase significantly compared with current fees. The SAC has recommended a 3-year phase in of the updated cost per trip, with the first year including 50 percent of the increase, and approximately 25 percent increases in years 2 and 3. Table A-2 shows the projected TSDCs (before future inflation adjustments) during the recommended 3-year phase-in period. The City Council has the final determination on the phasing option. Discounts and Incentives The SAC discussed incentives and discounts for certain development types, and recommends the following: • 50 percent discount for new homes (including Accessory Dwelling Units) that are 500 square feet or smaller • 25 percent discount for homes (including cottage housing) that are 501-800 square feet • Maintain the existing affordable housing 100 percent discount; qualified as affordable housing by the City of Ashland Housing Program and deed restricted to remain affordable for a minimum of 30 years. • Provide a 20 percent discount for developers planning to employ Transportation Demand Management (measures aimed at reducing single occupancy vehicle use); as an example this credit recognizes developing near transit (e.g., Transit Triangle); eligible projects must demonstrate achievable transportation impact reductions and parking reductions. Report Contents This methodology report is organized as follows: • Executive Summary – Provides background information on TSDCs in Ashland, and a summary of the recommended TSDC methodology and major findings. • Section 1 – Introduction – Provides a summary of SDC statutory requirements. 84 CITY OF ASHLAND TRANSPORTATION SYSTEMS DEVELOPMENT CHARGES DRAFT METHODOLOGY AUGUST 2018 V • Section 2 – Growth Requirements – Presents the approaches used to determine future growth in trips and the growth share of project costs. • Section 3 – TSDC Cost – Summarizes the reimbursement and improvement project costs, based on the approaches and assumptions presented in Section 2 and the updated Project List. • Section 4 – TSDC Schedule – Provides information on system-wide unit costs, the process for assessing TSDCs to individual developments, and method for updating for future cost escalation. Appendix A provides the detailed Improvement Project List, as well as the TSDC Schedule. 85 1-1 SECTION 1 Introduction Oregon SDC Law Oregon Revised Statutes 223.297-223.314 authorize local governments to assess System Development Charges (SDCs) for the following types of capital improvements: • Drainage and flood control (i.e., storm water) • Water supply, treatment, and distribution • Wastewater collection, transmission, treatment, and disposal • Transportation • Parks and recreation In addition to specifying the infrastructure systems for which SDCs may be assessed, the SDC legislation provides guidelines on the calculation and modification of SDCs, accounting requirements to track SDC revenues, and the adoption of administrative review procedures. A summary of key provisions is provided below. SDC Structure Oregon law allows that an SDC may include a reimbursement fee, an improvement fee, or a combination of the two. Reimbursement Fee The reimbursement fee is based on the value of available reserve capacity associated with capital improvements already constructed or under construction. The methodology used to calculate the reimbursement fee must consider the cost of existing facilities, prior contributions by existing users, the value of unused capacity, grants, and other relevant factors. The objective of the reimbursement fee methodology is to require new users to contribute an equitable share of the capital costs of existing facilities. When new users pay for their share of the available reserve capacity through the SDC reimbursement fee, the money received can be used to fund other capital needs (e.g., system replacements). Improvement Fee The improvement fee is designed to recover all or a portion of the costs of planned capital improvements that add system capacity to serve future users. An increase in system capacity may be established if a capital improvement increases the level of performance or service provided by existing facilities or provides new facilities. The portion of the improvements funded by improvement fees must be related to the need for increased capacity to provide service for future users. 86 1-2 Credits The legislation requires that a credit be provided against the improvement fee for the construction of “qualified public improvements.” Qualified public improvements are improvements that are required as a condition of development approval, identified in the system’s capital improvement program, and either (1) not located on or contiguous to the property being developed, or (2) located in whole or in part, on or contiguous to, property that is the subject of development approval and required to be built larger or with greater capacity than is necessary for the particular development project to which the improvement fee is related. Review and Notification Requirements The methodology for establishing or modifying improvement or reimbursement fees shall be available for public inspection. The local government must maintain a list of persons who have made a written request for notification prior to the adoption or amendment of such fees. The notification requirements for changes to the fees that represent a modification to the methodology are 90-day written notice prior to first public hearing, with the SDC methodology available for review 60 days prior to public hearing. Other Provisions Other provisions of the legislation require: • Preparation of a capital improvement program or comparable plan (prior to the establishment of a SDC), that includes a list of the improvements that the jurisdiction intends to fund with improvement fee revenues and the estimated timing, cost, and eligible portion of each improvement. • Deposit of SDC revenues into dedicated accounts and annual accounting of revenues and expenditures, including a list of the amount spent on each project funded, in whole or in part, by SDC revenues. • Creation of an administrative appeals procedure, in accordance with the legislation, whereby a citizen or other interested party may challenge an expenditure of SDC revenues. The provisions of the legislation are invalidated if they are construed to impair the local government’s bond obligations or the ability of the local government to issue new bonds or other financing. 87 3-1 SECTION 2 Growth Requirements Introduction This section presents the projected future growth needs, and the bases for determining the costs that will be recovered from growth through the TSDCs (“growth share”). To comply with Oregon SDC law and industry standard practices, new development cannot be charged for costs associated with capacity needed to serve existing development– either in the form of used capacity on existing facilities or future expansion needed to remedy existing deficiencies. To be defensible, the methodology must: • Specify how growth needs will be evaluated (e.g., volume, volume/capacity ratio, level of service, etc.) • Identify the list of existing facilities and future projects needed to address growth needs. • Allocate project costs between growth and existing development, based on the portion of each project that relates to providing capacity for growth vs. addressing an existing deficiency or increase the level of performance for existing development. System-Wide Growth in Trips To evaluate the roadway capacity needs and the amount of vehicle trips that are generated by existing and future development, the regional travel demand model was utilized. Specifically, the model was utilized to approximate the existing number of trips (base year) using the City street network. The model then considers forecast population and employment increases by transportation analysis zone (TAZ) to project future year (2037) trips generated within the City’s currently acknowledged Urban Growth Boundary (UGB). Table 2-1 lists the total number of trip ends for the base year and future year scenarios. As listed, the total number of trip ends is forecasted to grow from 134,944 to 173,010. The growth in average daily trip ends (38,066) represents about 22 percent of the future projections. Table 2-1 Model Vehicle Average Daily Trip Ends (Within the City’s currently acknowledged UGB)1 Base Year Trips Future Trips Growth Trips Trip Ends 134,944 173,010 38,066 1 ODOT TPAU (May 16, 2018); excludes external-external trips 88 3-2 Growth Share The system-wide growth in trips will be accommodated by existing roadway reserve capacity, as well as planned future system expansion for all modes of travel (auto, transit, bike and pedestrian). According to SDC statutory requirements: “An increase in system capacity may be established if a capital improvement increases the level of performance or service provided by existing facilities or provides new facilities.” A key component of the SDC methodology is allocation of existing facility and planned future facility costs to growth, in proportion to estimated capacity requirements. For purposes of determining growth share, individual projects are analyzed to determine the portion of capacity costs needed for future growth requirements versus existing development. Two general methods are used for determining the growth share: 1. Standards-Based approach – where the allocation of project costs to existing development is limited to correcting any existing deficiency. Existing deficiencies are evaluated based on current performance relative to the appropriate planning/design standard for the particular improvement. For intersections, the standard is a “volume-capacity ratio (v/c ratio)”1. For multimodal improvements, the standard is miles per capita of bikeways and pedestrian ways. 2. Capacity Utilization approach – Improvements to existing facilities to address safety, modernization, and other performance considerations provide capacity for growth and enhanced performance for existing development, so the costs are allocated in proportion to the utilization of the facilities, as determined for each improvement individually. Table 2-2 provides a summary of the allocation basis for existing and future development by major project type. Table 2-2 Summary of Growth Share Methods Project Type Existing Share Future Development Share Roadway and Intersection Level of Performance Improvements (e.g., safety and modernization) Existing development trips as a percent of total future 2037 trips Future development trips as a percent of total future 2037 trips New roadways and extensions 0% 100% Intersection capacity and Bike and Pedestrian Improvements Limited to existing deficiency (as defined by v/c or level of service) 100% - Existing Deficiency Studies Share of future population (89%) Share of future population (11%) 1 Volume-to-capacity ratio is defined as motor vehicle trips divided by the hourly capacity of the facility to serve those trips. 89 3-3 The recommended methodology is based on a mode-specific analysis for determining growth share of project costs, which takes into consideration the different travel characteristics of pedestrians, cyclists and motorists, as described below. Roadways and Intersections (Improved Level of Performance) For upgrade of existing facilities (i.e., realignments, modernization, and other improvements), the growth share analysis for each roadway and intersection project was based on information from the travel demand model. These projects were evaluated using existing and future traffic volumes at each location. These volumes reflect the relationship between land use and transportation and rely upon estimates of household and employment growth by area of city (i.e., TAZ). This means that each new roadway or intersection project will have a different growth related proportion, as shown in Table A-1 (appendix). New Roadway and Intersection Facilities; Existing Facility Expansion (Capacity Only) New roadways and expansions driven by future development capacity requirements are allocated 100% to growth, since the capacity is needed entirely for new development. Similarly, intersection improvements that are not needed to meet existing mobility standards, but are needed once the growth trips are added to the intersection, are assumed to be 100% funded by growth, since there is no existing deficiency. Data was compiled from the TSP to determine if facilities were operating with a volume/capacity ratio less than the required standard. Bike and Pedestrian Improvements Unlike roadway and intersection projects, trip data for bike and pedestrian improvements is not available. Therefore, the growth share for bike and pedestrian facilities is based on the planned level of service (LOS). The planned LOS is defined as the quantity of future facilities per 1,000 population served. The following equation shows the calculation of the planned LOS: LOSPlannedServedPopulationFuture QPlannedQExisting =+ Where: Q = quantity (miles of bike or pedestrian facilities), and Future Population Served (within the UGB) = 23,183 The existing and future miles of bike and pedestrian facilities are shown in Table 2-3. 90 3-4 Table 2-3 Existing and Future Bike and Pedestrian Facilities Current Additional (miles) Future Facility Type (Miles) Stand-Alone Projects Road Projects (Miles) Multi Use Path 3.93 1.9 0 5.8 Bike Lanes2 22.0 9.6 2.4 34.0 Sidewalks 3 80.0 9.8 2.5 92.3 1City-owned paved shared use paths 2Bike lanes only; does not include bike shoulders 3On improved and partially improved arterials and collectors The City’s population forecast for existing and future (2038) conditions are presented in Table 2-4. Growth during the planning period is estimated to be 2,483 people. Table 2-4 Current and Future Population Current (2018) Future (2038) Growth Population 20,700 23,183 2,483 Table 2-5 presents the existing and future LOS for bike and pedestrian facilities, based on the existing and planned future facilities presented in Table 2-3 divided by the existing and projected future population presented in Table 2-4. In all cases, the planned LOS is higher than the existing LOS, which means that there are existing deficiencies for bike and pedestrian improvements, so a portion of future improvements are needed by existing development. Table 2-5 Existing and Future Bike and Pedestrian LOS Miles/1,000 People Facility Type Current Future Multi Use Path 0.19 0.25 Bike Lanes 1.06 1.47 Sidewalks 3.86 3.98 The capacity requirements, or miles, needed for the existing population and for growth are shown in Table 2-6 and estimated by multiplying the planned (future) LOS for each facility type (from Table 2-5) by the population of each group (from Table 2-4). 91 3-5 Table 2-6 Existing and Growth Capacity Needs Total Miles Needed Facility Type Current Growth Total Multi Use Path 5.2 0.6 5.8 Bike Lanes 30.4 3.6 34.0 Sidewalks 82.4 9.9 92.3 Existing development’s needs are assumed to be met first by the existing inventory of facilities; any shortfall is assumed to be provided from planned improvements. Therefore, the additional need for facilities by the existing population is equal to the total inventory needed (from Table 2-6) less the existing inventory (from Table 2-3). For example, the planned LOS results in a total need of 5.18 miles of multi-use paths for existing development. The current inventory of 3.93 miles is deducted from the total need to yield an additional need of 1.25 miles. Table 2-7 shows the existing and growth allocation for the planned improvements by project type. For the multi-use paths, the growth need is equal to 0.6 miles, so the additional 1.9 miles of path are allocated 67 percent and 33 percent, respectively to existing and growth. For bike projects, the overall growth need is 30 percent (3.6 miles) of the planned additional bike lanes; however, improvements are in conjunction with roadway projects, and as such are allocated in proportion to future auto trip volumes. As shown in Table 2-7, the roadway project allocations result in 0.38 miles of bike lane costs allocated to growth, so there is an additional need of 3.3 miles (34 percent) from the stand-alone bike projects. Similarly, for sidewalk improvements, the roadway allocations result in 0.41 miles of new sidewalks allocated to growth. However, the total growth need is 9.9 miles, so 97 percent of the stand- alone sidewalk costs on the project list are allocated to growth. Table 2-7 Allocation of Additional Facilities Miles Added % Allocation Existing1 Growth Total Existing Growth Total Multi Use Path 1.25 0.6 1.9 67% 33% 100% Bike Lanes Road Projects2 2.0 0.38 2.4 84% 16% 100% Bike Projects 6.4 3.3 9.6 66% 34% 100% Subtotal 8.4 3.6 12.0 70% 30% 100% Sidewalks Road Projects 2.1 0.41 2.5 84% 16% 100% Pedestrian Projects 0.3 9.5 9.8 3% 97% 100% Subtotal 2.42 9.9 12.3 20% 80% 100% 1 Existing need assumed to be met first by current facilities 2 Numbers in bold used for growth share of stand-alone bike & pedestrian projects in Table A-1 Studies Growth share for corridor studies are based on the average of growth trips on facilities with future planned improvements. 92 3-6 SECTION 3 TSDC Cost Introduction The development of the TSDC cost generally involves the following key steps: 1. The TSDC project list is updated to reflect projects and costs related to current and future system needs. 2. Project costs are reduced by projected external funding amounts (assessments, grants, contributions by other agencies). 3. Net project costs are allocated between growth and existing development, as described in Section 2. As allowed by Oregon SDC law, the TSDC costs include both completed (reimbursement) and planned future (improvement) projects costs. Both components of the TSDC cost are summarized below. Project List and Costs City staff reviewed the financially constrained transportation project list developed as a result of the adopted 2013 TSP. All projects were updated to 2018 costs based upon the Oregon Department of Transportation (ODOT) unit costs of construction. Costs were updated to include the new Americans with Disabilities Act (ADA) standards for crossings. Completed projects were moved to a list considered for the reimbursement fee based on actual construction costs and City funding sources. Improvement Costs The improvement TSDC cost is summarized by major project component in Table 3-1. A detailed list of projects is provided in Table A-1 (appendix). The TSP was adopted in 2013 and placed a priority on sidewalks, especially school routes. As a result, the project list has over $16M in sidewalk projects that will most likely be completed through Safe Routes to School or other grant programs. Based on Council’s prior direction, the Nevada Street Bridge extension (Council action June 20, 2017) was removed from the eligible projects for funding and will be reviewed again during the TSP update. City staff added the Ashland Street, Oak Knoll, and E. Main/Hwy 66 intersection potential roundabout project (R9) to the list to reflect higher priority needs in the city. Developer-driven projects expected to be constructed within the next 5-7 years are also included on the list shown in Table A-1. In most cases these new projects will provide benefits not only to the new development area, but also to the community at large. If the City 93 3-7 will be giving TSDC credits for work being done by the developer, funds must be accounted for and collected through the TSDC. Many developer driven projects are constructed to include more pavement and sidewalk width to be consistent with City standards for a certain type of street in lieu of a reflecting the minimum width that would be required just to serve development. For those development driven projects, the City’s share to “upsize” the roadway was estimated to be 35%. The costs will be adjusted as the project is built to ensure equitable credits for the development completed above the general standard (similar to water and sewer pipeline up-sizing). As shown in Table 3-1, the total cost of improvements on the project list is about $56 million. Future improvement costs were adjusted for expected external funding totaling almost $24 million, as follows: • Sidewalk projects potentially eligible for Safe Routes to School or other grant programs are assumed to be grant funded at 75 percent • New bikeways assume 10 percent grant funding • Improvements on ODOT facilities include 90 percent external funding • Roadway safety projects assume other funding of 25 percent • Development driven projects assume 65 percent developer funded The growth portion (i.e., TSDC cost) is about $16.7 million. Table 3-1 City of Ashland TSDC Methodology Summary of Improvement Project Costs Project Type Total Cost Other Funding % Growth1 TSDC Cost2 Studies $153,400 $0 11% $16,430 Transit $4,425,000 $0 11% $473,937 Pedestrian $16,359,225 $10,763,813 97% $5,486,026 Bike $5,943,660 $594,366 34% $1,969,374 Intersection Studies $330,400 $0 24% $80,406 Intersection & Roadway Improvements $27,884,972 $11,728,161 52% $8,323,813 Crossing $1,180,000 $767,000 100% $413,000 Total $56,276,657 $23,853,340 52% $16,762,985 1 Growth portion before other funds applied 2 Other funding applied first to non-growth share of cost; any remaining funds reduce TSDC cost Reimbursement Costs The reimbursement project lists and costs are shown in Table 3-2. Project costs reflect actual construction costs, adjusted for other funding sources. The growth share represents the portion of roadway capacity reserved for future development trips, as estimated from the travel demand model. The total reimbursement growth cost is almost $1.2 million. 94 3-8 Table 3-2 City of Ashland Transportation SDC Methodology Reimbursement Project Costs Description Actual Project Cost Other Funding NET CITY $ GROWTH % SDC $ Siskiyou Blvd, Gresham, 3rd, Lithia Way Intersection $5,128,571 $2,900,000 $2,228,571 36% $802,657 N. Main/Hersey/Wimer Intersection Realignment $1,049,051 $682,696 $366,356 17% $60,802 Walker Ave @ E Main - Install right turn lane $701,351 $418,920 $282,431 40% $114,005 Railroad Crossing Imp; E Main (07) $443,002 $100,000 $343,002 30% $103,287 Railroad Crossing Improvements; Oak $115,960 $115,960 71% $82,481 Will Dodge Way reconstruction $27,909 $27,909 51% $14,192 N. Main Road Diet $108,657 $32,597 $76,060 13% $9,726 $7,574,501 $1,234,213 $3,440,288 35% $1,187,150 95 4-1 SECTION 4 TSDC Schedule Introduction The TSDC for an individual development is based on the system-wide unit cost per trip and the number of trips attributable to a particular development. System-Wide Unit Costs ($/Trip) Based on the growth trips and TSDC costs summarized in Sections 2 and 3, the total cost per average daily trip is equal to $471.55, as shown in Table 4-1, and is comprised of the following components: $440.36 (improvement fee) + $31.19 (reimbursement fee) Table 4-1 City of Ashland Transportation SDC Methodology Transportation System Unit Costs of Capacity ($/Trip) Improvement SDC Reimbursement SDC Combined SDC Cost Basis (1) $16,762,985 $1,187,150 $17,950135 Growth Trip Ends (2) 38,066 38,066 38,066 SDC per Trip End $440.36 $31.19 $471.55 (1) From Tables 3-1 and 3-2 (2) From Table 2-1 Compliance Charge Local governments are entitled to include in the TSDCs, a charge to recover costs associated with complying with the SDC statutes. Compliance costs include costs related to developing and administering the SDC methodology, project list (including but not limited to TSP and other studies), and credit system; as well as annual accounting and other City administration costs. Table 4-2 shows the calculation of the compliance charge per trip, which is $16.05, or about 3.3 percent of the total cost per trip ($488). 96 4-2 Table 4-2 Estimated Compliance Costs Total $ Amortize (Years) Annual $ Growth % Growth $ SDC Study $50,000 5 $10,000 100% $10,000 TSP $225,000 10 $22,500 52% $11,633 Accounting, Legal, Planning $1,000 1 $1,000 100% $1,000 Total Cost $22,633 Annual Trips 1,410 Compliance $/Trip $16.05 TSDC Schedule The TSDC for an individual development is based on the cost per trip (including the reimbursement, improvement, and compliance fees) and the number of trips (average daily) attributable to a particular development, where the number of development trips is computed as follows: Number of Development Trips = Trip Generation Rate X Adjustment Factors X Development Units Table A-2 (in Appendix A) includes the updated TSDC rates and traffic impact assumptions for typical land use categories. Trip Generation Rates In recognition of Ashland’s character and its residents’ travel behaviors, the SAC reviewed the differences between basing the TSDC on average daily versus PM peak hour (4-6 pm) trip generation. After significant debate, the SAC recommended the use of average daily trips as more proportional and equitable for TSDC assessment purposes. Average daily trips recognize the overall capacity utilization of the system, not just capacity used by trips generated during the PM peak. The City will continue to use the Institute of Transportation Engineers (ITE) average daily trip generation rates to determine the TSDCs for individual developments. Use of ITE trip generation data is standard in the transportation industry. ITE trip rates by land use are based on studies from around the country, and in the absence of local data, represent the best available source of trip data for specific land uses. Trip Rate Adjustments The updated methodology includes pass-by and diverted linked trip adjustments. The current methodology adjustments for trip length are eliminated, as available data to reasonably estimate average trip length for a given land use type in comparison to other uses is extremely limited. Furthermore, trip length may be more directly attributable to location within an area and the availability of other similar uses in the area than it is to simply the type of use. 97 4-3 The updated methodology adjustments are discussed in more detail below. Pass-by Trips Pass-by trips refer to trips that occur when a motorist is already on the roadway, as in the case of a traveler stopping by a fast-food restaurant on the way home from work. In this case, the motorist making a stop while “passing by” is counted as a trip generated by the restaurant, but it does not represent a new (or primary) trip on the roadway. Pass-by trip adjustments in the updated methodology are based on published data by land use from the ITE. Diverted Link Trips The updated methodology also adjusts traffic impact based on “diverted link” trips, which is another type of non-primary trip. In this case, the motorist will divert from a primary route to access a nearby use (e.g., a vehicle may turn off a major roadway onto an intersecting street to access a land use), and then return to the original route to complete the trip. As with the pass-by trip adjustments, the diverted link trip adjustments included in the updated methodology are based on reported ITE data. TSDC Implementation The SAC made a number of recommendations related to the implementation of the TSDCs, aimed primarily at addressing revenue adequacy and affordability objectives. Inflationary Adjustments In order to keep pace with inflation, and avoid significant future TSDC adjustments, the SAC recommends that the City’s fees increase with the Engineering News Record (ENR) construction cost index July 1st each year. Phase-In As a result of the updated cost per trip, as well as changes to ITE trip rates since the 1999 methodology, the TSDCs for many land use categories increase significantly compared with current fees. The SAC has recommended a 3-year phase in of the updated cost per trip, with the first year including 50 percent of the increase, and approximately 25 percent increases in years 2 and 3. Table A-2 shows the projected TSDCs (before future inflation adjustments) during the recommended 3-year phase-in period. Discounts and Incentives The SAC discussed incentives and discounts for certain development types, and recommends the following: • 50 percent discount for new homes (including Accessory Dwelling Units) that are 500 square feet or smaller • 25 percent discount for homes (including cottage housing) that are 501-800 square feet 98 4-4 • Maintain the existing affordable housing 100 percent discount; qualified as affordable housing by the City of Ashland Housing Program and deed restricted to remain affordable for a minimum of 30 years. • Provide a 20 percent discount for developers planning to employ Transportation Demand Management (measures aimed at reducing single occupancy vehicle use); as an example this credit recognizes developing near transit (e.g., Transit Triangle); eligible projects must demonstrate achievable transportation impact reductions and parking reductions. 99 Table A-1 City of Ashland, Oregon TRANSPORTATION SDC Project List Type/ # Street Description Classification Priority 2018 Cost Other Funding % Growth TSDC Cost 1 GENERAL POLICIES & STUDIES S1 NA Funding Sources Feasibility Study NA 2 $35,400 11% $3,791 S2 NA Downtown Parking & Multi-Modal Circulation Study 1 $118,000 11% $12,638 ST Total Policies & Studies Projects $153,400 $16,430 PEDESTRIAN PROJECTS O1 NA Travel Smart Education, Targeted Marketing Program $53,100 0% $0 P1 N. Main St/Hwy 99 N. Main St to Schofield St Boulevard 1 $73,750 97% $71,626 P4 Laurel St Nevada St to Orange Ave Avenue 2 $737,500 $553,125 97% $184,375 P5 Glenn St/Orange Ave N. Main St to 175' E of Willow St N'hood Street 1 $295,000 $221,250 97% $73,750 P6 Orange Ave 175' west of Drager St to Helman St Avenue 1 $368,750 $276,563 97% $92,188 P8 Wimer St Thornton Way to N. Main St N'hood Street 2 $1,180,000 $885,000 97% $295,000 P9 Maple St Chestnut St to 150' E of Rock St Avenue 1 $147,500 $110,625 97% $36,875 P10(1) Scenic Dr Maple St to Wimer St Avenue 1 $368,750 $276,563 97% $92,188 P17 Beaver Slide Water St to Lithia Way N'hood Street 1 $73,750 97% $71,626 P18 A St Oak St to 100' W of 6th St Avenue 1 $368,750 $276,563 97% $92,188 P22 N. Mountain Ave 100' S of Village Green Way to Iowa St Avenue 1 $663,750 97% $644,634 P23 Wightman St 200' N of E. Main St to 625' S of E. Main St N'hood Collector 1 $590,000 $442,500 97% $147,500 P27(1) Walker Ave Oregon St to Woodland Dr Avenue 1 $295,000 $221,250 97% $73,750 P28(1) Ashland St S. Mountain Ave to Morton St Avenue 1 $663,750 $497,813 97% $165,938 P38(1) Clay St Siskiyou Blvd to Mohawk St Avenue 1 $442,500 $331,875 97% $110,625 P57(1) Tolman Creek Rd Siskiyou Blvd to west side City Limits Avenue 1 $626,875 97% $608,821 P58(1) Helman St Hersey St to Van Ness Ave Avenue 1 $147,500 $110,625 97% $36,875 P59 Garfield St E. Main St to Siskiyou Blvd N'hood Street 1 $1,106,250 $829,688 97% $276,563 P60 Lincoln St E. Main St to Iowa St N'hood Street 1 $663,750 $497,813 97% $165,938 P61 California St E. Main St to Iowa St N'hood Street 1 $737,500 $553,125 97% $184,375 P62 Quincy St Garfield St to Wightman St N'hood Street 2 $221,250 $165,938 97% $55,313 P63 Liberty St Siskiyou Blvd to Ashland St N'hood Street 1 $958,750 $719,063 97% $239,688 P64 Water St Van Ness Ave to B St N'hood Street 2 $368,750 $276,563 97% $92,188 P65 Faith Ave Ashland St to Siskiyou Blvd N'hood Street 1 $516,250 $387,188 97% $129,063 P66 Diane St Jaquelyn St to Tolman Creek Rd N'hood Street 1 $29,500 $22,125 97% $7,375 P67 Frances Lane Siskiyou Blvd to Oregon St N'hood Street 1 $14,750 $11,063 97% $3,688 P68 Carol St Patterson St to Hersey St N'hood Street 1 $221,250 $165,938 97% $55,313 P70 Park St Ashland St to Siskiyou Blvd N'hood Street 1 $958,750 $719,063 97% $239,688 P72 C St Fourth St to Fifth St N'hood Street 2 $147,500 97% $143,252 100 A-2 Table A-1 City of Ashland, Oregon TRANSPORTATION SDC Project List Type/ # Street Description Classification Priority 2018 Cost Other Funding % Growth TSDC Cost 1 P73 Barbara St Jaquelyn St to Tolman Creek Rd N'hood Street 2 $147,500 $110,625 97% $36,875 P74 Roca St Ashland St to Prospect St N'hood Street 2 $368,750 $276,563 97% $92,188 P75 Blaine St Morton St to Morse Ave N'hood Street 2 $147,500 $110,625 97% $36,875 P78 Patterson St Crispin St to Carol St N'hood Street 2 $147,500 $110,625 97% $36,875 P79 Harrison St Iowa St to Holly St N'hood Street 2 $147,500 $110,625 97% $36,875 P80 Spring Creek Dr Oak Knoll Dr to Road End N'hood Street 2 $516,250 $387,188 97% $129,063 P81 Bellview Ave Green Meadows Way to Siskiyou Blvd N'hood Street 2 $368,750 97% $358,130 P37 Clay St Faith Ave to Siskiyou Blvd Avenue 2 $1,475,000 $1,106,250 97% $368,750 ST Total Pedestrian Projects $16,359,225 $10,763,813 $5,486,026 BICYCLE PROJECTS B2 Wimer St Scenic Dr to N. Main St Avenue 1 $27,140 $2,714 34% $9,201 B3 Nevada St Vansant St to N. Mountain Ave Avenue 2 $312,110 $31,211 34% $105,806 B5 Maple/Scenic/Nutley N. Main St to Winburn Way N'hood Collector 1 $149,270 $14,927 34% $50,603 B7 Iowa St Terrace St ; S. Mountain to Walker Ave Avenue 1 $325,680 $32,568 34% $110,406 B9 Ashland St Morton St to University Way Avenue 2 $40,710 $4,071 34% $13,801 B10 S. Mountain Ave Ashland St to E. Main St Avenue 1 $162,840 $16,284 34% $55,203 B11 Wightman St E. Main St to Siskiyou Blvd Avenue 1 $81,420 $8,142 34% $27,602 B13 B St Oak St to N. Mountain Ave Avenue 1 $108,560 $10,856 34% $36,802 B16 Lithia Way Oak St to Helman St Avenue 1 $149,270 $14,927 34% $50,603 B17 Main St Helman St to Siskiyou Blvd Boulevard 1 $67,850 $6,785 34% $23,001 B18 N. Main St Jackson Rd to Helman St Boulevard 2 $352,820 $35,282 34% $119,607 B19 Helman St Nevada St to N. Main St Avenue 1 $108,560 $10,856 34% $36,802 B20 Water St Hersey St to N. Main St N'hood Street 2 $40,710 $4,071 34% $13,801 B25 Tolman Creek Rd Siskiyou Blvd to Green Meadows Way Avenue 2 $135,700 $13,570 34% $46,003 B26 Normal Ave E. Main St to Siskiyou Blvd Avenue 1 $257,830 $25,783 34% $87,405 B29 Walker Ave Siskiyou Blvd to Peachey Rd Avenue 1 $54,280 $5,428 34% $18,401 B31 Indiana St Siskiyou Blvd to Oregon St N'hood Street 1 $27,140 $2,714 34% $9,201 B33 8th St A St to E. Main St N'hood Street 1 $27,140 $2,714 34% $9,201 B37 Clay St Siskiyou Blvd to Mohawk St Avenue 2 $27,140 $2,714 34% $9,201 B39 Glenn St/Orange Ave N. Main St to Proposed Trail N'hood Collector 2 $54,280 $5,428 34% $18,401 B40 Laurel St Orange St to Nevada St N'hood Collector 2 $54,280 $5,428 34% $18,401 TR2 New Trail Clay St to Tolman Creek Rd Multi-Use Path 2 $542,800 $54,280 33% $180,316 TR1 Northside Trail Orchid Ave to Tolman Creek Rd Multi-Use Path 1 $2,714,000 $271,400 33% $901,578 B38 Oregon/Clark St Indiana St to Harmony Lane NS 1 $54,280 $5,428 33% $18,032 ST Total Bicycle Projects $5,943,660 $594,366 $1,969,374 101 A-3 Table A-1 City of Ashland, Oregon TRANSPORTATION SDC Project List Type/ # Street Description Classification Priority 2018 Cost Other Funding % Growth TSDC Cost 1 TRANSIT PROJECTS O5 Transit Service Program Provides funds & allocation guidance to improve transit svc $3,245,000 11% $347,554 O5 Transit Service Program Provides funds & allocation guidance to improve transit svc $1,180,000 11% $126,383 ST Total Transit Projects $4,425,000 $0 $473,937 INTERSECTION & ROADWAY IMPROVEMENTS S3 N. Main St (OR 99) Helman St to Sheridan St Boulevard 2 $88,500 21% $18,891 S5 Siskiyou Blvd Ashland St to Tolman Creek Rd Boulevard 2 $88,500 20% $17,467 S6 Ashland St (OR 66) Siskiyou Blvd to Tolman Creek Rd Boulevard 2 $88,500 28% $25,185 S9 Ashland St (OR 66) Clay St to Washington St Boulevard/Ave 2 $23,600 31% $7,210 S10 Siskiyou Blvd Highway 66 to Beach St Blvd/N'hood Coll 1 $41,300 28% $11,653 ST Studies Subtotal $330,400 $0 $80,406 Intersection & Roadway Projects R5 Siskiyou Blvd (OR 66) Lithia Way (OR 99 NB) / E. Main St Boulevard/Ave 1 $73,750 $66,375 100% $7,375 R6 Siskiyou Blvd (OR 66) Tolman Creek Rd Boulevard/Ave 1 $118,273 $106,445 14% $11,827 R8 Ashland St (OR 66) Oak Knoll Dr / E. Main St (realignment) Boulevard/Ave 1 $602,851 $542,566 24% $60,285 R19 Normal Ave Ext Normal Ave to E. Main St Avenue 2 $3,630,499 31% $1,133,777 R25 Washington St Ext Washington St Tolman Creek Rd N'hood Collector 1 $1,584,169 $1,029,945 17% $267,855 R29 Washington St Ext Washington St to Benson Way N'hood Collector $1,535,180 $997,867 100% $537,313 R36 N. Main St N. Main St Permanent Diet Boulevard 2 $295,000 13% $37,722 R38 Ashland St Siskiyou Blvd to Walker Ave Streetscape Boulevard 2 $1,298,000 $843,700 40% $454,300 R39 Ashland St Walker Ave to Normal Ave Streetscape Boulevard $1,534,000 $997,100 39% $536,900 R40 Walker Ave Festival St Siskiyou Blvd to Ashland St Avenue 1 $1,150,500 36% $416,717 R9 Ashland St (OR 66) Oak Knoll Dr / E. Main St (roundabout) Boulevard/Ave 3 $4,646,250 $1,161,563 24% $1,123,342 R43 New Roadway (E) Mistletoe Rd to Siskiyou Blvd (OR 99) Boulevard $5,099,960 $3,314,974 100% $1,784,986 R44 Tolman Creek Mistletoe Rd Streetscape Boulevard $4,104,040 $2,667,626 28% $1,164,086 R41 Ashland St Tolman Creek Rd Streetscape Boulevard/Ave 4 $2,212,500 36% $787,328 ST Total Intersection & Roadway Improvements $27,884,972 $11,728,161 52% $8,323,813 RAILROAD CROSSING PROJECTS X3 Normal Ave Crossing Upgrade Planned Avenue 4 $1,180,000 $767,000 100% $413,000 ST Total Railroad Crossing Projects $1,180,000 $767,000 $413,000 Total $56,276,657 $23,853,340 52% $16,762,985 1 Grants & contributions applied first to non-growth share of cost; any remaining funds reduce growth cost for TSDC calculation purposes 102 Table A-2 City of Ashland, Oregon New $/Trip TSDC by Land Use (Updated and 3-Year Phase In)$488 $320 $397 $488 ITE Code Description Unit of Measure Updated TSDC per Unit Daily Trip Rate Diverted Pass-by Linked Trip Factor 2 Adjusted Daily Trip Rate Year 1 Year 2 Year 3 90 PARK & RIDE LOT WITH BUS SERVICE PER PARKING SPACE 1,370$ 2.81 0% 0%2.81 899$ 1,116$ 1,370$ 110 GENERAL LIGHT INDUSTRIAL PER TGSF 2,419$ 4.96 0% 0% 1.00 4.96 1,587$ 1,969$ 2,419$ 130 INDUSTRIAL PARK PER TGSF 1,643$ 3.37 0% 0% 1.00 3.37 1,078$ 1,338$ 1,643$ 140 MANUFACTURING PER TGSF 1,916$ 3.93 0% 0% 1.00 3.93 1,258$ 1,560$ 1,916$ 150 WAREHOUSING PER TGSF 848$ 1.74 0% 0% 1.00 1.74 557$ 691$ 848$ 151 MINI WAREHOUSE PER TGSF 736$ 1.51 0% 0% 1.00 1.51 483$ 599$ 736$ 154 HIGH-CUBE/SHORT-TERM STORAGE WAREHOUSE PER TGSF 683$ 1.40 0% 0% 1.00 1.40 448$ 556$ 683$ 160 DATA CENTER PER TGSF 483$ 0.99 0% 0%1.00 0.99 317$ 393$ 483$ 210 SINGLE FAMILY DWELLING/TOWNHOME PER DU 4,603$ 9.44 0% 0% 1.00 9.44 3,021$ 3,748$ 4,603$ 220 APARTMENTS/CONDOS PER DU 3,569$ 7.32 0% 0% 1.00 7.32 2,342$ 2,906$ 3,569$ 225 OFF-CAMPUS STUDENT APARTMENT PER BEDROOM 1,536$ 3.15 0% 0% 1.00 3.15 1,008$ 1,251$ 1,536$ 240 MANUFACTURED HOUSING 2,438$ 5.00 0% 0% 1.00 5.00 1,600$ 1,985$ 2,438$ 251 SENIOR HOUSING DETACHED PER DU 2,082$ 4.27 0% 0% 1.00 4.27 1,366$ 1,695$ 2,082$ 252 SENIOR HOUSING ATTACHED PER DU 1,804$ 3.70 0% 0% 1.00 3.70 1,184$ 1,469$ 1,804$ 253 CONGREGATE CARE FACILITY PER DU 985$ 2.02 0% 0% 1.00 2.02 646$ 802$ 985$ -$ 310 HOTEL/MOTEL PER ROOM 4,076$ 8.36 0% 0% 1.00 8.36 2,675$ 3,319$ 4,076$ 411 CITY PARK PER ACRE 380$ 0.78 0% 0% 1.00 0.78 250$ 310$ 380$ 430 GOLF COURSE HOLES 14,813$ 30.38 0% 0% 1.00 30.38 9,722$ 12,061$ 14,813$ 444 THEATER SEATS 858$ 1.76 0% 0% 1.00 1.76 563$ 699$ 858$ 492 HEALTH/FITNESS CLUB PER TGSF 12,205$ 25.03 0% 0% 1.00 25.03 8,010$ 9,937$ 12,205$ 491 TENNIS PER COURT 13,511$ 27.71 0% 0% 1.00 27.71 8,867$ 11,001$ 13,511$ 495 COMMUNITY CENTER PER TGSF 14,053$ 28.82 0% 0% 1.00 28.82 9,222$ 11,442$ 14,053$ 520 ELEMENTARY SCHOOL PER STUDENT 922$ 1.89 0% 0% 1.00 1.89 605$ 750$ 922$ 536 PRIVATE SCHOOL (K-12)PER STUDENT 1,209$ 2.48 0% 0% 1.00 2.48 794$ 985$ 1,209$ 522 MIDDLE SCHOOL/JUNIOR HIGH SCHOOL PER STUDENT 1,039$ 2.13 0% 0% 1.00 2.13 682$ 846$ 1,039$ 530 HIGH SCHOOL PER STUDENT 990$ 2.03 0% 0% 1.00 2.03 650$ 806$ 990$ 540 JUNIOR/COMMUNITY COLLEGE PER STUDENT 561$ 1.15 0% 0% 1.00 1.15 368$ 457$ 561$ 550 UNIVERSITY/COLLEGE PER STUDENT 761$ 1.56 0% 0% 1.00 1.56 499$ 619$ 761$ 560 PLACE OF WORSHIP PER TGSF 3,389$ 6.95 0% 0% 1.00 6.95 2,224$ 2,759$ 3,389$ 565 DAY CARE CENTER PER STUDENT 877$ 4.09 56% 0% 0.44 1.80 576$ 714$ 877$ 590 LIBRARY PER TGSF 35,132$ 72.05 0% 0% 1.00 72.05 23,056$ 28,604$ 35,132$ 610 HOSPITAL PER TGSF 5,227$ 10.72 0% 0% 1.00 10.72 3,430$ 4,256$ 5,227$ 710 GENERAL OFFICE BUILDING PER TGSF 4,749$ 9.74 0% 0% 1.00 9.74 3,117$ 3,867$ 4,749$ 720 MEDICAL-DENTAL OFFICE PER TGSF 16,969$ 34.8 0% 0% 1.00 34.80 11,136$ 13,816$ 16,969$ 731 DEPARTMENT OF MOTOR VEHICLES PER TGSF 5,466$ 11.21 0% 0% 1.00 11.21 3,587$ 4,450$ 5,466$ 732 US POST OFFICE 50,681$ 103.94 0% 0% 1.00 103.94 33,261$ 41,264$ 50,681$ 813 FREE-STANDING DISCOUNT SUPERSTORE PER TGSF 17,552$ 50.7 0% 29% 0.71 36.00 11,519$ 14,291$ 17,552$ 816 HARDWARE/PAINT STORE PER TGSF 3,298$ 9.14 0% 26% 0.74 6.76 2,164$ 2,685$ 3,298$ 817 NURSERY (GARDEN CENTER)PER TGSF 33,206$ 68.1 0% 0% 1.00 68.10 21,792$ 27,036$ 33,206$ 820 SHOPPING CENTER/RETAIL PER TSFGLA 7,363$ 37.75 26% 34% 0.40 15.10 4,832$ 5,995$ 7,363$ 841 AUTOMOBILE SALES PER TGSF 13,575$ 27.84 0% 0% 1.00 27.84 8,909$ 11,052$ 13,575$ 850 SUPERMARKET PER TGSF 13,537$ 106.78 38% 36% 0.26 27.76 8,884$ 11,022$ 13,537$ 851/853 CONVENIENCE MARKET PER TGSF 54,785$ 624.2 16% 66% 0.18 112.36 35,954$ 44,605$ 54,785$ 854 DISCOUNT SUPERMARKET PER TGSF 22,597$ 90.87 28% 21% 0.51 46.34 14,830$ 18,398$ 22,597$ 857 DISCOUNT CLUB PER TGSF 12,841$ 41.8 0% 37% 0.63 26.33 8,427$ 10,455$ 12,841$ 862 HOME IMPROVEMENT SUPERSTORE PER TGSF 8,694$ 30.74 0% 42% 0.58 17.83 5,705$ 7,078$ 8,694$ 880 PHARMACY/DRUGSTORE W/OUT DRIVE THRU WI PER TGSF 14,495$ 90.08 14% 53% 0.33 29.73 14,495$ 14,495$ 14,495$ 881 PHARMACY/DRUGSTORE WITH DRIVE THRU WIND PER TGSF 20,226$ 109.16 13% 49% 0.38 41.48 20,226$ 20,226$ 20,226$ 911 WALK-IN BANK PER TGSF 12,440$ 59.33 22% 35% 0.43 25.51 8,164$ 10,129$ 12,440$ 912 DRIVE-IN BANK PER TGSF 20,973$ 100.03 22% 35% 0.43 43.01 13,764$ 17,076$ 20,973$ 931 QUALITY RESTAURANT PER TGSF 11,855$ 83.84 27% 44% 0.29 24.31 7,780$ 9,652$ 11,855$ 932 HIGH TURNOVER RESTAURANT PER TGSF 16,957$ 112.18 26% 43% 0.31 34.78 11,128$ 13,806$ 16,957$ 934 FAST FOOD RESTAURANT WITH DRIVE-THRU PER TGSF 62,002$ 470.95 23% 50% 0.27 127.16 40,690$ 50,481$ 62,002$ 937 COFFEE/DONUT WITH DRIVE-THROUGH PER TGSF 44,002$ 820.38 0% 89% 0.11 90.24 28,877$ 35,826$ 44,002$ 936 COFFEE/DONUT WITHOUT DRIVE-THROUGH PER TGSF 50,010$ 932.39 0% 89% 0.11 102.56 32,820$ 40,717$ 50,010$ 944 GASOLINE/SERVICE STATION PER VEH.FUEL.POS.19,291$ 172.01 35% 42% 0.23 39.56 12,660$ 15,706$ 19,291$ 945 GAS/SERVICE STATION W/CONVENIENCE MKT PER VEH.FUEL.POS.13,017$ 205.36 31% 56% 0.13 26.70 8,543$ 10,599$ 13,017$ 1 Discounted by pass-by trips 2 Discounted by pass-by and diverted link trips TGSF = Thousand Gross Square Feet TSFGLA = Thousand Square Feet Gross Leasable Area DU = Dwelling Unit VEH. FUEL POS. = Vehicle Fueling Position Updated ITE 10th Edition Phased $/Trip 103 A RESOLUTION ADOPTING TRANSPORTATION SYSTEMS DEVELOPMENT CHARGE METHODOLOGY, PURSUANT TO ASHLAND MUNICIPAL CODE SECTION 4.20.040 AND 4.20.050. Page 1 of 2 RESOLUTION NO. 2018- A RESOLUTION ADOPTING TRANSPORTATION SYSTEMS DEVELOPMENT CHARGE METHODOLOGY (2018), PURSUANT TO ASHLAND MUNICIPAL CODE SECTIONS 4.20.040 AND 4.20.050. RECITALS: A. The City adopted a new Transportation Systems Plan on March 19, 2013 through ordinance 3080 that amended the comprehensive plan. THE CITY OF ASHLAND RESOLVES AS FOLLOWS: SECTION 1. Resolution 2017-26 is repealed. SECTION 2. The Draft Methodology Report Transportation Systems Development Charges dated August 27, 2018, including Discounts and Incentives as presented on page 4-3, Transportation SDC Project List (Table A-1), and Transportation SDC by Land Use charges per trip (Table A-2) are hereby adopted in their entirety. SECTION 3. The Draft Methodology Report Transportation Systems Development Charges dated August 27, 2018, will be renamed FINAL Methodology Report Transportation Systems Development Charges dated November 6, 2018. SECTION 4. The Transportation Systems Development Charges and phased $/trip attached to this resolution and marked “Exhibit A” will be effective January 1, 2019 (year 1) and will adjust for year 2 and year 3. SECTION 5. The Transportation Systems Development Charges will adjust for inflation with the Engineering News Record (ENR) construction cost index on July 1st each year as described on page 4-3 of the methodology report. SECTION 6. The Transportation Systems Development Charges will adjust on January 1, 2020, for year 2 increases, and on January 1, 2021, for year 3 increases. SECTION 7. One copy of this Resolution along with the Transportation Systems Development Charges Methodology Report, Transportation SDC Project List (Table A-1), and Transportation SDC by Land Use (Table A-2) shall be maintained in the office of the City Recorder and shall be available for public inspection during regular business hours. 104 A RESOLUTION ADOPTING TRANSPORTATION SYSTEMS DEVELOPMENT CHARGE METHODOLOGY, PURSUANT TO ASHLAND MUNICIPAL CODE SECTION 4.20.040 AND 4.20.050. Page 2 of 2 SECTION 8. The fees imposed by this Resolution are classified as not subject to the limits of Section 11b of Article XI of the Oregon Constitution (Ballot Measure No. 5). This resolution was read by title only in accordance with Ashland Municipal Code §2.04.090 duly PASSED and ADOPTED this ____ day of _________, 2018. Melissa Huhtala, City Recorder SIGNED and APPROVED this ____ day of ____________, 2018. John Stromberg, Mayor Reviewed as to form: David Lohman, City Attorney 105 CITY OF ASHLAND 20 East Main Street Tel: 541-488-6002 Ashland, Oregon 97520 Fax: 541-488-5311 www.ashland.or.us TTY: 800-735-2900 September 22, 2020 Mrs. Leigh Hood 520 Terrace Street Ashland OR, 97520 RE: Terrace Street Traffic Calming Mrs. Hood, At the September 17, 2020 Transportation Commission meeting, a specific agenda item was dedicated to discuss data collected as part of the Terrace Street Traffic Calming program process along with your letter regarding the program dated August 17, 2020 The Commission reviewed all speed and volume collected in 2020 along with historic data collected in 2009. There was much discussion on possible next steps with respect to the Traffic Calming program and your request. The Commission deemed appropriate next steps would be to collect bicycle and pedestrian count information for the roadway corridor, generate mapping of the area that shows trail connections and collect data on other similar type roadways in the area for further review and discussion. The Commission would like this data collected at an appropriate time, most likely in spring of 2021. The expectation is that activity levels would begin to return to a more normalized pattern by then and the data collected would better provide them information needed to discuss viable next steps. Please let me know if you have any questions. Sincerely, Scott Fleury PE Interim Public Works Director City of Ashland Linda Peterson-Adams Ashland Transportation Commission Chair 106