HomeMy WebLinkAbout1999-094 Contract - SigCorpCITY OF ASHLAND REQUEST FOR PROPOSALS (RFP) DATE OF THIS RFP: January 27, 1999 1. PURPOSE OF RFP. The City of Ashland is requesting proposals from qualified persons to provide Broadband HFC equipment as described on the attached documents entitled, "RFP for HFC Specifications." This Request for Proposals (RFP) is intended to provide interested persons with sufficient information to prepare and submit proposals for consideration by the city. It is the city's intent to select the most advantageous proposal based on the evaluation criteria stated in this RFP. The city reserves the right to reject any and all proposals. 2. CONTACT PERSON AND DEPARTMENT. Offerors are cautioned not to make any assumptions as to the implied meaning or intent of any part of the RFP. Offerors should request clarification if needed. Every request for information on, or clarification of the RFP, must be submitted to Pete Lovrovich, Director of Ashland Public Utilities, 90 North Mountain ,Ashland, Oregon 97520 in writing at least ten days prior to the date set for the opening of proposals. 3. COMPLAINT PROCESS. Any prospective offeror who contends that the provisions of this RFP or any aspect of the procurement process will encourage favoritism in the award of the contract for services, or substantially diminish competition, must file a written protest to the RFP at least ten days prior to the date set for the opening of proposals. Failure to file a protest will be deemed a waiver of any claim by an offeror that the procurement process violates any provision of ORS Chapter 279 or the City of Ashland Local Contract Review Board Rules. 4. ADDENDA. The provisions of this RFP cannot be modified by oral interpretations or statements. If inquiries or comments by offerors raise issues that require clarification by the city, or the city decides to revise any part of this RFP, addenda will be provided to all persons who receive the RFP. Receipt of an addendum must be acknowledged by signing and returning it with the proposal. 5. CONTRACT The offeror selected by the city will be expected to enter into a written contract in the form attached to this RFP. The proposal should indicate acceptance of the city's contract provisions or suggest reasonable alternatives that do not substantially impair the city's rights under the contract. If inclusion of any of the city's contract provisions will result in higher costs for the services, such costs must be specifically identified in the proposal. Unconditional refusal to accept the contract provisions proposed by city without offering acceptable alternatives may result in the disqualification of the offeror or a less favorable evaluation of its proposal. PAGE 1-REQUEST FOR PROPOSALS 6_ SUBMISSION OF PROPOSALS 6.1. In order to be considered, sealed proposals must be delivered to the address specified in the this RFP and must be entitled "Proposal for Broadband HFC Equipment" before the time and date specified in this RFP. Offerors who mail proposals should allow extra mail delivery time to ensure timely receipt of their proposals. Proposals received after the specified time and date cannot be considered, and will be returned unopened to the offeror. 6.2. Proposals shall be submitted in sealed packages or envelopes and clearly identified on the exterior of the envelope or package as noted in the above special information table. 6.3. The city will not pay for any costs incurred by offerors in the preparation, submission and presentation of their proposals. 6.4. Proposals received in response to this RFP will be opened at the time and date specified. Offerors who wish to be present at the time will be informed of the number and names of offerors. No other information will be made available at that time. 7. Wi~;HDRAWAL OF PROPOSALS Any proposal may be withdrawn by delivering a written request to person named in paragraph 3 above at any time prior to the time set for opening proposals. The request shall be executed by a duly authorized representative of the offeror. PAGE 2-REQUEST FOR PROPOSALS Request For Proposal for HFC Outside Video and Data Cable Plant Provide all required equipment to allow the distribution of video through a bi-directional HFC Network. Provide proposal design upon attached Node map. The proposed system consists of twenty five (25) nodes typical in size and subscriber count. System consists of approximately one hundred and ten (110) miles of coaxial plant. Provide a cost, per node, as per your proposed design. Performance guarantees are to be provided. All equipment to be Y2K compliant. Section #1 - Instructions to Proposers Form and Style RFPs shall be submitted as provided within this RFP document ONLY! To facilitate consideration of their proposals, vendors are to submit three (3) complete printed response packages. Vendors must also provide a copy of their responses on a 3.5" computer diskette in Microsoff Word for Windows, version 6, format. Supporting explanatory information may be submitted and will be reviewed. Supporting information should be attached to the printed response packages and annotated with the section to which it supports. All blanks on the RFP form are to be filled in. March 5, 1999 Addressed to: Pete Lovrovich, Director of Ashland Public Utilities, 90 North Mountain ,Ashland, Oregon 97520 Interlineation, alterations and erasures must be initialed by the signer of the RFP. Section #2 - Vendors proposals In order to be considered, vendors must submit a complete response to this RFP following the outline of the requirements provided. Distribution of the proposals to parties other than those specifically designated is subject to our approval. Failure to observe this requirement may result in vendor disqualification. 4 Section #3 - Right to Reject or Modify Selection of the winning vendor's proposal does not mean that all aspects of the proposal are acceptable. We retain the right to modify the terms and conditions in the proposal or reject terms and conditions proposed by the vendor prior to the execution of the contract as we deem necessary to ensure a satisfactory procurement. We may, by written notice stating the extent and effective date, cancd and/or terminate any order resulting from this solicitation for cause in whole or in part, at any time. Section #4 - Vendor Corporate Overview A: State core business, mission and vision statements. B: Describe your organization and how it is structured. Organization charts are helpful supplements to your explanations. '"C: Location that will support this project: D: Describe what differentiates your product from your competition. E: Describe how your solution might help reduce costs and/or provide greater value compared to other solutions. Section #5 - References Provide three references using the proposed equipment. Please provide the following for each reference. Reference I A: Company name: B: Company Address: C: Brief description of company, products, and industry serviced: D: Contact name, position, and Eraall address E: Products installed: Reference II A: Company name: B: Company Address: C: Brief description of company, products, and industry serviced: D: Contact name, position, and Eraall address E: Products installed: Reference III A: B: -.C: D: E: Company name: Company Address: Brief description of company, products, and industry serviced: Contact name, position, and Email address Products installed: Section #6 - Price Quotation All quotations for prices of products or services stated in the vendor's proposal shall be fixed from the date on which the proposal is submitted by the vendor for a period of one hundred and twenty (120) days. All prices quoted shall be F.O.B. Destination, Freight Prepaid. Definition of F.O.B. Destination, freight prepaid: Seller pays freight charges. Seller bears freight charges. Seller owns goods in transit. Seller files claims, if any. Title passes to buyer at destination. Part # Equipment List Price Discount Price Section #7 - Warranty List any components used in your solution, that are warranted, and indicate what the warranty period is for each of those components. Section #8 - Explanation of support plan(s) available Provide a total explanation of your companies Support Plan(s). Section #9 - Training Requirements and Costs Provide any options in respect to training and associated costs. Section #10 - Evaluation of Proposals 10. 1 Proposals which do not contain all information required by this RFP or are otherwise non-responsive may be rejected immediately. 10.2 The city reserves the right to waive irregularities or deficiencies in a proposal if the city determines that waiver is in the best interests of the city. 10.3 The city may request supplemental written information from an offeror concerning the offeror's ability to perform the services. If an offeror fails to provide supplemental information within the time stated in the request, the city may refuse to consider the offeror's proposal. 10.4 The city may request an interview with any offeror. If a proposal is unclear, or appears inadequate, the offeror may be given an opportunity in the interview to explain how the proposal complies with this RFP. 10.5 The city reserves the right to make such investigation it deems appropriate to determine whether an offeror is qualified to provide the services. If an offeror fails to cooperate with an investigation, or if an offeror provides false, misleading or incomplete information, the city may refuse to consider the offeror's proposal. 10.6 In cases of doubt or differences of opinion concerning the interpretation of this RFP, the city reserves the exclusive right to determine the intent, purpose and meaning of any provision in this RFP. 10.7 The following criteria will be applied in the evaluation process: 10.7.1 Proposals that accept the city's contract provisions, or propose alternatives that are acceptable to the city, will be awarded the appropriate point values. A maximum of 10 points may be awarded under this subsection. 10.7.2 The general experience and qualifications of the offeror, including experience in providing the type of services, equipment and systems that are covered by this RFP, will be evaluated. A maximum of 40 points may be awarded under this subsection. 10.7.3 The ability of the offeror to provide services, equipment and installation promptly and efficiently as needed by the city. A maximum of 25 points may be awarded under this subsection. 10.7.4 The cost of services, equipment and systems to be provided, including all reports, documents and warranties required to be provided. A maximum of 25 points may be awarded under this subsection. 10.8 The total points awarded to each proposal will be tabulated and the offerors shall be ranked accordingly. A contract with the offeror deemed to be most qualified will then be negotiated. If negotiations with the offeror who is ranked highest are unsuccessful, the city may proceed to the next most qualified, and so on, until a contract is successfully negotiated. 10.9 The persons evaluating the proposals will submit a written report on the evaluation process and a recommendation on selection of a contractor to the City Director of Ashland Public Utilities, who will make the final decision on award of a contract. The contractor selected by the city and all other offerors will be notified of the city's selection. Final award will depend upon the execution of an acceptable contract. Award of the contract may be withdrawn if the contract is not signed within 7 days of the date of award. CONTRACT Contract made on the date specified below in Recital A between the City and Contractor as follows: Recitals: A. The following information applies to this contract: CITY: CITY OF ASHLAND City Hall 20 East Main Street Ashland, Oregon 97520 (541) 488-5357 FAX: (541) 488-5320 Date of this agreement: June 3, 1999 Contractor: $igCorp Communications Address: 20 NW Fourth Street Evansville, Indiana 47708 Telephone: (812) 4644668 FAX: (812) 461-3349 ¶B: RFP date: January 27, 1999 Proposal date: March 5, 1999 ¶2.2. Contracting officer: John DiDomizio ¶2.4. Project: AFN Broadband HFC Equipment ¶6.1. Contractors representative: Tim Lillpop ¶8.3. Maximum contract amount: Per RFP Response B. On the date noted above, City issued a request for proposals (RFP) for the project described above. Contractor submitted a proposal in response to the RFP on the date noted above. C. After reviewing Contractor's proposal and proposals submitted by other offerors, City selected Contractor to provide the services covered by the RFP. City and Contractor agree as follows: 1. Relationship between City and Contractor: Contractor accepts the relationship of trust and confidence established between Contractor and City by this contract. Contractor covenants with the City to perform services and duties in conformance to and consistent with the standards generally recognized as being employed by professionals of Contractor's caliber in the locality of the project. Contractor furlher covenants to cooperate with City, City's representatives, contractors, and other interested padies in furthering the interests of City with respect to the project. 2. Definitions: Generally words, terms and phrases used in this contract shall have the meaning ascribed to them in the construction industry, unless the context clearly indicates otherwise. As used in this contract: 9 2,1. "City" means the City of Ashland, Oregon. 2.2. "Contracting officer" means the person specified in Recital A above or that persoWs designee. 2.3. "Project" means the project described in Recital A. 2.4. "Work" or "Services" shall mean all labor, materials, plans, specifications, opinions, reports, and other services and products which Contractor is required to provide under this contract. 3. Term: The term of this contract shall commence on the date specified in Recital A above and end on completion of the project unless sooner terminated as provided in this contract. 4. Authority of Contracting Officer: The contracting officer shall have the authority to act on behalf of City in the administration and interpretation of this contract. The contracting officer shall have complete authority to authorize services, transmit instrU..c, tions, receive information, interpret and define City's policies and make other decisions with respect to Contractor's performance. 5. C~ntractor Performance: Contractor shall at its own risk and expense, perform the work described above and, unless otherwise specified, furnish all labor, equipment and materials required for the proper performance of such work. 5.1. In connection with the work described in the RFP, Contractor shall: 5.1.1. Consult appropriate representatives of City to clarify and define City's requirements relative to the project. 5.1.2. Review available data relative to the project. 5.1.3. Identify data which is not available and is needed to fulfill the services, and act as City's representative in obtaining such data. 5.1.4. Prepare monthly progress reports to the contracting Officer on the status of the project. 5.1.5. Cooperate with other Contractors retained by City in the exchange of information needed for completion of the services and the project. 5.2. Contractor shall commence performance of services within five days after receiving written authorization from the contracting officer for work described in the RFP. Contractor shall perform the services as expeditiously as is consistent with professional skill and care and the orderly progress of the project. Upon request of City, Contractor shall submit for City's approval, a schedule for the performance of work elements described in the RFP. Each schedule shall include allowance for periods of time required for City°s review and approval of Contractor's services. Each schedule, approved by City, shall become a part of this contract. 5.3. Contractor shall perform the services as an independent contractor in accordance with generally accepted standards in Contractor's profession. Contractor shall be responsible for the professional quality, technical accuracy and the coordination of all services performed by Contractor. Contractor shall, without additional compensation, correct or revise any error or deficiencies in the services that are caused by Contractor's negligence. City's review, approval, acceptance of, or payment for, any of the services shall not be construed to waive any of City's rights under this contract or of any cause of action arising out of Contractor's services. In the event of any breach of this contract by Contractor or negligent performance of any of the services, City's cause of action against Contractor shall not be deemed to accrue until City discovers such breach or negligence, or should have, with reasonable diligence, discovered such breach or negligence. The preceding sentence shall not be construed, however, to allow City to prosecute an action against Contractor beyond the maximum time limitation provided by Oregon law. 6. Assignment of Contractor's Personnel: 6.1. The services covered by this contract shall be rendered by, or under the supervision of the person specified in Recital A above, who shall act as Contractor's representative in all communications and transactions with City. 6.2. Contractor will endeavor to honor reasonable specific requests of City with regard to assignment of Contractor's employees to perform services if the requests are consistent with sound business and professional practices. 7. Responsibilities of City: 7.1. City will cooperate fully with Contractor to achieve the objectives of this contract. 7.2. City will provide information, documents, materials and services that are within the possession or control of City and are required by Contractor for performance of the services. 7.3. City will arrange for access to, and make all provisions for Contractor to enter upon, public and private property as required for Contractor to perform the services. 7.4. City will provide all permits necessary for completion of the project. 7.5. The contracting officer will act as liaison between City, Contractor, public agencies, and others involved in the project. 8 Payment: 8.1. City shall pay Contractor for services and reimburse Contractor for expenses incurred by Contractor in performance of services in accordance with a payment schedule to be submitted by Contractor and accepted by City. No reimbursement will be made for expenses that are not specifically itemized in this payment schedule without prior approval by the contracting officer. 8.2. Contractor shall submit monthly invoices to City for Contractor's services within ten days after the end of the month covered by the invoice. 8.3. Total payments under this contract or any amendments shall not exceed the sum specified in Recital A above. 9. Compliance with Law: 9.1. This contract will be governed by and construed in accordance with laws of the S.tate of Oregon. Contractor shall promptly observe and comply with all present and future laws, orders, regulations, rules and ordinances of federal, state, City and city 'governments with respect to the services including, but not limited to, provisions of ORS 279.312, 279.314, 279.316 and 279.320. 9.2. Pursuant to ORS 279.316(2) any person employed by Contractor who performs work under this contract shall be paid at least time and a half pay for all overtime in excess of 40 hours in any one week, except for persons who are excluded or exempt from overtime pay under ORS 653.010 to 653.261 or under 29 U.S.C. Sections 201 to 209. 9.3. Contractor is a "subject employer" as defined in ORS 656.005 and shall comply with ORS 656.017. Prior to commencing any work, Contractor shall certify to City that Contractor has workers' compensation coverage required by ORS Chapter 656. If Contractor is a carrier insured employer, Contractor shall provide City with a certificate of insurance. If Contractor is a self-insured employer, Contractor shall provide City with a certification from the Oregon Department of Insurance and Finance as evidence of Contractor's status. 10. Ownership of Documents: All documents prepared by Contractor pursuant to this contract shall be the property of City. To the extent permitted by law, City shall, within the limits of the Oregon Tort Claims Act, defend, indemnify and hold harmless Contractor, its Contractors, agents and employees against all damages, claims, expenses and losses arising out of any reuse of plans, specifications and other documents prepared by Contractor without prior written authorization of Contractor. 11. Records: 11.1. Contractor shall develop and maintain complete books of account and other records on the services which are adequate for evaluating Contractor's performance. Contractor shall maintain records in such a manner as to provide a clear distinction between the expenditures and revenues related to the project and the expenditures and revenues related to Contractor's other business. 11.2. Contractor's books and records shall be made available for inspection by City at reasonable times, to verify Contractor's compliance with this contract. City shall have the right to request an audit of Contractor's books and records by a certified public accountant retained by City. 12. Indemnification: Contractor shall defend, indemnify and save City, its officers, agents, and employees harmless from any and all claims, actions, costs, judgments, damages or other expenses resulting from injury to any person (including injury resulting in death,) or damage to property (including loss or destruction), of whatsoever nature arising out of or incident to the negligent performance of this contract by Contractor (including but not limited to, the negligent acts or omissions of Contractor's employees, agents, and others designated by Contractor to perform work .~ar services attendant to this contract). Contractor shall not be held responsible for any claims, actions, costs, judgments, damages or other expenses, directly and proximately caused by the negligence of City. 13. Insurance: 13.1. Contractor shall, at its own expense, at all times during the term of this contract, maintain in force: 13.1.1. A comprehensive general liability policy including coverage for contractual liability for obligations assumed under this contract, blanket contractual liability, products and completed operations and owner's and contractor's protective insurance; 13.1.2. A professional errors and omissions liability policy; and 13.1.3. A comprehensive automobile liability policy including owned and non-owned automobiles. 13.2. The coverage under each liability insurance policy shall be equal to or greater than the limits for claims made under the Oregon Tort Claims Act with minimum coverage of $500,000 per occurrence (combined single limit for bodily injury and property damage claims) or $500,000 per occurrence for bodily injury and $100,000 per occurrence for property damage. ! 3,3. Liability coverage shall be provided on an "occurrence" basis. "Claims made" coverage will not be acceptable, except for the coverage required by subsection 13.1.2. 13.4. Certificates of insurance acceptable to the City shall be filed with City prior to the commencement of any work by Contractor. Each certificate shall state that coverage afforded under the policy cannot be canceled or reduced in coverage cannot be made until at least 30 days prior written notice has been given to City. A certificate which states merely that the issuing company "will endeavor to mail" written notice is unacceptable. 14. Default: 14.1. There shall be a default under this contract if either party fails to perform any act or obligation required by this contract within ten days after the other party gives written notice specifying the nature of the breach with reasonable particularity. If the breach specified in the notice is of such a nature that it cannot be completely cured within the ten day period, no default shall occur if the party receiving the notice begins performance of the act or obligation within the ten day period and thereafter proceeds with reasonable diligence and in good faith to effect the remedy as soon as practicable. 14.2. Notwithstanding subsection 14.1, either party may declare a default by written notice to the other party, without allowing an opportunity to cure, if the other party repeatedly breaches the terms of this contract. 14.3. If a default occurs, the party injured by the default may elect to terminate this contract and pursue any equitable or legal rights and remedies available under Oregon law. All remedies shall be cumulative. 14.4. Any litigation arising out of this contract shall be conducted in Circuit Court or District Court of the State of Oregon for Jackson County. 15. Termination without Cause: 15.1. In addition to the right to terminate this contract under subsection 8.4 or subsection 14.3, City may terminate by giving Contractor written notice sixty days prior to the termination date. 15.2. In addition to the right to terminate this contract under subsection 14.3, Contractor may complete such analyses and records as may be necessary to place its files in order and, where considered necessary to protect its professional reputation, to complete a report on the services performed to date of termination. 14 15.3. If City terminates the contract under subsection 15.2, Contractor shall be paid for all fees earned and costs incurred prior to the termination date. Contractor shall not be entitled to compensated for lost profits. 16. Notices: Any notice required to be given under this contract or any notice required to be given by law shall be in writing and may be given by personal delivery or by registered or certified mail, or by any other manner prescribed by law. 16.1. Notices to City shall be addressed to the contracting officer at the address provided for the City in Recital A above. 16.2. Notices to Contractor shall be addressed to the Contractor's representative at the address provided for the Contractor in Recital A above. 17. Assi.qnment: City and Contractor and the respective successors, administrators, assigns and legal representatives of each are bound by this contract to the other party and to the partners, successors, administrators, assigns and legal representatives of the other party. Contractor shall not assign or subcontract Contractor's rights or obligations under this contract without prior written consent of City. Except as stated in this section, nothing in this contract shall be construed to give any rights or benefits to anyone other than City and Contractor. 18. Modification: No modification of this contract shall be valid unless in writing and signed by the parties. Fed. ID #55-,,?Z~515q/,~ ~E~D AS ~O C/ONTENT Coding ~ ~18 ~. %~. ~C', (for City use only)