Loading...
HomeMy WebLinkAbout2007-05-09 Budget Committee Minutes BUDGET COMMITTEE MEETING May 9, 2007 – PAGE 1 of 5 City of Ashland Budget Committee Meeting Draft Minutes May 9, 2007 6:00pm Civic Center Council Chambers, 1175 East Main Street CALL TO ORDER Chairman Thompson called the Citizen’s Budget Committee Meeting to order at 6:10 pm on May 9, 2007 in Council Chambers at 1175 East Main Street, Ashland Oregon. ROLL CALL Mayor Morrison was present. Councilors Navickas, Hartzell, Hardesty, Silbiger, Jackson and Chapman were present.Committee Members Bond, Heimann, Thompson, Stebbins, Everson, Levine, and Gregorio were present. STAFF PRESENT: MARTHA BENNETT, CITY ADMINISTRATOR LEE TUNEBERG, ADMINISTRATIVE SERVICES/FINANCE DIRECTOR PAULA BROWN, PUBLIC WORKS DIRECTOR MIKE MORRISON, PUBLIC WORKS SUPERINTENDENT MICHAEL MORRISON, MAINTENANCE SAFETY SUPERVISOR JOHN PETERSON, STREET SUPERVISOR BRYN MORRISON, ACCOUNT REPRESENTATIVE MIRANDA IWAMOTO, ACCOUNT CLERK II PUBLIC INPUT None BUDGET COMMITTEE MEETING May 9, 2007 – PAGE 2 of 5 CAPITAL IMPROVEMENT PROGRAM OVERVIEW Paula Brown, Public Works Director, presented the Capital Improvement Program (CIP) for the City of Ashland. Ms. Brown began her presentation by listing the responsibilities of CIP development (see attached handout). She continued with the structure of the program which is split out by divisions. The divisions listed were Transportation, Storm Water, Airport, Water, Wastewater, Electric, Telecommunications, City Facilities, Technology and Parks & Recreation.Ms. Brown continued with the major accomplishments of FY 06-07 (see attached handout). Ms. Brown addressed the significant budget changes from 06-07 to 07-08 as increased materials costs. It was reported that petroleum, steel and pipe have increased significantly and that street projects have increased 30% over the last two years. Other changes include under spending the anticipated FY 07 CIP by approximately half and then reprogramming the 8 million for FY 08. Ms. Brown explained that Council approved 3 modifications (see attached handout). Ms. Brown said that work at the police station will need to be postponed until Facilities Master Plan is completed. She also reported that sidewalks are still a priority and that they are looking for grant funding for the Laurel St. sidewalks. Ms. Brown said that they are reviewing options for paving A & B streets, and that A St. will be paved in FY 08 but that B St. will be postponed. It was stated that A St. is partially grant funded and that the City is responsible for approximately $190,000. Ms. Brown also spoke about the formation of a Transportation Finance Committee. The committee looks into street financing/funding and long-term planning. Ms. Brown stated that the total proposed budget for fiscal year 2008 is approximately $8,900,000. She continued by listing the various projects per division (see attached handout for complete list). Some of the projects mentioned were the Jefferson St. extension, C & Eureka construction, miscellaneous concrete repairs, bus shelters near high school, Hosler Dam security projects, plant processing improvements, Lithia Fountain renovation, Wastewater Plant permit renewal, park development and Oak Knoll irrigation. Ms. Brown talked about the Park and Ride. She said that grants have been received from the Federal Transit Authority and that the City is currently working with RVTD, ODOT and Jackson County to figure out a site. The City is currently looking at a site near El Tapatio (Hwy. 99). Ms. Brown reported that Jackson County will try to match the grant, but that the City has reserved $30,000 for that project. The committee asked about the need for a Park and Ride. It was answered that various studies over the last few years have shown a need for a Park and Ride. Ms. Brown also spoke about the Airport Entitlement Project. She reported that the new Avigation Weather Operation System (AWOS) was finally approved and it allowed BUDGET COMMITTEE MEETING May 9, 2007 – PAGE 3 of 5 parking lot/road improvements. The project is 95% grant funded by FAA and Oregon Department of Aviation. The committee inquired about the street fund being out of balance and bond funding. Ms. Brown explained that the FY 07 anticipated CIP was so much higher than what was actually spent that most of those projects were shifted to FY 08 construction funding. It was also reported that the funding and long-term plans for the remainder of the projects are being evaluated by the Transportation Finance Committee. Committee member Gregorio inquired about why the FY 07 System Development Charges (SDC’s) are lower than in previous years. Ms. Brown replied that it was a conservative estimate but added that the City is not seeing as many new projects coming down the line as in the past. It was also reported that the monies associated with the SDC’s are restricted. Councilor Hartzell asked about the long-term projections for 2009-2012 and inquired about the ending fund balance. Ms. Brown explained that the bonds are affecting the ending fund balance. It was clarified that the projections take expenditures into account but not as much revenue. Ms. Brown also said that the Transportation Finance Committee (Street Task Force) is looking for new possible revenues, but that the projections only take the current standard practices into account. Mr. Tuneberg talked about future projections. The committee discussed the history of debt funding. Mr. Gregorio inquired about the cost of the plan permit renewal and what is included in the $250,000. It was answered that the $250,000 is for design (thermal reduction/cooling plant), analysis and permit but not actual improvements. Ms. Brown said that the City will only spend the $250,000 if they have to and that it’s a high estimate. She also talked about the importance of meeting DEQ requirements. Councilor Hartzell asked about the Lithia Fountain replacement. Ms. Brown said that it is up to historical standards and that the design is an exact replica. She also reported that it will be bronzed so it won’t break. The committee inquired about spending $100,000 for general improvements and maintenance for City facilities. Ms. Brown reported that with regard to the number of City facilities, $100,000 is not excessive. The committee asked about underground electric work and it was reported that the subdivisions were chosen based on priority. It was reported that these aging neighborhoods have wires built directly into the dirt and now they need conduit. Ms. Brown finished her presentation by talking about the challenges for FY 2008. Ms. Thompson said that another challenge is funding an 8 million dollar CIP budget without identified financing sources and wants to know about prioritization of projects. Ms. BUDGET COMMITTEE MEETING May 9, 2007 – PAGE 4 of 5 Brown explained that the CIP is based on the Master Plan and that the Master Plan is based on the current rate models. She explained that the life of a material (i.e., pipe) must be taken into account. Ms. Brown spoke about how it takes a lot of balancing to figure out what is or isn’t a priority and then determine how to finance it. Everson/Bond ms to approve CIP budget as presented. The committee was opened to discussion. Committee member Heimann expressed concern about not knowing the funding. Ms. Brown pointed out that FY 08 is funded and the only project without funding is the Helman Sidewalk project which will probably be grant funded. If not grant funded, it will be brought to Council. Discussion about long-term projections and funding followed. Councilor Navickas inquired about the thermal improvements. He said that there are various alternatives that are not achievable because of political reasons. Ms. Brown stated that the City must meet DEQ requirements and that she will bring the best solution to the Council. The committee voted on the motion. All Ayes. PUBLIC WORKS Paula Brown, Public Works Director, also presented the budget for the Public Works Department. Ms. Brown talked about the organization and major accomplishments of the department (see attached handout). Ms. Brown also spoke about the budget over time and the 2008 proposed budget (see attached handout). The 2008 proposed budget was reported to be approximately $24,000,000. Ms. Brown said that the Public Works budget is broken down by fund and presented the committee with a pie graph (see page 4 of handout). Ms. Brown continued by talking about the significant budget changes. Ms. Brown spoke about how CIP is the most volatile and that project costs have increased significantly. She also spoke about how FY 07 CIP was under spent. She said that the focus for Water this year will be updating the treatment plant and watershed management. She said that another focus is transportation safety such as traffic safety, pedestrian safety, bicycle safety, and railroad safety. Ms. Brown reported that she is pleased with conversations with ODOT and the Railroad about alternatives and improvements. Ms. Brown also talked about the airport. She said that the City has not raised rental rates as much as needed and therefore, maintenance will continue to decline as rent stays flat. The new parking lot/road improvements should improve the situation. Ms. Brown said that many of the current leases are 20 years long but that many of them are up for negotiation. She explained that the City owns the hangars which can be a source of revenue and that there is 100% occupancy for the hangars. BUDGET COMMITTEE MEETING May 9, 2007 – PAGE 5 of 5 Ms. Brown spoke about the responsibilities and the personnel of the Street division. She talked about the increases in Personal Services and said that the total increase was about 7%. Ms. Brown stated that the Street division does about $230,000 in general maintenance. Ms. Brown continued to talk about the responsibilities, focus, personnel and budgets for Ground Maintenance, Storm Water, Water, Wastewater, Cemetery, Facilities Maintenance, Admin/Engineering/GIS and Fleet (see attached handout for detailed lists). Committee member Stebbins asked if fringe benefits are more influenced by health benefits or retirement. It was answered that health benefits usually have more of an impact. Councilor Hardesty asked if it’s typical for health coverage to double from single to family. The answer was yes. Councilor Hartzell inquired about the Facilities Master Plan and whether or not it will be helpful. Ms. Brown answered that she thinks it will be helpful because it will identify space efficiency and the needs of the City facilities. Ms. Brown spoke about the Green Fleet Strategy. It was reported that the City has not yet worked on its “carbon footprint” but that there has been discussion. Ms. Brown pointed out an error on page 105. She pointed out that the Total Replacement cost should be $882,000 and that Total New Equipment should be $30,000, not $130,000. Ms. Brown also said that 3 vehicles (2 dump trucks and 1 Digger Derrick) have been reprogrammed from FY 07 to FY 08. It was explained that these vehicles have a long build-out time. Ms. Brown has proposed 2 electric cars for pool vehicles and those will be purchased for about $15,000 each. Ms. Thompson called attention to 3-68 and asked about the debt service line. Ms. Brown said that it is old debt. Mr. Tuneberg said that the City has refunded some of the old debt to offset new debt. He also said that a significant portion of it is associated with the Wastewater Treatment Plant. Levine/Bond ms to accept the Public Works budget as presented. All Ayes. Councilor Hardesty complimented all the grant work done by the Public Works Department. Ms. Brown talked about her staff and the good work they do for the City. ADJOURNMENT Meeting adjourned at 8:17 pm. Respectively Submitted, Miranda Iwamoto Account Clerk II Capital Improvement Program City of Ashland Proposed Budget for 2007-2008 May 9, 2007 CIP Development Responsibilities Master Plans; capacity, life, growth, etc Maintenance Records Service Level Expectations; maintain appropriate serviceable levels not too high, yet not broken Revenues and Budgeting Implications; when is borrowing appropriate and from what source fees, service charges, SDCs Balance; both budget availability and staffing Timing; appropriate timing for replacement based on capacity needs vsproject cost avoid crises response 1 CIP Program Structure Transportation; Streets, Sidewalks, LIDs Storm Water (funded through the Street Fund) Airport Water; Supply, Treatment and Distribution Wastewater; Treatment and Collection Electric Telecommunications (AFN) City Facilities Technology (computers, IT, hardware and software) Parks and Recreation Major Accomplishments in FY 2006-2007 Completed design E. Main Railroad Improvements Completed construction Raw Water Transmission Line; Dam to the Plant ($2.8M) Majority of construction complete for Water Plant Process Improvements ($375K) sodium hypochlorite conversion chemical feed and hydraulics sludge lagoon & waste line Completed acquisition and installation of the Membrane sections at Wastewater Treatment Plant ($300K) Good progress on all Electric Projects 2 Significant Budget Changes From 2006-2007 The Capital Improvement Program (CIP) project costs have been updated due to considerable increases in material costs. Street projects have increased 30% in the last two years FY07 CIP was significantly under-spent as staff pursued design completions in a busy and competitive market. FY08 reprograms project funds for construction with a total of $8.4 million programmed for completion. The projects in the Street Fund and Water Fund continue to be the largest CIP programs. Budget over Time Planned vsActual $25,000,000 plannedactual $20,000,000 TAP $15,000,000 $10,000,000 $5,000,000 $0 FY07 Incomplete: Fire Station Bond$2,457,000 Wastewater Projects; designed, but not in construction$830,000 Water Projects being tested for validity through the model$1,228,000 Transportation, LIDs-designs incomplete / project not ready$2,320,000 Other projects $10,000 TOTAL FY07 UNDEREXPENDED AMOUNT$6,845,000 3 CIP Approvals Council Study Session –December 4, 2006 Public Hearing –March 6, 2007 Council Approval with following modifications –March 6, 2007 Facility improvement for police station and parking lot be held until the completion of the Facilities Master Plan Evaluate funding options for Laurel Street Sidewalk project and include in FY07/08 Review options or alternatives to paving A & B Streets Budget Committee Discussion –May 9, 2007 Final Budget Approval –May 27, 2007 2008 Proposed Budget Parks & Rec, Computers & IT, $650,000, 7% Administration, $175,000, 2% $210,000, 2% Transportation, Electric, $600,000, $2,227,000, 25% 7% Airport, $240,000, 3% Wastewater, $1,780,000, 20% Storm Water, $375,000, 4%Water, $2,160,000, AFN, $499,000, 6% 24% 4 FY08 CIP Transportation Street Projects = $1,420,000: st A Street Rebuild Oak to 1Street –failing system $290,000 (see also sewer replacement) C & Eureka Construction (CMAQ total $665K through ODOT –City funds $100,000) E. Main Railroad Crossing Pedestrian and Bicycle Safety Improvements –Grant for $100K; total $130,000 Jefferson Street Extension (BrammoMotors and OECDD Funds) - $600,000 projected for FY08 Park and Ride –Grant with City match estimated at $30,000 working with Jackson County Hersey Street Pedestrian Safety Improvements –ADA, tree wells, sidewalk issues; $150,000 Miscellaneous Concrete Safety Repairs; $150,000 Beach; FY08 design, FY09 Const evaluate for 2008 CMAQ Project FY08 CIP Transportation (cont.) LIDs= $807,000 (each requires Council approval first): Schofield / Monte Vista LID-$387,000 Council added Laurel Street Sidewalks –apply for grant; $360,000 Upper Beach scheduled as the FY09 CMAQ Project; design in FY08 Council overall LID policy review scheduled for September 2007 Storm Water = $375,000: Planning on $200,000 -$300,000 each year per master plan Water Quality Improvements; $35,000; riparian, creek frontage, temperature, etc Replace SD Line in Alley E. Main St to Blaine; $75,000 Replace SD Line in Iowa Street from Sherman to Gresham; $90,000 Beach / Mountain Creek Improvements; $100,000 multi year project total $685,000 Airport = $240,000 Entitlement Project new AWOS, Parking & Road Improvements grant funded (95%) & “soft match”using staff time 5 FY08 CIP Water = $2,160,000 Water Supply (16%) Transmission Line (Reeder to Plant) Reeder Reservoir Study; sediment analysis TAP to Ashland; complete preliminary design FERC Part 12 Safety Analysis Right Water for the Right Use; consultant support Water Plant (22%) Water Plant Process Improvements Sludge Lagoon & Waste Line Improvements HoslerDam security and telemetry Water Distribution (62%) Loop Road Distribution Reservoir or Improvements Ditch Road Waterline replacement Lithia Fountain Historic Renovation in Plaza Design Granite Street Waterline Replacement FY08 Wastewater = $1,305,000 Wastewater Plant (36%) Focus on permit renewal requirements and temperature Analysis of Thermal Improvements (and design) Permit Evaluation and Renewal Coordinate with “Right Water for the Right Use” Wastewater Distribution (64%) N. Main Pump Station Replacement; construction Wastewater Line Replacements (construction): A Street Oak to 1st (linked with the street project) Alley E Main to Blaine Oak Street Lithia to B Street Ashland Creek Main Line Replacement; construction Design Grandview Pump Station Replacement 6 FY08 CIP Electric = $600,000 Primary focus for the CIP is undergroundingelectric utility lines will piggyback with other utility construction (same trench, etc.) Based upon the Electrical System Planning Study, the department will complete planned upgrades Load shifting elements are based upon Pacific Power’s request and will be funded over the next 5 years (~$345K) Line and facility replacements and upgrades completed as maintenance under the 10-year plan FY08 CIP AFN / Technology AFN CIP is based on Business Plan and Master Plan presented to Council at a Study Session in Spring of 2007; $499,000 Technology Plan is primarily computer replacement program –refunded by each City division through “technology debt”; $175,000 7 FY08 CIP Facilities = $210,000 Completing Facilities Assessment and Facilities Improvement Master Plan Aging facilities, space needs, coordination of uses, Fire and Police, etc. Council Priority prior to any future project development Annual Facilities Improvements and Major Repairs Planned for review of Fire Station & Bond Measure Future (FY09/10) FY08 CIP Parks & Recreation = $650,000 City funded Open Space Acquisition and Park Development N. Main and Scenic Park Development Vogel Park Development CalleGuanajuatoImprovements Ice Rink Cover Replacement / Improvement Oak Knoll Irrigation Replacement 8 Challenges for FY 2008 Impacts to the CIP Construction timing or unanticipated delays Design concerns and approval process Funding increases or shortfalls including industry cost changes, not receiving grants, etc. Schedule changes; weather, permits, etc. Focus Better predict the impacts and factors that delay project starts or completions Continue to identify and stretch funding through grants, etc Provide updates to Council 9 Public Works Department City Of Ashland Proposed Budget for 2007-2008 May 9, 2007 Structure of PW Department Operational Divisions Support Divisions PW Superintendent Engineering, GIS and Administration Water Airport Wastewater Grounds Maintenance Streets Traffic Safety Fleet “Specialty”Areas Facilities Maintenance (includes Cemeteries) Personnel: 59.8 FTE (same as FY07) 2 1 Public Works Department 59.8 FTE Public Works Director (1.0 FTE) Administrative Staff (2.0 FTE) GIS Division Engineering, InspectionPublic Works Operations (2.5 FTE) Traffic Safety, Surveying(PW Superintendent) (5.0 FTE)(1.0 FTE) Administrative Staff (3.0 FTE) (Locater and Warehousing) Water Wastewater Treatment & ReuseStreet Operaions DivisionFleet & Building Maintenance (Division Manager)(6.65 FTE)Supervisor (0.8 FTE)(1.0 Temp)(1.0 FTE) Wastewater Collection, Pump StationStorm Drain SectionBuildingWater Distribution Division (5.0 FTE)(3.55 FTE--split WW and Streets)(2.0 FTE)(11.8 FTE) Wastewater TreatmentShop / FleetWater Treatment Plant (5.0 FTE)(3.0 FTE)(4.0 FTE) Cemetery (2.0 FTE) 3 Major Accomplishments in FY 2006-2007 Completed the two water pipeline projects and made significant progress on Water Process Improvements Nearly complete on the water model as it relates to future distribution reservoir locations and TAP connection Completion of all designs for FY08 projects Implemented the Street Financing Task Force Implemented the “Right Water for the Right Use”Program and established the Water Use Task Force Initiated discussions to improve the Local Improvement District (LID) process 4 2 PW Budget Over Time $30,000,000 Variability primarily in Capital $25,000,000 $20,000,000 $15,000,000 $10,000,000 $5,000,000 $0 200420062008 ActualActualProposed Personal ServicesMaterials and Services 5 Debt ServiceCapital Outlay 2008 Proposed Budget PW Department = $23,937,732 Debt Service, Salaries and $2,493,886, 10% Benefits, $4,926,176 , 21% Capital Projects, $8,332,500, 35% Materials and Services, $8,185,171, 34% 6 3 2008 Proposed Budget PW Department = $23,937,732 General Fund, Equipment Fund, $339,165, 1% $2,209,923, 9% Street Fund, Cemetery $5,210,174, 22% (Central Services), $1,387,186, 6% Airport Fund, $420,204, 2% CIP Facilities, Wastewater Fund, $765,491, 3% $6,555,144, 27% Water Fund, $7,050,446, 30% 7 Significant Budget Changes From 2006-2007 The Capital Improvement Program (CIP) project costs have been updated due to considerable increases in material costs. FY07 CIP was significantly under-spent as staff pursued design completions in a difficult and competitive market. FY08 reprograms project funds for construction with a total of $8.4 million programmed for completion. The projects in the Street Fund and Water Fund continue to be the largest CIP programs. Other than changes in CIP, most of the PW Funds see little change or decreases in their overall funds. The Cemetery (General Fund), Street, Water and the Central Service Funds all realize decreases this year. PW service level fees were all increased in FY07, and will not be increased in FY08 to hold with Council direction. 8 4 2008 PW Department Focus Water Pursue solutions to water quality and temperature improvements Evaluate better water management options with the “Right Water for the Right Use” Continue to complete a very dynamic program for water delivery and treatment process improvements Complete preliminary engineering design and system feasibility for the TAP pipeline Watershed Establish a stronger, formalized role for the City in the stewardship of the Ashland Work toward implementing the solutions from the Mt Ashland mediation team; QA/QC, monitoring, etc. 9 2008 PW Department Focus –cont. Transportation Improve pedestrian and traffic safety –Education, Enforcement and Engineering Continue to investigate safe alternatives to improve Wimer/ North Main intersection Improve safety of railroad at-grade crossings Improve sidewalk and bicycle safety especially on routes to schools Utilize the Street Finance Task Force to develop options for long range financial stability Explore regional transit planning opportunities including options with RVTD 10 5 2008 PW Department Focus –cont. CIP Complete the FY08 construction program City Facilities Develop a consolidated City-wide Facilities Master Plan GIS Continue to provide valuable infrastructure data for all City departments LID Assist Council in developing appropriate long term LID policy 11 Airport Airport Budget over Time Airport Focus Variability is in the $1,400,000 Capital Improvements $1,200,000 are funded through $1,000,000 Federal (FAA) and $800,000 State grant programs $600,000 $400,000 FY08 Grant through $200,000 the Entitlement Grant $0 and will provide 2005 Actual2006 Actual20072008 acquisition of a Super AmendedProposed AvigationWeather Materials and ServicesCapital OutlayDebt Service Operating System (AWOS) & complete Commission Goals are for airport self road and parking lot sufficiency and to add airport businesses improvements Review and increase rental rates and update revenue projections to meet loan Personnel:0 FTE obligation 12 In PW Engr/Support 6 Street Fund Council Priorities Responsibilities Enhance sidewalks and bicycle Patching, paving and crack facilities –routes to school sealing, and painting Improve railroad crossing safety Sweeping, bike lane / bike path maintenance Explore transit options and regional transit opportunities Signs and crossings Improve traffic safety –Education, Drainage ditch cleaning Engineering and Enforcement and minor storm drain pipeline construction Measurably improve traffic safety in neighborhoods Street maintenance, grading unimproved Performance Measures streets, pothole repairs and patching due to weather Support the efforts of the Street and water damage Financing Task Force to: Emergency response establish service level expectations support for downed trees, develop a 5-year maintenance plan to flooding, snow removal and meet the targeted OCI accident cleanup evaluate adequate user fees leverage state, federal and other Personnel: 9.0 FTEs financing to reduce direct community impact 13 Street Fund Division FocusStreet Operations Budget Safety $4,000,000 $3,500,000 Efficient response to $3,000,000 community concerns $2,500,000 Validate the 5-year $2,000,000 maintenance and $1,500,000 reconstruction $1,000,000 requirements $500,000 Systematically evaluate $0 20042005200620072008 street operations, ActualActualActualAmendedProposed efficiencies, service Personal ServicesMaterials and ServicesCapital Outlay needs, and community Street System expectations. 102 miles of paved streets Shift work priorities to approximately 194 lane miles better respond to the 10.5 miles of unpaved streets & alleys community’s needs over 22,000 signs 14 7 Grounds Maintenance Street Fund Division FocusGrounds Budget Agreement with Parks $200,000 Maintain all City landscaping $150,000 Medians (Siskiyou, Mountain $100,000 Ave, N. Main entry, Ashland Street) $50,000 Downtown trees and planter areas $0 2005 Actual2006 Actual20072008 Library grounds AmendedProposed Materials and Utilities Materials and UtilitiesContracted Services Tree grates and repairs to planter structures Performance Measures Water and electrical Water conservation and “Right Water for the Right Use” Budget Changes Positive public perception Minor increase in watering 15 Storm Water Program ResponsibilitiesCouncil Focus Improved surface water quality Assist with implementation of riparian area protection ordinance Continued implementation of the Pursue water quality and new Non-Point Source Discharge Elimination System (NPDES) temperature improvements through requirementsan active storm water management program Develop consistency with the “Right Water for the Right Use”goals Maintain the open swales and pipe systems to minimize line blockages Personnel: 3.55 FTE Update the 1998 Storm Water and Shared with Streets and Drainage Master Plan Wastewater Implement annual maintenance storm water line and open ditch standards to deter flooding maintenance and construction Link sweeping program to integrate sediment pond cleaning with permit requirements and water quality improvements 16 8 Storm Water Program Street Fund Performance MeasuresStorm Water Budget Infrastructure $900,000 77 miles of storm water lines $800,000 1,700 catch basins $700,000 $600,000 1,400 inlet structures $500,000 720 manholes $400,000 11 miles of open ditches $300,000 Bioswales $200,000 Elks /City Parking Lot $100,000 $0 Detention & Wetlands 20042005200620072008 ActualActualActualAmendedProposed Facilities RocaPonds Personal ServicesMaterials and ServicesCapital Outlay North Mountain Park FY08 Focus Dog Park North Mountain Park Water Quality Improvement RiverwalkSubdivision NPDES & TMDL regulations 17 Water Division Responsibilities:Operations: Ensure total compliance with Supply, Treatment & Distribution various regulatory requirements Install new services Infrastructure: Construct new or repair main 4 distribution reservoirs lines 127 miles of water lines Maintenance and repair of the 6 pump stations existing system 33 pressure reducing stations Maintain and operate Lithia water 1,135 fire hydrants system; lines, pumps and 8,100+ individual services and fountains meters Maintain and operate City’s 322 separate potable irrigation irrigation water fed by the Talent meters Irrigation District (TID) 138 irrigation accounts with City TID water Personnel:15.8FTEs 18 9 Water Division Conservation Performance Measures Expect high water quality; no Continue conservation efforts. action limit violations, and no Water conservation has improved. health risk concerns. The lowest winter day is 2.0 mgd. System efficiency; evaluate Summer averages continue to and take appropriate drop slightly. measures to favorably compare to industry Population vsWater Use standards. 22,000200 190 21,000 180 Water Use vscost per MG 170 1,320600 20,000 160 1,300 500 19,000150 1,280 400140 1,260 18,000 130 1,240300 120 17,000 1,220 200 110 1,200 16,000100 100 1,180 1,1600 2000200120022003200420052006 populationgpcd 19 use MGcost per MG Water Division Budget Changes Water Budget Over Time Treatment added 1 FTE $10,000,000 Capital = $2,288,000 $9,000,000 Two major pipeline $8,000,000 projects and initial water treatment plant process $7,000,000 improvements basically $6,000,000 complete $5,000,000 FY08 overall water capital $4,000,000 budget is significantly $3,000,000 decreased from FY07 $2,000,000 Increases in capital projects are shown for $1,000,000 distribution system $0 improvements 20042005200620072008 ActualActualActualAmendedProposed Consulting Projects for: Personal ServicesMaterials and Services FERC Part 12 HoslerDam Debt ServiceCapital Outlay Safety Study “Right Water for the Right Use”20 10 Water Fund –Forest Interface Program Focus Forest Budget Over Time Wildfire and forest interface $500,000 management Budget variability is with $400,000 program grants Planning on over $200,000 Wildfire Fuels Reduction $300,000 Grant ($100,000 approved) Applied for other grants $200,000 Wildfire Evacuation Modeling and Public Outreach (DHS) Noxious Weed Management $100,000 (OFWF) Contract services $0 Small Woodlands Service as 20042005200620072008 contract City Forester ActualActualActualAmendedProposed Various Silviculturalservices Personal ServicesMaterials and Services Personnel : 1 FTE 21 Wastewater Division Infrastructure:Operations: Plant averages 2.25 mgdCollection, Treatment and Disposal or Reuse 114 miles of collection lines 7 lift (pump) stations Responsibilities: 2,300 manholes Ensure total compliance with 7.980+ individual services various regulatory requirements and meters Install new services Construct new or repair main lines Personnel:12.8 FTEs Maintenance and repair of the existing system Maintain and operate membrane tertiary system from May through November Centrifuge biosolidsprior to landfill disposal 22 11 Wastewater Division Council Priorities Division Focus Bear Creek Watershed Develop aggressive conservation and reuse Total Maximum Daily strategies for the “Right Water for the Right Use”. Loads (TMDL), Produce a high quality and highly treated temperature is the final wastewater effluent and biosolidsproduct. hurdle for the WWTP Continue to coordinate with DEQ on the newly adopted temperature management rules to “Right Water for the Right potentially use effluent as a resource. Evaluate Use” the ability to augment creek flows though Ashland’s effluent may appropriate water trading. be a significant Optimize collection and maintenance operations resource and reuse to minimize service disruptions and claims. option; “Right Water Appropriately reduce overall chemical use for the Right Use” Use foaming agents to reduce root damage and Evaluate blockages in sewer lines environmentally friendly options for Continue to eliminate illegal cross-connections, temperature reduction typically storm water lines, from the sewer system. Not just on-site Establish and implement a Fats, Oils and Grease mechanical (FOG) Program for food service establishments evaporative cooling within the City of Ashland. 23 Wastewater Division Performance Measures Treated Effluent and Cost per MG 1,200$1,200.00 Fully meet DEQ NPDES permit requirements with no violations 1,000$1,000.00 Evaluate the impacts of temperature 800$800.00 standards on effluent reuse to meet 600$600.00 new permit requirements Reduce the costs of sewer claims by 400$400.00 controlling backups (roots, grease, 200$200.00 etc). Increases in cleaning, inspection, foaming have decreased 0$0.00 the number of responses for main 2003200420052006 year line blockages. Increase the productivity of the Secondary EffluentTertiary Effluentcost/MG (treated) television line inspection analysis. Implement the rolling 5-10 year plan System efficiency; strive to meet industry for system maintenance and repairs. standards for the cost to collect and treat sewage. Participate with other divisions to optimize equipment use, downsize the fleet and encouraging safe use of alternative technologies. 24 12 Wastewater Division Wastewater Budget Over Time Significant Budget Issues The FY08 capital improvements total $1,305,000 $7,000,000 Treatment Plant included plant $6,000,000 evaluation, process improvements and temperature changes to meet $5,000,000 permit and TMDL requirements. Debt continues to decline as the $4,000,000 DEQ loan is paid back. The budget reflects the FY07 6% $3,000,000 increase in wastewater user fees. $2,000,000 No fee increases are proposed for FY08. Staff will reevaluate and $1,000,000 recommend changes based upon operational needs in FY09. $0 Budgeting and financing must 20042005200620072008 ActualActualActualAmendedProposed meet DEQ loan requirements. Personal ServicesMaterials and Services Loan requirements are projected Debt ServiceCapital Outlay to increase as food and beverage tax revenues end in December 25 2010. Admin, Engineering & GIS Division FocusPerformance Measures Manage Capital Improvements Program Provide high quality and Coordinate with ODOT and CORP for consistent engineering safety improvements at RR crossings design and management Increase alternative transportation and Maintain construction fuel uses budgets and project Evaluate transit and regional transit completion within 5% alternatives Maximize funding Conduct comprehensive facilities opportunities and leveraging master plan grant funds from outside Provide effective project management, constructive review & inspection sources; ODOT, DEQ, FAA, services etc Continue to enhance GIS program Provide master planning for Continue storm water NPDES Public Works infrastructure permitting requirements Coordinate infrastructure Update the City’s 1998 Transportation needs with other departments System Plan. 26 13 Admin, Engineering & GIS Division Budget Over Time Functions: Public works administration $1,400,000 and operational oversights $1,200,000 Master planning and long range focus $1,000,000 Geographic Information $800,000 System $600,000 City engineering, design $400,000 review, subdivision reviews, $200,000 inspection, traffic and surveying work $0 20042005200620072008 Support to commissions and ActualActualActualAmendedProposed committees; Traffic Safety, engineering personnelengineering materials Airport, Forest Lands, Water support personnelsupport materials Use, Street Financing Significant Budget Changes Support division budget is 10% less. Personnel: 13.5 FTEs Design funds tracked through CIP project program. 27 Engineering budget same as FY07. Facilities Maintenance ResponsibilitiesPerformance Measures Manage and perform Evaluate and monitor the cost of maintenance, improvements facilities maintenance on a square and janitorial services for foot basis. City owned buildings Determine industry standards for 100+ City facilities, 60 like facilities and attain similar or lower costs with the same high maintained through this division standard. Enterprise funds manage Reduce the backlog of their respective facilities maintenance items and ensure timely correction of all items brought to the division. Personnel: 2FTEs Ensure safety items are corrected under the Fleet and Facilities within 72 hours of notification. Supervisor 28 14 Facilities Maintenance Facilities Budget Over Time Significant Budget Changes FY08 budget is 8.8% higher $800,000 than the overall FY07 base $700,000 Includes $105,000 for the $600,000 Facilities Master Plan Replacements and major $500,000 facility repairs/improvements $400,000 are in the Capital $300,000 Improvement budget All facilities maintenance $200,000 costs are in this budget with $100,000 the exception of unique items $0 for the Airport, Fire Station, 20042005200620072008 Water Treatment Plant and ActualActualActualAmendedProposed the Wastewater Treatment Personal ServicesMaterials and ServicesCapital Outlay Plant. Utility costs are included in 29 this budget for most facilities Cemetery Responsibilities Cemetery Budget Over Time City’s 3 historic cemeteries: $400,000 20 acres of land; 11,500+ plots $350,000 Staff maintains cemetery grounds, sells plots, headstones, conducts $300,000 interments $250,000 Watering and tree care is $200,000 coordinated with the Parks Department. $150,000 Personnel: 2 FTEs $100,000 under the direction of the Fleet and $50,000 Facilities Supervisor $0 20042005200620072008 Significant Budget Changes ActualActualActualAmendedProposed Decrease of 5% from the FY07 Personal ServicesMaterials and ServicesCapital Outlay base. Reduce the amount of summer temporary employees by 50% Performance Measures Use of supervised Jackson County Ensure the cemeteries are efficiently work release crews for annual maintained, water wise, cost effective maintenance 30 Slight increases for utility costs 15 Fleet Maintenance Shop Budget Over Time Shop Focus / Performance Measures $800,000 Integrate a computerized fleet $700,000 maintenance and replacement program $600,000 Develop policies for replacement and $500,000 maintenance to meet industry standards $400,000 Implement new “Green Fleet”strategy $300,000 Create an Equipment Acquisition $200,000 Committee to evaluate future purchasing $100,000 Develop a policy to pool and share heavy equipment across departments $0 20042005200620072008 “Right size”the fleet by going smaller or ActualActualActualAmendedProposed reduce number of vehicles Personal ServicesMaterials and Services Continue investigating options for use of alternative fuels and new technologies Training Requirements Provide a high quality, effective shop repairs New equipment & diagnostics technology Evaluate shop overhead Safety and operational standards Fuel efficiencies & emission control 3 FTEs 31 Fleet Acquisition Replacements for Existing EquipmentNew Equipment Acquisition Computer Services:Pool Vehicles, Electric Cars, 2 each $30,000 IT Mini Van #209 1994 Ford Taurus $25,000 Total New Equipment $30,000 Fire Department: Ambulance –1992 ambulance $170,000 Reprogrammed from FY07 Police Department: Electric Digger Derrick, #98$238,000 Police Hybrid, Jeep Cherokee #373 $28,000 Wastewater 10 Yard Dump #74$135,000 Police Hybrid, Chevy Malibu #399 $28,000 Street 10 Yard Dump #116$128,000 Police Motorcycle, BMW motorcycle $25,000 Total Reprogrammed$501,000 Public Works: Sewer Division, 1 Ton Pickup Truck $32,000 Total Acquisition $1,413,000 Cemetery Division, Tilt Bed Trailer (#5T) $12,000 PW Trailer Mount Air compressor, #198A $20,000 PW Engineering, Hybrid SUV, replace #348 $28,000 City Fleet = 129 vehicles: Water Plant Compact pickup, #320 $24,000 71 Light Duty Street Division, Paint Vehicle #282$40,000 46 Heavy Duty / Special Use Street Sweeper, Replace Schwarz $180,000 Sewer Jet-Vacuum Combo #397$270,000 23 pieces of Heavy Equipment Total Replacement $882,000 32 16