CROMAN ADVISORY COMMITTEE AGENDA
November 18, 2009
5:00 p.m. – 6:30 p.m.
I. CALL TO ORDER:5:00 PM, Siskiyou Room, Community Development & Engineering Services
Building, 51 Winburn Way
II. APPROVAL OF OCTOBER 21, 2009 CROMAN ADVISORY COMMITTEE MINUTES
III. UPDATE OF NOVEMBER 10, 2009 PLANNING COMMISSION MEETING
IV. DISCUSSION OF PROPOSED CROMAN MILL SITE DESIGN AND USE STANDARDS AND
IMPLEMENTING ORDINANCE (CHAPTER 18.53)
V. COMMITTEE RECOMMENDATIONS
VI. REVIEW NEXT STEPS/TIMELINE
VII. ADJOURNMENT
In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please
contact the Community Development office at 541-488-5305 (TTY phone number is 1-800-735-2900). Notification 72 hours prior
to the meeting will enable the City to make reasonable arrangements to ensure accessibility to the meeting (28 CFR 35.102-
35.104 ADA Title1).
CROMAN ADVISORY COMMITTEE
MINUTES
OCTOBER 21, 2009
CALL TO ORDER
Chair Matt Warshawsky called the meeting to order at 5:00 p.m. in the Siskiyou Room, 51 Winburn Way.
Committee Members Present: Staff Present:
Richard Hendrickson, Airport Commissioner Bill Molnar, Community Development Director
Eric Navickas, City Councilor Brandon Goldman, Senior Planner
Russ Chapman, Conservation Commissioner April Lucas, Administrative Assistant
Keith Swink, Historic Commissioner
Graham Lewis, Housing Commissioner
Jim Lewis, Parks & Recreation Commissioner
Larry Blake, Planning Commissioner
Matt Warshawsky, Transportation Commissioner
Kerry KenCairn, Tree Commissioner
Pam Hammond, Chamber of Commerce Representative
Paul Steinle, SOU Representative
Absent Members:
David Wilkerson, Public Arts Commissioner
Rylan Heyerman, Neighborhood Representative
Mary Kay Michelsen, Neighborhood Representative
Ben Bellinson, Neighborhood Representative
APPROVAL OF SEPTEMBER 9, 2009 CROMAN ADVISORY COMMITTEE MINUTES
The minutes of September 9, 2009 were approved as presented.
REVIEW AND DISCUSSION OF PROPOSED CROMAN MILL SITE DESIGN AND USE STANDARDS AND
IMPLEMENTING ORDINANCE (CHAPTER 18.53)
Community Development Director Bill Molnar explained at tonight’s meeting staff will review what occurred at recent Planning
Commission meetings and review the changes that have been proposed. He stated questions were handed out to the group
at the beginning of the meeting and he invited the Committee to send their thoughts and comments to staff after tonight’s
meeting. Mr. Molnar briefly commented on the purpose of this Committee and clarified it is to suggest minor adjustments to
the plan, to provide a different viewpoint from the groups they represent, and for them to brief the other groups at their
respective meetings.
th
Staff reviewed the Croman plan elements that were discussed at the September 29 Planning Commission meeting. Senior
Planner Brandon Goldman commented on the Planning Commission’s outline of questions and noted the Planning
Commission held a vote on whether the land use designations and how they are laid out is appropriate. He stated the
Planning Commission also reviewed the Land Use Matrix and what uses should be allowed in each of the overlay zones. Mr.
Goldman clarified the Planning Commission asked staff to look into providing flexibility to the child/daycare center provision to
allow it to be open to the public in case this is needed to keep it viable. He stated another change is the option for a
manufacturing plant to have a retail outlet to allow goods to be sold on site. Staff was also asked to look at whether public
offices should be a conditional use. Mr. Molnar noted if the Committee does not agree with any of these changes, or any of
the uses outlined in the matrix, now is the time to discuss it.
Croman Advisory Committee
October 21, 2009
Page 1 of 3
Mr. Molnar commented briefly on the City’s conditional use permit process and clarified these uses would only be allowed
under certain circumstances. Comment was made questioning if these circumstances will be clearly defined since it may be
difficult to remember the intent 10 years from now when a proposal comes forward.
Staff continued their review of the last Planning Commission meeting. Mr. Goldman noted the Commission’s discussion of
whether the southern portion of the site should be annexed, and what the implications might be. He stated there has been a
lot of concern that annexing this property would facilitate changes in the land uses quicker than desired; and the direction from
the Planning Commission was to not recommend annexing the southern piece at this time. Mr. Molnar clarified even though
we don’t propose annexation at this point, this area would still be included in the plan. He stated the central boulevard
proposed to pass through the southern portion could still be built to City standards, and by not annexing it, this would allow the
farm and trailer park to remain until a proposal comes forward that is consistent with the Croman plan.
Mr. Goldman noted the rail and transit standards included in the proposed Design Standards, and commented on the rail spur
easement requirements. Mr. Molnar noted some Planning Commissioners expressed interest in increasing the compatible
industrial zone near the railroad, however there are grade and topography issues that would need to be addressed, and staff
also has concerns with moving the industrial area too close to the office corridor.
Mr. Goldman commented on the proposed residential overlay in the mixed-use and neighborhood center areas, and clarified
residential would be allowed, but 100% of the ground floor is reserved for commercial use. He stated the plan’s guiding
principles are clear the intent is to provide for a large number of jobs, however, staff is looking into creating opportunities for
live-work situations. He stated as part of the special permitted use, upper floors could be developed for residential so long as
they meet the maximum number of residential units per acre that will be embedded in the ordinance. Comment was made
questioning if there will be any protection for businesses, and whether they could run a swing or graveyard shift without getting
opposition from the residential units in the area. Mr. Goldman noted where the residential would be located and clarified it is a
fair distance from the industrial areas at the southern end of the site. Mr. Molnar suggested a possible solution to complaints
could be requiring residential property owners to sign hold harmless agreements. Comment was made voicing support for this
and indicating if they are going to have a residential component, there should be a clear understanding what can and will
occur on that site.
Comment was made questioning the kennel and veterinary clinic provision, since these uses are not necessarily high
employment. Mr. Goldman clarified even though this is listed as an allowed use, the employee per acre component still has to
be complied with. He added the restrictions on outdoor running tracks would also limit a large kennel from locating on the
Croman site.
Mr. Goldman briefly reviewed the City’s buildable land inventory and the industrial land available. He also commented on the
street alignment plan and clarified the Planning Commission asked staff to explore more of an east-west street layout to
address solar issues for the buildings. Mr. Goldman stated the next Croman Advisory Committee meeting will be on November
th
18, and staff will bring forward an alternative street layout at that time. Mr. Molnar added while staff is currently exploring this
possibility, the intent it to keep the package as a whole intact. He stated the street layout may be more important for residential
than commercial, and noted it might be possible to address the issues through specific energy requirements for the buildings.
Mr. Molnar added the main problem for commercial buildings is keeping them cool, followed by lighting the interior. Mr.
Goldman noted in addition to changes in traffic flow, a new street layout would also create impacts on block widths.
Mr. Goldman stated the last element discussed by the Planning Commission was the alignment of Tolman Creek Road. He
stated the recommendation from the Planning Commission was for the plan to identify the objective of the central boulevard,
but to defer the final design to a later date after the TSP update is complete and the land has been acquired.
Mr. Molnar commented on the Design Standards and explained how they are structured. He stated it might appear that the
standards are lengthy, but 60% already exist and were pulled over into this section. He also noted the addition of a
sustainable standards section, which will address green streets, stormwater management, and parking. Commissioner
KenCairn commented on possibly allowing parking at the front of the building if it is attractive, incorporates green tactics, and
serves the public better at that location.
Croman Advisory Committee
October 21, 2009
Page 2 of 3
Mr. Goldman provided clarification on the proposed active edges and stated this will be required in the highest profile locations
where most of the traffic and activity is. He noted the proposed limitations on the number of access points off the main
boulevard and around the park area, and clarified this is consistent with the original Crandall & Arambula plan.
Mr. Goldman commented briefly on green streets, and stated this is not a new concept, but is relatively new to Ashland. He
explained this will allow stormwater runoff to stay on the site to the greatest extend possible, instead of flowing to the City’s
water treatment plan. He added buildings will also be asked to capture stormwater and use it in their landscaping. Commission
KenCairn voiced concern with this provision and stated it is not feasible to collect stormwater for year-round irrigation of
landscaping unless you have a huge storage capacity. She added the plan could require storage, but not a percentage to be
used for landscaping. KenCairn suggested a possible matrix be developed if they want to successfully achieve this element.
REVIEW NEXT STEPS
Staff explained the next steps are for the Committee members to update their commissions and groups, and to be prepared to
th
form recommendations at the November 18CAC meeting. The Committee chair and other members were also invited to
attend the public hearings before the Planning Commission and City Council.
The grant proposal for the central boulevard was noted, and Mr. Molnar explained this is going before the City Council in
November. He noted these types of grants (gas tax revenues) are quite competitive and are generally tied to job creation.
Staff noted the three questions handed out at the beginning of the meeting and asked that the members email their responses
to staff.
ADJOURNMENT
Meeting adjourned at 6:30 p.m.
Respectfully Submitted,
April Lucas, Administrative Assistant
Croman Advisory Committee
October 21, 2009
Page 3 of 3
Memo
DATE: November 10, 2009
TO: Ashland Planning Commission
FROM: Brandon Goldman, Senior Planner
RE: Croman Mill Site Redevelopment Plan
Questions:
1. Are the land uses included in the land use matrix consistent with the goals and objectives of the
Croman Mill Site Redevelopment Plan? Are there uses that should be modified, deleted or added?
2. Do the design standards seem consistent with the employment center envisioned in the Croman Mill
Site Redevelopment Plan? Are there standards that should be changed, deleted or added?
3. Do the sustainable design standards go too far, not go far enough or seem just about right?
Background:
The City Council reviewed and approved the original conceptual plan on February 17, 2009. The plan
was forwarded to the Planning Commission to refine the plan and develop an implementing ordinance.
To date, the Planning Commission has had the opportunity to study and evaluate refinements to the
redevelopment plan at six meetings (3/10/2009, 5/12/2009, 5/26/2009, 7/28/2009, 9/29/2009, 10/13/2009). In these
previous meetings the Planning Commission has reviewed the land use distribution, street and
transportation framework, allowable land uses, proposed ordinance language, site design standards, and
sustainability standards. The Croman Advisory Committee has held three meetings (7/15/2009, 9/09/2009,
10/21/2009) in order to become familiarized with the original plan, review the items noted above, and
formulate their recommendations
The three questions listed above are intended to cover broad categories relating to major components of
the draft Croman Mill District (CMD) Redevelopment Plan. These questions were provided to the
st
Croman Advisory Committee (CAC) at their meeting on October 21, 2009 for consideration in
reviewing the draft ordinance and design standards. The CAC will discuss their responses to these
th
questions at their final meeting on November 18, 2009. The CAC will forward recommendations,
comments, and concerns to the Planning Commission and City Council as part of the public hearing
process.
Over the last nine months a considerable amount of discussion has occurred generating comments and
suggestions from Planning Commissioners and members of the Croman Advisory Committee
concerning the development of the Croman Mill Redevelopment Plan. Given the breadth of discussion
in these prior meetings it is difficult to encapsulate all of the relevant points raised in one memorandum.
-2-
In an effort to assist the Commission in identifying issues that have previously been raised that may
warrant further discussion, as well as list those primary discussion items that have been largely
addressed, a summary is provided. This background of the prior discussion topics may be of assistance
in formulating answers to the three questions presented, and thus an effort has been made to categorize
each of these topics within one of the broad questions noted above.
Prior Discussion Items
Question 1) Land Uses
Are the land uses included in the land use matrix consistent with the goals and objectives of the Croman
Mill Site Redevelopment Plan? Are there uses that should be modified, deleted or added?
Land Use
Distribution of Office Employment and Compatible Industrial
The original land use framework in the conceptual plan located the compatible industrial district to the
west of the central boulevard and the Office Employment (C-OE) district to the east of the central
boulevard. Through discussions before the PC and CAC it was expressed that locating the Compatible
Industrial (C-CI) area adjacent to the existing rail line merited consideration. As a result, the revised
framework shifts the division of the two zoning districts in a north-south orientation so that the office
employment district is located on the northern portion of the site and the compatible industrial district is
on the southern portion of the site.
o CAC and PC members have discussed the relative size and location of the various land
use designations.
o CAC and PC members have raised the question as to whether the current M-1 Zoned
property on the north-east portion of Mistletoe (which includes the mini-warehouses and
the newly constructed office) should be rezoned to Office Employment or Compatible
Industrial and as such incorporated into the Croman Mill District plan zone.
Freight Rail Spur Easement
Relating to the distribution of C-OE and C-CI overlay areas, the Croman Advisory Committee and the
Planning Commission have each discussed the value of retaining the opportunity for future use of the
existing railroad line for freight shipping and receiving. In Staff’s discussion with the Oregon
Department of Transportation (ODOT) rail safety and rail planning divisions, it was expressed that a
freight spur crossing multiple streets is a difficult option, which raised significant issues of public safety
and cost. Due to the re-orientation of the land uses noted above, the proposed redevelopment plan now
includes a “proposed rail spur area” along the eastern edge of the Compatible Industrial Overlay area.
Annexation
The issue of whether to annex the plan area located outside the City Limits was discussed by the
Planning Commission on 9/29/09. Various commissioners have expressed a desire to retain the farming
use currently located on that piece of property at this time. Commissioners and Staff also discussed the
potential of including the area within the redevelopment plan for future inclusion, yet not annexing the
property at this time. Further it was stated that the Central Blvd. extension to Siskiyou Blvd. could still
be accommodated independent of its annexation.
DEPT. OF COMMUNITY DEVELOPMENT Tel: 541-488-5305
20 E. Main Street Fax: 541-552-2050
Ashland, Oregon 97520 TTY: 800-735-2900
www.ashland.or.us
-3-
Office Employment Overlay (C-OE) Land Uses
Concerning the use of Office Employment zoned lands, discussion has included numerous
comments reflected in the minutes that this overlay should include opportunities for:
o Temporary Employee Housing
Ensuring it is reserved for employee use and not used as tourist accommodations.
o Small Coffee Houses and Restaurants (less than 1,500 sq.ft.)
o Ancillary Employee Serving Uses
o Manufacturing and Assembly Space
Discussion began regarding the percentage of floor area that is eligible to be
utilized for manufacturing, assembly or warehouse within an office building.
o Fitness Clubs
It was expressed by various Commissioners that on-site fitness areas for
employees were an important use, however full scale fitness clubs open to the
public would be incongruous with the desire to maximize employment density.
o Day Care Facilities
It was expressed by various Commissioners that on-site day care facilities for
employees should be permitted, and further that they should not be restricted to
employees but available to the general public as well.
Compatible Industrial (C-CI) Overlay Land Uses
o Allowance for limited retail use in association with a permitted manufacturing or
assembly use.
For plan consistency it was noted that retail in conjunction with a permitted
manufactured use of less than 600 sq.ft. should be permitted outright in the C-CI
overlay area.
o Outdoor Storage
The proposed ordinance and design standards as currently drafted would preclude
outdoor storage of materials. Several Planning Commissioners expressed that in
circumstances where the outdoor storage area was limited in size and screened
appropriately that it could potentially be considered as a conditional use.
Neighborhood Center (C-NC) Overlay Land Uses
o Residential Uses and Density
A suggestion was made by an individual Planning Commissioner that the
proposed neighborhood center be used exclusively for high density housing. As
proposed the redevelopment plan calls for 100% of the ground floor of each
building in both the Neighborhood Center and the Mixed Use overlay areas to be
commercial in use. Therefore the exclusive use as residential as suggested would
not be permissible under the proposed ordinance. Varied opinions were given on
whether high density housing should be permitted in the Neighborhood Center or
whether the employment opportunities provided in the land use matrix should
take precedence.
o Manufacturing and Assembly
A Commissioner suggested that allowances for “manufacture or assembly
contiguous to a retail outlet” be removed from the Neighborhood Center
concerned that this is an inappropriate use in that zone.
DEPT. OF COMMUNITY DEVELOPMENT Tel: 541-488-5305
20 E. Main Street Fax: 541-552-2050
Ashland, Oregon 97520 TTY: 800-735-2900
www.ashland.or.us
-4-
Mixed-Use Overlay (C-MU) Land Uses
o Early in the planning process Planning Commissioners raised the issue of allowing for a
degree of flexibility both in regard to land uses and design standards. The revised land
use framework delineates the area adjacent to Hamilton Creek along the plans western
boundary, and the southern portion of the site adjacent to Siskiyou Blvd., both as mixed-
use overlay areas. This designation provides an opportunity for mixing residential units
with office or light industrial uses. This new land use designation aims to provide some
flexibility to address physical constraints, transition from existing residential areas, and
building types while retaining the target use of employment generation.
Tolman Creek Road Realignment
o The Planning Commission discussed the proposed realignment of Tolman Creek Road.
In recognizing that this component would be a future phase of development, and would at
that time necessitate a more thorough evaluation, it was suggested that the
Redevelopment Plan include some wording acknowledging that the plan shows a concept
for this intersect, but exact geometry is to be determined.
Public & Institutional Uses
o Public Offices
Comments were made by a member of the Planning Commission that Public
service and Community Buildings should be permitted in a manner that is
consistent with similar private uses. Specifically it was questioned why such
public uses were listed as permitted outright in the CI and OS overlay areas.
o Private Schools
A suggestion was made by a Planning Commissioner that private schools, adult
education centers, or technical schools be permitted in the OE and CI overlay
area.
Night-time or Evening Uses
o Concern has been expressed that should the site develop out as entirely day time office or
manufacturing uses, the area could be essentially empty at night.
o A CAC member raised the question as to what protection is in there for businesses to
ensure they can run a swing or graveyard shift without getting opposition from the
residential units in the plan area.
It was suggested that a “hold harmless agreement” could be recorded on the deed
of all new residential units within the CMD zone to inform future residents of the
types of activities that they can expect in the vicinity.
Land Intensive Uses
o Commissioners have raised the question as to whether land uses such as lumber yards,
sorting yards, and recycling centers should be accommodated in the CMD zone.
The currently proposed Land Use matrix does not identify such uses as allowable
in an effort to preclude uses with a relatively low number of employees per acre.
DEPT. OF COMMUNITY DEVELOPMENT Tel: 541-488-5305
20 E. Main Street Fax: 541-552-2050
Ashland, Oregon 97520 TTY: 800-735-2900
www.ashland.or.us
-5-
Question 2) Design Standards
Do the design standards seem consistent with the employment center envisioned in the Croman Mill Site
Redevelopment Plan? Are there standards that should be changed, deleted or added?
Solar Orientation
o The proposed design standards include minimum setbacks intended to orient buildings
toward the street. Commissioners have discussed that in order to accommodate active
and passive solar energy opportunities the standards should allow a degree of flexibility
to enable deviation from this street orientation in favor of solar orientation.
Section VIII-B-1(1-5) of the Design Standards outlines the orientation standards
as currently proposed.
Street Layout
o The proposed street layout, and its potential impacts on solar orientation opportunities for
th
buildings, has been raised at both PC and CAC meetings. At the October 13 Planning
Commission meeting, staff was asked to explore an east-west street layout to evaluate
solar orientation issues for future development. This evaluation is to be completed in
th
advance of the scheduled December 8 Public Hearing before the Planning Commission
to help inform how the proposed street layout, and an alternative east-west street
orientation, would impact the maximum energy efficiency of employment and
compatible industrial building construction.
o A Commissioner raised the issue of retaining flexibility in the location of Accessways.
It was noted that the local streets and the proposed central boulevard are integral
to the proposed grid pattern and traffic circulation.
It was suggested that the plan could consider other options for the Accessways,
such as consideration of an alternative multi-use path as satisfying their intended
purpose, or permitting more flexibility in their locations.
Active Edge Development
o The “Active Edge” includes all property immediately adjacent to the Central Blvd, as
well as the lands facing the Central Park. As proposed this area would have added design
requirements providing for at least 65% of the total linear feet of the building’s façade to
be built within two feet of the sidewalk with all front doors facing streets and walkways.
Additionally, at least 50% of the first-floor façade would have to be comprised of
transparent openings (clear glass, windows or doors) between 3 and 8 feet above grade.
Lastly, blank walls (without doors or windows) longer than 40% of a façade, or more
than 50 feet longalong sidewalks would be precluded.
In discussion of the solar orientation question noted above, and in regard to
potential opportunities for plaza space in front of buildings, the requirement for
buildings to be built within two feet of the sidewalk limitation was questioned by
Commissioners.
The stipulation that only 65% of the building façade comply with this specific
setback, and its implications regarding plaza space opportunities, has not been
discussed by the Commission.
DEPT. OF COMMUNITY DEVELOPMENT Tel: 541-488-5305
20 E. Main Street Fax: 541-552-2050
Ashland, Oregon 97520 TTY: 800-735-2900
www.ashland.or.us
-6-
Building Height
o The topic of building height was a substantive one in the initial community meetings and
early Commission discussions. The proposed ordinance includes a dimensional table that
proposes both minimum heights and maximum heights.
Questions have been raised regarding the 2 story minimum and how that would be
applied to Industrial buildings that may desire to have a one story portion.
o Members of the Airport Commission serving on the CAC have raised concerns regarding
the potential multi-story buildings and their impact on the flight paths of incoming
aircraft.
To address this concern the maximum height allowable in the proposed design
standards for each overlay zone is equal to the preexisting limits of 40’ in the M-1
zone and 35’ in the R-1-5 zoned property. However, through the application of a
height bonus for meeting LEED sustainability standards a building could
potentially exceed these pre-existing height limitations. In these cases in
consideration of this stated concern, the draft design standards include the
requirement that: increases in building height exceeding the maximum permitted height
through the application of a Sustainable Development Height Bonus shall demonstrate
compliance with Federal Aviation Administration standards for airport approach zones (VIII-
C-8 (1)d).
Proximity to Existing Residences
o Both CAC and PC members raised concerns about the impact of future Office or
Industrial development upon the existing residences in the immediate vicinity.
In response to such concerns the area immediately to the east of Hamilton Creek
is proposed to be a mixed use overlay area (C-MU) to allow a more gradual
transition from the adjacent residences to the interior of the redevelopment site
where higher intensity uses would be located.
A “Residential Buffer” area in proximity to existing residences has been proposed
to establish specific design standards and height limitations within this transition
area.
Industrial Building Design
o Flexibility in Design
There has been limited discussion regarding the type of buildings permitted in the
C-CI area that is not located on the Central Blvd, indicating that there may be a
value in allowing a greater degree of design flexibility to allow more traditional
industrial type buildings.
The issue of retaining some higher level of design standards along the active edge
was raised in the original plan and has been again raised through this review
process.
o Rail Spur Orientation
The current design standards state that buildings built adjacent to the rail spur
easement shall be designed to accommodate a loading & unloading area in
consideration of the rail access.
DEPT. OF COMMUNITY DEVELOPMENT Tel: 541-488-5305
20 E. Main Street Fax: 541-552-2050
Ashland, Oregon 97520 TTY: 800-735-2900
www.ashland.or.us
-7-
Sustainability Standards:
Do the sustainable design standards go too far, not go far enough, or seem just about right?
Prior discussion before the Planning Commission and the Croman Advisory Commission have not yet
addressed in full the details outlined in the Sustainable Design Standards or the Sustainable Height
Bonus allowance for LEED certified buildings. However as energy conservation, water conservation,
and other sustainability issues have significant crossover with other aspects of the plan, a number of
pertinent concerns have been voiced that address the question above.
Rainwater Catchment
o The representative of the Tree Commission serving on the CAC raised voiced concern
over the proposed Sustainability Standard that recommends that harvested rainwater or
reclaimed water be used to irrigate at least 25 percent of a project’s landscaped areas.
It was noted that in the dry months such a standard could be difficult or
impossible to comply with without extensive on-site, or district serving, water
retention systems.
It was suggested that rainwater catchment should be than a recommendation,
requiring a certain amount of retention so it is achievable.
Parking Standards
o Commissioners discussed whether certain areas, like the neighborhood commercial
center, might have reductions in parking beyond the current parking standards and
whether this could encourage people to use public and alternative transportation.
It was noted that LEED neighborhood standards can provide for reductions in
parking when adequate alternative transportation, or consolidated parking
structures are available.
The Commission was favorable toward reductions in parking in consideration of
alternative parking management proposals.
o It was briefly discussed at the CAC 10/21/09 meeting that a percentage of onsite parking
spaces is to be made of pervious materials as a method of storm water management.
DEPT. OF COMMUNITY DEVELOPMENT Tel: 541-488-5305
20 E. Main Street Fax: 541-552-2050
Ashland, Oregon 97520 TTY: 800-735-2900
www.ashland.or.us
Memo
DATE: November 18, 2009
TO: Croman Advisory Committee
FROM: Brandon Goldman, Senior Planner
RE: Croman District Standards
The Croman Mill Design Standards (Section VIII) has been drafted to be included in Ashland’s Site
Design and Use Standards (SDUS) to guide development of the Croman redevelopment plan area. The
SDUS handbook also contains specific approval standards that are used to guide land use decisions
citywide. Many of Ashland existing design standards within the SDUS handbook remain applicable to
the Croman site and as such have been incorporated into Section VIII verbatim. Therefore the Croman
Mill Design Standards contains reiterated pre-existing standards, as well as new standards specifically
developed to address the goals of the Croman Redevelopment Plan.
Included in the Croman Advisory Committee packet is a highlighted version of Croman District
Standards document which was previously distributed to the Committee at the end of September. None
of the text ,or graphics, have changed from what was previously distributed. However, this version has
been highlighted to more readily identify the newly drafted standards that are specific to the Croman
Site Design Standards. The language that was directly excerpted from elsewhere in Ashland’s existing
code and Site Design and Use Standards is not highlighted. Lastly, the attached version has also been
annotated with text boxes within the left margin of each page to help identify the source of language that
has been appropriated from elsewhere in Ashland’s existing Land Use Code and Design Standards.
S ECTION VIII
Croman Mill District Standards
Adopted by the Ashland City Council date
Ordinance ###
NEW LANGUAGE HIGHLIGHTED
A. Street Standards
VIII-A-1) Street Design
The design and construction of streets and public improvements shall be in accordance with
the Ashland Street Standards, except as otherwise permitted for the following facilities with the
Croman Mill District.
1.Central Boulevard
The tree-lined boulevards that currently exist along Siskiyou Boulevard and Ashland Street
new site specific
are an easily identifiable feature of Ashland’s boulevard network. Application of this
sections from
streetscape design to the Central Boulevard will create a seamless boulevard loop, linking
initial Croman
the Croman Mill district with downtown Ashland. The Central Boulevard also serves as the
Plan (Crandall
front door to the Croman Mill district, creating a positive first impression when entering the
Arambula Plan)
district.
Ashland Site Design and Use Standards 1
DRAFT 9.29.09
2.Tolman Creek Road Realignment
Additional auto traffic will be generated by the
redevelopment of the Croman Mill district. The
realignment of Tolman Creek Road with the
Central Boulevard will address impacts to the
neighborhood by directing traffic away from the
neighborhood and Bellview School, and toward
the Croman Mill district while maintaining access
to Tolman Creek Road for neighborhood-
generated trips.
Ashland Site Design and Use Standards 2
DRAFT 9.29.09
Ashland Site Design and Use Standards 3
DRAFT 9.29.09
3.Local Commercial Streets
Local Commercial Streets provide district
circulation to and from employment uses,
the Central Park and the neighborhood
center.
Ashland Site Design and Use Standards 4
DRAFT 9.29.09
4.Protected Bikeway and Pedestrian Path
The Protected Bikeway and Pedestrian Path runs
parallel to the Central Boulevard and connects with
the City’s existing Central Bike Path in two locations
– adjacent to the Central Park and adjacent to the
day-lighted section of Hamilton Creek.
The design of the protected bikeway should include
the following elements.
1. A grade-separated two-way colored bicycle path
buffered from on-street parking by landscaping.
2. A sidewalk separated form the bicycle path by
striping, bollard or a grade separation.
3. Tabled intersections.
4. Elimination of auto right turns on red at
intersections.
5. Incorporate rumble strips along the bike path at
the approaches to all intersections.
6. Signage to alert drivers, pedestrians and riders
approaching intersections.
7. Consideration of a bikes-only signal phase at signalized intersections.
Ashland Site Design and Use Standards 5
DRAFT 9.29.09
5.Multi-use Paths
The multi-use paths provide pedestrian and
bicycle connections between the district and
Multi-Use Path
adjacent neighborhood, employment and
shown at 10’
commercial areas. The plan includes the
surface in 14’-
extension of the Central Bike Path and the
20’ right of way
Hamilton Creek Greenway trail. The Central
in this plan.
Bike Path extends the existing multi-use path
along the southern edge of the CORP rail line
Ashland Street
within a 20-foot wide dedicated easement, and
Standards show
serves as a viable commuter route and link to
6-10” surface in
the downtown. The Hamilton Creek Greenway
10-18’ right of
trail provides access to the neighborhood
way for multi-
center and an east/west connection across the
use paths.
creek.
Ashland Site Design and Use Standards 6
DRAFT 9.29.09
Ashland Site Design and Use Standards 7
DRAFT 9.29.09
6.Accesssways
The accessways are intended to
Grid
provide circulation primarily for
Connectivity
pedestrian and bikes to preserve the
required per
grid that dictates the form of the land
Ashland Street
uses. The accessways would connect
Standards
the Central Boulevard to the Central
(Section I #10)
Bike Path and allow for shared bicycle,
and Connectivity
travel lanes and temporary loading
Standards
zones as necessary to serve
(Section II)
development sites.
Ashland Site Design and Use Standards 8
DRAFT 9.29.09
VIII-A-2) Limited Auto Access Streets
Developments abutting the Central Boulevard and local streets surrounding the
The Transportation
Central Park shall limit the number of curb cuts to one per block as indicated on
Element of the
the Limited Access Streets map.
Comprehensive Plan
Policy :
# 17. “ Direct
driveway access
onto streets
designated as
boulevards and
avenues should be
discouraged
whenever an
alternative exists or
can be made
available”
#18: “Require
design that
combines multiple
driveway accesses
to a single point in
residential and
commercial
development”.
VIII-A-3) Access
1. Street and driveway access points in the Croman overlay zones shall be
Substitutes “Central
limited to the following.
Blvd” for “Arterial”
a Distance Between Driveways.
and “Local Streets
On Central Boulevard – 100 feet
and Accessways”
On Collector Streets – 75 feet
for “residential”
On Local Streets and Accessways – 50 feet
b. Distance from Intersections
ALUO Controlled
On Central Boulevard – 100 feet
access 18.72.120
On Collector Streets – 50 feet
On Local Streets and Accessways – 35 feet
Ashland Site Design and Use Standards 9
DRAFT 9.29.09
Similar to Ashland Street
Standards for shared
2. Shared Access. All lots shall provide an access connection to abutting
driveways (Section VI(3))
parking areas that is at least 20 feet in width. The applicant shall grant a
and SDUS 18.72.120
common access easement across the lot.If the site is served by a shared
Controlled Access
access or alley, access for motor vehicles must be from the shared
access or alley and note from the street frontage.
Street Standards State: “ If a
property has alley access, a
curb cut for a driveway is not
permitted “
VIII-A-4) Required On-Street Parking
On-street parking in a curb-side parallel parking configuration shall be provided
along the Central Boulevard and local streets as indicated on the Required On-
Street Parking map. Angled parking and loading zones are prohibited on these
streets.
Ashland Site Design and Use Standards 10
DRAFT 9.29.09
B. Design Standards
The Croman Mill District Design Standards provide specific requirements for the physical
orientation, uses and arrangement of buildings; the management of parking; and access to
development parcels. Development shall be designed and constructed consistent with the
following Design Standards.
VIII-B-1) Orientation and Scale
1. Buildings shall have their primary orientation toward the street rather
Excerpted from Site
than the parking area. Building entrances shall be oriented toward the
Review
street and shall be accessed from a public sidewalk. Where buildings
SDUS II-C-1a-1
are located on a corner lot, the entrance shall be oriented toward the
higher order street or to the lot corner at the intersection of the streets.
Public sidewalks shall be provided adjacent to a public street along
the street frontage. Buildings shall be located as close to the
intersection corner as practicable.
2. With the exception of the areas along Active Edges, building
The exception
entrances shall be located within 10 feet of the public right of way to
regarding the Active
which they are required to be oriented. Exceptions may be granted for
Edge is new.
topographic constraints, lot configuration, designs where a greater
Distance was 20 feet
setback results in an improved access or for sites with multiple
in Basic Site Review
buildings, such as shopping centers, where this standard is met by
Standards.
other buildings. Automobile circulation or parking shall not be allowed
between the building and the right-of-way. The entrance shall be
SDUS II-C-1a-2
designed to be clearly visible, functional, and shall be open to the
public during all business hours.
3. These requirements may be waived if the building is not along an
SDUS II-C-1a-3
active edge and is not accessed by pedestrians, such as warehouses
and industrial buildings without attached offices, and automotive
service stations.
4. Building frontages greater than 100 feet in length shall have offsets,
SDUS II-C-2a-2
jogs, or have other distinctive changes in the building façade.
5. With the exception of the areas along Active Edges, any wall which is
SDUS II-C-2a-3
within 30 feet of the street, plaza or other public open space shall
contain at least 20% of the wall area facing the street in display areas,
windows, or doorways. Windows must allow view into working areas
or lobbies, pedestrian entrances or displays areas. Blank walls within
30 feet of the street are prohibited. Up to 40% of the length of the
building perimeter can be exempted for this standard if oriented
toward loading or service areas.
SDUS II-C-2a-4
6. Buildings shall incorporate lighting and changes in mass, surface or
finish giving emphasis to entrances.
SDUS II-C-2a-6
7. Buildings shall incorporate arcades, roofs, alcoves, porticoes, and
awnings that protect pedestrians from the rain and sun.
VIII-B-2) Parking and On-site Circulation
1. Parking areas shall be located behind buildings or on one or both
SDUS II-C-1e-1
sides.
2. Parking areas shall be shaded by deciduous trees, buffered from
adjacent non-residential uses and screened from non-residential
SDUS II-C-1e-2
uses.
Ashland Site Design and Use Standards 11
DRAFT 9.29.09
3. Protected raised walkways shall be installed through parking areas of
SDUS II-C-2c-1
50 or more spaces or more than 100 feet in average width or depth.
4. Parking lots with 50 spaces or more shall be divided into separate
SDUS II-C-2c-2
areas and divided by landscaped areas or walkways at least 10 feet in
width, or by a building or group of buildings.
5. Developments of one acre or more must provide a pedestrian and
SDUS II-C-2a-2
bicycle circulation plan for the site. One site pedestrian walkways
must be lighted to a level where the system can be used at night by
employees, residents and customers. Pedestrian walkways shall be
directly linked to entrances and to the internal circulation of the
building.
6. Parking areas shall meet the Parking Lot Landscaping and Screening
SDUS II-C-2a-3
Standards of Section II-D of the Site Design and Use Standards.
VIII-B-3) Automobile Parking
With the exception of the standards described below, automobile parking shall be
provided in accordance with the Off-Street Parking chapter 18.92 and Section II–D
Parking Lot Landscaping and Screening Standards.
1.Neighborhood Commercial (NC) Overlay On-Street Parking. In the
References 18.92
Neighborhood Commercial (NC) overlay, all uses are required to provide off-
street parking in accordance with the Off-Street Parking chapter, except that
Provision to address
the parking required may be reduced by up to 50% through implementation of
parking demand
an alternative parking management strategy that reduces demand by an
management potential.
equal; percentage.
2.Office Employment (OE) Overlay Surface and Structured Parking. A
maximum of 50 percent of the required off-street parking can be constructed
as surface parking on any development site. The remaining parking
requirement can be met either within an on-site structure or through payment
of in-lieu-of-parking fees to the City to fund public parking structure(s) serving
the district.
VIII-B-4) Streetscape
1. One street tree chosen from the street tree list shall be placed for
SDUS II-C-2b-1
each 30 feet of frontage for that portion of the development fronting
the street. Street trees shall meet the Street Tree Standards in
Section II-E of the Site Design and Use Standards.
2. Hardscape (paving material) shall be utilized to designate “people”
SDUS II-C-2b-1
areas. Sample materials could be unit masonry, scored and colored
concrete, pavers, or combinations of the above.
Exception for
3. With the exception of the areas along Active Edges, a building shall
be setback not more than 20 feet from a public sidewalk unless the
Active Edge is new,
area is used for pedestrian activities such as plazas or outside eating
the remainder is
areas. This standard shall apply to both street frontages on corner
excerpted from
lots. If more than one structure is proposed for a site, at least 65% of
SDUS II-C-2b-1
the aggregate building frontage shall be within 20 feet of the sidewalk.
Ashland Site Design and Use Standards 12
DRAFT 9.29.09
VIII-B-5) Building Materials
1. Bright or neon paint colors used extensively to attract attention to the building
SDUS II-C-2f-2
or use are prohibited. Buildings may not incorporate glass as a majority of the
building skin.
VIII-B-6) Build-to-Lines and Active Edges
Buildings developed along an Active Edge Street as identified in the Croman
Master Plan shall be built so that:
1. At least 65% of the total linear feet of the building’s façade is built within
SDUS II-C-2b-2
two feet of the sidewalk.
(65% requirement)
2. All front doors must face streets and walkways.
Provisions excerpted
3. At least 50% of the first-floor façade is comprised of transparent openings
from LEED
(clear glass) between 3 and 8 feet above grade.
Neighborhood
4. No blank walls (without doors or windows) longer than 40% of a façade, or
Standards
more than 50 feetoccur along sidewalks, whichever is less.
Ashland Site Design and Use Standards 13
DRAFT 9.29.09
VIII-B-7) Building Height Requirements
All buildings shall have a minimum height as indicated in the Building Height
Requirements Map and Dimensional Standards Table, and shall not exceed the
maximum height except as provided for a sustainable development height bonus.
1.Street Wall Height: Maximum street wall façade height for the Croman Mill
district for all structures that are not within one full city block of a residential
zone is 50 feet.
2.Upperfloor Setback: Buildings taller than 50 feet must step back upper
stories, beginning with the third story, by at least 10 feet measured from the
façade of the street wall facing the street, alleyway, public park or open space.
3. Residential Buffer Zone: All buildings in the Croman Mill District within the
Residential Buffer Zoneshall meet the following height standards:
a. Maximum Height: The maximum height allowance for all
a. Existing Max
structures within the Residential Buffer is Zone 40 feet.
height in M1 is 40’
b.Upper Floor Setback Requirements: Buildings taller than 35 feet
must step back upper stories by at least 10 feet measured from the façade
facing the street, alleyway, public park or open space.
4. Architectural Standards for Large Scale Buildings: The following
SDUS II-C-3
architectural standards will apply to all buildings with a gross floor area greater
defines large scale
Ashland Site Design and Use Standards 14
DRAFT 9.29.09
than 10,000 square feet, a façade length in excess of 100 feet, or a height
taller than 45 feet.
a. On upper floors use windows and/or architectural features that provide
interest on all four sides of the building.
b. Abrupt changes in building heights and/or roof orientation should be
diminished by offsets of building form and mass.
c. Use recesses and projections to visually divide building surfaces into
smaller scale elements.
d. Use color or materials to visually reduce the size, bulk and scale of the
building.
e. Divide large building masses into heights and sizes that relate to human
SDUS II-C-3a-1
scale by incorporating changes in building masses or direction, sheltering
roofs, a distinct pattern of divisions on surfaces, windows, trees, and small
scale lighting.
f. On-site circulation systems shall incorporate a streetscape which includes
SDUS II-C-3a-4
curbs, sidewalks, pedestrian scale light standards and street trees.
VIII-B-8) Landscaping
1. Landscaping shall be designed so that 50% coverage occurs after
SDUS II-C-1c-1
one year and 90% coverage occurs after 5 years.
2. Landscaping design shall utilize a variety of low water use and
SDUS II-C-1c-2
deciduous and evergreen trees and shrubs and flowering plant
Highlighted section
species as described in Section III – Water Conserving Landscaping
Added for clarification
Guidelines and Policies.
3. Buildings adjacent to streets shall be buffered by landscaped areas at
SDUS II-C-1c-3
least 10 feet in width. Loading facilities shall be screened and buffered
when adjacent to residentially zoned land.
SDUS II-C-1c-4
4. Irrigation systems shall be installed to assure landscaping success.
5. Efforts shall be made to save as many existing healthy trees and
SDUS II-C-1c-5
shrubs on the site as possible.
VIII-B-9) Lighting
1. Lighting shall include adequate lights that are scaled for pedestrians by
SDUS II-C-2e
including light standards or placements of no greater than 14 feet in height
along pedestrian pathways.
VIII-B-10) Screening Mechanical Equipment
Screen rooftop mechanical equipment through extended parapets or other roof
forms that are integrated into the overall composition of the building. Screen
ground floor mechanical equipment. Renewable energy generation devices may
be exempt from screening subject to Site Review approval by a hearings body.
VIII-B-11) Transit Facilities Standards
The location of planned transit routes within the Croman Mill District shall be
defined according to the Croman Mill District Transit Framework map in
collaboration with the local transit authority. Transit service facilities such as
shelters and pullouts shall be integrated into the development application
consistent with the following standards.
Ashland Site Design and Use Standards 15
DRAFT 9.29.09
1. All Large Scale development located on an existing or planned transit route
shall accommodate a transit stop and other associated transit facilities unless
the Director of Community Development determines that adequate transit
facilities already exist to serve the needs of the development, or
2. Escrowing funds in order to enable the City or its agents to construct the
transit facilities at the time transit service is provided to the development.
VIII-B-12) Freight Rail Spur Easement – Compatible Industrial (CI)
1. A Rail Spur easement a minimum of 500 feet in length by 25 feet in width shall
be set aside at the approximate location presented on the Croman Mill District
Transit Plan Map.
2. No buildings or permanent structures can be established within the spur
easement so not to preclude installation of a rail spur for freight loading and
unloading.
3. Buildings adjacent to the reserve strip shall be designed and configured to
permit loading and unloading.
Ashland Site Design and Use Standards 16
DRAFT 9.29.09
Transit Plan Map Detail
VIII-B-13) Commuter Rail Platform Easement – Neighborhood Commercial
(NC)
1. A Commuter Rail Platform easement
or designated rail road right-of-way a
minimum of 400 feet in length and
25 feet in width shall be set aside at
the approximate location presented
on the Croman Mill District Transit
Plan Map.
2. No buildings or permanent
structures can be established within
the platform easement so as not to
preclude installation of a commuter
rail platform for loading and
unloading.
3. Buildings adjacent to the reserve
strip shall be designed and
configured to permit loading and
unloading.
VIII-B-14) Open Spaces
1.Central Park. The purpose of the Central Park is to serve as a public amenity
and accommodate the daily needs of employees (e.g. breaks, lunch time) as
well as for special events that will attract residents citywide. The Central Park
design shall provide a minimum of the following elements.
a. Circulation through and around the park.
Ashland Site Design and Use Standards 17
DRAFT 9.29.09
b. A centrally located flexible hardscape area to accommodate large
gatherings.
c. Street furniture, including lighting, benches, low walls and trash
receptacles along walkways and the park perimeter.
d. Simple and durable materials.
e. Trees and landscaping that provide visual interest with a diversity of
plant materials.
f. Irregular placement of large-canopy trees within passive areas
adjacent to the Central Boulevard.
g. 8-ft. minimum sidewalk width and 7-ft. minimum parkrow width.
h. A central hard surface gathering space of no more than 50% of the
total park area.
2.Transit Plaza. A location for the transit plaza shall be reserved between the
commuter rail platform and commercial uses along the Central Boulevard.
The design of the plaza shall include the following elements.
a. Provide a waiting, loading and unloading area for commuter
passengers.
b. Include outdoor gathering space adjacent to commercial uses.
c. Accommodate the central bike path.
d. Include conveniently located and secure bike parking.
Ashland Site Design and Use Standards 18
DRAFT 9.29.09
VIII-B-15) Compact Development
The site layout is compact, and enables future intensification of development and
changes to land use over time. The following measures shall be used to
demonstrate compliance with this standard.
1. The development achieves the required minimum floor area ratio (FAR) and
minimum number of stories, or shall provide a shadow plan that demonstrates
how development may be intensified over time for more efficient use of land
and to meet the required (FAR) and minimum number of stories.; and
2. Opportunities for shared parking are utilized.; and/or
3. The proposal contains an equally good or superior way to achieve the above
criterion.
C. Sustainable Development Standards
VIII-C-1) Conserve Natural Areas
Preserve water quality, natural hydrology and habitat, and preserve biodiversity
through protection of streams and wetlands. Conserving natural water systems
shall be considered in the site design through application of the following
standards.
1.Designated creek and wetland protection areas shall be considered positive
design elements and incorporated in the overall design of a given project.
2.Native riparian plan materials shall be planted in and adjacent to the creek to
enhance habitat.
3. Create a long-term management plan for on-site wetlands, streams,
associated habitats and their buffers.
VIII-C-2) Create Diverse Neighborhoods
Ashland Site Design and Use Standards 19
DRAFT 9.29.09
Using the following measures to encourage diversity in the neighborhood by
providing a balanced range of housing types, land uses and employment
opportunities is recommended.
1. Provide a diversity of housing types.
2. Differentiate units by size and number of bedrooms.
3. Provide rental and for purchase housing.
VIII-C-3) Design Green Streets
Green Streets are public streets that have been built or retrofitted to include
landscape areas that increase stormwater infiltration, reduce and slow the rate of
runoff, and use bio-filtration to remove pollutants.
1. New streets shall be developed to capture and treat stormwater in a manner
consistent with the Croman Mill District Stormwater Management Plan Map,
the City of Ashland Stormwater Master Plan, and Ashland Green Streets
Engineering Standards.
2. All development served by planned Green Streets as designated on the
Croman Mill District Green Street Map shall accommodate said facilities by
including the same in the development plan; and/or
3. Escrow funds in order to enable the city or its agents to construct the Green
Street at the time full street network improvements are provided to serve the
development.
Ashland Site Design and Use Standards 20
DRAFT 9.29.09
Green Streets
VIII-C-4) Design Green Surface Parking
Parking areas shall be designed to minimize the adverse environmental and
microclimatic impacts of surface parking through design and material selection. All
parking areas shall meet the following standards, and shall comply with the Off-
Street Parking chapter and the Site Review chapter.
1. Use less than 20% of the lot area for surface parking.
2. Surface lots shall not exceed two acres in area, including landscape,
circulation and ingress/egress.
3. Use paving materials with a high solar reflectance reduce heat absorption.
4. Provide porous solid surfacing on a least 50% of the parking area surface.
5. Provide at least 50% shade cover over the surface lot within five years of
project occupancy.
VIII-C-5) Manage Stormwater Run-Off
Reduce the public infrastructure costs and adverse environmental effects of
stormwater run-off by managing run-off from building roofs, driveways, parking
areas, sidewalks and other hard surfaces through implementation of the following
standards.
1. Design grading and site plans to capture and slow runoff.
2. Design parking lots and other hard surface areas in a way that captures and
treats runoff with landscaped medians and swales.
Ashland Site Design and Use Standards 21
DRAFT 9.29.09
3. Use pervious or semi-pervious surfaces that allow water to infiltrate the soil.
4. Retain rainfall on-site through infiltration, evapotranspiration or through
capture and reuse techniques.
5. Direct discharge storm water runoff into a designated green street and
neighborhood storm water treatment facilities.
VIII-C-5) Recycling Areas
All developments in the Croman Mill District shall provide an opportunity-to-recycel
site for use of the project occupants.
1. Commercial. Commercial developments having a solid waste receptacle shall
ALUO 18.72.115(A)
provide a site of equal or greater size adjacent to or with access comparable
to the solid waste receptacle to accommodate materials collected by the local
solid waste franchisee under its on-route collection program for purposes of
recycling. Both the opportunity-to-recycle site and the common solid waste
receptacle shall be screened by fencing or landscaping such as to limit the
view from adjacent properties or public rights-of-way.
2. Multi-Family Residential.All newly constructed multi-family units, either as part
ALUO 18.72.115(B)
of an existing development or as a new development, shall provide an
opportunity-to-recycle site in accord with the following standards:
a. Multi-family developments not sharing a common solid waste receptacle
shall provide an individual curbside recycling container for each dwelling
unit in the development.
b. Multi-family developments sharing a common solid waste receptacle shall
provide a site of equal or greater size adjacent to or with access
comparable to the common solid waste receptacle to accommodate
materials collected by the local solid waste franchisee under its residential
on-route collection program for purposes of recycling. Both the
opportunity-to-recycle site and the common solid waste receptacle shall
be screened by fencing or landscaping such as to limit the view from
adjacent properties or public rights-of-way.
3. Screening refuse and recycle areas. Refuse and recycle areas shall be
SDUS II-D-6
screened from view by placement of a solid wood or masonry wall from five to
eight feet in height. All refuse and recycle materials shall be contained within
the refuse area.
VIII-C-6) Minimize Construction Impacts
Minimize pollution and waste generation resulting from construction activity
through the following measures.
1. Construction Activity Pollution Prevention. Develop and implement an erosion
and sediment control plan to reduce pollution from construction activities by
controlling soil erosion, waterway sedimentation and airborne dust generation
in accordance with Ashland Public Works Standards. The erosion and
sediment control plan shall be submitted with the final engineering for public
improvements and building permit.
2. Construction Waste Management. Recycle and/or salvage non-hazardous
construction and demolition debris in accordance with the Building Demolition
Debris Diversion requirements in 15.04.216.C.
Ashland Site Design and Use Standards 22
DRAFT 9.29.09
VIII-C-7) Practice Low-Impact Site Development
Using the following low-impact site design, construction and management
practices to reduce the environmental impacts of site development is
recommended.
1. Use harvested rainwater or reclaimed water for the irrigation of at least 25
percent of a project’s landscaped areas.
2. Incorporate passive and active solar strategies in the design of in the design
and orientation of buildings and public spaces.
3. Specify energy-efficient infrastructure systems, including traffic lights, street
lights, water and wastewater pumps and treatment systems.
4. Utilize recycled materials in the construction of roadways, parking lots,
sidewalks and curbs.
5. Minimize light pollution from the project to improve nighttime visibility, increase
night sky access and to reduce development impact on nocturnal
environments by using down-shielded light fixtures that do not allow light to
emit above the 90 degree plane of the fixture.
VIII-C-8) Performance Standards for Sustainable Development Bonuses
Green buildings improve air and water quality, reduce solid waste, conserve
natural resources, reduce operation costs, optimize life-cycle economic
performance and minimize the strain on local infrastructure. Given that buildings
are responsible for a large portion energy and resource use, the provisions of this
section are intended to promote sustainable developments that reduce the impact
of the built environment in the City of Ashland.
Projects that achieve a high performance green building standard and significantly
improve energy performance beyond the current minimum Oregon requirements
are eligible for a sustainable development bonus as follows.
1.Height Bonus
In the event that a building or structure is determined to be meet the standard
for LEED Certified building, the building height may exceed the maximum
height specified for the CM overlay districts within the Dimensional Standards
Table, through application of a sustainable development bonus as follows:
a. A building obtaining LEED Certification as meeting the LEED Silver
Standard may be increased in height by up to one (1) story.
b. A building obtaining LEED Certification as meeting the LEED Gold
Standard may be increased in height by up to two (2) stories.
c. A building obtaining LEED Certification as meeting the LEED Platinum
Standard may be increased in height by up to four (4) stories.
d. Increases in building height exceeding the maximum permitted height
through the application of a Sustainable Development Height Bonus shall
demonstrate compliance with Federal Aviation Administration standards for
airport approach zones.
e. Developments in the Residential Buffer overlay are not eligible for
increases in building height in excess the maximum permitted for the overlay
district.
Ashland Site Design and Use Standards 23
DRAFT 9.29.09
f. Not withstanding the bonuses permitted through this section, no building
may exceed the Sustainable Development Bonus maximum height per the
Dimensional Standards Table.
2.Demonstration of Achieving LEED or an Equivalent Program Rating
Projects awarded a sustainable development bonus, pursuant to this section ,
shall provide the City with satisfactory evidence of having completed the
following steps in the process toward demonstrating achievement of LEED
certification:
a. Hiring and retaining a LEED Accredited Professional as part of the project
team throughout design and construction of the project.
b. Developments seeking a Sustainable Development bonus shall provide
documentation with the planning application, and prior to issuance of a
building permit, that the proposed development as designed and constructed
will meet or exceed the equivalent LEED standard relating to the sustainable
development bonus awarded.
c. A final report shall be prepared by the LEED Accredited Professional and
presented to the City upon completion of the project verifying that the project
has met, or exceeded, the LEED standard relating to the sustainability bonus
awarded.
d. The report shall produce a LEED compliant energy model following the
methodology outlined in the LEED rating system. The energy analysis done
for the building performance rating method shall include all energy costs
associated with the building project.
e. The project developer shall be required to provide a lien or performance
bond to the City of Ashland in an amount equal to the value of the bonus.
i. This lien or performance bond shall be calculated on the square
footage of the additional space provided by the bonus multiplied by
one hundred dollars ($100.00) per square foot.
ii. This lien or performance bond shall be released by the City at such
time that the project attains LEED Certification.
3.Sustainable Development Bonus Penalty Section
If the project fails to attain LEED certificationwithin three years of receiving its
initial Certificate of Occupancy, then the Developer shall be subject to a fine
equal to the higher of:
a. 1% of the total construction costs, or
b. The amount of the Lien/ Performance Bond provided pursuant to section
VII-C-7.2.e.
c. If the fine is not paid within thirty (30) days of the date it is imposed, then
the City shall have the authority to revoke the Certificate of Occupancy for the
building.
Ashland Site Design and Use Standards 24
DRAFT 9.29.09
D. Additional Plan Maps
Ashland Site Design and Use Standards 25
DRAFT 9.29.09
Ashland Site Design and Use Standards 26
DRAFT 9.29.09
Ashland Site Design and Use Standards 27
DRAFT 9.29.09