June 25, 2019
CALL TO ORDER
Graf called the meeting to order at 4:10 PM
Committee Members Present: Pat Acklin, Joe Graf, Rich Miller, Don Morris, Donna Rhee, Alex Amarotico, Lesley
Adams
Committee Members Absent: Kate Jackson, Darrell Boldt, John Williams
Staff present: Scott Fleury, Steve Walker, Kevin Caldwell, Taina Glick, Michael Morrison
ANNOUNCEMENTS
None
APPROVAL OF MINUTES
May 28, 2019 filed as presented.
PUBLIC FORUM
Heulz Gutcheon —Ashland
Spoke of having spoken to City Council regarding climate change and his frustration over use of code not updated to
account for climate change. He introduced the concept of agriphotovoltaics and suggested utilizing anaerobic
digesting at the wastewater treatment plant. Rhee
Old Business
WTP Update
Fleury introduced Pierre Kwan, Project Manager from HDR Engineering who presented project -to -date information and
design of proposed water treatment plant (WTP). Presentation here. Morris inquired about seismic testing. Kwan
answered in the affirmative and that findings have been incorporated into design. Rhee inquired about where creek
water pushed through power house would be treated. Fleury explained existing infrastructure and potential for
expanded micro -hydroelectric capabilities. Committee members and staff discussed possibility of utilizing excavated
materials in this or other jobsites.
New Business
RH2 Master Plan Update
Rachel Lanigan provided updates on Chapter System Analysis and Chapter Capital Improvement Plan of the WMP
update. „1:::)r ,,,,int tii ,,,,,in h ,,,,ir . Fleury informed group that any questions or comments should be forwarded to himself or
Glick. Graf asked how TAP water moves to zones other than Crowson. Lanigan indicated that it does not. Discussion
took place about cost/benefit of replacement of Granite Reservoir. Amarotico asked about the possibility for the WTP
pump station to bypass the new WTP plant pump to provide water directly to the Crowson zone.
Prioritization of CIP update is:
• Projects currently planned in adopted Capital Improvements Plan
• Projects that resolve fire flow deficiencies
• Projects that reduce supply from Crowson to Granite zones
• Projects that address high pressure conditions
e iii �n�1(� ihi�ii°'i �s(iiir, , , � ('ill i ele i''°)A C "
, II I I I e 2 1 20,1119
mill
ASHLAND Water Advisory Committee
MINUTES
June 25, 2019
Updates from the last meeting were:
• Amended pressure zone adjustments
• Added long-term planning period (40+ years)
• Incorporated City staff direction on Granite Reservoir and boosting of TAP supply
• Adjusted project timing
• Pipe projects
o Removed some proposed projects
o Moved some proposed projects to annual maintenance budget from CIP
Committee members and staff discussed order of use of available water.
Next Committee meeting July 23, 2019 4:00 pm.