Loading...
HomeMy WebLinkAbout10.7.14 SDC Review Committee Packet MEMORANDUM TO: Members, SDC Committee FROM: Raymond J. Bartlett DATE: October 6, 2014 Meeting RE: Draft Transportation SDC The attached table shows the list of capital improvements, the portion of teach project that is attributable to growth, and the calculation of the SDC improvement fee, $2,131/PM Peak-Hour trip. Since the Committee last reviewed this table projects have been excluded and are shown as strikeouts and one project as previously discussed has been added at the bottom of the list and is shown as highlighted. The City’s Transportation Commission has agreed to both the excluded projects and adding the E. Main Street project. The net change in the cost basis of the SDC is a negative $639,000 which also reduces the amount of the SDC as shown in the following Table: Cost Basis $/ PM P-H Trip % Change from Current Current $2,043 Last meeting before cutting some projects $21,801,000 $2,455 120.2% Proposed for this meeting $21,755,000 $2,191 107.2% $ Change from Last Meeting ($46,000) ($264) 1409 Franklin Street, Suite 201  Vancouver, WA 98660 T/360.823.1700 Ashland Transportation CIP & SDC Calculation Table 1 Ashland Transportation Capital Improvements Plan Eligible SDC Projects Subtotal SDC Eligible SDC Type* # Street Description Classification High, Med, DD % Growth Project Costs By Project GENERAL POLICIES & STUDIES Table 6-1 (p. 90) S 2 NA Downtown Parking & Multi-Modal Circulation Study Boulevard 100,000 18.4% 18,000 1.81 S 1 NA Funding Sources Feasibility Study NA 30,000 18.4% 6,000 0.60 ST Total Policies & Studies Projects $130,000 18.5% $24,000 $2.41 PEDESTRIAN PROJECTS Table 7-1 (p. 96) P 6 Orange Ave N. Main St to Oak St Avenue 250,000 18.4% 46,000 4.63 P 7 Hersey St Thornton Way to N. Main St Avenue 750,000 18.4% 138,000 13.90 P 9 Maple St Chestnut St to 150' E of Rock St Avenue 100,000 18.4% 18,000 1.81 P 10(1) Scenic Dr Maple St to Wimer St Avenue 250,000 18.4% 46,000 4.63 P 18 A St Oak St to 100' W of 6th St Avenue 250,000 18.4% 46,000 4.63 P 22 N. Mountain Ave 100' S of Village Green Way to Iowa St Avenue 450,000 18.4% 83,000 8.36 P 25 Walker Ave 950' N of Iowa St to Ashland St Avenue 750,000 18.4% 138,000 13.90 P 27(1) Walker Ave Oregon St to Woodland Dr Avenue 200,000 18.4% 37,000 3.73 P 28(1) Ashland St S. Mountain Ave to Morton St Avenue 450,000 18.4% 83,000 8.36 P 38(1) Clay St Siskiyou Blvd to Mohawk St Avenue 300,000 18.4% 55,000 5.54 P 57(1) Tolman Creek Rd Siskiyou Blvd to west side City Limits Avenue 425,000 18.4% 78,000 7.86 P 58(1) Helman St Hersey St to Van Ness Ave Avenue 100,000 18.4% 18,000 1.81 P 1 N. Main St/Hwy 99 N. Main St to Schofield St Boulevard 50,000 18.4% 9,000 0.91 O 1 NA Travel Smart Education, Targeted Marketing Program NA 45,000 18.4% 8,000 0.81 P 23 Wightman St 200' N of E. Main St to 625' S of E. Main St N'hood Collector 400,000 18.4% 74,000 7.45 P 5 Glenn St/Orange Ave N. Main St to 175' E of Willow St N'hood Street 200,000 18.4% 37,000 3.73 P 17 Beaver Slide Water St to Lithia Way N'hood Street 50,000 18.4% 9,000 0.91 P 59 Garfield St E. Main St to Siskiyou Blvd N'hood Street 750,000 18.4% 138,000 13.90 P 60 Lincoln St E. Main St to Iowa St N'hood Street 450,000 18.4% 83,000 8.36 P 61 California St E. Main St to Iowa St N'hood Street 500,000 18.4% 92,000 9.27 P 63 Liberty St Siskiyou Blvd to Ashland St N'hood Street 650,000 18.4% 120,000 12.09 P 65 Faith Ave Ashland St to Siskiyou Blvd N'hood Street 350,000 18.4% 64,000 6.45 P 66 Diane St Clay St to Tolman Creek Rd N'hood Street 20,000 18.4% 4,000 0.40 P 67 Frances Lane Siskiyou Blvd to Oregon St N'hood Street 10,000 18.4% 2,000 0.20 P 68 Carol St Patterson St to Hersey St N'hood Street 150,000 18.4% 28,000 2.82 P 70 Park St Ashland St to Siskiyou Blvd N'hood Street 650,000 18.4% 120,000 12.09 October 7, 2014 Page 1 Ashland Transportation CIP & SDC Calculation Eligible SDC Projects Subtotal SDC Eligible SDC Type* # Street Description Classification High, Med, DD % Growth Project Costs By Project P 4 Laurel St Nevada St to Orange Ave Avenue 500,000 18.4% 92,000 9.27 P 37 Clay St Faith Ave to Siskiyou Blvd Avenue 1,000,000 18.4% 184,000 18.53 P 8 Wimer St Thornton Way to N. Main St N'hood Street 800,000 18.4% 147,000 14.81 D P 62 Quincy St Garfield St to Wightman St N'hood Street 150,000 18.4% 28,000 - P 64 Water St Van Ness Ave to B St N'hood Street 250,000 18.4% 46,000 4.63 P 72 C St Fourth St to Fifth St N'hood Street 100,000 18.4% 18,000 1.81 D P 73 Barbara St Jaquelyn St to Tolman Creek Rd N'hood Street 100,000 18.4% 18,000 - D P 74 Roca St Ashland St to Prospect St N'hood Street 250,000 18.4% 46,000 - D P 75 Blaine St Morton St to Morse Ave N'hood Street 100,000 18.4% 18,000 - D P 78 Patterson St Crispin St to Carol St N'hood Street 100,000 18.4% 18,000 - D P 79 Harrison St Iowa St to Holly St N'hood Street 100,000 18.4% 18,000 - D P 80 Spring Creek Dr Oak Knoll Dr to Road End N'hood Street 350,000 18.4% 64,000 - D P 81 Bellview Ave Green Meadows Way to Siskiyou Blvd N'hood Street 250,000 18.4% 46,000 - P 10(2) Scenic Dr Wimer St to Grandview Dr Avenue - 18.4% - - P 27(2) Walker Ave Woodland Dr to Peachey Rd Avenue - 18.4% - - P 28(2) Ashland St Morton St to Guthrie St Avenue - 18.4% - - P 38(2) Clay St Mohawk St to Southern Terminus Avenue - 18.4% - - P 42 S. Mountain Ave Ashland St to Prospect St Avenue - 18.4% - - P 54 Iowa St Terrace St to Auburn St Avenue - 18.4% - - P 57(2) Tolman Creek Rd Siskiyou Blvd to east side City Limits Avenue - 18.4% - - P 58(2) Helman St 1500' N of Orange Ave to Orange Ave Avenue - 18.4% - - P 40 Hillview Dr Siskiyou Blvd to Peachey Rd N'hood Street - 18.4% - - P 71 Orchard St Sunnyview Dr to Westwood St N'hood Street - 18.4% - - ST Total Pedestrian Projects 11,200,000 18.4% 2,061,000 208 BICYCLE PROJECTS Table 8-1 (p. 105) B 2 Wimer St Scenic Dr to N. Main St Avenue 20,000 18.4% 4,000 0.40 B 7 Iowa St Terrace St to Road Terminus; S. Mountain Ave to Walker Ave Avenue 240,000 18.4% 44,000 4.43 B 10 S. Mountain Ave Ashland St to E. Main St Avenue 120,000 18.4% 22,000 2.22 B 11 Wightman St E. Main St to Siskiyou Blvd Avenue 60,000 18.4% 11,000 1.11 B 13 B St Oak St to N. Mountain Ave Avenue 80,000 18.4% 15,000 1.51 B 16 Lithia Way Oak St to Helman St Avenue 110,000 18.4% 20,000 2.01 B 19 Helman St Nevada St to N. Main St Avenue 80,000 18.4% 15,000 1.51 B 26 Normal Ave E. Main St to Siskiyou Blvd Avenue 190,000 18.4% 35,000 3.53 B 29 Walker Ave Siskiyou Blvd to Peachey Rd Avenue 40,000 18.4% 7,000 0.71 B 17 Main St Helman St to Siskiyou Blvd Boulevard 50,000 18.4% 9,000 0.91 October 7, 2014 Page 2 Ashland Transportation CIP & SDC Calculation Eligible SDC Projects Subtotal SDC Eligible SDC Type* # Street Description Classification High, Med, DD % Growth Project Costs By Project TR 1 Northside Trail Orchid Ave to Tolman Creek Rd Multi-Use Path 2,000,000 18.4% 368,000 37.06 O 4 NA Retrofit Bicycle Program NA 50,000 18.4% 9,000 0.91 B 5 Maple/Scenic/Nutley N. Main St to Winburn Way N'hood Collector 110,000 18.4% 20,000 2.01 B 31 Indiana St Siskiyou Blvd to Oregon St N'hood Street 20,000 18.4% 4,000 0.40 B 33 8th St A St to E. Main St N'hood Street 20,000 18.4% 4,000 0.40 B 38 Oregon/Clark St Indiana St to Harmony Lane NS 40,000 18.4% 7,000 0.71 B 3 Nevada St Vansant St to N. Mountain Ave Avenue 230,000 18.4% 42,000 4.23 B 9 Ashland St Morton St to University Way Avenue 30,000 18.4% 6,000 0.60 B 25 Tolman Creek Rd Siskiyou Blvd to Green Meadows Way Avenue 100,000 18.4% 18,000 1.81 B 37 Clay St Siskiyou Blvd to Mohawk St Avenue 20,000 18.4% 4,000 0.40 B 18 N. Main St Jackson Rd to Helman St Boulevard 260,000 18.4% 48,000 4.83 D TR 2 New Trail Clay St to Tolman Creek Rd Multi-Use Path 400,000 18.4% 74,000 - D B 39 Glenn St/Orange Ave N. Main St to Proposed Trail N'hood Collector 40,000 18.4% 7,000 - B 40 Laurel St Orange St to Nevada St N'hood Collector 40,000 18.4% 7,000 0.71 B 20 Water St Hersey St to N. Main St N'hood Street 30,000 18.4% 6,000 0.60 B 14 A St Oak St to 6th St Avenue - 18.4% - - B 21 Oak St Nevada St to E. Main St Avenue - 18.4% - - B 22 Clay St E. Main St to Ashland St Avenue - 18.4% - - B 24 Clover Lane Ashland St to Proposed Bike Path Avenue - 18.4% - - B 30 Ashland St I-5 Exit 14 SB to Hwy 66 Boulevard - 18.4% - - B 35 Railroad Property Proposed Bike Path to N. Mountain Ave Multi-Use Path - 18.4% - - B 4 Glendower St Bear Creek Greenway to Nevada St N'hood Street - 18.4% - - B 6 Winburn Way Calle Guanjuato to Nutley St N'hood Street - 18.4% - - B 8 Morton St E. Main St to Ashland St N'hood Street - 18.4% - - B 12 Wightman St Road End to E. Main St N'hood Street - 18.4% - - B 28 Clay St Rail Line to Siskiyou Blvd N'hood Street - 18.4% - - B 34 1st St A St to E. Main St N'hood Street - 18.4% - - D TR 3 New Trail New Trail to Hersey St Multi-Use Path 220,000 18.4% 40,000 - D TR 4 New Trail A St to Clear Creek Dr Extension Multi-Use Path 110,000 18.4% 20,000 - ST Total Bicycle Projects 3,310,000 21.9% 725,000 73.01 TRANSIT PROJECTS Transit Service Program Funds (p. 118) L 14 -19 NA Establish Transit Hubs NA 1,000,000 18.4% 184,000 18.53 NA Support Circulator Svc NA 2,750,000 18.4% 506,000 50.96 NA Support SOU Svc NA - 18.4% - - ST Total Transit Projects $3,750,000 18.4% $690,000 $69.49 October 7, 2014 Page 3 Ashland Transportation CIP & SDC Calculation Eligible SDC Projects Subtotal SDC Eligible SDC Type* # Street Description Classification High, Med, DD % Growth Project Costs By Project INTERSECTION & ROADWAY IMPROVEMENTS Refinement Plan Studies, Table 10-2 (p. 133) S 10 Siskiyou Blvd Highway 66 to Beach St Blvd/N'hood Coll 35,000 18.4% 6,000 0.60 S 3 N. Main St (OR 99) Helman St to Sheridan St Boulevard 75,000 18.4% 14,000 1.41 S 5 Siskiyou Blvd Ashland St to Tolman Creek Rd Boulevard 75,000 18.4% 14,000 1.41 S 6 Ashland St (OR 66) Siskiyou Blvd to Tolman Creek Rd Boulevard 75,000 18.4% 14,000 1.41 S 9 Ashland St (OR 66) Clay St to Washington St Boulevard/Ave 20,000 18.4% 4,000 0.40 S 7 E. Main St Siskiyou Blvd to Wightman St Avenue - 18.4% - - ST Studies Subtotal $280,000 18.6% $52,000 $5.23 Intersection & Roadway Projects, Table 10-3 (p. 136) R 17 E. Nevada St Ext Bear Creek to Kestrel Pkwy Avenue 5,481,000 18.4% 1,009,000 101.62 R 40 Walker Ave Festival St Walker Ave to Normal St Avenue 780,000 18.4% 144,000 14.50 D R 35 N. Main St N. Main St Temporary Diet Boulevard - 0.0% - - R 5 Siskiyou Blvd (OR 66) Lithia Way (OR 99 NB) / E. Main St Boulevard/Ave 50,000 18.4% 9,000 0.91 R 6 Siskiyou Blvd (OR 66) Tolman Creek Rd Boulevard/Ave 61,000 18.4% 11,000 1.11 R 8 Ashland St (OR 66) Oak Knoll Dr / E. Main St (realignment) Boulevard/Ave 706,000 18.4% 130,000 13.09 R 25 Washington St Ext Washington St Tolman Creek Rd N'hood Collector 1,055,000 100.0% 1,055,000 106.25 R 19 Normal Ave Ext Normal Ave to E. Main St Avenue 2,705,000 18.4% 498,000 50.16 R 36 N. Main St N. Main St Permanent Diet Boulevard 200,000 18.4% 37,000 3.73 D R 38 Ashland St Siskiyou Blvd to Walker Ave Streetscape Boulevard 1,100,000 18.4% 202,000 - R 2 N. Main St Wimer St / Hersey St Boulevard/Ave - 18.4% - - R 9 Ashland St (OR 66) Oak Knoll Dr / E. Main St (roundabout) Boulevard/Ave - 18.4% - - R 11 Lithia Way (OR 99 NB) Oak Street Boulevard/Ave - 18.4% - - R 45 New Roadway (F) Washington St to New Roadway (E) Avenue 1,199,000 100.0% 1,199,000 120.76 R 39 Ashland St Walker Ave to Normal Ave Streetscape Boulevard 1,300,000 18.4% 239,000 24.07 R 43 New Roadway (E) Mistletoe Rd to Siskiyou Blvd (OR 99) Boulevard 4,322,000 100.0% 4,322,000 435.29 R 44 Tolman Creek Mistletoe Rd Streetscape Boulevard 3,478,000 100.0% 3,478,000 350.29 R 13 Siskiyou Blvd (OR 99) Park St Boulevard/Ave 296,000 18.4% 54,000 5.44 R 41 Ashland St Tolman Creek Rd Streetscape Boulevard/Ave 1,500,000 18.4% 276,000 27.80 R 42 E. Main St N. Mountain Ave Streetscape Boulevard/Ave 1,500,000 18.4% 276,000 27.80 R 12 Siskiyou Blvd (OR 99) Sherman St Boulevard/N'hood 391,000 18.4% 72,000 7.25 R 14 Siskiyou Blvd (OR 99) Terra Ave / Faith Ave Boulevard/N'hood 216,000 18.4% 40,000 4.03 R 24 Clear Creek Dr Ext Oak St to N. Mountain Ave N'hood Collector 2,505,000 100.0% 2,505,000 252.29 R 26 New Roadway (D) E. Main St to Ashland St (OR 66) N'hood Collector 2,422,000 0.0% - - R 29 Washington St Ext Washington St to Benson Way N'hood Collector 1,301,000 100.0% 1,301,000 131.03 R 31 Wimer St Ext Wimer St to Ashland Mine Rd N'hood Collector 3,125,000 18.4% 575,000 57.91 October 7, 2014 Page 4 Ashland Transportation CIP & SDC Calculation Eligible SDC Projects Subtotal SDC Eligible SDC Type* # Street Description Classification High, Med, DD % Growth Project Costs By Project R 20 Creek Dr Ext Meadow Dr to Normal Ave N'hood Street - - - R 22 New Roadway (B) Clay St to Tolman Creek Rd N'hood Street - - - R 23 New Roadway (C) McCall Dr to Engle St N'hood Street - - - R 27 Grizzly Dr Ext Jacquelyn St to Clay St N'hood Street - - - R 28 Mountain View Dr Ext Parkside Dr to Helman St N'hood Street - - - R 30 Kirk Lane Ext Kirk Lane to N. Mountain Ave N'hood Street - - - R 32 Kestrel Pkwy Ext Kestrel Pkwy to N. Mountain Ave (at Nepenthe Rd) N'hood Street - - - R 34 Railroad Property Existing Adjacent Streets to End of Property N'hood Street - - - R 46 Ivy Lane Ext Ivy Lane to Waterline Rd N'hood Street - - - R 47 Mary Jane Ave Ext Mary Jane Ave to S. UGB then E. to Clay St N'hood Street - - - R 48 Forest St Ext Between Existing Segments of Forest St N'hood Street - - - R 49 Croman Mill District Croman Mill District Connectivity N'hood Street - - - E. Main St Between Walker & Clay Streets 2,828,000 18.4% 520,000 52.37 ST Total Intersection & Roadway Improvements 37,121,000 47.8% 17,750,000 1,788 Total Roadway & Intersection Improvements $37,401,000 47.6% $17,802,000 $1,792.93 RAILROAD CROSSING PROJECTS Table 10-4 (p. 139) X 1 4th St Crossing N'hood Street 275,000 50% 138,000 13.90 X 2 Washington St Crossing Planned Avenue 1,000,000 18% 180,000 18.13 X 3 Normal Ave Crossing Upgrade Planned Avenue 750,000 18% 135,000 13.60 ST Total Railroad Crossing Projects $2,025,000 22.4% $453,000 $45.63 2012 CIP Totals $57,816,000 37.6% $21,755,000 $2,191 * No cost estimate; assumes improvements will be paid by developer October 7, 2014 Page 5