Loading...
HomeMy WebLinkAbout2.17.15 SDC Review Committee PacketMEMORANDUM TO: Members of SDC Review Committee FROM: Raymond J. Bartlett DATE: February 11, 2015 RE: Agenda, February 17, 2015 Meeting City of Ashland SDC Review Committee February 17, 2015 1:00 PM to 3:00 PM Siskiyou Room 51 Winburn Way Agenda Items 1. Approval of all minutes 2. Transportation SDC 1409 Franklin Street, Suite 201  Vancouver, WA 98660 T/360.823.1700 MEMORANDUM TO: Members, SDC Committee FROM: Raymond J. Bartlett DATE: February 17, 2015 RE: Transportation System Development Charge; Revised Since our last meeting which was devoted to the transportation system development charge (TSDC), City staff and consultants made several changes to the draft SDC. 1.The City retained R2 Engineering to review all of the construction cost estimates in the original Transportation System Plan (Kittelson & Associates, Inc., 2012) and they recommended thefollowing changes: a.R17 E. Nevada Street increased from $2,261,000 to $5,481,000b. R25 Washington Street Extension increased from $1,055,000 to $1,835,000c.X1 4th Street RR Crossing increased from $275,000 to $500,000 d. X3 Normal Avenue RR Crossing upgrade increased from $750,000 to $1,316,253. 2. The City’s Planning and Public Works Directors reviewed all of the allocation of project costs to future developments and recommended the following changes (see attached email memorandum): a.R25 Washington Street Extension decreased allocation to growth from 100% to 50% b. R19 Normal Avenue increased allocation from 18.4% to 50%c.R45 New Roadway—at Washington St decreased allocation from 100% to 50% d. R43 New Roadway—Mistletoe Rd. to Siskiyou Blvd decreased allocation from 100% to75% e.X3 Normal Ave. RR Crossing increased allocation from 18.4% to 50% f.R24 Clear Creek Dr Extension from Oak to N. Mountain Ave. increased allocation from18.4% to 50%g.R29 Washington Street extension to Benson Way increased allocation from 18.4% to 75% Table 1 summarizes and compares these changes to the current SDC and the SDC discussed at the last meeting. Table 2 shows these changes as highlighted cells. 1409 Franklin Street, Suite 201  Vancouver, WA 98660 T/360.823.1700 Transportation System Development Charge; Revised February 17, 2015 Table 1 Summary of Current, Proposed at Last Meeting, & Revised Transportation SDC Cost Basis $/ PM P-H Trip % Change from Current Current $2,043 Last meeting before cutting some projects & before updated costs from engineers $21,801,000 $2,196 7.5% Proposed for this meeting $19,807,000 $1,995 -2.4% $ Change from Last Meeting ($1,994,000) ($201) Page 2 Transportation System Development Charge; Revised February 2015 Table 2 Transportation Qualified CIP Projects and SDC Calculation Eligible SDC Projects Subtotal SDC Eligible SDC Type* # Street Description High, Med, DD % Growth Project Costs By Project GENERAL POLICIES & STUDIES Table 6-1 (p. 90) S 2 NA Downtown Parking & Multi-Modal Circulation Study 100,000 18.4% 18,000 1.81 S 1 NA Funding Sources Feasibility Study 30,000 18.4% 6,000 0.60 ST Total Policies & Studies Projects $130,000 18.5% $24,000 $2.41 PEDESTRIAN PROJECTS Table 7-1 (p. 96) P 6 Orange Ave N. Main St to Oak St 250,000 18.4% 46,000 4.63 P 7 Hersey St Thornton Way to N. Main St 750,000 18.4% 138,000 13.90 P 9 Maple St Chestnut St to 150' E of Rock St 100,000 18.4% 18,000 1.81 P 10(1) Scenic Dr Maple St to Wimer St 250,000 18.4% 46,000 4.63 P 18 A St Oak St to 100' W of 6th St 250,000 18.4% 46,000 4.63 P 22 N. Mountain Ave 100' S of Village Green Way to Iowa St 450,000 18.4% 83,000 8.36 P 25 Walker Ave 950' N of Iowa St to Ashland St 750,000 18.4% 138,000 13.90 P 27(1) Walker Ave Oregon St to Woodland Dr 200,000 18.4% 37,000 3.73 P 28(1) Ashland St S. Mountain Ave to Morton St 450,000 18.4% 83,000 8.36 P 38(1) Clay St Siskiyou Blvd to Mohawk St 300,000 18.4% 55,000 5.54 P 57(1) Tolman Creek Rd Siskiyou Blvd to west side City Limits 425,000 18.4% 78,000 7.86 P 58(1) Helman St Hersey St to Van Ness Ave 100,000 18.4% 18,000 1.81 P 1 N. Main St/Hwy 99 N. Main St to Schofield St 50,000 18.4% 9,000 0.91 O 1 NA Travel Smart Education, Targeted Marketing Program 45,000 18.4% 8,000 0.81 P 23 Wightman St 200' N of E. Main St to 625' S of E. Main St 400,000 18.4% 74,000 7.45 P 5 Glenn St/Orange Ave N. Main St to 175' E of Willow St 200,000 18.4% 37,000 3.73 P 17 Beaver Slide Water St to Lithia Way 50,000 18.4% 9,000 0.91 Page 3 Transportation System Development Charge; Revised February 2015 Eligible SDC Projects Subtotal SDC Eligible SDC Type* # Street Description High, Med, DD % Growth Project Costs By Project P 59 Garfield St E. Main St to Siskiyou Blvd 750,000 18.4% 138,000 13.90 P 60 Lincoln St E. Main St to Iowa St 450,000 18.4% 83,000 8.36 P 61 California St E. Main St to Iowa St 500,000 18.4% 92,000 9.27 P 63 Liberty St Siskiyou Blvd to Ashland St 650,000 18.4% 120,000 12.09 P 65 Faith Ave Ashland St to Siskiyou Blvd 350,000 18.4% 64,000 6.45 P 66 Diane St Clay St to Tolman Creek Rd 20,000 18.4% 4,000 0.40 P 67 Frances Lane Siskiyou Blvd to Oregon St 10,000 18.4% 2,000 0.20 P 68 Carol St Patterson St to Hersey St 150,000 18.4% 28,000 2.82 P 70 Park St Ashland St to Siskiyou Blvd 650,000 18.4% 120,000 12.09 P 4 Laurel St Nevada St to Orange Ave 500,000 18.4% 92,000 9.27 P 37 Clay St Faith Ave to Siskiyou Blvd 1,000,000 18.4% 184,000 18.53 P 8 Wimer St Thornton Way to N. Main St 800,000 18.4% 147,000 14.81 D P 62 Quincy St Garfield St to Wightman St 150,000 18.4% 28,000 - P 64 Water St Van Ness Ave to B St 250,000 18.4% 46,000 4.63 P 72 C St Fourth St to Fifth St 100,000 18.4% 18,000 1.81 D P 73 Barbara St Jaquelyn St to Tolman Creek Rd 100,000 18.4% 18,000 - D P 74 Roca St Ashland St to Prospect St 250,000 18.4% 46,000 - D P 75 Blaine St Morton St to Morse Ave 100,000 18.4% 18,000 - D P 78 Patterson St Crispin St to Carol St 100,000 18.4% 18,000 - D P 79 Harrison St Iowa St to Holly St 100,000 18.4% 18,000 - D P 80 Spring Creek Dr Oak Knoll Dr to Road End 350,000 18.4% 64,000 - D P 81 Bellview Ave Green Meadows Way to Siskiyou Blvd 250,000 18.4% 46,000 - P 10(2) Scenic Dr Wimer St to Grandview Dr - 18.4% - - P 27(2) Walker Ave Woodland Dr to Peachey Rd - 18.4% - - P 28(2) Ashland St Morton St to Guthrie St - 18.4% - - P 38(2) Clay St Mohawk St to Southern Terminus - 18.4% - - P 42 S. Mountain Ave Ashland St to Prospect St - 18.4% - - P 54 Iowa St Terrace St to Auburn St - 18.4% - - P 57(2) Tolman Creek Rd Siskiyou Blvd to east side City Limits - 18.4% - - P 58(2) Helman St 1500' N of Orange Ave to Orange Ave - 18.4% - - Page 4 Transportation System Development Charge; Revised February 2015 Eligible SDC Projects Subtotal SDC Eligible SDC Type* # Street Description High, Med, DD % Growth Project Costs By Project P 40 Hillview Dr Siskiyou Blvd to Peachey Rd - 18.4% - - P 71 Orchard St Sunnyview Dr to Westwood St - 18.4% - - ST Total Pedestrian Projects $11,200,000 $0 $2,061,000 $207.60 BICYCLE PROJECTS Table 8-1 (p. 105) B 2 Wimer St Scenic Dr to N. Main St 20,000 18.4% 4,000 0.40 B 7 Iowa St Terrace St to Road Terminus; S. Mountain Ave to Walker Ave 240,000 18.4% 44,000 4.43 B 10 S. Mountain Ave Ashland St to E. Main St 120,000 18.4% 22,000 2.22 B 11 Wightman St E. Main St to Siskiyou Blvd 60,000 18.4% 11,000 1.11 B 13 B St Oak St to N. Mountain Ave 80,000 18.4% 15,000 1.51 B 16 Lithia Way Oak St to Helman St 110,000 18.4% 20,000 2.01 B 19 Helman St Nevada St to N. Main St 80,000 18.4% 15,000 1.51 B 26 Normal Ave E. Main St to Siskiyou Blvd 190,000 18.4% 35,000 3.53 B 29 Walker Ave Siskiyou Blvd to Peachey Rd 40,000 18.4% 7,000 0.71 B 17 Main St Helman St to Siskiyou Blvd 50,000 18.4% 9,000 0.91 TR 1 Northside Trail Orchid Ave to Tolman Creek Rd 2,000,000 18.4% 368,000 37.06 O 4 NA Retrofit Bicycle Program 50,000 18.4% 9,000 0.91 B 5 Maple/Scenic/Nutley N. Main St to Winburn Way 110,000 18.4% 20,000 2.01 B 31 Indiana St Siskiyou Blvd to Oregon St 20,000 18.4% 4,000 0.40 B 33 8th St A St to E. Main St 20,000 18.4% 4,000 0.40 B 38 Oregon/Clark St Indiana St to Harmony Lane 40,000 18.4% 7,000 0.71 B 3 Nevada St Vansant St to N. Mountain Ave 230,000 18.4% 42,000 4.23 B 9 Ashland St Morton St to University Way 30,000 18.4% 6,000 0.60 B 25 Tolman Creek Rd Siskiyou Blvd to Green Meadows Way 100,000 18.4% 18,000 1.81 B 37 Clay St Siskiyou Blvd to Mohawk St 20,000 18.4% 4,000 0.40 B 18 N. Main St Jackson Rd to Helman St 260,000 18.4% 48,000 4.83 D TR 2 New Trail Clay St to Tolman Creek Rd 400,000 18.4% 74,000 - D B 39 Glenn St/Orange Ave N. Main St to Proposed Trail 40,000 18.4% 7,000 - Page 5 Transportation System Development Charge; Revised February 2015 Eligible SDC Projects Subtotal SDC Eligible SDC Type* # Street Description High, Med, DD % Growth Project Costs By Project B 40 Laurel St Orange St to Nevada St 40,000 18.4% 7,000 0.71 B 20 Water St Hersey St to N. Main St 30,000 18.4% 6,000 0.60 B 14 A St Oak St to 6th St - 18.4% - - B 21 Oak St Nevada St to E. Main St - 18.4% - - B 22 Clay St E. Main St to Ashland St - 18.4% - - B 24 Clover Lane Ashland St to Proposed Bike Path - 18.4% - - B 30 Ashland St I-5 Exit 14 SB to Hwy 66 - 18.4% - - B 35 Railroad Property Proposed Bike Path to N. Mountain Ave - 18.4% - - B 4 Glendower St Bear Creek Greenway to Nevada St - 18.4% - - B 6 Winburn Way Calle Guanjuato to Nutley St - 18.4% - - B 8 Morton St E. Main St to Ashland St - 18.4% - - B 12 Wightman St Road End to E. Main St - 18.4% - - B 28 Clay St Rail Line to Siskiyou Blvd - 18.4% - - B 34 1st St A St to E. Main St - 18.4% - - D TR 3 New Trail New Trail to Hersey St 220,000 18.4% 40,000 - D TR 4 New Trail A St to Clear Creek Dr Extension 110,000 18.4% 20,000 - ST Total Bicycle Projects $3,940,000 18.4% $725,000 $73.01 TRANSIT PROJECTS Transit Service Program Funds (p. 118) L 14 -19 NA Establish Transit Hubs 1,000,000 18.4% 184,000 18.53 NA Support Circulator Svc 2,750,000 18.4% 506,000 50.96 NA Support SOU Svc - 18.4% - - ST Total Transit Projects $3,750,000 18.4% 690,000 $69.49 INTERSECTION & ROADWAY IMPROVEMENTS Refinement Plan Studies, Table 10-2 (p. 133) S 10 Siskiyou Blvd Highway 66 to Beach St 35,000 18.4% 6,000 0.60 S 3 N. Main St (OR 99) Helman St to Sheridan St 75,000 18.4% 14,000 1.41 S 5 Siskiyou Blvd Ashland St to Tolman Creek Rd 75,000 18.4% 14,000 1.41 Page 6 Transportation System Development Charge; Revised February 2015 Eligible SDC Projects Subtotal SDC Eligible SDC Type* # Street Description High, Med, DD % Growth Project Costs By Project S 6 Ashland St (OR 66) Siskiyou Blvd to Tolman Creek Rd 75,000 18.4% 14,000 1.41 S 9 Ashland St (OR 66) Clay St to Washington St 20,000 18.4% 4,000 0.40 S 7 E. Main St Siskiyou Blvd to Wightman St - 18.4% - - ST Studies Subtotal $280,000 18.6% 52,000 $5.23 Intersection & Roadway Projects, Table 10-3 (p. 136) R 17 E. Nevada St Ext Bear Creek to Kestrel Pkwy 5,481,000 18.4% 1,009,000 101.62 R 40 Walker Ave Festival St Walker Ave to Normal St 780,000 18.4% 144,000 14.50 D R 35 N. Main St N. Main St Temporary Diet - 0.0% - - R 5 Siskiyou Blvd (OR 66) Lithia Way (OR 99 NB) / E. Main St 50,000 18.4% 9,000 0.91 R 6 Siskiyou Blvd (OR 66) Tolman Creek Rd 61,000 18.4% 11,000 1.11 R 8 Ashland St (OR 66) Oak Knoll Dr / E. Main St (realignment) 706,000 18.4% 130,000 13.09 R 25 Washington St Ext Washington St Tolman Creek Rd 1,835,000 50.0% 918,000 92.46 R 19 Normal Ave Ext Normal Ave to E. Main St 2,705,000 50.0% 1,353,000 136.27 R 36 N. Main St N. Main St Permanent Diet 200,000 18.4% 37,000 3.73 D R 38 Ashland St Siskiyou Blvd to Walker Ave Streetscape 1,100,000 18.4% 202,000 - R 2 N. Main St Wimer St / Hersey St - 18.4% - - R 9 Ashland St (OR 66) Oak Knoll Dr / E. Main St (roundabout) - 18.4% - - R 11 Lithia Way (OR 99 NB) Oak Street - 18.4% - - R 45 New Roadway (F) Washington St to New Roadway (E) 1,199,000 50.0% 600,000 60.43 R 39 Ashland St Walker Ave to Normal Ave Streetscape 1,300,000 18.4% 239,000 24.07 R 43 New Roadway (E) Mistletoe Rd to Siskiyou Blvd (OR 99) 4,322,000 75.0% 3,242,000 326.52 R 44 Tolman Creek Mistletoe Rd Streetscape 3,478,000 100.0% 3,478,000 350.29 R 13 Siskiyou Blvd (OR 99) Park St 296,000 18.4% 54,000 5.44 R 41 Ashland St Tolman Creek Rd Streetscape 1,500,000 18.4% 276,000 27.80 R 42 E. Main St N. Mountain Ave Streetscape 1,500,000 18.4% 276,000 27.80 R 12 Siskiyou Blvd (OR 99) Sherman St 391,000 18.4% 72,000 7.25 R 14 Siskiyou Blvd (OR 99) Terra Ave / Faith Ave 216,000 18.4% 40,000 4.03 R 24 Clear Creek Dr Ext Oak St to N. Mountain Ave 2,505,000 50.0% 1,253,000 126.20 R 26 New Roadway (D) E. Main St to Ashland St (OR 66) 2,422,000 0.0% - - R 29 Washington St Ext Washington St to Benson Way 1,301,000 75.0% 976,000 98.30 Page 7 Transportation System Development Charge; Revised February 2015 Eligible SDC Projects Subtotal SDC Eligible SDC Type* # Street Description High, Med, DD % Growth Project Costs By Project R 31 Wimer St Ext Wimer St to Ashland Mine Rd 3,125,000 18.4% 575,000 57.91 R 20 Creek Dr Ext Meadow Dr to Normal Ave - - - R 22 New Roadway (B) Clay St to Tolman Creek Rd - - - R 23 New Roadway (C) McCall Dr to Engle St - - - R 27 Grizzly Dr Ext Jacquelyn St to Clay St - - - R 28 Mountain View Dr Ext Parkside Dr to Helman St - - - R 30 Kirk Lane Ext Kirk Lane to N. Mountain Ave - - - R 32 Kestrel Pkwy Ext Kestrel Pkwy to N. Mountain Ave (at Nepenthe Rd) - - - R 34 Railroad Property Existing Adjacent Streets to End of Property - - - R 46 Ivy Lane Ext Ivy Lane to Waterline Rd - - - R 47 Mary Jane Ave Ext Mary Jane Ave to S. UGB then E. to Clay St - - - R 48 Forest St Ext Between Existing Segments of Forest St - - - R 49 Croman Mill District Croman Mill District Connectivity - - - R 50 E. Main St Between Walker & Clay Streets 2,559,000 18.4% 471,000 47.44 ST Total Intersection & Roadway Improvements 37,932,000 40.0% 15,163,000 $1,527.17 Total Roadway & Intersection Improvements $38,212,000 39.8% $15,215,000 $1,532.40 RAILROAD CROSSING PROJECTS Table 10-4 (p. 139) X 1 4th St Crossing 500,000 50.0% 250,000 25.18 X 2 Washington St Crossing 1,000,000 18.4% 184,000 18.53 X 3 Normal Ave Crossing Upgrade 1,316,253 50.0% 658,000 66.27 ST Total Railroad Crossing Projects $2,816,253 38.8% $1,092,000 $109.98 2012 CIP Totals $60,048,253 33.0% $19,807,000 $1,995 * No cost estimate; assumes improvements will be paid by developer Page 8 Transportation System Development Charge; Revised February 2015 From: Bill Molnar [mailto:molnarb@ashland.or.us] Sent: Friday, November 21, 2014 11:22 AM To: Mike Faught Cc: Raymond Bartlett (ray@economicandfinancialanalysis.com); Tami DeMille-Campos Subject: Transportation SDC % Growth Allocations Mike I have reviewed some of the projects identified for 100% Growth allocation on the list of intersection and roadway improvements and have the following suggestions. I have identified preliminary justification for allocating a higher % growth allocation than the 18.4% default attributed to population. R45 New Roadway (F) Washington to New Roadway (E) - 50% Growth • Integral section of City wide, seamless boulevard (arterial loop), linking the Croman Mill employment district to the downtown. • Completion of this section of the loop serves to deter non-local, employment district traffic from using Tolman Creek Road. • Provides important link to Transit Plaza and Commuter Rail Platform envisioned in Croman Mill Plan R43 New Roadway (E) Mistletoe Road to Siskiyou Boulevard (OR99) - 75% Growth • Integral section of City wide, seamless boulevard (arterial loop), linking the Croman Mill employment district to the downtown. • Completion of this section of the loop serves to deter non-local, employment district traffic from using Tolman Creek Road. • Provides important link to Transit Plaza and Commuter Rail Platform envisioned in Croman Mill Plan R45 New Roadway (F) Washington Street to New Roadway (E) - 50% Growth • Reduces impacts on problematic Tolman Creek Road/Ashland Street Intersection by allowing directing traffic heading south and north at Interchange 14 to utilize "right out" at Washington/Ashland Street intersection R24 Clear Creek Dr. Ext. Oak Street to North Mountain Avenue - 50% Growth • Vital to enhance area connectivity and alleviating overly circuitous routes • Provides convenient west to east route for cyclists, allowing them to avoid dramatic grade changes posed by Hersey Street to North Mountain R29 Washington Street Ext. Washington Street to Benson Way - 75% Growth Page 9 Transportation System Development Charge; Revised February 2015 • Important to area connectivity • Reduces impacts on problematic Tolman Creek Road/Ashland Street Intersection by allowing a more convenient southerly entrance to the large employment district. • Logical alternative for employment traffic traveling to and from Interstate 5 (rather than total reliance on Ashland Street) Let me know if you have questions. Bill Bill Molnar, Director Community Development Department 20 East Main Street, Ashland OR 97520 (541) 552-2042, TTY: 1-800-735-2900 FAX: (541) 552-2050 molnarb@ashland.or.us Page 10