Call to Order
Vice Chair Thompson called the meeting to order at 7:35 am.
Public Input
Neil Stewart passed around a list of Plaza enhancement suggestions. He also presented a model
of the Plaza and addressed each enhancement. He recommends replacing the existing trees with
London Plane Sycamore trees. He recommends expanding the pavement along the businesses of
North Main across from the Plaza to 12 feet. He suggests adding a fountain to the center of the
Plaza. He recommends free standing planters and circular seats around each tree. He suggests
removing the concrete seat walls and replace the area with groundcover and bushes. He also
recommends building a stage four feet off the ground. He volunteers to design and build the
improvements and the city would just pay for materials and labor.
David Sherr distributed material he would like included in the record. He then explained his
proposal for a slight redesign to the fountain in front of the Black Swan which include sealing
the stone per Jim Oleson, raising the water basin and planting flowers in the center.
Staff update on short list projects
Seltzer referred to the information she provided to the committee for each of the short list
projects:
1)Remove the asphalt on Lithia Way between Pioneer Street and Oak Street.
Motion by Hammond: Move approval to recommend to the City Council to remove the asphalt,
install irrigation, install top soil, order tree grates and wait to plant the tree until October, plant
annuals or some other temporary plants to provide color during the summer months. Second by
Dawkins, all in favor. Motion passes.
Robertson explained the best time to plant trees is in the fall. The committee will want input
from the Tree Commission on the type of trees to plant. Dawkins suggested the committee
should consider trees in large planter boxes vs planting in ground.
2) Welcome Signs
Motion by Dawkins: Move to recommend to the City Council to move forward with three
Welcome to Ashland signs to be placed at three locations: RR trestle, Ashland Street and
Siskiyou Boulevard at Tolman Creek Road. Seconded by Beam. Motion passes.
a
Friend clarified that these signs are "temporary" with the idea that in the near future more artistic
styled signs will be installed. The Public Art Commission could have a request for proposals
prepared by September, a decision on an artist by March and installation possibly by June of
2015.
It was noted that the charge of the committee was to focus on the downtown area and the signs
are not downtown. The committee feels that the signs are the "front door" to the downtown and
should be included.
3) Lighting at pathway from New Theater to Main Street
Motion by Dawkins: Move to recommend to the City Council to install a second Sternberg light.
Seconded by Jensen. Motion passes.
The committee asked staff to connect with the property owner of Earthly Goods to begin
discussion about possibly adding LED lights to the building and the possibility of a mural or
other decorative element to the wall.
4) Improve right of way at the corner of Lithia Way and Pioneer in front of Stop and Shop.
No action.
Staff will get a survey of the area. Kencairn offered to provide sketches of what could be done to
that area. Comments were made about providing seating in front of a business would not
necessarily be welcomed by the business. Staff explained there is a need for a retaining wall
because of elevation changes but it doesn't have to be a seat wall.
5) Improve landscape maintenance at city parking lots.
Robertson explained with the Park Commission ban on the use of urbicide, it is very difficult to
maintain those areas. It was suggested that new and denser plants be installed, soil amended to
inprove plant growth and crowd out weeds. Also suggested was contracting with outside service
to do the maintenance. They can spray. Also suggested was sending a communication from the
committee to Parks Commission to consider lifting the urbicide ban in some locations including
the median along Siskiyou Boulevard and city lot landscaping.
Criteria
Time constraints did not allow for a full discussion about criteria. Committee members were
supportive of the draft criteria put forward by Stef Seffinger.
Next meeting a eg nda
15 minutes for public input
15 minutes for discussion about criteria
60 minutes to discuss Plaza projects
Meeting adjourned at 9:00 am.
N
a)
an
a
March 26, 2014
The following is offered by Stef Seffinger as a springboard for criteria discussion.
Suggested criteria for evaluating downtown projects:
Rating scale 1-5 with 1 being does not meet criteria and 5 best meets criteria
CRITERIA
1. Increases aesthetics of downtown to draw both citizens and tourists to increase commerce and
enjoyment of downtown.
2. Increases safety of downtown
3 Provides better access and pedestrian traffic flow
4. Environmentally sensitive to changing climate and water use
5. Maintenance costs for project are reasonable
6. Public support for project
7 How well does project fit in with master plan for downtown.
9W,
C)
an
a
April 3, 2014
Downtown Beautification and Improvement ad hoc Committee
Plaza Improvement
1. Previously identified Plaza projects:
o Free standing planters
o Moveable tables and chairs
o Replace pavers
o Trellis over seat walls on Plaza
o Add denser (pedestrian -unfriendly) plants to planting beds on Plaza
In addition, based on the model presented by Neil Stewart:
• Replace the existing trees with London Plane Sycamore trees.
• Expand the pavement along the businesses of North Main across from the Plaza to
12 feet.
• Add a fountain to the center of the Plaza.
• Add free standing planters
• Add circular seats around each tree.
• Remove the concrete seat walls and replace the area with groundcover and
bushes.
• Add a stage four feet off the ground.