Loading...
HomeMy WebLinkAbout2025-005 AGRMT AMND #1 - Siskiyou Pump Service INC.AMENDMENT NO. 1 to GOODS & SERVICES AGREEMENT between THE CITY OF ASHLAND, an Oregon municipal corporation, �11 Cityll) land SISKIYOU PUMP SERVICE INC. a domestic business corporation, (" Contractor") for Lower Duck Pond Pump Replacement RECITAIN A. The City and Contractor previously entered into a Goods and Services Agreement effective January 27, 2025 (the "Agreement"), for furnishing and installing a new pump/filter for the Lower Duck Pond. B. The City and Provider now wish to amend the Agreement to increase the amount of compensation to be paid to Contractor. AGREEMENT NOW THEREFORE, in consideration of the mutual benefits and obligations set forth herein, the parties agree as follows: Amend Section 2 of the Agreement as follows, with strikeout wording deleted and underscored wording added: 2.1 City shall pay Contractor the sum of $31,467.00 (thirty -one -thousand -four -hundred -and sixty-seven dollars) " as provided herein as full compensation for the Work as specified in the supporting documents. 2.2 In no event shall Contractor's total of all compensation and reimbursement under this Agreement exceed the sum of $31,467.00 (thirty -one -thousand -four -hundred -and sixty- seven dollars) without the express, written approval from the appropriate Department Head or City Manager. Contractor acknowledges that any work delivered, or expenses incurred without authorization as provided herein is done at Contractor's own risk and as a volunteer without expectation of compensation or reimbursement. 2. This Amendment No. 1 is effective upon being signed by both parties. 3. Except as specifically modified by this Amendment No. 1, the terms and conditions of the Agreement remain in full force and effect. Page 1 of 2: Amendment No. 1 to Goods & Services Agreement between the City of Ashland and Siskiyou Pump Service Inc. IN WITNESS WHEREOF the parties have caused this Amendment No. 1 to be signed in their respective names by their duly authorized representatives as of the dates set forth below: CITY OF ASHLAND, OREGON y: 1'2¢:�aalkya:easta:yin(r�iir,V:r,,2r12:,V.,V.�,V.:3�'[��} Rocky Houston, Director Date: 03/17/2025 SISKIYOU PUMP SERVICE INC. By: 'Juartl—lin ia:u r'4 .r.11 tot r. ofa f>[:)1 Printed Name: Justin Holt Title: Owner Date: 03/17/2025 Page 2 of 2: Amendment No. 1 to Goods & Services Agreement between the City of Ashland and Siskiyou Pump Service Inc. Sisldyou Pump Service Inc. Rotary Drilling Co. 545 N Fir Medford, OR 97501 +15416644660 contact@siskiyoupump.com www.SiskiyouPump.com Estir-nate ADDRESS City Of Ashland Parks Department City Of Ashland Parks Department 20 East Main St Ashland, OR 97520 SALES REP JH PART NUMBER Quote revised 3/12/25 due to tariffs implemented. OK per conversation with Kevin REVISED QUOTE FROM S.A.I.S. dated 3/18/22 FOR REPLACEMENT OF CURRENT PUMP / FILTER EQUIPMENT IN NORTH PUMP VAULT MISC AG X2 ALPHAONE BIOMECHANICAL FILTER 10 CU' W/ 2 EA WUNDERMAX WMX3 1.65hp PUMP; 3" AUTO BACKWASH SYSTEM; 2 EA ZAPPRO UV -DUAL LAMP HIGH OUTPUT AND CHECK VALVES *LABOR2 LABOR FOR TWO TECHNICIANS WITH SERVICE TRUCK REMOVE EXISTING FILTER AND REPLACE WITH NEW FILTRATION SYSTEM - TIE-IN TO EXISTING 2" IN AND OUT FOR BOTH PUMPS. ESTIMATE # 1000519 DATE 03/12/2025 JOB ADDRESS Lower Duck Pond STY NET EA./'SATE CXTEN& N 25,928.00 25,928.00 12 207.50 2,490.00 *LABORI TECHNICAL ASSISTANCE, 1 960.00 960.00 PROGRAMMING AND COMMISSIONING THANK YOU! This is an ESTIMATE only. Estimates are valid for 30 days Price and product availability are subject to market changes & fluctuations and are subject to change without prior notice. Oregon CCB# 43015 Oregon WWC# 2081 PART C ESCRlF-H N QTY NET EA./'SATE CXTEN& N NUMBER MISC Misc. fittings, glue and primer, 1 789.00 789.00 PLUMB fasteners, and other materials that may be required to meet actual site requirements. FOR ESTIMATE PURPOSES ONLY. Billing will reflect only the materials delivered. *FREIGHT- FREIGHT/SHIPPING ESTIMATE - 1 1,300.00 1,300.00 1 WILL BE BILLED AT ACTUAL RATE ***NOTE: Requires access to pump vault via service truck. Parks dept responsible for providing safety measures to keep public away from work site. Parks dept to provide mini excavator for removal of old filter All old equipment removed to be disposed of by parks dept.*** Accepted By TOTAL Accepted Date $31,467.00 THANK YOU! This is an ESTIMATE only. Estimates are valid for 30 days Price and product availability are subject to market changes & fluctuations and are subject to change without prior notice. Oregon CCB# 43015 Oregon WWC# 2081 Final Audit Report 2025-03-17 Created: 2025-03-14 By: Brandon Terry (brandon.terry@ashland.or.us) Status: Signed Transaction ID: CBJCHBCAABAA-sNLtZOhYSUexYsl-Tu,iXkP3sOJu72gg TO 20250275 Amendment No. ent" History 1, Goods and Services Agreem "5 Document created by Brandon Terry (brandon.terry@ash land. or. us) 2025-03-14 - 5:58:34 PM GMT Document emailed to contact@siskiyoupump.com for signature 2025-03-14 - 5:58:39 PM GMT Email viewed by contact@siskiyoupump.com 2025-03-17 - 6:04:57 PM GMT 06, Signer contact@siskiyoupump.com entered name at signing as Justin Holt 2025-03-17 - 6:05:59 PM GMT 06, Document e-signed by Justin Holt (contact@siskiyoupump.com) Signature Date: 2025-03-17 - 6:06:01 PM GMT - Time Source: server Document emailed to Rocky Houston (rocky. housto n @ash land. or. us) for signature 2025-03-17 - 6:06:03 PM GMT Email viewed by Rocky Houston (rocky. houston @ash land. or. us) 2025-03-17 - 6:13:28 PM GMT 06, Document e-signed by Rocky Houston (rocky.houston@ashIand. or. us) Signature Date: 2025-03-17 - 6:13:45 PM GMT - Time Source: server Agreement completed. 2025-03-17 - 6:13:45 PM GMT . I Adobe Acrobat Sign