HomeMy WebLinkAbout2025-12 Revising Rates for Water ServiceRESOLUTION NO. 2025-12
A RESOLUTION REVISING RATES FOR WATER SERVICE PURSUANT
TO ASHLAND MUNICIPAL CODE SECTION 14.04.030 AND
REPEALING RESOLUTION 2019-10.
THE CITY OF ASHLAND HEREBY RESOLVES AS FOLLOWS:
SECTION 1. The "Water Rate Schedule" marked as "Exhibit A" for July 1, 2025 thru June 30,
2026 and "Exhibit B" for July 1, 2026 thru June 30, 2027 attached to this Resolution, shall be
effective for actual or estimated consumption on or after July 1, 2025.
Prorated calculations are permitted for any bills prepared for a partial month or billing period
that overlaps the effective date of this Resolution.
Miscellaneous Charges and Connection Fees established by previous resolutions remain in effect
until revised by separate Council Action.
SECTION 2. Copies of this resolution shall be maintained in the Office of the City Recorder.
SECTION 3. Classification of the fee. The fees specified in Section 1 and Section 2 of this
resolution are classified as not subject to the limits of Section 1 lb of Article XI of the Oregon
Constitution (Ballot Measure 5).
SECTION 4. Resolution 2019-10 is repealed on the effective date of this resolution.
This resolution was duly PASSED and ADOPTED this day of
2025, and takes effect upon signing by the Mayor.
A A
Alissa Kolodzins City Recorder
SIGNED and APPROVED this :_ day of —s�, CA je , , 2025.
— Lu-'et, Aj"
Tonya Grdfiam, Mayor
Resolution No. 2025-12 Pagel of 2
Reviewed as to form:
Resolution No. 2025-12 Page 2 of 2
City of Ashland, Oregon CITY OF
EXHIBIT A - WATER RATE SCHEDULE - July 1, 2025-June 30, 2026 -AS H LA N D
All water service provided by the City of Ashland shall be in accordance with Chapter 14.04 of the Ashland Municipal Code.
Billing:
The minimum monthly charge shall be the sum of the Customer Charge; Meter Charge; plus Quantity Charge, if applicable; and
Miscellaneous Charges, if applicable. Billing shall occur monthly with charges due and payable upon receipt.
Customer Charge:
A single customer charge is applied to each water account regardless of the number of metered water services.
Customer Charge, per account I July 2019 1 July 2025
Per monthl $ 13.331 $ 16.50
Meter Charge:
The meter charge applies to all metered water services and does not include any water consumption.
Meter Charge, per meter
July 2019
July 2025
0.75" and Fire Guard meters
$
15.62
$
15.95
1" meter
$
16.29
S
18.63
1.5" meter
$
74.52
$
71.50
2" meter
$
118.41
$
113.73
3" meter
$
237.45
1 $
225.87
4" meter
$
376.59
$
360.81
6" meter
$
741.01
$
711.65
8" meter
$
1.174.75
$
1.129.78
Quantity Charge:
All customers will be charged the following rates per cubic foot of water used.
Residential, per dwelling unit
November - April
July 2019
July 2025
0-500 cf per cycle
$
0.0280
$
0.0285
501 to 1,000 cf per cycle
$
0.0348
$
0.0385
1,001 to 2.500 cf per cycle
$
0.0472
$
0.0560
Over 2,500 cf per cycle
$
0.0609
$
0.0860
Residential, per dwelling unit
May - October
0-500 cf per cycle
S
0.0280
$
0.0285
501 to 1,000 cf per cycle
$
0.0348
$
0.0385
1,001 to 2,500 cf per cycle
S
0.0472
$
0.0560
2,501 to 3,600 cf per cycle
$
0.0609
$
0.0860
Over 3,600 cf per cycle
$
0.0784
$
0.1365
Residential Irrigation
November - April
July 2019
July 2025
0-1000 cf per cycle
S
0.0348
$
0.0385
1,001-2500 cf per cycle
S
0.0472
S
0.0560
over 2.500 cf per cycle
S
0.0609
S
0.0860
Residential Irrigation
May - October
0 to 1,000 cf per cycle
$
0.0348
$
0.0385
1,001 to 2,500 cf per cycle
S
0.0472
$
0.0560
2,501 to 3,600 cf per cycle
$
0.0609
$
0.0860
Over 3,600 cf per cycle
$
0.0784
$
0.1365
City of Ashland, Oregon CITY OF
WATER RATE SCHEDULE July 1, 2025-June 30, 2026 -AS H LA N D
Miscellaneous Charges:
TID Irrigation:
Fire Protection Service:
Commercial, less than 2" meter
July 2019
July 2025
0-2.500 cf per cycle
$
0.0348
$
0.0385
> 2.500 cf per cycle
$
0.0472
$
0.0560
Commercial, 2" or larger meter
0-15,000 cf per cycle
$
0.0348
$
0.0385
> 15,000 cf per cyclel
$
0.0472 1
$
0.0560
Institutional (governmental and municipal) I July 2019 1 July 2025
I Per cubic foot) $ 0.0334 1 $ 0.0412 1
Commercial and Institutional Irrigation
July 2019
July 2025
November to April
$ 0.0376
$ 0.0356
May to October
$ 0.0510
S 0.0597
TID, unmetered service
July 2019
July 2025
Per season, per acre or portion of acre
S
241.18
$
284.16
TID, metered service
Meter Replacement Charge, by meter size
0.75" meter
$
1.34
$
1.37
1" meter
$
2.01
$
2.26
1.5" meter
$
3.17
$
3.04
2" meter
$
4.27
$
4.09
3" meter
$
9.15
$
8.68
4" meter
$
19.88
$
19.01
6" meter
$
27.57
$
26.43
8" meter
$
33.25
$
31.93
Quantity Charge
$
0.0025
$
0.0030
'Meter replacement charge is assessed each month. regardless of consumption.
Fire Protection Service
July 2019
July 2025
Customer Charge, if applicable
$
13.33
$
16.50
Meter Replacement Charge
$
1.34
$
1.37
Meter Charge
$
15.62
$
15.95
Quantity Charge
$
0.0384
$
0,0385
Unmetered Fire Protection Servicel
$
15.62 1
$
15.95
Bulk Water:
For water provided on a temporary basis through a bulk meter on a fire hydrant, the following charges apply:
Bulk Water
July 2019
July 2025
Deposit*
$ 2,111.60
$ 2.494.50
Basic Fee
$ 266.62
$ 314.96
Quantity Charge
$ 0.0384
$ 0.0389
*Deposit is refundable less basic fee, quantity charge. and any damage to the city meter,
valve, wrench, and/or hydrant.
Outside City Limits:
All rates and charges for water service provided outside the city limits will be 1.5 times the rates for water service
provided within the city limits.
Council June 2025
EXHIBITA F&AAA
City of Ashland, Oregon CITY OF
EXHIBIT B - WATER RATE SCHEDULE - July 1, 2026-June 30, 2027 -AS H LA N D
All water service provided by the City of Ashland shall be in accordance with Chapter 14.04 of the Ashland Municipal Code.
Billing:
The minimum monthly charge shall be the sum of the Customer Charge; Meter Charge; plus Quantity Charge, if applicable; and
Miscellaneous Charges, if applicable. Billing shall occur monthly with charges due and payable upon receipt.
Customer Charge:
A single customer charge is applied to each water account regardless of the number of metered water services.
I Customer Charge. per account I July 2025 1 July 2026 1
Meter Charge:
The meter charge applies to all metered water services and does not include any water consumption.
Meter Charge, per meter
July 2025
July 2026
0.75" and Fire Guard meters
$
15.95
$
18.15
1" meter
$
18.63
$
23.48
1.5" meter
$
71.50
$
76.13
2" meter
$
113.73
$
121.25
3'' meter
$
225.87
1 $
238.15
4" meter
$
360.81
$
383.58
6" meter
$
711.65
$
758.60
8" meter
$
1,129.78
$
1,206.19
Quantity Charge:
All customers will be charged the following rates per cubic foot of water used.
Residential, per dwelling unit
November - April
July 2025
July 2026
0.500 cf per cycle
$
0.0285
$
0.0324
501 to 1,000 cf per cycle
$
0.0385
$
0.0438
1,001 to 2,500 cf per cycle
$
0.0560
$
0.0637
Over 2,500 cf per cycle
$
0.0860
$
0.0979
Residential, per dwelling unit
May - October
0.300 cf per cycle
$
0.0285
$
0.0324
301 to 1,000 cf per cycle
$
0.0385
$
0.0438
1,001 to 2,500 cf per cycle
$
0.0560
$
0,0637
2,501 to 3,600 cf per cycle
$
0.0860
$
0.0979
Over 3,600 cf per cycle
$
0.1365
$
0.1553
Residential Irrigation
November - April
July 2025
July 2026
0-1000 cf per cycle
$
0.0385
$
0.0438
1.001-2500 cf per cycle
$
0.0560
$
0.0637
over 2.500 cf per cycle
$
0.0860
$
0.0979
Residential Irrigation
May - October
0 to 1,000 cf per cycle
$
0.0385
$
0.0438
1,001 to 2,500 cf per cycle
$
0.0560
$
0.0637
2,501 to 3,600 cf per cycle
$
0.0860
$
0.0979
Over 3,600 cf per cycle
$
0.1365
$
0.1553
City of Ashland, Oregon
WATER RATE SCHEDULE July 1, 2026-June 30, 2027
Miscellaneous Charges:
TID Irrigation:
Fire Protection Service:
C IT Y OF
-ASHLAND
Commercial, less than 2" meter
July 2025
July 2026
0-2.500 cf per cycle
$
0.0385
$
0.0438
> 2,500 cf per cycle
$
0.0560
$
0.0637
Commercial, 2" or larger meter
0-15,000 cf per cycle
S
0.0385
$
0.0438
> 15,000 cf per cyclel
$
0.0560
1 $
0.0637
Institutional (governmental and municipal) I July 2025 1 July 2026
Per cubic footj S 0.0412 1 $ 0.0469
Commercial and Institutional Irrigation
July 2025
July 2026
November to April
$ 0.0356
$ 0.0405
May to October
$ 0.0597
$ 0,0679
TID, unmetered service
July 2025
July 2026
Per season, per acre or portion of acre
S
284.16
$
293.82
TID, metered service
Meter Replacement Charge*, by meter size
0.75" meter
$
1.37
$
1.53
1" meter
$
2.26
$
2.72
1.5" meter
$
3.04
$
3.22
2" meter
4.09
$
4.33
3" meter
8.68
$
9.10
4" meter
$
19.01
$
20.09
6" meter
$
26.43
$
28.00
8" meter
$
31.93
$
33.87
Quantity Charge
$
0.0030
$
0.0031
*Meter replacement charge is assessed each month. regardless of consumption.
Fire Protection Service
July 2025
July 2026
Customer Charge, if applicable
$
16.50
$
19.25
Meter Replacement Charge
$
1.37
$
1.53
Meter Charge
$
15.95
$
18.10
Quantity Charge
$
0.0385
$
0.0438
Unmetered Fire Protection Servicel
$
15.95
1 $
19.25
Bulk Water:
For water provided on a temporary basis through a bulk meter on a fire hydrant. the following charges apply:
Bulk Water
July 2025
July 2026
Deposit*
$ 2.494.50
$ 2,494.50
Basic Fee
$ 314.96
$ 314.96
Quantity Charge
$ 0.0389
$ 0.0389
*Deposit is refundable less basic fee, quantity charge. and any damage to the city meter.
valve. wrench, and/or hydrant.
Outside City Limits:
All rates and charges for water service provided outside the city limits will be 1.5 times the rates for water service
provided within the city limits.
EXHIBIT B