Loading...
HomeMy WebLinkAbout2025-12 Revising Rates for Water ServiceRESOLUTION NO. 2025-12 A RESOLUTION REVISING RATES FOR WATER SERVICE PURSUANT TO ASHLAND MUNICIPAL CODE SECTION 14.04.030 AND REPEALING RESOLUTION 2019-10. THE CITY OF ASHLAND HEREBY RESOLVES AS FOLLOWS: SECTION 1. The "Water Rate Schedule" marked as "Exhibit A" for July 1, 2025 thru June 30, 2026 and "Exhibit B" for July 1, 2026 thru June 30, 2027 attached to this Resolution, shall be effective for actual or estimated consumption on or after July 1, 2025. Prorated calculations are permitted for any bills prepared for a partial month or billing period that overlaps the effective date of this Resolution. Miscellaneous Charges and Connection Fees established by previous resolutions remain in effect until revised by separate Council Action. SECTION 2. Copies of this resolution shall be maintained in the Office of the City Recorder. SECTION 3. Classification of the fee. The fees specified in Section 1 and Section 2 of this resolution are classified as not subject to the limits of Section 1 lb of Article XI of the Oregon Constitution (Ballot Measure 5). SECTION 4. Resolution 2019-10 is repealed on the effective date of this resolution. This resolution was duly PASSED and ADOPTED this day of 2025, and takes effect upon signing by the Mayor. A A Alissa Kolodzins City Recorder SIGNED and APPROVED this :_ day of —s�, CA je , , 2025. — Lu-'et, Aj" Tonya Grdfiam, Mayor Resolution No. 2025-12 Pagel of 2 Reviewed as to form: Resolution No. 2025-12 Page 2 of 2 City of Ashland, Oregon CITY OF EXHIBIT A - WATER RATE SCHEDULE - July 1, 2025-June 30, 2026 -AS H LA N D All water service provided by the City of Ashland shall be in accordance with Chapter 14.04 of the Ashland Municipal Code. Billing: The minimum monthly charge shall be the sum of the Customer Charge; Meter Charge; plus Quantity Charge, if applicable; and Miscellaneous Charges, if applicable. Billing shall occur monthly with charges due and payable upon receipt. Customer Charge: A single customer charge is applied to each water account regardless of the number of metered water services. Customer Charge, per account I July 2019 1 July 2025 Per monthl $ 13.331 $ 16.50 Meter Charge: The meter charge applies to all metered water services and does not include any water consumption. Meter Charge, per meter July 2019 July 2025 0.75" and Fire Guard meters $ 15.62 $ 15.95 1" meter $ 16.29 S 18.63 1.5" meter $ 74.52 $ 71.50 2" meter $ 118.41 $ 113.73 3" meter $ 237.45 1 $ 225.87 4" meter $ 376.59 $ 360.81 6" meter $ 741.01 $ 711.65 8" meter $ 1.174.75 $ 1.129.78 Quantity Charge: All customers will be charged the following rates per cubic foot of water used. Residential, per dwelling unit November - April July 2019 July 2025 0-500 cf per cycle $ 0.0280 $ 0.0285 501 to 1,000 cf per cycle $ 0.0348 $ 0.0385 1,001 to 2.500 cf per cycle $ 0.0472 $ 0.0560 Over 2,500 cf per cycle $ 0.0609 $ 0.0860 Residential, per dwelling unit May - October 0-500 cf per cycle S 0.0280 $ 0.0285 501 to 1,000 cf per cycle $ 0.0348 $ 0.0385 1,001 to 2,500 cf per cycle S 0.0472 $ 0.0560 2,501 to 3,600 cf per cycle $ 0.0609 $ 0.0860 Over 3,600 cf per cycle $ 0.0784 $ 0.1365 Residential Irrigation November - April July 2019 July 2025 0-1000 cf per cycle S 0.0348 $ 0.0385 1,001-2500 cf per cycle S 0.0472 S 0.0560 over 2.500 cf per cycle S 0.0609 S 0.0860 Residential Irrigation May - October 0 to 1,000 cf per cycle $ 0.0348 $ 0.0385 1,001 to 2,500 cf per cycle S 0.0472 $ 0.0560 2,501 to 3,600 cf per cycle $ 0.0609 $ 0.0860 Over 3,600 cf per cycle $ 0.0784 $ 0.1365 City of Ashland, Oregon CITY OF WATER RATE SCHEDULE July 1, 2025-June 30, 2026 -AS H LA N D Miscellaneous Charges: TID Irrigation: Fire Protection Service: Commercial, less than 2" meter July 2019 July 2025 0-2.500 cf per cycle $ 0.0348 $ 0.0385 > 2.500 cf per cycle $ 0.0472 $ 0.0560 Commercial, 2" or larger meter 0-15,000 cf per cycle $ 0.0348 $ 0.0385 > 15,000 cf per cyclel $ 0.0472 1 $ 0.0560 Institutional (governmental and municipal) I July 2019 1 July 2025 I Per cubic foot) $ 0.0334 1 $ 0.0412 1 Commercial and Institutional Irrigation July 2019 July 2025 November to April $ 0.0376 $ 0.0356 May to October $ 0.0510 S 0.0597 TID, unmetered service July 2019 July 2025 Per season, per acre or portion of acre S 241.18 $ 284.16 TID, metered service Meter Replacement Charge, by meter size 0.75" meter $ 1.34 $ 1.37 1" meter $ 2.01 $ 2.26 1.5" meter $ 3.17 $ 3.04 2" meter $ 4.27 $ 4.09 3" meter $ 9.15 $ 8.68 4" meter $ 19.88 $ 19.01 6" meter $ 27.57 $ 26.43 8" meter $ 33.25 $ 31.93 Quantity Charge $ 0.0025 $ 0.0030 'Meter replacement charge is assessed each month. regardless of consumption. Fire Protection Service July 2019 July 2025 Customer Charge, if applicable $ 13.33 $ 16.50 Meter Replacement Charge $ 1.34 $ 1.37 Meter Charge $ 15.62 $ 15.95 Quantity Charge $ 0.0384 $ 0,0385 Unmetered Fire Protection Servicel $ 15.62 1 $ 15.95 Bulk Water: For water provided on a temporary basis through a bulk meter on a fire hydrant, the following charges apply: Bulk Water July 2019 July 2025 Deposit* $ 2,111.60 $ 2.494.50 Basic Fee $ 266.62 $ 314.96 Quantity Charge $ 0.0384 $ 0.0389 *Deposit is refundable less basic fee, quantity charge. and any damage to the city meter, valve, wrench, and/or hydrant. Outside City Limits: All rates and charges for water service provided outside the city limits will be 1.5 times the rates for water service provided within the city limits. Council June 2025 EXHIBITA F&AAA City of Ashland, Oregon CITY OF EXHIBIT B - WATER RATE SCHEDULE - July 1, 2026-June 30, 2027 -AS H LA N D All water service provided by the City of Ashland shall be in accordance with Chapter 14.04 of the Ashland Municipal Code. Billing: The minimum monthly charge shall be the sum of the Customer Charge; Meter Charge; plus Quantity Charge, if applicable; and Miscellaneous Charges, if applicable. Billing shall occur monthly with charges due and payable upon receipt. Customer Charge: A single customer charge is applied to each water account regardless of the number of metered water services. I Customer Charge. per account I July 2025 1 July 2026 1 Meter Charge: The meter charge applies to all metered water services and does not include any water consumption. Meter Charge, per meter July 2025 July 2026 0.75" and Fire Guard meters $ 15.95 $ 18.15 1" meter $ 18.63 $ 23.48 1.5" meter $ 71.50 $ 76.13 2" meter $ 113.73 $ 121.25 3'' meter $ 225.87 1 $ 238.15 4" meter $ 360.81 $ 383.58 6" meter $ 711.65 $ 758.60 8" meter $ 1,129.78 $ 1,206.19 Quantity Charge: All customers will be charged the following rates per cubic foot of water used. Residential, per dwelling unit November - April July 2025 July 2026 0.500 cf per cycle $ 0.0285 $ 0.0324 501 to 1,000 cf per cycle $ 0.0385 $ 0.0438 1,001 to 2,500 cf per cycle $ 0.0560 $ 0.0637 Over 2,500 cf per cycle $ 0.0860 $ 0.0979 Residential, per dwelling unit May - October 0.300 cf per cycle $ 0.0285 $ 0.0324 301 to 1,000 cf per cycle $ 0.0385 $ 0.0438 1,001 to 2,500 cf per cycle $ 0.0560 $ 0,0637 2,501 to 3,600 cf per cycle $ 0.0860 $ 0.0979 Over 3,600 cf per cycle $ 0.1365 $ 0.1553 Residential Irrigation November - April July 2025 July 2026 0-1000 cf per cycle $ 0.0385 $ 0.0438 1.001-2500 cf per cycle $ 0.0560 $ 0.0637 over 2.500 cf per cycle $ 0.0860 $ 0.0979 Residential Irrigation May - October 0 to 1,000 cf per cycle $ 0.0385 $ 0.0438 1,001 to 2,500 cf per cycle $ 0.0560 $ 0.0637 2,501 to 3,600 cf per cycle $ 0.0860 $ 0.0979 Over 3,600 cf per cycle $ 0.1365 $ 0.1553 City of Ashland, Oregon WATER RATE SCHEDULE July 1, 2026-June 30, 2027 Miscellaneous Charges: TID Irrigation: Fire Protection Service: C IT Y OF -ASHLAND Commercial, less than 2" meter July 2025 July 2026 0-2.500 cf per cycle $ 0.0385 $ 0.0438 > 2,500 cf per cycle $ 0.0560 $ 0.0637 Commercial, 2" or larger meter 0-15,000 cf per cycle S 0.0385 $ 0.0438 > 15,000 cf per cyclel $ 0.0560 1 $ 0.0637 Institutional (governmental and municipal) I July 2025 1 July 2026 Per cubic footj S 0.0412 1 $ 0.0469 Commercial and Institutional Irrigation July 2025 July 2026 November to April $ 0.0356 $ 0.0405 May to October $ 0.0597 $ 0,0679 TID, unmetered service July 2025 July 2026 Per season, per acre or portion of acre S 284.16 $ 293.82 TID, metered service Meter Replacement Charge*, by meter size 0.75" meter $ 1.37 $ 1.53 1" meter $ 2.26 $ 2.72 1.5" meter $ 3.04 $ 3.22 2" meter 4.09 $ 4.33 3" meter 8.68 $ 9.10 4" meter $ 19.01 $ 20.09 6" meter $ 26.43 $ 28.00 8" meter $ 31.93 $ 33.87 Quantity Charge $ 0.0030 $ 0.0031 *Meter replacement charge is assessed each month. regardless of consumption. Fire Protection Service July 2025 July 2026 Customer Charge, if applicable $ 16.50 $ 19.25 Meter Replacement Charge $ 1.37 $ 1.53 Meter Charge $ 15.95 $ 18.10 Quantity Charge $ 0.0385 $ 0.0438 Unmetered Fire Protection Servicel $ 15.95 1 $ 19.25 Bulk Water: For water provided on a temporary basis through a bulk meter on a fire hydrant. the following charges apply: Bulk Water July 2025 July 2026 Deposit* $ 2.494.50 $ 2,494.50 Basic Fee $ 314.96 $ 314.96 Quantity Charge $ 0.0389 $ 0.0389 *Deposit is refundable less basic fee, quantity charge. and any damage to the city meter. valve. wrench, and/or hydrant. Outside City Limits: All rates and charges for water service provided outside the city limits will be 1.5 times the rates for water service provided within the city limits. EXHIBIT B Council June 2025 MA