Loading...
HomeMy WebLinkAbout2025-09 Adopting a Miscellaneous Fees and Charges Schedule and Repealing Resolutions 2024-14 and 1994-24RESOLUTION NO.2025-09 A RESOLUTION ADOPTING A MISCELLANEOUS FEES AND CHARGES SCHEDULE AND REPEALING RESOLUTIONS 2024-14 AND 1994-24. RECITALS: A. The City of Ashland sets its fees and charges by resolution; and B. Parking fees and charges were set forth in Resolution No. 2016-14; and C. Deposits required on any initiative or referendum petition for final filing were set forth in Resolution No. 2009-05; and D. Miscellaneous fees and charges for the City are set forth in Resolution No.2024-14; and E. It is necessary to adjust the City's fees and charges annually to cover the full costs of providing the services involved. THE CITY OF ASHLAND HEREBY RESOLVES AS FOLLOWS: SECTION 1. There are hereby established, and there shall be collected, fees and charges as set forth in "Exhibit A," which is attached hereto and incorporated herein by this reference. SECTION 2. This resolution repeals Resolution Nos. 2024-14 and 1994-05 and supersedes any other resolution to the extent such resolution enacts fees and charges of the type set forth herein. SECTION 3. This resolution supersedes Resolution No. 2009-05 and incorporates the previously resolved language of SECTION 3, that "[d]eposit will be held by the City of Ashland until after the election and, in the case the referred or proposed measure is defeated at such election, the entire cost of holding the election on such measure shall be paid from such deposit, and if any balance remains after payment of such election expense, such balance shall be returned to the proposer of any such measure. In the event any such initiative or referendum is enacted at the election held thereon, the entire amount of such deposit shall be returned to the proposer of such measure, and the expenses of the election shall be paid by the City of Ashland." SECTION 4. This resolution is effective July 1, 2025 lissa Kolodzins i, City Recorder Resolution No. 2025-09 Page I of 2 SIGNED and APPROVED this 20th day of May 2025. Lu", Ai-, Tonya Gr9ham, Mayor Resolution No. 2025-09 Page 2 of 2 li%"b I mm I W�Al Ll I p MISCELLANEOUS FEES AND CHARGES Effective July 1, 2025 Table of Contents Citywide Miscellaneous Fees and Charges............................................................................................ 1 CopyFees...................................................................................................................................................1 CreditCard Processing Fee..........................................................................................................................1 Rates and Charges Set by Separate Resolutions...........................................................................................1 ResearchFee..............................................................................................................................................2 Finance Miscellaneous Fees and Charges............................................................................................. 3 BusinessLicense Fee..................................................................................................................................3 MarijuanaDispensary Permit Fees............................................................................................................... 3 Utility Billing Miscellaneous Fees and Charges.............................................................................................4 ParkingFees................................................................................................................................................4 Parking Fines and Fees (City-wide)...............................................................................................................5 City Recorder Miscellaneous Fees and Charges..................................................................................... 6 Planning and Community Development Misc. Fees and Charges............................................................. 7 AdministrativeAction Fees...........................................................................................................................7 TypeI Reviews............................................................................................................................................. 8 MiddleHousing Reviews..............................................................................................................................8 TypeII Reviews............................................................................................................................................9 TypeIII Reviews...........................................................................................................................................9 LegislativeAmendments.............................................................................................................................. 9 Other Planning/Community Development Fees.......................................................................................... 10 BuildingMiscellaneous Fees and Charges........................................................................................... 11 Permit Fees for Commercial and Residential.............................................................................................. 11 BuildingPermit Fees.................................................................................................................................. 11 Plan Review Fee for Commercial and Residential........................................................................................ 12 Miscellaneous Fees for Commercial.......................................................................................................... 12 Inspection Fees for Commercial and Residential........................................................................................ 13 DemolitionFees........................................................................................................................................13 ResidentialPlumbing Permit Fees.............................................................................................................. 13 CommercialPlumbing Permit Fees............................................................................................................. 14 Commercial Mechanical Permit Fees......................................................................................................... 16 Residential Mechanical Permit Fees........................................................................................................... 16 ElectricalPermit Fees................................................................................................................................ 17 Residential Restricted Energy Electrical Permit Fees................................................................................... 18 Building Permit Reinstatement Fee............................................................................................................. 19 Grading/Excavation Fees........................................................................................................................... 19 OtherBuilding Fees................................................................................................................................... 20 FireMiscellaneous Fees and Charges................................................................................................. 21 FireMarshal Review Fees...........................................................................................................................22 ElectricMiscellaneous Fees and Charges............................................................................................ 25 ElectricMeter Charges.............................................................................................................................. 25 Electric Line Extension Charges................................................................................................................. 26 ITMiscellaneous Fees and Charges..................................................................................................... 27 Police Miscellaneous Fees and Charges.............................................................................................. 29 PublicWorks Miscellaneous Fees and Charges.................................................................................... 30 PublicWorks - Fee Inflators........................................................................................................................ 30 Public Works / Engineering Inspections & Permits....................................................................................... 31 Sanitary Sewer Connection Fees................................................................................................................32 WaterConnection Fees............................................................................................................................. 32 Cemetery Fees, Sales of Liners, Markers.................................................................................................... 33 SextonFees...............................................................................................................................................33 AshlandAirport Fees................................................................................................................................. 34 Parksand Recreation Miscellaneous Fees and Charges........................................................................ 36 Picnic and Facility Rentals and Special Events............................................................................................ 36 FieldUsage...............................................................................................................................................37 CalleSeating............................................................................................................................................. 38 DanielMeyer Pool Fees.............................................................................................................................. 38 Recreation Programs & Community Gardens.............................................................................................. 39 Ashland Rotary Centennial Ice Rink............................................................................................................40 OakKnoll Golf Course............................................................................................................................... 41 Citywide Miscellaneous Fees and Charges Copy Fees Black and White Copies Letter/Legal --Single Sided — :' $0.25 ..... _ ----......... -....__...... --... -.... —--..._..._...------- -- -------••----......-----•----- Letter/Legal- Double Sided $0.45 —.............. .... .. ... ....------------....... Tabloid - Single Sided $0.45 .....---.--------------------------------............................. —.............. - ....... _..... - ........... -- --—..... -................. --- ... -....... --- - •. Tabloid - Double Sided Color Copies I -- — _ — -.— _— — �� ------.................. Letter/Legal $1.55 ---- --------------------------------------- ---- — _...... -- -- — ---- — -- --—..-_....... -- ... --... —....... --...... ....... - --- -- —_.... -- - ---- -- -....... ............ -----•-------- ------------ Tabloid ; $3.10 Credit Card Processing Fee Credit Card Processing Fee (excluding utility billing) 3.0% Rates and Charges Set by Separate Resolutions System Development Charges (SDCs) Parks and Recreation SDCs Resolution Transportation SDCs Resolution Sewer SDCs Resolution Storm SDCs Resolution Water SDCs Resolution Utility Rates and Fees Ashland Forest Resiliency Surcharge Resolution Public Safety Support Fee Resolution AFN Utility Fees Resolution Electric Rates Resolution Wastewater (Sewer) Rates Resolution Storm Drain Fees Resolution Transportation Fees Resolution Water Rates Resolution City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Research Fee A. The City will charge a research fee based on the average of hourly wages from the various salaryschedules. For the fiscal year 2025, the hourly research fee will be $58.00, billed in 15-minutes increments. The fee is calculated using the hourly wage, excluding the cost of benefits. The City will establish a fee in its annual fee resolution that is reasonably calculated to reimburse the City for the cost of making public records available, including locating the requested records, reviewing the records to delete exempt material, redacting protected information, supervising a person's inspection of original documents to protect the integrity of the records, compiling, or tailoring a record, to meet the person's request. The City may charge for search time even if it fails to locate any records responsive to the requestor or if the records located are subsequently determined to be exempt from disclosure. Copies of documents provided by a routine file search of 15-20 minutes or less will be charged at a copy rate established in the annual fee resolution. B. The City may charge a fee to reimburse the costs associated with the time spent by the City Attorney in reviewing public records, redacting exempt and non-exempt materials, and determining the application of ORS 192.505. C. The minimum fee is $25. Any research estimate above $25 will be provided in writing to the requester in advance. The requester must confirm in writing that theywant the Cityto proceed with making records available before the work is done. D. Prepayment is required if the amount of the request is greater than $25. If the actual charges are less than the prepayment, an overpayment shall be refunded. 2 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Finance Miscellaneous Fees and Charges Administrative Billing Charge Business License Fee Initial Business License Application Fee ----------------- --------------------------------------------------------- ------------------------------- First two employees' -- ----------------------------- -- ---------- -- -- ----.... Each additional employee Up to 10% per billing $123.15 --------------------- $5.15 A prorated fee of $10 per month, or portion of month, remaining in the fiscal year from the date of the application with a minimum fee of $25 is applicable to all business except for rental properties with fewer than two dwellings, pursuant to AMC 6.04.020 A. Temporary Business License Application Fee $25.65 - ---.... -..... ----.... -------...... -- --........................................ --............ —..... -.... --+----------- ------------- -- — Renewal Application Fee -------------- --------------------------------------------------------- — _..-------- --- — +— ---- - ---- -- First two employees' $76.95 — ------------------------------------------------------------ -- - — --- — ---_ _;_..— - --- Each additional employee € $10.30 — ------------------------------------------------------------------ --- — ---- — - --... _ — -- --- — -:- -------........._...... i i Late Application Fee ! $25.65 -------................................... ---------------------- -—-------------- — --- ----- -- -- --- t--------------....— -•-•----------------------- Late Renewal Fee (30 days past due) 10% ($25 minimum) Reprint Business License $10.30 'Definition of Employee (Pursuant to AMC 6.04.020.F): Any individual who performs service for another individual or organization having the right to control the employee as to the services to be performed and as to them a nner of performance. Employee also means a licensed real estate salesperson or associate real estate broker who engages in professional real estate activities only as an agent of a real estate broker or organization. Marijuana Dispensary Permit Fees Initial Application - July 1 through June 30 $82.10 Applicant shall pay a prorated fee of $10 for each month, or portion of a month, remaining in the fiscal year, from the date of the application with a minimum fee of $40.00 and a $80.00 maximum. Permit Renewal Fee - Due July 1 $61.60 ---- -------------------------------------- -- - ------------------------------------------------------•------------ . - _ .._...._._.. --—... --- ..... ——.._.... ....._. _ — - - — - -- — - ....................... f Late Application Fee (after start of business) ! $25.65 ----------------------------------------------------------------------------------------------------- ---------------------------- ---- _ ---- --- --- -- --- __ ..- - +... _... —.._..—....------------------------ Late Renewal Fee (30 days past due) `•. 10% ($25 minimum) 3 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Utility Billing Miscellaneous Fees and Charges Administrative Fees Notification of pending termination $10.30 Returned check charge -_ -- $35.95 Reconnection Charge ......... -.-...... -................ -.... _._..._---------_._-•-........... -........ -----........ _...._._-•--------_------ ......... -- ... _.... ..._........ ---------•--......._..___-----.._---•i- During business hours $30.80 After hours or on holidays $128.25._.._. Service Connection During business hours j $10.30 After hours or on holidays $128.25 Parking Fees - Description . Fee Charging Fees for Electric Vehicles --Per kWH j $0.25 ......_..------ - _._-----...._... _........... --__._ ........ ---- --- Paid Parking Fees (where applicable) -----------------------------......_----------.....- - - _-............ City structure or lot: __...-- - --- ------------ -- -- — ..._ _ _--- 6:00 am - 6:00 pm (or segment) $2,75 6:00 pm - 2:00 am (per hour) --- $2.75 - -- 6:00 am - 2:00 am (maximum) --------- ------- -+_ $14.00 Parking Permit (where applicable) i j 6:00 am - 6:00 pm Monday- Saturday (unless otherwise posted) i Other Downtown Parking Area Fees $40.00 Short-term (<30 minutes) from a marked business vehicle with flashers No charge Daily parking permit (orange) _ First day or fraction of day ; $14.00 Additional days (limited to five) - per day $2.75 No charge on Sunday or federal holidays. • Applicable permits/licenses must be current • Limit of two permits per business address at a time • Each permit is good for one parking space • Not applicable to handicapped or short-term spaces equal to or less than 15 minutes, green loading zones, fire or other restricted areas. 4 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Parking Fines and Fees (City-wide) Basic Fine ----------------------------- _ Overtime, improper parking, non-payment Additional Fines More than three or four parking tickets in a - - ------------------------------------------------------------------------------------------------ More than five parking tickets in a year - - - --- - - -- -- - - ------------------------------------------------ Handicap space violation Disabling boot, boot removal (available as negotiated by the City with tow company for 24-hour availability) $190.00 or state law $30.00 $35.00 ................... $70.00 $117.00 5 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 City Recorder Miscellaneous Fees and Charges AudioNideo & Large Formatted Documents USB Flash Drive (Each department will determine cost basis of document) ; $10.30 Liquor Licenses --...... _-............. ---.... - ..... __------...... --.......... _ _ ----......... _._— . ------ - ` -t—----------------- ---------- ._..._. Temporary/Special Event Liquor License (In addition to Fire license fee ($15.00)) i $20.00 --.._.......--------- New Outlet/New Liquor License $100.00 -.---------- .. —._... --- - .- - _ — - _-------------- -- ------ -- ----......_ Change of ownership license ! $75.00 - — - - -___ . _ ---- - -- --- -t---- —_ Annual renewal $35.00 i Lien Searches - Routine $35.00 ..................................----------------------------------------- -+ - i -Elections (Resolution 2009-05) -- - - Required deposit for Citizen Initiative $800.00 Annexation ! Processing fee for County $300.00 ----..... -..... ......._........................ ---............... � I Research Fee —........... - -...... _ See page 2 I $58.00 n. City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Planning and Community Development Misc. Fees and Charges Administrative Action Fees -.• .. . Fee Pre -Application Conference I $205.20 - --...... - - - - ---------------------------------------- — -- --- Final Plat Review -- -----.... -...... -.... --------....... -- -- - ---_----- ------ - --- -- -- _._ Partitions —. - -------r-- ---- - i $175.70+$13.60/lot Subdivisions ; $446.30+$37.20/lot Sign Permits -............. -............ -........ -............ _.................. --.-............... -...... -.................. -... ---................. -....................... -............... ---- ....... _._._.......... _ -- - --... -...... -............ --- .... --...... New Sign $175.95+$3.10/lot Portable Sign - - - --........ .... ------......... -..................... --................... -.-----..................... -................ ... -...... -.... -....... -............. -. ......... . ............. -- - -- $37.20 --......... ---............... ---...---.--_.. --- Replacement Sign $37.20+$3.10/lot Temporary Event Food Truck/Cart Permit - Per Event ..... _._....__...__ ..._... -- ._---- ----------------------- — - - -- ---- ._.... _ __- _ ___.......--_.._.._.... _ $34.15 ----- -- - - ----- ..... - - - --- - - - - € Food Truck/Cart Permit $446.30 Address Request Fee - Per Address # $50.30 Street Name Approval Fee - Per Street $128.25 Street Tree Removal Permit - ............................ I ! $102.60 - Home Occupation Permits i $37.20 Zoning Permit (fence, accessory structure, etc.) G $37.20 Land Use Approval Extension Request I $446.30 — Lot Line Adjustments $446.30 Any Other Administrative Action € $446.30 7 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Type I Reviews - D- . Fee 1 Tree Removal Permit (no other actions) $102.60 ....... - -------------------------------------------------------------------------------------------------------------- - Solar Setback Variance $1,349.60 Amendments to Conditions $1,349.60 ----------------------------------------_............-----------•----------- -- —.......... _....... — .... __........... ----........... __.._.—_........ --.-..—............. _.—_....... ..-- I Physical & Environmental Constraints Permit j $1,349.60 -- -..—................---------------...- Conditional Use Permit (Type I only) $1,349.60 Variance (Type I only) Residential Site Review Final Plan Performance Standards $1,349.60 $1,349.60+$89.55 $1,349.60+$89.55 i Land Partitions ! $1,349.60+$89.55 ------------------------------------------------- Commercial Site Review' (see next page) Any Other Type I Review $1,349.60+0.5% (.005) of project value $1,349.60 i i Independent Review of Wireless Communication Facilties2)see"°M"°ge) $5,000.00 Administrative Senate Bill 1537 Adjustment Middle Housing Reviews $1,349.60 $1,349.60 lA middle housing land division appeal must be filed within 14 days of mailing of the notice of the decision and be accompanied by a $300.00 deposit toward the cost of an appeal hearing before a referee. This deposit shall be refunded if the appellant materially improves their position from the Staff Advisor's decision. The appeal referee shall assess the cost of the appeal in excess of the initial deposit for costs, up to a maximum of $500.00, against an appellant who does not materially improve their position from the decision of the Staff Advisor. City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Type II Reviews Conditional Use Permit (Type II only) $2,827.65 Variance (Type II only) ' $2,827.65 I Outline Plan/Preliminary Plat for Subdivisions $2,827.25+$180.60/lot ------------------------ -- ---------------------------------- ---------- - - - -- --- -- - ------ Final Plan with Outline/Performance Standards Subdivision $3,607.10+180.60/lot Commercial Site Review' Any Other Type II Review $2.827.65+.5% (.005) of )ject value .................. .... $2,827.65 Independent Review of Wireless Communication Facilities2 $5,000.00 'Project value includes the estimated valuation of all structures (per State of Oregon Building Code), as well as all related project site improvements, such as grading, paving, landscaping, bioswales, etc. 2The initial deposit required with an application for anew wireless communication facility that is not collocated is $5,000 and shall be used by the City for the costs of expert review of the application. If at any time during the planning application process the account balance is less than $1,000, the Applicant shall upon notification bythe City replenish the account, so the balance is at least $5,000. The maximum total consultant fees to be charged to the Applicant shall be $15,000, and any unused portion of fee will be refunded. Type III Reviews Zone/Comprehensive Plan Map Change $3,606.80 .---- -------------------------------------------------------------------- .._..._.__....._------------------..--__ ----. ..._._.—..-._.__....--___..-- ............ --........ _...... _._.._._----------------------------------- Comprehensive Plan Change ! $3,606.80 ••---------- -----------------._....-- - - - - -- - -- ..... -- - -- --- -- -- — - i-------------- —....._.----------- -- - - -- - i Annexation ; $5,425.75 ---- - -- - - - - - - ------------ .................... ----------- -- - ---- --- _ — — —. - —*-- - - — - ----------------------------------- I i Urban Growth Boundary Amendment $5,425.75 Any other Type III Review 1 $3,606.80 Legislative Amendments Comprehensive Plan Map/Large Zoning Map Amendment $6,331.85 Land Use Ordinance Amendment $6,331.85 Comprehensive Plan Amendment I $6,331.85 .... - ... ......--------------------------------------------------------------------------------------------- - —..__...._.......... _._..... -•---.......... t--------- ---------- --------- ._.._-------------------------------- -----.. I City Sponsored Legislation (Council Directive) $0.00 9 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Other Planning/Community Development Fees Fee D• . Fee Appeals --- --------------------------- - A- --- Appeal for initial public hearing — — (Building Appeals Board/Demolition Review Board/Planning Commission) 1 $153.90 ........................... -...................------....------------------------....------------------------•--.................. - _ - - -- Appeal for final decision of City $333.45 Solar Access Permits $64.15+14.65/lot - -- ------------•-••------- s Community Development Fee ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ------------------------------------------------------......-------------------------- This fee is charged concurrently with Building Permit Fees at the time of building permit 1.2% of new construction per application for all building permits requiring a plan review. Fee shall not exceed $30,000 per building code definition of building permit for the Ashland School District. ! valuation ------------ ------------------------------------------------------------------------- -------------------------- - - -- - -----...... -+ - Copy Fees/Prepared Documents i - ---- --------------- ---------------------------- -----------------------------... � _ Site Design & Use Standards $5.00 .............................. .. ......._.-•------------------------------- .... Street Tree Guide $5.00 --- ... - ........................ . --------------. —....... —...... _... Transportation Element $5.00 ............................... ........----------------.....----------.._........_.._._.....-----......... ... -............................ -............................ -... -..... _...... _.... _-............. -------------..__......................_._.__..._--------._....-------------- - Downtown Plans (2001, 1998) t $5.00 -•------. --------------------------------------------------------------- --- ----...__._..._...... — -- - ............ ---... -...... -._......... Street Standards Guide $5.00 --................... --.........---------------------------------.--•-•-- — -------- -- -----.._....... -. —_ Comprehensive Plan/Land Use Code $40.00 —..------------------------------------------------------------------------- —------------- - -- — - - - --- -------------------------..------ Marijuana/Hemp/Psilocybin Land Use Compatibility Statement (LUCS) $240.85 Zoning Verification Letter (ZVL) $53.10 —------------------.....-----..------------------------- -- —------------ --- ----- — - —------------------- ----------- 1200-C Permit Verification $53.10 Research Fee Electronic documents that can be located by a routine file search of 15 minutes or less will be provided at no charge. Record requests that exceed 15 minutes of staff time to complete will be charged a minimum $25 research fee (see section 1, page7). Prepayment and written approval to proceed is required before any research work is done by staff. 10 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Building Miscellaneous Fees and Charges Permit Fees for Commercial and Residential In accordance with OAR 918-050-0100: "Residential construction permit fees shall be calculated using the following methodologies. (c) Effective January 1, 2009, a structural permit fee for new construction and additions shall be calculated using the ICC Building Valuation Data Table current April 1 of each year, multiplied by the square footage of the dwelling unit to determine the valuation. The valuation shall then be applied to the municipality's fee schedule to determine the permit fee. The plan review fee shall be based on a pre -determined percentage of the permit fee set by the municipality. (A) The square footage of a dwelling, addition, or garage shall be determined from outside exterior wall to outside exterior wall for each level. (B) The square footage of a carport, covered porch, or deck shall be calculated separately at fifty percent of the value of a private garage from the ICC Building Valuation Data Table current as of April 1. (C) Permit fees for an alteration or repair shall be calculated based on the fair market value as determined by the Building Official, and then applying the valuation to the municipality's fee schedule Commercial construction permit fees shall be calculated using the following methodologies. (c) A structural permit fee shall be calculated by applying the valuation to the municipality's fee schedule with a set minimum fee. Valuation shall be the greater of either. (A) The valuation based on the ICC Building Valuation Table current as of April 1 of each year, using the occupancy and construction type as determined by the Building Official, multiplied by the square footage of the structure; or (B) The value as stated by the applicant and approved by the building official. (C) When the construction or occupancy does not fit the ICC Building Valuation Data Table, the valuation shall be determined bythe Building Official with input from the applicant." Building Permit Fees Total Value of Work Performed -----------------................... --------------------...------------......------------------------------------ ----------- ------- ------------------------------------------------------------- - .--------- .-----------.......------------------..........-- $1.00 to $500.00 -- -----.......................... ... $92.35 per hour ------. --- --------- --------------------_... . ---- .... - ..------..............------------..... ----------........................................................+----------------------------------- $92.35 for the first $500.00 plus $10.30 for each additional $1,000.00 or fraction thereof, to and $501.00 to $2,000.00 including $2,000.00 -------------.-..........-..---------------------------------------..-..-------------- -----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------; $112.85 for the first $2,000.00 plus $8.25 for each additional $1,000.00 or fraction thereof, to and $2,001.00 to $25,000.00 ...----------------------------------------------------...---------------------s---------------- including $25,000.00 ----------------------------------------------------- -------------....---.....----------------.........-------------------..-..------- -----------------------------................ -....... - -- ---- $301.65 for the first $25,000.00 plus $8.25 for each additional $1,000.00 or fraction thereof, to and $25,001.00 to $50,000.00 •: including $50,000.00 .............---..............-----+ - -- -- -----------------.....------------------------------------- ------------------------------------------------...............------ ----------------- ----------------------------------------------------------------------------- ------------------------------------------ $506.80 for the first $50,000.00 plus $5.15 for each additional $1,000.00 or fraction thereof, to and $50,001.00 to $100,000.00 including $100,000.00 ........................................................................................... ............................. .. ....... .................................... .. ..... + ---- --------......-....-------------------...--------------------.-..---------------------- $763.30 for the first $100,000.00 plus $4.15 for each $100,001.00 and up additional $1,000.00 or fraction thereof 11 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Plan Review Fee for Commercial and Residential Plan Review Fee Fire and Life Safety Plan Review (When applicable) A plan review fee equal to 65% of the structural permit fee shall be due at application 40% of permit fee $92.35 per hour (1/2-hour minimum) Plus valuation Additional Plan Review required by changes, additions, or revisions I increase based on tables at Inspection Agreement (QAA) Review Fee Foundation Only Residential Deferred Submittal Fee Commercial Deferred Submittal (Payable at building plan review and is addition to plan review of deferred work) Phased Permit Fee Shell Building and Tenant Improvement Spaces Foundation Only Miscellaneous Fees for Commercial Commercial Fire Sprinkler/ Fire Suppression/Fire Alarm Commercial Fire Sprinkler/ Fire Suppression/Fire Alarm Review $92.35 per hour $282.15 + 10% of the total building permit fee for each phase of work. Not to exceed $1,538.85 for each phase. 65% of the structural permit fee calculated using the total valuation of the deferred portion + $100.00 per deferred item 65% of the structural permit fee calculated using the total valuation of the deferred portion + $100.00 per deferred item $282.15 + 10% of the total building permit fee for each phase of work. Not to exceed $1,538.85 for each phase. Permit fee for the construction of the shell building is based on 80%the valuation determined by building valuation data. The tenant improvement permit fee is based on 20% of the valuation. $282.15 + 10% of the total building permit fee for each phase of work. Not to exceed $1,538.85 for each phase. Total value of work performed (structural permit fee) 65% of structural permit fee Note: See appendix for methodology for calculation of valuation for all permit fees utilizing valuation/value of work 12 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Inspection Fees for Commercial and Residential - Description 2025/202. Fee Re -inspection Fee - Per Hour,1/2 Hour Min. $92.35 Inspections Outside Normal Business Hours - Per Hour, Per Inspector,1 Hour Min. $133.40 ........... ...................................------------.....--------------- ........................................................ --........... ---------- ------------..----------------------- -- _' $51.30 per discipline/permit. Renewal Temporary Certificate of Occupancy and Reapplication Fee(s) required every 30 days Site Observation -Inspection - Per Hour, 1 Hour Min. (e.g. pre permit consultation) $92.35 - - -.................................-- ------------------------------------------------------------------------------ - _._ --__ — . -- ------ ---- - - -- Without additional work done - per hour, $150 min I $92.35 Special inspection report - per hour I $66.70 --------- ---- -------.................... ---------------------------------------------------------------------------------------------------------------------------- I-------------------------------------------------_-_ - - - - Re -issued Certificate of Occupancy Demolition Fees Fee Description Demolition Review Fee (non-exempt structures) Demolition Permit Fee - Per Building,) Hour Min. (Permit fee for verifying utilities have been safely removed and capped off) Demolition Capping off Sewer, Water, Rain Drain - Per Hour, 1 Hour Min. Residential Plumbing Permit Fees Fee Description New Residential _....._._.- ....................... -- - ---- - ---- - - -- ----.......... -... ---------........ ------ - - - - - - 1 bathroom/kitchen includes: first 100 feet of water/sewer lines; hose -bibs ice maker; under floor low -point drains; and rain -drain packages) No Charge $369.35 $92.35 $92.35 $410.40 2 bathrooms/1 kitchen i $512.95 3 bathrooms/1 kitchen $589.90 ---..................... _..---........ ------------------ _ _.- _ --- ------------------------------------------ Each additional bathroom (over 3) - ------------•--.._....... _..................... _........ ..... .......... ...... _...... _.......................-............................. ..---------Each -- _........ -.... ----.......... -...... $51.30 additional kitchen (over 1� ------------------- ---__ _ -- -__. —. ____ ._ __.._.- _ _..._ _ --- ----------------------- $51.30... -- —--- ------------------------- -- Remodel / Alterations Remodel / Alterations (minimum fee) -••-.... ------- ....._- $76.95 --- .._.-- -- -- - -- -- - ---........... --------.......... ------------- - Each fixture, appurtenance, and first 100 ft. of piping $20.55 Minimum fee (when purchased as a bathroom unit(s) - includes the first 100 ft. of water service, sanitary & storm) $76.95 Piping or private storm drainage systems exceeding the first 100 ft. ! - -- - ........ - -- - - - --------------------..-------- $22.60 --- Backflow assembly ..-.-.-_-._............... _....__......_.........__......_.............. ........................... ....__................ ...... - $25.65 Re -pipe water supply -._...... _._.......... --- -- - $92.35 - - - --------...................... _... Alternate water heating systems (coils, heat pumps, etc) ! $61.60 $61.60 _Solar Swimming pool piping _ --- - - — r -$51.30 13 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Residential Plumbing Permit Fees, Continued - Description Residential Fire Sprinkler (includes plan review_ ) - - • • . Fee -- - 0-2,000 square feet ..._.._. _.._........._..- -- — --- ---..__..._._._.-.........__...- - --------...... _... __......... _- ..... -•------............ - .... — - 2,001-3,600 square feet -—$205.20 -----.......... -- $256.50 3,601-7,200 square feet ' $359.10 7,201+ square feet — $461.70 Manufactured Dwelling or Pre -Fab - - -- ------ - --_.._ ._._—.- - --- -- --- __—_ - ----............... _._--........ Connections to building sewer and water supply - per space ... - ..... - $51.30 RV and Manufactured Dwelling Parks Installation fee ---...... -............................. ... _....................... ........... -- .................. _ -- -- -------------------- State fee —-$153.90 $30.80 Factory manufactured awning/carport Each additional 10 spaces Fee based on vawation or instaiiation cost and system equipment. Refer to structural permit fees. — $102.60 Commercial Plumbing Permit Fees -.- • • . Fee Commercial, Industrial, and Dwellings Other than One- or Two-family Minimum fee _ $76.95 I Each fixture -� _ $41.05 Swimming pool piping $61.60 Piping - per foot $0.80 Plumbing plan review 30% Sanitary Services First 100 feet ------..._........ __.._.... -......... -- - - ----... - $0.80 Each additional 100 Feet or fraction thereof .... ._..... .._. $0.80 -- --j�----- Storm Services - —---------- ---- ----- ._ .. First 100 100 feet ....-._._. $0.80 Each additional 100 Feet or fraction thereof $0.80 — -- _------ --------- t.---•-- — i Water Services First 100 feet --.... -... -...... -......... --..... -.................. -- ............. -_ _ - ------____- ...... _... — $0.80 Each additional 100 Feet or fraction thereof $0.80 14 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Commercial Plumbing Permit Fees, Continued Commercial Fire Sprinkler (including plan review) ----- .............. -..... -- --- - ....._...... - - - -- - - ---- --- - - - Fee based on valuation of installation cost and system equipment $1.00 to $500.00$92.35 per hour - - -- - - - - ----- - - -- --------r -- $92.35 for the first $500.00 plus $10.30 for each additional $501.00 to $2,000.00 $1,000.00 or fraction thereof, to and including $2,000.00 ..... -... -................................................................................................................. ---............. - $112.85 for the first $2,000.00 plus $8.25 for each additional $2,001.00 to $25,000.00 $1,000.00 or fraction thereof, to and including $25,000.00 ---- - - - _ $301.65 for the first $25,000.00 plus $8.25 for each additional $25,001.00 to $50,000.00 $1,000.00 or fraction thereof, to and including $50,000.00 _ _ _ _ $506.80 for the first $50,000.00 plus $5.15 for each additional $50,001.00 to $100,000.00 $1,000.00 or fraction thereof, to and including $100,000.00 - $763.30 for the first $100,000.00 plus $4.15 for each $100,001.00 and up i additional$1,000.00 or fraction thereof Fire sprinkler/fire suppression/fire alarm plan review 65% of structural permit fee Minimum permit fee - --------------------------------------------------------------- i $92.35 Miscellaneous i .._._ Minimum fee ---------------�---- t- $92.35 ------------------$41.05 Specialty --------- - -- .._._.........(-- ....................... _....... _... _.................. _.._.... _................................. ... -...... __.........................................._...._.................._....._.._................................................... ....._..... Re -inspection no. of hrs. x fee per hour p $92.35/hr. 1/2 hr. minimum Special requested inspections (no. of hrs. x fee per hour) $92.35 7 Medical Gas Piping . ..................... ................. . ........... . ................... Minimum fee $51.30 t - ---- _.._..........._._........_......._............_.........__....... _..__..._..........._.... - --...._..........................._.._.. _ - _ .._....-- Valuation $500 to $2,000 $51.30+$5.15 per $1000 of valuation Valuation $2,001 to $25,000 $128.25 + $18.50 per $1000 of valuation - ------•--- _ . - - _-- Valuation $25,001 to $50,000 ---r-- j $554.00 + $14.40 per $1000 of valuation Valuation $50,001 to $100,000 i $913.05 +$9.25 per $1000 of valuation _._._..- • - - - -- -------------•-----._..._..----.............. _...... _... -----... -----.................... _•-•- Valuation greater than $100,000 ....... -.._...._...-- -- - --._..._.. .......__...-.._......- ----------------------------------------------- 1 $1,374.75 + $8.25 per $1000 of valuation Rainwater Harvesting System Fee based on valuation of work to be performed. ------------- --- - -- - ---- Minimum fee $76.95 I $76.95 for the first $500 plus $9.25 for each additional $100 Valuation $i to $500 i or fraction thereof, to and including $2,000 $215.45 for the first $2,000 plus $10.30 per $1,000, or Valuation $2,001 to $25,000 j fraction thereof, to and including $25,000 $451.40 for the first $25,000 plus $10.30 per $1,000, or Valuation $25,001 to $50,000 ' fraction thereof, to and including $50,000 ........................................................-- --- - - - - - - - - --............ - - -- - - �---- ------ - - - --- -- --- .... ---- -- -- - - - - - --- - $707.90 for the first $50,000 plus $9.25 per $1,000, or Valuation $50,001 to $100,000 i fraction thereof, to and including $100,000 --- - - - - _ - - -- - _ _ - ---E- --- ----- ------................ - ..... -.... $1,169 for the first $100,000 plus $9.25 per $1,000 or fraction Valuation greater than $100,000 1 thereof 15 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Commercial Mechanical Permit Fees Fee .• 0. Fee Commercial Mechanical Permit Fees — Valuation 500 to 1 — _ $ $ $92.35/minimum $92.35 for the first $2,000.00 plus $10.30 for each Valuation $501 to $100,000 additional $1,000.00 or fraction thereof. $1,070.00 plus $10.00 for each additional $1,000.00 or Valuation $100,000+ _ — — — thereof. _ _fraction $100.00 each item plus 65% of mechanical permit fee of - Deferred submittals +fees deferred submittal valuation. Plan review fee --- ..... - ......... - ..... ----- .....— — - -- - -- ..... -- - 25% of permit fee Miscellaneous Fees Re -inspection $92.35 Specially requested inspection (per hour) $66.70 Regulated equipment (un-classed) $51.30 Residential Mechanical Permit Fees Fee Description . Fee Mechanical Permit Minimum Fee — $76.95 Furnace/Burner including ducts & vents -� — --- I Up to 100k BTU/hr. ------------------------- - $20.55 ----- Over 100k BTU/hr. -- — $20.55 Heaters/Stoves/Vents Unit heater $20.55 -_....... . .....----------------- Wood/pellet/gas stove/flue i — ------ - -- . _—. $20.55 Repair/alter/add to heating appliance or refrigeration unit or cooling system/absorption system --..............•---------------............--------- € $20.55 Evaporated cooler $20.55 Vent fan with one duct/appliance vent $20.55 Hood with exhaust and duct ..... __- .... -•-... ----......... --......—.._..-........ -..... -_-.-........................ -... _............. --............. -.... _._............ ---....... ........ .................. ------- $20.55 Floorfurnace including vent ............ -...... -----.......... -......... ----....... _.....- $20.55 Gas Piping One tofour outlets (any number of outlets) ) $20.55 _ Air -handling Units, including Ducts j — Up to 10,000 CFM _ -- —_ $20.55 Over 10,000 CFM $20.55 16 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Residential Mechanical Permit Fees, Continued - Description 2025/202. Fee Compressor/Absorption System/Heat Pump j Up to 3 hp/100K BTU $20.55 Up to_15 hp/500K BTU $20.55 Up to 30 hp/1,000 BTU ------ ------ ----My—_---- I ----- ------ $20.55-- -- _ -- -- ----- --- -- --_ -_-- - ---- --_ --- �..-------- Up to 50 hp/1,750 BTU $35.95 Over 50 hp/1,750 BTU $46.20 Incinerator Domestic incinerator $20.55 Electrical Permit Fees -D- . • . Fee Residential per unit, service included ' 1,000 sq. ft. or less $138.50 —---- ------- -------- ----._....-----•------------------- -- Each additional 500 sq. ft. or portion thereof $25.65 .......... _..._--------------- -------------------- - ------------- ......... ---- -----...__.._...._.— - - - - - +---------.. — ----- - - Limited energy $32.85 — ------------_—....—_-- Each manufactured home or modular dwelling service or feeder $51.30 ....._.-- -- — - ---_ .._ -_.. ------------_.......--_- _ - -- - ---+------- ------ --------------- ---- -- - - -- - — - — Multi -family residential $35.95 Residential and Commercial -Services or Feeders/Installation, Alteration, Relocation _ .... -----..................... -_-.-................. -..... _........ --....... ---.... -... -... - .... _._.......... -- - --- ..............._ - - - --------------------.............----------------.... -............ -- - - - 200 amps or less $97.50 201 to 400 amps $118.00 — - - -- -- -- —+ -- ---- - --------------.....__....--- 401 to 600 amps ' $194.95 -...... - - -- - ........... --........ -... - .... - ---._..._._................. _-......... -......... ---...................... - - - . 601 to 1,000 amps $256.50 Over 1,000 amps or volts $564.25 ----- Reconnect only -----__.-.-.-..------- --------- ••---------—._._.. $76.95'- Temporary Services or Feeders 200 amps or less - - $76.95 201 to 400 amps $102.60 401 to 600 amps i $153.90 601 to 1000 amps $256.50 ...... --- _... - - ----......----... ---------•-••-•--..._................................. --........ ........ .............................. -........... --_ _ ..-......---- --- .- Over 1,000 amps or volts $461.70 Branch Circuits: New, Alteration, Extension Per Panel i ... —..... - ....... --... ----- - ----- -... Branch circuits with purchase of a service or feeder -- — $6.20 Branch circuits without purchase of a service or feeder: _ — - — -- _ - _ - --- First branch circuit $66.70 - - ---- --- --- ------- - -� -- Each additional branch circuit j $7.70 17 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Electrical Permit Fees, Continued Miscellaneous Fees: service or feeder not included Each pump or irrigation circuit j $66.70 -------------------------------------------------------- -•-... - ... - ..__ ..._ _ - — --__ Each sign or outline lighting $66.70 .__------------------------------------------------- -----........................... --.................. _... _.- ................................ -----.-..._......_.....---------•-----------t--•---.._........._-.... ---------........................ Signal circuit(s) or low voltage system, alteration or extension (each system) ! $66.70 . . . ............................. ..... -- .------..........---.....- _._-- - - Subdivision lighting per pole in addition to service I $41.05 .......................................... . .. .........................----- ............. --------- -._.._ ... -._...... - - _--- .-- --•--... -......... ---............ -...... -- Swimming pool (panel, 3 circuits and bonding) i $92.35 -------------------------------------------------------------........... —___ — _—.----- -----_ - _.. -} ------------- - - - -- - _ - - - - Specially requested inspection (Per hour) --•------------------------------------------...-•---•----....------•----------------------------------------- --..._ ---- - ._____---•----------$92.35 --•--- Each additional inspection over the allowable in any of the above, for those not covered i under residential inspection caps (per inspection) - per hour,'/2 hour min. $92.35 ------ - - - -- ------------- -- -- - - - - -- -- ------------------------------- — -. - --- -- --- --- Special inspection - per hour, 1/2 hour min. ! $92.35 _.. -- -- - --_ --- ---_--------------- Reinspection - per hour, 1/2 hour min. i $92.35 _ —--_._...... __...... .---- ------- --------- _--- -.._ - ------------------------------- Field review -change of use - per hour, 1/2 hour min. $92.35 Residential Restricted Energy Electrical Permit Fees Fee for All Systems', Including: $25.65 Audio and stereo systems I - ----------------------------------------------- Burglar alarm system — Doorbell -- — — -.............................................................. -._...__ _._.._. ---- - _...._........ _........ — ------..... -- ..._-_......... . ------_____ -..._.-_---- -........... --------- - Garage -door opener i ---......................................................................... ............................. -..... .... -- - i--------------- Heating, ventilation, & air-conditioning systems ----------------------------------------------------------------------------------------------------------------------- ----------- - ------ ---- - -- -- -- Landscape lighting & sprinkler controls i ------- -------------------------------------------------------------------------------------------------------- -----• ----- f---_--------•_- -.._ Landscape irrigation controls .......................................................... .------------------------------------- -.... -...... --'-----...__......---...........-"-'-'--......... -... -----..__........ _..... _... _.----F-- Outdoor landscape lighting •`. -------------------------------------------------------------------------------- ----.... --- ..... - -..._.-.-__.. --- Vacuum Svstems i Each Additional Inspection $25.65 'For new construction, this permit fee covers all systems listed or can be sold separately. Renewable Energy Systems Renewable Energy Systems ........... - __........._. _ _--- ... _ _. - -- 5 KVA or less - _-- $102.60 .-..................................................... - - ..._•--........ ---... ---...... -........... - 5.01 KVA to 15 KVA $102.60 - --- --- -- --- ------ - -- -- ----------- - - ----.............................................. 15.01 KVA to 25 KVA ---------------------------------------------- ------ — --- — --t - - -- - -- __...._...__..---..... ---................-$160.05 25.01 KVA and above j $160.05 plus $6.45/KVA for each additional 18 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Renewable Energy Systems, Continued • Description . Fee Engineered Systems (Separate Electrical application required) Plan Review _ 65% of Building Permit. Re -Inspection Fee - per hour, 1/2 hour minimum Wind generation systems in excess of 25 KVA: $92.35 25.01 KVA to 50 KVA $209.30 50.10 KVA to 100 KVA $481.15 ---- - - - - ------------------------------------------------------------------................................ -- -------...--------------------...---...-----..._..............--- ----------- ------------- - --- -- -- -- For wind generations systems that exceed 100 KVA the permit fee shall be calculated in accordance with OAR 918-309-0040 ------------------------------------------------------------------------------------------------------------- ------------------- ---------------------------------------------------------------------------------------------------•.................................. -.......... — _—.—.._.__..—.—_...... Solar generation systems in excess of 25 KVA, per KVA $6.45 --------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------_-......---------- ------ -- The permit charge will not increase beyond the calculation for 100 KVA. Permits issued under this sub -section include three inspections. Additional inspections will be billed at an hourly rate. Building Permit Reinstatement Fee A building permit expires after a period of 180 days from the date of issue with no inspection activity. To reactivate an expired permit, a fee of $50.00 per construction discipline is required (Building, Plumbing, Mechanical, Electrical). If the sum of the original permit fee subject to reinstatement is less than $50.00, a reinstatement fee equal to half of the value of the original permit fee shall be accessed for permit reinstatement. Grading/Excavation Fees Grading Fees --- - - - ---- - -- --------------------------------- Plan Review Fee - per hour $92.35 --------------------------------------------------------_....----------------------------._.._._.._..---- --- .... -. ----..__._....- 50 cubic yards or less ........ .-----------------------------------------•-------...........__.._......-----------------------------.......----..................__....—........ 4 •--._..__._--- --------------- ---------------------- ---- ------------ ------------------------------ No Fee - - -f ------------------- - ------------ -- --- _._...._... __ _._..—.------------------------ 51-100 cubic yards $128.25 .......................... ... - --- ----- - ----- ....... _—._...._. ---- -- - - ----.._..---- -- ---- 101-1,000 cubic yards - -- ---------------------------------------- -- ---.. _ _ .. - — - -- - - - — -- - }------- ------- - -------------._.—.._..----••---------......_._----------. ------------------ ---- —-r----- ----- -- - - __ __ ..—.__....-$205.20 1,001-10,000 cubic yards $410.40 -- ......_......_.-.... - ----- —.--.------ --- - -t------------------------------------------------ - ... I $512.95 for the first 10,001 cubic yards plus $51.30 for each additional 10,000 cubic yards or 10,001-100,000 cubic yards - - - - --------------- - - -- ---- -------------------------------------------------........-----.............................................._._...... :fraction thereof ------------------------------------...........-------------------------------------------- Additional plan review required for changes, additions, or revisions to approved plans - per hour, 1/2 hour minimum I $92.35 ----------------------------------------------- -- ------------------------- ----------------._. _ --}- --- - ----- _ _ -- •--- Permit Fees j ----------------------------------------- -- --- - -- ------ 50 cubic yards or less - 1 _ -- -- -- - - -- - -- -- I No fee - -- _- -_-. -------.. _ _- -- -- - -- 51-100 cubic yards .—.._...-------------r-------------------------------------------------------------------------- -- -- -+ -- - -- ---- ---- ------- ------ -------------- --------------- $102.60 --- ------ -- - $102.60 for first 101 yards plus $35.95 for each 101 1,000 cubic yards additional 100 cubic yards or fraction thereof 19 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Other Building Fees Investigation Fees ------------------------------------------------------------------------------------------------------------------------------------------------------ Investigation Fee A - Low effort to determine compliance. Per hour. $92.35 -- ------------- - ----------- -------------------------------------------------------------------------------------------------------------------------------------................................... ------------ -- ---- - (----- .. -- .---------- ----...--------------.............................................................----...-------- Investigation Fee B - Medium effort to gain compliance. Stop work order posted. Applicant obtains required permits within 10 business days. Per hour, $150 minimum. $92.35 ----------------------------------------------------------------------------------------------------- - .............. ............. -................. ................................... ....... ------------------------------------------ ---------------------------------------------------------------- ... Investigation Fee C - High effort to gain compliance. Applicant failed to meet deadline or has had more than one documented violation in 12 months for starting work without permits. Per hour, $250 minimum. $92.35 State of Oregon Surcharge - ORS 455.210(4) State of Oregon permit surcharge is 12% of structural, plumbing, mechanical and electrical components of the overall building permit. Building Permit Refund Policy The City of Ashland Community Development Department offers partial refunds for building permits that have been issued, have had no inspections performed and have not yet expired (six months from issue date). Refunds for permits that have expired are limited to any Systems Development Charges (SDC's) that were part of the permit fees. How to Request a Refund Submit a letter of refund request signed by applicant/owner with a mailing address forthe refund check to the Community Development Department at 51 Winburn Way. The refund will be processed within 30 days of the date of the request letter. The following fees are not refundable Building Plan Check Fee Fire Protection Review Fee 50% of Community Development Fee (maximum equal to Building Plan Check Fee) 50%of Engineering Development Fee (maximum equal to Building Plan Check Fee) The remainder of the permit fees are refundable. A $50.00 administrative fee will be subtracted from the eligible refund amount for costs associated with the refund process. 20 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Fire Miscellaneous Fees and Charges -D- ., 0. Fee Report Fees _.... ------------.............. _._... _.... _._....... ------................ ----........... -.......... -._... _........... _.._ ........ -............ - ... --- --- -------- _-------- _..._ - --- -- - --------- --------- Non-patient pre -hospital care reports 10 pages or less --,- $20.55 -- -- -- _ - —_—_ Each additional page ---.... -.... - ... ----._...._...._.......__..._......_.................. ---.... ---........... -........................ _........... -.......................... --............ _..__..... _..-............ -............. - - ......._.........._............ $0.30 _ .......__........ Fire incident reports 10 pages or less $12.35 Over 10 pages ----•-•-- -- - — ----------------.._.__......----•------------------------------------------------._....._._...........---------------------------------------------•-----•--............_._....-•----...... -------- -------- ----------- - $15.40 - - ......_.. -- ...... Patient report 10 pages or less $41.05 Each additional page I $0.30 ........ ._....._.---- ...................... - --- - ------......... _.............. -.......... -....... -----...... ----.-........... _.... --.-................. - Mailing cost ....................... —................ .(......_......_........------...... F Actual Cost - -- - -- -- Fire Investigation and Fire Marshal Reports ................................................ - ---.....--------....-------------- Narrative report 10 pages or less -------------___....__..__-•-•-------------_....._.__...._._...—...----- -• ` ----- $20.55 ------------------ _..-----__—......_ Each additional page ..... ........ ................ --.. .............................. - ....... - -----....... -_ .....-----------------------------.._...-..._...... _. - -- - - --. -. .-._ $0.30 -... __._......__._ _ ..._ Photos - each $1.05 Photo log $20.55 Investigation drawings/chart - each i $20.55 Research Fee .............................................. _.. ._ __ ... ---- — -- - --....... ---------------................ --........ - - ...._...._... --- ---- - Page 2 --- - - -- -. _ . ..._... ............... Cost Recovery Fees (MVC, Haz-Mat, Rescue) -- - i Level 1 MVC -Assessment and stabilization ---_.._.._..._...._..--.......... -........ --............. _.._ First hour .............. _... - ... -... -............ .................. .._._...... --..... -........................... $538.60 Each additional hour $266.75 Level MVC - Level 1 plus fluid clean-up -....... - -- - - -- --... __........_.......... -... -..... ----.............. -.-.-.---.................. ................. ........... --............. -................ i........................ ......... ......... ------ ------------ ---•-•----------- ----........ ___•_- ........ First hour i $564.25 — Each additional hour our -- - --- $312.90 -- Extrication (requires use of extrication equipment)........---•-------------- -- --------•-•-•--__ ..............-( -- -- --------- ----- ------- ----------------------- _...---••-MVCwith First hour $1,641.45 Each additional hour ! $820.75 Hazardous Material Incidents ...... -.............. Level 1- Incident command, isolate and deny entry, evacuations if needed - $872.05 Haz-Mat 8 activation with AF&R engine standby - per hour ...........................---. - -- -- ...__.._......_.._.... - - - - - -................._.......---•------------------------------- ---••------........._--.................__.................... $497.60 ....... Haz-Mat 8 activation with AF&R ambulance standby - per hour $369.35 Victim Rescues �-------------- --_ - - -- - - Engine response - per engine, per hour - -- - - -- - ---- - -- - - - t - - $512.95 - Technical rescue team - per person, per hour ( $169.30 21 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Fire Miscellaneous Fees and Charges, Continued - Description 2025/202. Fee Emergency Medical Services AF&R ambulance membership- basic annual - ......._-._._.....--- _..._... - --- - ---•---------------- ...._ _.-............._. $67.75 - . AF&R ambulance membership -plus annual $125.20 Emergency medical service fee - aid call per patient $448.00 Advanced Life support- transport - per patient (per current rate schedule) $1,551.00 Basic life support transport - per patient (per current rate schedule) i $1,351.00 Ambulance mileage rate - per mile (per current rate schedule) ': $23.30 Ambulance waiting time, per 1/2 hour $56.45 ...... _....... __._......._................. - - -- - --........ .............. _......... _... .... _.._......... Ambulance stand by -per hour, 2 hour minimum -..i............ -- -- -- --- -- -... -- _- - $123.15 - --- -------F'....------------•---- On scene coordinator - per hour j $61.60 Extra attendant - each $56.45 Emergency_ Medical Services/Standby Fees - -- - -- Structure engine standby for events -per hour $497.60 t Brush engine engine standby for events -per hour -� - -- ---------------- $312.90 Fire and Life Safety Division standby - per hour $112.85 Fire Marshal Review Fees -D .. 00. Fee Plan Checks ' 24% of the Building Division Structural Permit Any building permit Fee and Plan Check Fee _ _ 24% of the Building Division Structural Permit Condominium Fee and Plan Check Fee Survey Plat Review Fees Partition plats $109.80 Condominium plats ' $236.00 Subdivision plats ' $236.00 Other - - - -------------------------- ..... --- ------......... ............. -----......... -- - All hydrant flow requests. To be charged to the developer or installer ------. - --- ..........g ------_.._. _ _._..- _........-_............__._......_..........- - - ------------. -- - -- - - - ---- ----------------------.............. ... -.... _._.-_........... - $153.90 ---- False alarm charge $256.50 First Aid/CPR Classes - Per Person Cost I - _ Basic Life Support (BLS) for Healthcare Providers CPR Class $71.85 Heart Saver CPR & First Aid Class _ $71.85 Heart Saver CPR Class _ ----- — -_ - $46.20- Family and Friends CPR Class $7.20 22 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Fire Marshal Review Fees, Continued Inspection Fees Initial Inspection (Re -inspection Included) i ..------ ...... f------- - - ----- _------- --------- --------- -------------------------------- Travelers Accommodation -....... 1---------------- --._.._--- _-------- - ---- - -- $41.05 - -- - ._........... -..... _............................ -....... ---................ ---------... -............. _...................... -------.......... _-.._................. -......... -.......................... Occupancy Type "B" I $0.00 _-...... -................... _......... _.---.......... -___ _.... -- ... ----...... .._ 0-1,000 sf. --r---- - -------- - ---- --- - --- - i - -- -- - - $41.05 1,001-3000 sf. ! $76.95 Occupancy Type "A, E, M, S" 0-3,000 sq ft $76.95 Occupancy Type " F, H, I" - --- ---------------------.... -_-..-...... _--- --- t- - --- ---- -- -_ _-- 0-3,000 sq ft - - ------..... ----------- ------ - _ --- - -- --_ - __._..-_... -----•-•----._.�_._.- ; - - $128.25 -- - -- 3,001-10,000 sq ft $205.20 ... _._....... --......... -............ --....--•------------ - --... - -- - - -------........---------------------------•------........._...... 10,001-20,000 sq ft - - _ - .....---- ------------ -- .._.._._.....__... - - ---- $256.50 - -- --- -........ - - - - - ...... - --......_........... _...... -.................... - ._.._......------..... --- -_......._....-...-...----------- Over 20,000 sq ft $307.80 ............... Occupancy Type "A, B, E, M, S" - 3,001-10,000 sq ft i $128.25 10,001-20,000 sq ft $179.55 Over 20,000 sq ft i $230.85 Occupancy Type "R, SR" 3 to 10 Units $76.95 11 to 40 Units I $128.25 -... ..... _---------......... _...... -- - ---._......---------.....__...... ---- ---- -- ._....._..- --------------+-----------------------------• 41 to 70 Units _ _ . $179.55 ---..... -....... -..... ----..............._.__....----•-............. __... -.... -..... -...... -........ ........... -----...._.._......... - -- - --- ..._...........------------• Over 70 Units - -+----------------- $256.50 _... ..._....-- ............. ------ -- - .... - - ----......... _- ----- - - - . -.. -. - --- - --._._-._ Non-compliance after 2nd inspection: inspection fee + - Base Fee +$102.60 Non-compliance after 3rd inspection: inspection fee+ I Base Fee+$205.20 Non-compliance after 4th inspection / subsequent inspections: inspection fee + `•. Base Fee +$410.40 Operational Permits i ----------_....__........ Fireworks public display - - -- - - .. ------......._.._.....------•------------•-----••------....__._..-----------------•----.................._..._...------------------- - - -......... _....... - - -......_._........_........._$153.90... Exhibits and trade shows $153.90 -............................ -----........................ -----.......... . .......--------------------....__...... - - --- -- -- - -- .... - - - ---- .._}...... -._ --------•------......__..__.... Fumigation and thermal insecticide fogging ....................................... ------------------- $307.80 -- -- - - _..... -...---- Vehicles or equipment in assembly buildings s $51.30 and special effects -----_ ••-• -------- - ----- - --- $76.95 - --Pyrotechnic - --_ _ . -- - - Open flame r-•-- •: .-_-_-...-.---- $76.95 ------- - ...-- --•-- ----_----•-----------_.-�-..-- Haunted houses $51.30 Marijuana processing $512.95 Fire performances (per event) $76.95 Temporary membrane structures, tents and canopies ....--.._.._.._..... ------............ -.._..... ;. ---•----....----••---------------------...--._..__......__.._ 200-400 sq ft ....................--- _...........- _ _ -- -- - ---•----- ....-.... - $51.30 ------. -- - - ..._......-......_._.....--------..---------------------.._._ Above 400 sq ft -- ........ -.............. - ..... $128.25 Hydrostatic test $76.95 Underground flush test ! $76.95 Hood system trip test $76.95 Fire acceptance test $153.90 _ Egress light test $153.90 - -._--- --- ---_ _- - - ---........ Above ground 1p tank install $76.95 23 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Fire Marshal Review Fees, Continued -.- . Fee Operational Permits, Continued Above ground 1p tank removal $153.90 Commercial 1p usage less than 500 gallons ----------------------------------------------- ....--.....-.... — ------------------...------------. --- - - - -t- ------------------------------- $76.95 - Underground fuel tank install ! $307.80 Underground fuel tank removal -- - j $512.95 Construction and Use Permits _ - ---- ..- .............__----------------- ....._ _ .._._-.._._..-----......................................................... ......... ... ...................... Compressed gas ......... _.'..__.._.._..... _... _.......... -._._._... _.............. _.... _.......... _....... $153.90 Flammable and combustible liquid storage $153.90 Hazardous materials storage ........----- _ $307.80 . _ -.._— _—_---- — - - ------ - - -- - ---- Hazardous materials production -_. _ - `•. _ _. $307.80 ----- -- - -- -........................ ----............ -.... -..-._...... .......__._........................................ --- Industrial ovens ...... -................. --------- ------------------------------ $153.90 ----..............-- - — -- ------------------ - —.._.._._._._.._......... -........ -... -- High piled combustible storage - - - - - ........... -... -......... .... ----................................ - --- - --- ------ --------------------- -- -- $153.90 $51.30 - $512.95 depending on Permits not specifically mentioned but required byfire code I staff hours and complexity — Temporary liquor license (in addition to City Recorder fee listed on page 10) --- ............. -- - - -- - - -- - - -- - - - -_.._......................_....._........._._----------------- ------------ I ------------------------------------- - - $15.40 ........_.... - - - Pre application comments $25.65 After hours and weekend inspections — — ----------------- - $153.90 Fire Systems Cover Up/ Acceptance Test Inspections 0-3,000 sq ft `•. $76.95 3,001 to 10,000 sq ft $128.25 _ 10,001 to 20,000 sq ft $179.55 _ 20,001 to 40,000 sq ft _ $359.10 40,001 to 80,000 sq ft $718.15 Above 80,000 sq it - ----- $1,025.90 Weed Abatement i Staff time See page 2 Mailingcost i Actual Cost -... ................... -..... ---._._....... _._....___..._..----......... _................... _......-..._.... -... ----...................... - ........... Weed abatement by contractor I Actual Cost -- Other ---- ------ ---- - -----—._....... __...- - ------ ------- T-shirt --------------- -- _..--.-.--..----------------------------------- -- 2565 ------hint -....._._.............._...._...--- -- -- - ---- - - --- -- Sweatshirts ... -.... ................... --....... ------............ --------....... - ... -.... -... __. _....____.--.-..__....... _... _...... _.. ----------------------...................._._....._......._.............._$: _.................... -....... ---- - $35.95 - - ----- Misc. apparel items i Prices vary 24 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Electric Miscellaneous Fees and Charges - Description Banners -Each $128.25 Temporary Service Drop Single phase underground temp 300 amps or less $253.40 -•-----•— - -- - - - ------------------------•--•-•---••-•--- -- - ---------------------------------------------..........._..- --+ Single phase overhead temp 300 amps or less $302.65 - __._.......- _ ..._.......... - - - -- -... ----... -- ....... — — — _ _- -----+_-- Three phase Actual Cost Street Light Install of light shroud $82.10 Electric Meter Charges - Description 2025/202. Fee Meter Tests for Accuracy Once in twelve months -- -- -- No Charge Two or more times in twelve months — ........................._..--••-------- -- - - $180.60 —_._._._ .—......._..—............... Meter repairs/replacement (damaged by customer) ___._....._....._.... ---------- ------ ------------- ------ --_....... I Actual Cost ---- -------- ------- ---------- -------- ------- ------- --_.._...._ _ -- ----- - --- — — Non -Radio Frequency Meter Charges — Conversion from radio frequency (RF) to non-RF meter j No Charge Monthly Fee to manually read Non RF meter ; No Charge ... ...... __.... _............................................................_-.--...............-..-._-----.--------------......_...-____._..-...............-------........_.........................._................_........._._....._....�----_............__......_..._....................-"_..._..__.._.._...._ Service Calls Once in twelve months 1 No Charge - Two or more times in twelve months i $208.30 Other hours or holidays .... _._-- .............................. --- - - ----------- $310.85 Service Connection for Applicant De -energize service $260.60 Scheduled Work After Hours •----•---- . - - - - -- __-._...... _--_... _._............. ----------........... ---................ -........... -....... — Actual Cost -...- ........... --•--- +--- ------ Unauthorized Connection $220.60 25 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Electric Line Extension Charges Fee Description . Fee New Single -Family Residential Service ------------------------------------------------------------------------------------------- Overhead service in existing developed areas from distribution line to and including meter. ..... -----..—_..... - ...... - — - ---_._..__....._.. - ... -- .... --- - - ---_..__......_------------------------ — -- - _ -- - - ------------------- —_... --- $595.05 .._.............. ._ ..._... Overhead service upgrade or increased service for 300 amps or less $595.05 —.— _._.. - --------------. --- ---_ __. - -- Replacement of service from overhead to underground, 300 amps or less. Customer provides all ........ — — -- - trenching, conduit, backfilling and compaction as directed by the City. $1,248.55 Underground residential service of 300 amps or less. Customer provides conduit, trenching, _ _ back fill, compaction as directed by the City. $715.05 Underground Distribution Installation Charges Per lot less house service and engineering fees. --- -- $1,216.75 ----- Subdivisions of of 0 to 20 engineering fee per lot ._........... .----------- __ — —. — — __ __ - - -- - —_ —...__- $175.45 __..— _ -- ----- - - _ .—......_ Subdivisions of 21+ engineeringfee per lot -• _-------------- _._..._-- ---- — __ __ __....------............. ---._... ........... ...... _ -- ---- -- -- - ---- - $265.75 Three phase subdivision as required by City per lot -- $265.75 —_ — Any Overhead/Underground Service Over 300 Amps -- i { Actual Cost ............... —.............. ---........... ............ ............ —. Commercial, Institutional and Industrial Service ; Actual Cost Blower Door Leak Test (Gas heat customers only) * - - $76.95 --- I Duct Leak Test (Gas heat customers only) * ._..__._._._............... .................................... ................. -•------------- - $128.25 --------------------------------- 1 "Electric heat customers = no fee 26 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 IT Miscellaneous Fees and Charges Installation Fees Basic installation - Pre -wired CAN outlets only. (Additional charges for parts and supplies apply) - (Additional charge ----------------_ _-....__ _ --------t---- ...----- $20.00 ___. Add Trap ("filter") _ .........................- -........................................... -- ... -.............. - ---..... ---..... -.......... -... -...... --............ -.......... -............... ------------ ----------•- - $10.00 - New customer cable modem activation $10.00 ...... ...--__...... ............ _. _ Cable modem (refurbished 90 -day replacement warranty) '•. -- $50.00 Additional materials $10.00 - ----------- ---------------------------- -- Over -and -beyond regular installation including multi outlets, outlet plates, additional wiring, -- • j replacement of customer damaged outlets. i - --- - ------ -- ... - - - - - --- -- -----._._..... _.......................... _._.............. ... __.............. _............ _......... _._........__...,..._....._ Wi max standard installation -------- --------------- -------------------------- $200.00 Disconnect Fees Disconnect _.-__......... -- .... - ..... -- -- -- -- - --- --- - - ---- --- -- -- -- -- - -- ---------- - - -- - - -- -- $50.00 Remove trap ("filter") $10.00 - -- - - - ------ - -- ----------- -......... Truck Roll ----------------- $35.00 Field Technician Hourly Rate ----....................... ------ --- - - ------ -.......... -......... ----....................... _-......... _....... --........ .... -.......... -__.... _.... ........................................ --............. -......... -.... -..................... ......... -- Non-standard work such as advancing troubleshooting, non-standard outlets, fishing wire inside walls, etc. $55.00 Consulting and Technical Support Hourly Rate i For support issues not related to AFN infrastructure, performance, and reliability. Minimum charge one hour. $85.00 Non -City Employee Staff Screening Charge for each vendor employee submitted for authorization to access AFN and City Service Center I _ facilities. i $150.00 ................. -....................... __........ -............................... -... ---........................ -................................................... ---.......... ................ _...._._._....................... ................. i- ---------------------- _.. -- Fiber Service Installation Individual Business Case Overhead served connections ------------- .................-- - - --- ---- - -- -- -- ------------------...._...--- -- ; (IBC) & quote - - -._._..._........_.._.---........_....__.......--t_---•_---•-----------------------_ Underground served connections - - -- - - - - ---................................... -......... --................. -.._.._-..................... _............................................... --....... IBC & quote ------------------ ----------------- ---- _ ----------------- _.. _- Ethernet Transit @ 100 Mbps IBC & quote Transit @ 1000 Mbps ........... _— —__.. _.._...... -.. _ _._..__..... _..__._... --- ........ ___....._.._ IBC & quote ;. _... -- -- - --------.._._. Static IPAddress -Per Month, Each $5.00 Maximum of 5 Static Internet Protocol (IP) addresses* Minimum level of service for static IP and Quality of Service (QoS) is "CHOICE" or higher service tier. QoS Fee - Per Month $3.50 - - - ---- - - -- - -- - ------ ............... VOIP (phone) enhancement available with AFN Choice or higher service level through AFN certified modems. - 27 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 IT Miscellaneous Fees and Charges, Continued DescriptionFee 0. Fee Business Augmented Upload Package (additional5 Mbps) - Per Month $15.00 Available exclusively for AFN Direct Small Office/Home Office (SOHO) or Small Business. Must have current City of Ashland _business license. *Additional fee added to base AFN Direct retail rates on specific packages. ----..-..... ..._...... -- SOHO business augmented upload package - per month. j -- Maximum SOHO upload speed with augmented upload service at up_to 9 Mbps. i $80.00 Small Business augmented upload package - per month. — _ _ Maximum Small Business upload speed with augmented upload service at up to 10 Mbps. j $100.00 Non -return of Customer Premise Equipment (CPE) Devices .... ---...... --_ _............. -- - - - -- --------............................... $300.00 _... -.---.... ---............ CPE's must be returned on disconnect date of AFN services. —-------..........................-----------------_---- -- - - ------_ - - -- ....... _ ........................... ,.-- .—__... ------------------------------- Cable TV (CAN) Seasonal Reconnects & Disconnects -- _ ...----.................... __.._...._.... --........ _.. - - - —_ _.._....... -------_ ..._—.......... ---r--------- _ Disconnects & reconnects - per visit $10.00 Service change - per visit ----------- �. - - - _.._..._.................._.. - $10.00 Install HBO filter - per visit - — - --_ _ ..- — --- ! i $10.00 -- --- CAN House Amp Fee - Each -- - ------------------- - - ? $35.00 — Utility Billing Lobby Signage Fee - Per Month _....—..._._ _............... - - -- -- E ! $100.00 Cable Modem Rental - Per Month ---- -- - --- --------------------------------------------------------------- - -- --- _ _ ... - $5.00 - -- _ - Non -Return of Rented Modem at Closing of Account - Each -- - ( ••-••_ E '• $50.00 Cable Modem Purchase - Each - $50.00 •---------------------�-•..... --- * Resolution 2010-28 (Section 2, page 38) grants Information Technology management ability to set i - - - -- - --- promotional rate_ s. - -- — - ------------ - ----------------------..................------------------------•---._.-..-------------• ...............---- - - _.._.._-- - --_- -- �- -- --- - - -------- --- Fibecservices Fiber Essentials - Wholesale i $40.00 - ........ -.... -......... ._----------•---..._-_---------- --- ....... ---- Fiber Essentials - Retail ! $50.00 --_--......... - -_ Fiber Advanced -Wholesale _ -- -- --�— ......_--- ............... {.._ -- --- _...._........... - - $48.00 Fiber Advanced Retail -_— _— -$60.00 Fiber Ultimate - Wholesale - $75.00 Fiber Ultimate - Retail $90.00 Fiber Multi -gig- Wholesale $90.00 ---- --- - - - --- -- - - - - Retail...............— FiberMulti-_----------fi...._.._-_.---------------•---• g g - ............. ; - - - ----- - $120.00 Fiber Ultimate Promotional - Wholesale - - — $60.00 Fiber Ultimate Promotional - Retail —....... ....... _......... - — ._._.._....- ---- $70.00 _ --- - -- ..__._.._.._ Router setup - Wholesale '-'-- - -. .. ._.... _---........ -------- _. $25.00 Router setup - Retail i--._------- _.--------------------------------- ? $50.00 --Router monthly fee -Wholesale -- $4.75 �— -_ Router monthly fee -Retail -- — $6.49 Mesh unit monthly fee - Wholesale $1.49 ---............................ --------------------------------------- ......................--- .----------------••--•--- - -- ....___ _ Mesh unit monthly fee - Retail ; $3.49 28 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Police Miscellaneous Fees and Charges Police Reports 10 pages or less - Over 10 pages Research Fee ........................................... — Visa Letters Fingerprint Cards-- First card Each additional card Audio See page 2 $12.35 $15.40 $19.50 $35.95 $10.30 $19.50 $19.50 MobiL Audio Video Recordings (MAV)1 $19.50 --------------------------------------------------------------------------------------------------------- ------ — -- _.— _ — -- - — - — - i Body Camera Video' I $19.50 ..............._.._..... -- - .._.. . -------------......__........ -----............ ---___..._... _......... ---- --- -- -----...__---------- ----i- _-.---...... - ...... -- Impound/Tow Fee - Cash Only $107.75 Vehicles for Hire - Per Ordinance 3160 Permit fee for transportation network company $5,129.50 - -- -- - -- — _ +----------- —-------------- Permit fee for taxi or limousine company $512.95 .___.._._....._._..--._.._..-_-_... _............ __.._.._..._..........._......_....._-........ _... _..___... _............ _.._-.... ...... _._......_...._...__..__............ k""""............--------...__...._.._........._..._._.._...._._ Permit for vehicle for hire drivers — .... -... - ..... - _._._......-........ - ---- - - — _ _ _ - - -_ _ — - - ..... _-- — ---- . New i $61.60 Renewal --------------- --- � --- $61.60 'Any audio or video recording requiring extensive redaction, more than 30 minutes, shall be charged at a rate outlined under Research Fee. Refer to section 1, pg. 7. (CD) 29 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Public Works Miscellaneous Fees and Charges Engineering Development Fee ; 0.75% of Valuation This fee is charged concurrently with Building Permit Fees at the time of building permit applications. The fee applies to all new residential dwelling units and commercial developments. Remodels, additions and accessory buildings are not assessed this fee. Public Works - Fee Inflators Fee Description March CPI - Used for Plat & Plan Checks, PW & Engineering Inspections, Permits and Cemetery Fees March 2025 CPI value = 313.250 (New) March 2024 CPI value = 312,332 (Old) (319.615-312.332)/312.332 = 2.4% March ENR - Used for Sewer and Water Connection Fees March 2025 ENR value=13782.50 (New) March 2024 ENR value = 13532.01 (Old) (13782.50-13532.01/13532.01=1.9% January CPI - Used for Airport Fees January 2025 CPI value = 317.671(New) January 2024 CPI value = 308.417 (Old) (317.671-308.417)/308.417 = 3.0% 30 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Public Works / Engineering Inspections & Permits Fee Description . Fee 5% Engineer Fee (5% of the public Subdivision Construction Inspection/Public Works Improvement Inspection improvement cost) Street or Alley Excavation Permit $250.00 Encroachment Permit $250.00 Miscellaneous Construction Permit (Construction of curb, sidewalk, driveway apron, etc.) _._......._._._....---__-------------------------------------------------------•----•----•--..-_............-----------...--.................. ....... -.... -........._.-.......F......_._........------......------......------........... f I ---------------------•------------- $83.00 Dust Suppression Permit I j $83.00 Driveway Painting Permit (Includes a can of paint) I ' $19.00 Right -of Way Closure Street `• ... l------------------- ...--- ------ -- ---------- -- - _ $250.00 - - - ----------------------- --_....-........ _..--_---.... ---........................ -----... _ --...._.--•-...... _............. --............ --........... -................. _......... Sidewalk: >72 hours $83.00 Sidewalk: <72 hours i $19.00 -------- •-•-------------- - - ---- --_-._ - _ .._..__...... -—............ --- ------.._.... __......... Parking Space: >72 hours _.... ------.-..... ------...... -.... ----........... $83.00 Parking Space: <72 hours $19.00 Block Party $19.00 Sidewalk Dining -Annual Renewal Per Sq. Ft, Min 50 Sq. Ft. ..._._._..._.-._.-------------------------•--•--------------------- - .—._—�------- -------------------- $6.00 Functional Item -Annual Renewal - ---- --- -- — __._.._..-.._--.......... --.... -..... -...... ---..... - ..... .-.._..... $83.00 Special_ Event Permit - -..... ...__................. _ ---......... ---.................... -..... -........ ---...... ....... -................ ...... -.............. ------ ...... ------ .......-._.......... _...._..--•- --_ ............_ _ -_._ Base fee 1---------- $130.00 Events that require City staff overtime Actual Cost Street Painting Permit $19.00 Loaned Functional Item, Pennant Application Fee $169.00 Publication Box per Publication - Annual Renewal --........ -------------------- ---- ---------_. -___ _i.—.._..------—--------- $35.00 -- Bike Rack Purchase j $165.00 Special Vehicle Permit -Initial Fee - -- -- - -- .........--•----.............................. ----....................... -............ -... _............ ... -.............. -.... ........ ' ....................... -................. _•-.......... -....... -..... --.......................................... Initial Fee $346.00 Annual Renewal - $134.00 i Penalty for No Permit 150% of permit cost I Street or Alley Vacation $837.00 An administrative fee of 25%will be assessed on all permit refunds. Refunds will not be issued if requested later than one year following the application date. 31 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Sanitary Sewer Connection Fees Sanitary Sewer Mainline Video Inspection - Min Charge (Cost based on time and materials) Water Connection Fees Installation of Water Services ..................................................... ............_..._..... _ _ --- -- -- - — — — -- ...... --- - -- - — --- The installation of all new water services and taps regardless of size will be charged on a time and materials basis. Actual Cost Utility Locates ----------------...... I Nam_ � 1111 $406.00 . ..... _.....-� .-........Additional locates at_same address .__...._._._..—.._............... __—_._.___ .—._.___. __.___.---_._....._.... $88.00 Water Meter Re -Read ........................... ... .. .. . .. . Once in 12 months —--- No Charge — -----------------------_........................... Each additional re -read in 12 months $41.00 Water Meter Field Test $63.00 Water Meter Bench Test 3/4" or 1" Water Meter $139.00 ---- --- -- -- — — 11/2" or 2" Water Meter ------------------------------ .._...------ $260.00 -- ._------- - — - — --- — -- — ---- -- — Larger Meters Actual Cost - — — Water Pressure Check ............................................ ...----.................. _.............. - — _ — vva— Nlwaulc V lug vlwc lu is Ivl I la i Iw v11a1sc ...—............._-------...........------------...----------------------------------------------------- .---.._ .............................. Each additional pressure check in 12 months F $49.00 -- — i Water Chlorination Test - Subdivision Retest Upon Failure i (Cost based on time and materials) $822.00 Water Pressure Test - Subdivision Retest Upon Failure (Cost based on time and materials) $497.00 32 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Cemetery Fees, Sales of Liners, Markers Fee Description 2025/2026 Fee Sales of grave spaces or burial plots, liners and markers: fees split, 40%tothe cemetery fund and 60% to the cemetery trust fund. Grave Space Lawn and monument sections $647.00 Baby Land $204.00 Niches (bronze) $547.00 Urn garden i $204.00 Crypt $1,367.00 Concrete Cemetery Box, Including Setting .......... . ... . ......... . . . ...... . .... $547.00 Concrete Liners Cost 10% . . . . ........... . . .. . ........ plus . . . . ......... . .... . .... . Final Inscriptions - Minimum Charge . . . . . .. . ........... . . . . . . ... . ........ . .............. $191.00 Niche Vases - - - ---------- $184.00 Grave Markers . ........................................ . .... . Wholesale cost X 2.5 not to exceed $753.00 . . . . . ............. . ...... . . . . ...... Grave Marker Setting, Concrete Base . ......................... . .................... $204.00 Monticello Burial Vault (Seated Concrete) $1,505.00 Sexton Fees Fee Description 2025/2026 Fee Opening and Closing Graves .......................... - . ... . $547.00 ----Ground-------------_.... .......... . . . .. Doubte-deep .. . .. . . . . ................................ $614.00 ------------------------- ­ ............. . ............. . . ... . ......... — ----- Infant ----------- I ------------------------------- . ............... . ... . .................. . . ........... . ........ . .. . .. . .................................. ..... ................. . . .. . . ........... ...... . . . ....... . . . . . ....... . ..... . . ................................... $204.00 Opening and Closing Crypts . ........ . .... . .. . . ...... . ....... . ....... . . . . .................... . . ... . ..... -------- - ----- - - $547.00 Opening Closed Crypts . . ... . .. . .. . .... . . . . ......... . ........ . . .... . ..... . ..... . ... ........... -- — - - ------ - — -------- $547.00 Opening and Closing Niches . ........... . .... . .... . . .... $140.00 ... . ...... Opening Closed Niche $140.00 Inter Cremains in Grave Spaces ............................ ---------------------------------------------------------------- $204.00 _Scattering of Cremains­___ $140.00 (Paid in advance) $1,367.00 -Disinterment Saturday, Sunday or Holiday Burial i $546.00 33 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Sexton Fees, Continued Grave Setup Rental - Per Occurrence $139.00 i Tent Rental - Per Day $67.00 Perpetual Care Lots, Sold Before 1927 ! $140.00 i Vases ............... -- ----- Galvanized $55.00 Cemetery fees will be subject to a 1.5% finance charge per month if not paid within 60 days of use. All above services will be sold pre - need in installments, interest free, with a minimum payment of one -twelfth of the total sale. Ashland Airport Fees Lease Type A - City Owned - Rentals -------------------------------------------------------- .......---. -__ -- --- - -___.. I T-hangars ..-------•----......-------------------- _-- -_ Without doors - $248.00 ----------. .......................... ---- ---..—_.. --- -- __— --- ---- - 'With vintage doors —......... - !- ----- - --- _ - - - - -------------------------- $311.00 'With contemporary doors ................................... ---.............. --..__.._...-•-----............. - ........ -- ' _ -- ._.._-.... $391.00 - _._...-Helicopter hangar_.._. _-------------------------_--- --- - -....__..._•_•----- $311.00 ...__•-------------------------------.......-----f--- Bo_x hangars - --------------- ----- ----------------------------- -- -- - - - - -- - --------------------_.................................... ...- ...-------------------- ---- - - -- ....... With reversionary stack door -per sq. ft./month __.... ........................ --------------------------------------------------------------------------------------------------------•------------ --- -.. - ..._Y------- ._.. _ :. -------------------------- $0.32 --_.._..... ---- --- - ....._--- Shell rental" (privately built, City owned) -per sq. ft./month -- $0.37 .... ----..................... - "Amenities" for any City Owned Hangar i ... --- Office space (inside dimension) -per sq. ft./month .-....__ ... ....... --------.... _...... .....---... ------ .............................. 1 $0.31 -------------- ------------------------------------ - ....--------------......... .....-------------------------- .------------------....._...____-----------------------......._ _t - - _ _ - Bathroom (building footprint - outside wall dimension) -per sq. ft./month .....-....---------------------------------------------------------- ........................---._.--.............................__...._-......------...__................. -- - ...-- ... $0.03 .--........................__....._...••-----------_ Heat (any upgraded head source including gas and electric -per sq. ft./month ----------------- ..---------------............-..-...........-----------------------...................................................--- ---•-------------- --------- __..__ ----- ----- $0.01 ------ Monthly tie -downs ------------- ---........ ...... ----- ---- ------- -. — — - ........................ ........--------- --- Small ------------------------------ ----- - -- -- - -----.... --r---.__....—__----•-----.._........ ._._...... _........................... $54.00 - _ --- _ _ - _...-..... Large --- — .r - -- ...........- - ': $-- --.................................. __ -- _— -_— - - --_._ ._....._..--- - -----............ _—..... -... _1-.—.---- --------- ----.._.._..---------- Overnight tie -downs •: --------66.00 ---- Small $7.50 ----- .---- - - - - - -- - ---- - - -----...--- -- ----.__....-- - - _.._ Large g ... _...... ---------- ------ ------ -_..__-------- $11.50 Tie Down Rental Policy -- - -- - --------------------------------------------_------------------- - -- ---... - ..... -- ----........... -...... -......... -..... i ............ -........................ At[ parties utilizing tied down parking are required to provide written consent to the Airport -.............. ..:.................. -................. _........................................... -......... - deeming the owner of any stored or parked aircraft as the last FAA registered owner of that aircraft. After an unpermitted failure to pay required rent or the aircraft becomes inoperable either mechanically or by regulation, and any such condition exceeds a ninety (90) day period for storage or parking, the Ashland Airport has the authority to treat the aircraft as a nuisance under AMC Chapter 2.31 Uniform Violation Abatement Process. Any appeal to the Ashland Airport taking such action is subject to AMC 2.30 Uniform Administrative Appeals Process. Lease Type B - Ground Lease - City Owned Hangars j - - - -- -- - - - - ----------------------------------------------------------------------------------------------...._.....- - - - -- - --_- Ground lease - no minimum footage - per sq. ft., per year -- -- —` -- _ $0.254 34 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Ashland Airport Fees, Continued Lease Type C - Ground Lease - Privately Owned Hangars --- --------- Privately owned ground lease minimum footage 60'x40' - per sq. ft., per year ' $0.597 Hangar Reservation Fees $103.00; and 75.00 is applied to T-hangar - basic fee i first months' rent $2,060.00 - Non-refundable Ground lease space space reservation fee* Reservation fees are valid for a period of 1 year at which time can be renewed for an additional 12 months if progress is shown towards development of a hangar onsite. Specialized Aviation Service Operations (SASO) Fee (Annual) - -- _ - - - ---- ---------------.._._....._.._.-----------------------------------•----- ----_.....---------------..-.._...........__.......... _ The square footage of the hangar multiplied by 1.6, multiplied by the current B Ground Lease fee rate. A Hanger keeper will have the square footage of the hangar multiplied by 1.0, multiplied by the current B Ground Lease fee rate. Mobile Service Providers (MSP) Airport User Fee (Annual) Basic Fee First two employees $361.00 _ . __ -- — — --- ---- _----------------� — - - --- Each additional employee i $26.00 Temporary MSP (90 days max, non-renewable) i $103.00 Freight Operation (Follows Medford International Airport adjustments annually) Tariff Rate i $5.45/1,000 lbs. 'An additional electrical surcharge of $5.00permonth will be added to this amount. 2Large aircraft defined as a single engine turbo -prop or multi -engine aircraft with a gross certified aircraft weight of 6000lbs. or greater 35 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Parks and Recreation Miscellaneous Fees and Charges Picnic and Facility Rentals and Special Events -.- p. 0. Fee Group Picnic Rentals -- ------ ----- Cotton Memorial Area - 4-hour rental ---------- - -- $125.00 ------•--------...... -•-....... _..__.--................................... -..... -... .................. _................... --.... -.............. _._.._... _..... _......... -._...._... -... --............... Madrone Area - 4-hour rental ----......... -.......... _.__ ...-- -- _.........._.... $75.00 Root Memorial -4-hourrental $75.00 _ _ _ _ - Hillside Picnic Area - 4-hour rental -_ - — -- $75.00 _....._.._........... _....... ---........... ............... - .... -_...__._._..............-.... -... ---....... -.......... --... __............. Sycamore Grove - 4-hour rental __._............. -•--............. ...... - --....._.. $75.00 North Mountain Park Pavilion - 4-hour rental $75.00 Lawn below Upper Duck Pond _...... ......... _............... _ - --------- ----------- -------------- _............ -..... --....... ..... ....... $75.00 _ Butler Band Shell - 8-hour rental _.____._ .. Under 200 people $250.00 Over200 people $500.00 Garden Way Pavilion - 4-hour rental --------- - - - ---- _ _ _ ---- --........ i -- $75.00 Private Use/Rental Tennis/Pickleball Courts -1 hour rental $20.00 Ashland Japanese Garden ...... - -.... -------- ---- - Private Event Rental - 3 hours rental -------------------------------------------------------- — ------ . - -- -- -- ......... -'`----- sday Off season, Monday -Thursday ----'}-- -----------...... $750.00 - - --------........ _ ........................... ---- - --- - ._........_............. - - Off0 season, Friday -Sunday _ . -- t ..._......_._........ ; -------------------------------- $1,000.00 Busy season, Monday -Thursday $1,250.00 Busy season, Friday -Sunday $1,500.00 Busy season = April - July and October ' Off season = November - March, August and September Deposits -Refundable Credit Card Only Picnic areas $75.00 Butler Band Shell I $150.00 Buildings security B ---------- - -- ----------------------$1 $150.00 Japanese Garden -- ----- ....--- ' $150.00 Special Event Event Fees --------------------------------------------------------•----...-. _- -- -----... -....... ---.... - ......... ---.._..._....._ Special event application fee _ ------------------------ ----- _ $130.00 Street closure fee --••--------.... $150.00 -_ - __-_ _ _..._...----•----•............. -------............... __..._ Park booth fee (per booth) .......... - .... ---- - - -_ $30.00 Exclusive Use Fee -Impact Fee/Per site location /per 8 hours -----........._ j $150.00 - Alcohol Fee (non-refundable) --- _ Not for profit i $500.00_ _ _ _ All other -- _ ------ $1,000.00 36 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Picnic and Facility Rentals and Special Events, Continued -.- .. . Fee General Building Reservations ---- The Grove -full facility ........................._._...__............_._..._... _ ------__..._...._._._...._.._._......__...... _._..._...__--.......... ..... _._.... __.............. -- ----.—...—.... _....... ..—._....... _..... l._....._......--___......._—_— .......... ...... -----............. _._..... _.... —._..._.. Weekdays - per hour $100.00 Weekends - per hour —..._........_ $175.00 _....----____. _... The Grove Otte/Petterson OR Gym ...._....................._...------................_._...._......._...... ----------.._._._..--.......................................................................... ---............ __...........-...... -............... --..................... _............. ........... _.... —...Weekdays - per hour $40.00 —.__._...._ _...— - -----....._..__...... ----................... ---... _..... ---..... _... — ... _................ --- - - — ....i......__..__..._.—. Weekends - per hour — ------ $60.00 ---..__.....—_._........ _..... ------ --- --- - ... -..... Hunter Park Senior Center - Single Room -------.._...__............................................_.........................................__......._--.._....__—_.............. ..----.................................. __._......... _...... _...... _..... __... _ ............... --- ........ _... --.._.............. _..._.._.;.._ ;- —-._..........._._.. ... ........ .... _............. .-- ------- _.._--- — ....... _...... Weekdays - per hour .._......... -------.................................. ........................ ---. ............................... - --- _.._..-----....-.--.......... ----------- $40.00 Weekends - - per hour Ashland Senior Center - full facility kitchen &office) Weekends only per hour _..._ ........................—...... I $120.00 ---.._........ _.... __..._..----..._.._.................. _........ __..... _.._ Community Programming Partner Fee $20.00 Pioneer Hall -- ........................ ---........................ __...................... .... ... ..... ....... —......... _............... __.............................. _........ _.... _......................................................... _......... . -- -- . Weekdays - per hour $23.00 Weekends -per hour $35.00 Pioneer Hatt Cleaning Fee (nonrefundable) ......... --- --.._........._............_....---...---- .._......................................._. $0.00 Community Center i _....__— .......................... —..—_.—.__._. Weekdays -per hour --.—..__............... —..._...........- ---------------.._. .. ........ -----F- 1 $23.00 Weekends -per hour ........ _..... __.._...................................... _..__..__........ _.._._..---- .................... _..---... --..._..._......_...... _................ ......... __._....... _......... _........ _ _._...._.... _..... _._............ - -.....__....._._..... __- ............._.......... __......... _..—_$35.00 Community Center Cleaning Fee (nonrefundable) _..__.....................-----._..__..................... ............ ---._...._.........__... ----- .._...... _-..........------- __... -- --._ .-.............. .--......__.;......._..._..------ ..................... _.............. ............. i $0.00 Miscellaneous equipment fee $100.00 ...- .............. _....___..._..................... .... ... ----- --- _. --- - - Electricity use fee - per hours -- - -----.........._ _ j $25.00 Field Usage Fee Description . Fee Field Usage ......................................-----._._.......................................----...._..............._-.._._....................-----------.-........ -..__.... __...... _...... I __...... _.......... _-...... _ ._...................... ............. _... _............. _..................................... .......... _................ Tournaments - per day per team -...._....._...._....-.............._....._..---..._....._..._.._............................._.............._................................................._......_................................... - _--...._......__...-.._..._.._...._.......__...........__.._........._ $50.00 ...._......_........._.__....-..-.__....._._._..._.._...._..._. Ball field lights - per hour $34.00 Facility Usage ..__.... ..................... _............... .............. _-........... _..-_....................... _... ----..................... -._._..__........................ _._...... ------..._...............__._._....... --.... ......... 1 day per week/season (each organization) ...... _.._.._................. __._....._..._..._. -.-.._ $300.00 2 days per week/season (each organization) $450.00 . .._ .... ...............--- ............... .......... _ ........ _.... _._......... ------ .............. ... -._.................. -........... -._.._---- ..... 3.4 days per week/season (each organization) .......... _...._.........................................................................._..._........_._.._.._...__ ..... ----._..._....---.._.... _t..-_._..... _ .-_.._....... - -- $600.00 - 5-7 days per week/season (each organization) $750.00 37 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 CaLle Seating Fee Description 2025/2026 Fee Calle Seating 8-month Season ................ ... - . . . ............. . . . . . ............... . ............._..---------- Artisans 2 weekend days per week - per sq. ft. $6.99 Restaurant Seating 7 days per week - per sq. ft. ............ . . ...... . .... . ..... . . .... . ...... . ............... . ...... . . $10.36 5 days per week - per sq. ft. $6.48 9.5-month Season . . . .... . .. . .. . ........ . . ... . . . .... . .......... . ..... . ......... . . . . ........... . . ... . .................. . ....... --- - - - ---------------------- Artisans 2 weekend days per week - per sq. ft. j $6.99 Restaurant Seating . . .................. . .... . . . . . ......... . .. . . ........ . 7 days per week _per sq. ft* . ..... . ........... . . . ........................... t $12.30 5 days per week - per sq. ft. $7.69 Daniel Meyer Pool Fees Fee Description 2025/2026 Fee Daniel Meyer Pool Admission Youth $3.00 ...... . . . .. ...... . ... . ... . . .. . ............... ........... - ----- . . ... . . ......... . . ........... . Adult $4.50 Lap swim Youth ............ . ... . .... . . ...... . . . ............... . . . .......... . ............ ............. . . ........ . .... . .. ................................... $3.00 . . ....................... Adult $4.50 Water Aerobics/Water Polo Youth .......... . ....... . $5.00 . ............... Adult . . ....... . ...... . . $5.00 Swim lessons (8 class session) Per 8 class lesson 1 to 4 ratio .............. . . . ...... ----------------------- - - . . . ..... . ...... . .... ..... . .......... . . .... . . . ..... . ............ $48.00 . ..... . ... . Per 8 class lesson I to 6 ratio ............ . ..... - — --- - ---- - ---- - ------ $55.00 Cost is dependent on the age of the child and the length of the lesson. Senior only sessions . ....... . ...................... .............. ...... $3.00 . . ................ . . . .......... Private lessons . . . . ... . ............ . .... . .. $30.00 Open swim/Lap swim punch card Youth/Senior 10 punch ... . . . . ...... $27.00 . ... . ..... . ............. Youth/Senior 20 punch $54.00 Adult 10 punch $40.50 Adult 20 punch $81.00 . ........... .... . . ................ . .. . . . . .... . .......... . . ......... . . .. . . . ....... . ..... . Water aerobics punch card (20 punch only) . . .......... . ....... $90.00 38 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Recreation Programs & Community Gardens _60/40 up to 80/20 split w/ instructor and APRC Adult Recreation Programs ......... ---- ......... -.......... - - ...._...._....._...__............................ ­ 60/40 up to 80/20 split w/ instructor and APRC Senior Recreation Programs & Services _- 60/40 up to 80/20 split w/ instructor and Senior Activity Classes APRC (activity fees range from $2-10/class) TouchPass lost card replacement $2.00 Community Garden Fees - - - - -- - - -------- - ----.... __....... -.-._....... __.... -- .... --..... -..... -....... - .... - - _ } - - - - --- - - ----- - -=- ------•--$45.00 1Ox10 I 1Ox12 _ ; $54.00 ......... _....... _ - - -- -- --- --fi------------- 1OX2O - ---- -- ------ ----- - - - - -.- a $80.00 --..........................-----------.......... .... -................. -- - -- - - - ---- -- - - --- - --- -- -------- 20x20 -------------------- --.._-...-- $100.00 ---.................... --........ - ----.— _ _ — -- - 412 - depending on location ----- --- -- - --- $22.00 to $29.00 Refundable deposit $50.00 Nature Center School Programs K-2/half day $150.00 3-5/ full day $225.00 39 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Ashland Rotary Centennial Ice Rink Fee D- . Fee General Admission -------------------------------------- - — - -- — — —.__ - __ -------- �-------------------- Youth ... ---- -- - -- - - - - — - - - - - - - - - --- - $4.00 - -- -............................. _._._.......... --.... -•-......... Adult —...... --............. ...... -----..............._.._.........._.._-...._..........__.......__.._.... _ $5.00 Skate Rental $3.00 Hockey.Admission - Youth Adult - — -- - - --- -�-- $5.00 $9.00 Skating Private Lesson -30 Minutes $28.00 Group Rental Rate - Per Person (8-30 ppl) $8.00 Ashland Rotary Centennial Ice Rink Discounts -------------------------------------------------------- --------------------------------------------------------- ._............. -------- Special event ......................... -... ------...... - ................. -------------...................._....------------------------- ...... --- - ---................... _.............. __._. _.- ....... _._ ---- Youth $2.00 -._._..._._......... ... ------- -- -- - ---- — - ---- $4.00 _Adult Cheap skate -rental �_--_- , W— - — $1.00 _ Student night admission (includes skate rental) I $6.00 Recreation skate gift card _..._._... _.... ._.....-... ---........ ....................................... --............. .._._.._ .... _........... _... --- ---------- ----- ------------------------------- - $6.00 - - ....... Ice Rink Multi -Pass i Youth punch card -all programs (5-13) -- ^_ _ $35.00 Adult punch card -all programs (14+) $45.00 School groups - (per group of 30) $100.00 40 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025 Oak Knoll Golf Course Annual Passes' ............................... _.......... -....... - ... Single ----- Annual payment (7 days) FEE $1,199.00 Single Annual (M-F only) No Holidays $859.00 Multi Round Card (10/9 hole rounds, expires 1 yearfrom purchase) ..................... -•-------- -- - ._............. - - - ----...... - - - - - ---..............- ----... -.... -.......... _._..... $179.00 Name Change: SeniorNet (55+) - single ------...... -............... _..-.... -..... ---- ............... - ... ---- - ---- SeniorNet Annual payment (7 days) ----- -- -- $1,099.00 SeniorNet (M-F only) No Holidays 1 $799.00 Couple/domestic partner ___._..._ -- ---_.._..- - - --------.... _.........------..... -... -........ --- _ — - —._._._... ----...... - ---........... Couple/Domestic Partner Annual payment $1,399.00 Couple/Domestic Partner (M-F only) No Holidays $999.00 -- -.-. ---- --- - Family_+ 1-couple plus one (17and under) in household ------------- t- - Annual payment ----- j $1,574.00 Family+ 1(17 and under) in household (M-F only) No Holidays $1,174.00 Junior -single (17 and under) + $199.00 --•--------------- - - ------ Snowbird (for 6 months) - single ---- ----- ------ $750.00 Daily Adult Fees (Ages 18 +) j - 9 holes walk -... -...... ................................ -....... -._.... _.................... -.............. -... _.................. -... -..... -...................... -.... .... -_.................. -... -................ ........ �....... -................. .................. $20.00 ... - - - - ........... 18 holes walk --- ............. -------._...---- . ------ Senior & Veteran 9 holes walk $32.00 $18.00 Senior & Veteran 18 holes walk - •----------- - -- I - _ $28.00 ------ -_ ..._ ------- - Cart Fees - Per Person, Year -Round --............ _... _._.... ------ .._.. _ --- i ------- —. -- - 9 holes (per seat) $10.00 18 holes (per seat) $15.00 Daily Junior Fees (Ages 8 to 17) -__.... _-_...... --............ --............... -.......................... -------........................ 9 holes - year-round ; $8.00 ---.._ .....__ -- ................_- --.... ---.......... ._..--...... -------........ --.............. -- -- - --- --- 18 holes -year-round -- _ $15.00 -- --- -- Driving Range - One Token (35 balls) '• $4.00 -- --- --- --_ ...._ -- — - -- ---- ----- _-- - - --- ......... _.._._..- Oak Knoll Golf Course Wedding Fees --- . - - --- ---... --- --.............. - _.._ -- - - - - ..... - - -- - November -February -full day - ...... -__ - - - ------ ------------- -------------------- $750.00 November -February - half day $400.00 _ _ _ March -October - full day _ - _ _ — $1,500.00 March -October - half day $800.00 Credit Card Processing Fee 3% The Director has authority to modify rates for marketing and market conditions no less than 20% below standard rates 41 City of Ashland Miscellaneous Fees and Charges - Effective July 1, 2025