Loading...
HomeMy WebLinkAbout2025-06-24 Planning PACKET Planning Commission Meeting Agenda ASHLAND PLANNING COMMISSION S MEETING AGENDA Tuesday, June 24, 2025 Note: Anyone wishing to speak at any Planning Commission meeting is encouraged to do so. If you wish to speak, please rise and, after you have been recognized by the Chair, give your name and complete address for the record. You will then be allowed to speak. Please note the public testimony may be limited by the Chair. I. CALL TO ORDER 7:00 p.m., Civic Center Council Chambers, 1175 E. Main Street II.ANNOUNCEMENTS 1.Staff Announcements 2.Advisory Committee Liaison Reports III.CONSENT AGENDA Approval of Minutes 1.April 29, 2025 Special Meeting Minutes 2.May 27, 2025 Special Meeting Minutes 3.June 10, 2025 Regular Meeting Minutes IV.PUBLIC FORUM Note: To speak to an agenda item in person you must fill out a speaker request form at the meeting and will then be recognized by the Chair to provide your public testimony. Written testimony can be submitted in advance or in person at the meeting. If you wish to discuss an agenda item electronically, please contact PC-public-testimony@ashland.or.us by June 24, 2025 to register to participate via Zoom. If you are interested in watching the meeting via Zoom, please utilize the following link: https://zoom.us/j/95515818704 V. LEGISLATIVE PUBLIC HEARING PLANNING ACTION: PA-L-2025-00016 APPLICANT: Southern Oregon University LOCATION: The Southern Oregon University District ZONE DESIGNATION: SO (Southern Oregon University) COMP. PLAN DESIGNATION: Southern Oregon University District ORDINANCE REFERENCES: 15.04.210-.216 Demolition or Relocation of Structures 18.3.6 Southern Oregon University District 18.4.7 Signs 18.5.2.030 Review Procedures 18.5.7.020 Applicability & Review Procedure 18.5.9 Comprehensive Plan, Zoning & Land Use Ordinance Amendments 18.6.1 Definitions DESCRIPTION: Ashland’s Planning Commission and City Council will conduct public hearings to consider a legislative amendment to the Southern Oregon University Facilities Master Plan. This amendment includes proposed zone changes for properties identified on the attached map that may be sold into private ownership by Southern Oregon University. With adoption of this Page 1 of 2 1 Planning Commission Meeting Agenda Master Plan amendment, the zoning for these properties will be changed as noted on the attached map, however they would remain subject to the SOU Masterplan and SO zoning overlay while under SOU-ownership. Once under private ownership, these properties would be subject to the zoning regulations of the underlying zoning proposed here. VI.OPEN DISCUSSION VII.ADJOURNMENT Next Meeting Date: July 8, 2025 If you need special assistance to participate in this meeting, please contact Brandon Goldman at planning@ashlandoregon.gov or 541.488.5305 (TTY phone number Notification at least three business days before the meeting will enable the City to make reasonable arrangements to ensure accessibility to the meeting in compliance with the Americans with Disabilities Act. Page 2 of 2 2 Planning CommissionMinutes Note: Anyone wishing to speak at any Planning Commission meeting is encouraged to do so. If you wish to speak, please rise and, after you have been recognized by the Chair, give your name and complete address for the record. You will then be allowed to speak. Please note the public testimony may be limited by the Chair. April 29, 2025 SPECIAL MEETING DRAFT Minutes I.CALL TO ORDER: Chair Verner called the meeting to order at 7:00 p.m. at the Civic Center Council Chambers, 1175 E. Main Street. Commissioner Perkinson attended the meeting via Zoom. Commissioners Present: Staff Present: Lisa Verner Brandon Goldman, Community Development Director Eric Herron Derek Severson, Planning Manager Gregory Perkinson Michael Sullivan, Executive Assistant Russell Phillips Susan MacCracken Jain Kerry KenCairn John Maher Absent Members: Council Liaison: II.ANNOUNCEMENTS 1.Staff Announcements: Community Development Director Brandon Goldman made the following announcement: The Commission will review an annexation proposal and site development for 1511 Highway 99 North at its May 13, 2025 meeting. 2.Advisory Committee Liaison Reports – None III.PUBLIC FORUM – None IV.TYPE III PUBLIC HEARINGS PLANNING ACTION: PA-T3-2024-00013 APPLICANT: City of Ashland DESCRIPTION: Ashland’s Planning Commission and City Council will conduct public hearings to consider legislation updating the city’s zoning map and associated land use regulations to designate Climate Friendly Area (CFA) overlay zones as required under the state’s Page 1 of 3 In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please email planning@ashland.or.us. Notification 72 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to the meeting (28 CFR 35.102-35.104 ADA Title 1). 3 Planning CommissionMinutes Climate Friendly & Equitable Community (CFEC) rules. In areas designated as CFAs, cities must allow multifamily residential (with ground-floor mixed use) and townhome development as well as commercial, office and civic uses with maximum building heights of at least 50 feet. A minimum density of at least 15 dwelling units per acre (du/ac) is required for single-use residential developments, and there can be no maximum density cap. In addition, companion changes to the Downtown (C-1-D) zoning district will be considered to permit multi-family dwellings outright, without a mixed-use requirement, at a minimum density of 30 du/ac; to increase the maximum allowed building height from 40 feet to 50 feet, with the option to increase to 60 feet as a Conditional Use; and to remove maximum density limits, without formally designating the Downtown (C-1-D) district as a CFA. Consultant Presentation Elizabeth Decker of JET Planning provided a brief presentation on the proposed CFA map and code changes recommended by the Consultants and those required by the state (see attachment 1). These updates consisted of the following: MAP UPDATES Amend Zoning Map: Maintain existing base zones o Add new Climate Friendly (CF) Overlay for both CFAs o Remove Residential (R) Overlay in Railroad Property o Limit extent of Pedestrian Place overlay o Remove existing Transit Triangle (TT) Overlay o Amend Site Design Zones Map: Expand Detail Site Review Overlay to full extent of both CFAs o CODE UPDATES Add new Climate Friendly (CF) Overlay chapter Remove Transit Triangle (TT) chapter Related updates throughout ADDITIONAL CODE UPDATES Lift Maximum density in E-1, C-1, and C-1-D Zones Increase allowed heights and allow multifamily residential downtown The Commission discussed various aspects of the code and map updates, including walkability, building height, and the historic nature of the downtown area. The Public Hearing and Public Record were closed at 7:40 p.m. Page 2 of 3 In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please email planning@ashland.or.us. Notification 72 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to the meeting (28 CFR 35.102-35.104 ADA Title 1). 4 Planning CommissionMinutes Decision Commissioners Phillips/KenCairn m/s that the Commission recommend that the City Council adopt the ordinance amendments as proposed, including the following actions to implement Climate Friendly Areas within the City of Ashland: Amend the Land Use Ordinance to establish a new Climate Friendly (CF) Overlay chapter and repeal the existing Transit Triangle Overlay (AMC 18.3.14, new and repealed) Adopt additional code amendments for consistency and clarity within AMC Title 18, including updates to chapters 18.2.1, 18.2.2, 18.2.3 and 18.2.6, to align with CFA regulations, ensure implementation of applicable development standards and expand development standards in the C-1, E-1 and C-1-D areas including downtown Amend the Site Design Zones Map to align the Detailed Site Design Review boundary with the Climate Friendly Area boundaries (AMC 18.4.2) Amend the Zoning Map to apply the Climate Friendly Overlay and amend the Residential Overlay Roll Call Vote: All AYES. Motion passed 7-0. V.OPEN DISCUSSION – None VI.ADJOURNMENT Meeting adjourned at 7:52 p.m. Submitted by, Michael Sullivan, Executive Assistant Page 3 of 3 In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please email planning@ashland.or.us. Notification 72 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to the meeting (28 CFR 35.102-35.104 ADA Title 1). 5 Planning CommissionMinutes Note: Anyone wishing to speak at any Planning Commission meeting is encouraged to do so. If you wish to speak, please rise and, after you have been recognized by the Chair, give your name and complete address for the record. You will then be allowed to speak. Please note the public testimony may be limited by the Chair. May 27, 2025 SPECIAL MEETING DRAFT Minutes I.CALL TO ORDER: Vice-Chair KenCairn called the meeting to order at 7:00 p.m. at the Civic Center Council Chambers, 1175 E. Main Street. Commissioner Perkinson attended the meeting via Zoom. Commissioners Present: Staff Present: Kerry KenCairn Brandon Goldman, Community Development Director Eric Herron Derek Severson, Planning Manager Gregory Perkinson Michael Sullivan, Executive Assistant Russell Phillips John Maher Absent Members: Council Liaison: Lisa Verner None Susan MacCracken Jain II.ANNOUNCEMENTS 1.Staff Announcements: Community Development Director Brandon Goldman made the following announcement: The Planning Commission’s approval of the project at 231 Granite Street, PA-T2-2025- 00053, was appealed and will go to the City Council for review at its June 17, 2025 meeting. 2.Advisory Committee Liaison Reports – None III.PUBLIC FORUM – None IV.DISCUSSION ITEMS 1. Walkable Design Standards Consultant Presentation Consultants Pauline Ruegg and Jamin Kimmell of Cascadia Partners detailed how their organization had developed a Walkable Design Standards Guidebook in coordination with the Department of Page 1 of 3 In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please email planning@ashland.or.us. Notification 72 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to the meeting (28 CFR 35.102-35.104 ADA Title 1). 6 Planning CommissionMinutes Land Conservation and Development (DLCD,) which includes a model code for cities to achieve compliance with the state’s Climate Friendly & Equitable Communities rules OAR 660-012-0330 and OAR 660-012-0405. They stated that these design standards would only apply to land use regulations and presented on the following recommended code changes: Applying more design standards to single-family residences & duplexes. Reducing the visual prominence of garages in the streetscape. Limiting Driveway Widths. Requiring more windows and weather protection for commercial uses. Ms. Ruegg also outlined some code changes that the City could voluntarily implement, such as increasing requirements for nonresidential uses in the Basic and/or Detailed Site Overlay to improve pedestrian-orientation, or requiring frequent entries, transparency, and transitions from public to the private realm (see attachment #1). Discussion The Commission was generally supportive of the required policy changes, but was hesitant to adopt changes that were not required by state law that could inhibit or unnecessarily increase the cost of development. 2.Transportation System Plan (TSP) Public Engagement Plan In the interest of limited time remaining, the Commission determined to remove this item was the agenda and instead discuss it at the June 10, 2025 Regular Meeting. V.LEGISLATIVE PUBLIC HEARING A.Economic Opportunity Analysis Mr. Goldman stated that the Economic Opportunity Analysis (EOA) is a technical support document to the City’s Comprehensive Plan, is required by Statewide Planning Goal 9, only creates a factual basis for future land use decisions and does not create policy or regulations, and that its adoption would replace the previous EOA from 2007. Consultant Chris Mefford of Community Attributes Inc. (CAI) provided a brief overview of the EOA, outlining the scope of the study, its methodology, saliant focal points such as population growth, economic composition, interest rates, and the City’s economic development priorities (see attachment #2). He then detailed the six Strategic Themes identified in the study below: Theme 1: Strengthen Economic Resilience through Diversification Page 2 of 3 In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please email planning@ashland.or.us. Notification 72 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to the meeting (28 CFR 35.102-35.104 ADA Title 1). 7 Planning CommissionMinutes Theme 2: Foster Inclusive, Forward-looking Community Theme 3: Unlock the Potential of Local Talent and Institutions Theme 4: Make Space for Business Growth Theme 5: Build Regional Partnerships to Scale Impact Theme 6: Activate Ashland’s Lifestyle Advantage Mr. Mefford concluded with next steps, which culminate with the EOA’s adoption by June 30, 2025. Vice-Chair KenCairn closed the Public Hearing and Public Record at 8:43 p.m. Deliberation and Decision The Commission discussed which shareholders were consulted with over the course of the study, the potential for repurposing buildings or redevelopment, and potential changes in development over the next 20 years. Commissioners Herron/Perkinson m/s that the Commission recommend that the City Council approves PA-L-2025-00017 adopting the 2025 Economic Opportunity Analysis. Roll Call Vote: All AYES. Motion passed 5-0. IV.OPEN DISCUSSION The Commission discussed ex parte contact. Mr. Goldman stated that ex parte contact could potentially occur before the Commission receives the meeting packet, but that ex parte contact should merely be disclosed prior to the Public Hearing where that item is discussed. V.ADJOURNMENT Meeting adjourned at 8:56 p.m. Submitted by, Michael Sullivan, Executive Assistant Page 3 of 3 In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please email planning@ashland.or.us. Notification 72 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to the meeting (28 CFR 35.102-35.104 ADA Title 1). 8 Planning CommissionMinutes Note: Anyone wishing to speak at any Planning Commission meeting is encouraged to do so. If you wish to speak, please rise and, after you have been recognized by the Chair, give your name and complete address for the record. You will then be allowed to speak. Please note the public testimony may be limited by the Chair. June 10, 2025 REGULAR MEETING DRAFT Minutes I.CALL TO ORDER: Chair Verner called the meeting to order at 7:00 p.m. at the Civic Center Council Chambers, 1175 E. Main Street. Commissioner Perkinson attended the meeting via Zoom. Commissioners Present: Staff Present: Kerry KenCairn Brandon Goldman, Community Development Director Lisa Verner Derek Severson, Planning Manager Gregory Perkinson Aaron Anderson, Senior Associate Planner Russell Phillips John Maher Susan MacCracken Jain Absent Members: Council Liaison: Eric Herron None II.ANNOUNCEMENTS 1.Staff Announcements: Community Development Director Brandon Goldman made the following announcements: The Climate Friendly Areas modifications had their second reading at Council on June 3, rd and the Economic Opportunity Analysis (EOA) Ordinance had its first reading. The Council determined to fill the vacant Council seat from a pool of candidates and selected Derek Sherrell. At the June 17 Council meeting, the EOA will have its second reading and the Council will th hear an appeal on the Commission’s approval of 231 Granite Street. At the June 24 Planning Commission meeting the Commission will consider adoption of th the SOU Master Plan. At the July 15 Council meeting, the Council will consider the Hamilton Creek floodplain th map amendments and the Request for Proposals for the remaining six affordable units on the city-owned lots in the Beach Creek Subdivision. At the August 5 Council meeting, the Council will conduct a hearing and first reading of th the ordinance for the Grand Terrace Annexation 2.Advisory Committee Liaison Reports Page 1 of 4 In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please email planning@ashland.or.us. Notification 72 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to the meeting (28 CFR 35.102-35.104 ADA Title 1). 9 Planning CommissionMinutes Commissioner MacCracken Jain announced there would be a dedication event for the newest Playwright’s Walk Plaque on Sunday, June 22 at 2:00 p.m. at the Railroad Park on nd A Street, and noted that she has invitations for anyone interested. She explained that this plaque would honor the “Say Their Names” memorial & Black Lives Matter, and would tie in to Juneteenth celebrations. III.CONSENT AGENDA Approval of Minutes 1. May 13, 2025 Regular Meeting Minutes Commissioner Phillips suggested that in the “Staff Announcements” on page 1, it should refer to the May 27 meeting rather than the April 29 meeting. thth MacCracken Jain/Phillips m/s to approve the Consent Agenda as amended. Voice vote: All AYES. Motion passed 6-0. IV.PUBLIC FORUM – None V.TYPE II PUBLIC HEARING PLANNING ACTION: PA-T2-2025-00056 SUBJECT PROPERTY: 120 Westwood Street PROPERTY OWNERS: Ian and Amie Crisp APPLICANTS: Rogue Planning & Development DESCRIPTION: A request for a variance to the maximum allowed lot coverage to allow for an addition to the existing garage. COMPREHENSIVE PLAN DESIGNATION: Low Density Residential; ZONING: RR-.5; MAP: 39 1E 08 BA; TAX LOTS: 904 Ex Parte Contact No ex parte contact was disclosed, Chair Verner stated that she conducted a site visit. Staff Presentation Senior Planner Aaron Anderson presented the staff report, outlining the request for a variance to lot coverage to allow the construction of a small addition to an existing garage to the property that currently exceeds the permitted lot coverage. He concluded that the Planning Commission could make findings that the approval criteria had been met and that the request is reasonable given the improvement in the nonconforming situation as well as the planning history and surrounding development patterns (see attachment #1). Page 2 of 4 In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please email planning@ashland.or.us. Notification 72 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to the meeting (28 CFR 35.102-35.104 ADA Title 1). 10 Planning CommissionMinutes Questions of Staff Commissioners discussed lot coverage, and whether requiring the removal of impervious surface proposed as appropriate or necessary. Applicant Presentation Amy Gunter of Rogue Planning and Development Services, LLC gave the applicants’ presentation. She explained that the space being added was for project cars which are not driven regularly, and as such didn’t require paved access to the driveway bay. She emphasized that the applicants would support not being required to remove impervious already in place. She further noted that the applicants were concerned with requiring a deed restriction relative to cover as it would have the potential to impact future sales. She requested that the condition be removed or amended to avoid impacting the ability to sell the property. Questions of the Applicant Commissioner MacCracken Jain asked if other alternatives were considered to reduce coverage, including removal of the curved driveway. Ms. Gunter responded that the driveway surface has a decorative design that would disrupt the appearance of the property, and further noted that this decorative treatment has been in place for over 25 years. She suggested that the removals proposed made the most sense. Commissioner Maher asked about other properties’ coverage compliance. Ms. Gunter responded that she had calculated all other properties within the subdivision and found that they were at well over 20 percent coverage. Commissioner KenCairn suggested that most of the hardscape to be removed puts gaps in site circulation that weren’t practical for the functional use of the property. The property owner responded that they in fact wanted to reduce the impervious coverage as proposed. Chair Verner closed the Public Hearing at the Public Record at 7:34 p.m. Discussion and Decision There was discussion of whether to include deed restriction relative to the second kitchen discussed in the staff report. Mr. Anderson confirmed there is already a deed restriction to not install a kitchen, and the applicant had provided photos demonstrating that the second kitchen had been removed. Staff stated that they are confirming with the Building Official whether a formal inspection would be needed, but that no additional conditions with regard to the kitchen are needed. Commissioner Perkinson suggested allowing applicants to work with Staff to adjust the language for a lot coverage deed restriction. Page 3 of 4 In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please email planning@ashland.or.us. Notification 72 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to the meeting (28 CFR 35.102-35.104 ADA Title 1). 11 Planning CommissionMinutes Commissioner KenCairn suggested allowing the Variance and capping the lot coverage percentage at the 50.5 percent proposed. Commissioners Phillips/Maher m/s to approve application with conditions to require: 1) All conditions of the applicant; 2) Require a deed restriction to memorialize this planning approval with lot coverage to be limited to 50.5 percent, and 3) That prior to final project approval, the applicants’ proposed removal of hardscape material shall be completed and verified by the Staff Advisor. Roll call vote: All AYES. Motion passed 6-0. VI.UNFINISHED BUSINESS Transportation System Plan Public Engagement Plan Mr. Severson provided some brief background. Commissioner MacCracken Jain requested that the Public Arts Advisory Committee be added to the “City Bodies” list of stakeholders. There was discussion of why the Ashland School District and Willow Wind were noted separately. Mr. Severson explained that both were noted by the Transportation Commission specifically, and Mr. Goldman added that Willow Wind is located outside the city limits and the urban growth boundary and might not otherwise be included. Commissioner Phillips questioned how success would be measured. Mr. Severson responded that success would be measured both by demonstrating that typically underserved members of the community were involved in the process, and that there input was incorporated into the Transportation System Plan. He added this would likely be documented through a report attached to the Plan. Mr. Goldman noted that a joint meeting of the Transportation Advisory Committee and Planning Commission would likely occur in January or February. VII.OPEN DISCUSSION - None VIII.ADJOURNMENT Meeting adjourned at 7:57 p.m. Submitted by, Michael Sullivan, Executive Assistant Page 4 of 4 In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please email planning@ashland.or.us. Notification 72 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to the meeting (28 CFR 35.102-35.104 ADA Title 1). 12 _________________________________ 13 14 15 16 _________________________________ 17 18 19 20 21 22 23 24 25 26 _________________________________ 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 _________________________________ 53 54 55 56 57 58 59 60 61 62 63 64 65 66 Southern Oregon University Board of Trustees RESOLUTION Delegation of Authority for the Sale of Real Property Whereas, Southern Oregon University (SOU), on July 1, 2015, became an independent university with its own governing Board of Trustees. Whereas, the State of Oregon has substantially changed its investment in Oregon universities and their ability to obtain funding for capital construction during the last decade; Whereas, SOU has experienced a shift in student population over the past decade, including a significant number of students taking online courses that do not require the same level of academic facilities; Whereas, upon an evaluation of current real estate owned by SOU, it has determined that there are specific properties in the university’s portfolio that have no near-term or long- term plans to be used by the university; Whereas, the university is facing a one-time revenue downturn related to the failure of the Federal Government’s Free Application for Federal Student Aid (FAFSA) systems update, which has adversely impacted our ability to recruit new students; Whereas, SOU has the lowest financial reserves of any university in the State of Oregon and has less than twenty-five days of operating expenses, which places the SOU in an insecure financial condition; Whereas, Oregon Revised Statute 352.113 (2) provides that the Board of Trustees may authorize the disposal of real property; Whereas, the Board of Trustees may delegate the disposal of real property to the President of the University or his designee in accordance with the Bylaws and Board Statement of Delegation of Authority. Now, therefore, the Board of Trustees of Southern Oregon University approves the following: 1.Resolved, the Board of Trustees authorizes the President or his designee to dispose of and sell for the financial benefit of the university the properties listed in Attachment A to this resolution; 67 2.Be it further resolved that the President or his designee is authorized to negotiate and enter into transactions they believe will be in the best interests of the university in disposing of properties in Attachment A; 3.Be it further resolved that the President or his designee may take all necessary direct, indirect, and ancillary actions necessary to facilitate the sale of the property, including but not limited to working with the City of Ashland, Jackson County, and any neighboring or impacted landowners regarding land use designations, property line adjustments, and property vacations that may be required to facilitate a sales transaction; 4.It is further resolved that any proceeds generated by the sale of the properties listed in Attachment A may only be used to close the current year budget gap of any approved budget by the Board of Trustees and for university-ending fund balance reserves. VOTE: Barry Yes Chavez Yes Clough Yes Franks Yes Lee Yes Medina Absent Mendoza Absent Santos Yes Schepmann Absent Sharma Shelby Yes Taitano Yes Thalden Yes Thorndike Absent DATE: October 18, 2024 Recorded by, _________________________ Sabrina Prud’homme University Board Secretary 68 Attachment A - Delegation of Authority for the Sale of Real Property 1 of 2 OREGON NATIONAL GUARD STUDENT ARMORY APARTMENTS & FAMILY HOUSING THALDEN PAVILION STUDENT THE FARM AT SOU QU INC Y ST APARTMENTS & FAMILY HOUSING SOFTBALL COMPLEX SOU FARM FIELDS I OW A ST IO WA S T Parking Lot #34 39 1E 09DD TL 400 & 500 approx 0.38 ac PRACTICE FIELDS RAIDER STADIUM FACILITIES MANAGEMENT PLUNKETT & PLANNING CAMPUS CENTER PUBLIC SAFETY STUDENT RECYCLING RECREATION CENTER CENTER LEE ST HE NR Y S T. DIGITAL MEDIA H OM ES AVE CENTER STEVENSON UNION BOOK WEB ST ER ST STORE WE BS TER ST JEFFERSON PUBLIC MUSIC RADIO PA RKE R S T RAIDER TAYLOR OREGON STUDENT CENTER SERVICES GREENSPRINGS FOR THE ARTS COMPUTING CENTRAL SERVICES AS HLA ND ST MARION ASH LAN D STR EE T ADY DEBOER SCIENCE HANNON SCULPTURE SCHNEIDER LIBRARYART MUSEUM Henry St. Properties (8) vacant rental houses STUDENT OUTREACH & & garden) HEALTH & ENGAGEMENT SUSANNE WELLNESS 39 1E 09DD HOMES COX TL 6000, 6199, 6100, M ADR ON E 6198, 6200, 5801, 5800, ST PLE AS ANT W AY 5700, 5600, 5500,&5300 F ERN ST approx 3.42 ac. CAMPBELL CENTER MADRONE Roca St. Properties 39 1E 15BB OR EG ON ST TL 1500, 1501, 1502, 1503, 1352 Madrone St. 1600, 6800, & Fern St. ROW single family house approx 2.55 ac (including 39 1E 15BB TL 9200 P RO SPE CT ST Fern St. ROW) P RO SPE CT ST 0.23 ac WI ND SOR S T EL MS ST F IEL DER ST LIL AC CIR E MM A S T W OO DLA ND D R CAMPUS MAP 010050400 69 January 31, 2024 70 Attachment A - Delegation of Authority for the Sale of Real Property 2 of 2 BEESFTTUBY!MPUBDDPVOU!$BDSFBHF QBSLJOH!MPU!$45 Qbsljoh!Mpu!$45T!Npvoubjo!Bwfovf4:2F1:EE!5112.118641.21/31 Qbsljoh!Mpu!$4545:!T!Npvoubjo!Bwf4:2F1:EE!611!2.118642.:1/29 Upubm!Qbsljoh!Mpu!$45!Bdsfbhf1/49 IFOSZ!TUSFFU!QSPQFSUJFT Tjohmf!Gbnjmz!Ipnf!)Sfoubm*215:!Btimboe!Tu4:2F1:EE!6411!2.11868:.91/57 Wbdbou!)Hbsefo*Btimboe!Tu4:2F1:EE!6611!!2.118692.22/19 Wbdbou!)Hbsefo*Cfbdi!Tu4:2F1:EE!6711!2.118693.11/57 Tjohmf!Gbnjmz!Ipnf2171!Ifosz!Tu4:2F1:EE!6811!!2.118694.91/35 Tjohmf!Gbnjmz!Ipnf2151!Ifosz!Tu4:2F1:EE!69112.118695.71/44 Tjohmf!Gbnjmz!Ipnf2149!Ifosz!Tu4:2F1:EE!69122.118696.31/25 Wbdbou!Mpu2149!Ifosz!Tu4:2F1:EE!7111!!!2.118698.:1/39 Tjohmf!Gbnjmz!Ipnf2167!Ifosz!Tu4:2F1:EE!72112.11869:.61/2: Sjhiu!pg!XbzIfosz!Tu4:2F1:EE!72:92.1:997:.11/12 Sjhiu!pg!XbzIfosz!Tu4:2F1:EE!72::!!!2.1:9979.:1/14 Tjohmf!Gbnjmz!Ipnf2177!Ifosz!Tu4:2F1:EE!7311!!2.1186:1.21/33 Upubm!Ifosz!Tusffu!Bdsfbhf4/55 SPDB!TUSFFU!QSPQFSUJFT Wbdbou!Mpu741!Spdb!Tu4:2F26CC!2611!!2.119998.11/33 Wbdbou!Mpu731!Spdb!Tu4:2F26CC!2612!2.193:12.71/24 Wbdbou!Mpu735!Spdb!Tu4:2F26CC!2613!2.193:13.51/27 Wbdbou!Mpu739!Spdb!Tu!4:2F26CC!2614!2.193:14.31/36 Wbdbou!MpuGfso!Tu4:2F26CC!27112.119999.91/56 Wbdbou!Mpu759!Spdb!Tu4:2F26CC!7911!2.119:49.21/9: Upubm!Spdb!Tusffu!Bdsfbhf3/21 2463!NBESPOF Tjohmf!Gbnjmz!Ipnf!)Sfoubm*2463!Nbespof4:2F26CC!:311!!!2.119:73.51/34 Upubm!Nbespof!Tusffu!Bdsfbhf1/34 71 72 FACILITIES MASTER PLAN AMENDMENT 1 73 Table of Contents FACILITIES MASTER PLAN AMENDMENT ................................................................................. 1 SOU’s Land Acknowledgment .................................................................................................... 3 Chapter 1—Introduction ............................................................................................................ 4 Understanding the 2025-35 Facilities Master Plan Maps ..................................................... 5 Who We Are ........................................................................................................................... 6 Purpose of the Master Plan ................................................................................................... 6 Outreach ................................................................................................................................. 7 Chapter 2—Academic Facilities ............................................................................................... 13 Chapter 3—Athletics ................................................................................................................ 19 Chapter 4—Housing ................................................................................................................. 25 Chapter 5—Future Development ............................................................................................. 30 Chapter 6—Sustainability ........................................................................................................ 35 Chapter 7—Zoning and Design Guidelines..............................................................................43 Acknowledgments ................................................................................................................ 61 Appendix A — Maps ............................................................................................................. 62 Appendix B — Campus Facilities Detail ................................................................................. 69 Appendix C — The Farm Design and Site Plan Documents ..................................................... 73 2 74 SOU’s Land Acknowledgment We acknowledge that Southern Oregon University is located within the ancestral homelands of the Shasta, Takelma, and Latgawa peoples who lived here since time immemorial. These Tribes were displaced during rapid Euro-American colonization, the Gold Rush, and armed conflict between 1851 and 1856. In the 1850s, discovery of gold and settlement brought thousands of Euro-Americans to their lands, leading to warfare, epidemics, starvation, and villages being burned. In 1853 the first of several treaties were signed, confederating these Tribes and others together – who would then be referred to as the Rogue River Tribe. These treaties ceded most of their homelands to the United States, and in return they were guaranteed a permanent homeland reserved for them. At the end of the Rogue River Wars in 1856, these Tribes and many other Tribes from western Oregon were removed to the Siletz Reservation and the Grand Ronde Reservation. Today, the Confederated Tribes of Grand Ronde Community of Oregon and the Confederated Tribes of Siletz Indians are living descendants of the Takelma, Shasta, and Latgawa peoples of this area. We encourage YOU to learn about the land you reside on, and to join us in advocating for the inherent sovereignty of Indigenous people. 3 75 Chapter 1—Introduction Substantial changes have occurred in higher education since the adoption of the Southern Oregon University Master Plan in 2010. In 2013, the Oregon University System and the Chancellor’s Office were eliminated by the Oregon Legislature and each university became self-governed with an independent board of trustees. The state also created a Higher Education Coordinating Commission. These changes substantially altered the funding model for higher education in Oregon as well as the model for capital construction for Oregon’s Technical and Regional Universities (TRUs). This 2025-35 Southern Oregon University Campus Facilities Master Plan (2025-35 Master Plan) is an update from the 2010-2020 SOU Master Plan and is prepared as a guide for campus facility development that is likely to occur during this cycle. This Facilities Master Plan seeks to embrace the current economic realities faced by SOU. With the State of Oregon’s support of public universities and the reality that student tuition cannot continue to climb, this plan also addresses SOU’s desire to create non-traditional revenue and cost containment methods for the long-term stability of SOU as well as put in place opportunities for SOU to build its reserve to face difficult times as we recently did during the pandemic. SOU has intentionally notundergone extensive Visioning and Imagining exercises, as was done leading into the 2010-2020 Plan. This 2025-2035 Master Plan is designed to update changes from the 2010 plan that have occurred on campus as well as identify those projects which the University believes will occur in this cycle. Some Future Development areas are identified for desired projects which are, as yet, undefined and unfunded. The eventual design and use of these Future Development areas and potential projects, will likely require additional discussions and better development of the campus needs that each will address. It is anticipated that in the future, prior to the next iteration of a campus Facilities Master Plan, SOU will engage stakeholders and the community again, in a new strategic Visioning process. This 2025-35 Master Plan is broken down into sections that address the main facilities elements of the SOU campus, each with a map (See, Appendix A) identifying existing and future facilities: Capital Improvements generally; Academic Facilities; Housing Facilities; Athletic Facilities and Sustainability Infrastructure. 4 76 Understanding the 2025-35 Facilities Master Plan Maps The maps are integral parts of this Master Plan. They both aide in the understanding of the future development of campus facilities and also help identify what is known about each project. To capture where we are going in the next decade, it is at times important to understand where we are today. Below is the map of the existing SOU campus: Additionally, this Master Plan addresses some zoning and development code issues (See Appendix A, Map 6, Zoning if Transferred) which will help SOU and the City work together in the upcoming ten years. This plan has been created by a Project Team tasked with identifying the facility needs that fit the goals and clear objectives of the University over this next ten- year period. This Facilities Master Plan supersedes the previous 2010-2020 Plan. In many ways, this 2025-35 Master Plan reflects where the University knows it is headed, while also anticipating the unknown demands on our campus, and provides the flexibility to respond to opportunities during this next ten- year period. 5 77 Who We Are Southern Oregon University is a regionally-engaged learning community committed to being the educational provider of choice for learners throughout their lives. WE INSPIRE curiosity and creativity, compel critical thinking, foster discovery, and cultivate bold ideas and actions. WE ACHIEVE student success, professional preparation, and civic engagement through service excellence, evolving technologies, and innovative curriculum. WE FOSTER access, equity, inclusion and diversity in thought and practice. WE PREPARE our learners to be responsible, engaged citizens in our democracy. WE PROMOTE economic vitality, sustainability, cultural enrichment, and social well-being in our region, the state, the nation, and the world. Purpose of the Master Plan The 2025 Master Plan serves several purposes. It is a guide to facility development, it anticipates student and faculty needs, and it creates certainty of process and understanding between SOU and the City of Ashland. This Master Plan supports the evolving academic and professional development needs of students by identifying facilities such as the Creative Industries Project and The Farm; it anticipates housing needs for the future such as the redevelopment of the Cascade future development area; and it fosters our culture and values by engaging tribal communities, celebrating and supporting our thriving Athletics programs, and embracing sustainability and renewable resources. The Project Team conducted interviews with many stakeholders including Athletics staff; the SOU Native Nations Liaison; Sustainability Director; Facilities Management; University Housing staff; the Deans of Arts and Communication including Center for the Arts; Education, Leadership, Health, and Humanities; Social Sciences; Science and Business; Honors College; and the Dean of Undergraduate Studies and the University Library. 6 78 Outreach The Project Team held two comment forums, both on-campus events, that were held on October 3, 2024and October 10, 2024to present the basic elements of this 2025-35 Master Plan. The goal of these sessions was to communicate the known projects for the next ten years, facilities challenges facing the University and the potential disposal of some University-owned property. During these forums participants could ask questions and concerns. SOU stakeholders and the surrounding community were invited by email and flyers. Based on stakeholder and community feedback, the Project Team included additional future development projects to the Master Plan and clarified the labeling and presentation of several items. In addition to these forums, SOU created a website in order to make it easy for any interested party to submit comments to the Project Team. Examples of this successful outreach include the addition of more family housing for students on the map as well as refined places for public art. 7 79 The Project Team has also worked with Associated Students of Southern Oregon University (ASSOU) Leadership to discuss changes in the 2025-35 Master Plan. Internal Comment Example “The Hawk could improve the consistency and quality of offerings. The dorms could have maintenance promptly repair broken laundry machines. The dorm HVAC could be better explained to students and adjustments supported. The fire alarms could be monitored and false alarms fined to improve sleep quality for students.” External Comment Example “It would be helpful to have more than a map to look at and guess the intention. Could some text be added to the website to explain the maps? Is student population increasing? Decreasing? What majors are seeing greater/less interest? Providing some context around the uni’s patterns and goals would help us provide better feedback.” City of Ashland Goals Statewide planning Rules (OAR 660-30) direct State institutions such as SOU to coordinate with local jurisdictions on campus facilities. This recognizes the unique longevity, growth, and renovation needs for University facilities and the unique role of a university campus within any city. The City of Ashland has created a zoning designation for the SOU campus properties (Southern Oregon UniversityDistrict ) that governs the use and development of this area. The specific provisions of that use and development, contained in this Master Plan, are intended to govern how the campus grows and functions. Once adopted by the City of Ashland, the provisions in \[Chapter 7\] of this Master Plan become the primary governing rules for SO -zoned property, including the future zoning of some property should it be transferred out of University System ownership. In addition to the use and development provisions, the City works in partnership with SOU to create effective transportation systems, infrastructure and services. Together, both SOU and the City work together to benefit the surrounding businesses and community as a whole. SOU’s direct academic programs involveover 5,000 individuals and create a large positive economic impact. Our graduates provide a workforce multiplier for the region and we offer many other campus outreach programs. 8 80 9 81 History Southern Oregon University began as Ashland Academy in 1872, and went through several changes prior to being an official state normal school in 1887. The school was closed due to lack of funding in 1890-95 but reopened in 1899. In 1904, the school became a full state school but funding was again eliminated in 1909, leading to the facility being closed. Finally, in 1926 the school was reestablished in its current location. The initial school facility was Churchill Hall, followed by Britt Hall in 1936 and Susanne Homes 1947 (original section). In 1939 three state normal schools were designated Colleges of Education by the state. Naming Heritage In 1956, the Southern Oregon College of Education became Southern Oregon College, and in 1975 the name changed to Southern Oregon State College. The current moniker of Southern Oregon University was adopted in 1997.Throughout that time, while the name had changed, the mission of serving the educational needs of our students and helping make Ashland a vibrant community remained steadfast. Bright Future This 2025-35 Master Plan looks to a bright future honoring this legacy and charting a course to serve the students of a new era. Each section of this Master Plan addresses elements of campus and charts a path forward: Educational/Academic Facilities, Housing, Athletics, Sustainability, Future Development Areas, and Zoning and Development Standards. A Master Plan is by its nature a forward-looking document but it is also an opportunity to reflect on the 2010-2020 Master Plan and identifies certain elements(completed, continuing, and discontinued), which will inform decisions for this next period of time. Each section of this Master Plan identifies some significant changes that have occurred in the past fifteen years such as upgrades to Churchill Hall and the Performing Arts / JPR Building, the creation of the Lithia Motors Pavilion and creation of Raider Village (Shasta Hall and McLoughlin Hall). 10 82 Changes Since 2010 Master Plan Some projects identified in the 2010-2020 Master Plan have not been pursued and are now considered to be non-viable. These include the Arboretum, Faculty Housing facilities, and the stand- alone Jefferson Public Radio facility. Other priorities from that previous Master Plan have provided significant benefits to the SOU community, such as the pedestrian crossing upgrades along Siskiyou Blvd. and the SOU Solar Initiative. Solar power generation has continued through this past decade and is a significant part of SOU’s ongoing success (see Sustainability, Chapter 5). Some larger ideasdiscussed in the past, such as creating a special overlay zoning district with the City of Ashland, tentatively titled the “University District,” or the construction of Faculty Housing, are no longer included. This idea of an overlay zoning district was discussed in the 2000 Master Plan and again is Spotlight: Improved Safety referenced in the 2010-2020 Master Plan. The potential In 2012, as part of the North Campus Village (“NCV”) residence halls project, SOU commissioned a traffic benefits of providing for a engineering study to analyze the vehicle and pedestrian pattern of development and traffic flow along and across Siskiyou Blvd and Ashland Street redevelopment of property within the SOU campus boundaries. The consultants near or adjacent to the recommended installation of a new diagonal crosswalk at the University is something that major Siskiyou-Indiana-Wightman intersection as well as the the University looks forward to installation of pedestrian-activated flashing crossing signals at discussing in the future, but is other select locations along Siskiyou Blvd and Ashland St. beyond the scope of a Facilities As part of the NCV construction project, SOU upgraded the Master Plan. traffic signals and installed the diagonal crosswalk at Siskiyou- By its nature, the creation of a Indiana-Wightman. As recommended by the traffic study, University District zoning SOU also installed pedestrian -activated flashing crossing signals at Siskiyou Blvd & University Ave, Siskiyou Blvd & overlay will impact not only Garfield St, Siskiyou Blvd & Bridge St, Ashland St & Stadium the University but our St, and Siskiyou Blvd & Frances Lane. neighbors, so a larger process of engagement is critical and Since the signalization and crosswalk improvements, should be done through the pedestrian safety along Siskiyou has improved dramatically, leadership of the City. In 2018 with only 17 incidents down from 47 Motor Vehicle/Pedestrian incidents (as reported by Ashland Police the City did create the Transit Department) over this 12-year period. Triangle District, which encompassed some of the area 11 83 bordering the University. Current discussions with the City indicated that this Transit Triangle District may evolve into a Climate Friendly Area, consistent with the state-wide Climate Friendly and Equitable Community Rules adopted by the State of Oregon. Faculty Housing was an approved element of the 2010-20 Master Plan but funding and design never occurred and has been removed. Related issues such as identifying the appropriate land use zone for property transferred by the University to a private party is addressed as part of the process of legislative adoption for this Master Plan by the City (“Zoning if Transferred” Map, Appendix A.) Transportation System Since the 2010-20 Master Plan the University has seen a significant reduction in enrollment, a significant increase in on-line or hybrid learning and a corresponding reduction in transportation impacts and needs. In recent years there has been a reduction in requested parking passes and no new parking facilities created. It is possible to get a discount for having a carpooling parking pass and the SOU community can get RVTD passes (free for faculty, staff, and discounted for students). RVTD reports increases in SOU pass usage. In light of current needs, no new or altered vehicle system elements (parking, roads or access points) are proposed to be changed. Consistent with our goals of sustainability and multi-model transportation, SOU continues to encourage bicycle use. There are 13 covered bike parking locations on campus providing 260 spots. Understanding that the primary use of bicycles by the SOU community and that the center of campus is encouraged to be ‘walkable', these bike shelters are located primarily around the perimeter of the academic campus and at residence halls. The most recent residence halls (Shasta and McLoughlin) have included bike hangers in each room to provide this option to student bike owners. This is a recognition of security preferences and value of today’s bike. We will continue to review the needs of bike users and update our policies (currently evaluating how to address e-bikes in regard to safety and security) to reflect changing usage and equipment. This will also include working to add secure bike parking to the new Creative Industries project on the west side of campus that would be open to the public for visitors to that side of campus, including for theater or concert events. Pedestrian connectivity and safety continue to be a focus for SOU (See Spotlight on Pedestrian Safety Crossing Siskiyou.) Facilities staff continue to work tirelessly to maintain the quality of pathways throughout campus as those are impacted by weather, landscaping and ordinary wear and tear. One significant project outlined in this Master Plan is within the Athletics core of campus - an improved pedestrian way from Raider Village to the new Softball Complex. This will connect the elements of the campus sporting facilities to the main residence and dining hub providing a comfortable and well signed spine through the north end of campus. 12 84 SOU prides itself in being a walk friendly and bike friendly campus and will continue to build on existing programs and initiatives through the length of this Master Plan. Chapter 2—Academic Facilities Where We Have Been The 2010-20 Facilities Master Plan identified several SOU buildings in need of upgrades & re- investment. Churchill, Britt, Central, McNeal, Science, Theater Arts, and Cascade were identified on that list. SOU has been able to address all of these buildings since 2010 and has also made significant improvements to Taylor Hall. A Map of Academic Facilities and supporting buildings is attached as Appendix A and a full list of facilities and information about each is set forth in Appendix B. 13 85 Significant Changes to SOU Buildings Since 2010 Academic Reno Work Scope Notes BuildingsDates Seismic upgrade and complete systems replacement (HVAC, plumbing, electrical), new Churchill Hall2011 fire & life safety systems, ADA upgrades, new windows, new interior finishes throughout Seismic upgrade and complete systems 2019-24 replacement (HVAC, plumbing, electrical), new Britt Hall (4 fire & life safety systems, ADA upgrades, new phases) roof, new interior finishes throughout Seismic upgrade and complete systems Upper floor TI 2022-replacement (HVAC, plumbing, electrical), new Central Hall buildout scheduled current fire & life safety systems, ADA upgrades, new for 2025 interior finishes, new roof, exterior refurbish Building replaced by the new Lithia Motors McNeal 2017-18 Pavilion and Student Recreation Center Seismic upgrade and complete systems replacement (HVAC, plumbing, electrical), new Science 2015-16 fire & life safety systems, ADA upgrades, new Building windows, new roof, exterior waterproofing, all new interior finishes and equipment A new wing was Theater Arts Interior renovations to the existing building. added to the (Oregon 2017-18 Building additions to add new program spaces existing building for Center for the and faculty offices. New interior finishes new JPR studios & Arts) offices. Replacement of all windows, new exterior 2013 & finishes, renovation of public restrooms, ADA Taylor Hall 2022 upgrades, upgrades to lobbies & corridors, Anthropology dept. renovation Two all-new residence halls (Shasta & Replacement of North Campus McLoughlin-700 beds) and a new Cascade was Village (New 2011-12 Dining/Kitchen facility (Hawk Dining) were envisioned in the Res Halls) constructed on the north campus 2010 MP Replacement of the Abatement & hazardous materials removal in Cascade Cascade complex 2024 progress. Complete demolition to be Complex was anticipated in completed in 2025 the 2010 MP 14 86 Where We Are Going This Master Plan anticipates significant work (beyond maintenance and repair) to several existing buildings in this 2025-35 cycle: Academic Anticipated Work Scope Notes Buildings dates Complete renovation of the existing Music (Creative building and an approx. 10,000 sq. ft. 2025-27 Industries) addition for a new teaching theater, new ADA restrooms & support spaces Exterior rehabilitation (new windows & No change in Education- 2025-27 doors, skylights, exterior waterproofing, building footprint Psychology interior renovations anticipated Digital Media Interior renovations and an approx. 2027-28 Center (DMC) 4,000 sq. ft. addition Future Dev Partial demolition of the west wing, Susanne Homes TBD complete renovation of original building. Demolition of old the farmhouse (155 The Farm Future Dev Walker Ave). Construction of a new Administration TBD multi-purpose building for food prep, Building education, and administration 15 87 SPOTLIGHT: The Farm at SOU Located at the far north end of the SOU campus, adjacent to Pending projects include the new farmhouse (2,200 sq. the ScienceWorks Hands-on Museum, The Farm at SOU is a ft), classrooms, exhibition space, offices, restrooms, a center for sustainability. The student-led organic farm pollinator garden, and a commercial kitchen. produces healthy, sustainably harvested food for the SOU These improvements have been designed and will be community. It is a hub for education, student and faculty incorporated around the existing Thalden Pavilion. research and community outreach to Ashland and the entire Together with the Ashland School District and Rogue Valley. Our projects are inspiring a generation of ScienceWorks, SOU commissioned plans for the phases ecologically-committed leaders who promote a vision of of improving The Farm which are incorporated into this living and working sustainably in community and on the Master Plan and attached as Appendix A. land. The Farm at SOU is and was conceived as a learning laboratory where students from all disciplines can dream The Farm currently employs up to 12 students at one big. Student research and projects on this site have already time. The Farm is critical to two SOU degrees as well as included work on K-12 curriculum to teach watershed a Certificate in Environmental Horticulture and restoration, research on solar technologies in agricultural Horticultural Business. In addition to restoration landscapes, the role of visual art in environmental activism, ecology, hydrology, soil science, and agroecology, the and research on soil water retention. The Farm hosts Farm following courses are taught exclusively at The Farm: to School programs through a collaboration with Rogue Sustainable Food Systems: The Land Valley Farm to School. Sustainable Food Systems: The Harvest As shown on the Academic Facilities Map in Appendix A, Sustainable Food Systems: The Planting The Farm has significant investment and anticipated Propagation, Integrated Pest Management development. Irrigation Management Greenhouse Management Creative Industries The Creative Industries represent a dynamic economic and occupational subsector that encompasses a broad spectrum of activities focused on culture, entertainment, arts, and information. This project will transform the existing Music Building into a state-of-the-art collaborative learning environment, equipping students with professional-grade facilities and tools to thrive in the Creative Industries economy. The renovation will include a seismic upgrade, full replacement of mechanical, electrical, and plumbing systems, new life-safety systems (fire alarms and sprinklers), substantial ADA accessibility improvements, and energy efficiency enhancements. A key component of the project is a 10,000-square-foot expansion, featuring a new teaching studio and support facilities to enhance hands-on learning opportunities. This upgraded facility will enable students to integrate creativity and innovation into their educational experiences and career pathways. SOU’s Creative Industries curriculum emphasizes STEM competencies while prioritizing creative production and storytelling. Students will be 16 88 prepared for diverse careers across music, performing arts, film and video, digital media, design, software development, television, radio, video gaming, eSports, virtual and augmented reality, product design, fashion, architecture, advertising, strategic communication, publishing, journalism, and more. The skills cultivated within this program are not only essential for success in creative fields but also applicable across numerous economic sectors, highlighting the versatility and adaptability of creative development and production. This project is a critical step in preparing students to lead and innovate in the fast-evolving Creative Industries landscape. Education-Psychology Building Renovation Education-Psychology Building is a 47,000 sq. ft. 3-story academic building that was constructed in 1973. The facility is home to the Education and Psychology departments and houses numerous classrooms, faculty offices and the community pre-school. The facility is substantially unchanged since it was constructed 52 years ago. SOU will rehabilitate the Ed-Psych “exterior envelope” over the next 2-3 years. Work scope will include new roofing, replacing the existing skylights, replacing exterior doors and windows, re- sealing patio decks and stair landings, and re-pointing and re-sealing the exterior brick veneer. The building footprint will remain unchanged. The building appearance will be substantially unchanged after this envelope rehabilitation project is completed Digital Media Center SOU’s current Digital Media Center (DMC) is a vital hub for Creative Industries development and media literacy education in Southern Oregon. The DMC boasts unparalleled production resources in the region, including a sound recording booth, an equipment check-out facility, and a 1,000-square-foot multi-cam studio equipped with an LED lighting grid and green screen. These facilities have established the DMC as a key partner for local news organizations, K-12 media educators, and Southern Oregon Public Broadcasting Service (SOPBS). As part of the Creative Industries Project, many current DMC functions will be merged into the new facility. Once the Creative Industries space is online, the existing DMC building will be repurposed for other academic and athletic uses, maximizing the value of SOU’s infrastructure. 17 89 Susanne Homes Building Susanne Homes, constructed in two phases (1947 and 1958), is another example of SOU’s evolving campus needs. Originally designed as a dormitory to foster independent student living, its decades-old infrastructure—including obsolete and failing plumbing systems, steam heating, single-pane windows, community restrooms, and undersized electrical service—can no longer support student housing. Since 2018, the building has been partially occupied by the Honors College and SOU Service Center. A high-level architectural review suggests that the 1958 addition should be demolished, while the original 1947 wing has potential for renovation into academic space. Although design and funding for a renovation have not yet begun, the deteriorating infrastructure necessitatesfuture planning. SOU’s ability to fund academic structures largely relies on State bonding approved by the Oregon Legislature for maintenance, repairs, new construction, demolition, and substantial remodels. With significant deferred maintenance across campus, SOU has strategically allocated available funds to prioritize safe and effective learning environments. While the rising costs of renovation reflect the evolving nature of higher education and increasingly complex building operations, SOU remains committed to addressing these challenges. Beyond maintenance, SOU has embraced innovation to meet the needs of modern students, offering flexible modalities such as online synchronous and asynchronous classes. These advancements require significant investment in physical spaces and technology to support delivery. Despite these shifts, SOU upholds the value of in-person instruction and human interaction, ensuring that the majority of courses continue to foster direct engagement in well- maintained and technologically advanced learning spaces. 18 90 Chapter 3—Athletics Student-athletes play a substantial role in the fabric of SOU. With over 450 student-athletes, our athletic programs are key to SOU’s recruitment and retention of students. Our student-athletes maintain higher-than-average grade point averages and tend to be some of our most involved students in both on- and off-campus activities. SOU has a vision to provide student-athletes, alumni, donors, and fans with competitive facilities and outstanding game-day experiences. A significant part of making this vision a reality was replacing McNeal Pavilion with the current Lithia Motors Pavilion and renovating Raider Stadium. These were key initiatives of the 2010 Master Plan which have beenachieved. Where We Have Been The aging McNeal Pavilion was SOU’s marquee athletics facility for nearly sixty years and was replaced with a state-of-the-art three-story building. The $22 million secured by SOU in 2012, however, was based on renovating, not replacing, the pavilion. When architects and engineers determined that a full replacement was necessary for safety reasons, the state allocation was simply not enough to construct a new facility and house all necessary programs. SOU’s national championship football program, among others, like track and field, was without a locker room in the current plan. The “finished” 100,000 square-foot Lithia Motors Pavilion was not large enough to accommodate all the needs of a growing athletic program for men and women competing in thirteen sports (now nineteen), as well as academic offices and classrooms. To mitigate space issues, SOU simultaneously renovated Raider Stadium. This ensured that SOU 19 91 could remain competitive in the recruitment of student-athletes and compliant with federally mandated Title IX requirements for gender equity. The new Lithia Motors Pavilion is now providing both competition space and locker room space for men’s and women’s indoor sports (basketball, volleyball, and wrestling), men’s and women’s soccer, office space for athletic administration, as well as other academic programs. The building also continues to house the Bob Riehm Arena offering 1,400 seats for spectators attending SOU basketball, volleyball, and wrestling competitions. There are also four classrooms for students enrolled in the Outdoor Adventure Leadership Program and Health and Physical Education. The Raider Stadium renovation project ensured that outdoor sports (in particular football and track and field/cross country) had coach offices, locker rooms for the men’s and women’s teams, meeting and conference areas, a training room, and a weightlifting area for all programs. Improvements have extended beyond the Stadium to Wightman Street, where three dilapidated tennis courts have been converted into sand volleyball courts used by our new Beach Volleyball team. The continued rehabilitation of this area may include upgrades to make the remaining space multi-functional for other similar sports such as Pickleball. 20 92 Where We Are Going As shown on the Athletic Facilities Map, our facilities will continue to be centered around the Lithia Motors Pavilion. The vision for the SOU Athletics District includes a new pedestrian mall that flows seamlessly between Raider Village, the Lithia Motors Pavilion, and Raider Stadium and it will extend to connect to the Softball Complex. This proposed pedestrian walkway and plaza space will use pavers and other natural materials to unite the Athletics District and direct the SOU community to athletic events. Proposed Improvements during this Master Plan include a Softball Complex (Spotlight below), a small expansion to the Lithia Motors Pavilion, a Practice Building, and upgraded facilities for concessions and food trucks. This Master Plan anticipates the continued growth and success of our Athletics programs. We have identified areas that will serve this growth and where future development will take place. SOU does anticipate the use of Future Development Areas shown on the Athletics Map, to be developed under the Design and Development Guidelines and will be in furtherance of our educational Mission. The full design, programming, and funding of such areas are as-yet undetermined. One example of a need that may be addressed with such future development is that our current roster of 110 wrestlers, between our men’s and women’s teams, would benefit from a potential new facility (labeled as Future Development), located between the Lithia Motors Pavilion and the Beach Volleyball courts. Similarly, we appreciate and embrace the passionate Raider fans who attend events at Raider Stadium and want to make this an amazing experience for attendees. This is why the development of a tailgating area has been identified for Future Development, but because there is no current design, timing, or funding for the project, it has been designated for Future Development. 21 93 SOU also anticipates needed upgrades for Raider Stadium. This facility was built in the 1980s and needs additional renovations. An assessment of every aspect—from bleachers to bathrooms to the press box—will be undertaken to move forward with making this facility the center of a quality game-time or graduation experience. The Athletics District is an exciting hub of student life and community engagement with SOU. Investments in these facilities will continue to pay off, creating academic opportunities and top- notch venues for our student-athletes. 22 94 SPOTLIGHT: Softball Complex Since the reintroduction of softball as an intercollegiate sport and the field conversion from baseball to softball, the SOU softball program has won several Conference Championships and three National Titles (2019, 2021 and 2023). The SOU softball program is one of the most popular sports with fans, SOU alumni, and community members. Historically an underutilized baseball field, this portion of the Athletics District was revived in 2001 and the outfield and dirt infield were modified to softball field dimensions. The distance from the dugouts to the playing field remains at baseball field distances. There is a seating capacity of 500 in the existing bleachers. The bleachers and press box have not been changed or upgraded since being installed or slightly improved in 2001 for the softball field conversion. The previous concession stand building has been converted to the team’s locker room. The City-approved plans for the new Softball Complex include new ADA facilities, increased seating capacity, a new entry plaza connecting the Softball Complex to Raider Village, new dugouts, concession facilities, a press box, and a renovated field to NCAA standards, including appropriate lighting and a scoreboard. 23 95 24 96 Chapter4—Housing While SOU continues to modernize its curriculum and offer modalities like online learning, we strongly believe there is tremendous value to having in-person learning. We offer a variety of housing types and styles on campus including family housing. If SOU did not offer on-campus housing, there be further strain on local market rate housing which already has extremely low vacancy rates and, due to Ashland’s limited public transportation, may price some students out of having a collegiate in-person learning experience. Our campushousing provides a socially rich and academically supported experience. Living on campus gives the advantage of being closer to classes and participating in SOU activities. Living on campus leads to making more friends, having better success in any course of study, and creating a tremendous sense of community. In addition to creating a strong experience, living on campus reduces the impacts created by commuting to SOU and also helps to alleviate some of the demand on housing surrounding campus. As shown on Housing Facilities Map in Appendix A, we currently have 962 unrestricted beds available for housing in residence halls and 178 seasonally available beds in Greensprings. SOU also has 166 apartments at SAFH ranging from studios to four bedroom units, as shown on the Housing Map. 25 97 Where We Have Been The on-campus residence hall experience has changed significantly over the years. The modern housing experience reflects more privacy, independence, and better amenities than units built decades ago. Aging facilities such as Cascade and Greensprings have come with a host of issues. Cascade was approved for demolition as part of the last Master Plan and will be completed in 2025. Greensprings continues to suffer infrastructure challenges as a result of its age and initial design. One of the most significant developments during the past fifteen years was the creation of Raider Village and construction of Shasta and McLoughlin Halls. These additions have been critical to providing housing that meets the current expectations and needs of our students. McLoughlin Hall SOU broke ground on Raider Village in April 2012 and officially opened in fall of 2013. McLoughlin Hall is part of Raider Village and features a suite design with both single and double rooms available. It’s primarily a community for returning and transfer students but is open to all students. McLoughlin Hall is also home to the Multicultural Community on the second floor. The purpose of this Multicultural Themed Housing Community is to provide a space for students of different cultures and backgrounds to live, study, and intentionally engage with and explore their unique histories. Shasta Hall Shasta Hall is part of Raider Village and features a semi- suite design with both single and double rooms available. This is primarily a first-year community, but open to all students. Shasta Hall is also home to The Garden 26 98 (LGBTQIA+) Community on the 2nd floor. The purpose of The Garden (LGBTQIA+) Themed Housing community is to provide a safe space for LGBTQIA+ students and allies to live, study, and engage together. Greensprings The Greensprings complex is currently used for seasonal housing because of the deferred maintenance challenges impacting thesefacilities. The failure of critical infrastructure in the 1960s structures has limited its current use. The physical limitations include a lack of air-conditioning, no ADA-compliant amenities, and outdated electrical and plumbing systems. The layout of units, ceiling height, and outdated resident common areas are also sub-optimal and not what current students desire. We believe that prior to 2035 we may no longer be able to house students at any time of year due to the failing facilities which include heating for the building. We recognize that this facility is located at the heart of campus and could meet many future needs if funding became available. Various options are being explored, including keeping the existing concrete structures and creating new interior spaces and infrastructure. A critical first step will be understanding the seismic condition of the current buildings and suitability for renovation. With such substantial work pending and no current plans beyond the current use, the rehabilitation of Greensprings is included as part of this 2025-35 Master Plan. 27 99 Where We Are Going Student Apartments and Family Housing Student Apartments & Family Housing serves members of the SOU community who would benefit from this living situation. This is also an area that we heard addressed many times during our listening sessions with the community and SOU stakeholders. As a result of these conversations, a Future Development Area for expanding the Student Apartment and Family Housing has been added to the Housing Map. It is designated as Future Development because there is no current design or funding for this project. But it SPOTLIGHT: Cascade Future Development Area has clearly been identified as a As part of the 2010-20 Master Plan, the Cascade Complex need, being the type of housing was identified as having significant limitations and in need of most in demand with an massive renovation if it were to continue to serve as a extensive waiting list for residence hall. The scope of deficiencies and cost of even available units. These units minimal upgrades made it unsustainable to continue its provide a flexible and historic use. SOU discontinued use of Cascade as a residence economical option for members hall in 2012. The building was used as flex space to support numerous capital renovations to other buildings on campus. of the SOU communityand particularly older students and Aspen, Baker, and Cedar also functioned as SOU Conference those with families. space until the heating hot water infrastructure failed in late 2023. As part of the approval process for Shasta and University District Lot McLoughlin Halls, Cascade was identified for demolition, with those facilities as replacements. The assessments and We also expect that the process for demolition are underway and this area is University District Future identified for future development. Funding for demolition was allocated to SOU in 2022, through the American Rescue Development project will Plan Act (ARPA) and will be completed in 2025. With the include housing facilities. The completion of the demolition of the old Cascade facility development of this important comes the opportunity to create something innovative and gateway to the SOU campus is special. The options for the future of this area are vast, and too undefined in scope, design, discussed under the Future Development section of this or funding to discuss in detail. At Master Plan. some time in the future, should this project advance, we expect that there will be more opportunities to discuss the design and uses of this area. While being the most undefined of all potential projects identified in this Master Plan, we could see a housing component at this site should SOU grow to the extent that this project is likely. 28 100 29 101 Chapter 5—Future Development Areas Generally As shown on the Capital Improvements Map, there are areas that SOU anticipates will be developed for certain uses in the future. At this time, because there is no specific design nor funding, these projects are identified as “Future Development.” The University anticipates more discussion as the design of projects in these areas evolves, but it would be the intent of the University to develop projects within the approved Development and Design Guidelines contained in this 2025-35 Master Plan. These designated parts of campus are identified on both the Capital Improvements Map as well as the Maps for each type of use anticipated (Housing, Athletics, etc.) Housing - Future Development Faculty housing is no longer anticipated to be a project undertaken by the University. Land identified as potential faculty housing in the 2010-20 Master Plan is now targeted for rezoning and potential sale. While this is no longer a part of the Master Plan, the idea of housing for members of the SOU community, of all ages, continues to be an integral part of SOU’s mission. StudentApartmentsandFamilyHousing(SAFH) One of the key comments during the open forums on this Master Plan (from student leadership) was an identification that the most in-demand housing for students is Family Housing, which is available at the complex of apartment housing located at the north-west extension of SOU. It is an excellent resource for a member of the SOU community, making higher education possible while having a working spouse and children. Identified on the Housing Map as SAFH – Student Apartments and Family Housing – this area imagines an expansion of the existing SAFH development. The University has identified this as an area that could meet this need and would be compatible with the adjacent new Softball Complex. 30 102 Cascade Housing Complex Surrounding the Campbell Center (where the Osher Lifelong Learning Institute (OLLI) program is housed), the Cascadeproject is one of the most exciting projects on the horizon at SOU. It is identified as a Future Development because the design and funding models are just now beginning to be developed. The Cascade building was identified in the 2010-20 Master Plan as an aging facility, where demolition was a likely outcome for this resource and it is currently in the process of being demolished. The removal of this old facility will make way for a new housing facility and creates an opportunity for a new campus dynamic. Retirement today looks very different than it did just decades ago. As people transition from full-time careers, today’s active and engaged retirees are looking for dynamic places to live, learn, and play. Across the nation, communities and campuses are embracing a cohort of older people who want to be part of a college environment. A new facility on the Cascade site could provide a living environment where everyone is involved in not just OLLI courses, but other campus academic courses, concerts, art installations, and athletic events. The educational opportunities for a new residence are limitless. Similar in many ways to the newest student housing (McLoughlin and Shasta residence halls), SOU envisions that this project would be a public/private partnership. It has the potential to generate revenue and welcome a whole new demographic of SOU students and community members. It is easy to imagine a facility that is not just for living but incorporates educational spaces where students are engaged with and learning from older students and residents. Residents are anticipated to be part of the SOU community, just as students living in Shasta Hall or student and their families living in SAFH apartments are today. The University expects that development partners would work within the Design and Development Guidelines within this Master Plan and with the City of Ashland. Determining the viability, programming, and design for this facility is a top priority for the University. 31 103 Academic Facilities - Future Development Native Nations Gathering Space, Native Gardens, Learning Garden Southern Oregon University, in this 2025-2035 Master Plan, identifies several spaces on campus to honor and respect the history and land stewardship of the Indigenous people who lived here since time immemorial. We know that our community benefits from the sharing and fostering of the deep cultural traditions and teachings made available to us by Indigenous communities. As a University, we actively look for ways to continuously develop this connection and recognition. The 2025-35 Master Plan is just one way in which we illustrate this commitment. In partnership with Native students, Native community members and our Native Nations Liaison, the University has identified three Future Development Areas to intentionally create space: The Learning Garden, the Native Garden, and the Native Nations Gathering Space. The Learning Garden is proposed to be located in the heart of the Educational and Academic core of campus while the Native Garden is proposed to be located near The Farm at SOU. Both of these projects will foster Indigenous Traditional Ecological Knowledge (ITEK), implementing and promoting biodiversity, soil health, and ecosystem resiliency. Each area will feature hands- on learning and engagement through workshops, demonstrations, and cultural events. The Native Nations Gathering Space is designated for a location within the North Campus Zone, which contains most of the residential and recreational elements of campus. While there are no current plans for specific development within this envelope, this space is envisioned to enhance the partnership and collaboration between the SOU community and the local Indigenous communities. 32 104 Athletics - Future Development Field House Between the Lithia Motors Pavilion and Raider Stadium, Athletics has identified an area for a future facility. The popularity of certain programs with student athletes justifies considering where growth for indoor programming might occur. There is currently no design nor funding for this project. Tailgate area Fantastic game day experiences are an important way for Ashland and all Raider fans to come to campus and be part of SOU. Located between Raider Stadium and the new Softball Complex, this area is identified for creating a place for game day experiences. Temporary food carts and concessions are existing uses and are will be connected by a new pedestrian mall, but this specific area is reserved for a more dynamic experiential area expanding and enhancing these offerings. Mixed Use / Other – Future Development University District Property After the potential new Cascade project, the University District Property is the most dynamic and far-reaching. This property is truly a blank slate on the edge of campus. Located at the corner of Walker Avenue and Ashland Street, this area, when developed, will become a significant gateway and signature feature of the SOU community. It is easy to imagine a project here embracing campus needs for housing, support services, academic space, or other retail opportunities that would transition from adjacent commercial uses to campus residence halls. With the widest range of potential, SOU believes it should have the widest range of development options and standards. The City has indicated that new zoning standards related to responsible infill and density may be appropriate here – if Ashland is to preserve its current boundaries, creative infill will be required, which the City has chosen to pursue in many elements of its Development Code. As such, the Design and Development standards in this Master Plan have specific provisions addressing flexibility in the development of this University District property. 33 105 34 106 Chapter 6—Sustainability SOU has an extensive history of environmental initiatives and sustainability practices. Climate and Sustainability have only become more important to our communities and to our world over the past fifteen years since the last Master Plan was approved. As part of the 2010 Master Plan, SOU outlined certain goals relating to achieving carbon net zero, developing a strong economy, ensuring sustainable use of natural resources, and preserving those resources. As discussed in that 2010 Master Plan, SOU adopted its own Climate Action Plan and related goals. See https://sustainability.sou.edu/climate-action/. SOU is a GOLD-rated university under the Sustainability Tracking Assessment & Rating System (STARS), a program run by the Association for the Advancement of Sustainability in Higher Education. In 2019 Southern Oregon University received the national “Excellence and Innovation Award” from the American Association of State Colleges and Universities for developing “a comprehensive and impactful sustainability program by collaborating across operations, academics, and engagement.” This outstanding partnership continues as Southern Oregon University uses our land, buildings, and infrastructure as a living laboratory for hands-on learning in multiple disciplines including: hydrology, land use planning, restoration, sustainability management, climate and energy, project management, and art installation. Campus projects are intimately connected to the curriculum. Our students leave SOU knowing they can make a difference in the world, because they already have made a difference using the SOU campus as their lab. In addition to the positive environmental impacts, SOU is also hoping our sustainability measures and goals will help to mitigate future costs. Our solar generation and energy efficiency goals, for example, will allow us to stabilize future costs and mitigate our need to raise fees to meet the continuously rising energy costs. 35 107 Where We Have Been Transportation SOU currently has 16 vehicle charging ports (8 double stations) on campus. These charging stations are located both at residential buildings and adjacent to workplace buildings. There are plans to continue to expand the number of electric vehicle charging ports on campus. Recycling Program and Center A recycling program with an on-campus recycling center for glass, plastics, paper, cardboard, and cans was founded by students in 2011 as part of a capstone project focused on diverting waste from landfill. This is supported by indoor and outdoor central collection points. Minimizing waste production and supporting reuse is our priority. Having a recycling center on campus helps ensure that the highest quality materials for recycling leave the campus. We also recycle a number of other materials and products including ink toner and cartridges, batteries, lamps, lightbulbs, electronic appliances and equipment, books, plants, oil, furniture, wood, scrap metal, marker pens, regular pens, and spray cans. Energy Efficiency SOU’s proactive approach includes upgrading to energy-efficient lighting, boilers, and HVAC systems and installing new meters to better track energy consumption. SOU upgraded the mechanical equipment at the Central Plant Building on campus in 2019. Boilers 1 and 2 were replaced with high-efficiency Hurst boilers with high-efficiency Riello Burners. Boilers 3 and 4 had the burners replaced with the same high-efficiency Riello Burners. A new Riello control system was installed to operate the boilers more efficiently. A new water softener system was installed to help reduce chemical usage. The existing 800-ton and 500-ton centrifugal chillers were replaced with two 800-ton, higher-efficiency centrifugal chillers. The roof-mounted, three-cell cooling tower was replaced with a larger-capacity, high-efficiency, two- cell cooling tower. One of the two existing condenser water pumps was replaced with a larger- capacity pump. 36 108 The operation of the HVAC system for each campus building on the University’s direct digital control (DDC) system is scheduled based on the building occupancy information. When a building is not occupied, the temperature controls go into “unoccupied” status, with a lower setback temperature during the heating season and a higher setback temperature during the cooling season. HVAC systems are also upgraded during renovation projects across campus. LED lighting became the SOU campus standard in 2016 and all new construction and renovation projects since 2016 have incorporated LED lighting. Projects with lighting retrofits throughout the building include the Theatre Building, The Lithia Motors/SRC, Britt Hall, and the Recycling Center. Other renovation projects with partial LED retrofits include the Music Building, Taylor Hall, the Science Building, the Osher Lifelong Learning Institute, and Raider Stadium. SOU has been gradually replacing exterior campus lighting with LED fixtures and more than half of the campus has been retrofitted with LED since 2016. Solar For a small public university, solar is a strong story for SOU. Ideally located in the Rogue Valley, the focus on solar energy dates back to 2000. The analysis of potential solar energy production was a significant goal of the 2010-20 Master Plan. SOU currently has ten solar arrays on campus, totaling 696 kW of solar capacity, plus an array at the Higher Education Center in Medford and a pole-mounted array installed last year by a nonprofit on land leased from SOU. SOU’s first solar array was installed on its Library in 2000. This 6kw solar array has 24 solar panels. In January 2019, SOU expanded and added an additional 55.65 kW of solar to the site, increasing the system's capacity to 62.37 kW. In 2013, students allocated $85,000 from the student Green Fund to install a 32 kW solar array on the Stevenson Union. In 2014, McLoughlin Hall and Shasta Hall both had solar panels added to their roof spaces. McLoughlin Hall has a 73.7kW solar photovoltaic (PV) system and solar thermal panels. Shasta Hall incorporates an82.5kW. In October 2018, the Student Recreation Center/Lithia Motors Pavilion added a 63 kW solar PV system to its facilities. The solar array contributes to the SRC/Lithia Motors Pavilion's LEED Gold Certification as one of its many green building features. 37 109 Designed with solar energy in mind, SOU's Recreation Storage Building boasts a south-facing roof with an optimal tilt to maximize the region's solar resource. The building showcases a 24.14 kW system. This was SOU’s first net zero building, generating more electricity than it uses. Two more solar arrays came online in 2021, The Farm Storage with a 15,48 kW array and the Stadium Storage building with a 49.68kW array. Both net zero buildings mark a total of 3 net zero buildings on campus. In June 2024, SOU installed a 241 kW solar array in addition to the existing one on Lithia’ Motors Pavilion, making it the largest solar array in the City of Ashland. Clean renewable energy is supported by numerous programs such as Oregon’s Clean Energy Targets greenhouse gas emission reduction targets as well as City of Ashland Climate and Energy Action Plan. Solar Arrays are an ideal form of clean energy in the Rogue Valley with the abundance of sunlight and SOU has taken the initiative of working to become the first publicly funded university to generate on campus 100%of its electrical usage. Solar Array locations are identified on the Photovoltaic Array Map (see Appendix A) and design standards are included in the Zoning and Design Guidelines chapter of this Master Plan. Stormwater, Fire Resiliency, and Biodiversity SOU has a long history of pursing and achieving distinction relating to our efforts in managing landscaping and biodiversity. We continue to earn recognition as a Tree Campus USA—an honor we’ve held since 2014—and SOU was the first Bee Campus USA in 2014. Our landscape planning relies heavily on ecological design practices, incorporating regionally-adapted, native, and drought- tolerant plant species. Our ongoing lawn conversion projects aim to increase plant biodiversity, continue to attract a greater number of bird and pollinator species as well as transition to a more drought- tolerant campus in recognition of the changing climate. In 2019, a student project, funded by the Student Green Fund, led to the creation of a self-sustaining bioswale in parking lot 36, effectively managing stormwater and significantly reducing contaminants in local waterways. Additionally, it serves as a practical model for eco-friendly water management, enhancing the campus’s landscape and providing educational opportunities in environmental 38 110 science. There is also a stormwater drainage project at parking lot 4. Together these projects show our ability to innovate, educate and be environmentally conscious all at the same time. Our projects capture stormwater and incorporate drought-tolerant, native plant species. Our irrigation development projects serve the long-term goal of reducing our irrigation water use through data-driven and sensor-based technologies. Low-volume/high-efficiency sprinklers, weather-based control systems, and lawn-replacement projects all contribute to operate with the least possible impact to our local watershed. Where we are going Sustainability is more than just a design feature or construction element at SOU; it is part of the culture. We continue to set goals that illustrate this commitment and pave the way for our future, both environmentally and as a cost-containment measure. Some of these key goals are set forth below. Transportation system goals Achieve a 100% electric campus fleet Expand the number of electric vehicle charging stations on campus Improve commuter transport-related greenhouse gas Recycling Program and Center goals Enhance waste reduction and recycling on campus to minimize landfill waste Foster awareness and participation in waste reduction and SOU’s recycling programs Energy Efficiency Goals Achieve 100% daytime electricity use through renewable electricity generation on campus by 2035 Improve energy efficiency by 25% within 10 years (base year 2022) Reduce Scope 1 and Scope 2 emissions by 50% by 2033 (base year 2022) 39 111 Solar Energy Goals SOU has the goal to generate 100% of its daytime electricity use on campus by solar and be the first public university to do so. It is aiming to have this in place by 2035. See Appendix A for the location of existing and proposed arrays. The future development as outlined in this Master Plan will not only address energy efficiency but will create shading of parking areas and improve water conservation. Stormwater, Fire Resiliency, and Biodiversity Goals SOU’s landscape and biodiversity is managed in a way that helps prepare for the changing climate, including transitioning to more drought-tolerant areas as well as ensuring fire resilience. To continue to enhance pollinator areas and maintain our certification for Bee Campus USA To explore rainwater capture and use, specifically as part of any new solar canopy system. To continue to care for the trees on campus and maintain certification for Tree Campus USA. SOU will continueto pursue its Climate Action Plan published 2010 and updated in he City of Ashland’s Climate and 2021/2022 https://sustainability.sou.edu/climate-action/. T Energy Action Plan, published in 2017, includes an assessment of Ashland’s changing climate. We anticipate that during this 2025-2035 Master Plan, efforts towards climate change resiliency will only intensify. Sustainability lies at the heart of our vision for the future of this campus, driving environmental stewardship, social responsibility, and economic resilience. By integrating innovative green infrastructure, fostering inclusive and equitable community engagement, and optimizing resource efficiency, we aim to create a campus that not only reduces its ecological footprint but also enriches the lives of its students, faculty, staff and surrounding community. Southern 40 112 Oregon University (SOU) has long embraced sustainability as a core principle, weaving it into every aspect of campus operations, academics, and community engagement. The achievements outlined in this Master Plan reflect SOU's commitment to environmental stewardship, innovation, and leadership in addressing the challenges of our changing climate. From energy efficiency and solar power expansion to sustainable landscaping, waste reduction, and the transformative learning experiences provided by The Farm, SOU has established itself as a pioneer in sustainable higher education. Through strategic investments in sustainable practices, we are preparing for a future that balances growth with environmental integrity, enhances social well-being, and promotes long-term financial stability. This master plan commits to leading by example, cultivating a culture of sustainability that extends beyond our campus borders and inspires change at local, national, and global levels. Looking forward, this Master Plan builds on that legacy with ambitious yet attainable goals to enhance energy efficiency, achieve carbon net zero, expand renewable energy use, and foster a campus culture centered on resilience, ecological responsibility, and social equity. At the heart of these efforts is a commitment to social justice—ensuring that sustainability initiatives empower all members of our campus and surrounding community, reduce environmental disparities, and promote inclusivity. By aligning our actions with the principles of equity, SOU aims to create solutions that serve the most vulnerable populations, address systemic inequities, and amplify the voices of historically marginalized groups. Whether through curriculum that equips students to tackle social and environmental challenges, partnerships with local organizations, or a focus on community resilience, SOU prioritizes a holistic approach to sustainability. These efforts underscore our belief that environmental justice and social justice are inextricably linked, and that a truly sustainable future is one where all people thrive. Together, we can ensure that this campus thrives as a model for sustainable development—a place where innovation, creativity and education fuel a more equitable and resilient world. This Master Plan embodies SOU’s enduring commitment to shaping a more sustainable, equitable, and just world. 41 113 42 114 Chapter 7—Zoning and Design Guidelines The design guidelines for development under this Facilities Master Plan update are intended to serve several goals: Provide for buildings at a density appropriate both to a significant university and to the scale • of the Ashland community; Ensure that the scale and articulation of buildings enhance the ‘sense of place’ of the • campus and support walking within the campus environment; Provide direction and certainty to the future development within the SO Zone; • Express the permanence and long-term role of the University in the community. • Application of Master Plan Development Standards The design guidelines in this Master Plan apply within the SO zone and have been adopted by Ordinance. These guidelines apply toprojects and uses related to the educational function of the University and those accessory uses such as Athletic facilities, Housing facilities, Offices, Classrooms and a variety of other facilities described and anticipated in this Master Plan. Development of the SOU campus shall comply with the provisions of the Southern Oregon University District Overlay inthe Ashland MunicipalCode(AMC)18.3.6. Zoning Property owned by the University is currently zoned SO and the uses and development of this property are addressed in AMC 18.3.6. In the past, property that is transferred from University ownership into private ownership has been required to go through the often challenging process of legislatively amending the zoning designation for that specific lot and the related land use maps of the City. SO zoninguses and standards, as addressed in City Code and in this Master Plan, are not appropriate once property is transferred to private ownership. To address this future contingency, SOU is seeking to rezone certain property as part of this Master Plan. These lots will obtain a new residential zone designation but still be subject to the SO District overlay and standards until such a time as the property is no longer owned by the University. The University has identified properties that are under-utilized (listed on the Zoning if Transferred Map), which could conceivably be transferred in the next ten years. Adoption of this 2025-35 Master Plan by the City is a Type IV, legislative approval process, so it is the process necessary to address the potential zoning of property that may be transferred to private parties. Rezoning these lots will provide certainty of future zoning and allow the City 43 115 the opportunity to evaluate appropriate zoning of all parcels at one time, rather than lot by lot. This process is also an opportunity to address one lot which is currently zoned SO but has already been transferred from the University to a private party on Roca Street (668n Roca St.) and who are joining in the application for review of this Master Plan solely for the purposes of the proposed change in zoning from SO to R 1.75, consistent with other similarly situated lots adjacent to it. The zoning of properties identified on the Zoning If Transferred Map will, upon completion of a transfer of any designated lot from the University/ State of Oregon to a private party, will no longer be subject to the SO District overlay. (which by its terms applies only to University owned property.) 44 116 45 117 Site Design Review Projects as outlined in this 2025-35 Master Plan are anticipated to follow the standards of this Chapter. The City of Ashland has various levels of land use site plan review. For projects expressed in this Master Plan, within the areas identified on the applicable Maps, and within the design parameters of this Chapter and Master Plan, the following review process levels apply: For projects 15,000 SF or less - Type I review For projects greater than 15,000 - Type II review Project Design Standards Development density within a university campus is a complex issue, with advantages and disadvantages at both ends of the spectrum. All new construction and major renovations by the University will strive to meet a minimum of Silver LEED standards. For projects serving the University built and operated by private partner, the University will encourage the builder to meet the LEED Silver standards. Several factors specific to SOU support campus development at medium densities: SOU is relatively land-locked,and both the cost of land and the fact that the campus is • surrounded by established neighborhoods limit the potential for expansion of the campus. Any future growth of campus will likely need to be accommodated within this limited land area. The nature of academic programs warrants durable construction at a scale that is cost • effective and supports individual academic programs under one roof. Creating a cohesive campus community that is dense enough to support short walking • distances – and ultimately improved transit – requires a density higher than low residential densities. However, the University also recognizes that the land is located within a community with existing neighborhoods and that its developments ought to be of a compatible scale with those neighboring uses. This is recognized by the SO Zoning provisions calling for Type II or CUP approval processes for projects with potentially significant impacts to surrounding properties. BuildingMassingandOrientation Thoughtful orientation of buildings supports several important development goals. Orientation of entries to the pedestrian circulation system increases the walkable nature of the campus. A generally east-west orientation can help support energy efficiency in building design. And the treatment of building scale – how it is articulated and expressed – can help larger institutional 46 118 buildings be compatible with nearby residential uses. To accomplish the goals described above, the following guidelines apply to new campus construction and major renovations under this Master Plan. Maximum Building Height New construction will be limited to four story construction, except as specifically noted in this 2025-35 Master Plan document. Specific height in feet will be dependent on specific construction types. In areas adjacent to existing residential neighborhoods, building height will typically be lower in order to make an appropriate transition to the surrounding context. However, in order to create a campus that is compact, walkable, and more supportive of transit, single story buildings are strongly discouraged in all campus areas. Maximum Building Size In order to avoid potentially monotonous conditions, individual buildings shall be limited in overall length and footprint \[i.e. ground area covered\] as follows \[See Figure 16\]: 300’ maximum length for academic buildings • 250’ maximum length for residential buildings • 45,000 SF maximum footprint for buildings with retail uses open to the public • No SF maximum footprint for academic or residential buildings • Figure 16: Building Length and Articulation Guidelines 47 119 Building Articulation For any building longer than 200 feet, the plan shall include design elements to prevent unbroken wall lengths greater than 150 feet. These elements shall be an offset or ‘jog’ in the plan or a significant recessed entry or court of at least 25’ in width. Building Entries Buildings that face a major street shall have a significant entry facing the street. Buildings facing the main campus open space shall have a major pedestrian entry facing that open space. Where a building faces both a significant street and the main campus open spaces, entries shall be provided to both. Entries shall be strongly articulated and clearly understandable as entries. Development Along Siskiyou Boulevard Any development or redevelopment along the south side of Siskiyou Boulevard shall seek to reinforce a strong relationship between the campus and the boulevard, through an appropriate combination of the following strategies: Development of a strongly articulated façade and pedestrian entries facing Siskiyou • Boulevard. Minimization of service functions on the Siskiyou Boulevard face of the building, and • enhanced screening of these functions where they exist. Improved, consistent and significant signage acknowledging that visitors have entered the • campus. Building Orientation Wherever consistent with other design goals, such as street orientation, align buildings with the longer dimension in the east-west configuration, to improve potential for building design to capture energy savings related to passive solar management. Setbacks Where campus development occurs across a street from off-campus private housing, buildings shall be set back from the public right-of-way by at least 15 feet, to provide a buffering landscape. Where campus development is across from commercial development and includes ground- floor non-residential uses, buildings shall be allowed and encouraged to be sited at the back of 48 120 the public right-of-way, to encourage a pedestrian-oriented urban streetscape pattern but also balanced with the historical pattern of campus development and building placement. Materials and Character Materials and construction systems shall be selected for long-term durability, and shall be generally consistent with existing campus buildings. While there is not a clear established palette of materials for campus buildings, preference should be given to materials similar to the more significant buildings on campus – such as Churchill Hall and Hannon Library – including red brick, concrete, and stucco. Scale, materials, and massing should be used to create an appropriate transition from the campus to adjacent neighborhoods. Rooftop mechanical equipment will be screened from street view. Lighting Integrate architectural lighting as cohesive elements of building designs in order to contribute to the atmosphere of the built environment and enhance safety. Exterior lighting will promote safe pedestrian environments along roadways, at intersections, and in public spaces. Signage on Campus SOU requires an effective system of visual communication that projects a uniform institutional identity, while at the same time integrating well with the present and future campus environment. Good signage provides a harmonious and aesthetically pleasing arrangement in the following three areas of design: 1.Communication:What signs say, to whom, and for what purpose; how they say it; where the signs are located and how well signs communicate. 2.Graphic Design: How typography, maps, diagrams, iconic and coded symbols, and colors are used to organize information and emphasize messages to help create an overall visual identity. 3.Sign Design: How signs are fabricated and installed, their size and shape, how they are maintained and integrated within the campus physical environment and how they work within the City of Ashland. All SOU signage shall be requested, designed and installed by Facilities Services to ensure all sign standards are followed. The SOU Sign Plan contained within this Master Plan governs the signs placed on property within the SO District overlay. All signs and sign structures shall comply with the standards identified in this Master Plan. When consistent with this Master Plan, 49 121 signage may be installed; any sign not within the size, display, or location standards in this Master Plan must have prior approval of the City of Ashland. Signs that already exist upon adoption of the sign plan will continue to be approved signs. If an existing sign is replaced, then the sign plan policies apply. All signs shall be installed in a manner that does not damage existing buildings orstructures or alter character defining features of buildings or structures. Additional care should be taken with the installation of signs on historic structures. Permanent signs required by building code shall be installed consistent with applicable regulations, standards, and guidelines. Signage along ODOT jurisdictionroadways will comply with any applicable standards and process prior to installation. All other sign requests not included in this document must be submitted to SOU Facility Services for review and approval prior to installation. Any signs that exceed size limits or specific location standards shall be submitted to the City of Ashland for review and approval by the City. Maximum Sign Sizes Building Identification: 10 square feet. Scoreboards: Any replacement of existing scoreboards may be the size of the current scoreboards at the Raider Stadium scoreboard and as approved for the Softball Complex. Reader / Information boards: 9’-9” maximum height as described in this Master Plan. Display features, if visible from ODOT jurisdiction/roadway, shall comply with all applicable ODOT standards and shall go through any applicable ODOT approval process prior to installation. Panel Boards; (3 feet square) Sandwich Boards; (3 feet square) Directional Signs; (ODOT Standards) You are Here; (5 feet square unless otherwise placed in approved locations.) Sign Area Calculations Sign area shall include the entire area within a single perimeter composed of squares or rectangles. When signs are constructed of individual elements, the area of all sign elements, which together convey a single, complete message, shall be considered as a single sign. The sign area is determined by calculating the area enclosed by the smallest single rectangle that will enclose the outside dimensions of the background panel or surface. The sign area is also determined by 50 122 calculating the area enclosed by the smallest single rectangle that will enclose the outside dimensions of the sign display. SOU Banner Plan The SOU Banner Plan, as established by the SOU Facilities department, identifies the parameters for artwork, message, and placement to guarantee that banners are used for SOU- appropriate information and represent the University with an overall institutional message. Any banners visible from an ODOT Right-of-Way must also comply with the applicable ODOT regulations. As temporary signage, banners meeting the SOU Banner Plan may, upon prior approval by Facilities, be installed for an established limited period of time. The University uses outdoor lamp post banners to create a sense of place and as a method of celebrating SOU achievements and the University’s strategic mission. Nothing in this chapter permits the use of the public Right-of-Way facilities for signage without prior approval of the City. Sign Graphic Standards The graphic standards for SOU signage will provide uniformity throughout campus. Message design, nomenclature, and application will be standardized according to this Master Plan (see SOU Graphic Identity Guidelines). Message legibility is considered from the perspective of a variety of users: visitors, university community, vendors and service visitors, people with vision impairment and people with mobility impairment, and other users. SOU may revise and change the graphic design, logo, and messaging within any sign provided that specifications on size, display or location in this Master Plan are still met. 51 123 SOU Graphic Identity Guidelines: 52 124 Monument / Gateway Signs At the gateways to campus, the primary entry and directional signs should be consistent in scale and materials. The base or backdrop for these monument signs should be constructed of durable materials and selected for compatibility with existing campus architecture. The preferred composition shall include steel, natural stone, concrete, or masonry, sited to blend with the natural topography. Earthen berms may be used to blend the sign base into the natural grade where adjacent slopes warrant their use. The entry portals to the campus are an important part of the wayfinding experience and appropriate design of these gateways should enhance the sense of arrival for SOU visitors. There are five (5) identified gateways, two existing and three potential future gateways, as identified on the Master Plan Educational Facilities Map. Smart Kiosks SOU may place electronic smart kiosks internally and externally facing which will have the ability to change a digital screen for purposes like, way finding, campus information, campus events, security, and emergency purposes. The smart kiosks will be similar in design but not limited to the design and size of the kiosk. Kiosks for gateway entry, direction or informational signs within campus will be the Smart City Kiosk (Smart City Kiosk with 55" Display and Speakers from Peerless-AV. 84.1 x 35.4 x 9.9" / 2137 x 899 x 252 mm) or similar. Sign Locations Signs will be placed in standard locations where they can easily be found. Wherever possible, signs will be placed together in a unified system to avoid clutter to the landscape. Site signage will be located so as not to become an obstacle or to conflict with exit signs or pedestrian traffic. Signs will be placed to allow safe pedestrian clearance, vertically and laterally. Sandwich boards shall not be placed on the sidewalk along Siskiyou Blvd. No sign shall be placed within the public Right-of-Way (including sidewalks) or within the areas adjacent to intersections defined by the City of Ashland as a “Clear Vision Triangle.” 53 125 Site location should avoid conflict with door openings or vehicular operations. Signs will be located wherever possible in the “natural line of vision.” Consideration of those with limited head mobility and reduced peripheral vision will be given.Interior signage will be placed where it can easily be found, with consideration for tactile signs where possible. Certain permitted signage, such as scoreboards or electronic reader boards, shall be allowed only in areas identified in this 2025-35 Master Plan. Any signage that is not in compliance with this Master Plan shall be approved by the City of Ashland through the normal process for obtaining a sign permit. Sign Requests Requests for signs can be made through the SOU Marketing Department. Food Trucks The perpetual operation of food trucks and seating may occur within the designated area for food trucks in this Master Plan (See, Maps). Temporary operation of food trucks and seating or the operation of a food truck and accessory seating lasting no more than 72 hours (including set-up and take-down) are permitted in the SO zone. Food truck vendors shall obtain a business license, register for, and pay applicable food and beverage tax, and receive any requisite inspections from the Building and Fire Departments and the Jackson County Environmental Public Health Department. Tree Preservation and Removal Climate change in the Rogue Valley has applied extreme stress to many of SOU’s legacy trees, including campus Douglas Fir, Ponderosa Pine, Sequoia, Ash & Oak species. Drought, prolonged excessive heat, the flat-headed fir borer, the emerald ash borer and the pine beetle have put unprecedented strain on SOU’s tree population. Despite our best efforts and practices, some of SOU’s trees do fall ill and die or become so unsafe that they must be removed. The decision to remove a tree is not taken lightly. SOU adheres to the following principles when deciding the fate of a tree: Identify the affliction; Contract with a licensed arborist to confirm diagnosis and recommend a care plan; Implement an appropriate care plan to be performed by SOU landscapers or a licensed arborist. Appropriate personnel will be decided on a case-by case basis jointly between the SOU Landscape Supervisor and contracted arborist; Selectively prune & remove dead or dying branches to boost afflicted tree’s survival chances; 54 126 If a tree has died, it shall be removed as quickly as possible by SOU landscapers or a licensed arborist. Appropriate personnel will be decided on a case-by-case basis jointly between the SOU Landscape Supervisor and contracted arborist; SOU will replant a minimum of (1) tree for each tree that is removed. Healthy trees shall be maintained wherever possible but can be removed if: The tree is unavoidably within the footprint of a remodeled or newly constructed building; The tree is causing significant damage to a building or infrastructure that cannot be economically remediated, other than through tree removal; The tree is deemed unsafe by a licensed arborist. SOU shall have a certified arborist on staff or have a contract arborist (two year minimum agreement) who will maintain a comprehensive list of all significant trees as defined by Ashland Municipal Code 18.6.1.030, and who will document the reason for the removal of any such tree. The arborist shall maintain all supporting documentation demonstrating the need for removal. The staff or contract arborist will deliver to the City an annual report (similar to what is provided at the time of this Master Plan by the City Parks Department) and documentation to the City. SOU will remove significant trees only upon consultation with licensed arborist (either on staff or contract). SOU will maintain records of any significant tree removal and arborists consultation and recommendations. The annual report will summarize significant tree removals on campus. Locations shall be marked on a campus map and an accompanying spreadsheet shall detail: location, species, cause of death (if applicable), reason for removal, actions taken for replacement. Parking Lot Trees The 2010 SOU Campus Master Plan established that: “Parking areas shall be shaded by deciduous trees, buffered from adjacent non-residential uses and screened from non-residential uses” and that new parking areas comply with City standards for parking lot shading and landscaping. With SOU’s commitment to becoming the 1st publicly funded university to generate enough solar power to completely offset our daytime electrical consumption (estimated at 7.2GW), SOU will be installing parking lot canopies with solar arrays. This is consistent with the recently adopted Climate Initiatives adopted by the State and being implemented at the City level. Pursuing this Sustainability goal requires a change in SOU’s practices to prepare our parking lots 55 127 to be solar canopy ready. Parking lot design moving forward will prioritize maximum solar exposure to the South and limit tree plantings in traditional planter wells that used to be distributed throughout a parking lot. New parking facilities will comply with State and City standards for the number, location and maintenance of trees within parking areas and / or the creation of solar arrays. Solar Arrays Solar Arrays are supported by the Oregon Climate Initiative. SOU has taken the initiative of becoming the first publicly funded university to completely offset its electrical usage with solar power generation. Solar Array locations are identified on the Photovoltaic (PV) Array Map below (and in Appendix A) and equipment as described generally herein may be installed as rooftop or parking lot canopies. It is anticipated that while the technology of solar energy capture may evolve even through the duration of this Master Plan, SOU may continue to install similar equipment in these locations. Further, solar is anticipated to be an option on any new facilities, new development, or new parking areas on campus and is hereby approved to be installed in those locations consistent with the standards of this Master Plan. Arrays within the areas identified on the Photovoltaic (PV) Map and meeting the following standards are permitted: painted steel canopies max length: approx. 120 ft max width: approx. 45 ft. max height: approx. 25 ft. Demolition or Relocation of Buildings As an enduring university institution, SOU has continually adapted to the needs of the community and its students. The combination of perpetual ownership and public benefit mission has 56 128 required an evolution of facilities, including the demolition and replacement of buildings. A university campus of this size is substantially different from the development and ownership of other individually owned lots within the City. As such, the provisions of Demolition and Relocation Standards of AMC 15.04 will generally not apply to redevelopment within the SO District overlay, except it is required to salvage or recycle construction and demolition debris. Prior to Demolition of facilities, SOU shall submit a plan for the salvage or recycling of construction and demolition debris to the City of Ashland Demolition Review Committee for conformance with City standards, which will reasonably approve or modify this Plan in accordance with those standards. Art Installations SOU believes that art in public places promotes visually diverse and culturally rich environments that enhance public spaces and contribute to the lives of Ashland’s residents and visitors. Selection of art for permanent installation on Campus will be made by a SOU Arts Selection Committee. The installation of permanent artwork on Campus shall follow the guidelines of Art in Public Places legislation. Temporary installations of artwork are an important part of the University culture and contribute to an environment of innovation and growth. Temporary installations of art shall be located in designated areas established in this Master Plan (see Academic Facilities Map) pursuant to approval by the SOU Arts Section Committee. Water Resource Protection Zones Nothing in this Master Plan exempts property within the SO District from the standards of AMC 18.3 as it implements State policy, providing that SOU may work with the City and state and federal agencies such as DSL or the Army Corps. to identify applicable Water Resources. Future Development Areas – Special Standards This 2025-35 Master Plan contemplates several distinct areas of Future Development, as shown on the Capital Improvements Map: The University District lot, the Cascade Housing Facility redevelopment, expanded Family Housing, a Native Nations Facility and Gardens, as well as a new Athletics Field House and Tailgating area. Unlike other designated projects which have a fixed scope, purpose, and funding – the University anticipates these general projects to happen in the area shown but does not currently have project designs. As discussed in more detail in 57 129 the chapter on Future Development, these projects will either be built to the standards of this Chapter or pursuant to a Conditional Use Permit, pursuant to City Code. University DistrictLot – Corner of Walker St. and Ashland St. The University and the City share common goals of in-fill, increased density, and efficient development where possible. The City has promoted higher density and innovative development in many ways such as with its Transit Triangle district and its Cottage Cluster ordinance. The University anticipates that the University District Lot and privatelyowned property surrounding will create a focal hub of living and working in Ashland, centrally located between the historic downtown and larger commercial / employment areas to the south of town (such as the Croman area). Buildingheight is limited to the height of the tallest existing building in Ashland. While these standards differ from surrounding current development, the option of vertical development could contribute to this node of Ashland. Parking needs, if any will be evaluated on a campus-wide basis. CascadeHousing For the Cascade Future Development Area. While not intended to substantially alter the nature of the surrounding neighborhood the density may be higher than the density of the prior Cascade Complex which was approximately 194,000 square feet of student housing. A maximum of five stories including residential living, educational instruction space and mixed- use is allowed including; the establishment of common areas, classrooms, medical offices, daycare, support uses (e.g. haircare, nailcare), and retirement living and/or medical facilities which may or may not be required to be licensed by the State of Oregon. Parking needs, if any will be evaluated on a campus-wide basis. Alternatively, the design of a new facility could have a lower architectural profile creating an expansive footprint. Student Apartment and Family Housing The existing demand for units with the existing Student Apartment and Family Housing area is very high. The University and the City share a common value in addressing the housing crisis facing all members of the Ashland community. Adequate housing stock is a national, state and local issue but it is acute to Ashland because of the livability here and the demands of both the University and the tourism industry. The City has promoted higher density and innovative housing development. Expansion of the SAFH units, as shown on the Housing Map may be a maximum of four-story housing units. Residential living and mixed-use is allowed including; the establishment of common areas, classrooms, daycare, and support uses (e.g. laundry, university services, and counseling). Maximum parking standards for this intensity of residential use shall be followed for this project. 58 130 Native Nations The Native Nations Future Development Area reflects a desire to create a meeting and programming space for Native Nations activities for the campus and to liaise with the community at large. The University envisions a remodel of the existing single-family residential home or a new facility to accommodate the meeting and programming needs. A maximum of a three-story building may be considered that would meet with the character of the surrounding university athletic property and the multi-family housing that is being built near it. Parking needs, if any will be evaluated on a campus-wide basis. Learning Garden For the Learning Garden area identified in Attachment A, Map 2, Capital Improvements, LG the University desires to create an educational space and gathering space for projects will foster Indigenous Traditional Ecological Knowledge (ITEK), implementing and promoting biodiversity, soil health, and ecosystem resiliency. This area will feature hands-on learning and engagement through workshops, demonstrations, and cultural events.The university envisions a new facility to accommodate the meeting and programming needs. A maximum of three-story building may be installed with both indoor and outdoor spaces and meet with the architecture of the academic buildings surrounding it. No minimum or maximum parking on-site shall be required. Native Garden & Greenhouse For the Native Garden & Greenhouse area identified in Attachment A, Map 2, Capital Improvements, NG, the University desires to create an educational gardening space with a greenhouse to jumpstart a vision for Indigenous Traditional Ecological Knowledge (ITEK), implementing and promoting biodiversity, soil health, and ecosystem resiliency. This area is currently raw land that is planted and has water and electricity. The university envisions a new facility to accommodate the meeting and programming needs. A greenhouse will be installed and outdoor gardens will be planted. The university may install adjacent parking. No minimum or maximum parking on-site shall be required. Conclusion Like all development codes, these Design Guidelines will provide specific standards and direction to the University and its stakeholders. Renovation, development and wayfinding will all be improved by having this understanding with the City. While Master Plans cannot capture 59 131 all the future changes that may occur on a dynamic campus, it will provide the base standards for a new decade of success and positive growth. 60 132 Acknowledgments 2025 Facilities Master Plan Amendment Acknowledgments We would like to acknowledge the following individuals and groups for their help in compiling this plan. CONSULTANTS Alan Harper, Land Use Consultant ZCS, Architectural Consultant Hathaway Larson, LLP, Legal MASTER PLAN TEAM Rob Patridge, Executive Sponsor & General Counsel Leon Crouch, Director of Facilities Services James McNamara, Projects & Planning Manager Susan Dyssegard, Executive Assistant Holly Frazier, Executive Assistant SOU CABINET Dr. Richard J. Bailey, Jr., President Dr. Casey Shillam, Executive Vice President & Provost Dr. Peter Angstadt, Interim Vice President for Finance & Administration Dr. Carson Howell, Vice President for Finance & Administration Janet Fratella, Vice President for University Advancement Rob Patridge, General Counsel Sabrina Prud’homme, Board Secretary Jonathan Chavez Baez, Assistant Vice President for Equity, Diversity & Inclusion Dr. Carrie Vath, Dean of Students Matt Sayre, Athletics Director SPECIAL THANK YOU TO Faculty & Staff Associated Students of Southern Oregon University (ASSOU) Tiana Gilliland, President ASSOU Dr. Vince Smith, Dean School of Science & Business Becs Walker, Director of Sustainability 61 Kenwani’cahee Kravitz, Native Nations Liaison Patricia Syquia, Attorney for the office of General Counsel 133 Appendix A — Maps 1)Current Conditions 62 134 2) Capital Improvements 63 135 3) Academic Facilities 64 136 4)Housing Facilities 65 137 5)Athletic Facilities 66 138 6) Zoning if Transferred 67 139 7) Photovoltaic EV Arrays 68 140 Appendix B — Campus Facilities Details 69 141 70 142 71 143 72 144 Appendix C — The Farm Design and Site Plan Documents 73 145 74 146 75 147 148