HomeMy WebLinkAboutHargadine_80_PA-T1-2025-00263
The comments of this pre-app are preliminary in nature and subject to change based upon the submittal of
additional or different information. The Planning Commission or City Council are the final decision making
authority of the City, and are not bound by the comments made by the Staff as part of this pre-application.
ASHLAND PLANNING DIVISONSITE: 80 Hargadine Street
PRE-APPLICATION CONFERENCE APPLICANT: Bryan Cope
COMMENT SHEETREQUEST: CUP for Expansion of aNon-
June 5, 2024conforming structure, Site Design Review for
Third Unit
PLANNING DIVISION COMMENTS
This pre-application conference is intended to highlight significant issues before the applicant
prepares and submits a formal application.
Summary:The proposal is to repair the concrete roof of an existing non-conforming garage, raise the
height of the wood-framed header of the garage, create a deck on the roof of the garage as previously has
existed, remove the existing wood deck connected to the cold storage room, and extend the cold storage
room by 8-10 feet and convert to an ADU. The garage structure is non-conforming in regard to its western
setback and pursuant to AMC 18.1.4.030.B would require a conditional use permit (CUP) to expand the
3-dimensional envelope. The existing house has been turned into a duplex per county assessor’s records,
meaning that adding an “ADU” would be the third residential unit on the site and pursuant to AMC
18.5.2.020.B.1. would require a Site Design Review to approve.
The applicant should feel welcome to consult further with the Historic Review Board. They meet bi-
weekly on Thursday afternoons at 3:00pm.
Increasing the volume of a structure so close to the property line could be problematic for certain building
elements with regard to the Oregon Structural Specialty Code (OSSC). It is strongly recommended that
the applicant reach out to the Building Division to confirm what will be required of the remodel/repair.
Property pins will need to be visible for building footing inspections to confirm the location of the
property line. If you are unable to recover the established monuments a professional surveyor may need
to be employed.
Density (Third Unit): The base density for R-2 zoned property is 13½-dwelling units per acre. For
the subject property, this equates to 0.13 acres x 13.5 du/acre = 1.755 dwelling units as a base density.
Additionally, the minimum lot area for three dwellings is 9,000 square feet and the lot here is less than
approximately 6,000 square feet. The development of three or more dwellings would require Site
Design Review, however there is not enough lot area here to accommodate a third unit on the property,
even if all of the units were less than 500 square feet in size and therefore only counted as .75 of a
unit. As such, a third unit on the property could not be approved.
MPFA: AMC 18.2.5.070 provides for the Maximum Permitted Floor Area (MPFA) in Historic
districts. A final application would need to detail the amount of Gross Habitable Floor Area (GHFA)
80 Hargadine Street
June 5, 2024 / VA
Page 1
within the historic district and demonstrate that the proposed GHFA falls within the allowed MPFA.
Historic District: The Historic Preservation Advisory Committee Review Board reviewed the
proposal prior to the pre-application submittal during the May 9, 2024, meeting.Materials submitted
to the Review Board are the same materials submitted for the pre-application. Members were
generally supportive of the necessary garage repairs but did not have comments on the repairs or
expansion of the cold storage room. The final Site Review application submittal should also include
written materials and drawings to demonstrate compliance with the Historic District Development
Standards of 18.4.2.050. (i.e.. including scalable elevations of all sides of the buildings as proposed,
clear scalable drawings with details of materials, trim, etc as described in AMC 18.5.2.040.B..
Traveler’s Accommodation: As staff understands it, the applicant may be interested in operating a short-
term rental on the property. When this was previously proposed, it required a Variance to the requirement
for proximity to a higher order street as well as the standard required Conditional Use Permit. Travelers
Accommodations also require the business owner live on site as their primary residence during operations.
It could be difficult to obtain Variance approval to allow a Travelers Accommodation given that there is
a recognized statewide housing crisis, and a Variance would effectively be taking a rental unit (a
recognized needed housing type) out of available housing inventory.
UNDERLYING ZONE PROVISIONS (18.2.5.030.A.)
ZONING: R-1-2, Multi-Family Residential with a 5,000 square foot minimum lot size. Minimum
lot width is 50 feet. Lot depth 80 feet to 250% of the width. Lot width shall not exceed lot depth.
OVERLAYS: The property is located in the Hargadine Historic District. The house at 80 Hargadine
Street is identified as the Nininger, Amos, & Vera House and is individually listed, historic
contributing. Additional information on the existing house is available at the Community Development
Department. The property is also located in the hillside and wildfire lands overlays.
MAXIMUM BUILDING HEIGHT: 30 feet maximum height within the historic districts.
SETBACKS: Eight feet for unenclosed porches, 15 feet for front yards, and 20 feet for front-facing
garages. Six feet for side yards but ten feet for side yards abutting a public street. Ten feet per story
and five feet per half-story for rear yards. In addition, the setbacks must comply with the solar access
requirements.
LOT COVERAGE: A maximum of 65 percent of the lot may be covered with impervious surface.
Please identify on site plan and in text all areas of landscaping, impervious surface, patio space,
outdoor recreational space, etc.
LANDSCAPING REQUIREMENTS: 35 percent of the site must be retained in landscaping, and a
site-, size-, and species- specific landscaping plan is required at time of formal application. The
landscape plan must address any required screening, and include street trees, one per 30 feet of street
frontage where applicable. Avoid using lawn. Provide irrigation system for all landscaped areas.
Landscaping shall be designed so that 50 percent coverage occurs after one year and 90 percent
80 Hargadine Street
June 5, 2024 / VA
Page 2
coverage occurs after five years.
PARKING, ACCESS, AND INTERNAL CIRCULATION: The City of Ashland no longer has
minimum off-street parking requirements. However, if parking is voluntarily provided on-site, the
application will be subject to the parking standards of 18.4.3 for dimensions, circulation, surface
materials, and backup standards.
WRITTEN FINDINGS
Conditional Use Permit AMC 18.5.4.050
A. Approval Criteria. A Conditional Use Permit shall be granted if the approval authority finds
that the application meets all of the following criteria, or can be made to conform through the
imposition of conditions.
1. That the use would be in conformance with all standards within the zoning district in which
the use is proposed to be located, and in conformance with relevant Comprehensive plan
policies that are not implemented by any City, State, or Federal law or program.
2. That adequate capacity of City facilities for water, sewer, electricity, urban storm drainage,
paved access to and throughout the development, and adequate transportation can and will be
provided to the subject property.
3. That the conditional use will have no greater adverse material effect on the livability of the
impact area when compared to the development of the subject lot with the target use of the zone,
pursuant with subsection 18.5.4.050.A.5, below. When evaluating the effect of the proposed use
on the impact area, the following factors of livability of the impact area shall be considered in
relation to the target use of the zone.
a. Similarity in scale, bulk, and coverage.
b. Generation of traffic and effects on surrounding streets. Increases in pedestrian, bicycle,
and mass transit use are considered beneficial regardless of capacity of facilities.
c. Architectural compatibility with the impact area.
d. Air quality, including the generation of dust, odors, or other environmental pollutants.
e. Generation of noise, light, and glare.
f. The development of adjacent properties as envisioned in the Comprehensive Plan.
g. Other factors found to be relevant by the approval authority for review of the proposed
use.
4. A conditional use permit shall not allow a use that is prohibited or one that is not permitted
pursuant to this ordinance.
5. For the purposes of reviewing conditional use permit applications for conformity with the
approval criteria of this subsection, the target uses of each zone are as follows.
80 Hargadine Street
June 5, 2024 / VA
Page 3
b. R-1. Residential use complying with all ordinance requirements, developed at the
density permitted by chapter 18.2.5 Standards for Residential Zones.
PLANS AND EXHIBITS
Conditional Use Permit: AMC 18.5.3.040
A. General Submission Requirements. Information required for Type I or Type II review, as
applicable (see sections 18.5.1.050 and 18.5.1.060), including but not limited to a written statement
or letter explaining how the application satisfies each and all of the relevant criteria and standards.
B.Plan Submittal. The plan or drawing accompanying the application shall include the following
information.
1. Vicinity map.
2. North arrow and scale.
3. Depiction and names of all streets abutting the subject property.
4. Depiction of the subject property, including the dimensions of all lot lines.
5. Location and use of all buildings existing and proposed on the subject property and
schematic architectural elevations of all proposed structures.
6. Location of all parking areas, parking spaces, and ingress, egress, and traffic circulation for
the subject property, including accessible parking by building code.
7. Schematic landscaping plan showing area and type of landscaping proposed.
8. A topographic map of the site showing contour intervals of five feet or less.
9. Approximate location of all existing natural features in areas which are planned to be
disturbed, including, but not limited to, all existing trees of greater than six inches DBH, any
natural drainage ways, ponds or wetlands, and any substantial outcroppings of rocks or boulders.
OTHER CITY OF ASHLAND DEPARTMENT COMMENTS
BUILDING: The applicant will need to meet current building codes for any additions, remodels, and
changes of use. Adjusting the wall height or footprint would trigger requirements for fire separation
from property lines and other structures on the same lot outlined in 302 of the ORSC (see ORSC
Section R302.1). Please contact the Building Division for any building codes-related questions at 541-
488-5305.
CONSERVATION:For more information on available water conservation programs, including any
available appliance rebates or assistance with landscaping and irrigationsystem requirements, please
contact the Conservation Division at 541-552-2062. For information on any financial or technical
assistance available for the construction of Earth Advantage/Energy Star buildings, please contact
Conservation Analyst/Inspector Dan Cunningham at 541-552-2063 or via e-mail to
dan.cunningham@ashland.or.us
80 Hargadine Street
June 5, 2024 / VA
Page 4
ENGINEERING:Please contact Karl Johnson of the Engineering Division for any Public
Works/Engineering information at 541-552-2415 or via e-mail to karl.johnson@ashland.or.us .
FIRE: Please contact Mark Shay from the Fire Department for any Fire Department-related
information at 541-552-2217 or via e-mail to mark.shay@ashlandoregon.gov.
WATER AND SEWER SERVICE:Please Contact the Water Department at 541-5488-5353 with
any questions regarding water utilities.
ELECTRIC SERVICE: If any upgrades to an existing service are necessary, please have the
applicant contact the Electric Department at 541-488-5357.
PROCEDURE
A CUP is subject to a “Type I” procedure which includes an administrative decision made following
public notice and a public comment period. Type I decisions provide an opportunity for appeal to the
Planning Commission as provided in AMC 18.5.1.050.G. The decision of the Planning Commission
is the final decision of the City on an appeal of a Type I decision.
APPLICATION MATERIALS:
The application is required to include drawings of the proposal (i.e. plan requirements) as well as
written findings addressing the applicable approval criteria in accordance with the Ashland Land Use
Ordinance (ALUO), Chapter 18 of the Ashland Municipal Code. The following section includes the
requirements for plans and approval criteria which are applicable to the proposal as described in the
pre-application submittals. When more than one planning approval is required for the proposal,
multiple sections of the ALUO may apply. The burden of proof is on the applicant(s) to ensure that
all applicable criteria are addressed in writing and that all required plans, written findings, and other
materials are submitted even if those items were not discussed in specific, itemized detail during this
initial pre-application conference.
Submittal Information.
The application is required to include all of the following information.
a. The information requested on the application form at
https://or-ashland.civicplus.com/DocumentCenter/View/262/Zoning-Permit-Application-
PDF
b. Plans and exhibits required for the specific approvals sought (see below).
c. A written statement or letter explaining how the application satisfies each and all of the
relevant criteria and standards in sufficient detail (see below).
d. Information demonstrating compliance with all prior decision(s) and conditions of
approval for the subject site, as applicable.
e. The required fee (see below).
The Ashland Land Use Ordinance, which is Chapter 18 of the Municipal Code, is available on-
line in its entirety at: https://ashland.municipal.codes/LandUse
80 Hargadine Street
June 5, 2024 / VA
Page 5
Narrative Submittal Requirements:
Applicants are advised that in addition to required plans, written findings addressing how the
ordinance criteria are satisfied in narrative format are required. The applicable criteria are included
below. The Ashland Land Use Ordinance in its entirety may be accessed on-line at:
https://ashland.municipal.codes/LandUse
Conditional Use Permit AMC 18.5.4.050
o
Tree Removal (if applicable)AMC 18.5.7.040
o
Plan Requirements:
Two (2) digital copies of the plans below. Please submit clear, reproducible copies. The final
application submittal need to include scalable drawings to facilitate review by staff,
commissioners and the public.
Conditional Use Permit: AMC 18.5.4.040
o
Tree Protection Plan (if applicable) AMC 18.4.5.030
o
Tree Removal (if applicable) AMC 18.5.7.030
o
FEES: Conditional Use Permit$1,271.25
NOTE: All applications received are reviewed and must be found to be complete before being
processed or scheduled at a Planning Commission meeting. Applications will not be accepted
without a complete application form signed by the applicant(s) and property owner(s), all required
materials and full payment. Applications are reviewed for completeness in accordance with ORS
227.178.
For further information, please contact: June 5, 2024
Veronica Allen, Associate Planner Date
City of Ashland, Department of Community Development
Phone: 541-552-2042 or e-mail: veronica.allen@ashland.or.us
80 Hargadine Street
June 5, 2024 / VA
Page 6
CityofAshlandPlanning Division
51 Winburn Way • Ashland, OR 97520
Phone (541) 488-5305 • Fax (541) 488-6066
Email:
Planning@ashland.or.us
Pre-Application Conference
InformationSheet & SubmittalRequirements
PURPOSE
Pre-application conferences are required for all projects that require a Type I, Type II or Type III planning
actions as defined in Chapter 18.5.1 of the Ashland Municipal Code. Definitions for Type, I, II and III planning
actions can be found at www.ashland.or.us/code.asp. If you are unsure if your project falls into any of the
categories listed, please contact the Planning Division of the Community Development Department for
assistance at (541) 488-5305.
The purpose of the pre-application conference is to allow the applicant and the City Staff to meet and
discuss the proposed project early in the development process. This early review and meeting helps to
identify opportunities and key issues prior to preparation and submission of the Planning application. Before
a proposal goes before the Planning Commission for approval, most of the issues can be worked out so
that the project is ready for review with few additional changes or conditions needed.
PROCESS
Requests for a pre-application conference must be submitted to the Planning Division a minimum of two
weeks in advance of the scheduled meeting. Pre-application conferences are scheduled for Wednesdays
between 2:00 and 4:00 PM. These conferences are scheduled on a first come – first served basis. A time
cannot be reserved without payment and a complete submittal as described on the attachment.
The narrative and the plans are then electronically sent to each concerned department to review and return
comments to the Project Planner. Where applicable, other agencies such as the Oregon Department of
Transportation and Jackson County will be invited to comment.
At the conclusion of the pre-application conference, you will receive a list of comments on what you will
need to submit for your planning action. In some cases, the Project Planner may recommend waiving the
pre-application meeting if the pre-application comments are self-evident and there are no critical issues.
Once the pre-application comments are issued, you have six months to submit for your planning action. If
more than six months elapse from the time of the conference to your planning application, a second
conference may be required due to potential code changes.
CityofAshlandPlanning Division
51 Winburn Way • Ashland, OR 97520
Phone (541) 488-5305 • Fax (541) 488-6066
Email:
Planning@ashland.or.us
DESCRIPTION OFPROJECT
Project Description
I. Remove broken concrete roof from existing garage; increase height of existing wood-framed header,
above garage’s stone walls approximately 14-15”; replace roof with fire-retardant material; extend existing deck that is attached to
back wall of garage, out over the new garage roof. II. Increase square footage of existing cold storage building, that is attached to
the deck, to add a shower and make it into an additional dwelling unit.
APPLICANT
Name Bryan Cope Phone 626-755-0843 E-Mail bac0829@yahoo.com
Address 80 Hargadine Street City Ashland Zip 97520
PROPERTY OWNER
Name Bryan Cope Day Time Phone 626-755-0843
Address 80 Hargadine Street City Ashland Zip 97520
DESCRIPTION OFPROPERTY
Street Address 80 Hargadine Street Assessor’s Map No. 39 1E 09BC04900 Tax Lot(s) 10067665
SUBMITTAL REQUIREMENTS
submit this form with true scale PDF drawings to Planning@ashland.or.us.
To request a pre-application conference, The
application will need to include plans addressing the application submission requirements including site and landscaping plans
drawn to a standard scale and formatted to print to scale on paper no larger than 11-inches by 17-inches.
1.Completed Application.
2.Narrative –
Provide a written description of proposal and request. (If in Historic District, provide pictures of existing
structures, elevations of proposed structures and details of planned exterior design features and materials)
3.Site Plan –
The site plan should contain all applicable elements in the Site Plan Checklist (see page 2) plus any other
information pertinent to this proposal. The site plan will be checked to insure all applicable information is included at the time
the pre-application date is set.
4.Additional information -
Provide in the narrative or with the site plan:
1) Number of acres in development
2) Total gross square footage of all structures
3) Number of stories on each structure
4) Indicate number of and square footage of:
a) Dwelling Units (include the units by the number of bedrooms in each unit – e.g. 10 1-bedroom, 25 2-bedroom, etc)
b) Office Spaces
c) Retail Units
d) Other Spaces
CityofAshlandPlanning Division
51 Winburn Way • Ashland, OR 97520
Phone (541) 488-5305 • Fax (541) 488-6066
Email:
Planning@ashland.or.us
5) Percentage of lot coverage by:
a) Structures e) Landscaping
b) Streets & Roads f) Number of parking spaces
c) Parking Areas/Driveways g) Total square footage of landscaped areas.
d) Recreation Areas h) Other pertinent information of the proposed development
5.LEED® Certification –
Indicate whether project will be pursuing LEED® certification.
6.Submittal Fee - $200.00
PRE-APPLICATION SITE PLAN CHECKLIST
YESNON/A
1. ProjectName -Stonehouse Garage Improvements and Additions
X
2. Owner Name
X
3. Site Address and Map & Taxlot Number
X
Vicinity Map - with street names and locations of all existing and proposed streets
4. Vicinity
within or on the boundary of the proposed development
Map
5. Scale & North Arrow
Exhibit A
6. LotLayoutwith approximate dimensions for all lot lines
X
7. Zoning Designations in proposed developmentand surrounding properties
X
8. Location&Useof allproposed and existingbuilding, fencesandstructures
X
9. Indicate which buildingsare to remain and whichare to be removed
X
Locationof all landscaped areas. Indicateexisting trees, size, species, and
10.
X
approximate drip line (outer branch location). Identify trees to be removed.
11.
Locationand size of allpublic utilitiesin and adjacent tothe proposed development
X
including water line and meter size, sewer lines, storm drain lines, nearest fire
hydrant.
Locations of drainage ways or public utilityeasementsin and adjacent to proposed
12.
X
development.
13. Location, size anduse of all contemplatedand existingpublic areas
X
14. Approximatetopography (slope)of the site
X
Location of all parking areas and individual and handicap parking spaces, ingress
15.
X
and egress on the site and on-site circulation
Use designation fortheareas not covered by buildings(e.g. loading, storage,
16.
X
vacant, open space, etc.)
17. Elevations ofthe building(s)
X
Constructionmaterials– woodframe, masonry, etc. (If project is in a Historic District
18.
X
provide pictures of existing structures and indicate proposed exterior materials for
siding, windows, trim and roofing)
CityofAshlandPlanning Division
51 Winburn Way • Ashland, OR 97520
Phone (541) 488-5305 • Fax (541) 488-6066
Email:
Planning@ashland.or.us
PRE-APPLICATION BUILDING INFORMATION
Please attempt to indicate the following (Note: if information is not known please leave blank)
1.Current Building Occupancy Type (select one):
Assembly = More than 50 occupants
Theaters, Restaurants, Nightclubs, Taverns and Bars, Community Halls, Art Galleries, Places of Worship,
Arenas, Bleacher’s, etc.
Business = Less than 50 occupants
Professional Service Office, Barber and Beauty Salons, Training and Skill Development not within a school
or academic program, Bank, Print Shop, etc.
Educational
Schools K-12th Grade, Religious Educational Rooms and Auditoriums, Day Care Facilities
Factory
(F- Occupancy’s include, among others, the use of a building or structure or portion thereof, for assembling,
disassembling, fabricating, finishing, manufacturing, packaging, repair or processing operations that are not
classified as Group H-Hazardous or Group S-Storage Occupancy’s
High Hazard
H-Occupancy’s includes, among others, the use of a structure, or a portion thereof, that involves the
manufacturing, processing, generation or storage of materials that constitute a physical or health hazard in
quantities allowed in control areas complying with section 414 of the Oregon Structural Specialty Code.
Institutional
I-Occupancy’s includes, among others, the use of a building or structure or a portion thereof for more than 16
persons, excluding staff, who reside on a 24 hr. basis in a supervised environment and receive custodial
care. Detoxification Facilities, Hospitals, Medical Care, Nursing Homes, Congregate Living Facilities, Social
Rehabilitation Facilities, Assisted Living Facilities, Alcohol and Drug Centers, Correction Centers, Jails,
Reformatories, Adult and Child Day Care Facilities.
Mercantile
Department Stores, Drug Stores, Markets, Motor Fuel-Dispensing Facilities, Retail or Wholesale Stores,
Sales Rooms.
Residential
Single Family Residence, Hotels, Motels, Apartment Houses, Vacation Time Shares, Congregate Living
Facilities (more than 16 occupants), Assisted Living Facilities (with or without a Memory Care Endorsement),
Residential Treatment Facilities, etc.
2.Is a Change of Occupancy being requested? NO
Assembly High Hazard
Business Institutional
Educational Mercantile
Factory Residential
3.If Residential please indicate which type (select one):
R-1 Occupancy
Hotels (transient), Motels (transient), Boarding Houses (transient) with more than 10 occupants.
R-2 Occupancy
Apartment Houses, Congregate Living Facilities (non-transient) with more than 16 occupants, Dormitories,
Hotels (non-transient), Motels (non-transient), Vacation Time Share Properties, Boarding Houses (non-
transient) with more than 16 occupants, etc.
CityofAshlandPlanning Division
51 Winburn Way • Ashland, OR 97520
Phone (541) 488-5305 • Fax (541) 488-6066
Email:
Planning@ashland.or.us
R-3 Occupancy
Detached One and Two Family Dwellings and Townhouses, Adult Care Facilities (six or fewer persons of any
age less than 24 hrs.), Adult Foster Homes as defined in ORS Chapter 443, or Family Child Care Homes
located in a private residence as defined in the Oregon Structural Specialty Code section 310.2. Buildings
that do not contain more than two dwelling units, Boarding Houses (non-transient), Child Care Facilities that
provide accommodations for six or fewer persons of any age for less than 24 hrs., Congregate Living
Facilities (non-transient) with 16 or fewer occupants, Lodging Houses, etc.)
R-4 Occupancy
This occupancy shall include buildings, structures or portions thereof for more than five but not more than 16
persons, excluding staff, who reside on a 24-hr. basis in a supervised residential environment and receive
custodial care, Congregate Living Facilities, Halfway Houses, Social Rehabilitation Facilities, Alcohol and
Drug Centers Assisted Living Facilities (with or without a Memory Care Endorsement), Residential Care
Facilities (with or without a Memory Care Endorsement), Residential Treatment Facilities, Group Homes and
Facilities, etc.)
4.Type of Building Construction:
Types I and II construction are those types of construction in which the building elements listed in Table 601 of
the Oregon Structural Specialty Code are of noncombustible materials. Type III construction is that type of
construction in which the exterior walls are of noncombustible materials and the interior building elements are of
any material permitted by the Oregon Structural Specialty Code. Type IV Construction (Heavy Timber) is that
type of Construction in which the exterior walls are of noncombustible materials and the interior building
elements are of solid or laminated wood without concealed spaces. Type V Construction is that type of
construction in which the structural elements, exterior walls and interior walls are of any materials permitted by
the Oregon Structural Specialty Code.
Type I Type IV
Type II Type V
Type III
Is the building equipped or proposed to be equipped with a Fire Protection System? (e.g., Fire Sprinklers
5.
or Fire Alarms)
Yes No
Any questions regarding the pre-application conference or the formal land use application submittal can be directed to
the Ashland Planning Division at (541) 488-5305. The City of Ashland Land Use Code can be found online at
www.ashland.or.us/code.aspby clicking on Chapter 18 and selecting the desired section.
Stonehouse Garage Improvements and As
Bryan Cope
80 Hargadine Street Ashland, OR 97520
Pror Bryan and Breena Cope
80 Hargadine Street Ashland, OR 97520
Property Desc The herein as The
Stonehouse,
There is a 6-
The lot layout legal
and is surrounde
Immediately
to the north are various
F
It is a one and one- that is and
g unit on the property
measures the
There is a
is 2,000
-
The remainder
The property is also a
materials throughout the proposed
There is no proposed
Pro
i
a
propose -to on the
garage equipment storage; and
operty
Remove
R-
6-
-hour, -retardant
S2, as presented in
Remove the en elevated
and Th
, at grade, out to meet the
- to
-
the Stonehouse Garage ,
is outlined in the
May 2024
May 2024
May 2024
May 2024
The Stonehouse Garage
1982
May 2024
be fixed
must
Garage Roof
Garage is connected to and supports
May 2024
existing wood deck
May 2024
May 2024
May 2024
Existing Deck
Height
626-755-0843
Bryan Cope