HomeMy WebLinkAbout2020.10.08 Climate Policy Minutes Minutes for the Climate Policy Commission
October 8, 2020
Page 1 of 6
MINUTES FOR THE CLIMATE POLICY COMMISSION
Thursday, October 8, 2020; Held Electronically
1. Call to Order (item starts at 00:15 on video)
Chair Rick Barth called the meeting to order at 4:01 p.m. Commissioners Bob Kaplan, Ray
Mallette, Jeff Wyatt, and Council Liaison Tonya Graham were present. Commissioners Julian
Bell and Chris Brown and Interim City Administrator, Adam Hanks arrived later in the meeting.
Commissioner Gary Shaff and Staff Liaison Stu Green were absent.
2. Consent Agenda (00:20)
2.1. September 18, 2020 Minutes
Mallette/Kaplan made/second a motion to accept minutes from the September 18 Climate Policy
Commission (CPC) meeting. Further discussion: none. All ayes. Motion approved unanimously.
3. Announcements
3.1. Next Meeting: November 12, 2020
3.2. Staff Update (5:18)
This item was initially skipped and revisited when Hanks arrived. Hanks discussed the following
items:
• City financing for heat pump water heater incentive program status
Bonneville Power Administration (BPA) has increased their funding for incentive programs
allowing for more funding for the City's other conservation programs. As a result, a heat pump
water heater incentive program is being developed with implementation possibly in January.
Kaplan asked about the magnitude of all of the conservation programs and resources. Hanks
stated that the BPA funding is approximately $210,000 for the federal fiscal year(this does
change per year), $75,000 a year for solar and $80,000 a year for other conservation programs
like the weatherization and heating upgrades zero-interest loan program. Hanks also mentioned
that the City's United States Department of Agriculture (USDA) application for a large energy
upgrade loan program was not selected.
Barth asked how much funding is available for the heat pump water heater program. Hanks
stated if there was a high demand the City would have to put a cap on the program to ensure
other programs are available, but when implemented will not have a set limit. Since heat pump
water heaters does not fit for all water heater replacements, Hanks does not see the demand to
exceed the amount of funding available.
Julian Bell arrived at 4:14 p.m.
Mallette asked if there was an incentive for electric hot water heater upgrades not just the heat
pump version. Hanks stated that there is currently an electric incentive through BPA. BPA does
not incentivize fuel switching, so any program that allows customers to switch from natural gas
to electric would be City funded. Wyatt asked if a document outlining the current incentive
programs is available. Hanks stated the City has one and BPA has a manual for current
incentives that he will send to the Commission.
• Confirm how clean fuel revenues can be used for electrification
Hanks stated that the City has started the process for selling the clean fuel credits. He is hoping
to monetize the credits in November and bring a supplemental budget to Council to approve their
allocation later. The money is not restricted by the State to be reinvested in the Electric Fund or
Minutes for the Climate Policy Commission
October 8, 2020
Page 2 of 6
electrification efforts. Because of this the Transportation Commission has voiced support
through a motion to keep that money for electric, transportation, or Climate and Energy Action
Plan (CEAP) programs. Graham asked about the process for Council to monetize the credits and
that CPC should also make a recommendation to Council regarding how the credits are used.
Hanks stated that in January CPC could be presented with the clean fuel credits monetized
amount and decide how to recommend spending of the credits to Council. Most likely the
supplemental budget for the money will go to Council in February or March, before the next
budget planning process.
Bell asked when the Transportation System Plan would be approved by Council Hanks will
follow up with Public Works regarding the timeline.
3.3. Other Announcements from Commissioners (1:17)
This item was discussed before 3.2 Staff Update. Barth mentioned the Commission was invited
to view the Bend Clean Energy Conference. Barth has a slide deck for The Helping Cities Go
Low Carbon presentation, and he will share the slides with the rest of the Commission. Wyatt
will follow up on getting the recordings and slide decks for the other presentations to disperse to
the Commission.
Hanks arrived at 4:05 p.m.
3.4. Reports from Representatives of Other Commissions
4. Public Forum
No public forum was submitted for this meeting.
5. Presentation
5.1. Avista Representative Presentation (24:15)
This item has been moved to the November meeting due to the Avista Representative's request.
Hanks gave a brief update about Avista's plan to use landfill gas from Dry Creek Landfill,
operated by Rogue Disposal and Recycling. A legislative change at the State level now allows
for Avista to change their rate base to account for capital investments for renewable natural gas
projects, like this one. Kaplan asked what the consumption of natural gas in Ashland was. Hanks
stated this information is received on a quarterly basis with the franchise payments. Stu Green
also has historical data on natural gas use from the Greenhouse Gas (GHG) inventory.
6. Old Business
6.1. Commissioner Recruitment (31:45)
Barth announced the current vacancies. Graham had reached out to a student at Ashland High
School student, but they are no longer interested. Graham will contact Southern Oregon
University (SOU) regarding the vacancies, but anyone who has specific contacts at Ashland High
School or SOU please let her know. Graham emphasized looking for diversity when recruiting
any applicants. Kaplan was approached by someone interested in the Commissions work and
encouraged the person to view the meeting tonight. Wyatt will follow up with a SOU
Environmental Science professor. Mallette asked if the student can be a high school or college
student. Hanks stated that CPC's code allows for either. Mallette also has a connection at SOU
that he will contact.
6.2. Vice Chair Election (35:35)
Minutes for the Climate Policy Commission
October 8, 2020
Page 3 of 6
Barth described the duties and expectations of the Vice Chair. Bell nominated himself as Vice
Chair and Wyatt provided a second. Further discussion: none. All ayes. Bell was selected as Vice
Chair unanimously.
6.3. Focus Areas
6.3.1.Administration& Planning
6.3.1.1. Subcommittee Alternatives (39:25)
Mallette asked if members can meet at less than a quorum. Hanks stated yes that was acceptable
as long as a Subcommittee is not officially formed. Hanks also clarified that collaboration
between meetings should be focused on research and organization and save pertinent discussion
and decisions for the Commission meetings. Wyatt/Bell made a motion that the CPC suspend the
Subcommittee structure until further notice. Further discussion: none. All ayes. Motion passed
unanimously.
6.3.1.2. Commission Constraints (45:35)
Barth asked Hanks what parts of CEAP could the Commission work on without Council
direction. Hanks stated items that did not affect policy decisions and items that would not require
staff to delay other Council directed work. Other constraints include current Department's
budgets and if an item needs more than one Department's input. Bell requested that previous
items the Commission has worked on be presented to Council before the end of the year. Graham
suggested that the Commission plan on presenting items to the new Council after January 1 and
reach out to the newly elected between the election and the formal Council meeting.
Chris Brown arrived at S:00 p.m.
Hanks reminded the group that staff will also need time to prepare a staff report and
recommendations for items that go to Council. He suggested that aligning with staff s current
projects could help streamline this process.
6.3.1.3. Council CPC Meeting (1:05:43)
Barth listed the previous four items recommended to Council: 1) Direct staff to collaborate with
CPC to develop a comprehensive electric and gas utility plan with planning starting November 1;
2) Direct staff in collaboration with CPC and Conservation and Climate Outreach Commission
(CCOC) to develop and outreach and engagement campaign for LEAP; 3) Direct staff to build
an existing internal science based climate education efforts for annual staff training by June 30,
2021; and 4) Prioritize LEAP and climate knowledge in hiring management positions. Barth
would like to know when this can be scheduled for Council. Graham recommended this list to be
include in the presentation to the new Council after January. Hanks would like more clarification
on the list in the future as some items could be dealt with City management instead of being
presented to Council. For the November CPC meeting, staff will prepare a list of pros and cons
for each item and possibly have Tina Gray, Human Resource Director, attend the November
meeting.
6.3.2.Utilities
6.3.2.1. Comprehensive, Master, and Capital Improvement Plans (1:18:08)
Mallette stated that the Commission has been focusing on four plans for Public Works: Water
Master Plan (Council approved in August), Talent Ashland Phoenix Interne (TAP) (presented to
Council in October), Storm Drain Master Plan and Water Management and Conservation plan;
both scheduled for the next Biennium. For TAP, Scott Fleury, Interim Public Works Director,
Minutes for the Climate Policy Commission
October 8, 2020
Page 4 of 6
did include reducing GHG emissions and conserving water. A missing element for TAP, that
could be instead included in the Water Management and Conservation plan, is a climate study
preferably done by 2023 to determine regional water supply.
Mallette asked if input should be given on the Ashland Parks and Recreation Commission
(APRC) pool plan. Barth asked that Mallette update Green's master plan timeline document with
his input to bring back at a future meeting. Mallette suggested that Wyatt work with him on the
master plan updates. Barth requested that the pool master plan and design planning be added to a
future agenda. Graham recommended a letter to APRC be written regarding the pool. Barth
suggested that Mallette and Wyatt write the letter to the next meeting for approval by the
Commission.
6.3.2.2.Electric Master Plan (1:28:05)
Barth asked if CPC should take the lead role to create the strategic part of an Electric Master
Plan. Currently, there is no official Electric Master Plan, but the Electric Utility does have an
infrastructure and rate design plan. Hanks envisioned that this would be a consultant project
selected by a request for proposal (RFP) as there is specific electric industry aspects that are
needed to take into consideration. CPC's would serve as the ongoing review body and could help
with public outreach and technical review. As a place to start, the RFP would be created with the
CPC and sent out in January. Barth tasked Mallette, Wyatt, and he to come back with a draft
RFP beginning at the November meeting.
6.3.2.3. SOCAN Survey Report (1:36:15)
Wyatt stated that while the report showed enthusiasm for climate action in Ashland, the
respondents were self-selected and not entirely representative of all of Ashland. Graham stated
that the Geos Institute had a scientifically significant report that did capture an accurate
representative of Ashland in 2016. She will send out the link to the Commission to the survey.
Barth stated that the survey does indicate knowledge of CEAP is not widespread in the
community, which could be an item that CCOC pursues.
6.3.3.Built Environment (1:41:39)
6.3.3.1. PV Ready Requirements Update
Bell spoke with Mark Knox of KDA Homes and learned that in 2019 Governor Kate Brown
committed the State to require all residential construction be Photovoltaic (PV) solar ready by
2022; 2023 for new commercial buildings. Bell asked how the Governor's Executive Order 20-
04 might alter this timeline and what could be done locally to address this. Wyatt stated that the
building codes for April 2021 includes a PV solar ready provision for residential. Hanks stated
the roof space availability might not fit in with the building code but could be something that
could be implemented at the City level through the land use code. Kaplan asked about if this
applies to the reconstruction of Talent and Phoenix. Hanks stated that the April 2021 building
code would apply to the reconstruction; however, mobile and manufactured homes are under a
different code and this might not apply to them.
Barth asked if those working on Built Environment want to bring specifics for next month to
move forward for land use planning side. Bell, Brown, and Kaplan will look into prioritizing
land use code for solar PV ready. Hanks reminded that the Community Development
Department's workload has been full of State mandates for housing requirements that need to be
implemented by June 30, 2021 through the Planning Commission and City Council. This means
Minutes for the Climate Policy Commission
October 8, 2020
Page 5 of 6
that this will be scheduled out 18 to 36-month work plan timeline especially if they are public
facing projects.
6.4. Electrifying Ashland (1:54:55)
Kaplan explained the outline provided in the packet. He asked for what other items might need to
be on this list or come off the list. Barth stated that 1.5.2. Establish a residential tool library
should be a task for CCOC if they are willing to accept the task. Graham stated that those items
not prioritized can also be given to other Commissions or local organizations.
With no additions or subtractions, Kaplan asked for prioritization for the first year and individual
assignments which are as follows:
Consumption (Built environment focus area)
1. Engage planning department about land-use and other codes (e.g. density bonus, EV
charging, PV readiness, planning for transit, solar reserve area). Next step for task
leaders should include prioritizing topics taking into account the level of effort required by
planning department staff and greenhouse gas emissions impact.Assigned to Brown and Shaff.
2. Electrify existing residential buildings and increase energy efficiency (task A): Develop a
Home Energy Score Program drawing on existing models elsewhere (particularly
Portland).Assigned to Kaplan.
3. Electrify existing residential buildings and increase energy efficiency (task B): Create
Energy Retrofit Ashland loan program.Assigned to Kaplan and Graham.
4. Develop a municipal facilities plan to electrify and increase efficiency. Not assigned in
the meeting. Kaplan will prepare a one pager to start the discussion,pending task
leader assignment at the next meeting.
5. Outreach and coordination with SOU and ASD on future phase-out of natural gas. Also
OSF and Asante Ashland Community Hospital?Assigned to Bell.
6. Electrify new buildings (task A) : EV-ready wiring in new residential construction.Assigned
to Brown.
7. Electrify new buildings (task B): PV reservation and protection for new construction.Assigned
to Brown.
8. Electrify transportation (task A): CPC participation in the transportation plan.
Provisionally assigned to Shaff.
9. Electrify transportation (task B): Use of clean fuels credits. Not assigned in the meeting.
This mattes will be taken up by the full commission in January,prior to staff sending a
revised budget request to the City Council to allow appropriation of revenues from sale
of the credits.
10. Electrify transportation (task C): Light weight vehicles (electric and human powered
bicycles).Provisionally assigned to Shaff.
11. Phase out gas-powered lawn and garden equipment, starting with municipal operations.
Provisionally assigned to Shaff.
Generation, by source (Utilities focus area)
12. Develop electric master plan: Develop the Request for Proposals for a specialized
consultant(task A):Assigned to Bath, Mallette, and Wyatt.
13. Develop electric master plan: Identify funding source for specialized consultant (task B):
Assigned to Bath, Mallette, and Wyatt.
14. Develop electric master plan: Public outreach from basic goals (Safe, Reliable,
Minutes for the Climate Policy Commission
October 8, 2020
Page 6 of 6
Affordable, Resilient, GHG emissions neutral to negative) (task Q.Assigned to Barth, Mallette,
and Wyatt.
15. Plan for 1 MW project permitted under terms of BPA purchase agreement. This includes
exploring a range of financing and ownership options.Assigned to Graham.
Kaplan will compile the list with the assignments and asked all of those who volunteered for
items to write a one-page report and submit to Barth by October 29 in time to be included for the
November meeting packet.
7. New Business
8. Wrap Up (2:25:30)
8.1. Future agenda items
• Council Interaction Process
• APRC Pool Representative
• State Level Actions and Advocacy
Barth asked about staff availability for the various items that need staff support. Hanks will
create a one-page report on which items need which Departments input and staff availability for
projects. Mallette asked who the best contact in Ashland Parks and Recreation Commission
(APRC) is since he and Wyatt will be preparing a letter regarding the Commission's pool
recommendation. Bell stated Michael Black, the Director, would be the best contact. Chair Barth
adjourned the meeting at 6:29 p.m.
Respectfully submitted,
Elizabeth Taylor