HomeMy WebLinkAbout2025-08-18 Study Session MIN ASHLAND CITY COUNCIL
STUDY SESSION MINUTES
Monday,August 18,2025
Mayor Graham called the meeting to order at 5:30 p.m.
Council Present: Mayor Graham, Councilors Bloom, Dahle, DuQuenne, Hansen, Kaplan, and Sherrell
Council Absent: none
Staff Present:
Sabrina Cotta City Manager
Alissa Kolodzinski City Recorder
Chad Sabotka AFN Operations Manager
Marianne Berry Finance Director
Rocky Houston Parks and Recreation Director
I. Call to Order
II. Reports and Presentations
a. Ashland Fiber Network Business Plan Update
Cotta introduced the item as a follow up to a previous meeting. Berry and Sobotka presented an
update on the business plan for Ashland Fiber Network (AFN) (presentation attached).The technical
differences between the network technologies were explained: DOCSIS 3.1, G.hN, and PON (Passive
Optical Network).The current legacy DOCSIS 3 network is 25 years old and supports only up to 250
Mbps download and 30 Mbps upload.A hybrid implementation approach was proposed, leveraging
DOCSIS 3.1 to deliver gigabit speeds using existing coaxial infrastructure while strategically deploying
PON in new developments and other targeted areas. The DOCSIS 3.1 upgrade would enable AFN to
offer fiber-like speeds of 1 gigabit per second symmetrically (both download and upload) by
replacing the 25-year-old active devices with new state-of-the-art equipment. It was expressed that
reviewing the business plan earlier in the year revealed that implementing PON citywide would be too
capital-intensive at approximately $15 million over two years. Instead,a hybrid approach of DOCSIS 3.1
and targeted PON deployment would allow AFN to provide gigabit internet to 90% of Ashland within
existing cash flow capabilities. The capital plan for the current biennium includes a budget of$2.4
million,with $1.75 million allocated to DOCSIS 3.1 upgrades and plans for continued expansion of PON
and bucket truck acquisition. For future biennia,the capital plan projected approximately $4.8 to $5.8
million in additional investments.
The Council discussed whether the plan offered a competitive advantage for attracting enterprise
customers. It was confirmed that AFN is focusing on downtown corridors for business,yet 90% of
Ashland's electric meters are residential, making residential customers key. Inquiries about new
housing developments confirmed that 100% PON implementation could happen in areas such as
Caldera Oaks, Midtown Lofts, and Beach Creek subdivision. Questions arose concerning funding
sources, marketing plans, and staffing, and it was clarified that funding would derive from the AFN
enterprise fund's existing balance and operating revenues, not the general fund. Staffing will gradually
increase,with 0.5 FTE already added and more planned for future years. Overall,the plan leverages
City Council Study Session
August 18,2025
Page I of 3
the strengths of the existing technology and explores strategic upgrades to maintain competitiveness
in both residential and business markets.
AFN's achievement of capturing a 50% market share in Midtown Lofts was highlighted as impressive,
even without marketing efforts,given that competitors had already installed their equipment in
advance.The plan's dependence on internal funds, including the contingency fund,and not external
financing,was confirmed alongside being debt-free. It was noted that capital spending elements
were adjusted for potential tariffs and that additional funds would first come from material and
services transfers, resorting to a contingency draw if necessary.
The Council reached a general consensus supporting the hybrid approach and acknowledged
potential future budget supplemental needs to allocate funding within the AFN fund. It was confirmed
that AFN can proceed with the $1,600,000 appropriation to roll out the hybrid expansion program of
DOCSIS 3.1 and PON,with a mid-biennium review planned to assess the necessity of a budget
supplemental.
b. East Main Park Update
Houston presented an update on the East Main Park project, explaining that the approved design from
2022 included a parking lot off East Main Street,dog parks, a pump track, skills park, restroom,
playground, nature play area, sports court,trail system,and community garden. Since then,the
projected cost had risen to over $5.5 million, substantially higher than the $2.5 million budgeted, and
requiring project phasing. Phase One would focus on the pump track (which has a $1 million grant
associated with it), parking lot,dog park, restroom, and a connecting trail.
The Phase One cost estimate had subsequently increased from $2.5 million to $3 million, and
presented several options to address the shortfall:
• Reduce scope by eliminating or modifying restrooms or parking lot.
• Increase funding by using reserves, removing other planned projects, or seeking additional
grants.
• Request a code change and revise the project to change access point from East Main to
Abbott.
• Apply for a variance from street improvement requirements.
A public meeting was held the previous week with 78 attendees who expressed strong support for
maintaining the original design and spoke that the Parks Commission would be reviewing options at
their upcoming meetings on September 3rd and loth.
Concerns were raised about escalating costs due to inflation and possible tariffs. Exploring variance
options under AMC 18.5.0.5.05 was discussed as a way to proceed with the park without completing
street improvements, aligning the project closer to budget.Although road improvements were
estimated initially,they were not detailed early in the planning, resulting in a budgeting oversight.
Separating street improvements from the park project, possibly through a Local Improvement District,
was considered to ease financial strain while potentially enhancing safety and encouraging
development in the area by improving road infrastructure,though such improvements are expensive.
City Council Study Session
August 18,2025
Page 2 of 3
Meeting Extended by 30 minutes by unanimous agreement.
Public comment was received from citizens who expressed concern about safety for older residents
and children regarding the pump track, support for the original concept, concern about funding and
potential impacts on the neighborhood,and questioned whether the park would serve the immediate
neighborhood or rather attract visitors from throughout Jackson County.
It was clarified that while many bike enthusiasts attended the public meeting,there were also many
residents from the neighborhood present. Further clarification was provided that this was planned as
a community park rather than a neighborhood park, designed to serve both the immediate area and
the broader community, like Garfield Park with its splash pad.
The Council discussed further and acknowledged the complicated nature of the project and the
difficulty in predicting costs in the current economic environment and looked forward to the Parks
Commission recommendation.
III. Adjournment of Study Session
The meeting was adjourned at 7:24 p.m.
City Recorder Alissa Kolodzinski Mayor Tonya Graham
City Council Study Session
August 18,2025
Page 3 of 3
.g
i T Y O E
SH
d• ��• Now,
PilotAFN
•• •
AugustBusiness Plan Update
i
, 2025
Need Council to provide guidance and approval
of next steps for AFN Pilot Program and
confirm Fiber Expansion Plan.
topicLast time - - -.
■ April 3, 2023: AFN Business and Technology Planning Presentation
■ January 16, 2024: Approval of GPON (Gigabit Passive Optical Network) vendor
■ April 30, 2025: AFN Budget Summary
■ June 2, 2025: Next Gen Fiber Pilot Project Update
/r
Download/ Installation Installation Installation Customers per
Upload Speeds Type Cost Time Unit Best For
4--J O
m Unlimited
O kA -250 Mbps/ Emaiis,
tA v -30 Mbps Coax (impact on speeds) Facebook
Q
M Unlimited
H 1,000 Mbps/ $5 million Once city block Remote Work,
Coax (no impact on
V -1,000 Mbps (citywide) in 1 week speeds) Streaming
0
O
O
C C 1,000 Mbps/ Fiber up to the $100,000 One city block Max 64 High Density
Z building,coax (targeted in 4 hours customers Residential or
1,000 Mbps to customer locations Commercial
U only)
l—
Max128 Cloud
Z 2,500 Mbps/ 100%Fiber $15 million One city block customers Computing,
p0, 2,500 Mbps (citywide) in 2 months (recommended Online Gaming
64) (+Future Proof)
Download/ Installation Installation Installation Customers per Deployment
Upload Speeds Type Cost Time Unit Best For
Strategy
d—J
M Unlimited
O ,� -250 Mbps/ Emails, Legacy
(ACoax - - (impact on
U -30 Mbps speeds) Facebook 5y5tewl
(n O
Unlimited
U 1,000 Mbps/ $5 million Once city block Remote Work,
Coax (no impact on
V -1,000 Mbps (citywide) in 1 week speeds) Streaming 17eploy to
� c replace
O leo&ICy
O sys+etm
C 1,000 Mbps Fiber up to the $100,000 One city block Max 64 High Density
/
t building,coax (targeted in 4 hours customers Residential or
1,000 Mbps to customer locations Commercial
U only)
Q�
� I.7e�l0y IVl AYEAS
Max 128 Cloud Wlo eX15-floo
Z 2,500 Mbps/ 100%Fiber $15 million One city block customers Computing, Ih f rastYUctc4re Or
p0, Z,500 Mbps (citywide) in 2 months (recommended Online Gaming W/ �)I/��l-bAVIdW idf'(/I
64) (+Future Proof) J
dewlawd
/r
Node Mini-bridger
(dollar for scale) (dollar for scale)
Upstream fiber *=
Coax
Downstream fiber y
x
m
0
CMTS Router
Head-end
Sp6tter
Legacy DOCSIS 3.0 x
0
U
4OP44
Ethernet Coax Coax
Router Cable Modem Line Extender
i!& (dollar far scale)
Tap
(dollar for scale)
Mini-bridger
Node (dollar for scale)
Fiber to Head-end Coax Coax
.�; • Splitter
li
',1►..dlllUll lug o -.-W
DOC S S 3.� ✓ Less costly & less time to deploy X
✓ Speeds of Up to 1 Gbps 0
Ethernet Coax Coax
44
Router Cable Modem Line Extender
(dollar for scale)
Tap
(dollar for scale)
Gigabit Home Networking (G.hn)
✓ Less costly to deploy but limited areas
✓ Speeds of up to 1 Gbps
Fiber to Head-end Coax Coax Ethernet 104V
� —i Splitter
Endpoint Router
Positron G.hn GAM
Passive Optical Network (PON)
Fiber to Head-end Fiber Fiber Ethernet
ONT Router
✓ Deployment very costly and takes 8x longer
than DOCSIS 3.1
✓ Speeds of up to 2.5 Gbps
✓ Future-proof technology
AFN Capital Plan
BN 25-27
CapEx Summary Goals.
Currently in budget $ 1,649,491
Requesting additional-Contingency draw 163,844 �- Provide Gigabit speed service to of
Requesting additional-M&STransfer 563,156 Ashland by 2033, by 2027.
TotalNeed $ 2,376,491 ➢ Capture of market share by
2033
Capital5pending
Docsis 3.1 Ugrade 1,750,000 Y Reach 50/50 split between PON/DOCSIS
PON Fiber Expansion 190,000 3.1 by 2033; fuller PON deployment 2029
Cable Modems 225,000 and beyond
Bucket Truck+Maintenance 140,000
Rebranding&Target Marketing 70,000
Total capital expenditures $ 2,375,000
AFN Net Position Forecast Model
updated: 18-Aug-25
ON 23.25 ON 25-27 6N 27-28 BN 2931 ON R
Yew♦ 1 2 3 4 6 e 7 0 9 10
FIscat Yew Endinglune30, 2023 2024 202b 2026 2027 1. 2028 2030 2031 2032 2033
Subscribers 4,075 4.250 4,313 4,563 4,90 5,363 5,713 6,013 6,313 6,613 6,913
Increase 175 63 3- 300 300 300
Average Rate $55 $55 $55 $55 $56 $57 $% $60 $61 $62
Market Snare 12,500 34% 35% 37% 40% 43% 46% 48% 51% 53% 55%
Gigabit Coverage(3.1,G.nn.PON) 20% 60% 90%
Inflationary escalator 0% 0% 2% 2% 2% 2% 2% 2%
Estimated Revenue $ 2,805.000 S 2,846,580 $ 3.011.580 S 3.275,580 $ 3.610.372 $ 3,922,911 S 4,211.489 S 4.510,040 t 4,818,849 S 5,138.206
Financial Forecast
Actual/Forecasted Revenue $ 2.789,598 S 2.799,594 $ 3,060.390 $ 3,075.391 S 3,610.372 S 3,922,911 S 4.211,489 $ 4.510.040 $ 4.818,949 $ 5,138,206
Inteestlrominvesbnents 142.511 132.733 110,000 100,000 130.000 130,000 130.000 130,000 130,000 130,000
ActuatiForecasted Expenditures
Personnel Costs- 33% B47,016 951,365 1,159,709 1,207,093 1,227.165 1,333,398 1,431,485 1,532,963 1,637,927 1,746,476
Added Personnel• 116.250 359,213 369,989 382.089 392,521 404,297 416,426
Materials&Services 45% 1,252,332 1,358,651 1,175,397 1,192,285 1,624,667 1.765.310 1,895,170 2.029,518 2.168,482 2,312,193
Capital Outlay(actuaVadopted) 337.802 289,467 980.344 689,147
capital Outlay proposed... 363.500 36$500 1,0a0.000 3-n.9 r so0,0a, S Cr?) 8Dv..1) BUO.OGo
Debt 517,445 517,445 - - - - - - -
Contingency
Total Expenditures 2.954.595 3,115.928 3.678.950 3.548.275 4,211,045 4,IM697 4.507.744 4,755,002 5,010,706 5,275,095
Net Excess/(Deficiency) (22,486) (183,601) (508.%0) (372.884) 1470,673) (215.785) (166,255) (114,962) (61,857) (6,889)
Beginning Fund Balance 3,175,716 3,153,230 2,969,629 2,461.069 2,068,185 1,617.512 1,401.726 1.235,472 1,120,510 1,058.653
Ending Fund BaWtca f 3.1W.230 $ 2.980.020 S 2461.0119 S ZDW.305 S 1.627,512 S 1.401.n6 $ 1,225,472 S 2,140AI0 $ 1,060,653 S 1,061.786
Minimum EF8(2D%avg exp) S 649.965 S 689.544 $ 762,551 S 901.868 $ 865.832 $ 902,096 S 951.563
Excess of minimum EFB S 1.438.220 $ 927,968 $ 639,175 $ 433.604 $ 254,678 $ 156,557 $ 100,201
Total BN 25-27 Budget $ 7,274,819
Contingency $ 163,944
FTE 7.0 7.5 8-5 10.5 10.5 10.5 10.5 10.5 10.5
0
ASHLAND FIBER NETWORK
.A iviunlcipul Broudbund Utility
➢ Supports City Government
■ Franchise fees, internal service delivery, IT/network expertise
➢ Provides a Public Service
■ Reliable and affordable internet access for residents/businesses
■ Wireless public networks
■ Low-cost hosting for school district, college and larger businesses
■ Assistance programs for low-income residents
➢ Economic Development Goals
■ Supports remote-work offices & provides low-cost Gigabit high-speed
service for businesses in existing and future commerce districts
➢ Supports City's Emergency Coordination Efforts
QUESTIONS?
i s
Technology Snapshot
Legacy System Net Generation Gigabit High Speed Service
DOCSIS3.0 DOCSIS3.1 Mom- '
(Data Over Cable Service Interface Specification) (Gigabit Home Networking) (Passive Optical Network)
25 years old Current generation cable system, Related to DOCSIS 3.1 100%Fiber(future-proof)
significantly more reliable than 3.0
Download speeds up to-250 Mbs Download speeds-1,000 Mbs Dowload speeds-1000 Mbps Download speeds-2,500 Mbps
Upload speeds up to-30 Mbps Upload speeds-1,000 Mbps Upload speeds-1000 Mbps Upload speeds-2,500 Mbps
Limited upgrade options Brand new active devices(nodes, Fiber to Bldg,Coax to customer(no Does not require electricity
mini bridgers,line extenders) drilling)
Installation time fast Significantly more reliable than Reliability of fiber,installation Can be easily upgraded
DOCSIS 3.0 speed of coax
Installation time is very fast Max of 64 customers per G.hn GAM Max 128 customer per port
(recommended limit is 64)
Can support unlimited#of Fastupgradetime(cityblock-4hrs Customer intallationtakes2Xas
customers at full speed wi30 min downtime) coax(must drill holes)
Can support unlimited#of Primarily multi-dwelling units Deployment is very expensive and
,� customers at full speed time-consuming