Loading...
HomeMy WebLinkAbout2025 - Findings - #PA-L-2025-00016 ex h,bJ g BEFORE THE CITY COUNCIL CITY OF ASHLAND,JACKSON COUNTY,OREGON November 4,2025 IN THE MATTER OF PLANNING ACTION#PA-L-2025-00016,A REQUEST ) FOR A LEGISLATIVE AMENDMENT TO THE SOUTHERN OREGON ) UNIVERSITY FACLITIES MASTER PLAN. THIS AMENDMENT ) INCLUDES PROPOSED ZONE CHANGES FOR SURPLUS PROPERTIES ) IDENTIFIED TO BE SOLD BY SOUTHERN OREGON UNIVERSITY. WITH ) FINDINGS, ADOPTION OF THIS MASTER PLAN AMENDMENT,THE ZONING FOR ) CONCLUSIONS & THESE PROPERTIES WILL BE CHANGED AS NOTED DETAILED IN THE ) ORDERS. PROPOSED MAPS UPON TRANSFER TO PRIVATE OWNERSHIP. ) OWNER/APPLICANT: Southern Oregon University ) RECITALS: 1) The Southern Oregon University campus boundary includes approximately 164 acres split roughly north-south by Siskiyou Boulevard. The Ashland Comprehensive Plan identifies the Southern Oregon University (SOU) land use classification as areas designed to provide for the unique needs of SOU. The`SOU' land use classification is delineated on the Comprehensive Plan Map,and as outlined in the Comprehensive Plan, the boundary of the SOU area was mutually approved by SOU and the City. The Comprehensive Plan's `SOU' designation is implemented by Chanter 18.3.6 "Southern Oregon University District"of the Ashland Land Use Ordinance,and the corresponding special district is established on the Zoning Map. 2) The SOU Master Plan establishes the permitted uses, campus-specific procedures and design standards and delineates anticipates development projects in the SOU zoning district over the upcoming decade. The current plan, the 2010-2020 SOU Master Plan, was approved and adopted by the City Council in April 2010. The Master Plan is generally completed in ten-year cycles looking at the upcoming decade,although the ten-year cycle here was disrupted by the COVID-19 pandemic. 3) The application proposes a legislative amendment to adopt an update to the Southern Oregon University Facilities Master Plan. This amendment includes proposed zone changes for properties that may be sold into private ownership by Southern Oregon University which are identified in the proposed plan. With the adoption of this Master Plan amendment,the zoning for these properties will be changed as noted on the attached map,however they would remain subject to the SOU Masterplan and SO zoning overlay regulations for as long as they continue to be under SOU ownership. Findings of Fact and Conclusions of Law Page 1 Once sold and under private ownership,each of these properties would be subject to the zoning regulations of the underlying zoning proposed here. 4) On June 24, 2025, the City of Ashland Planning Commission considered the amendment of the City of Ashland's Comprehensive Plan to adopt and incorporate the Southern Oregon University 2025 Facilities Master Plan Amendment as a supporting document;to amend the Zoning Map and Comprehensive Plan Map;and to amend the Ashland Municipal Code and Land Use Ordinances to align with the Southern Oregon University 2025 Facilities Master Plan Amendment at a duly advertised public hearing,and following deliberations,recommended approval of the amendments. 5) On July 15, 2025 and October 7', 2025, the City Council of the City of Ashland conducted a duly advertised public hearings on the above-referenced amendments following the close of the public hearing and record,deliberated and conducted first and second readings approving adoption of this Ordinance in accordance with Article 10 of the Ashland City Charter. The Council determined that in order to protect and benefit the health,safety and welfare of existing and future residents of the City,it is necessary to amend the Ashland Municipal Code and Land Use Ordinance in manner proposed,that an adequate factual base exists for the amendments,the amendments are consistent with the comprehensive plan,that the proposed zoning map and land use code amendments are consistent with City of Ashland approval criteria for land use ordinance and zoning map amendments as set forth in AMC 18.5.9.020.B and are consistent with the City of Ashland Comprehensive Plan, with other City policies, and with the Oregon Statewide Planning Goals and OAR 660-030-0070, and that such amendments are fully supported by the record of this proceeding. 6) AMC 18.5.9.020.13 speaks to the requirements for"Type I1I" legislative amendments as follows: B. Type III. It may be necessary from time to time to make legislative amendments in order to conform with the Comprehensive Plan or to meet other changes in circumstances or conditions.The Type III procedure applies to the creation, revision, or large-scale implementation of public policy requiring City Council approval and enactment of an ordinance;this includes adoption of regulations,zone changes for large areas,zone changes requiring comprehensive plan amendment, comprehensive plan map or text amendment,annexations(see chapter 18.5. for annexation information),and urban growth boundary amendments.The following planning actions shall be subject to the Type III procedure. 1. Zone changes or amendments to the Zoning Map or other official maps, except where minor amendments or corrections may be processed through the Type II procedure pursuant to Findings of Fact and Conclusions of Law Page 2 subsection 118.5.9.020.A above. 2. Comprehensive Plan changes, including text and map changes or changes to other official maps. 3. Land Use Ordinance amendments. 4. Urban Growth Boundary amendments. (Ord. 3195 § 5, amended, 12/01/2020) SECTION 1.EXHIBITS For the purposes of reference to these Findings,the attached index of exhibits, data, and testimony will be used. Staff Exhibits lettered with an "S" Proponent's Exhibits, lettered with a"P" Opponent's Exhibits, lettered with an "O" Hearing Minutes,Notices, and Miscellaneous Exhibits lettered with an "M" SECTION 2. CONCLUSORY FINDINGS Now,therefore,the City Council of the City of Ashland finds, concludes, and recommends as follows: 2.1 The City Council finds that it has received all the information necessary to render a decision based on the complete application materials,staff report,public hearing testimony and exhibits;and by their reference each of these are incorporated herein as if set out in full. 2..2 The City Council further notes that as outlined in the Comprehensive Plan, the boundary of the SOU zoning district was mutually approved by SOU and the City. The campus boundary encompasses approximately 164-acres that are roughly split north and south by Siskiyou Boulevard.This Master Plan update does not propose an expansion of the existing Southern Oregon University campus boundary and its corresponding City of Ashland SOU special district zoning designation; however, this amendment does include proposed zone changes for properties identified on the attached map that may be sold into private ownership by Southern Oregon University. With adoption of this Master Plan amendment,the zoning for these properties is proposed to be changed as noted in the plan, however these properties would remain subject to the SOU Masterplan and SOU special district zoning overlay while under university ownership. Once under private ownership, these properties would be subject to the zoning regulations of the underlying zoning proposed here. Findings of Fact and Conclusions of Law Page 3 The Council also notes that the Master Plan proposes a number of code changes with regard to the campus, including: • AMC 15.04.216—As proposed,the city's Demolition/Relocation Ordinance would no longer apply to university properties. • AMC 18.3.6—Proposed revisions would clarify that the SOU zone is subject to the Water Resource Protection Zones regulations in AMC 18.3.11 and that areas within 50-feet of privately owned property would be subject to "Type II" Site Design Review with a public hearing before the Planning Commission rather than to a Conditional Use Permit, and that any construction greater than 70 feet in height would be subject to a Conditional Use Permit. • AMC 18.4.7—As proposed,Southern Oregon University would not be subject to the sign regulations of AMC 18.4.7 but would be subject to a campus master sign program incorporated in the proposed Master Plan. • AMC 18.5.2.030 — The proposal would clarify that any new building on campus greater than 15,000 square feet shall be reviewed through a"Type II"procedure with a public hearing at the Planning Commission. • AMC 18.3.6.040 - The amendments remove a maximum height allowable for Conditional Use approvals within the SO Zone and exempts development within the former Cascade Complex from CUP review when under 60 feet (five stories) in height and less than 194,000 square feet of gross floor area.Projects to be developed within 50 feet of privately owned property continue to require a Conditional Use Permit,except for minor site alterations such as signage,access,driveway,sidewalk, or landscaping improvements. • AMC 18.5.7.020 —The proposal would exempt tree maintenance and removal on campus from the city's Tree Removal Permit process,but would require that SOU provide annual updates to the Planning Division through the Tree Management Advisory Committee similar to the handling of tree removals on Parks properties. 2.3 The City Council notes that the Planning Commission conducted a duly noticed public hearing on June 24, 2025. Following the close of that hearing, the Planning Commission recommended that the Council adopt the updated SOU Facilities Master Plan subject to a number of specific recommendations, including: • The Planning Commission recommended that the Conditional Use Permit requirement be retained for any project or construction activity within 50 feet of private property in order to preserve discretionary review and require consideration through a public hearing. Planning Commissioners also recommended that any project of 15,000 or more square feet of gross habitable floor area(GHFA)be subject to Type II Site Design Review procedure. • The Planning Commission recommended that solar arrays over parking lots meeting the specific design requirements presented in the proposed Master Plan and associated draft ordinance be exempted from the land use process and instead be subject to administrative land use approval in conjunction with building permit review. The Planning Commission also recommended that it be made clear that the Findings of Fact and Conclusions of Law Page 4 installation of solar arrays over existing parking lots would not trigger parking lots to be upgraded to new standards. The Commission further recommended that any newly constructed parking lots be required to comply with current parking lot standards. • The Planning Commission recommended that a 50-foot height be outright permitted within the SOU district,with heights up to 60 feet to be outright permitted with the inclusion of affordable housing or student housing,with greater heights to require a Conditional Use Permit up to a maximum of 70 feet for the greater campus area. The Planning Commission further recommended that the height for the University District property bounded by Ashland Street,Walker Avenue,Webster and Stadium Streets be limited to no more than nine-stories or 110 feet under the Conditional Use Permit process. • Planning Commissioners supported exempting the University from the Tree Removal Permit process in a manner similar to the treatment of the Parks Department in the code,with an annual report to the Tree Management Advisory Committee,provided that the University uses licensed professional arborists for tree removal work. • In response to concern from neighbors over the lack of transparency with neighbors of the properties proposed for sale,Planning Commissioners also recommended that with Master Plan adoption,the University be required to establish a standard of direct communication with neighbors prior to the construction of new buildings,the sale of university property or the adoption of Master Plan updates. 2.4 The City Council notes that AMC 18.5.9.020 which speaks to Plan Amendments and Zone Changes,which are legislative in nature,in terms of achieving conformance with the Comprehensive Plan or meeting"other changes in circumstances or conditions." There are no specific quasi-judicial land use approval criteria to be addressed. The Council finds that The Economy Element of the Ashland Comprehensive Plan includes specific policy direction that,"The City shall work with the College to encourage the growth of research and graduate programs. The City shall encourage the establishment of the Asian Studies facility, and other such facilities that provide a bridge to the international marketplace (7.07.03.6)." The Council further finds that the university is "a motor of economic growth for the city through generation of payroll, local purchases by employees and students, enhancement of student abilities to find or make jobs for themselves in Ashland, and as an incubator for innovations and as a favorable attraction for education- intensive firms that may be considering the move to Ashland. " The Council finds that there have been significant changes in circumstances or conditions relative to the university which necessitate the requested update to the SOU Facilities Master Plan. As the university team has explained through the application process, college campuses must constantly evolve within a broader context of higher education that includes changes to available state funding,the broader national economy,fluctuations in admissions, and changing demands for specific programming.SOU continues to work tirelessly to build a solid foundation and to innovate, and the proposed updated SOU Facilities Master Plan Findings of Fact and Conclusions of Law Page 5 reflects new goals in response to these everchanging circumstances. This Master Plan identifies projects which the university indicates have a degree of certainty in terms of their need,funding and design,while also outlining future development opportunities and some base design standards to apply to those yet to be clearly defined projects. The university has explained that part of maintaining a solid foundation in terms of financial stability may necessitate the sale of certain properties, and as such this Master Plan identifies those lots which are being considered for potential sales and proposes changes to the underlying Zoning and Comprehensive Map designations,while maintaining the SOU District overlay until those properties are sold. Without this proposed change,these properties would remain subject to the requirement to develop according to the Master Plan in support of the educational functions of the university,even if privately owned,unless individual developers were to obtain Conditional Use Permit approval or request property-specific legislative amendments to the Master Plan. 2.5 The Council finds that the Ashland Comprehensive Plan's Public Services Element seeks to"To make maximum effort toward utilization of present and future educational and recreational facilities and resources through public, private and city cooperation (Goal 9.07.03)," and finds that coordinated master planning for the future development of the university district is beneficial to the city and the university. 2.6 The City Council finds that adoption of the SOU Facilities Master Plan update is in keeping with the Oregon Statewide Planning Goals and with OAR 660-030-0070 which calls for state agencies including universities to coordinate their land use planning efforts with cities to ensure compliance with local comprehensive plans. Specifically with regard to state land use Goal 10"Housing"which seeks"To provide for the housing needs of citizen of the state,"the Council finds that the Statewide Planning Program requires each city to inventory its buildable residential lands,project future housing needs, and provide the appropriate types and amounts of land within the UGB necessary to meet those needs. The Housing Element of the Ashland Comprehensive Plan was amended and acknowledged in 2019. The City of Ashland has an acknowledged Housing Capacity Analysis (2021) and Buildable Lands Inventory (2024) which provide a factual basis for needed housing types and available land supply. The City has acknowledged zoning standards relating to residential development including provisions for housing density, setbacks,parking requirements,lot coverage,types,and development in environmentally or physically constrained areas. The requested zone changes here will add 6.15 acres of additional residentially zoned land, which was formerly identified for university development,to accommodate further housing development within the city. While this land may have developed to accommodate student or faculty housing were it to remain part of the SOU zone,the likelihood and timing would remain uncertain whereas the zone change here enables the immediate sale of these properties to support private residential development in a location near the university where there is a need for student and faculty housing, and in a manner which seeks zoning compatible with the adjacent residential neighborhoods. The City of Ashland has an acknowledged Comprehensive Plan that complies with this goal, and the proposed amendments do not modify the existing goals and policies related to Goal Findings of Fact and Conclusions of Law Page 6 10. The proposed map and code amendments expand housing opportunities in ways consistent with comprehensive plan goals and policies, and as such,the Council finds that this Goal is met. 2.7 The City Council finds that several of the amendments adopted at First Reading on October 7, 2025, differ from the Planning Commission's prior recommendations but are consistent with the overall intent of the Southern Oregon University(SOU)2025 Facilities Master Plan and the City's Comprehensive Plan.The Council determined that the revisions proposed by SOU and incorporated into Ordinance 3268 clarify the applicability of Conditional Use Permit(CUP)review and streamline the development review process in a manner that continues to provide for appropriate public oversight. Specifically,the Council approves amendments to AMC 18.3.6.040(Conditional Uses)to eliminate the 70-foot CUP height limit,to exempt redevelopment within the former Cascade Complex and replacement of existing buildings meeting defined thresholds from CUP review, and to clarify that minor site modifications such as signage, access, driveways, sidewalks,or landscaping do not trigger a Conditional Use Permit even when located within 50 feet of privately owned property. The Council further found that"projects,"as referenced in AMC 18.3.6.040(B),refer to new building development occurring within 50 feet of privately owned land, which remains subject to Conditional Use Permit (CUP) review to ensure potential impacts on adjacent properties are evaluated through a public review process.This requirement does not apply to ancillary site improvements such as signage,access,driveways,sidewalks,or landscaping, which are expressly excluded from the definition of"projects" in this context. The Council finds that these refinements balance the City's interest in maintaining compatibility along campus boundaries with the University's need for flexibility in implementing its long-range facilities plan.By distinguishing between major development projects and minor site improvements, the adopted amendments reduce unnecessary procedural requirements while maintaining consistency with the Comprehensive Plan goals for intergovernmental coordination, institutional development, and land use compatibility. The Council concludes that the adopted changes advance the objectives of the SOU 2025 Facilities Master Plan and facilitate efficient university development consistent with the intent of the SOU zoning district and the City's broader planning framework. SECTION 3. DECISION 3.1 Ashland is fortunate to have Southern Oregon University within the community,as the university adds to the community's diversity,the richness of our culture,and strengthens the local economy. The master planning efforts of the university seek to ensure that it will remain a strong and viable institution within the Oregon University System, as well as to make certain that it recognizes the values and concerns of the Ashland community. Findings of Fact and Conclusions of Law Page 7 Based on the whole record of the public hearing on this matter,and all materials submitted by staff, the applicant and other participants,the City Council finds that this update of the SOU Facilities Master Plan is necessary to meet changing circumstances and conditions since the plan was last updated in 2010. As noted in the Economy Element of the Comprehensive Plan, "... it is likely that ... [Southern Oregon University]will remain a motor of economic growth for the city through generation of payroll, local purchases by employees and students, enhancement of student abilities to find or make jobs for themselves in Ashland, and as an incubator for innovations and as a favorable attraction for education- intensive firms that may be considering the move to Ashland. " This Master Plan update incorporates zone changes intended to enable the sale of some University properties to help address budget shortfalls which the University must address in the current fiscal year,and as such will have an indirect but positive impact to the city in alleviating shortfalls affecting a "motor of economic growth for the city" while also providing additional land to support needed private housing development near campus. Therefore,the City Council approves the application and adopts this update of the SOU Facilities Master Plan as a supporting document to the Ashland Comprehensive Plan, with the inclusion of the following conditions, noting that this decision is supported by evidence contained in the whole record. 1. All proposals of the applicant become conditions of approval unless otherwise specifically modified herein. 2. A Conditional Use Permit(CUP) shall be required for any project to be developed within 50 feet of privately owned land.This requirement does not apply to alterations limited to signage, access, driveways, sidewalks, or landscaping, nor to the replacement or redevelopment of existing buildings not exceeding their current height or gross floor area. 3. Any project of 15,000 square feet or more of gross habitable floor area(GHFA)shall be subject to a Type II Site Design Review procedure with a public hearing before the Planning Commission. 4. Redevelopment within the former Cascade Complex area that does not exceed 60 feet or five stories in height and 194,000 square feet of gross floor area shall be permitted through Type II Site Design Review and does not require a Conditional Use Permit,and shall be permitted outright,including associated site improvements such as signage, access, driveways, sidewalks,and landscaping. 5. Within the SO Zone,buildings up to 60 feet in height are permitted outright.Projects exceeding 60 feet may be considered through the CUP process without a fixed upper limit, subject to the discretionary approval criteria in AMC 18.5.4. Within the University District properties located within the SO zone on the property bounded by Ashland Street,Walker Avenue,Webster Street and Stadium Street shall align with the CFA regulations and allow only a 50-foot height as permitted outright,with up to a 60-foot height permitted outright with the inclusion of at least 25 percent affordable or student housing. To exceed the outright permitted 50-foot height along Ashland Findings of Fact and Conclusions of Law Page 8 Street without the inclusion of affordable or student housing,a CUP shall be required and the upper height limit for this `university district' property at the corner of Ashland Street and Walker Avenue shall be nine-stories or 110 feet. 6. Solar arrays installed over parking lots or as ground-mounted systems, that are generally consistent with the illustrative design guidance in the SOU 2025 Facilities Master Plan shall be exempt from separate land use approval and may be reviewed administratively with building permits.The maximum allowable height for ground- mounted solar installations is 38 feet to accommodate dual-axis tracking systems. Installation of solar arrays over existing parking areas shall not trigger upgrades to current parking lot design standards; however, any newly constructed parking lots shall comply with applicable standards.The Master Plan's solar design standards are illustrative rather than mandatory and may be applied with reasonable flexibility to accommodate evolving solar technologies and design efficiencies. 7. That the University shall be exempted the Tree Removal Permit process in a manner similar to the treatment of the Parks Department in the code,with an annual report on removals over the past year and a plan for removals for the coming year to be provided to the Planning Division and its Tree Management Advisory Committee, and provided that the University uses licensed professional arborists for tree removal work. 8. That the University shall be required to provide public notice to neighboring property owners prior to the construction of new buildings,the sale of university property or the adoption of Master Plan updates. �� &k_ November 4,2025 Tonya G aham, Mayor Date Findings of Fact and Conclusions of Law Page 9