HomeMy WebLinkAbout2025-131 AGRMT AMND #1 DSL Builders LLC Memo TO: Sabrina Cotta, City Manager FROM: Jason, Strait, Project Manager DATE: 10/15/2025 RE: City Manager Signature Needed for Change Order to DSL Builders Contract Background: This item is conning to you for signature to add scope to the Booster Pump Station Improvement Project Contract with DSL Builders. This project is an ARPA grant funded project which includes upgrades to the Booster Pump Stations at each of the TAP partners (Talent, Ashland and Phoenix). The original contract scope was competitively bid and the award reviewed and approved by Ashland City Council. This scope addition is specific to the Ashland Booster Punrp Station and involves changing out the two isolation valves on the water pipelines entering that station. This change is required as the valves were found to be leaking after the contract was awarded and isolation of the facility is required to accomplish the awarded contract scope. Council Action: N/A. Signatures Required: 1. Cite Manager on Page 2 of Amendment I Other Relevant Information: None Insurance waived or reduced? No Change. Who to return to if different from sender? Return to sender Are all other signatures required collected? Yes Are all attachments listed included? Attachment 1: Amendment 1 to the Booster Purnp Station Improvements Project 2021-13b Contract with DSL Builders LLC CITY OF ASHLAND 20 East Main Street Tel 541-488-6002 Asirkand Oregon 97520 Fax:541-488-5311 TTY: 800-735,-2900 AMENDMENT NO. 1 to Public Improvement Contract between THE CITY OF ASHLAND, an Oregon municipal corporation, ("Cityll DSL Builders LLC a company, ("Contractor") for Booster Pump Station Improvements Project 2421-13b RECITALS A. The City and Contractor previously entered into a Public Improvement Project effective November 25, 2024(the"Agreement"), for Booster Pump Station Improvements. B. Subsequent to the award of the Contract it has been identified that the valves isolating portions of the scope of work at the Ashland Booster Pump Station are leaking at a significant rate and must be changed for the work to be accomplished, To provide the required isolation for the work to be performed two new valves will be installed,replacing the existing valves The value of the additional work covered under the current proposed Amendment 1 is agreed to be$52,917. C. The City and Contractor now wish to amend the Agreement to increase the amount of compensation to be paid to Contractor. AGREEMENT NOW THEREFORE,in consideration of the mutual benefits and obligations set forth herein, the parties agree as follows: 1. Amend Section 4.1 of the Agreement as follows, with strikeout wording deleted and underscored wording added: 2.1 City shall pay Contractor a sum not to exceed $ 1,914,717 ($-44,�( , ) as provided herein as full compensation for the Work including the additional specified work in the SUPPORTING DOCUMENTS included with this Amendment 1, which are incorporated herein. Contractor agrees to complete this Amendment in accordance with the Contract specifications and requirements, including any change orders. 2.2 In no event shall Contractors' total of all compensation and reimbursement under this Agreement exceed the total sum listed in Section 2.1 without the express, written approval from the City official whose signature appears below, or such official's successor in office. Contractor expressly acknowledges that no other person has authority to order or authorize additional Work which would cause this maximum sum to be exceeded and that any authorization from the responsible official must be in writing. Page 1 of 2:Amendment No. t to Public Improvement Contract between the City of Ashland and DSL Builders LLC Contractor further acknowledges that any Work delivered, or expenses incurred without authorization as provided herein is done at Contractors' own risk and as a volunteer without expectation of compensation or reimbursement, 2. This Amendment No. I is effective upon being signed by both parties. 3. Except as specifically modified by this Amendment No. 1,the terms and conditions of the Agreement remain in full force and effect. IN WITNESS WHEREOF the parties have caused this Amendment No. I to be signed in their respective names by their duly authorized representatives as of the dates set forth below: CITY OF ASHLAND,ORE,GON DSL Suit L ' ui, By: By: Sabrina Cotta, City Manager 0/1 LZ rirrrated Name: James Macedo s Date: Title: \4r fer-).r V6"i r- Date: 10 0m— AATF, 9.10,25 cat,,_ Page 2 of 2:Amendment No, 1 to Public improvement Contract between the City of Ashland and DSL Builders LLC 01 1'llrrw; CHANGE ORDER �"a NO. 002 �,�mmtll " �p' 91� U�li+lip{i�tA«V, -r'1 s 1 h�t) PROJECT: TAP Boaster Pump Station improvements DATE OF ISSUANCE: September 91,2025 OWNER: City of Ashland BID ITEMS NIA CONTRACTOR: DSL Builders ENGINEER: R112 Engineering,Inc. CONTRACT PRICE CHANGE DESCRIPTION 1.0) Replacement of Two Buried 16"Isolation Valves.The two existing buried 16"gate valves located on the suction and discharge lines leading to and from the Ashland Booster Pump Station do not seal completely and need replacement. The existing gate valves shall be replaced with 16" plug valves. Change Order Item Prices: Note. Prices shown in black are additional compensation amounts to the Contractor. 1.0 Replacement of Two(2)Buried 16"Isolation Valves.... ..............................................................$52,917.00 Total Additional Compensation ......... ...................... .........................................................$52,917.00 GENE,RAL INFORMATION Previous Change Orders:—,....... .............................. ...............................Change Order 001:In Progress • Change Order 001 consists of the relocation of the backup power generator for the Ashland Booster Pump Station and all associated work required to complete the relocation. This change order has been initiated but has not been completed. CONTRACT PRICE ADJUSTMENT Original Contract Price:................ ............. ...... .........................----........ ...... ........$1,861,800.00 Total of Previous Completed Change Orders;.... ......... ...................................,.......................,$0.00 TotalThis Change Order:..,,.,,,----............................... ..................... .... ..... ..........................$52,917.00 Total Adjusted Contract Amount:..................................................................................................$1,914,717,00 RECOMMENDED: APP 7►�EI1. APPRO By �t -r tic .�_. B f: B Y E gineer Contractor Nvner By signing this form,the Owner and the Contractor agree to release all claims to additional work or credit or delays, occurring prior to the Date of Issuance,which have not been identified in this Change Order fonn. 09,109/25 1:32 PM J:Ma1a=M23M37M60 9D00=90 OrMSTO 002-Valve Replxeomc0Wh*agc Ordcr 002-valve Rcplaccmudocx INEIMOVU3U aA1VA NOUVIS dwnd HBIS009 ONV'lHSV GMn$--1SV,-AOk,1* t-Y I cn 0 11 a S CL CL (n w ,21 Ilk CT Sn CL C13 "0 D Dlu"" SL I IS8 195 Pine St NE, Salem, OR 97301 — Phone 503.363.0202 — Fax 503.371.5337 DATE: 8-21-2025 TO: Jason Strait City of Ashland Public Works 51 Winburn, Ashland, OR 97520 SUBJECT: TAP—COR 002 Ashland BPS Valve Replacement We have been, asked to price out replacing two 16" valves, I anticipate the following scope of work: • Install Temporary Fencing Sawcut and remove sidewalk Excavate around valves Shut down and drain piping(performed by city) Cut 16" piping Remove 16" gate valves and piping Install new 16" Plug Valves and piping Backfill Replace sidewalk TOTAL COST 52,917.00 Respectfully, Wayne Sargent Project Manger Page 1 m $ � 3 \ C) o co4 C) a ) ® / 2 \ \ L \ \ \ \ \ \ \ / 0 ¢ 7 k kkk / \ \ ® emm E \ \ E o E A : k § \ / to \ \ \ � Q E \ 8 j 93 / @ \ - « u LLI J � 2 ƒ § § 0 f z / k \ ® \ U \ § ] E C \ § \ IL 7 § [ CL § a > LL d A \ a _ 3 § § E / ) / Of k \ en U S G - > oco Ij / \ / j / Ao ( - G ® \C LU \ w ; u 8 ° G $ A % k § k % 2 / / (DCO M } / e § ocRf \ / 0 « \ / § cj MNCQ j \ � 3 = o o wo J § § \ } \ \ \ \ \ e G � ° 82 \ ] § � § \ k § cu ° / m3G@GG \ / � / § \ \ $ $ \ k & § = qq q $ % ggqq ) \ \\ �~ _ � � / ) � ] / m \ 2 \ 2 \ G $ $ ) co C / Mr (D 7 Gm ^ a : f { { { { F L ] $ I ) ± L \ ] ] ) / \ cu E k & » E ; cn § ° § ¥ � � \ co ( LL \ c ` \} /A § � ] ] ; \ } kf2 , off $$ ° � \ c a- El Ea ci �) \ k P ) ¥ a- ca G ] ƒ 2 / ƒ 3 § § § zoo • � � � � m » � = co — mn � mm � = = o � � � � m = w � ) J oa U C a E C7 n. 6 iL€ 7 J Q b as � c � N a `o O � U m O [I: 0 c m m N 0 (tl ~ E O a a a . a c J Q1 Csl y 1G O a f0 E U.1 co Y C n gg a U o 3 n o - O wo O M J � m � U ❑ fn o £ p 0 0 — U nj z NNNNN Waxne Sauent Frorn- Jolin,Herbst@ferguson.com Sent: Wednesday,July 30,2025 10:23 AM To: Wayne Sargent Cc: Jesse Thrasher; Kevin Jolly Subject: RE: TAP Booster Pun)p Station Improvement SOVR2,pdf You don't often get einail from johii.herbst@ferguson.com. Learn 21, kJ Ln� g, . t mth 5 U1 UL Wayne, See below quote for this. Thanks. John Herbst Outside Sales—Waterworks Plant Division: Ferguson Enterprises, LLC C: 360-304-3708 E: ILI Price Quotation # B496646 FEL PORTLAND WATERWORKS #3011 9129 NORTH TYNDALL AVENUE PORTLAND,OR 97217-6964 Phone:!503-240-6747 Bid No.......: B496646 Bid Date...: 07/30/25 CustPhone: 503-363-0202 Quoted By: XJH Terms.........: NET 10TH PROX Customer.: DSL BUILDERS LLC Ship To....... DSL BUILDERS LLC 195 PINE ST NE 195 PINE ST NE SALEM,OR 97301 SALEM,OR 97301 cust PO#..: Job Name.: TAP BOOSTER Item t M �Tota t o (Description DI 18MJ16 16 MJ N/LUBE PLUG VI,V 21 86K 1 20'ILA 1 17228,24 . E A 92&89 D' 130-M 16 X--I 5 MJ'C 153 1,0—N-G—S,-L,N, L'IA 2 r. 9641415 1 . ......... �El 116DSC 16 MEGA I.UG'A&PKG NW MJ GSKT17/DI 81 275.830 2206.64 �AFT501116......................'Ji­6 C1-350150 CL Dl­F'AS'T1TE PIPE 20-1 90.45p-11 1'1- I 1 809.0 11 0 Subtotal: $23172.77 Inbound Freight: $0,00 Tax: $0,00 Order Total: $2317237 Quoted prices are based upon receipt of the total quantity for immediate shipment(48 hours).SHIPMENTS BEYOND 48 HOURS SHALL BE AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE.QUOTES FOR PRODUCTS SHIPPED FOR RESALE ARE NOT FIRM UNLESS NOTED OTHERWISE. Due to the uncertain impact of potential tariffs,Ferguson's quotation/proposal has not included any provision or contingency for future tariffs or increase of existing tariffs.Ferguson reserves the right to adjust prices to reflect the impact of any new or increased tariffs that affect our costs at the time of shipment.Ferguson will provide notice of any such adjustments along with,documentation supporting the changes. CONTRACTOR CUSTOMERS:IF YOU HAVE DBE/MBEIWBE/VBE/SDVBE/SBE GOOD FAITH EFFORTS DIVERSITY GOALS/ REQUIREMENTS ON A FEDERAL,STATE,LOCAL GOVERNMENT,PRIVATE SECTOR PROJECT, PLEASE CONTACTYOUR BRANCH SALES REPRESENATIVE IMMEDIATELY PRIOR TO RECEIVING A QUOTE/ORDER. Setter not responsible for delays,lack of product or increase of pricing due to causes beyond our control,and/or based upon Local,State and Federal laws governing type of products that can be sold or put into commerce.This Quote is offered contingent upon the Buyer's acceptance of Setter's terms and conditions,which are incorporated by reference and found either following this document,or on the web at h w -P _p tt-ps-,//w_,w _nt V -rrn., terguscn.co yvLao mtly s-ate.Govt Buyers:All items quoted are open market unless noted otherwise. LEAD,LAW WARNING: It is illegal to install products that are not"lead free"in accordance with US Federal or other applicable law in potable water systems anticipated for human,consumption.Products with*NP in the description are NOT lead free and can only be installed in non-potable applications. Buyer is solely responsible for product selection, HOW ARE WE DOING?WE WANT YOUR FEEDBACK! Enter the following link to complete a survey about your bids: hilt psWs,ui�, (,m=40736, ------------- ............. ............. From: Wayne Sargent<W1V Ejg,� rJs kbLffldr corn>e_(�) _............ Sent: Wednesday,July 30, 2025 8:46 AM To: Bradley Baxter<lii adle , a tL!U(F)f2iguF Lqn,corn> Z.I..............-Y-h-L Cc:Jesse Thrasher<Ig�.FLp Kevin Jolly<Kevh�L( sj5 hu 1(_6 -[, flders,conl> -— --------------------- Subject: FW:TAP Booster Pump Station Improovement SOVR2,pdf Caution: This email originated from outside of the organization. DO NOT click links or open attachments unless you recognize and trust the sender. Brad I need pricing on the following 0 2(two) 16" plug valves a 2(two) 16" long body sleeves 8 MJ restraint kits 16" DI pipe Wayne Sargent DSL Builders LLC S03-871-0054 2 Rent A Fence LLC 2688 SW 3RD ST. CORVALLIS, OR 97333 -= 3/6/2025 2025116-1 DSL Builders LLC 195 Pine Street Salem, OR 97301 APR o 2 2025 y Capital Fountain - 3 Month Rental Dates 3/3/2025-6/1/2025 Delivery/Pick Up Location Project Manager: Jeremy 541-619-5703 156 Waverly st.ne Salem, OR 97301 Provide/install Approx. 528 LF of construction fence panels 528 3.25 1,716.00 6'x12'Temporary Fence Panel 44 Metal fence stand 39 Fence Panel Clamps 40 Sets Gate Wheels 1 Delivery I Pick Up Location 1 600.00 600.00 Costs includes standard (1) trip set up(1)trip removal of temporary fence. Additional trips for moving, adding, or removing temp panels will be billed seperately, This does include prevailing wage rates Payment terms for rental of any and all temporary fencing is due in full 15 days upon delivery of fence or additional services provided 541-210-3213 mvw.oregon rent afe nee,cono Total $2,316.00 service@oregonrentafence.com United' Rentals 1/15/2025 D S L BUILDER LLC 1315631 jUiNW-E. WASH IN GTON/M W-WESTERN MOUNTAINS/Iv W-HIGII PLAINS[NW-PUGET 0 - SOUND/NW-OREGON Geography Name: LAW-HIGH PLAINS Iv W-WESTERN MOUNTAINS/NW-E.WASHINGTON/NW-OREGON I NW-PUGET SOUND P&D Type Fixed mildillum 115.00 OverageLevell 15 Overagellatel 3.00 OverageLeve]2 0 Overagellate2 0.00 OverageLeveI3 0 Os,eragellate3 0.00 OverageLevc]4 0 OverigeRW4 0.00 Overagel,eve)5 0 Overageltate5 0.00 CAT CLASS DESCRIPTION DAY WEEK MONTH mua � 100 3185 COMPRESSOR 175-195 CFM $154.00 $459.00 $1012,00 1010 3186 COMPRESSOR 175-195 CFM TIER 4 S154.00 $459.00 S1012.00 �ill SO 110 2400 AIR HOSE 3/4"X 50' $7.00 $18,00 S29.00 OEM 160 2620 ROLLER 1.5 TON DOUBLE DRUM SMOOTI I S260.00 $717.00 $1587.00 DS 160 2621 ROLLER 1.5 TON DOUBLE DRUM SMOOTH GAS 5260.00 $717.00 51587.00 IN I 230 5130 FORKLIFT 61 FORKS $1.00 $1.00 $1.00 230 5250 FORKLIFT JIB S48.00 $95.00 S188.00 gol pIi i III i!i m MENEM= 231 1200 FORKLIFTWHSE 5000#GAS/LP $274.00 $676.00 $1224.00 231 1205 FORKLIFT WHSE 5000#LOW PROFILE $274.00 S67&00 S1224.00 GAS/LP VIR! j!, mmmmm 233 1025 FORKLIFT VARIABLE REACH 5000# 16-20' $398.00 $1069.00 S2069.00 233 11610 FORKLIFT VARIABLE REACH 6000#35-39' $442.00 $1081.00 $2069.00 233 1170 FORKLIFT VARIABLE REACH 6000ft 40-49' $447.00 $108L00 S2069.00 Page I of 3 CAT CLASS DESCRIPTION DAY NVEEK MONTH 233 1370 FORKLIFT VARIABLE REACH 80009 40-49' $501.00 $1164.00 S2481.00 233 165D FORKLIFT VARIABLE REACH 10000#50'& S524,00 $1552.00 $3586.00 233 1675 FORKLIFT VARIABLE REACH 120009 53'-69' S561A0 $1752.00 S4149.00 OEM 240 313I GENERATOR 19-29 KVA S231,00 $605.00 $1210.00 240 3132 GENERATOR 19-29 KVA TIER 4 $231.00 $605.00 $1210.00 240 3157 GENERATOR 45-49 KVA TIER 4 $259.00 $605.00 $148 L00 300 1000 SCISSOR LIFT 10-13'ELECTRIC $137.00 $271.00 $464.00 300 1512 VERTICAL LIFT 12'ELEC SELF PROPELLED $137.00 $271.00 $464.00 300 1515 VERTICAL LIFT 15'ELEC SELF PROPELLED S 142,00 $276.00 $477.00 300 1520 VERTICAL LIFT 18-20'ELEC SELF $147.00 $296.00 $488.00 PROPELLED 300 1999 SCISSOR LIFT 18-19'ELECTRIC 60"LENGTH $147.00 $296.00 $488.00 300 2000 SCISSOR LIFT 19'ELECTRIC $147.00 $296.00 S488.00 300 2515 SCISSOR LIFT 24-26'ELECTRIC 30-36"WIDE $187.00 $358,00 $697.00 300 2525 SCISSOR LIFT 24-26'ELECTRIC 46-68"WIDE S 187.00 S358.00 $687.00 300 2545 SCISSOR LIFT 25-27'ELECTRIC 4WD $238.00 S441.00 $1117.00 300 2551 SCISSOR LIFT 25-2T IC 4WD $238.00 $553,00 $1117.00 300 2995 SCISSOR LIFT 30-33'ELECTRIC 32"WIDE S210.00 $477.00 $952.00 300 2999 SCISSOR LIFT 30-35'ELECTRIC 46-48"WIDE $210.00 S477.00 $952.00 300 3051 SCISSOR LIFT 30-35'IC 4WD $274.00 $648.00 $1323.00 300 4000 SCISSOR LIFT 39-40'ELECTRIC $295.00 $578.00 $1368.00 300 4555 SCISSOR LIFT 45'ELECTRIC 50-55"WIDE $463.00 S933,00 $1950.00 soy 310 3050 BOOM 30-33'ARTICULATING DC $287.00 $851.00 $1883.00 310 3450 BOOM 34-39'ARTICULATING DC $315.00 $900,00 $1975.00 310 4001 BOOM 40-50'ARTICULATING $419.00 $1059.00 $2028.00 310 4003 BOOM 45-50'TELESCOPIC 4WD $419.00 $1059.00 $2028.00 310 4026 BOOM 37-44'TELESCOPIC $419.00 $1059.00 $2028.00 310 6001 BOOM 60-64'ARTICULATING $476.00 $1287.00 $2463.00 310 6026 BOOM 60-64'TELESCOPIC $476.00 $1287.00 $2463.00 310 6526 BOOM 65-70'TELESCOPIC $476.00 $1287.00 $2463.00 310 8001 BOOM 76-85'ARTICULATING $906.00 $2611.00 S4700.00 310 8526 BOOM 84-86'TELESCOPIC 4WD $906.00 S2611,00 $4700,00 310 9800 BOOM 12 5'TELESCOPIC WITII JIB 4WD S1 115,00 $2955.00 $9900.00 r 320 4000 LIGHT TOWER,6KW $154.00 $324.00 $595.00 320 4001 LIGHT TOWER,4-7KW VERT MAST S154,00 $324.00 $595.00 320 4003 LIGHT TOWER,4-7KW LED VERT MAST S154.00 $324.00 S595.00 i 903 71 SKID STEER LOADER 1700-1899# S245,00 $882.00 $2088.00 Immmmmomm 905 1015 EXCAVATOR25000-29999# $497.00 $1700.00 S4100.00 905 1060 EXCAVATOR 43000-54999# S790.00 S2700,00 $6100.00 905 iD80 EXCAVATOR 50000-59999#REDUCED TAIL $840.00 $2825.00 $6800.00 SWG Page 2 of 3 CAT CLASS DESCRIPTION DAY WEEK A40NTH 907 100 MINI EXCAVATOR 10000-140009 $439.00 $1293.00 $2900.00 907 114 MINI EXCAVATOR 14800-199999 $458,00 $1600.00 $3900.00 907 35 MINI EXCAVATOR 3000-3999# $255.00 $925.00 $1900.00 907 62 MINI EXCAVATOR 6000-6799# $312.00 $881.00 $2111.00 907 75 MINI EXCAVATOR 7400-9199# $376.00 $1030.00 S2190.00 Page 3 of 3