HomeMy WebLinkAbout2026-009 AGRMT AMND #3 Outlier Construction - Emergency Shelter Upgrades AMENDMENT NO. 3
to
AIA A141-2014 Design Build Contract
between
THE CITY OF ASHLAND,
an Oregon municipal corporation,
('ICitylp)
and
Outlier Construction Inc.
("Contractor")
for
Project 2022-12 Emergency Shelter Upgrades
RECITALS
A. The City and Contractor previously entered into a AIA A141-2014 Design Build Contract
effective May 21,2025 (the"Agreement"), for the Project 2022-12 Emergency Shelter Upgrades
B. The City and Contractor now wish to amend the Agreement to increase the amount of compensation to be
paid to Contractor to support the construction documentation phase of the project in order to develop a
guaranteed maximum construction price to be authorized under a future amendment.
AGREEMENT
NOW THEREFORE, in consideration of the mutual benefits and obligations set forth herein, the
parties agree as follows:
I. Amend the amount of compensation from $1,033,596 (one million thirty three thousand five hundred
and ninety six dollars)to(one million forty six thousand four hundred and eighty six dollars and nine
cents),an increase of$12,890.09(twelve thousand eight hundred ninety dollars and nine cents).
2. This Amendment No. 3 is effective upon being signed by both parties.
3. Except as specifically modified by this Amendment No. 3, the terms and conditions of the AIA
Agreement remain in full force and effect.
IN WITNESS WHEREOF the parties have caused this Amendment No. 3 to be signed in their respective
names by their duly authorized representatives as of the dates set forth below:
CITY OF ASHLAND, OREGON Outlier Construction Inc.
1
By: t By: --
blic Work r: Scot Fleury
Printed Name: PeA0 EF.,01PAA
Date: 2.3.2026 Title: C,00
Date: 7i
Page I of 1: Amendment No. I to AIA A 141-2014 Design Build Contract with Outlier Construction Inc.