Loading...
HomeMy WebLinkAbout08 20 17 Mark Copy of City Hall Ad Hoc Voting SheetCity Hall Ad Hoc Voting Sheets I have compiled the voting sheets into an excel spreadsheet. The summary of votes changed slightly for two reasons. The first difference is the spreadsheets are based on each criteria voting and in some cases the total were not tallied correctly. At the meeting we used the raw vote score to calculate the total points each option received. The Lithia Way option was calculated incorrectly at the meeting and the score on the excel sheets reflects the accurate vote total. I have also tried to standardize the scoring sheet. It is human nature that some individuals will have higher voting than others. The standardization takes into account the average score for all options and criteria, and then based on the standard deviation provides a standardized score based on the amount above and below the average. The results did not change but the range within which the projects are separated becomes less. The spreadsheets also provide a breakdown of the ranking each voter provided for the options.Total 1 1B Rebuild City Hall keep stucco $9.5 236 2 1A Rebuild Exisitng City Hall $8.5 Million 229 3 5 Briscoe 195 4 4A Courts/Civic Center Retain ComDev 187 5 4B Courts/Civic Center Incorparate ComDev 180 6 3B Lithia/Pioneer 100 Stalls 160 7 3A Lithia/Pioneer 50 Stalls 159 8 2 ComDev Expansion 146 Standardized 1 1B Rebuild City Hall keep Stucco $9.5 Million 4.4219 2 1A Rebuild Exisitng City Hall $8.5 Million 3.79658 3 5 Briscoe 0.75932 4 4A Courts/Civic Center Retain ComDev 0.04467 5 4B Courts/Civic Center Incorparate ComDev -0.58065 6 3B Lithia/Pioneer 100 Stalls -2.36728 7 3A Lithia/Pioneer 50 Stalls -2.45661 8 2 ComDev Expansion -3.61792 COA050096